Home
EZ Screen Room EZSR8OBBZ Instructions / Assembly
Contents
1. Screen wall panel for openings up to 8 ft w x 10 ft h Made in the USA EZ Screen Room EZ PRSRT STD US Postage Paid Lake Ozark MO Permit No 11 COMMERCIAL amp RESIDENTIAL Is sitting and enjoying your patio not possible due to pest and insects Are you tired of having to bath your family in bug spray to enjoy or play outside Are you tired of leaves and debris being blown on to your patio If you answered with even one yes then you will love your EZ Screen Room Create the perfect outdoor environment with EZ Screen Room EZ Screen Room is a knockdown pre engineered screen room system delivered in kit form The system is designed to be assembled between existing posts and or railing and covers all sized openings up to 8 wide and 10 tall Installation is a snap with a few simple tools enjoyment is a lifetime Easy to follow illustrated instructions Engineered for ground and balcony installations Residential amp Commercial Available in White and Dark Bronze applications Powder coat finish Utilizes flat spline for superior screen retention 10 year warranty Vendor No 60083341 S O SKU 516 036 EZ Handrail sold separately ORDER BY 2PM CST FOR SAME DAY SHIPPING S O SKU 516 036 CONGRATULATIONS You are on your way to creating an outdoor living area that will provide years of maintenance free enjoyment EZ Screen Room s quick and efficient approach to cons
2. Qty Length Description 4 8 ft 1x2 in aluminum extrusion Open Back Part D E F G 2 4 ft 1x2 in aluminum extrusion Open Back Part A B 1 8 ft 2x2 in post w dual screen channels Part C 1 12 ft 8 Fiberglass screen Part S1 1 12 ft 4 Fiberglass screen Part S2 8 2 Capri Clips Part F2 10 12 ft Spline Part S3 50 1 2 in Self tapping fastener Part F3 30 2 in Hex head metal wood fastener Part F1 20 in Hex head metal wood fastener Part F4 20 4 in Hex head metal wood fastener Part F5 20 2 1 4 in Concrete fastener Part F6 Note For ACQ treated lumber use stainless 18 8 fasteners not included 5 PLANNING amp LAYOUT SCREEN WALL 1 DETERMINE WHETHER THE FIBERGLASS SCREEN WILL BE INSTALLED FROM THE INTERIOR OR EXTERIOR OF THE SCREEN ROOM BEFORE INSTALLING ANY FRAME COMPONENTS ENSURE ALL THE SCREEN CHANNELS FACE THE SAME DIRECTION SHOWN BELOW Note 2nd level screen rooms or higher are usually installed from the interior for safety and convenience Screen oi TI 2 DETERMINE THE HEIGHT OF MIDRAIL C THE STANDARD HEIGHT IS USUALLY 36 Note If you have existing railing position the new Midrail at same height as the top of the ex isting railing Be sure that you will have access to the screen channels on the midrail Midrail C Important SCREEN DOORS IF YOU ARE PLANNING A SCREEN DOOR THE DOOR FRAME MUST BE INSTALLED PRIOR TO CONSTRUCTING THE SCREEN WALL REFE
3. CORY MARY ANNE NO AUTOMATED PHONE PROMPTS SPEAK DIRECTLY WITH THE SUPPORT TEAM M F 7 4 CST 3 4 DAY LEAD TIMES TO ALL 48 STATES ORDERS SHIP SAME NEXT DAY Www HDezhandrail com Vendor No 60083341 S O SKU 516 036 28
