1. B lt p 37in 64 cm 94 cm lt A 62 in eRe 157 cm Floor Clearance The library has a floor clearance of 0 75 inch 19 mm 4 Selecting an Installation Location Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 Floor Strength The floor at the installation site must be rated at 250 lb ft 1221 kg Inclination and m2 This is sufficient to support a fully loaded Quantum ATL 7100 Characteristics Series library The floor must be level to within 0 25 inch 6 4 mm over a 6 foot by 6 foot 1 83 meter by 1 83 meter area The floor at the installation site must be uncarpeted and free of defects Power and Grounding The power inlet is an IEC 320 connector see figure 3 Outside North America replace the power cord with a harmonized 3 x 2 mm power cord that is approved by the country where used Caution To prevent equipment damage connect the library to a erounded electrical outlet Figure 3 Library Power eromne IEC 320 T 320 Type Receptacle 100 120V 200 240V 3 5A 7A 50 60 Hz f 7 4A 2A ae Line Neutral Environmental The installation site must have the following environmental Conditions conditions Humidity 10 to 90 e Temperature 15 C to 32 C 59 F to 90 F e Altitude sea level to 13 200 feet 4 023 km These environmental conditions only apply when the library is in operation Note For additional libr
2. Quantum ATL 7100 Series Library Unpacking Instructions Introduction g OP TIC Ma CAD IG C OVET aaa E A canon sees eaatereoces 3 Selecting an Installation Location 4 FOOT of cc eee eee eee ert er reer re Tere ee ener ere EV CEATA E ra a ieeroataemeainen E E E 4 Floor Strength Inclination and Characteristics eeeeeeseeseeseeseeeereesresee 5 Powerand Grounding sosessirass aso innn nan EO ne ee ener 5 Environmental CondillON Sasss rane tre entre see ere ert 5 Preparing for the Installation 6 Providing the Necessary Tools and Equipment c cee eeeeeeeeeeeeees 6 Tbe ESD CAO Soson an ts nentes wacu eee eaeoiee sees eueeenceeee 6 Unpacking the Library 7 Rev iN r dalam LIDII enmerermerr rere cette cree nce cere erect er creer ete ee teres 7 Unpack DE locch gee nt Sane eee E eee 7 Chieckine the Packie ist scdsressssepiuscerpsascensteonsstescaesesacsevasessemacsanevassencsastans 11 Positioning Me LIDIA eserse iinne enen En Ena eSEE SRE 11 Installation Procedures 13 Removing the Internal Packing Materials sssssesesseesssesssesssesessessssesses 13 Storing the Shipping Materials eee ceeesecsecseeeseeseeeeseeeseeeeeens 15 Ps Ve A R E N 16 Document 6241100 03 Ver 3 Rel 1 August 2001 1 Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 2 6207947 05fN 8 Introduction Figure 1 Quantum ATL 7100 Series Library Optional Cable Cover Quantum ATL 7100 Series
3. Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 6 Remove the internal packing material see figure 13 a b O Q Remove the horizontal carriage tie wrap Gently raise the extension axis assembly Remove the vertical axis packing block Gently push the carriage assembly toward the front of the library Remove the horizontal axis packing block Lower the extension axis to the floor of the library Figure 13 Internal Packing A Material AA Horizontal carriage ZA tie wrap ee AA t WA ae Za If AZ i Horizontal packing 4 X block a f Vertical axis z packing block Storing the Shipping To store the shipping and packaging materials for future use Materials l 1 Replace the ramp extensions a Remove the Velcro straps securing the ramp extensions to the pallet in the unloading position b Slide the two ramp extensions into their shipping position on top of the pallet c Secure the ramp extensions with the Velcro straps 2 Place the molded top shipping bag and all packaging materials on top of the pallet 3 Collapse the cardboard box 4 Place the box on top of the packaging materials on the pallet 5 Secure the pallet packaging materials and cardboard box for future use Installation Procedures 15 Quantum ATL 7100 Series Library Unpacking Instructions Doc
4. Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 This document explains how to unpack the crate containing the Quantum ATL 7100 Series library an automated storage and retrieval system see figure 1 After completing the instructions in this booklet perform the set up procedure using the instructions in the QuantumlATL 7100 Series Library Facilities Planning and Installation Guide The Quantum Quantum ATL 7100 Series library may include an optional cable cover The cable cover ships in a separate box strapped on top of the Quantum ATL 7100 Series crate For information on this optional item refer to the Quantum ATL 7100 Series Cable Cover Installation Instructions in the cable cover shipping box Introduction 3 Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 selecting an Installation Location When choosing an installation site for the library consider the following requirements e Floor space e Floor clearance e Floor strength and inclination e Power and grounding e Environmental conditions Floor Space The Quantum ATL 7100 series library requires over 2 ft of open floor space around the entire unit see figure 2 Figure 2 Floor Space Requirements _ 25 in 64 cm Rear Front Library 74 in 188 cm 24 in 61 cm Pa 5 gt 25 in 64 cm y lt 25in
