Home
        Remeha Avanta Plus Gas 360 Technical Instruction
         Contents
1.                                        JO S   S      123456789 1011     8502N086                  f Make the connections  respecting the live  L   neutral  N  and  earth terminals         Control panel RD 9 22 08 05   300005192 001 A    2 Installation with optional Rematic control unit                                               a B     Qc   X rematic      55  O     A            w lu ce                                           0000168    21 Fitting the Rematic control unit       The Rematic control unit is fitted on the left hand side of the front of  the panel              8502N090       8502N089          22 08 05   300005192 001 A Control panel RD 9        3  Installing the supplementary wiring      Remove the  External Regulation  harness                D000173         Fitthe harnesses delivered with the REMATIC RC4 5 option             D000172              8  Control panel RD 9 22 08 05   300005192 001 A    22 Connections optional REMATIC       Connection block for Rematic sensors and controls     See the instructions supplied with the control unit and any remote  control unit used     fy Separate the extra low voltage sensor wires from 230 V  power wires in order to prevent electromagnetic  interference     Inside the boiler     Boilers with one cable channel  Place the 230 V main supply  cables on one side of the cable channel and the sensor cables on  the other  The cables shall be held in place on either side using  plastic ties     Boilers with two cable channels 
2.                         i e v    Zd o  T      e   m        OA 8               f  va     va               Ld i  k 2  va     va       62g 1          i    si    6597   L i CE  2145   m 9 7 va H3Z MM  Er     x      ed la          a i pompe So        IV  vo     zy de                            i  8  L 9  87309 LAI      i 5 v wey  Wa           La     i             im Pe Ps       FE                                       La      NS               03 vo m m  L                ls           vo  LA LA o 6 09  11 WA Hx          ND      L zaz 6 AU               Spare E 1          l  n 17               M    i   90603  La L d pum  vA 8  6A LAZ 1798        ai                 xz Ftzlaaad Aad         cadi      REEL 6 z z s 9  1 g9 T           92  fords Le     su         98               Sl E a T va  09    SVD   VW3HOS3dlONIHHd   NVHYOVIO ONIYIM   NVIdINVINOULS   AdiONIYd      VIN3HOS             Starting up and operation       1 Control panel without Rematic control unit                                           2                E     ik EE                                                A N The first start up is to be performed by your installation  engineer     Before starting the boiler  check if the installation is filled with water   Start the boiler in the following order       Boiler temperature regulation by means of the thermostats   Place the boiler thermostat 5 in the required position  If the burner  has 2 stages  the stage 2 thermostat must always be set to value  which is approximate
3.  2 stage burners   It may be fitted along with several optional features       Rematic control unit for 2 stage burners regulating the burner and  2 mixing valve  for heating only or for heating and domestic hot  water      Hour run meter s  Package BG 40      Flue gas thermometer  Package BP 28     Symbols used          Caution danger    Risk of injury and damage to equipment  Attention must be paid to the warnings on  safety of persons and equipment           1 Specific information    Information must be kept in mind to maintain comfort       Reference             Refer to another manual or other pages in this instruction manual          22 08 05   300005192 001 A Control panel RD 9        Description       11 8 9 110 13 6                                                                    8502N008    1 3 position switch Auto   Manual M   TEST STB    The switch may be left on either position manual M or automatic AUTO     STB TEST  temporary action to test the safety thermostat     Press the TEST STB switch and set pump shut off switch  2   B to the  Summer  position 3t    2 Switch Burner   Heating pump   This button is used to control the burner and the heating pump   Both buttons are in  Winter     position  Heating and hot water production systems operate  if a hot water tank is included    Both buttons are in  Summer  34 position  The burner and the heating pump don t operate   If the boiler is fitted with a control unit  both buttons must be left on the Winter   positio