4. TO FIT ON TOP OF MID RAIL C AND EXTEND TO TOP OF THE OPENING CEILING OR HEADER IN MOST CASES 8 FASTEN TO EXISTING POST OR WALL USING APPROPRIATE 2 FASTENERS F1 BE SURE TO USE THE APPROPRIATE FASTENER FOR THE APPLICATION i e wood concrete or brick fasteners IMPORTANT Position D and EJ s screen channels to align with A B and C screen channels 2 fasteners installed every 2 ft Upright D Upright E 10 MEASURE CUT AND INSTALL TOP AND BOTTOM CHANNEL 9 MEASURE AND CUT SECTIONS F AND TO FIT HORIZONTALLY AT THE TOP AND BOTTOM OF THE SCREEN WALL FASTEN USING THE APPROPRIATE F1 FASTENERS APPROPRIATE FASTENER FOR THE APPLICATION i e wood concrete or brick 10 INSTALL TOP F AND BOTTOM G WITH APPROPRIATE 2 FASTENERS F1 MAKING SURE THE SCREEN CHANNELS ARE POSITIONED APPROPRIATELY CONGRATULATIONS YOUR OPENING SHOULD BE COMPLETELY FRAMED AS PICTURED BELOW Wees 11 WORKING WITH SCREEN AND SPLINE 11 NOW IS A GOOD TIME TO PRACTICE HOW THE FLAT SPLINE FITS INTO THE SCREEN CHANNEL CUT A 6 PIECE OF SPLINE USING YOUR FINGERS PUSH THE FLAT SIDE OF THE SPLINE INTO THE DEEPER EDGE OF SPLINE CHANNEL WITHOUT ANY SCREEN NOW PRACTICE ROLLING THE SPLINE ROLLER TOOL TO LOCK THE SPLINE INTO THE SPLINE CHANNEL See illustrations US GN Ree EEL eee Tiel M y i SAHIN Ey i DIM Pree L
5. F IS DONE COMPLETE BOTH SIDES AS YOU DID WITH THE LOWER PANEL NOTE AS THE SPLINE LOCKS INTO PLACE YOUR SCREEN SHOULD BECOME TIGHT IF NEC ESSARY PULL OUT SPLINE AND RESTART PROCESS UNTIL YOU ACHIEVE DESIRED LOOK AND SCREEN TAUGHTNESS 19 REPEAT STEPS 12 18 FOR UPPER PANEL ABOVE MIDRAIL 16 TRIMMING THE SCREEN CAREFULLY TRIM OFF EXCESS SCREEN THAT IS OUT 20 SIDE THE SPLINE USING A SHARP UTILITY KNIFE MERE n PE WT s lt PIES AL LISTE a Lu t Eegen ar m 21 TUCK SPLINE INTO CORNERS USING THE TIP OFA SCREWDRIVER CONGRATULATIONS YOUR SCREEN WALL IS NOW COMPLETE NOREEN DOOR INSTALLATION 36 Installed Width 80 Installed Height Left or Right outswing Mounting fasteners incl Powder coated finish Heavy duty handle 18 PLANNING amp INSTALLING A SCREEN DOOR 1 Determine screen door location and remember Most screen doors swing outwards The screen door can be positioned next to existing posts A wider screen door is always better Aright hand screen door is hinged on the right when viewed from the exterior Aleft hand screen door is hinged on the left from when viewed from the exterior Door Height usually 79 exactly Door Width usually 35 exactly 19 PLANNING amp INSTALLING A SCREEN DOOR 1 Layout contents of the EZ Screen Room Door Frame Kit and review all of the installat
6. R TO PAGE 18 MEASURE AND CUT LOWER SCREEN PANEL 3 MEASURE AND CUT MIDRAIL C TO FIT HORIZONTALLY BETWEEN EXISTING POSTS OR WALLS AT THE DETERMINED HEIGHT DO NOT INSTALL MIDRAIL UNTIL STEP 6 MAKE A SMALL PENCIL MARK INDICATING EXISTING HANDRAIL LOCATION 4 MEASURE AND CUT BOTTOM LEG A AND BOTTOM LEG B TO FIT BELOW MIDRAIL C AND EXTEND TO THE FLOOR See illustrations below DO NOT INSTALL UNTIL NEXT STEP IMPORTANT Ensure the Midrail C will be level when placed on top of Leg A and B Illus A Midrail C d Gol ZS te Leg A Leg B ASSEMBLY LOWER SCREEN PANEL 5 INSTALL A AND B WITH 2 FASTENERS F1 SPACED EVERY 2 FT Use the appropriate fastener for the existing application i e wood concrete or brick construction ASSEMBLY continued THE MIDRAIL 6 ATTACH MIDRAIL C ON TOP OF LEGS A AND B USING CAPRI CLIPS F2 AND SELF TAP PING FASTENERS F3 See NOTE below prior to installation 2 NOTE When possible screw 2 fasteners in lower Capri Clip holes and into posts for additional frame strength EXTRA CAPRI CLIPS ARE INCLUDED IN THIS SYS TEM YOU MAY CHOOSE TO INSTALL CAPRI CLIPS AT ALL MATERIAL INTERSECTIONS BUT ONLY 2 ARE RE QUIRED AS ILLUSTRATED ABOVE FOR LOWER HALF MIDRAIL C TO A amp B CONNECTIONS MEASURE CUT AND ASSEMBLE UPPER PANEL 7 MEASURE CUT AND INSTALL UPRIGHT D AND E
