1. e Treat the system with sodium hypochlorite to a level of 4 to 5 mg L ppm free chlorine residual at a pH of 7 0 to 7 6 The chlorine re sidual must be held at 4 to 5 mg L ppm for six hours measurable with standard commercial water test kits If the cooling tower has been in operation and then shut down for a duration of time and not drained perform one of the two previous biocidal treatment programs directly to the cooling water storage vessel cooling tower sump drain down tank etc without circulating stagnant water over the cooling tower fill or operating the cooling tower fan After biocidal pretreatment has been successfully completed cooling water may be circulated over the tower fill with the fan off 4 13 14 Operation When biocidal treatment has been maintained at a satisfactory level for at least six hours the fan may be turned on and the system returned to service Resume the standard water treatment program including biocidal treatment Tower Operation General The cold water temperature obtained from an operating cooling tower will vary with the following influences 1 Heat load With the fan in full operation if the heat load increases the cold water temperature will rise If the heat load reduces the cold water temperature will reduce Note that the number of degrees range through which the tower cools the water is established by the system heat load and the amount of water being
2. Marley AV Cooling Tower User Manual 98 1514E SPX COOLING TECHNOLOGIES Note A Warning A Caution Note Contents This manual contains vital information for the proper installation and operation of your cooling tower Carefully read the manual before installation or operation of the tower and follow all instructions Save this manual for future reference Tower LOC ation 4 Tower ea aai aa aa aada 5 Recing TOWO A A EARNE 5 Hoisting TOWE 5 Tower 6 Tower Stat 12 14 Wintertime Operation 16 Tower Cleaning Water Treatment and Blowdown 19 Belt TenSiOning 2 2 Geli 21 AlGHMOME isinyi sever ia N A 22 Schedule of Tower 23 Seasonal Shutdown amp aa 25 Prolonged teeters 26 Maintenance 27 Troubleshooting siseringi cette oaa iaa 28 Additional IMfOrmMation cevesasvecedesdevecenedeavieeadedaeveatszaisctas 30 The fol
3. Observe the action of the sheaves and belt s to be sure that the motor is properly aligned with the fan sheave If A Warning Caution Note Installation necessary correct the alignment See the Maintenance section for belt tensioning and sheave alignment page 22 Improper installation of the fan guard will destroy the structural in tegrity of the fan guard It is essential that the fan guard be installed in accordance with the Field Installation Manual shipped with the tower Do not force the fan cylinder out of round 3 Momentarily energize bump the motor and observe rotation of the fan The fan should rotate in a counterclockwise direction when viewed from below If rotation is backwards shut off the fan and reverse two of the three primary leads supplying power to the motor If tower is equipped with a two speed motor check for proper rota tion at both speeds Check also to see that starter is equipped with a 20 second time delay which prevents direct switching from high speed to low speed If the fan is intended to be reversed for deicing purposes make sure that the starter is equipped with a 2 minute time delay between changes of direction These delays will prevent abnormal stress from being applied to the mechanical equipment and the electrical circuit components 4 Run the motor and observe the operation of the mechanical equip ment Operation should be stable 5 After the first 30 minute run chec
4. Rebalance Cooling fan hitting end bell guard Reinstall or replace fan Motor Runs Hot Wrong voltage or unbalanced voltage Overload Check voltage and current of all three lines against nameplate values Check fan blade pitch See Fan Manual Check for drag in fan drive train as from damaged bearings Wrong motor RPM Check nameplate against power supply Check RPM of motor Bearings overgreased Remove grease reliefs Run motor up to speed to purge excessive grease Wrong lubricant in bearings Change to proper lubricant See motor manufacturer s instructions One phase open Stop motor and attempt to start it Motor will not start if single phased Check wiring controls and motor Dirty motor Clean motor Winding fault Check with Ohmmeter Bent motor shaft Straighten or replace shaft Insufficient grease Remove plugs and regrease bearings Too frequent starting or speed changes Limit cumulative acceleration time to a total of 30 seconds hr Set on off or speed change set points farther apart Consider installing a Marley VFD drive for fine temperature control Deterioration of grease or foreign material in grease Bearings damaged Flush bearings and relubricate Replace bearings Motor Does Not Come Up To Speed Wrong Rotation Motor Voltage too low at motor terminals because of line drop Check transformer and setting of taps Us
5. Set motor overload protection to 110 of motor nameplate amps This setting allows the fan motor to operate during cooler weather During cooler weather it is common for the motor to draw 6 to Note Installation 10 higher than nameplate amps High amps are common during tower commissioning when the tower is dry and the ambient air temperature is cool Do not start the motor more than six times per hour Short cycling the tower will cause fuses breakers or O L s to operate and will decrease motor life When using a two speed starter Motor rotation must be the same at slow speed and high speed Single winding motor requires a starter with a shorting contactor Two winding motor requires a starter with out a shorting contac tor All two speed starters must have a 20 second time delay relay when switching from high speed to low speed Do not start the motor more than six times per hour each low speed start and each high speed start count as one start When using a VFD Before beginning ensure that the motor is rated for Inverter Duty per NEMA MG 1 part 31 Set the VFD solid state overload protection to 119 of motor nameplate amps and set maximum current parameter in the VFD to motor nameplate amps Maximum current parameter will reduce fan speed and limit amp draw to nameplate amps during cold weather operation If furnished with a mechanical O L set this at 110 over motor nameplate amps Motor rotat
