Home
New Buck Corporation 261 User's Manual
Contents
1. Ye Figure 12 LHH CLEAN OUT DOOR 4 amp MASONRY CHIMNEY HOW TO LOCATE CHIMNEY EXIT AND INSTALL F Vertical exit into masonry flue using 6 DVL Close Clearance pipe with Elbow With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 19 Figure 13 1 Before connecting these units to a masonry chimney determine that the masonry flue pass through connector thimble meets the NFPA 211 Code and local building codes maintain manufacturers minimum clearances from the ceiling If the connector thimble does not meet these codes the pass through connector must be modified Connectors may pass through walls or partitions constructed of combustible material if the connector is a Either listed for wall pass through or is routed through a device listed for wall pass through and is installed in accordance with the conditions of the listing b Selected or fabricated in accordance with the conditions and clearances as stated in the NFPA 211 Code Any unexposed metal that is used as part of a wall pass through system and is exposed to flue gases shall be constructed of stainless steel or other equivalent material that will resist corrosion softening or cracking from
2. A B C D E E MODEL 261 14 4 14 7 8 3 16 NOTE Allclearances are to combustibles with all low clearance shields and double wall pipe or shielded single wall pipeand minimum floor protector NOTE Model 261 comes standard with low clearance shields HOW TO LOCATE CHIMNEY EXIT AND INSTALL C Vertical Wall Exit using 6 Single Wall pipe minimum 24 ga blued or black with elbow and any Listed 2100 UL HT chimney and Listed 2100 UL HT T Box assembly With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 13 Figure 7 l Mark the plumb line on the wall directly behind the center of the heater See Page 13 Figure 8 NOTE When using 24 ga minimum blue or black steel pipe maintain 18 minimum clearances between pipe and ceiling Place the vertical portion of the heater pipe and the elbow in position and project a point onto the plumb line level with the center of the elbow Measure up so there will be at least 1 4 rise per foot of horizontal connector pipe maintaining clearances to the ceiling as noted in Page 13 Figure 8 This will give you the center of the hole for the chimney penetration After locating the center of the penetration install the tee box and chimney as per the chimney manufacturer s specifications Connect the chimney collar to the tee box using 24 ga minimu
3. Figure 3 Figure 4 BACK WALL 7 ll LISTED 2100 UL 103 HT TYP CHIMNEY gt STORM COLLAR E 2 YY Z z Ay 4 FLASHING pe RADIATION SHIELD LISTED 2100 UL 103 HT TYPE gt INSTALLATION A SUPPORT CEILING SINGLE WALL x CONNECTOR PIPE Mee NEW BUCK Ww CAST COLLAR Part MA6CHIMCNB A B C D E E G MODEL 261 13 8 13 12 8 3 16 NOTE All clearances are to combustibles with low clearance shields and using single wall pipe and minimum floor protector The clearances above may be reduced Follow NFPA 211 codes if available or follow instructions on Pages 10 11 NOTE Model 261 comes standard with low clearance shields HOW TO LOCATE CHIMNEY EXIT AND INSTALL B Vertical Exit using 6 DVL Close Clearance pipe or Shielded Single wall pipe and any Listed 2100 UL 103 HT chimney With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 11 Figure 5 l Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit A small weight on a string will serve as a plumb bob Mark the ceiling where the string is suspended to locate the center of the chimney hole After locating the center of the hole install the ceiling support box chimney
4. 3l How to locate chimney exit and 1mstall z 1 aoo rtc cd ede et 32 A Vertical Installation using DVL Close Clearance Pipe 1 Alcove Installation Vertical Exit with standard close clearance shield and pipe shield 32 2 Alcove Installation Horizontal Exit with standard close clearance shield and pipe shield 34 B Rear Installation using DVL Close Clearance Pipe 1 Alcove Installation Rear Exit with standard close clearance shield and pipe shield 36 SECTION V Freestanding Mobile Home Installation eese 39 Minimum Clearances Floor Protection and Combustibles 39 Preparing Stove For Installation bero nta dede be bulis tes HO den 40 Prepatins Heater Location ose oov x otio Piet nU elu ERA D etl ela an tune ue nA fale o sadn 41 Minimum Clearances to Combustibles 42 How to locate chimney exit and ea bite vena ver Ratte in 43 Wood Heater Seo tox eens ral et EO ound Aud ATEO yl en AOT 46 Operati UN 47 Drs 48 EINEELEBD WARRANTY edo apto T RE Ua Gr RATS S aD uta Pelis 50 INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS MODELS 261 READ THIS FIRST IMPORTANT INSTRUCTIONS WARNING THESE UNITS GENERATE A LOT OF HEAT SO TREAT THEM WITH CARE HOT