4.  Place the 230 V main supply  cables in one cable channel and the sensor cables in the other   The cables shall be held in place on either side using plastic ties     Outside the boiler   use 2 pipes or cable guides at least 10 cm apart     f Failure to comply with these instructions could lead to  interference and control unit malfunctioning or even  damage to the electronic circuitry     22 08 05   300005192 001 A Control panel RD 9        2 3 Moutingofthe control unit          00004 38       0000137          00139            Q Bring the blue connectors out through the opening in the control  panel      2  Plug the connectors onto the back of the control unit     Control panel RD 9       Push the control unit into the front of the control panel and fix it  with the 2 plastic screws supplied  push and 1 4 turn  clockwise  on  the front of the control unit        Close the control panel     22 08 05   300005192 001 A    3 Connecting a third party control unit       CO  2          LL ZL 91 ZL 8L      D000180         Control of the first stage of the burner by volt free contacts    Control of the second stage of the burner by volt free contacts    4 Connecting the harness                CD Take out the shunt  bridge  CA     Connect the  External Regulation  harness to the control  panel harness     22 08 05   300005192 001 A Control panel RD 9        5 Connecting the low water pressure switch alarm indicator  Only NL                    D000183    CD  Low water pressure switch a
5. Control panel Gas 360                                                   u            A    hy ce                         Technical  instructions    CE    00400 CR remeha       Contents     ___                                                    A      3  1 PIESENtAtIoN     ci e ehe E KR ARR E AE Kade RR e AR Rc d dd 3  Ie Ul               DO ladri 4  Operating                   caverns EROR RUN RE RR 5  Electrical connections                            atene 5  1    Terminal  DOCK nre aio             gates                                al 5   11 Electrical corinections        is          i ke mr em e                        RUE Ri e RU RE                 Re or RE o      Re      6   2 Installation with optional Rematic control unit LL    7   2 1 Fitting the Rematic control Unit    7   2 2 Connections optional REMATIC   La 9   2 3 Mouting of the  control Unit    e e e Roe e 10   3 Connecting a third party control unit    HH meme 11   4   Connecting the harness  i  2s ess ber ria eee er      UR RR OE qn Ro RU      AE ia E Rh Rt d        11   5 Connecting the low water pressure switch alarm indicator  Only NL                                12   6 Connecting the safety thermostat alarm indicator   Hm 12   7 Connecting        or two hour run meters  Package      40                                                            13   8 Connecting the flue gas thermometer  Package BP 28                                                             14   9 Connecting the bumer  ee nhe rrr rrr e
6. Hd 3svHd 1       i        UVVIIIVHOS YILNIMHIININOZ HOLIMS YALNIWYIWWNS        Ma_LVM WHVAM UIV_LINYS            LOH                       YELIVHOSYELNIM H3INNOS YINH3LI BNILAMBYILNI        M3SSVMNSVM BUIVLINVS                        so3 iS   amp   UVVTSAVHOS       1 307 H30NYH8 SOVLS PUZ HOLIMS H3NHh8 zaz                    3HOSINH3HL                  LINDO        84  15 2 HILIVHOS H3NN3HN8 3UNTIV euez YNITNYA                      zaz YILIVHOSS  NNLSIITI       1                      N  N          5               SAWA Al3dvS S  LOVLNOOSCISHONISA LOVLNOS Al34VS so TLNIALINOWN                   3NNVA S   DIV LNOMS LISHH3HOIS ALIHNOIS      19 VINOO so  Vel PZ 9NDIH3M              39VIS        HOLVOIGNI 440 NO        da DiLiis4v                       09 34N1S    31HOonans83lul38              euez 3HOHVIN INVAOA        3ddV svogav MWnalvsnigso 13dv19 09           151 SNINY IM 3rdWv 1 39VLS 15  HOLVOIONI 440 NO                 epz HITTALUNN 3OVIS Puz            NNY YNOH        33015  31HONITSCIIHLIA FUNTIV 88  3HOHVIN INVAOA      34n1S Z H31H3ZN3QNh 1SS83lH138 FYNTIV euez FHIVHYOH YNILdNOD         ardWvi aiHonaTWsviv almnoas  WUVIV          5              SOI3H          HOLVOIONI NUYVIV IVISONHIHL AT34vs SLVA      15  HANALuNn 39VI1S 5              NOH YNOH         MW3zNauo3gunivis3dWals liHH3HOIS      1V1SOWH3Hl3WHVIV INVAOA     SILVA 34n1S L H3 11H3ZN3QNh 1ISS83lH      FYNTIV          3HIVHOH H  31dWOO          M3 10HLNOO  AVVISOWM3H  SQI3H            IVISOWH3HL A134VS SL TOY LNO