5. ary specifications including environmental requirements during shipping and storage refer to the QuantumlATL 7100 Series Library Facilities Planning and Installation Guide Selecting an Installation Location 5 Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 Preparing for the Installation Providing the Necessary Tools and Equipment Taking ESD Precautions Use the following steps to prepare for the installation e Providing necessary tools and equipment e Taking ESD precautions Provide the following tools for leveling the library e 3 4 inch open end wrench e Level Some components within the Quantum ATL 7100 Series library contain static sensitive parts To avoid damaging these parts while performing installation procedures always observe the following precautions e Do not switch on the library during installation procedures e Keep the library power cord connected to a grounded power outlet except when working with AC electrical components e Avoid contact with power supplies EMI filters and AC electrical components while the library is connected to a power outlet e Use an antistatic wrist strap e Keep static sensitive parts in their original shipping containers until ready for installation e Do not place static sensitive parts on a metal surface Place them inside their protective shipping bag or on a grounded antistatic mat e Avoi
6. d touching connectors and other static sensitive components e Keep library doors and access panels closed whenever possible Note Dry climates and cold weather heating environments have lower relative humidity and are more likely to produce static electricity Preparing for the Installation Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 Unpacking the Library This section explains how to unpack the library and move it to its installation location The following are the major steps in this section e Receiving the library e Unboxing the library e Checking the packing list e Positioning the library Note Before following the instructions in this section verify the installation site meets the requirements found in Selecting an Installation Location on page 4 of this document Receiving the Library Inspect the shipping pallet and carton for damage that may have occurred during shipment Report any damage to the shipper Warning The library weighs approximately 500 pounds 227 kg Use at least two people to unpack move and install the library Unpack the Library To unpack the library 1 Verify the minimum floor space requirements see figure 4 Note Unpacking the crate requires a minimum of 8 feet 2 44 meters in front of the library and adequate space at the sides and back for two people to maneuver Unpacking th
7. e Library 7 Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 Figure 4 Minimum Floor Space Requirements Unpacking Site Library Pallet Ramp extension Unloading area minimum ee 2 Cut the two steel bands that secure the library and packing material to the pallet see figure 5 Caution The steel bands are under tension and will snap away when cut Figure 5 Removing the Steel Bands Optional cable cover R R Without AM N AMp 9 With optional optional Dp ATS cable cover _ ieee ae el 8 Unpacking the Library Figure 6 Removing the Cardboard Box Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 3 If the optional cable cover is included e Remove the cable cover box from the top of the library e Set the cable cover box aside e Refer to the Quantum ATL 7100 Series Cable Cover Installation Instructions to install the cable cover 4 Cut the two steel bands that secure the cardboard box to the pallet 5 Lift the box top straight up and off the cardboard box see figure 6 Open the four retaining clips on the rear of the cardboard box N O Unwrap and remove the cardboard box from the library Retaining clip Cardboard box Pallet 8 Lift the acc