5. Crack door for 15 seconds before fully opening door NEW BUCK CORPORATION NBC LIMITED WARRANTY FOR THE BUCK STOVE PLEASE READ THIS WARRANTY CAREFULLY PRODUCTS COVERED This warranty covers the New Buck Stove heating unit so long as it is owned by the original purchaser including optional and standard accessories purchased at the same time subject to terms limitations and conditions herein set out PRODUCTS NOT COVERED This warranty does not cover the following Glass Refractory material such as refractory cement or firebrick Gaskets This Warranty will also not cover any damage and or failure caused by abuse or improper installation of the products covered WARRANTY TIME PERIODS A Period I For one year from the date of purchase NBC will replace or repair at its option any part defective in materials or workmanship The costs of parts only are included The customer pays any labor or transportation charges required Thereafter B Period For the period after the first year from the date of purchase and extending for 5 years as long as the Buck Stove is owned by the original purchaser NBC will repair or replace at its option any part defective in materials or workmanship with the exception of electrical motors wiring switches and components optional and standard accessories and all parts not permanently attached to the heating unit Parts not permanently attached to the heating unit are define
6. 2 Open the primary air control under hearth push in To close pull all the way out 3 Twist two pieces of non colored newspaper into a roll and place them on the floor of the firebox 4 These models are not designed for the use of grates andirons or other methods of supporting the fuel 5 Lay several pieces of dry kindling on top of the newspaper 6 Place three or four small pieces of firewood 2 3 in diameter on top of the kindling 7 Light the newspaper in the front Close and latch the door Don t leave the fire unattended at this point The draft system of the heater should start quickly It may be necessary to preheat the chimney to get the draft started To do this open the door and add newspaper to the top rear of the wood Light or let this paper ignite and allow to burn while holding the door slightly cracked Once the draft has started close and lock the door You are over heating the unit if the chimney and or connector glows red 8 After embers and a coal bed have been established load the heater with wood NOTE THE FUELING DOOR MUST REMAIN CLOSED DURING OPERATION NOTE If the optional blower is being used on the Model 261 Non Cat operate the blower in the OFF position for the first thirty 30 minutes after starting the fire and in the OFF position for thirty 30 minutes after refueling the fire 47 PROBLEM 1 Sluggish Heater SECTION VIII TROUBLESHOOTING POSSIBLE CAUSE Obstruction in C
7. 1 Before connecting these units to masonry chimney determine that the masonry flue pass through connector thimble meets the NFPA 211 Code and local building codes and isa minimum of 18 from the ceiling If the connector thimble does not meet these codes the pass through connector must be modified NOTE When using 24 ga minimum blue or black steel pipe maintain 18 minimum clearances between pipe and ceiling Connectors may pass through walls or partitions constructed of combustible material 1f the connector is a Either listed for wall pass through or is routed through a device listed for wall pass through and is installed in accordance with the conditions of the listing b Selected or fabricated in accordance with the conditions and clearances as stated in the NFPA 211 Code Any unexposed metal that is used as part of a wall pass through system and is exposed to flue gases shall be constructed of stainless steel or other equivalent material that will resist corrosion softening or cracking from flue gases at temperatures up to 1800 F In addition a connector toa masonry chimney shall extend through the wall to the inner face or liner but not beyond and shall be firmly cemented to masonry EXCEPTION A thimble may be used to facilitate removal of the chimney connector for cleaning in which case the thimble shall be permanently cemented in place with high temperature cement 2 Once the through the wall thimble codes a
