Home

TP-Link TL-SG3210 V1 Installation Guide

image

Contents

1. 10 100 1000Mbps RJ45 Port SFP Port Figure 1 1 Front Panel of TL SG3210 The front panel of TL SG3216 is shown as the following figure Console Port LEDs 10 100 1000Mbps RJ45 Port SFP Port Figure 1 2 Front Panel of TL SG3216 4 pStream L2 Lite Managed Switch The front panel of TL SG3424 is shown as the following figure Console Port LEDs 10 100 1000Mbps RJ45 Port SFP Port Figure 1 3 Front Panel of TL SG3424 LEDs LED Status Indication On The Switch is powered on Power Off The Switch is powered off or power supply is abnormal Flashing Power supply is abnormal Flashing The Switch works properly System On Off The Switch works improperly On A 1000Mbps device is connected to the corresponding port 1000Mbps oft A 10 100Mbps device or no device is connected to the corresponding port On A device is connected to the corresponding port but no f activity a Flashing Data is being transmitted or received Off No device is connected to the corresponding port Note TL SG3216 TL SG3424 Switch features some Combo ports A Combo port consists of a RJ45 port and a SFP port and the two ports share the same LED Port Feature Model wy e Console Port SFP Port TLSG3210 8 1 TL SG3216 16 1 TL SG3424 24 1 10 100 1000Mbps Port Designed to connect to the device with a bandwidth of 10Mbps 100Mbps or
2. 1000Base X MMF or SMF SFP Module Optional LEDs Power System 1000Mbps Link Act Operating Temperature O0C 40 Storage Temperature 40 70 C Operating Humidity 10 90 RH Non condensing Storage Humidity 5 90 RH Non condensing 23 Hardware Specifications Appendix C Technical Support 4 pStream L2 Lite Managed Switch For more help please go to www tp link com support faq asp To download the latest Firmware Driver Utility and User Guide go to www tp link com support download asp For all other technical support please contact us by using the following details Global Tel 86 755 26504400 E mail support tp link com Service time 24hrs 7days a week Singapore Tel 65 62840493 E mail support sg tp link com Service time 24hrs 7days a week UK Tel 44 0 845 147 0017 E mail support uk tp link com Service time 24hrs 7days a week USA Canada Toll Free 1 866 225 8139 E mail support usa tp link com Service time 24hrs 7days a week Australia amp New Zealand Tel AU 1300 87 5465 NZ 0800 87 5465 E mail support tp link com au Service time 24hrs 7 days a week Malaysia Tel 1300 88 875465 1300 88TPLINK Email support my tp link com Service time 24hrs 7 days a week Turkey Tel 444 19 25 Turkish Service E mail support tr tp link com Service time 9 00 AM to 6 00 PM 7 days a week Italy Tel 39 02 66987799 E mail s
3. Dust the device regularly and keep the indoor air clean Keep the device well grounded and ensure static electricity has been transferred Electromagnetic Interference CIN o Gi eeeleecs s Electronic elements including capacitance and inductance on the device can be affected by external interferences such as conducted emission by capacitance coupling inductance coupling and impedance coupling To decrease the interferences please make sure to take the following measures Use the power supply that can effectively filter interference from the power grid Keep the device far from high frequency strong current devices such as radio transmitting station Use electromagnetic shielding when necessary Lightening Protection uh Extremely high voltage currents can be produced instantly when lightning occurs and the air in the electric discharge path can be instantly heated up to 20 000 As this instant current is strong enough to damage electronic devices more effective lightning 05 Installation 4 PStream L2 Lite Managed Switch protection measures should be taken Ensure the rack and device are well earthed Make sure the power socket has a good contact with the ground Keep a reasonable cabling system and avoid induced lightning Use the signal SPD Surge Protective Device when wiring outdoor 7 Note For detailed lightning protection measures please refer to Chapter 3 eS
4. TP LINK Enterprise Networking Solution Installation Guide Stream L2 Lite Managed Switch TL SG3210 TL SG3216 TL SG3424 COPYRIGHT amp TRADEMARKS Specifications are subject to change without notice TP LINK is a registered trademark of TP LINK TECHNOLOGIES CO LTD Other brands and product names are trademarks of their respective holders No part of the specifications may be reproduced in any form or by any means or used to make any derivative such as translation transformation or adaptation without permission from TP LINK TECHNOLOGIES CO LTD Copyright 2011 TP LINK TECHNOLOGIES CO LTD All rights reserved http www tp link com FCC STATEMENT FE This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense This device complies with part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device m
