1. E Apply bottom flashing tape 1 Cut a piece of flashing tape 12 longer than the opening width Apply at the bottom of the opening as shown 1E so it overhangs 1 to the exterior Note The tape is cut 12 longer than the width of the opening so that it will extend up each side approximately 6 F Tab the bottom flashing tape and fold Cut 1 wide tabs at each corner 1 2 from each side of corner 1F Fold tape to the exterior and press firmly to adhere it to the flashing paper G Apply bottom flashing tape 2 Cut a piece of flashing tape 12 longer than the opening width Apply at the bottom overlapping tape 1 by at least 1 DO NOT allow the tape to extend past the interior face of the framing 1G Note The flashing tape does not need to extend all the way to the interior of the framing H Attach the aluminum sill support or wood blocking to the exterior of the box plate to support the edge of the door sill Place the sill support flush with the subfloor 2 A Ci D Fold out installation fin to 90 Be careful not to remove or tear the fin corners Insert the door from the exterior of the building DO NOT slide the bottom of the Sa Check the interior reveal Make sure the measurement from the Secure the frame Insert a 1 wide shim behind the pilot hole at the lock strike s Faste
2. Exterior7 Architect Series and Designer Series G Architect Series and Designer Series Apply sealant and insert a 8 x 2 1 2 screw provided into each hole in the bottom of the door frame shown above in gold H Architect Series and Designer Series Position and secure the panel retainer by drilling pilot holes through the remaining holes in the retainer into the sill support or wood blocking then apply sealant to the holes and insert a screw into each hole as specified below Aluminum sill support 9 64 pilot holes 10 x 3 4 thread cutting screws provided Wood blocking 1 8 pilot holes 10 x 2 1 2 flat head wood screws provided Masonry floor 3 16 x 1 3 4 concrete screw Pilot drill per screw manufacturer s recommendations I Remove the factory installed screws from the retainer and repeat the process J Architect Series and Designer Series Drill a 3 16 clearance hole at each indentation in the extrusion at the top of the door frame into the rough opening stopping when the drill is through the door frame Apply sealant to each hole then insert a 8 x 3 stainless steel screw into each hole 4 INTEGRATING THE DOOR TO THE BUILDING FELT Note The flashing tape must be applied approximately 1 2 onto the frame cladding at the jambs and head Pre folding the tape 1 2 before removing the paper backing will make it easier to apply the tape correctly If the siding is less than 1 2 thick adjust the dimension o
3. 2008 Pella Corporation Part Number 80880102 INSTALLATION INSTRUCTIONS INSTRUCCIONES DE INSTALACION CLAD SLIDING PATIO DOOR SOUTHWESTERN WALL WITH HARD COAT STUCCO PUERTA PARA PATIO CORREDIZA PARA PARED ESTILO SURENO CON ESTUCO DE CAPA BASE Lea las instrucciones en espafiol en el reverso Installation Instructions for Typical Wood Frame Construction These instructions were developed and tested for use with typical wood frame wall construction in a wall system designed to manage water These instructions are not to be used with any other construction method Installation instructions for use with other construction methods multiple units or bow and bay windows may be obtained from Pella Corporation or a local Pella retailer Building designs construction methods building materials and site conditions unique to your project may require an installation method different from these instructions and additional care Determining the appropriate installation method is the responsibility of you your architect or construction professional YOU WILL NEED TO SUPPLY TOOLS REQUIRED e Cedar or Impervious shims spacers 12 to 20 e Tape measure 5 i e 2 galvanized roofing nails 1 4 lb 6 Levl WEEN e Closed cell foam backer rod sealant backer 12 to 30 ft D e Pella SmartFlash foil backed butyl window and door e Square flashing tape or equivalent eal yy eee A e High quality exterior grade polyurethane or silic