6. appearance sound and level of vi bration Abnormal aspects relating to the rotating equipment should be considered reason to shut down the tower until the problem can be located and corrected Observe operation of the motor sheaves belt and fan Become familiar with the normal operating temperature of the motor as well as the sight and sound of all components as a whole Inspect louvers drift eliminators and basin trash screens and remove any debris or scale which may have accumulated Replace any damaged 23 24 Maintenance or worn out components Use of high pressure water may damage the eliminator and louver material Observe operation of the float valve Depress the operating lever to make sure that the valve is operating freely Inspect the suction screen for plug ging Remove any debris that may have accumulated Check for any buildup of silt on the floor of the cold water basin Mentally make note of the amount if any so future inspections will enable you to determine the rate at which it is forming Every 3 months Lubricate fan shaft bearings While rotating equipment by hand grease the bearings until a bead forms around the seals a maximum charge of 0 55 ounces is recommended Chevron SRI 2 grease is recommended Every 6 months Check belt tension and condition Check makeup float valve seals replace as required If equipped with inlet flow control valve grease valve stem guide fully open and
7. center inlet flume as sembly to gain access to attach inlet fasteners Refer to the AV Field Installation Manual shipped with tower Marley flow control valve connection option The Marley flow control valve is designed to 1 take the place of a standard elbow normally required for inlet connection and 2 provide means of regu lating flow between individual cells Remove the center inlet flume assembly to gain access for attachment of valve Refer to the AV Field Installation Manual shipped with tower The valves provides a vertical face for attachment of your standard 125 flange 12 Wire motor in accordance with wiring diagram on motor nameplate Check motor connections and power supply voltage versus motor nameplate voltage Formaintenance safety purposes SPX Cooling recommends lockout type disconnect switch for all mechanical equipment In addition to a disconnect switch the motor should be wired to main power supply through short circuit protection and a magnetic starter with overload protection Motor Wiring Wire motor leads as shown on the motor nameplate matching the supply voltage Do not deviate from the motor nameplate wiring Either of following symbols be shown the motor nameplate A AA Y or YY These symbols represent how the motor is constructed on the inside and in no way have anything to do with a Delta or Wye electrical distribution system serving the motor When using a starter e
8. circulated in accordance with the following formula Heat Load Btu hr GPM x 500 or in Sl units Heat Load kilowatts Liters sec x 4 187 Range C The cooling tower establishes only the cold water temperature attain able under any operating circumstance Air wet bulb temperature Cold water temperature will also vary with the wet bulb temperature of the air entering the louvered faces of the tower Reduced wet bulb temperatures will result in colder water temperatures However the cold water temperature will not vary to the same extent as the wet bulb For example a 20 F 11 C reduction in wet bulb may result in only a 15 F 8 C reduction in cold water temperature Water flow rate Increasing the water flow rate GPM or L s will cause a slight elevation in cold water temperature while reducing the water flow rate will cause the cold water temperature to decrease slightly However at a given heat load see formula above water flow reduc tions also cause an increase in the incoming hot water temperature Use care to prevent the hot water from exceeding 125 F 52 C in Caution Operation order to prevent damage to the tower components 4 Air flow rate Reducing air flow through the tower causes the cold water temperature to rise This is the approved method by which to control leaving water temperature If your tower is equipped with a single speed motor the m
9. close return to original position and lock Clean and disinfect cooling tower with biocides Systems with biofoul ing high general bacterial counts or positive cultures of legionella may require additional cleaning Refer to Cooling Tower Cleaning section on page 19 Consult your water treatment expert as to prudent biological evaluation testing If basin silt level is significant drain the basin and clean it out Refer to Cooling Tower Cleaning section on page 19 Annually Relubricate motor Refer to motor manufacturer s recommenda tions Remove grease fill and relief plugs from front of motor and remove hardened grease with a wire or similar item Add grease until grease is forced out at relief hole Replace fill plug run to 1 hour and replace relief plug Check to see that all bolts are tight in the fan and mechanical equipment region including the fan cylinder and fan guard Use torque settings pre scribed in the fan manual Inspect the tower thoroughly making maximum use of instructions given in the separate service manuals Check structural bolted connections and tighten as required Make preventive maintenance repairs as necessary Maintenance Seasonal Shutdown Instructions When the system is to be shut down for an extended period of time it is recommended that the entire system cooling tower system piping heat exchangers etc be drained Leave the basin drains open During shutdown clean the tower s
10. load increases that normally occur with the replacement or addition of production equipment and still retain continuity with respect to your cooling tower system Tower rebuilding SPX Cooling Technologies routinely rebuilds and up grades cooling towers of all materials and manufacture If your tower ever reaches the limit of its service life we recommend that you investigate the cost of rebuilding before you routinely order a new replacement tower Each AV tower includes a document package containing general orientation drawings a Field Installation Manual and tower component user manuals These documents contain important information relating to safe installation and operation of the cooling tower Field installation is always required for piping inlets and piping outlets The fan guard on larger models an some optional accessories such as valves handrails ladders and safety cages may also require field installation If installation details are not covered in the Field Installation Manual a separate instal lation drawing for each purchased option is included in the document package If you have purchased an option and can t find the appropriate installation drawing contact your local Marley sales representative before proceeding For complete parts and service assistance contact the Marley sales rep resentative in your area If you need help locating the office nearest you please phone 800 462 7539 or check the internet at soxcoo