5. Lightning Protection Installation Site lt 1 5m a ae Eg When installing the device on a rack or a flat workbench please note the following items The rack or workbench is flat and stable and sturdy enough to support the weight of 5 5kg at least The rack or workbench has a good ventilation system The equipment room is well ventilated The rack is well grounded Keep the power socket less than 1 5 meters away from the device 2 3 Installation Tools Phillips screwdriver ESD preventive wrist wrap Cables Note These tools are not provided with our product If needed please self purchase ee them 2 4 Product Installation Desktop Installation To install the device on the desktop please follow the steps below 1 Set the device on a flat surface strong enough to support the entire weight of the device with all fittings 2 Remove the adhesive backing papers from the rubber feet Installation O6 Stream L2 Lite Managed Switch 3 Turnover the device and attach the supplied rubber feet to the recessed areas on the bottom at each corner of the device Feet Bottom of the Device Notch Figure 2 1 Desktop Installation m Rack Installation To install the device in an EIA standard sized 19 inch rack follow the instructions described below 1 Check the grounding and stability of the rack 2 Secure the supplied rack mounting brackets
6. gt 9 E mail 3 Microsoft Office Outlook 9 My Pictures b Notepad E My Music Aa 3 My Computer jes Command Prompt e My Network Places wy Paint Bb control panel OvisLink Wireless Client As Set Program Access and C Utility eS parsed ee HyperTerminal Printers and Faxes Help and Support IxChariot Console All Programs gt FA Log Off fo Turn Off Computer Figure 5 9 Open the Run window 3 Type cmd in the prompt Run window as Figure 5 10 and click OK Type the name of a program folder document or 3 Internet resource and Windows will open it for you Open Ex l i x Ca Ce e Figure 5 10 Run Window 4 Type telnet 192 168 0 1 in the command prompt shown as Figure 5 11 and press the Enter button WINDOWS system32 cmd exe T 2001 Microsoft Corp ings Admin gt telnet 192 Figure 5 11 Connecting to the Switch Configuration 20 PStrean L2 Lite Managed Switch 5 Type the User name and Password the factory default value for both of them is admin and press the Enter button then you can use the CLI now which is shown as Figure 5 12 es Telnet 192 168 0 1 Figure 5 12 Log in the Switch For detailed CLI configuration instructions please refer to the CLI Reference Guide on the resource CD 21 Configuration Appendix A Q1 Q2 Q3 Q4 L Stream L2 Lite Managed Switch Troubleshooting What could I do if forgot the username
7. 1000Mbps Each has a corresponding 1000Mbps LED Console Port Designed to connect with the serial port of a computer or terminal for monitoring and configuring the Switch Introduction 02 Stream L2 Lite Managed Switch SFP Port Designed to install the SFP module TL SG3216 TL SG3424 Switch features some SFP transceiver slots that are shared with the associated RJ45 ports The associated two ports are referred as a Combo port which means they cannot be used simultaneously otherwise only SFP port works TL SG3210 features two individual SFP ports Note For TL SG3216 and TL SG3424 when using the SFP port with a 100M module or a gigabit module you need log on to the GUI Graphical User Interface of the Switch o and configure its corresponding Speed and Duplex mode on Switching Port Port Config page For 100M module please select 100MFD while select 1000MFD for gigabit module By default the Speed and Duplex mode of SFP port is 1000MFD TL SG3210 supports 1000M SFP module connection only Rear Panel The rear panel of TL SG3210 is shown as the following figure Grounding Terminal Power Socket Figure 1 4 Rear Panel of TL SG3210 The rear panel of TL SG3216 TL SG3424 is shown as the following figure e Grounding Terminal Power Socket Figure 1 5 Rear Panel of TL SG3216 TL SG3424 Grounding Terminal The Switch already comes with lightning protection mechan