8. e load port door see figure 11 a Open the load port door b Remove the foam sheet c Close the load port door 2 Remove the packing material from the drive access door see figure 11 a If necessary unlock the drive access door b Open the drive access door c Remove the foam sheet d Close the drive access door 3 Remove the packing material from the front door by using the procedure in step 2 4 Remove the packing material from the storage array door a If necessary unlock the storage array door b Open the storage array door c Remove the foam sheet Installation Procedures 13 Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 Figure 11 Access Doors Load port door OL 7 ON Storage array door Front door Drive access door 5 Remove the tie wraps from the robotics area see figure 12 a Remove the tie wrap that secures the gripper b Remove the tie wrap that secures the horizontal carriage assembly to the library frame Note Do not cut the tie wraps Figure 12 Tie Wraps Gipper tie wrap ai o Wert Horizontal carriage tie wrap 14 Installation Procedures Quantum ATL 7100
9. essories tray up and off the library see figure 7 9 Lift the foam cap up and off the library see figure 7 10 Remove the two screws that secure the stop block The stop block is located under the library in front of the casters Unpacking the Library 9 Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 11 Remove the stop block Figure 7 Removing the Accessories Tray and Stop Block Accessories tray Foam cap Stop block 12 Pull the two ramp extensions out from under the library see figure 8 13 Secure the ramp extensions to the pallet using the Velcro straps 14 Carefully cut the shipping bag along the heat seal seam see figure 8 10 Unpacking the Library Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 Figure 8 Ramp Extensions G AN Ly Ne iis Heat seal seam Ramp extensions Checking the Packing After you finish unpacking the library check the packing list to verify List that you have received all library components and accessories If any part is missing or damaged contact your authorized reseller Positioning the To position the library Library Warning The library weighs approximately 500 pounds 227 kg Use at least two people to unpack move and install the library 1 Map out a route to the installation site 2 Verify the floor clearance strength and inclinat
10. ion information see figure 2 3 Verify that the library s leveling feet are raised If not raise each foot as needed as by turning the leveling foot until it is fully retracted see figure 9 Unpacking the Library Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 Figure 9 Leveling Feet 4 Using two people carefully wheel the library out of the shipping bag and down the ramp Caution When maneuvering the library do not push on nonstructural features see figure 10 Figure 10 Nonstructural Features Drive access door Storage array door gt Control panel Storage array a ce gt Front door door handle Front door handle 5 Roll the library to the final installation area 12 Unpacking the Library Quantum ATL 7100 Series Library Unpacking Instructions Document 6241100 03 Ver 3 Rel 1 August 2001 Installation Procedures Removing the Internal Packing Materials This section explains how to unpack the library s internal packing materials and prepare it for installation The following are the major steps in this procedure e Removing the internal packing materials e Storing the shipping materials e Leveling the library To remove the internal packing material from the library 1 Remove the packing material from th
11. ument 6241100 03 Ver 3 Rel 1 August 2001 Leveling the Library To level the library 1 Lower each foot of the library until it makes contact with the floor see figure 9 2 Apply a 1 4 turn clockwise with the open end wrench to tighten each foot against the floor 3 Center a carpenter s level on the top front edge of the library 4 Check the gauge on the level If the front of the library is level go to the next step If it is not level a Determine the tilt of the library b Lower the foot on the low side by applying a 1 4 turn with the open end wrench c Repeat until the front is level 5 Repeat the previous step for all edges of the library 6 Recheck the level on all top edges To continue installation procedures refer to the Quantum ATL 7100 Series Facilities Planning and Installation Guide 16 Installation Procedures

Download Pdf Manuals

image

Related Search

Related Contents

Garmin Q2 Installation Instructions  4. RÈGLEMENT  Indesit Moon SIXL 145  Manual de Instalación de Módulos Fotovoltaicos Solaria Gama  LIFELINE - Fulgor Milano  "取扱説明書"  PipeJunctionTutorial  Manual do Utilizador A20 Tipo 6269 A40 Tipos 6568, 6578, 6648  USER`S MANUAL - Public Surplus  仕様 13  

Copyright © All rights reserved.
Failed to retrieve file