11. Condition and Operation x x Observe Operation of Mechanical motor fan and drive mechanism x x Makeup valve if equipped x x Inspect for unusual noise or vibration x x Inspect and Clean Air inlet x x PVC drift eliminators x x Distribution basin nozzles and collection basin x x Fan motor exterior x x Check Collection water basin level x x Blowdown adjust as required x x Belt drive Fan shaft bearing lubrication every 3 mo every 3 months every 3 months Check and tighten support fasteners x Check shaft sheave and belt alignment x Check belt tension and condition x x Check sheave bushing fastener torque x Fan Check and tighten blade and hub fasteners x Check fan blade pitch and tip clearance x Check fan cylinder for loose fasteners x Motor Lubricate grease as required R Check mounting bolts for tightness x Operate at least 3 hours a month 3 hours a month hours a month Basin Heater if equipped Check for proper operation of temp low water level sensor x Inspect clean buildup of contaminant from sensor x x Structure Inspect tighten all fasteners x x Inspect and touch up all metal surfaces x R Refer to Component User Manual Note It is recommended at least weekly that the general operation and condition be observed Pay attention to any changes in sound or vibration that may signi
12. Schedule of Tower Maintenance Some maintenance procedures may require maintenance personnel to enter the tower Each cased face of the tower has a door for access to the interior of the tower All AV Series have a 30 wide by 42 high door opening The purchaser or owner is responsible for providing a safe method for entering or exiting the access door Protective clothing to avoid cuts from sheet metal should be worn Wet sheet metal an or dirt can be slippery Nonslip sole shoes should also be worn Included with this instruction packet are separate User Manuals on each major operating component of the tower and it is recommended that you read them thoroughly Where discrepancies may exist the separate User Manuals will take precedence The following is recommended as a minimum routine of scheduled main tenance Always shut off electrical power to the tower fan motor prior to performing any inspections that may involve physical contact with the mechanical or electrical equipment in or on the tower Lock out and tag out any electrical switches to prevent others from turning the power back on Service personnel must wear proper personal protective clothing and equipment Weekly Inspect for bacterial growth and general operation conditions Bacterial growth should be reported to your water treatment expert for immediate attention Monthly Weekly at start up Observe touch and listen to the tower Become accustomed to its normal
13. ake sure that cold water suction screens are clear and properly installed 3 Fill the water system to an approximate depth of 714 192 mm in the depressed area of the cold water basin at the air inlet side of the tower This is the recommended operating water level Adjust the float valve so that it is 75 open at that level Continue filling the system until the water reaches a level approximately 1 4 3 mm below the lip of the overflow If tower is equipped with a standard suction connection vent ac cumulated air from the top of the suction hood by removing one or both tap screws provided at that location Replace these tap screws when venting is complete 4 Completely open hot water flow control valve s Start your pump s and observe system operation Since the water system external to the tower will have been filled only to the level achieved in the cold water basin a certain amount of pump down of the basin water level will occur before water completes the circuit and begins to fall from the fill The amount of initial pbump down may be insufficient to cause the float valve to open However you can check its operation by pressing down on the operating lever to which the stem of the float valve is attached Some trial and error adjustment of the float valve may be required to Operation balance the makeup water with tower operation Ideally the float valve setting will be such that no water is wasted through the o
14. as required Do not start motor before determining that there will be no interfer ence with free rotation of the fan drive The motor should be operated for three hours at least once a month This serves to dry out windings and re lubricate bearing surfaces refer to Marley Electric Motor User Manual 92 1475 At start of new operating season make sure bearings are adequately 25 26 Maintenance lubricated before returning motor to service Prolonged Shutdown If shutdown period is longer than seasonal contact your Marley sales representative for additional information SPX Cooling Technologies Services Our interest in your AV Series cooling tower does not end with the sale Having conceived designed and manufactured the most reliable and longest lasting cooling tower of its class we want to make sure that you gain the maximum possible benefit from its purchase Therefore the following services are available which are intended to as sure the maximum possible service life under your operating conditions tailor the operating characteristics to your specific needs and maintain consistently optimum thermal performance capability They are available by contacting your Marley sales representative Replacement parts With the exception of the motor drive system and float valve every standard component of your tower is designed and manu factured by SPX Cooling Technologies We do this because commercially available
15. ate mixing Belt Tensioning The belts are adjusted by turning the jacking screw at the motor support Ideal tension is the lowest tension at which the belt will not slip under peak load conditions Check tension frequently during the first 24 48 hours of run in operation Overtensioning shortens belt and bearing life Keep belts free from foreign material which may cause slip Never apply belt dressing as this will damage the belt and cause early failure A Dodge V Belt Tension Tester is an alternate method for tensioning V belts Check with you local belt supplier 21 22 Maintenance Sheave Alignment e The motor sheave is to be positioned as close as possible to the motor in order to minimize torque on the motor bushings The motor and fan sheaves may have grooves that not used The bottom surface of the motor and fan sheaves must be aligned within Ya of each other and level within 12 12 in order to not adversely affect belt and sheave life e Alignment can be achieved by placing a straight edge across the top of the sheaves making sure that it is level and measuring down to the bottom surface of both sheaves at four points e The belt is to be located in the lowest set of grooves Bushing Fastener Size SH 4 20 SDS 74 20 SD 4 20 e 18 16 13 Ae 12 Bushing Fastener Torque Values A Warning Maintenance
16. components have not proved capable of withstanding the harsh environment of a cooling tower nor do they contribute their share to the thermal capability and operating characteristics intended Acomplete stock of all parts and components is maintained at one or more of the various Marley plants In cases of emergency they can normally be shipped within 24 hours by air freight if necessary However you would obviously benefit from anticipating your need in advance thus avoiding the cost of special handling Be sure to include your tower serial number from the tower nameplate when ordering parts Periodic maintenance You may wish to contract with SPX Cooling for regularly scheduled visits for the purpose of inspecting and reporting your tower s condition to make recommendations intended to prevent emer gencies and to perform maintenance considered outside the norm This service is not intended to replace the important function performed by your maintenance staff Their attention assures the tower s routine operating performance and is invaluable However we recognize that the unusual manner in which a cooling tower performs its function as well as the unique forces which act upon it may be considerations which occasionally require the services of an expert technician Maintenance Schedule Maintenance Service Monthly Semi annually Seasonal Startup or Annually Inspect General