4. on factory finish that needs no painting Clean this surface with mild soap and water Stubborn stains and deposits may be removed with mineral spirits DO NOT use abrasives DO NOT scrape or use tools that might damage the surface Use of inappropriate finishes solvents brickwash or cleaning chemicals will cause adverse reactions with window and door materials and voids the Limited Warranty CARE AND MAINTENANCE Care and maintenance information is available in the Pella Owner s Manual You can obtain an owner s manual by contacting your local Pella retailer This information is also available at www pella com IMPORTANT NOTICE Because all construction must anticipate some water infiltration it is important that the wall system be designed and constructed to properly manage moisture Pella Corporation is not responsible for claims or damages caused by anticipated and unanticipated water infiltration deficiencies in building design construction and maintenance failure to install Pella products in accordance with Pella s installation instructions or the use of Pella products in wall systems which do not allow for proper management of moisture within the wall systems The determination of the suitability of all building components including the use of Pella products as well as the design and installation of flashing and sealing systems are the responsibility of the Buyer or User the architect contractor installer or other construction p
5. NOT use steel wool BE CAREFUL NOT TO SCRATCH THE GLASS Remove sanding dust Pella products must be finished per the below instructions failure to follow these instructions voids the Limited Warranty e On casement and awnings it is optional to paint stain or finish the vertical and horizontal sash edges e On single hung and double hung do not paint stain or finish the vertical sash edges any finish on the vertical sash edges may cause the sash to stick it is optional to paint stain or finish the horizontal sash edges e On patio doors it is optional to paint stain or finish the vertical and horizontal panel edges Note To maintain proper product performance do not paint finish or remove the weather stripping mohair dust pads gaskets or vinyl parts Air and water leakage will result if these parts are removed After finishing allow venting windows and doors to dry completely before closing them Pella Corporation is not responsible for interior paint and stain finish imperfections for any product that is not factory applied by Pella Corporation Use of inappropriate finishes solvents brickwash or cleaning chemicals will cause adverse reactions with window and door materials and voids the Limited Warranty For additional information on finishing see the Pella Owner s Manual or go to www pella com EXTERIOR FINISH The exterior frame and sash are protected by aluminum cladding with our tough EnduraClad or EnduraClad Plus baked
6. f the fold so the exterior sealant line will cover the exterior edge of the tape A Apply side flashing tape Cut 2 pieces of flashing tape 4 longer than the frame height of the door Apply one piece 1 2 up onto the frame cladding over the nailing fin and onto the flashing paper to each side The tape should extend 2 above the top of the door and 2 below the bottom of the door Press the tape down firmly while folding down the excess tape at the top and bottom of the door B Apply top flashing tape Cut a piece of flashing tape long enough to go across the top of the door and extend at least 1 past the side flashing tape on both sides Apply the tape 1 2 up onto the frame cladding over the top nailing fin as shown Fold the overlapping tape down and press all tape down firmly Note The top flashing tape must overlap the side flashing tape to prevent water from getting behind it C Apply the top flashing paper Cut one piece of flashing paper at least 21 longer than the width of the rough opening Position the bottom edge of the flashing paper flush with the frame of the door and center the flashing paper with the width of the door Staple the flashing paper to the header Note When applying the first layer of building felt e
7. he bottom is level B Confirm the door will fit the opening Measure all four sides of the opening to make sure it is 3 4 larger than the door in width and 1 2 larger in height Measure the width at the top bottom and center Measure the height at the far left side the far right side and in the center Note 1 1 2 or more of solid wood blocking is required around the perimeter of the opening Fix any problems with the rough opening before proceeding C Apply flashing paper at the bottom 1C Cut one piece of flashing paper 18 longer than the width of the rough opening Position the top edge of the flashing paper with the top of the sill plate Center the flashing paper with the opening width Staple the flashing paper to the sill plate Note Bottom flashing paper is not required for installation on concrete floors D Apply flashing paper to the sides of the rough opening 1D Cut two pieces of flashing paper 18 longer than the height of the rough opening Apply one piece to each jamb Position the edge of the flashing paper with the inside edge of the trimmer jack stud and center the flashing paper with the height of the rough opening Staple the flashing paper to the trimmer
