Home
        Remeha Avanta Plus P420 Assembly Instructions
         Contents
1.     Position the front side panels with the bushes pointing to opposite side to the hinges on the door of the combustion chamber   the front of the boiler     OFx to the front on the lower casing brackets using 2 screws  HM5x25   serrated washers     25          Position the rear side panels with the bushes pointing to  the rear of the boiler     Insulation width  boiler body    Boiler  Front   Rear   P 420 8 520 RB2   930 MP3    P 420 9 520 RB2   480 MP4   610 MP5    P 420 10 520 RB2   480 MP4   770 MP2    P 420 11 520 RB2   480 MP4   930 MP3    P 420 12 520 RB2   480 MP4   480 MP4   610 MP5   P 420 13 520 RB2   480 MP4   480 MP4   770 MP2   P 420 14 520 RB2   480 MP4   480 MP4   930 MP3               8229N041A  Bo     gt  Position the remaining side panels in the order shown in the  diagram  position each panel in the lower casing supports and  hook it into the cable way     2 P 420 02 04 08   300016854 001 A    26         Position the front and rear covers in the order shown in the  diagram     The intermediate and rear covers are narrower than the front  cover       Affix the first intermediate cover  length 480  to the cable ways  using 4 screws HM5x25   serrated washers         Affix the remaining covers to the cable ways using 2 screws  HM5x25   serrated washers        8229N042A    Boiler type Puce Length of the intermediate cover pee Pack no    P 420 8 480  RB 1  480 490 MP3   P 420 9 480  RB 1  480 480 170 MP4 MP5  P 420 10 480  RB 1 480 480 330 MP2 MP4  P 420 11 480
2.    Remeha    P 420       F2    Assembly  Instructions       300016854 001 A       63193    1 Package list    Package list   Before starting to assemble the boiler  refer to the table below to check if you have received all the packages required     1  Boiler body   Accessories      Boilers supplied with an assembled body    Number of sections 8 9 10 11 12 13 14    Assembled boiler body    contents depend upon model  1 1 1 1 1 1 1    m  For boiler supplied with the boiler body in bulk    Number of sections 8 9 10 11 12 13 14  Front section 1 1 1 1 1 1 1  Special intermediate section 1 1 1 1 1 1 1  Normal intermediate section 5 6 7 8 9 10 11  Rear section 1 1 1 1 1 1 1  Common accessories 1 Package CS 20 CS 20 CS 20 CS 20 CS 20 CS 20 CS 20  Lower insulation  boiler body 1 Package CS 51 CS 53 CS 53 CS 55 CS 55 CS 57 CS 57    Base frame   dimensions depend upon  model    2  Baffle plates    Number of sections 8 9 10 11 12 13 14  Baffle plates 1 Package CS 30 CS 31 CS 31 CS 32 CS 32 CS 33 CS 33  3  Casing   Number of sections 8 9 10 11 12 13 14   Casing  common parts  Package RB2 1 1 1 1 1 1 1   Casing  variable parts Package MP2     1     1    Package MP3 1     1     1  Package MP4   1 1 1 2 2 2  Package MP5   1     1    4  Cable channel    Number of sections 8 9 10 11 12 13 14  Cable channel 1 Package CS 41 CS 42 CS 43 CS 44 CS 45 CS 46 CS 47    5  Control panel RC 1    6  Technical documents    Number of sections 8 9 10 11 12 13 14    Technical documents     Content depends upo
3.   RB 1  480 480 490 MP3 MP4  P 420 12 480  RB 1  480 480 480 170 MP5 MP4  P 420 13 480  RB 1  480 480 480 330 MP2 MP4  P 420 14 480  RB 1  480 480 480 490 MP3 MP4    02 04 08   300016854 001 A P 420        27 Assembly of the rear panels Package RB2                              K AZ       FETT LA    LR    NI O    Hook the lower rear panel 1  to the 2 bushes on the side panels        8229N054       2  Put in place the 2 self tapping screws    3 9 x 12 7   serrated washers without tightening them        Hook the left and right upper rear panels to the 2 bushes on the side panels and secure each one to the lower rear panel using 2 self   tapping screws    3 9x12 7   serrated washers     O Fix to the rear top panel  2 self tapping screws    3 9x12 7   serrated washers    