8. 4 Use Lightning Arrester Power lightning arrester and signal lightning arrester are used for lighting protection Power lightning arrester is used for limiting the voltage surge due to a lightning If an outdoor AC power cord should be directly connected to the device please use a power lightning arrester io Note Power lightning arrester is not provided with our product If needed please self a purchase it Signal lightning arrester is used to protect RJ45 ports of the device from lightning When cabling outdoors please install a signal lightning arrester before connecting the cable to the device When purchasing or using a signal lightning arrester please observe the following rules The port rate of the signal lightning arrester should match the rate of the desired port on the device If it is not matched this signal lighting arrester will not work Purchase a standard lightning arrester Install signal lightning arrester near the protected device and connect it to the ground via a shorter ground cable Grounding Terminal Equipotential Bonding Cable Ethernet Cable Signal Lightning Arrester Device Figure 3 4 Lightning Arrester Connection Note Signal lightning arrester is not provided with our product If needed please self N H purchase it Lightning Protection 12 Stream L2 Lite Managed Switch Chapter 4 Connection 4 1 Ethern
9. Appendix B Hardware Specifications Appendix C Technical Support Related Document m Audience This Installation Guide is for Network Engineer Network Administrator Conventions This guide uses the specific formats to highlight special messages The following table lists the notice icons that are used throughout this guide Remind to be careful A caution indicates a potential which may result in device damage gt 2 Remind to take notice The note contains the helpful cj information for a better use of the product IIl Audience Contents Chapter 1 Introduction 1 1 Product OVErViCW isseire ai 1 2 APPCaVanGe niser iis ea dees Chapter 2 Installation 2 1 Package Contents inisinia ninn 2 2 Safety PreCautions ccccceceeeeeeeeeeeeeeeeeetaee 2 3 Installation TOOS siirsi ninenin inasai 2 4 Product Installation sssssessssirerreesesnsrerrrrrnns Chapter 3 Lightning Protection 3 1 Cabling Reasonably seeeeeeeeeeeeeeeteees 3 27 COMMECEO GrOUNG oirne unisini 3 3 Eq ipotential BONdiNg sisseoste 3 4 Use Lightning Arrester ssssssssrsrrrrerreesssrne Chapter 4 Connection 4i Ethernet Port seienecceevencenvccxcuwenvacanenwetnecrcnatecss AD SEP POl snseietsasent on Grescesvctsdaveadesitauetnccnenenenes 4 3 Console Portis 4 4 Verify Installation 4 5 POWEr OM sisdsccssscetiiecncascstone 4 6 Initialization Chapter 5 Configuration 5 1 Configu
10. als to the console port on the Switch by a provided cable 2 Click Start All Programs Accessories Communications Hyper Terminal to open the Hyper Terminal as the following figure shown Set Program Access and Defaults W Windows Catalog R Windows Update ff Communications E Games E Startup gt internet Explorer Network Connections Network Setup Wizard E New Connection Wizard Remote Desktop Connection lt 2 Wireless Network Setup Wizard gt G Entertainment E System Tools gt W Address Book I Calculator GB Command Prompt E Notepad Y Paint Program Compatibiity Wizard Synchronize Tour Windows xP Windows Explorer A WordPad Remote Assistance Windows media Player 4B Windows Messenger Windows Movie Maker d FA Activate Windows A kxchariot E asmax E Logmett Tera Term Merosot office Macrovision Trunk Figure 5 4 Open Hyper Terminal 4 pStream L2 Lite Managed Switch 3 The Connection Description Window will prompt as Figure 5 5 Enter a name into the Name field and click OK Connection Description wy New Connection Enter a name and choose an icon for the connection Name tp ink Hse te0 Figure 5 5 Connection Description 4 Select the port to connect in Figure 5 6 and click OK Connect To B tp ink Enter details for the phone n