17. d beams and from the top of the bottom module before hoisting into place Remove paper backing form sealer strips around top perimeter of bottom module Place top module on the top peripheral bearing surface factory installed gasket of bottom module aligning mating holes as it is set in place Attach top module to bottom module with fasteners provided according to Field Installation Manual instructions If tower purchased is one cell only ignore steps 4 through 8 4 If collection basins to be equalized by the use of Marley standard flumes unbolt the temporary coverplate from the basin of the cell just installed The coverplate is located on the basin side 5 Unbolt temporary coverplate from the basin of the 2nd cell and set 2nd cell or bottom module of 2nd cell in place Align anchor bolt holes and flume openings in basin sides 6 Install flume according to Field Installation Manual instructions Note Caution Caution Installation It is important that the cells be firmly anchored and aligned before the flume is attached to the 2nd cell Repeat steps 2 and 3 for 2nd top section on AV63000 thru AV67000 models Repeat steps 4 through 7 for any remaining cells Attach your cold water supply piping to the cold water basin outlet connection in accordance with drawing instructions and utilizing gaskets provided by Marley Donot supportyour pipe from the tower or outlet connection s
18. e higher voltage on transformer terminals or reduce loads Increase wire size or reduce inertia Broken Rotor bars Wrong sequence of phases Look for cracks near the rings A new rotor may be required Have motor service person check motor Switch any two of the three motor leads 28 Troubleshooting Trouble Cause Remedy Loose bolts and cap screws Tighten all bolts and cap screws on all mechanical equipment and supports Make certain all blades are as far from center of fan as safety Fan devices permit All blades must be pitched the same See Unusual Fan Drive Fan User Manual Clean off deposit build up on blades Vibration Worn fan shaft bearings Check fan shaft endplay Replace bearings as necessary Unbalanced motor Disconnect load and operate motor If motor still vibrates rebalance rotor Blade rubbing inside of fan cylinder Adjust cylinder to provide blade tip clearance Fan Noise Loose bolts in blade clamps Check and tighten if necessary Fan shaft bearings Grease bearings Scale or foreign substance in circulating water system Insufficient blowdown See Water Treatment section of this manual Water treatment deficiency Consult competent water treating specialist See Water Treatment section of this manual Cold Water Temperature Too Warm See Tower Operation Entering wet bulb temp is above design Check to see if local heat sources are a
19. ee Warning page 20 and make any necessary repairs Pay particular attention to mechanical equipment Following each year s shutdown and cleaning inspect the tower s metal surfaces for evidence of the need to apply a protective coating Do not misinterpret grime transient rust from the piping system as a need to have the tower painted If relatively bright metal can be exposed by cleaning consider that the galvanizing has remained effective Unless there is evidence of a generalized failure of the galvanizing localized touch up should be all that is required To the extent that the galvanizing zinc coating still exists paint will not adhere to it readily Contact the manufacturer of the coating you intend to use for instructions Tower framework Check structural bolted connections and tighten as required Fans Check fan assembly bolting and tighten as required Use torque settings prescribed in the fan manual Fiberglass Components Check all fiberglass parts for exposed glass fibers If found the affected surfaces should be recoated using a two part polyamide epoxy primer to promote adhesion and a two part acrylic polyurethane enamel for the topcoat Fan shaft bearings Lubricate fan shaft bearings at close of each operat ing season see page 24 Electric motors Clean and lubricate motor at close of each operating season refer to motor manufacturer s recommendations Check motor anchor bolts and tighten
20. eezing weather Towers must not be operated with reduced water rate and or no heat load during freezing weather If the circulating water system cannot be shut down water returning from the process should be made to bypass the tower If a bypass is used all water must be bypassed without modulation If the water bypass is directly into the tower s cold water basin its design must be approved by SPX Cooling engineers Intermittent Wintertime Operation If periods of shutdown nights weekends etc occur during freezing weather measures must be taken to prevent the water in the cold wa ter basin and all exposed pipework from freezing Several methods are used to combat this including Marley automatic basin heater sys tems Unless some means of freeze prevention is incorporated into your system the tower basin and exposed pipework should be drained at the beginning of each wintertime shutdown period If tower basin is drained verify that all basin heaters have been shut off either by automatic cutoff or disconnect switch It is recommended that you discuss your freeze prevention options with your local Marley sales representative Warning Operation Tower Cleaning Water Treatment and Blowdown Maintaining Water Quality The steel used in AV Series towers has been galvanized with a heavy zinc coating averaging 2 0 mils in thickness AV Series towers are also available in stainless steel which is even more corrosion re
21. ff the water flow will increase in the vicinity of the louvers and reduce the ice buildup 3 Under extended extreme cold conditions it may be necessary to op erate the fan in reverse This forces warm air out through the louvers melting any accumulated adequate heat load must be available Reversal may be at either full or half soeed however SPX Cooling recommends reversal at half speed Reverse operation of the fan should be used sparingly and should only be used to control ice not to prevent it Reverse fan operation should not need to exceed 1 or 2 minutes Monitoring is required to determine the time required to melt accumulated ice Reverse operation of fans for prolonged periods during subfreezing weather can cause severe damage to fans and fan cylinders Ice can accumulate inside fan cylinders at fan blade plane of rotation and fan blade tips will eventually strike this ring of ice damaging the fan blades or cylinder Ice can also accumulate on fan blades and be thrown off damaging fan cylinder or blades Allow a minimum of 10 minute delay between reverse operation and forward operation dur ing subfreezing weather to permit ice to dissipate from fan blades and fan cylinders See Caution note on page 11 for fan speed change and reversing precautions 17 Caution A Warning 18 Operation 4 With no heat load on the circulating water icing cannot be controlled effectively by air control during fr