5  Hook the additional lower rear panel onto the 2 screws on panel 1  and tighten these 2 screws to secure the panel QO to Q     On the lower rear panel  2 screws   Serrated washers      28 Mounting of the front casing panels         8229EN043  8229EN039    1  Affix the lower front panel to the cross bar  2 screws    3 94x12 7    serrated washers      2  Position the lower cross bar and affix to the side panels using 2  self tapping screws    3 94x12 7   serrated washers        Position the panel for combustion chamber door and secure  using 2 screws HM12x25   flat washers       2   P 420 02 04 08   300016854 001 A       8229EN040       1  Hook the lower left and right front panels to the bush on the side panel   
4.  1  P 420 9 1 1 6 1  P 420 10 1 1 7 1  P 420 11 1 1 8 1  P 420 12 1 1 9 1  P 420 13 1 1 10 1  P 420 14 1 1 11 1          P 420 02 04 08   300016854 001 A    Assembly of the base frame  delivered unassembled    1          M001233          M001234    P 420    02 04 08   300016854 001 A    2 Fitting the brackets       Q Front      Rear   P 420 9   P 420 11   P 420 13     P 420 8   P 420 10   P 420 12   P 420 14    gt   Fitthe 2 rear holding brackets and secure them to the frame       Use the corresponding holes following the indication on the frame      gt  Position the lower insulation  fabric to the top  package CS 51 to CS 57  If necessary  adapt the length of or fold the lower insulation after  completing assembly of the casing     3 Positioning the frame and the rear section       8229N023   1  Establish the location of the frame on the basis of the opening direction of the furnace door and the length of the burner   2  Position the rear section on the frame and prop it up     amp  Affix it to the brackets  2 screws HM 12x40 40   4 washers L12   2 nuts HM12        Around every 100 mm  place points of silicon mastic  1 tube delivered with the accessories package CS 20  in the leak proofing groove in  the section using a gun     5  Carefully introduce the leak proof thermocord into the leak proofing groove     A do not pull on the seal while inserting it  Otherwise  you may stretch it and reduce its thickness  You must not make the junction  point with the thermocord in the l
5. 0  using 2  screws HM 12 x 25   2 nuts M 12   4 washers DE 12      OFit the hinge on the door of the combustion chamber  boiler  body accessories package  to the left or right depending on which  way you wish to open it and secure using 3 screws HM12x30    washers CL14           Boiler body accessories package      Assemble the door of the combustion chamber  4 nuts M12   4  thick washers       Put in place the added hinge with its hinge pin     4 P 420 02 04 08   300016854 001 A    15       OAtix the added hinge  boiler body accessories package  to the  2 a door of the combustion chamber using the 3 screws HM12x30   3  012 washers L 12  previously dismantled      Leave the 3 screws HM12x30 and the 3 washers L12 in  place on the combustion chamber door on the side  opposite to the added hinge       Put in place the left and right sweeping doors with their hinge  pin  package CS 20         8229EN021A    02 04 08   300016854 001 A P 420        16 Assembling the baffle plates                8229EN028A       8229EN051    8229EN022      Boilers for following countries  NL   BE   ES    Flue ways P 420 8 P 420 9   P 420 10 P 420 11   P 420 12 P 420 13   P 420 14  Upper  1  8229 0010 and 8229 0022 2 x 8229 0010   PEER ana 3 x 8229 0010  1 x 8229 0022  Central 2 x 8229 0011 and   2  8229 0011 and 8229 0023 2 x 8229 0011 no 3 x 8229 0011  Lower  3  8229 0012 and 8229 0024 2 x 8229 0012 Shore ie aie 3 x 8229 0012    1 x 8229 0024      Boilers for following countries  GB   HU   SE    ET 