7. ISONILHIIA HOSITOAD WALSAS ONI400  d HVS 399 YVIZNIYDIGUNIVYI ANILS LIAHYIHIAIS             5      LVLSOWYSHL 51                           1                               1      INOMIAI UNFTOULNOI 399  OJVHLSSNIGISHOS UINYOASNVUL ONILVIOSI L SFIMIOSAVUL NOILO3NNOO 3GV2SVO  vo Od3VHINN3H1 AN3W310SlQ UNILVINYOASNWUL IL ONNLIVHOSNICYASWM         5     wo  3ardwvi HOLVOIONI 3unTiv BILHONITYELS YNITINYE 3Wsviv  dvul        IVVISOWH3H IT3L39 SOVLS        LVLSOWYSHL Y37108                     SNIN3dvM3gsi3H dONMUNYA                                 1354              VAYdE 330152                               145544 euiez                       LVLSOWYSHL                 FLSVLSONNUYEL SLNIHINNIYE INVAOA L3 IN3NINYVAUY NOLNOS VAUdE  aanv           15  IVVISOWH3H LT313   9  15 151 1VISONH3HL Y37108 LH  L                yanyna a 33nis   YJI9IJYYNLVYJAWIL 145544 919  JYJIANVH        1V1SOWH3HL LH  L HINNIYE ananya a  AVVLSOWYSHL OVISONFILLLNW WALSAS 4401NHS LN3A 0349078 Avi dWOd FOVTDADIY          LINNHS oe A1VISOWH3HISSNnHOVMH380SVOgV MWnaTn033slLNV LVLSOWYSHL AVL 3dWndSI3HX13SS3                      39v19A03M      3dWOd oe  SNr1393H YOLVINDIY ou V SNIS3 dWOdSONINY VMSA V LINDYID          9NLLV3H v amp  SNmi3938 NOLLYINDIU 9H V SI3H3 3dWWndSI3H T3883   V LINOUIO                      v   145 E    b    ez  n    me D z  T     n va       ES  ah   st  va Di 92       84  SA NE   di          vi             3  va 3  va             f 2  a 2 2 qi DA         V S  SEVA g                              
8. larm indicator    6 Connecting the safety thermostat alarm indicator               E  E  19          amp            230V 50Hz  ALI    N    C    L N    8502N097                      N                      e                                                                                        2 217                        jil                 Safety thermostat alarm indicator        Control panel RD 9 22 08 05   300005192 001 A    7 Connectingoneortwo hour run meters  Package BG 40                    One or two optional hour run meters  stage 1 and 2  may be fitted on the front of the control panel   To do so       Cut the cover off with a cutter along the edges of the coloured rectangle     Pull out the  1 wires standing by in the control panel    Connect the wires to the hour run meter  the wires are interchangeable      Brown and blue wires for stage 1    Violet and blue wires for stage 2      Clip the hour run meter into the control panel     If the burner is a 1 stage burner  the counter displays the burner operating time   If the burner has 2 stages  the first stage hour run meters displays the total burner operating time and the second hour run meter displays the  operating time of stage 2     22 08 05   300005192 001 A Control panel RD 9        8 Connecting the flue gas thermometer  Package BP 28                 An optional flue gas thermometer may be fitted on the front of the control panel   To do so       Cutthe cover off with a cutter along the edges of the coloured 
9. ly 5  C less than that of the stage 1 thermostat     If required  move the maximum temperature stop as instructed  below     yr there is no control unit  we advise you never to set the  boiler thermostat below mark 4  approx  40  C  in order to  avoid the risk of combustion products condensing on the  walls of the boiler       Set switch 1 to the manual 4  position      Control unit in boiler room electrical cabinet  See the instructions supplied with the control unit and any  remote control unit used    e Check that safety thermostat 9 is properly set       do so   unscrew the hexagonal cap and press the reset button with a  screwdriver      Set the burner and heating pump buttons 2 to the Winter        position      Set main On Off switch 3 to CD      aD Em oo                          hy ce       8502N100    Moving the thermostat stop     M000154    A factory set stop limits the maximum temperature to 75   C  To move  the stop  proceed as follows       Pull the thermostat button out carefully  use pliers and a cloth       Remove the stop with the pliers      Put the stop in the hole of the desired higher temperature   maximum 90  C      22 08 05   300005192 001 A Control panel RD 9        2 Control panel with optional Rematic control unit                                                                                        ae                      V rematic    I                                            12 3     The first start up is to be performed by your installation  e