7. Y E LEY VETS yy treaty at IT EEN i Er deo Mc H dM Y ad Z W CN M wd D a t h tie Am m w E d n 1 LW A EI UI ECK YJ 3 LIEFT AA 4411753445 del del d Im but af SES t 2272223975 unn is 717771717773777153131 44422 ITITI ITITI T AARAA a a E L BR e 4 hahahah D K re aa LITYTTTTYYTYTITYTYYYY sa aradraree LI H TI IIIJ U 42 44 2 P CH D ANALARA VTT jasa OU 29 i W H EE HHHH 444244444 AM UA py i I i MEER 1114219332993 i tr T HR H 15 MEASURE SIDE A AND CUT OFF PIECE OF SPLINE 6 LONGER 16 STARTING ABOUT 1 BELOW THE UPPER RIGHT CORNER ROLL THE SPLINE AND SCREEN INTO THE CHANNEL ENSURE SPLINE COVERS ENTIRE SCREEN CHANNEL 17 REPEAT STEP 15 FOR SIDE B APPLY A SLIGHT SIDEWAYS PRESSURE WITH YOUR FINGERS AS YOU ROLL SIDE B NOTE AS THE SPLINE LOCKS INTO PLACE YOUR SCREEN SHOULD BECOME TIGHT IF NEC ESSARY PULL OUT SPLINE AND RESTART PROCESS UNTIL YOU ACHIEVE DESIRED LOOK AND SCREEN TAUGHTNESS REFER TO PG 7 FOR SIDES A B AND C 15 INSTALLING SCREEN continued LOWER AND UPPPER PANELS 18 STARTING IN THE MIDDLE OF F ROLL THE SPLINE AND SCREEN INTO THE CHANNEL TO WARDS EITHER CORNER NOW THAT THE TOP
8. ely FI fd Ld bk LLL Tt gege geg w w NOTE Flat edge of spline seats in flat edge of channel PROPER WHEEL SELECTION FOR SPLINE ROLLING TOOL U shaped wheel Round wheel 12 WORKING WITH SCREEN AND SPLINE WHEN SCREENING YOUR OPENING FOLLOW THE DIAGRAM BELOW AS TO THE ORDER IN WHICH TO SCREEN THE CHANNELS START AT BOTTOM PANEL 1 AND FINISH AT 4 THEN MOVE TO 1 4 OF THE LARGER TOP PANEL BE SURE TO READ AND UNDERSTAND THIS ENTIRE SECTION BEFORE YOU BEGIN THE SCREENING PROCESS Top Panel 1 Screen channel F Top Panel 2 Screen channel E 3 Screen channel D 4 Screen top channel C Bottom Panel 1 Screen bottom channel C 2 Screen channel B 3 Screen channel 4 Screen top channel G READ PAGES 13 14 15 AND 17 BEFORE YOU START 13 INSTALLING SCREEN LOWER PANEL 12 TAPE OR TACK THE SMALLER BOTTOM PANEL SCREEN S1 LOOSELY OVER LOWER OPEN ING BELOW MIDRAIL OVERLAP ALL EDGES AT LEAST 3 Note Extra screen is supplied Masking tape not included Masking tape not included 13 USE A PIECE OF 10 SPLINE S3 TO BEGIN INSTALLING THE LOWER SCREEN PANEL REFER TO PAGE 12 14 INSTALLING SCREEN continued LOWER PANEL 14 ALIGN MIDDLE OF SPLINE WITH THE MIDDLE OF THE MIDRAIL C ROLL THE SPLINE AND SCREEN INTO THE CHANNEL TOWARDS EITHER CORNER x as 7777709 Y j r I SELEY YTYT Y
9. ion steps Notice how similar constructing the door frame is to the screen wall the midrail has now become the door header 2x2 Post Part 1 2 3 4 5 Capri Clip Part F2 Fasteners 2 F1 1 2 ST F3 Packing List Qty Length Description 4 8 ft 2x2 in post w dual screen channels Part C 8 2 in Capri Clips Part F2 10 12 ft Spline Part S3 50 1 2 in Self tapping fasteners Part F3 30 2 in Hex head metal wood fastener Part F1 20 3 in Hex head metal wood fastener Part F4 20 4 in Hex head metal wood fastener Part F5 20 2 1 4 in Concrete fastener Part F6 20 DOOR FRAME CONSTRUCTION OVERVIEW Capri Cli K TH y Part F2 2x2 Post Part C1 C3 C4 2x2 Post Part C2 C5 1x2 Open Back not included 1x2 Open Back not included Ki Capri Clip