8. installation foams and strictly follow the foam manufacturer s recommendations for application Use of high pressure foams or improper application of the foam may cause the door to bow and hinder operation DO NOT use fiberglass insulation A Apply insulating foam From the interior insert the nozzle of the applicator approximately 1 deep into the space between the door and the rough opening and apply a 1 deep bead of foam This will allow room for expansion of the foam and will minimize squeeze out If using foam other than Great Stuff Window and Door Insulating Foam Sealant by the Dow Chemical Company allow the foam to cure completely usually 8 to 24 hours before proceeding to the next step Note DO NOT completely fill the space from the back of the fin to the interior face of the opening B Check the door operation by opening and closing the door Note If the door does not operate correctly check to make sure it is still plumb level square and that the sides are not bowed If adjustments are required remove the foam with a serrated knife Adjust the shims and reapply the insulating foam sealant SEALING THE DOOR TO THE 7 EXTERIOR WALL CLADDING VA WALL I Note When applying the casing bead for stucco leave 1 2 space Pal Ss o between the head of the door and the casing bead and 3 8 space between the door jambs and the casing bead for backer
9. n the door to opening by driving 2 galvanized roofing PREPARE THE DOOR FOR INSTALLATION Remove the plastic wrap and cardboard packaging from the door Note If screens grilles or hardware are removed from the door at this time label them and store them in a protected area Remove the shipping spacers Carefully slide the movable panel halfway open and remove the spacers from both the top and bottom of the movable panel TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL amp FRAME SAFELY Remove the venting panel by lifting it out of the lower track and tilting the bottom of the panel away from the door frame Then lower the panel out of the top track Carefully set the panel aside Note Assemble the OXXO frame per the instructions included with the door splice kit Note If the fin is not at 90 the door will not line up correctly on the interior SETTING AND FASTENING THE DOOR Place three 3 8 beads of sealant The first bead should be approximately 3 4 from the exterior of the rough opening the second 2 1 2 in from the first bead of sealant Place a third bead of sealant in the groove of the sill support or 1 4 from the exterior edge of the wood blocking TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS Samo door into the opening Sliding will damage the sealant lines Place the bottom of the CN door at the bottom of the opening then tilt the top into position Center the doo
10. nsure the sill flashing paper overlaps the building felt This will tie the door system into the building water management system 5 REINSTALL THE SLIDING PANEL TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL SAFELY A Insert door panel From the exterior of the building tilt the top of the panel toward the door frame and insert the top of the door panel into the top track Move the bottom of the panel toward the door frame until it is vertical Gently set the panel down into the bottom track Architect Series Adjust the panel clip and tighten the panel clip screw ProLine only Install bumpers and the panel retainer Follow the instructions included in the hardware box Note Be careful not to pinch your fingers between the two panels DO NOT close the sliding panel until you have installed the hardware The door may lock when closed B Install the handles and panel retainer Follow the instructions included in the hardware box If the panel is not square to the door frame adjust the bottom rollers by removing the adjusting hole cover and inserting an 8 long 2 Phillips screwdriver into the hole Turn clockwise to raise the panel and counter clockwise to lower the panel Follow the instructions included in the handle box for final adjustments C Install screen Instructions for installing the screen are found in the screen door package 6 INTERIOR SEAL Caution Ensure use of low pressure polyurethane window and door