10. n     3 Main ON OFF switch  Location for hour run meter for the first and second stage  optional     5 Boiler thermostat  30 to 90   C    A factory set stop limits the maximum temperature to 75   C  The stop may be moved if necessary     6 Stage        or stage two indicators   These only go on if the relevant thermostat or control unit require heating and if the safety contact is closed     Boiler thermometer  Location for flue gas thermometer  optional   Safety thermostat with manual reset  set to 110   C    10 10 A Circuit breaker  with delayed action and manual reset   11 Location for optional features or    RC4 RC5 control unit  13 Switch for selecting the number of burner stages  14 Burner alarm indicator   Reset button        Control panel RD 9 22 08 05   300005192 001 A    Operating principle  TSI        Boiler regulation    The boiler may be regulated     either by the boiler thermostats    or by the Rematic control unit  if any  optional terminal strip present  in control panel    or by the Rematic control unit of the cascaded installation    or by a third party control unit with volt free contacts for high low  and on off operation  if any  connection kit necessary      If the boiler is fitted with a Rematic control unit  the boiler  temperature is modulated by the regulator  which controls the burner  and the motorised mixing valves depending upon the outside  temperature  With a third party control connected  the boiler  thermostats are set to the maximum positio
11. n  Operating security is  provided by the safety thermostat with manual reset     Electrical connections  m                                                                                                               u       ps the electrical wiring has been carefuly checked in the  factory  the internal connections on the control panel must  not be changed in any way     Electrical connections must match the electrical diagrams delivered  with the equipment and comply with the instructions in the manual     The electrical connections shall comply with standards in force  The  equipment must have a power supply equipped with a omnipolar  switch with an opening distance above 3 mm     The earth connections shall comply with local standards     1 Terminal block       All connections are made with the terminal boxes designed for that  purpose on the back of the boiler s command board     22 08 05   300005192 001 A Control panel RD 9        1 1 Electrical connections                                           D000171    Proceed as follows to open the control panel     Open the side of the panel  Turn the panel   Remove the 4 screws               Q Remove the upper casing of the boiler     Take out the heater door    These cables will be fixed on to the control panel with cable clips     supplied      a separate bag       Remove the top front panel      Pull out the connection board cover   E E  E E  E E  LO LO  N P  e e  x x  m e  Hz o     CS                                      
12. ngineer     Before starting the boiler  check if the installation is filled with water   Start the boiler in the following order         Set the boiler thermostats 5 on maximum position   If required  move the maximum temperature stop as instructed  on the preceding page   7 Set the Rematic control unit 12  To do so  operate  according to the control instructions supplied with the  unit         Set switch 1 to the AUTO position      Check that safety thermostat 9 is properly set       do so   unscrew the hexagonal cap and press the reset button with a  screwdriver      Set the burner and heating pump buttons 2 to the Winter       position      Set main On Off switch 3 to CD     To  Boe     Control panel RD 9       D000182       2 5    22 08 05   300005192 001 A       Control panel RD9         22 08 05   300005192 001 A    NL    GB    D A C  S A    Tom  s A  Edison 29  Poligono Cogullada  50014 ZARAGOZA  Tel   34 76 464076  Fax   34 76 471311  Internet  www dac es  E mail  dac dac es    Remeha B V  E  Postbus 32   7300 AA APELDOORN   Tel   31 55 5496969   Fax   31 55 5496496   Internet  nl remeha com   E mail  remeha remeha com    Broag Ltd    Remeha House E  Molly Millars Lane   RG41 2QP WOKINGHAM  Berks    Tel   44 118 9783434   Fax   44 118 9786977   Internet  uk remeha com   E mail  boilers broag remeha com    Norte Comercial Organizaci  n S A   Bereteage Bidea  19   48180 LOIU  Vizcaya    Tel   34 94 471 03 33   Fax   34 94 471 11 52   E mail  nco nco es    IRL Euro Gas L