11. and over current of the device which is also a necessary measure to protect the body from electric shock In different environments the device may be grounded differently The following will instruct you to connect the device to the ground in two ways connecting to the grounding bar or connecting to the ground via the power cord Please connect the device to ground in the optimum way according to your specific operation environment Connecting to the Grounding Bar If the device is installed in the Equipment Room where a grounding bar is available you are recommended to connect the device to the Grounding Bar as shown in the following figure Switch Rear Panel Grounding Terminal Ground Cable Grounding Bar Figure 3 1 Connecting to the Grounding Bar Note The grounding bar is not provided with our product If needed please self purchase it Connecting to the Ground via the Power Supply If the device is installed in the normal environment the device can be grounded via the PE Protecting Earth cable of the AC power supply as shown in the following figure Switch Rear Panel AC Power Cord with PE cable Figure 3 2 Connecting to the Ground Lightning Protection 10 PStrean L2 Lite Managed Switch ho Note eS The figure is to illustrate the application and principle The power cord you get from the package and the socket in your situation will comply with the regulation in your
12. and password of the Switch 1 Connect the console port of the PC to the console port of the Switch and open hyper terminal 2 Power off and restart the Switch When you are prompted that Press CTRL B to enter the bootUtil in the hyper terminal please press CTRL B key to enter into bootUtil menu shown as the following figure HHH TP LINK BOOTUTIL v1 0 0 HHH HH HHH HHI HHI HHH HII Copyright c 2010 TP LINK Tech Co Ltd Create Date Oct 11 2010 09 43 33 help print this list reboot reboot the system ifconfig config the interface ftp config the remote host ip the user name user password and the image file name upgrade upgrade the firmware start start the system reset reset the system to the factory config 3 Enter the reset command to reset the system Th system will be reset to the factory default settings and the default login user name and password are both admin Why does the Power LED work abnormally The Power LED should be lit up when the power system works normally If the Power LED worked abnormally please take the following steps 1 Make sure that the power cable is connected properly and the power contact is normal 2 Make sure the voltage of the power supply meets the requirement of the input voltage of the Switch 3 Restore the Switch to the factory default settings What could do if could not access the web based configuration page You are recommended to check the fol
13. ay not cause harmful interference 2 This device must accept any interference received including interference that may cause undesired operation Any changes or modifications not expressly approved by the party responsible for compliance could void the user s authority to operate the equipment CE Mark Warning CE This is a class A product In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures Copyright amp Trademarks Related Document The User Guide and CLI Reference Guide of the product are provided on the resource CD To obtain the latest product information please visit the Official Website http www tp link com About this Installation Guide This Installation Guide describes the hardware characteristics installation methods and the points that should be attended to during installation This Installation Guide is structured as follows Chapter 1 Introduction This chapter describes the External Components of the Switch Chapter 2 Installation This chapter illustrates how to install the Switch Chapter 3 Lightning Protection This chapter illustrates how to prevent lightning damage Chapter 4 Connection This chapter illustrates how to do the physical connection of the Switch Chapter 5 Configuration This chapter instructs you to configure the Switch via Web Interface and CLI commands Appendix A Troubleshooting
14. country so they may differ from the figure above If you intend to connect the device to the ground via the PE Protecting Earth cable of AC power cord please make sure the PE Protecting Earth cable in the electrical outlet is well grounded in advance 3 3 Equipotential Bonding Equipotential Bonding is the practice of intentionally electrically connecting all earthed systems to the same grounding grid or connecting the grounding grids of all the earthed systems together through the ground or overground metal so as to create an earthed equipotential zone When lightning occurs the high voltage produced by lightning current in all systems will meanwhile exist in their ground cables and thus all ground cables have the same electrical potential and basically eliminate the electric strikes between the systems The figure below illustrates how to practice equipotential bonding in a network Q Grounding Terminal _ Equipotential Bonding Cable Ground Cable Grounding Bar Figure 3 3 Equipotential Bonding When equipotential bonding please note that the cable should be copper wrapped Kelly with its area being 6mm at least The shorter cable the better and use a grounding bar to establish an equipotential bonding point ho Note The equipotential bonding cable is not provided with our product If needed Cj please self purchase it 11 Lightning Protection 4 pStream L2 Lite Managed Switch 3