8. 8 3 16 10 NOTE clearances are to combustibles with all low clearance shields and single wall pipe with elbow and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE Model 261 comes standard with low clearance shields CEILING x NOTE Maintain Manufacturers Minimum Clearances DVL CLOSE E CLEARANCE PIPE 1 25 NEW BUCK CAST COLLAR MASONRY Part MAGCHIMCNB FLUE LINERS Figure 14 23 CLEAN OUT DOOR 4 MASONRY CHIMNEY a SECTION III E RESIDENTIAL FREESTANDING REAR EXIT INSTALLATION For optional rear exit installation locations refer back to table of contents Section III MINIMUM CLEARANCES TO FLOOR AND COMBUSTIBLES See minimum floor protector measurements and also for minimum clearances to combustibles Pages and Figures below A Rear Exit Into Masonry Flue Using Single Wall Pipe Page23 Figurel7 B B Rear Exit Into Masonry Flue Using DVL Close Clearance Pipe Page25 Figure19 C Rear Exit Vertical to Horizontal DVL Close Clearance Pipe and Elbows Page27 Figure21 D Rear Exit Into Masonry Fireplace using Single Wall Pipe Page28 Figure2
9. contact your dealer for assistance CAUTION The unit is painted with a specially formulated high temperature paint that cures during the first two or three firings You may notice a slight smoking effect and an odor of burning paint when you build the first fires This is normal and is not a cause for alarm In some cases these fumes will activate a smoke alarm Opening a window near the unit will allow these fumes to escape DO NOT build a large roaring fire until this curing is complete or the heater finish may be damaged 38 MEE SECTION Y FREESTANDING MOBILE HOME INSTALLATION MINIMUM CLEARANCES TO FLOOR AND COMBUSTIBLES See minimum floor protector measurements and also for minimum clearances to combustibles See Page 42 Figure 35 Floor Protection When installing freestanding heater a floor protector must be use Floor protection must be 3 8 minimum thickness non combustible material or equivalent How to use alternate materials and how to calculate equivalent thickness An easy means of determining if a proposed alternate floor protector meets requirements listed in the appliance manual is to follow this procedure 1 Convert specification to R value R value is given no conversion is needed factor is given with a required thickness in inches C factor is given R 1 C 2 Determine the R value of the proposed alternate floor protector Use the formula in step 1 to convert values not expr
10. 125 0 431 Step Compare proposed system R of 1 231 to specified of 0 893 Since proposed system R is greater than required the system is acceptable Definitions Thermal conductance Btu W hr f amp CF m CK Thermal conductance Btu inch W Btu hr ft Cf m CK HCF Thermal conductance ft hr F m K Btu W 6 Select an installation location that will give the best airflow from the front of the heater to the remainder of the home PREPARING THE STOVE FOR INSTALLATION 1 Inspect the unit for any obvious physical damage 2 Plug the power cord into a 115V AC outlet to test the motor and fan when optional motor is being used Do not run power cord under unit or in high traffic areas 3 Check the primary air draft control to ensure that it slides freely 4 Remove any items from within the firebox Spread a dropcloth on the floor behind the heater Next tilt the heater so that the back is on the drop cloth 5 Then obtain four legs attach the legs to holes in bottom of unit with bolts and washers supplied with the leg kit See Figure 1 1 EN Figure 1 6 Reposition the heater to the upright position 7 Next fasten New Buck s Cast Collar part number MA6CHIMCNB to the flue exit of stove to be used using the J hook s provided Position collar with gasket towards the unit tighten the J hook s Fir
11. Check the primary air draft control to ensure that it slides freely 4 Remove any items from within the firebox Spread a dropcloth on the floor behind the heater Next tilt the heater so that the back is on the drop cloth 5 Then obtain four legs attach the legs to holes in bottom of unit with bolts and washers supplied with the leg kit See Figure 35 1 SS Se Figure 33 6 Reposition the heater to the upright position 7 Next fasten New Buck s Cast Collar Part number MA6CHIMCNB to the flue exit of stove to be used using the J hook s provided Position collar with gasket towards the unit tighten the J hook s Firmly secured See Figure 36 8 Fasten New Buck s Flue Collar Plate to the exit not used for burning stove Firmly secure the Flue Collar Plate Bracket with the nut and washer provided See Figure 36 FLUE COLLAR PLATE 4 FLUE COLLAR PLATE Ka J HOOK NEW BUCK CAST COLLAR Figure 34 9 Now the stove 15 ready to be positioned in the predetermined location 40 FREESTANDING MOBILE HOME INSTALLATION PREPARING THE ROOM HEATER LOCATION 1 Select an installation location that will give the best airflow from the front of the heater to the remainder of the home See Page 42 Figure 35 minimum clearances to combustibles CAUTION THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR MUST BE AINTAINED MOVE OPENING AND OR RE