6. 2  Hook on the front casing support  2 bushes         Position the top front panel in the front casing support and hook it into the front cover     30 Rating plate                 gt  Affix the rating plate supplied with the instructions  which  corresponds to the country of destination     1  Boiler type  2  Power ranges    3  Thermic output    02 04 08   300016854 001 A P 420        NL Remeha B V  E  Postbus 32  7300 AA APELDOORN  Tel   31 55 5496969  Fax   31 55 5496496  Internet  nl remeha com  E mail  remeha remeha com    GB Broag Ltd   Remeha House E  Molly Millars Lane  RG41 2QP WOKINGHAM  Berks   Tel   44 118 9783434  Fax   44 118 9786977  Internet  uk remeha com  E mail  boilers broag remeha com    IRL    B J L  Mampaey BVBA  Uitbreidingstraat 54  2600 ANTWERPEN  Tel   32 3 2307106  Fax   32 3 2301153  Internet  www mampaey be  E mail  info mampaey be    B Thema S A   6  Avenue de l expansion  4460 GRACE HOLLOGNE  Tel   32 4 2469575  Fax   32 4 2469576  Internet  www thema sa be  E mail  info thema sa be    H Marketbau   Remeha Kft   Gy  r u  2   Ipari Park  2040 BUDA  RS  Tel   36 23 503 980  Fax   36 23 503 981  Internet  www remeha hu  E mail  remeha remeha hu    E Termibarna S A   C  Zamora 55 59  08005 BARCELONA  Tel   34 3 3000204  Fax   34 3 3009558    E Cuatrocesa S A   c  Sor Angela de La Cruz  10    10 Oficina C  28020 MADRID  Tel   34 91 658 18 88  Fax   34 91 658 30 77       Copyright    All technical and technological information contained in these techn
7. TT    CORRE     CRC    Lg 784 g 78 Lg Lg    P420 14       C000131                          1  Front    2  Rear     Fit the upper assembly rods  boiler body accessories  in the order  shown in the diagram above  Place the expansion spring and its  washer on each rod at the rear  Stop tightening the nuts when  the free space between the threads is around 2 mm      Fit the upper casing supports  package CS13  and the upper  cross bars  package CS10 11 12 14  with the assembly rods   boiler body accessories package  as per the details A B C D      Fit the lower assembly rods in the order shown in the diagram      Remove the assembly tool     10 P 420 02 04 08   300016854 001 A    10 Hydraulic test       After assembling the boiler body  the installer must carry out a water tightness test at a pressure equal to 1 3 times the operating  pressure  that is 7 8 bar mini  for 10 minutes at least     Ok  fC  Corp  S                8229N073    tT  N      Z  O  N  N           Ensure that all the air in the boiler is vented to avoid any  bursting of the body     After the tightness test  drain the boiler and remove all the parts used  for the test        02 04 08   300016854 001 A P 420       8229EN025B    Secure the flue gas nozzle  boiler body accessories  to the flue gas  box  package CS 20  using 4 screws HM 12 x40   4 nuts H 12   4  washers     2   P 420 02 04 08   300016854 001 A    12       HM12 x60       Orit the 2 threaded rods using multiple slip joint pliers  body  accessories p
8. ackage  M12x175 for the flue gas outlet       Secure the outlet and return pipes  boiler body accessories  package  using 4 nuts H16 for each pipe  24 mm spanner    remembering to insert the leak proof seal     1 A  P420 8 to P420 10  B   For P420 11 to P420 14  the return collector is replaced by  a collector with water distributor  marked  INJ         Fit the flue gas outlet to the heating body  6 nuts H12   6 flat  washers L12   19 mm spanner      O Fit 2 screws HM 12x60   2 nuts to the flue gas outlet for the  sweeping hatch  see detail      Affix the sweeping hatches  package CS 20  using 4 nuts H12    2 washers L12   2 washers M12     Assembling the flow switch   Fasten the flow switch on the sleeve tube  The direction of the arrow  head on the collet must be the same as the flowing out of the water  in the tube   The table opposite is used to check that the flow controller delivered  corresponds to the boiler being assembled     Boiler Flow controller no   P 420 8 8802 4706  P 420 9 8802 4710  P 420 10 8802 4712  P 420 11 8802 4722  P 420 12 8802 4725  P 420 13 8802 4727  P 420 14 8802 4729    02 04 08   300016854 001 A P 420           Put in place the lower plug and the upper plug with the sensor  tube  boiler body accessories package    Do not forget the hemp       Put the 8 M12x50 pins in place in the holes provided for this  purpose      amp  Put the 2 M12x85 pins in place in the holes provided for this  purpose     Fit the hinges to the sweeping doors  package CS2