15. e front panel Please keep the device power off when plugging the console cable Do not connect the console port with other ports by RJ45 cable 4 4 Verify Installation After completing the installation please verify the following items There are 5 10cm of clearance around the sides of the device for ventilation and the air flow is adequate The voltage of the power supply meets the requirement of the input voltage of the device The power socket device and rack are well grounded The device is correctly connected to other network devices 4 5 Power On Plug the female connector of the provided power cord into the power socket of the device and the male connector into a power outlet as the following figure shown Connection 14 PStrean L2 Lite Managed Switch Figure 4 4 Connecting to Power Supply Note The figure is to illustrate the application and principle The power cord you get ej from the package and the socket in your situation will comply with the regulation in your country so they may differ from the figure above 4 6 Initialization After the device is powered on it begins the Power On Self Test A series of tests run automatically to ensure the device functions properly During this time its LED indicators will respond as follows For TL SG3210 Switch The Power LED indicator will light on all the time The LED indicators of all the ports will light on for several seco
16. et Port Connect the Ethernet ports of the Switch to the network devices by RJ45 cable as the following figure shown RJ45 Port ELEF H RJ45 Cable Figure 4 1 Connecting the RJ45 Port 4 2 SFP Port Connect the SFP port to a SFP module For TL SG3216 TL SG3424 if an SFP transceiver purchased separately is installed in a slot and has a valid link on the port the associated RJ45 port will be disabled and cannot be used Figure 4 2 Inserting the SFP Module Note Gs The TL SG3216 TL SG3424 Switch supports 100 1000Base FX SFP module at full duplex mode When using a SFP module you need log on to the GUI of the Switch and configure the corresponding Speed and Duplex mode on Switching Port Port Config page TL SG3210 supports 1000M SFP module connection only 13 Connection 4 3 Console Port 4 pStream L2 Lite Managed Switch CLI Command Line Interface enables you to manage the Switch thus you can load the CLI after connecting the PCs or Terminals to the console port on the Switch via the provided cable Connect the console port of the device with your computer by the console cable as the following figure shown Figure 4 3 Connecting the Console Port You can also manage the device through the console port for details please refer to the CLI Reference Guide on the resource CD Note The console port is the first port on the left of th
17. ey TP LINK User Name Figure 5 2 Login 3 After a successful login the main page will appear as the following figure and you can configure the function by clicking the setup menu on the left side of the screen Configuration 16 PStrean L2 Lite Managed Switch 17 Configuration TP LINK TL 563216 System Summary BM System 2 4 6 8 10 12 14 16 SFP2 System Info m mur mu m m ii i oat i ee ee m User Manage f 3 3 7 g i 13 15 SEPL System Tools cranes ommno e System Description 16G Managed Switch YAN Device Name TL SG3216 Spanning Tee Device Location SHENZHEN System Contact www tp link com ate Hardware Version TL 563216 1 0 ETEA Firmware Version 0 6 0 Build 20110111 Rel 35950 Rt IP Address 192 168 0 1 me Subnet Mask 255 255 255 0 a a Default Gateway Maenan CAM MAC Address 00 0A EB 00 13 01 Sarnoconio System Time 2006 01 01 08 00 30 Run Time 0 day 0 hour 0 min 38 sec Logout Refresh Figure 5 3 Main Page of the Switch 5 2 Configure the Switch Using CLI You can log on to the Switch and access the CLI by the following two methods Log on to the Switch by the console port on the Switch Log on to the Switch remotely by a Telnet or SSH connection through an Ethernet port Logon by a Console Port To log on to the switch by the console port on the Switch please take the following steps 1 Connect the PCs or Termin