22. ffecting tower See if surrounding structures are causing recirculation of tower discharge air Discuss remedy with Marley representative Design wet bulb temp was too low May have to increase tower size Discuss remedy with Marley representative Actual process load greater than design May have to increase tower size Discuss remedy with Marley representative Overpumping Tower starved for air Reduce water flow rate over tower to design conditions Check motor current and voltage to be sure of correct contract horsepower Re pitch fan blades if necessary Clean louvers fill and eliminators Check to see if nearby structures or enclosing walls are obstructing normal airflow to tower Discuss remedy with Marley representative Excessive Drift Exiting Tower Distribution basins overflowing Reduce water flow rate over tower to design conditions Be sure hot water basin nozzles are in place and not plugged Faulty drift elimination Check to see that integral fill louvers and eliminators are clean free of debris and installed correctly If drift eliminators are separate from fill make sure they are correctly installed in place Clean if necessary Replace damaged or worn out components 29 30 Additional Information Increased load requirements AV Series towers are designed such that cells of either equal or unequal capacity can be added in the future This allows you to compensate for the
23. fy a need for closer inspection 27 Troubleshooting Trouble Cause Remedy Motor Will Not Start Power not available at motor terminals Check power at starter Correct any bad connections between the control apparatus and the motor Check starter contacts and control circuit Reset overloads close contacts reset tripped switches or replace failed control switches eee If power is not on all leads at starter make sure overload and short circuit devices are in proper condition Wrong connections Check motor and control connections against wiring diagrams Low voltage Check nameplate voltage against power supply Check voltage at motor terminals Open circuit in motor winding Check stator windings for open circuits Motor or fan drive stuck Disconnect motor from load and check motor and Geareducer for cause of problem Rotor defectve Look for broken bars or rings Unusual Motor Noise Motor running single phase Stop motor and attempt to start it Motor will not start if single phased Check wiring controls and motor Motor leads connected incorrectly Check motor connections against wiring diagram on motor Bad bearings Check lubrication Replace bad bearings Electrical unbalance Check voltages and currents of all three lines Correct if required Air gap not uniform Check and correct bracket fits or bearing Rotor unbalance
24. ion must be the same in both VFD mode and By pass mode If cable distance between the VFD and motor is greater than 100 feet a DV DT output filter is recommended to avoid damage to the motor 100 feet distance is based on our field experience the VFD manufacture may state different distances and distance does vary depending on the VFD manufacture Program the VFD for variable torque output Flux vector and con stant torque modes may damage the gearbox Do not start and stop the motor using the safety switch at the motor If the drive is being commanded to run and the load side is cycled ON and OFF with the safety switch this may damage the VFD Using a VFD in cooling applications has advantages over traditional single or two speed motor control A VFD can reduce the cost of electrical en 9 Warning A Warning Warning 10 Installation ergy being used and provide better temperature control In addition it reduces the mechanical and electrical stress on the motor and mechanical equipment Electrical savings can be large during periods of low ambient temperature when the cooling requirement can be satisfied at reduced speeds To benefit from these advantages it is important that the drive be installed correctly Marley supplies VFD and VFD controls specifically designed for our cooling products If you have purchased a Marley VFD and or controls package please follow the instructions in the User Manual for that s
25. ished by blowdown which is the constant discharge of a portion of Number of Concentrations 2 5X 3 0X 4 0X 5 F 2 78 C 25 18 11 10 5 56 51 38 25 15 F 8 33 C 2 38 1 18 78 58 38 20 11 11 3 18 1 58 1 05 78 51 25 F 13 89 C 3 98 1 98 1 32 98 64 Cooling Range Multipliers are based on drift of 0 02 of the circulating water rate the circulating water to waste As arule acceptable levels on which to base atreatment schedule will be in the range of 2 4 concentrations The following table shows the minimum amount of blowdown percent of flow required to maintain different concentrations with various cooling ranges Range Difference between hot water temperature coming to tower and cold water temperature leaving tower EXAMPLE 700 GPM 44 2 L s circulating rate 18 F 10 C cooling range To maintain 4 concentrations the required blowdown is 0 458 or 00458 times 700 GPM 44 2 L s which is 3 2 GPM 0 2 L s If tower is operated at 4 concentrations circulating water will contain four times as much dissolved solid as the makeup water assuming none of the solids form scale or are otherwise removed from the system When water treatment chemicals are added they should not be in troduced into the circulating water system via the cold water basin of the cooling tower Water velocities are lowest at that point which results in inadequ
26. k motor AMPS and voltage with full water and heat load Repitch fan if necessary correct for low ambi ent temperatures Refer to motor manual 6 After 10 to 60 hours of operation check the torque on the fan and motor sheave bushings and check belt tension Refer to the Main tenance section of this manual for torque values and belt tensioning instructions page 22 If the water supply system is not being operated or if there is no heat load on the system motor amps read at this time may indicate an apparent overload of as much as 10 20 This is because of the increased density of unheated air flowing through the fan Determi nation of an accurate motor load should await the application of the design heat load 11 Warning Note 12 Operation Tower Start Up Among other sources outbreaks of Legionnaires Disease have reportedly been traced to cooling towers Maintenance and water treatment procedures that prevent amplification and dissemination of Legionella and other airborne bacteria should be formulated and implemented BEFORE systems are operated and continued regularly thereafter to avoid the risk of sickness or death Water System 1 New installations should be cleaned and treated with biocides by a water treatment expert before startup 2 Remove any and all accumulated debris from tower Pay particular attention to inside areas of cold water basin hot water basins louvers and drift eliminators M
