Home
        Simpson Strong-Tie SET-XP22 Installation Guide
         Contents
1.    Simpson Strong Tie   Anchoring and Fastening Systems for Concrete and Masonry    Adhesive Anchoring Installation Instructions       A WARNING  When drilling and cleaning hole  use eye and lung    WN NOTE  Always check expiration date on   S   protection  When installing adhesive  use eye and skin protection     product label  Do not use expired product        GN CALIN Horizontal  Vertical and Overhead Applications       70    reach the bottom  of the hole        Refer to page 77 or vist www strongtie com for proper brush part number       2 9 CARTRIDGE PREPARATION     1  Check   Check expiration date  on product label  Do not use  expired product  Product is usable  until end of printed expiration  month     2  Open   Open cartridge  per package  instructions                 3  Attach   Attach proper  Simpson Strong   Tie   nozzle and  extension to    cartridge  Do not g Insert Insert cartridge       felt  the brush is  worn and must cna  gt   be replaced  hole           must reach the  bottom of the    2 1  Drill  2  Blow  3  Brush  4  Blow        Drill hole Remove dust Clean with a Remove dust  a to specified from hole nylon brush for from hole        sex diameter and with oil free CEEE SE a minimum of with oil free    io i 4 depth  compressed air ak 3 4 cycles  Brush compressed air     for a minimum coe le should provide for a minimum    of 4 seconds  ro ie resistance to of 4 seconds   S Compressed    Ee insertion  If no Compressed    air nozzle must ae resistance is ai
2. e  Prepare the hole per instructions    Hole Preparation    on product label   i Cee ar er ee Te Threaded Threaded  o s3    rod or rod or       q rebar rebar       2  Fill Fill hole 44     full   starting from bottom of hole to  prevent air pockets  Withdraw  nozzle as hole fills up     1  Install   Install Simpson Strong Tie    ARG adhesive retaining cap  Refer to  page 74 or visit www strongtie com  for proper ARC size     Note  Nozzle extensions may be needed for deep holes        3  Insert Insert clean  oil free  anchor  turning slowly until the  anchor contacts the bottom of    the hole           4  Do not disturb    Do not disturb  anchor until fully cured  see cure  schedule      Installation instructions continued on page 71    gt     C SAS 2012   2012 Simpson Strong Tie Company Inc     C SAS 2012   2012 Simpson Strong Tie Company Inc     Simpson Strong Tie   Anchoring and Fastening Systems for Concrete and Masonry    Adhesive Anchoring Installation Instructions       Continued from page 70     Sea When Anchoring with Screens  For AT  ET HP  and SET Adhesives  except SET1 7KTA   Prepare the hole per instructions    Hole Preparation              p5   E    O E         O     P an aE me    aan ile oa MR a vraa A meneh S   A  1 i i     cn     _    OO _      1  Fill Fill screen completely  2  Insert Insert adhesive 3  Insert   Insert clean  oil free 4  Do not disturb   Do not    Fill from the bottom of filled screen into hole  anchor  turning slowly until disturb anchor unt
3. il    the screen and withdraw the anchor contacts the fully cured   See cure me  the nozzle as the screen bottom of the screen  schedule for specific S  fills to prevent air pockets  adhesive   i     Opti Mesh   screens  Close  integral cap after filling         AN UO VGC Vinylester Glass Capsule     Hammer Capsule   Prepare the hole per instructions    Hole Preparation            e ean    1  Insert   Insert the 2  Install   Install 3  Drive   Drive stud or 4  Do not disturb   Do not disturb       VGC capsule s  double nut to rod to the bottom of anchor until fully cured    to the bottom of protect thread  the hole  Spinning  See cure schedule for VGC    the hole  either of the stud or rod VGC is not recommended  end first   is not required  for overhead applications     71    
4. r nozzle   S 3              5  Dispense   Dispense adhesive          modify nozzle  into dispensing tool  to the side until properly mixed   uniform color    Refer to www strongtie com for proper mixing  nozzle and dispensing tool part number   a GOSS Vertical Anchorage  Prepare the hole per instructions    Hole Preparation    on product label   Dry and Damp Holes  Water Filled Holes    z 1  Fill  2  Insert  3  Do not 1  Fill  2  Insert    3  Do not  Fill hole Insert clean  disturb  Fill hole insert clean  disturb   w  full  oil free i Do not completely oil free a Do not   TEF starting      be as anchor  293 disturb a Fan full  starting 2 oe anchor  z ar disturb      spf from bottom f         Saif turning  anchor until        from bottom 2 7 8e  turning foi Mag       anchor until  za      fof hole to     f slowly until     fully cured         of hole to     olimdlco     Slowly until    2o     fully cured   wo    preventair f  747   lt    the anchor  gt       See cure   prevent water     amp   f       theanchor     n        See cure  r  a pockets   e  gt    contacts the   schedule pockets  ue es contacts the   e   4 schedule     5_   Withdraw   gt   bottom of    _     for specific Withdraw       bottom of i     S   nozzle as    1 22 gt     the hole    222    adhesive     nozzle as hole           lt  gt     the hole    hole fills UD  Threaded rod me UD  Threaded rod  or rebar or rebar  Note  Nozzle extensions may be needed for deep holes   UA SS Horizontal and Overhead Anchorag
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Self-Teach Manual  Weider WEEVSY5922 User's Manual  Primary Surveillance Radar Extractor Control  Lian Li PC-V1110 computer case  I -MANUALE DI ISTRUZIONI PER SALDATRICE AD ARCO pag. 2  Here - Airzone  classement des meubles de tourisme  Le CNEF à usage des Églises locales  PodFlow 3 User Guide & Reference manual  User manual MB2-2F    Copyright © All rights reserved. 
   Failed to retrieve file