18. he Switch Before cleaning the device cut off the power supply Do not clean it by the waterish cloth and never use any other liquid cleaning method m Site Requirements To ensure normal operation and long service life of the device please install it in an environment that meets the requirements described in the following subsection Temperature Humidity SEE AH Installation 04 Stream L2 Lite Managed Switch Please keep a proper temperature and humidity in the equipment room Too high low humidity may lead to bad insulation electricity leakage mechanical property changes and corrosions Too high temperature may accelerate aging of the insulation materials and can thus significantly shorten the service life of the device For normal temperature and humidity of the device please check the following table Environment Temperature Humidity Operating OC 40C 10 90 RH Non condensing Storage 40T 70 5 90 RH Non condensing Clearness S WEES MEE esee bess The dust accumulated on the Switch can be absorbed by static electricity and result in poor contact of metal contact points Some measures have been taken for the device to prevent static electricity but too strong static electricity can cause deadly damage to the electronic elements on the internal circuit board To avoid the effect of static electricity on the operation of the Switch please attach much importance to the following items
19. ism You can also ground the Switch through the PE Protecting Earth cable of AC cord or with Ground Cable For detailed information please refer to Chapter 3 Lightning Protection Power Socket Connect the female connector of the power cord here and the male connector to the AC power outlet Please make sure the voltage of the power supply meets the requirement of the input voltage 100 240V 50 60Hz A Caution Please use the provided power cord 03 Introduction 4 PStream L2 Lite Managed Switch Chapter 2 Installation 2 1 Package Contents Make sure that the package contains the following items If any of the listed items is damaged or missing please contact your distributor a gt One Switch One Power Cord One Console This Installation Guide Cable and one Ground Cable Two mounting brackets and the fittings 2 2 Safety Precautions To avoid any device damage and bodily injury caused by improper use please observe the following rules Safety Precautions Keep the power off during the installation Wear an ESD preventive wrist strap and make sure that the wrist strap has a good skin contact and is well grounded Use only the power cord provided with the Switch Make sure that the supply voltage matches the specifications indicated on the rear panel of the Switch Ensure the vent hole is well ventilated and unblocked Do not open or remove the cover of t
20. lowing items 1 Check every port LED on the Switch and make sure the cable is installed properly 2 Try another port on the Switch and make sure the cable meets the requirement and works normally 3 Turn off the power After a while turn on the power again 4 Make sure the IP address of your PC is set within the subnet of the Switch 5 If you still cannot access the configuration page please restore the Switch to its factory defaults Then the IP address should be set as 192 168 0 x x is any number from 2 to 254 and Subnet Mask as 255 255 255 0 Why does the hyper terminal display abnormally Please check as follows 1 Make sure the power supply is normal and the console cable is properly connected 2 Check if the console cable is the right type 3 Ensure the parameters of the hyper terminal are correct configure Bits per second as 38400 Data bits as 8 Parity as None Stop bits as 1 and Flow control as None Troubleshooting 22 PStrean L2 Lite Managed Switch Appendix B Hardware Specifications Item Content IEEE 802 3 10Base T Ethernet IEEE 802 3u 100Base TX 100Base FX Standards IEEE 802 3ab 1000Base T IEEE 802 3z 1000Base X IEEE 802 3x Flow Control 10Base T UTP STP of Cat 3 or above 100Base TX UTP STP of Cat 5 or above Transmission Medium 100Base FX MMF or SMF SFP Module Optional 1000Base T 4 pair UTP lt 100m of Cat 5 Cat 5e and Cat 6 or above
