Home

Swim'n Play end deck User's Manual

image

Contents

1.
2. SCREWS CLOSE UP 4 LONG POST CLOSE UP 3 SHORT ANGLE SUPPORT BAR DECK TOP 49 5 16 POST HEX NUTS o 2 SCREWS LONG POST CLOSE UP 5 Finally attach another Long Square Post for the Ladder on either side of your deck in the location illustrated for your deck on the prior page Choose the location of your ladder depending on which side of the deck will provide the most convenient access to the pool Fasten this Post to the deck referring to Close Up 5 above for the proper assembly procedure 5 IMPORTANT ONLY HAND TIGHTEN SCREWS AT THIS TIME Position the Bottom Support Channels long L shaped pieces at the bottoms of the Posts according to the illustration below for your size deck Note the different sizes The illustrations are as viewing the deck from above with the Ladder to be installed on the left side 15 END DECK amp 18 END DECK 12 END DECK POOL Cnn 1 2 SHEET METAL SCREW Having positioned the Bottom Support BOTTOM SUPPORT Channels in their proper locations as oes illustrated above attach them to the bottom of the Posts including the Post for the Ladder using 1 2 Sheet Metal i BOTTOM Screws as shown at right OE POST 1 2 SHEET METAL SCREW 12 END DECK NOTE On the 12 End Deck you must now attach _ 52 5 16 gt 1 side of remaining 7277 Bottom Support Channel 15 r d to the outside Posts nearest the p
3. periodically test and maintain the Gates proper functioning WARNING Make sure that your pool is not accessible when not in use WARNING LABELS With your deck you are provided with 5 additional Warning Labels One Large Label 490090 is to be permanently affixed to the top of the pool s Top Ledge at the entry point of the pool The two long thin labels 490091 are to be affixed on the inside of the pool s Top Ledge opposite to and facing the entry point of the pool The two Square Labels 490021 are to be affixed on the outside edge of the deck by the outside ladder To affix these labels simply clean the area where the label is to be applied and peel off the backing and press the label firmly into place Should you need any additional Labels for any reason simply order them by part number from your local dealer or direct from the manufacturer NO DIVING SHALLOW WATER DT 490090 490021 ENTRY POINT Consumer Awareness Booklets The following books are available through the APSP The Sensible Way To Enjoy Your Pool published by the NSPI October 1983 revised September 1986 Children Aren t Waterproof published by the NSPI APSP Pool amp Spa Emergency Procedures For Infants And Children published by the NSPI Contact APSP 2111 Eisenhower Avenue Alexandria Virginia 22314 703 838 0083 Pool amp Spa Professionals The Association of
4. ASSEMBLY INSTRUCTIONS READ THROUGH AND UNDERSTAND ALL THE STEPS TO THIS INSTALLATION BEFORE ATTEMPTING TO INSTALL EITHER YOUR POOL OR YOUR DECK IF YOUR POOL IS ALREADY INSTALLED IT MAY BE NECESSARY TO LOWER THE WATER LEVEL IN YOUR POOL DOWN TO 2 TO ENABLE YOU TO PROPERLY INSTALL THIS DECK 313 REGINA AVENUE RAHWAY NEW JERSEY 07065 4891 Phone 732 574 1500 p Fax 732 574 1551 Swim It lay Inc www swimnplay com n D n n M MAMMA Sere NM Makers of Fine Above Ground Pools E aloo swimhplay com DANGER DO NOT DIVE OR JUMP into your pool Your pool is approximately 4 deep SHALLOW WATER It is not designed for diving or jumping If you dive or jump into your pool DIVING MAY you run the risk of permanent injury or death Alert all visitors and family of this and point out all warning labels supplied ADULT SUPERVISION REQUIRED INJURY i FACE COVER OM PAIN OVER 1HJ5 SIUN Part 420867 GENERAL Take time to follow the instructions and do things right the first time Read all instructions prior to starting Before you start check to see that you have the correct number of parts Use your parts list which is broken down by carton The manufacturer reserves the right to revise change or modify construction of their product CONTRACT INSTALLATIONS The manufacturer is in no way affiliated with any professional installer Therefore the manufac turer can assume no responsibility for errors