27. l the tower in one con tinuous operation Single cell towers ship on one truck Multicell towers depending on their size may require more than one truck Responsibility for the condition of the tower upon its arrival belongs to the trucker as does the coordination of multiple shipments if required Receiving Tower Prior to unloading the tower from the delivering carrier inspect the ship ment for evidence of damage in transit If damage is apparent note the freight bill accordingly This will be needed to support any future recovery claim Find and remove the installation instruction drawings and bills of material literature kit located in a plastic bag in the cold water basin This informa tion should be kept for future reference and maintenance purposes Hoisting Tower AV6300 through AV6700 models consist of two modules per cell The upper module includes hoisting clips at the top of the module The hoisting clips on the lower module are located near the bottom on the ends of the cold water basin All other models ship in a single module The hoisting clips for the single height models AV6100 and AV6200 are located at the top of the tower A Hoisting Installation label is located on the side casing near the access door and on a drawing in the literature kit Remove tower from the carrier and hoist into place according to the instructions on the label or on the drawing Hoisting clips are provided for ease of unloading and po
28. le corrosion and biological growth and should be used prudently Also combinations of chemicals may cause reactions which reduce treatment effective ness and certain chemicals such as surfactants biodispersants and antifoams may increase drift rate Unless you purchased a stainless steel AV Series the structure of your AV Series consists primarily of galvanized steel therefore your water treatment program must be compatible with zinc In working with your water treatment supplier it is important that you recognize the potential effects on zinc of the specific treatment program you choose 19 A Warning 20 Maintenance Cooling Tower Cleaning Any evaporative type cooling tower must be thoroughly cleaned on a regular basis to minimize the growth of bacteria including Legio nella Pneumophila to avoid the risk of sickness or death Service personnel must wear proper personal protective equipment during decontamination Do NOT attempt any service unless the fan motor is locked out Operators of evaporative cooling equipment such as water cooling tow ers should follow maintenance programs which will reduce to an abso lute minimum the opportunity for bacteriological contamination Public Health Service officials have recommended that good housekeeping procedures be followed such as regular inspections for concentrations of dirt scale and algae periodic flushing and cleaning and the following of a complete water
29. ling com 15 Note Caution 16 Operation Wintertime Operation The Marley fill system used in the AV Series cooling tower has air entrance louvers that are molded integrally as part of the fill This feature makes these towers very forgiving of cold weather operation even at the low temperature and reduced load conditions encountered in free cooling and other low temperature applications Nevertheless during operation in subfreezing weather the opportunity exists for ice to form in the colder regions of the tower Slushy transitory ice forms routinely in the colder regions of the fill of low temperature towers and is visible through the tower louvers Such ice normally has no adverse effect on tower operation but its appearance should be a signal to the operator to undertake ice control procedures It is the operator s responsibility to prevent the formation of destruc tive hard ice on the cooling tower fill Certain guidelines should be followed 1 Do not allow the tower s leaving water temperature to drop below a minimum allowable level say 36 F to 40 F 2 C to 4 5 C If such low temperature operation is necessary or beneficial to your process establish the minimum allowable level as follows During the coldest days of the first winter of operation observe whether any ice is forming on the louver face particularly near the bottom part of the louver face If hard ice is present on the louvers you mus
30. ling com SP COOLING TECHNOLOGIES 7401 WEST 129 STREET OVERLAND PARK KANSAS 66213 UNITED STATES 913 6647400 spxcooling spx com spxcooling com In the interest of technological progress all products are subject to design and or material change without notice 2008 SPX Cooling Technologies Inc Printed in USA Manual 98 1514E
31. lowing defined terms are used throughout this manual to bring at tention to the presence of hazards of various risk levels or to important information concerning the life of the product Indicates presence of a hazard which can cause severe personal injury death or substantial property damage if ignored Indicates presence of a hazard which will or can cause personal injury or property damage if ignored Indicates special instructions on installation operation or maintenance which are important but not related to personal injury hazards Warning Note Preparation The Marley AV Series cooling tower purchased for this installation repre sents the current state of the art in crossflow induced draft cooling tower design Thermally and operationally it is the most efficient cooling tower of its class These instructions as well as those offered separately on motors fans float valves etc are intended to assure that the tower serves you prop erly for the maximum possible time Since product warrantability may well depend upon your actions please read these instructions thoroughly prior to operation If you have questions about the operation and or maintenance of this tower and you don t find the answers in this manual please contact your Marley sales representative When writing for information or when order ing parts please mention tower serial number shown on the nameplate located on the access door Safet