9. ep 9   then   1  Put the left and right cable ways in place  respecting the assembly sequence   2  Secure the cable ways  3 screws HM5x25   serrated washers       Sccure the front top panel  package RB2  with 4 screws HM5x25   serrated washers     18  P 420 02 04 08   300016854 001 A    21 Control panel assembly        1  Front    2  Rear  1  Position the control panel in the rear bushes     Open the control panel by unscrewing the 2 screws on the front  of the panel        8229N053       8229EN033A    except NL  see instructions delivered with the water low safety   Then  insert the bulbs inside the pocket and maintain them with the  pressure sensitive switch  spring     At the front  screw the control panel to the cover using 2 self   tapping screws    3 9x12 7   serrated washers  Phillips  screwdriver           Carefully unroll and take out the various bulbs from the control  panel  passing them through the opening in the front cover     23 Electrical connection       All connections are made with the terminal boxes designed for that  purpose on the back of the boiler s command board        Connections must be made by a qualified technician     02 04 08   300016854 001 A P 420 19     24 Casing assembly          8229N040    1  Position the front side panels  length 520   Package RB2  in the O Fit to the front  2 screws    3 94x12 7   serrated washers      lower casing supports and hook them into the cable ways  5  Position the burner cable as shown in the diagram and on the
10. ical instructions  as well as any  drawings and technical descriptions supplied  remain our property and shall not be multiplied    without our prior consent in writing     Subject to alterations     02 04 08    3000    16854  001  A    D A C  S A    Tom  s A  Edison 29  Poligono Cogullada  50014 ZARAGOZA  Tel   34 76 464076  Fax   34 76 471311  Internet  www dac es  E mail  dac dac es    Norte Comercial Organizaci  n S A   Bereteage Bidea  19   48180 LOIU  Vizcaya    Tel   34 94 471 03 33   Fax   34 94 471 11 52   E mail  nco nco es    Euro Gas Ltd   Unit 38  Southern Cross Business Park  Boghall Road  Bray  Co  WICKLOW  Tel   353 12868244  Fax   353 12861729  Internet  www eurogas ie  E mail  sales eurogas ie    1312    LR remeha       
11. n country  MHECRES 1 1 1 1 1 1 1      2   P 420 02 04 08   300016854 001 A    2 Boilers supplied with an assembled body          8229N057A    m Manoeuvring the assembled boiler body   Mounting     To manoeuvre the assembled body  it is possible to use the four For boilers with assembled boiler body  start assembly from figure 16  lifting rings located on the frame     m Hydraulic test     Refer to view 10  Certain parts will have to be removed to carry out the hydraulic test     3 Mounting    Warning   Assemble the boiler in the order given by the 1 Refer to the applicable price list for any optional features used   numbers of each figure  in compliance with all the  instructions     Tools required      122 box spanner     1 Phillips screwdriver     1 hammer     1 putty gun     1 stanley knife     13 19 24 spanners     1 Allen key     JDTE or JDTE Plus assembly tool    02 04 08   300016854 001 A P 420        m Boilers supplied with an assembled body    e Hydraulic test     Mounting   Refer to view 10 For boilers with assembled boiler body  start assembly from figure 16  Certain parts will have to be removed to carry out the hydraulic test     m For boiler supplied with the boiler body in bulk    Hydraulic test  Refer to view 10  Mounting  Assembly of the sections is done from back to front  as shown below  beginning with assembly view 1       8229N025B    8229 0003 8229 0005 8229 0001 8229 0002  Q Front     Rear  Boiler type Rear section Le See ee Front section  P 420 8 1 1 5