13. rectangle     Clip the thermometer into the opening     Bring the sensor to the back of the boiler via the cable channel and insert it in the flue gas pipe      14  Control panel RD 9 22 08 05   300005192 001 A    9 Connecting the burner                                                                            8502N164B       Gas pressostat  bridge factory fitted   Not used on a Gas 360    2a Gas valve 2nd stage  2b Safety box   Gas valve 1st stage    Anti backflow thermostat Package RD19  optional as of 10 section  models     4 Flue damper  only version Gas 360 L  bridge plug factory fitted   5 Leak proofing system  Package RD18  bridge factory fitted     22 08 05   300005192 001 A Control panel RD 9                    Skeleton Diagrams                                                                                                                                                                                                                                                                                                                                                                                                               n            W L100 00ZS0000                                           Zvoivisosssu4     osd o  1WVISOISS3HdSVO 1V1SOSS3Hd SVO 954      S  YVVTAJVHOS 1831  HOLIMS 1S3L IZ                              MILIVHOSISIL 1591 YNILANYYAUNI 1z YILININ IYLNIN N Ico     IS  UVYTDIVHOS 3N3W3O1V HOLIMS NIV oz asv4 3svHd 1 MH3L IVHOSLdnvH IVYINIO UNILANYYILNI 92 3sv
14. rre 15                        caosa io    alienare IEEE Ret 16  Starting up and operatioli     seo ux x EAE                       ia ARI NC EE RE RR REEF ER 17  1 Control panel without Rematic control unit    0 0    Hmmm en 17   2 Control panel with optional Rematic control Unit    18    Control panel RD 9 22 08 05   300005192 001 A    Introduction  r         _   _   1111_   _         _            _      _      _      _                                                                     _11 z y    The control panel is fitted to Remeha boilers in the Gas 360 ranges     This product will be marketed in the following European Union  member states      Version L  BE  ES  Version S  GB  HU  ES    Directive 97 23 EC    Gas and oil boilers with a maximum operating temperature of 110  C  and hot water tanks with a maximum operating pressure of 10 bar  pertain to article 3 3 of the directive  and therefore  cannot be CE   marked to certify compliance with the directive 97 23 ECThe boilers  and hot water tanks are designed and manufactured in accordance  with the sound engineering practice  as requested in article 3 3 of the  directive 97 23 EC  it is certified by compliance with the directives 90   396 EC  92 42 EC  73 23 EC and 89 336 EC     1 Presentation    f Warning    The boiler shall be assembled and installed by a qualified  professional only     For a proper operating of the boiler  follow carefully the instructions        The control panel is used to control boilers with 1 or
15. td   Unit 38  Southern Cross Business Park  Boghall Road  Bray  Co  WICKLOW  Tel   353 12868244  Fax   353 12861729  Internet  www eurogas ie  E mail  sales eurogas ie    J L  Mampaey BVBA  Uitbreidingstraat 54   2600 ANTWERPEN   Tel   32 3 2307106   Fax   32 3 2301153  Internet  www mampaey be  E mail  info mampaey be    Thema S A    6  Avenue de l expansion  4460 GRACE HOLLOGNE  Tel   32 4 2469575   Fax   32 4 2469576  Internet  www thema sa be  E mail  info thema sa be    Marketbau   Remeha Kft   Gy  r     2    Ipari Park   2040 BUDA  RS   Tel   36 23 503 980   Fax   36 23 503 981  Internet  www remeha hu  E mail  remeha remeha hu    Termibarna S A    C  Zamora 55 59  08005 BARCELONA  Tel   34 3 3000204  Fax   34 3 3009558    Cuatrocesa S A    C  Sor Angela de La Cruz  10    1   Oficina C   28020 MADRID   Tel   34 91 658 18 88   Fax   34 91 658 30 77        Copyright    All technical and technological information contained in these technical instructions  as well as any  drawings and technical descriptions supplied  remain our property and shall not be multiplied without  our prior consent in writing      Ours is a policy of continuous development  We reserve the right to alter specifications without prior  notification    Subject to alterations    LR remeha       
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
MVME162BUG 162Bug Debugging Package User's Manual      Page 1 Page 2 調達要求番号 ニ ~5 ー TY ー A50ー 34 陸 上 自 衛 隊  Heart Rate Monitor  A2T Multitrac A2T Multitrac  香港オークションのハイライトを飾った Patek Philippe の  PIANO DI SICUREZZA E DI COORDINAMENTO  Le sécurimètre : Free Download, Borrow, and Streaming : Internet Archive  BENDIX BW7250 User's Manual    Copyright © All rights reserved. 
   Failed to retrieve file