32. otor may be shut off when the water temperature becomes too cold This will cause the water temperature to rise When the water temperature then becomes too warm for your process the motor can be restarted When operating in this mode care must be taken not to exceed a total acceleration time of 30 seconds per hour Fan cycling limits From a dead stop determine the number of sec onds it takes the fan to arrive at full speed Divide this number into 30 to determine the allowable number of starts per hour Considering the normal fan and motor sizes utilized on AV Series towers anticipate that approximately 4 to 5 starts per hour are allowable If yourtower is equipped with atwo speed motor you will enjoy greater opportunity for temperature control When the water temperature becomes too cold switching the fan to half speed will cause the cold water temperature to rise stabilizing at a temperature a few degrees higher than before With a further reduction in water temperature the fan may be cycled alternately from half speed to off subject to the same constraint of 30 seconds of allowable acceleration time per hour as outlined above If your tower consists of two or more cells cycling of motors may be shared between cells increasing your steps of operation accordingly For greater insight on cold water temperature control please read Cooling Tower Energy and its Management Marley Technical Report H 001 A available at spxcool
33. sistant than galvanized steel in certain environments Other materials used PVC fill drift eliminators and louvers aluminum fans etc are selected to offer maximum service life in normal cooling tower environment defined as follows Circulating water with a pH between 6 5 and 8 achloride content as NaCl below 500 ppm a sulfate content SO4 below 250 ppm total alkalinity as CaCO3 below 500 ppm calcium hardness as above 50 ppm a maximum inlet water temperature not to exceed 125 F 51 7 C no significant contamination with unusual chemicals or foreign substances and adequate water treatment to minimize scaling e Startup Conditions The water conditions during the initial tower opera tion are crucial in preventing premature corrosion of galvanized steel white rust For at least the first eight weeks of operation should be controlled between 6 5 and 8 0 with hardness and alkalinity levels between 100 and 300 ppm expressed as CaCO e Chlorine if used shall be added intermittently with a free residual not to exceed 1 ppm maintained for short periods Excessive chlorine levels may deteriorate sealants and other materials of construction e Anatmosphere surrounding the tower no worse than moderate indus trial where rainfall and fog are no more than slightly acid and they do not contain significant chlorides or hydrogen sulfide H2S e Many proprietary chemicals exist for control of sca
34. sitioning tower For overhead lifts or where additional safety is required safety slings should also be placed under the tower Under no circumstances should you combine the top and bottom modules of AV6300 through AV6700 models and attempt to hoist them at the same time by utiliz ing the hoisting clips alone Note Note Note Installation Tower Installation These installation instructions are intended to help you prepare before your tower arrives If discrepancies exist between these instructions and those shipped with the tower the instructions shipped with the tower will govern 1 Prior to placement of the tower confirm that the supporting platform is level and that the anchor bolt holes are correctly located in accor dance with Marley drawings 2 Place tower or bottom module of AV6300 through AV6700 on your prepared supports aligning anchor bolt holes with those in your sup porting steel Make sure that the orientation agrees with your intended piping arrangement Attach tower to supporting steel with four 1 2 13 mm diameter bolts and flat washers by others Position flat washers between the bolt head and the tower basin flange Remove the sheet metal fill protector shields from the bottom of the top module before setting in place 3 AV6300 through AV6700 models only Remove shipping guards from bottom of top module AV6500 thru AV6700 Clean any debris from the underside of the top module fill skid an
35. t increase the allowable cold water temperature If the coldest possible water is beneficial to your process ice of a mushy consistency can be tolerated but routine periodic observation is advisable If the minimum allowable cold water temperature is established at or near minimum heat load it should be safe for all operating condi tions Having established the minimum allowable cold water temperature main taining that temperature can be accomplished by fan manipulation as outlined in Item 4 under Tower Operation However in towers of more than one cell where fans are manipulated sequentially please realize that the water temperature will be significantly lower in the cell or cells operating at the highest fan speed than the net cold water temperature Warning Operation produced by the entire tower would indicate Wintertime operation of multicell towers at low cold water temperature levels requires that the operator be especially watchful 2 As cold air enters the louvers it causes the water flowing over the fill to be drawn inward toward the center of the tower Thus under fan operation the louvers and lower periphery of the tower structure remain partly dry seeing only random splashing from within the tower plus normal atmospheric moisture from the entering air Such lightly wetted areas are most subject to freezing Therefore if excessive ice forms on the louvers stop the fan for a few minutes With the fan o
36. tform with ladder and handrail ladder extensions for distribution basin platform ladders used where the base of the tower is elevated safety cages for distribution basin platform ladders mechanical equipment access platform and ladder fan cylinder extensions flow control valve Tower Location Space available around the tower should be as generous as possible to promote ease of maintenance and to permit freedom of airflow into and through the tower If you have questions about the adequacy of the avail able space and the intended configuration of the tower please contact your Marley sales representative for guidance Prepare a stable level support foundation for the tower utilizing weight wind load and dimensional information appearing on appropriate Marley submittal drawings Supports must be level to insure proper operation of the tower The cooling tower must be located at such distance and direction to avoid the possibility of contaminated tower discharge air being drawn into building fresh air intake ducts The purchaser should obtain the services of a Licensed Professional Engineer or Registered Architect to certify that the location of the tower is in compliance with appli cable air pollution fire and clean air codes A Warning Receiving and Hoisting Tower Shipment Unless otherwise specified AV Series towers ship by truck on flat bed trailers which lets you receive hoist and instal