21. nds and then turn off after the initialization The System LED indicator will flash which represents a successful initialization For TL SG3216 TL SG3424 Switch The Power LED indicator will light on all the time After keeping off for several seconds the LED indicators of all the ports will flash momentarily and then turn off again after the initialization The System LED indicator will flash which represents a successful initialization 15 Connection 4 pStream L2 Lite Managed Switch Chapter 5 Configuration 5 1 Configure the Switch via GUI 1 To access the GUI of the Switch open a web browser and type the default management address http 192 168 0 1 in the address field of the browser then press the Enter key http 192 168 0 1 Microsoft Internet Explorer File Edit View Favorites Tools Help Q ex X E pe Search She Favorite Address http 192 168 0 1 Eao inks Esn Figure 5 1 Web Browser K Note To log on to the GUI of the Switch the IP address of your PC should be set in C the same subnet addresses of the Switch The IP address is 192 168 0 x x is any number from 2 to 254 Subnet Mask is 255 255 255 0 For the detailed instructions as to how to do this please refer to Appendix B in the User Guide on the Resource CD 2 Enter admin for the default User Name and Password both in lower case letters Then click the Login button or press the Enter k
22. r Pipelines Min Parallel Net Length Min Parallel overlapping Net Height L mm H mm Down conductor 1000 300 PE 50 20 Service pipe 150 20 Compressed air pipe 150 20 Thermal pipe not wrapped 500 500 Thermal pipe wrapped 300 300 Gas pipe 300 20 The two diagrams below demonstrate parallel net length and parallel overlapping net height 7 Note The above minimum net length height is required when metal raceway is not CA used If any requirements cannot be met you can add a steel tube or metal raceway for shielding Requirements for the distance between Ethernet cable and high power electric devices are in following tables Cable Pave Way Parallel cabling lt 2kVA One is in the grounded metal raceway or metal pipe powerline The both are in the grounded metal raceway or metal pipe Parallel cabling 2 5kVA p One is in the grounded metal raceway or metal pipe powerline The both are in the grounded metal raceway or metal pipe Parallel cabling gt 5kVA One is in the grounded metal raceway or metal pipe powerline The both are in the grounded metal raceway or metal pipe Device Min Distance m Switch case 1 00 Transformer room 2 00 Elevator tower 2 00 Air conditioner room 2 00 Min Parallel Length mm 130 70 10 300 150 80 600 300 150 3 2 Connect to Ground 4 PStream L2 Lite Managed Switch Connecting the device to ground is to quickly release the lightning over voltage
23. re the Switch via GUI 5 2 Configure the Switch Using CLI Appendix A Troubleshooting Appendix B Hardware Specifications Appendix C Technical Support 01 01 01 04 04 04 06 06 08 08 10 11 12 13 13 13 14 14 14 15 16 16 17 22 23 24 Contents IV Stream L2 Lite Managed Switch 01 Chapter 1 Introduction Introduction 1 1 Product Overview TP LINK JetStream L2 Lite Managed Switch designed for workgroups and departments provides wire speed performance and abundant layer 2 management features It provides a variety of service features and multiple powerful functions with high security The EIA standardized framework and smart configuration capacity can provide flexible solutions for a variable scale of networks ACL 802 1x and Dynamic ARP Inspection provide robust security strategies QoS and IGMP snooping filtering optimize voice and video application Link aggregation LACP increases aggregated bandwidth optimizing the transport of business critical data SNMP RMON WEB CLI Telnet Log in bring abundant management policies TP LINK JetStream L2 Lite Managed Switch integrates multiple functions with excellent performance and is friendly to manage which can fully meet the need of the users demanding higher networking performance 1 2 Appearance Front Panel The front panel of TL SG3210 is shown as the following figure LEDs Console Port