12. ower part of the section       6   P 420 02 04 08   300016854 001 A       8229EN013     Handle the nipples with gloves  there might be sharp  1  Sandpaper  edges   2  Lubricant  Supplied     Clean the bores and nipples  Coat with the lubricant supplied with  the sections     9       8229EN014      Gently push in the 2 nipples     02 04 08   300016854 001 A P 420        6 Assembling the sections                  Thermocord     Special intermediate section in front of rear section     1  Place the first special intermediate section  making sure that it is turned in the right direction  i e  with the flattening groove against the  thermocord     2  For safety reasons  insert an upper assembly rod  loose boiler body accessories package  into the holes in the 2 sections      Push the section gently and simultaneously on the 2 nipples of the rear section with a hammer and a piece of wood positioned in line with  the bores     8 gt  P 420 02 04 08   300016854 001 A         Put the assembly tool in position     Tighten gradually so as to bring together the upper and lower connections evenly and simultaneously     8            Fit the remaining sections one by one in the order shown  proceeding as per the views 3 4 5 6     Leave the assembly tool in place     02 04 08   300016854 001 A P 420        9 Fitting the upper and lower assembly rods and the upper casing  supports                                                                                           A   _ _ Ee   a  his FMI 
13. xaz   38220 0010  lO ERLE camo I eam  LONGI   PODE and GAA 2x 8229 0012 Se 2 x 8229 0012 2 x 8229 0012    The 8 figure part number of the baffle plate is moulded into the  metal       Put the upper  central and lower baffle plates in place  following the  order of assembly shown in the diagram        Follow the order of assembly shown in the diagram   Hook the baffle plates into one another before fitting them  into the flue ways       Close the sweeping doors and secure using 3 nuts HM12   3 thick  washers L12x32x6     18 P 420 02 04 08   300016854 001 A    17 Boilers supplied with an assembled body           1  Rear       Unscrew the screw A on the bracket    lt  LA To fit the flow controller  refer to stage no  11        18       QO Affix the lower casing supports  packages RB2  MP2 and MP5   to the frame using 1 screws HM8x25   serrated washer for each  support     8229N039    Insert the boiler body insulation panels  Hold the insulation in  place by knotting each strap to the lower casing support on either  side of the boiler          H  M 8x25    Insulation width  boiler body      500 500 600 800 900  Boiler    Rear       Front    P 420 8  P 420 9  P 420 10  P 420 11  P 420 12  P 420 13  P 420 14  package RB2 MP4 MP5 MP2 MP3                                       02 04 08   300016854 001 A P 420        19        gt  Insert the rear insulation   Package R B2     8229N031          Hi   8229EN029A  i Boilers supplied with an assembled body  Fit the upper crosspieces  See st
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
USER`S GUIDE  Manual de Usuario Writer LibreOffice  Referencias en General  16-KANAL-AUDIOMISCHPULT  ヒーター製品検査ガイドライン ヒーター製品検査ガイドライン  Norma CEI - Classificazione luoghi con pericolo incendio  工事説明書 - 長府工産株式会社  Samsung Электрический духовой шкаф BQ2D7G044, 65 л  Инструкция по использованию  電動丸(3000 KANZEN FUKASE) 取扱説明書 - Shimano      Copyright © All rights reserved. 
   Failed to retrieve file