12. Flue Collar Plate to the exit not used for burning stove Firmly secure the Flue Collar Plate Bracket with the nut and washer provided See Figure 16 FLUE FL COLLAR PLATE F HOOK FLUE COLLAR PLATE BRACKET NEW BUCK CAST COLLAR Figure 16 9 Now the stove is ready to be positioned in the predetermined location 21 PREPARING THE ROOM HEATER LOCATION 1 Select an installation location that will give the best airflow from the front of the heater to the remainder of the home 2 Place the protective floor pad in position 3 Place the unit on the pad making sure the minimum clearance specifications are met 4 If connecting to an existing masonry flue first ensure that the flue conforms to the NFPA 211 Code and or consult your local code for proper procedures This model is designed for connection to any Listed 2100 UL 103 HT TYPE chimney also any Listed UL DVL Close Clearance Pipe Follow pipe manufactures instructions carefully CHIMNEY This room heater must be converted to 1 a chimney complying with the requirements for Type HT chimneys in the Standard for Chimneys Factory Built Residential Type and Building Heating Appliance UL 103 or 2 a code approved masonry chimney with a flue liner HOW TO LOCATE CHIMNEY EXIT AND INSTALL A Rear exit Into Masonry Flue using 6 Single Wall Pipe minimum 24 ga blued or black pipe With standard close clearance shield and pipe shield NOTE For minimum clear
13. WHILE IN OPERATION KEEP CHILDREN CLOTHING AND FURNITURE AWAY CONTACT MAY CAUSE SKIN BURNS READ ALL INSTRUCTIONS BEFORE INSTALLING AND USING THE APPLIANCE FAILURE TO FOLLOW INSTRUC TIONS MAY RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCES e The New Buck Corp non catalytic MODEL 261 has been tested by ITS Warnock Hersey to ANSI UL Standards 1482 e Install and operate your units according to instructions provided in this manual Local building codes may apply therefore contact your local building inspector or fire marshal for necessary installation requirements and permits which may go beyond these instructions e If appliance is installed in mobile homes DO NOT INSTALL IN SLEEPING ROOMS e Examine the masonry fireplace and chimney prior to installation of the fireplace accessory to determine that the construction meets the minimum fireplace construction requirements illustrated in the instructions that it is free from cracks loose mortar creosote deposits and other blockage or other signs of deterioration CAUTION DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE DO NOT USE A FLUE INTENDED FOR A GAS APPLIANCE DO NOT CONNECT TO ANY DISTRIBUTION DUCT OR SYSTEM CAUTION YOUR CHIMNEY OR FLUE MUST BE CORRECTLY SIZED A CHIMNEY OR FLUE THAT IS TOO SMALL OR LARGE IN DIAMETER OR TOO SHORT CAN CAUSE YOUR STOVE TO SPILL SMOKE WHEN TH
14. instructions provided with the motor assembly kit POSSIBLE TOOLS NEEDED FOR INSTALLATION If you decide to install your own stove there are several hand tools you may need to do the job If you do not already have them they are readily available at most hardware stores Caulking gun Large adjustable wrench may not be needed Drop cloths or newspapers Vacuum cleaner or whisk broom Flashlight 1 tube of silicone Code 103 or 106 or high temperature rubber cement rated between 450 F 600 7 32 drill bit and electric drill Socket Ratchet Set Wrench Electric Sawzall INSTALLATION PREPARATION Locate furniture and other materials away from the area stove will be to allow free access Cover the adjacent floor areas with the drop cloths to protect from soiling or marring the surface 3 Ifusing an existing flue clean it of ashes and soot 4 Check the flue for excessive build up of creosote or soot Also check for obstructions such as bird s nests If the flue is excessively dirty clean it or have someone clean it professionally BEFORE installing or using the room heater 5 Ifthe flue is not used seal off with metal or tightly packed non combustible insulation NOR CAUTION THE UNIT IS PAINTED WITH A SPECIALLY FORMULATED HIGH TEMPERATURE PAINT THAT CURES DURING THE FIRST TWO OR THREE FIRINGS YOU MAY NOTICE A SLIGHT SMOKING EFFECT AND AN ODOR OF BURNING PAINT WHEN YOU BUILD THE FIRST FIRES THIS IS NO