5. OST FENCE BRAKET INSERTED THROUGH POST Attach the Straight Fence Brackets to the top of the Standard Posts simply by inserting the shorter end through the slots in the Post until it stops Next press one Post Cap to the top of each Post Using the illustration for your size deck on the previous page assemble the Fence Postions Note carefully the location for the different sizes Attach the Fence portions to the Fence Brackets using the 7 Sheet Metal Screws as illustrated below Slip a protective Rubber Screw Cap on the exposed end of each screw Ruber Cap 1 2 Sheet Metal Screw 1 2 SHEET METAL SCREW Using the Latch Latch Bar and Hinges as templates drill the holes in the locations as illustrated at the bottom Drill a 5 32 hole for the Latch Bar and Self gy _ LATCH BAR pe ee Closing Hinges i o nme Saas Drill a 7 64 hole for the Latch 8 3y Mount the Hinges and the Gate using 1 2 ITT long Self Tapping Screws so that the Gate swings on to the deck in the direction of LATCH the rear fence Mount the Latch Bar to the Gate using Ee the 10x1 2 Self Tapping Screw Mount the Latch to the Gate Post using pue 6x3 8 long Self Tapping Screws GATE S Note the Latch mounts approximately E j 21 8 from the top of the Gate Ta TTS gt Test the Gate to insure that it is perfectly aligned and closes and completely latches by itself MEV TROM INSIDE THE DECK lt is very important to
6. P LEDGE OF YOUR POOL Clear out and level the ground in the location where your deck is to be installed Use the Assembly Drawings below for reference while assembling your deck Note ladder can be installed on either side During assemly please note that the ledges on the pool are to be removed where the deck meets the pool The extension on the front of the deck will replace your pool legde Please refer to Step 7 RIGHT PATIO LADDER ASSEMBLY DRAWINGS VIEWED FROM ABOVE RIGHT PATIO 15 END DECK IMPORTANT ONLY HAND TIGHTEN SCREWS AT THIS TIME Elevate your two outside deck sections using either patio blocks or saw horses Attach the Posts referring to the Close up Illustrations below and on the following page for the proper assembly procedure for each location ONLY HAND TIGHTEN THE SCREWS at this time CLOSE UPS CLOSE UP 3 CLOSE UPS 2a amp 2b K Se 2a amp 2b 15 END DECK POST FOR LADDER amp ATTACHES ON EITHER SIDE A 18 END DECK CLOSE UP 3 CLOSE UP 3 POOL CLOSE UPS CLOSE UPS 2a amp 2b CLOSE UP 3 2a amp 2b _ HN ES POST FOR LADDER 12 END DECK ATTACHES ON EITHER SIDE CLOSE UP 4 CLOSE UP 3 CLOSE UP 3 CLOSE UP 2b CLOSE UP 2a CORNER POST BRACKET POST BRACKET HECTARE EGU 1 4 x 20 x 2 1 4 x 20 1 4 x 20 x 1 2 1 2 SHEET TRUSS HEAD SCREW HEX NUT TRUSS HEAD SCREW METAL SCREW HEX o NUTS gj 9 2