24. s ly Outdoor cables should be buried and paved to the indoor through basement A piece of steel wire should be paved underground along the pipe and connected to the lightning protection terminal of the building for shielding Before connecting the cable to the device install a signal lightning arrester on the corresponding port When an aerial cable is set up the cable should be through a metal pipe 15m long at least before coming into the building The two ends of this metal pipe should be grounded Before connecting the cable to the device install a signal lightning arrester on the corresponding port It s not necessary to pave STP cables through pipes The shielded layer of STP cable should be well grounded Before connecting the cable to the device install a signal lightning arrester on the corresponding port Requirements for Cabling Indoors When cabling indoors keep a certain distance away from the devices that may cause high frequency interferences such as down conductor cable powerline power transformer and electromotor The main cable should be paved in the metal raceway of the access shaft When cabling keep the loop area formed by the cable itself as small as possible Lightning Protection 08 Stream L2 Lite Managed Switch 09 Lightning Protection Requirements for the distance between Ethernet cable and other pipelines are shown in the table Ethernet Cable Othe
25. to each side of the device with supplied screws as illustrated in the following figure Rack mounting Bracket Screw Figure 2 2 Bracket Installation 3 After the brackets are attached to the device use suitable screws not provided to secure the brackets to the rack as illustrated in the following figure MMA KAA Rack ay fails ele aie eee 2 v e 2 2 e e 2 Figure 2 3 Rack Installation A Caution Please set 5 10cm gaps around the device for air circulation Please avoid any heavy thing placed on the device Please mount devices in sequence from the bottom to top of the rack and ensure a certain clearance between devices for the purpose of heat dissipation 07 Installation 4 PStream L2 Lite Managed Switch Chapter 3 Lightning Protection 3 1 Cabling Reasonably In the actual network environment you may need cable outdoors and indoors and the requirements for cabling outdoors and indoors are different A reasonable cabling system can decrease the damage of induced lightning to devices Note It s not recommended using Ethernet cables outdoors When cabling outdoors please use a signal lightning arrester Requirements for Cabling Outdoors Aerial cabling without safeguard is not allowed IL EEETETI PEGREEE PEGREEE It s not allowed cabling down the building to connect network devices in different floor
26. umber that you want to dial Country region United States 1 Area code Phone number Connect using COM1 Figure 5 6 Select the port to connect 5 Configure the port selected in the step above as the following Figure 5 7 shown Configure Bits per second as 38400 Data bits as 8 Parity as None Stop bits as 1 Flow control as None and then click OK Configuration 18 PStrean L2 Lite Managed Switch 19 Configuration COM1 Properties Port Settings Bits per second Data bits Parity Stop bits Flow control Figure 5 7 Port Settings 6 Type the User name and Password in the Hyper Terminal window the factory default value for both of them is admin The DOS prompt TP LINK gt will appear after pressing the Enter button as Figure 5 8 shown It indicates that you can use the CLI now tp link HyperTerminal file Edit View Call Transfer Help Oe 83g 05 F User admin Password TP LINK gt Connected 0 00 32 Auto detect Auto detect Figure 5 8 Log in the Switch Logon by Telnet To log on to the switch by a Telnet connection please take the following steps 1 Make sure the switch and the PC are in the same LAN 2 Click Start Run to open the Run window Stream L2 Lite Managed Switch r s Admin Internet I My Documents Internet Explorer i 2 My Recent Documents
27. upport it tp link com Service time 9 00 AM to 6 00 PM Monday to Friday Indonesia Tel 62 021 6259 135 E mail support id tp link com Service time 9 00 12 00 13 00 18 00 From Monday to Friday except public holidays Germany Austria Tel 49 1805 875465 German Service 49 1805 TPLINK E mail support de tp link com Fee 0 14 EUR min from the German fixed phone network and up to 0 42 EUR min from mobile phone Service time Monday to Friday 9 00 AM to 6 00 PM GMT 1 or GMT 2 Daylight Saving Time in Germany Except bank holidays in Hesse Switzerland Tel 41 0 848 800998 German Service E mail support ch tp link com Tel 41 0 848 800998 German Service Fee 4 8 Rp min depending on rate of different time Service time Monday to Friday 9 00 AM to 6 00 PM GMT 1 or GMT 2 Daylight Saving Time Technical Support 24 TP LINK The Reliable Choice Website http www tp link com Tel 86 755 26504400 E mail support tp link com 7106503627 Rev 1 0 0

Download Pdf Manuals

image

Related Search

Related Contents

Smarty_Déclaration des Performances    Connector Service Manual    

Copyright © All rights reserved.
Failed to retrieve file