Part F2 Capri Clip Part F2 Joins with EZ Screen Room Kit Joins with EZ Screen Room Kit 21 CONSTRUCTING THE DOOR FRAME Cut C1 and C2 one inch greater than the height of the screen door Example If the screen door is 79 then cut C1 and C2 at exactly 80 O c D O gt N oO O c EF N 2 22 CONSTRUCTING THE DOOR FRAME Cut C3 FIVE 5 inches greater than the width of the screen door Example If the screen door width is 35 then cut C3 at exactly 40 This ensures the header will cover the top of C1 and C2 and g
10. ives a 1 2 clearance on each side of the screen door 40 amp 5 If door is 35 wide 23 CONSTRUCTING THE DOOR FRAME Assemble C1 C2 and C3 using 2 Capri Clips F2 and fasteners F3 The frame will be 1 in wider and 1 in taller than your door size Use your square to ensure the frame is true 80 C2 36 24 CONSTRUCTING THE DOOR FRAME Assemble C3 C4 and C5 using 4 Capri Clips F2 and fasteners F3 e CN 1x2 not incl with door kit 1x2 not incl with door kit 25 CONSTRUCTING THE DOOR FRAME Attach hinges to door and frame refer to screen door installation instructions provided by your screen door manufacturer MAKE SURE DOOR IS LEVEL AND SWINGS FREELY Attach door handle and swing arm Refer to screen door in stallation instructions pro vided by screen door manu facturer 26 DOOR FRAME IS COMPLETE Thank you for choosing EZ Screen Room to construct your outdoor enclosure We look forward to your continued patronage Take a look at the additional EZ Products available at your favorite building materials supplier EZ Handrail Code compliant picket railing Dmi i i I m EZ Handrail Glass Edition 8 glass slat railing 27 Vendor No 60083341 S O SKU 516 036 THE HOME DEPOT EZ SCREEN ROOM SUPPORT TEAM Here are some friendly faces of your support team
11. tructing screen walls will have you relaxing in your new outdoor environment in no time PLEASE READ THESE INSTRUCTIONS ENTIRELY BEFORE YOU BEGIN 55 INTRODUCTION Please check the contents of EZ Screen Room box against the enclosed packing list This will al low you to become familiar with the components of your new EZ Screen Room system Inspect all component parts for familiarity Layout recommended tools Before cutting any component know its use measure twice and cut once Boxcontents are designed to fit all openings up to 8 wide x 10 tall Review all local building codes e THE INCLUDED FASTENERS ARE FOR WOOD CONCRETE AND BRICK APPLICATIONS Note The screen wall featured to the left is square The fascia trim is arched Railing is installed separately 2 TOOL CHECKLIST Spline Roller Variable speed drill Tape measure Miter chop or circ saw Framing square Level 1 4 driver Pencil 1 8 1 4 Drill bits Ear protection Metal file Safety Glasses Tape BOX CONTENTS COMPONENTS not all components are viewable in photo 1x2 Open Back Parts A B D E F G 2x2 Post Part C Fiberglass Screen Part S1 S2 Spline Part 53 Capri Clip Part F2 Fasteners 2 F1 1 2 ST F3 BOX CONTENTS continued PACKING LIST not all components are viewable in photo ti 1 SOSTA Not all components are viewable Packing List
Download Pdf Manuals
Related Search
Related Contents
Port Designs LUGANO Blue 15.4" LAPIN BIO BEYNEL Cirago IPC3150 Shark GI305 Use and Care Manual Unités de réfrigération shake/granité Manual - Goldair Copyright © All rights reserved.
Failed to retrieve file