7. ening the screws let all other screws remain loose at this time E CLOSE UP 15 PATIO l NOT USED ON 12 DECK FOR 18 DECKS ONLY LOCATION B LOCATION A POOL For all size decks At the two places labeled Location A in A the illustration above attach Long Square Posts in the manner E SE an y illustrated at right in Close up 15 For the 18 Decks only At the two places labeled Location B in dum the illustration above also attach Long Square Posts in the manner 1 4 x 20 1 4 x 20 x 1 2 illustrated at right in Close up 15 EMO eee 9 IMPORTANT ONLY HAND TIGHTEN SCREWS AT THIS TIME LADDER 15 END DECK BOTTOM SUPPORT CHANNEL 5x6 75 BOTTOM DECK BOTTOM de OF POST ANGLES 1 2 SHEET METAL SCREW 12 END DECK For the 12 End Deck attach the two 75 Bottom Angles to the bottom of the Posts as shown Use 1 2 Sheet Metal Screws but only hand tighten at this time LOCATION A Sea 10 In the locations marked Location A see the CLOSE UP 17 previous page attach Angle Support Bars to i i ANGLE the top of the Post and Deck as illustrated in Ebor Close up 16 at right Also attach Angle Support Bars to the bottom of the Post and the Bottom Support Channel as illustrated in Close up 17 at right Note Where One Angle Support Bar attach to the Post use the Sheet Metal Screws Where Two Angle Support Bars attach to the Pos
8. imply place the bracket 734 from the top of the Vertical Then using the Post Bracket as a template drill through the Vertical using a 5 16 drill bit If your pool is filled with water it will be necessary for you to lower the water level to 2 deep in order to safely drill these holes and attach the Fence Post Brackets Take the Verticals and attach two Fence Post Brackets to each Vertical using the 1 4 x 20 x 3 4 Screws and Washers and Hex Nuts provided as shown You may now assemble your pool 19 9 giai gA FENCE POST 94 N BRACKETS P d HEX 2 Pieces Lor NUT r i WASHER e 1 4 x20x3 A 1 4 FENDER 1 4 x20 HEX 9 HEAD SCREW Assemble the Square Fence Post to the Post Bracket using the D 1 x 20 x 2 Screws and Hex Nuts as shown at right If your pool is equipped with Full Contoured Covers like those below you must first assemble the covers to the pool before attaching the Posts 1 4 x20x2 1 4 x20 HEX TRUSS HEAD SCREW NUT 15 Use the illustrations below for reference during attaching the sections of Fence to the Fence Posts as described on the next page 69 1 8 69 1 8 69 1 8 1 8 69 1 8 69 1 8 69 1 8 69 1 8 69 1 8 69 1 8 END POST Attach the Universal Fence Brackets to the top of OR the End or Corner Posts simply by inserting the CORNER POST oval end into the slot in the Post and pressing down as shown Next press one Post Cap to the top of each Post STANDARD P
9. in installation by the home owner or said profes sional installer If you have your deck installed by others please supervise to be sure they comply with the proper installation techniques shown Their past experience or short cuts may not cover the latest improvements in our decks Do not allow any short cuts of any nature LOCAL CODES Local building code may require obtaining a building permit and may have regulations on set backs barriers devices and other conditions that must be followed Any after market or home built deck should be built to the local building code requirements including load capacity and fencing requirements Local electrical code may require obtaining a building permit and may have regulations on setbacks devices and other conditions that must be followed All electrical outlet connections should be a minimum of 5 feet from the outside perimeter of the wall of the pool From 5 10 feet there should be either a fixed connection outlet box or twist lock connection with a GFCI Connect power cords to a 3 wire grounding type outlet only Severe electrical shock could result if you in stall your pump or filter on a deck They could fall into the water causing severe shock or electrocu tion Do not install on a deck or other surface at above or slightly below the top SEAT of the pool BARRIER REQUIREMENTS If the distance from the top of the assembled pool is less than 48 vertically from the surround i