37. treatment program including biocidal treatment See Tower Startup instructions on page 12 The visual inspection should take place at least once a week during the operating season The periodic flushing and cleaning should be done be fore and after each cooling season but in any event at least twice a year The louvers drift eliminators and easily accessible fill surfaces should be flushed by use of a moderate pressure water nozzle being careful not to cause physical damage A reliable water treatment program should be installed and maintained Filtration devices may be employed to reduce the suspended solids concentrations thus increasing the effectiveness of the water treatment program See Tower Startup instructions on page 12 Blowdown A cooling tower cools water by continuously causing a portion of it to evaporate Although the water lost by evaporation is replenished by the makeup system it exits the tower as pure water leaving behind its burden of dissolved solids to concentrate in the remaining water Given no means of control this increasing concentration of contaminants can reach a very high level In order to achieve water quality which is acceptable to the cooling tower as well as the remainder of your circulating water system the selected water treatment company must work from a relatively constant level of Note Maintenance concentrations This stabilization of contaminant concentrations is usually accompl
38. upport it externally 10 11 Normally one of the following three outlet arrangements is provid ed Cased face or air inlet face suction connection This is a factory installed galvanized pipe nipple extending horizontally from the side or end of the cold water basin It is both beveled for welding and grooved for a mechanical coupling If a weld connection is used it is recommended that the weld area be protected against corrosion Cold galvanizing is suggested applied according to the manufacturer s instructions Bottom outlet connection This is a factory installed screened cir cular opening in the cold water basin floor of one or more cells An appropriately sized circular opening has been drilled to accept a 125 ANSI B16 1 flat face flange connection Attach makeup water supply piping to the float valve connection located at the air inlet face of the tower If you wish to pipe overflow and drain water to a remote discharge point make those connections at this time Attach your warm water return piping to the inlet connections of the tower Do not support your pipe from the tower or inlet connection support it externally Warning Installation Normally one of the following two inlet arrangements is provided Standard distribution basin connections There is acircular opening in the top deck of the tower near the air inlet face drilled to accept standard 125 flat face flange Remove the
39. verflow at pump shutdown However the water level after pump start up must be deep enough to assure positive pump suction 5 If a tower installation is equipped with flow control valves adjust them to equalize hot water depth in the distribution basins after reaching design water flow rate Each basin should have from 2 to 5 70 mm to 140 mm water depth with uniform depth from basin to basin Fix valves in this position when depth is correct If the tower is a single cell installation this step is not necessary Uniform distribution depth of 2 to 5 70 mm to 140 mm is essential to efficient tower operation Contact your Marley sales representative if you are considering a permanent change in circulating water flow rate that would prevent operation within these limits 6 Continue pump operation for about 15 minutes after which it is rec ommended that the water system be drained flushed and refilled 7 While operating the condensing water pump s and prior to operat ing the cooling tower fan execute one of the two alternative biocidal treatment programs described in the following e Resume treatment with the biocide which had been used prior to shutdown Utilize the services of the water treatment supplier Maintain the maximum recommended biocide residual for the specific biocide for a sufficient period of time residual and time will vary with the biocide to bring the system under good biological control or
40. y First The location and orientation of the cooling tower can affect the safety of those responsible for installing operating or maintaining the tower How ever since SPX Cooling Technologies does not determine the location or orientation of the tower we cannot be responsible for addressing those safety issues that are affected by the tower s location or orientation The following safety issues should be considered by those responsible for designing the tower installation e access to and from maintenance access doors thepossible need for ladders either portable or permanent to gain access to the distribution basin or maintenance access doors e the possible need for distribution basin platforms e potential access problems due to obstructions surrounding the tower e lockout of mechanical equipment e the possible need for safety cages around ladders e the need to avoid exposing maintenance personnel to the poten tially unsafe environment inside the tower It is not intended nor assumed that access to the fan deck is needed or necessary Note A Warning Preparation Those are only some of the safety issues that may arise in the design process SPX strongly recommends that you consult a safety engineer to be sure that all safety considerations have been addressed Several options are available that may assist you in addressing some of these personnel safety concerns including distribution basin access pla
41. ystem Most VFD problems can be avoided by purchasing the Marley drive system If you are installing a VFD other than the Marley drive please refer to that drives installation manual Improper use of a VFD may cause damage to equipment or personal injury Failure to correctly install the VFD drive will automatically void all warranties associated with the motor and any equipment that is either electrically or mechanically directly attached to the VFD drive system The length of this warranty avoidance will be contingent on properly installing the VFD system and repairing any damage that may have occurred during its operation SPX Cooling Technologies does not assume responsibility for any technical support or damages for problems associate with non Marley brand VFD systems Changing the operational fan speed from the factory settings could cause the fan to operate in an unstable region which may result in damage to the equipment and possible injury Mechanical Equipment Always shut off electrical power to the tower fan motor prior to performing any maintenance on the tower Any electrical switches should be locked out and tagged out to prevent others from turning the power back on 1 Install AV61000 and AV62000 fan guard according to the installation drawing shipped with the tower The fan guard on other models is factory installed 2 Spin the fan manually to assure that all fan blades properly clear the inside of the fan cylinder

Download Pdf Manuals

image

Related Search

Related Contents

Benutzerhandbuch  Ultrasound System Service Manual  Philips InstantCare Pressurised steam generator GC7530/02  0307mu4040CE-0 4140OEM BINARY PROTOCOL FOR 1 LOAD  Mode d`emploi Octagon 100&250  Model - DSD32R 32 channel REALTIME DVR    

Copyright © All rights reserved.
Failed to retrieve file