11. one sealant pi t 2 to 3 tubes per door ak e Stapler ct e Great Stuff Window and Door Insulating Foam Sealant by the Dow Chemical Company or equivalent low pressure polyurethane window and door foam DO NOT use high pressure or latex foams e Sealant gun e Scissors or utility knife e Pella aluminum sill support or 2 x 4 wood blocking e Drill e Interior trim and or jamb extensions 15 to 40 ft oe ee To e 9 wide Fortifiber flashing paper or equivalent 2 Phillips with 8 shaft and small flat blade REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT Fin ee Ei Corner Nailing Fin i Top y a Flashing S Side Tape h Flashing i Tape n Interlocker 9 P qa p e r Side Flashing Tape iM l Sill Flashing Tape 1 J200 Sill Flashing Tape 2 Always read the Pella Limited Warranty before purchasing or installing Pella products By installing this product you are acknowledging that this Limited Warranty is part of the terms of the sale Failure to comply with all Pella installation and maintenance instructions may void your Pella product warranty See Limited Warranty for complete details at http warranty pella com 1 ROUGH OPENING PREPARATION A Confirm the opening is plumb and level Note It is critical that t
12. r between the sides of the opening to allow equal clearance for shimming and insert one roofing nail in the first hole from the corner on each end of the top nailing fin These are used to hold the door in place while shimming it plumb and square Plumb and square door Insert shims as necessary between the door and the sides of the rough opening starting up 6 from the bottom of the door Note DO NOT OVER SHIM T Interior interior face of the door to the interior face of the wall is equal at several points around the door Note If the dimensions are not equal check to make sure the fins are folded out to 90 at all points Insert a 8 x 2 1 2 screw included in the panel retainer and screw package into the pilot hole making sure it passes through the shim and into the rough opening Note The weather strip must be pushed aside to reveal the pilot hole Be careful not to damage the weather strip Architect Series and Designer Series have 2 lock strikes ProLine has one lock strike nails into each pre punched hole in the nailing fin Note Make sure the fin corner is lying as flat as possible ProLine Doors Proceed to Step 4 3 SETTING AND FASTENING THE DOOR continued Interior L Fixed Panel gt
13. rod and 3 4 Backer Rod and sealant Refer to the illustration Southwestern Wall With Stucco Sealant typical 1 2 Clearance Accessory Groove Note The sealant details shown are standard recommendations a from the sealant industry Contact your sealant supplier for Insulating gt recommendations and instructions for this and any other application Foam i SEALING THE DOOR TO THE EXTERIOR WALL CLADDING continued A Insert backer rod into the space around the door leaving at least a 1 2 clearance between the backer rod and the exterior face of the casing bead Note Backer rod adds shape and depth for the sealant line B Apply a bead of high quality exterior grade sealant to the entire perimeter of the door At each end of the bottom of the door insert sealant into the spaces between the bottom of the door and the sill support and connect it to the perimeter sealant C Shape tool and clean excess sealant When finished the sealant should be the shape of an hourglass Note This method creates a more flexible sealant line capable of expanding and contracting D Remove plastic guards at the base of the door once construction is complete 8 INTERIOR FINISHING If the products cannot be finished immediately cover with clear plastic to protect from dirt damage and moisture Remove any construction residue before finishing Sand all wood surfaces lightly with 180 grit or finer sandpaper DO
14. rofessional and are not the responsibility of Pella Pella products should not be used in barrier wall systems which do not allow for proper management of moisture within the wall systems such as barrier Exterior Insulation and Finish Systems EIFS also known as synthetic stucco or other non water managed systems Except in the states of California New Mexico Arizona Nevada Utah and Colorado Pella makes no warranty of any kind on and assumes no responsibility for Pella windows and doors installed in barrier wall systems In the states listed above the installation of Pella products in barrier wall or similar systems must be in accordance with Pella s installation instructions Product modifications that are not approved by Pella Corporation will void the Limited Warranty

Download Pdf Manuals

image

Related Search

Related Contents

  SB-AV502  Toshiba SD3010 User's Manual  取扱説明書[DC-1NJB1] (1.57 MB/PDF)    こちら    Manual de instruções, Torneamento  OWNER`S MANUAL GUIDE DE MONTAGE  LG Electronics 265 Cell Phone User Manual  

Copyright © All rights reserved.
Failed to retrieve file