10. ng grade a fence or barrier is needed to surround the pool with a minimum height of 48 A barrier is necessary to provide protection against potential drowning and near drowning and is not a substitute for constant supervision of children A barrier is a fence wall or a combination thereof which completely surrounds the swim ming pool and obstructs access to the swimming pool Barriers must comply with local and national building codes and the US Consumer Product Safety Commission These are minimum fencing and barrier re quirements Check your local building codes for other requirements they may request Optional fencing kits are available Please contact your lo cal dealer If pool covers are used for safety barriers they should comply with ASTM F 1346 Stan dard Performance Specification for Safety Covers and Labeling Requirements for All Covers for Swimming Pools Spas and Hot Tubs GETTING STARTED Unpack and identify all the parts to your deck using the enclosed packing list TO ASSEMBLE THE DECK YOU WILL NEED DRILL WITH A 7 64 5 32 3 16 AND 5 16 BIT 7 16 WRENCH 3 POINT PHILLIPS SCREW DRIVER MEASURING TAPE AND MARKING PENCIL ATTENTION DECKS ARE MADE FOR 52 INCH DEEP POOLS IF YOUR POOL IS 48 DEEP YOU WILL HAVE TO DIG A TRENCH OR CUT THE BOTTOM OF THE POSTS 4 INCHES INORDER TO LEVEL THE HEIGHT OF THE DECK WITH THE HEIGHT OF YOUR POOL THE BASE OF THE DECK MUST BE LEVEL WITH THE TO
11. ngle Support Bars The illustrations below indicate which of the Close up illustrations at the bottom of this page and at the top of the next page show the proper assembly procedure for each location Where One Angle Support Bar attach to the Post use the 7 Sheet Metal Screws Where Two Angle Support Bars attach to the Post use the 1 Sheet Metal Screw Where the Angle Support Bars attach to the deck use the 7 Truss Head Screws and Hex Nuts CLOSE UP CLOSE UP 13 CLOSE UP 13 yer 13 15 END DECK POST FOR LADDER amp ATTACHES ON EITHER SIDE a 138 END DECK CLOSE UP 10 CLOSE UP 10 POOL CLOSE UP CLOSE UP 13 CLOSE UP 13 13 POST FOR LADDER 12 END DECK ATTACHES ON EITHER SIDE CLOSE UP 12 CLOSE UP 10 CLOSE UP 10 CLOSE UP 10 DECK gt E i 2 ANGLE SUPPORT BAR po 9 1 4 x 20 1 4 x 20 x 1 2 1 2 SHEET 1 SHEET HEX NUT TRUSS HEAD SCREW METAL SCREW METAL SCREW CLOSE UP 13 LARGE ANGLE i SMALL SUPPORT ANGLE BAR IMPORTANT ONLY HAND TIGHTEN SCREWS AT THIS TIME For the 15 and 18 Decks assemble the Center Patio to the already assembled deck sec tions using the 1 Round Head Screws and Hex Nuts For the 12 Decks assemble the two outside deck sections together using the 1 Round Head Screws and Hex Nuts Firmly tighten these screws Next attach the Left Patio and Right Patio sections in the same manner firmly tight
12. ool See right 18 END DECK 4 79 7 16 _ gt IMPORTANT ONLY HAND TIGHTEN SCREWS AT THIS TIME Where the Posts and the Bottom Support Channels join attach Angle Support Bars The illustrations below indicate Close up illustrations show the proper assembly procedure for each location Where One Angle Support Bar attach to the Post use the 1 2 Sheet Metal Screws Where Two Angle Support Bars attach to the Post use the 1 Sheet Metal Screw Where the Angle Support Bars attach to the Bottom Support Channels use the 1 2 Truss Head Screws and Hex Nuts Note carefully in the Close ups the position of the slots in the Angle Support Bars Again only hand tighten screws at this time CLOSE UP CLOSE UP 47 CLOSE UP 7 ee 7 15 END DECK POST FOR LADDER amp ATTACHES ON EITHER SIDE a 18 END DECK CLOSE UP 7 CLOSE UP 7 POOL CLOSE UP CLOSE UP 7 CLOSE UP 7 7 E POST FOR LADDER 12 END DECK ATTACHES ON EITHER SIDE CLOSE UP 7 CLOSE UP 7 CLOSE UP 7 POOL BOTTOM ANGLE OF POST CLOSE UP 7 Sun ni PORREN SCREW CLOSE UP 8 ANGLE BOTTOM SUPPORT SUPPORT BAR BOTTOM CHANNEL o S o OF POST HEX NUT TRUSS HEAD SCREW METAL SCREW METAL SCREW SUPPORT SA CHANNEL IH K DAN a oe D 1 S ba sa X A 1 4 x 20 1 4 x 20 x 1 2 1 2 SHEET 1 SHEET IMPORTANT ONLY HAND TIGHTEN SCREWS AT THIS TIME Where the Posts fasten to the deck attach A
13. rews and Hex Nuts 1 SHEET METAL ANGLE SCREW SUPPORT BAR Before continuing make sure that all the Posts are perfectly straight and tighten all screws and nuts securely You may now remove the saw horse or patio blocks and allow your deck to rest on the ground VIEW FROM Attach your assembled deck to your pool as shown Remove the ledges where the deck will be assembled Move your deck into its final position On the 12 and 15 End Decks attach the deck ledge to the verticle top plates Drill holes on top of the deck aligning with the holes of the top plates and tighten screws supplied for the removed ledges If your pool is equipped with full contour style ledge covers it is necessary to cut them with a hacksaw as illustrated below This will enable the deck to mount closer to the pool 15 END DECK TOP RAIL TOP PLATE DECK VIEW FROM ABOVE POOL WALL VIEW FROM SIDE CUT ALONG THIS LINE 12 END DECK Use the illustrations below for reference during the assembly of the Fence Posts as described on the next page O FENSURROUND INSTRUCTIONS x E eee A GENERAL ASSEMBLY ILLUSTRATION Use the General Assembly Illustration below for reference as you assemble the Fensurround STANDARD POST FENCE BRAKET INSERTED THROUGH POST END POST OR CORNER POST Before assembling your pool drill the required holes in the Verticals S
14. t use the 1 Sheet Metal Screw Where they attach to either the deck or the Bottom Support Channels fom m DA 1 4 x 20 1 4 x 20 x 1 2 1 2 SHEET HEX NUT TRUSS HEAD SCREW METAL SCREW CLOSE UP 16 PATIO 0 O ANGLE In the locations marked Location C Saas S see the previous page attach 49 5 16 Posts to the Deck as illustrated Pres ul i SHEET in Close up 4 at right Also attach Angle METAL SCREW Support Bars to the top of the Posts and the deck as illustrated in Close up 12 at right Note Where One Angle Support Bar attach to the Post use the 1 2 Sheet Metal Screws Where Two Angle Support Bars attach to the Post use the 1 Sheet Metal Screw Where they attach to the deck 49 5 16 CLOSE UP 12 use 2 Truss Head Screws and Hex Nuts prd POST For the 18 Decks Only In the BAR locations marked Location B see the previous page attach Angle Support Bars to the top of the Post and Deck as illustrated in Close up 11 at right Also attach Angle Support Bars to the bottom of the Post and the Bottom Support Channel as illustrated in Close up 17 at right Note Where One Angle Support CLOSE UP 17 CLOSE UP 11 Bar attach to the Post use the 12 Sheet Metal Screws ANGLE SUPPORT Where Two Angle Support Bars attach to the Post use the 1 Sheet Metal Screw Where they attach to either the deck or the Bottom Support Channels use 17 Truss Head Sc

Download Pdf Manuals

image

Related Search

Related Contents

2014 年版 ブラジルにおける問題点と要望 1/51  Samsung UE22ES5400W  XWEB3000/5000 EVO (V.1.0)  評価事例PDFファイル  Initiation aux langages de commandes et `a la programmation sous  ORION_130T_PRO_TH_PRO_(tov_st_2015_2015)  ATORNILLADORA TALADRADORA RECARGABLE / AVVITATORE  Manuel d`instructions  citizenwatch.jp  Samsung CRF-114EF  

Copyright © All rights reserved.
Failed to retrieve file