15. 3 and Page29 Figure24 Floor Protection When installing freestanding heater a floor protector must be use Floor protection must be 3 8 minimum thickness non combustible material or equivalent R 0 06 How to use alternate materials and how to calculate equivalent thickness An easy means of determining if a proposed alternate floor protector meets requirements listed in the appliance manual is to follow this procedure 1 Convert specification to R value R value is given no conversion is needed K factor is given with a required thickness T in inches C factor is given R 1 C 2 Determine the R value of the proposed alternate floor protector Use the formula in step 1 to convert values not expressed as For multiple layers add R values of each layer to determine the overall R value 3 Ifthe overall R value of the system is grater than the R value of the specified floor protector the alternate is acceptable Example The specified floor protector should be 3 4 thick material with a K factor of 0 84 The proposed alternate is 4 brick with a C factor of 1 25 over 1 8 mineral board with a K factor of 0 29 Step a Use formula above to convert specification to R value R 1 K x T 1 0 84 x 75 0 893 Step b Calculate of proposed system 4 brick of C 1 25 therefore Rbrick 1 C 1 1 25 0 80 1 8 mineral board of K 0 29 therefore Rmin bd 71 029 x0 125 0 431 Step Compare proposed system o
16. CES A 2 Alcove Vertical Wall exit using 6 DVL Close Clearance pipe Elbow and any listed 2100 UL 103 HT TYPE Chimney With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles 4 Maintain BACE WATD Yj Figure 29 Manufacturers r 4 Minimum Clearances I A H F Y B C Y 2 N Li gt E Y nl z Sa G YY g 2 IEEE lt gt 24 Yj 9 n 2 Y An r Ent D 2 lt A Y ate A B G H I MODEL 261 14 4 7 16 8 3 47 10 84 LISTED 2100 UL 103 HT TYP CHIMNEY REEFER TO MANUFACTURERS CEILING NOT E Maintain Manufactures Minim Clearances INSTALLATION INSTRUCTION CENTERLINE PVL CLOSE a OF ELBOW CLEARANCE MARK PLUMB 7 LINE ON WALL M ES LISTED 2100 UL 103 HT TYP 5 CHIMNEY T BOX ASSEMBLY m COH P REEFER TO MANUFACTURERS Part gt 2 INSTALLATION INSTRUCTION Figure 30 WALL PASS THROUGH IN CONNECTOR SIDE NOTE All clearances are to combustibles with all low clearance shields and double wall pipe and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE Model 261 comes standard with low clearance shields 35 B 1 Rear
17. D E F G H I MODEL 261 14 4 16 8 3 47 10 84 CEILING LISTED 2100 UL 103 HT TYPE CHIMNEY REEFER TO MANUFACTURERS INSTALLATION INSTRUCTION Figure 32 gl L 1 bat LISTED 2100 UL 103 HT TYPE CHIMNEY T BOX ASSEMBLY REEFER TO MANUFACTURERS INSTALLATION INSTRUCTION IN SIDE WALL NOTE All clearances are to combustibles with all low clearance shields and double wall pipe and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE Model 261 comes standard with low clearance shields 37 FINAL CHECK 1 Recheck the specified clearances 2 Remove all foreign material from the firebox area 3 Open the primary air draft 4 Plug the power cord into a 115V AC outlet when using with optional motor 5 Place crumpled pieces of newspaper in the stove Light it and close the doors Ensure that the stove draws properly through the primary draft 6 Check for smoke leaks around the door CAUTION Open the doors and check for smoke escaping from the front of the stove Smoking usually indicates a defective or poorly positioned chimney Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near the open damper with a poker or fire tong Once the chimney heats up a proper draft can usually be obtained If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem
18. E DOOR IS OPENED CON INTRODUCTION Your new MODEL 261 is a non catalytic unit designed to meet the most stringent emissions standards without the use of a catalytic combustor This effect is achieved through the use of secondary air which is mixed with primary air in the unit s firebox For peak performance we suggest the use of hard seasoned natural wood loading wood length way from front to rear You should not burn trash or garbage artificial or paper logs gift wrapping treated or painted wood or any type of coal DO NOT USE CHEMICALS OR FLUIDS TO START THE FIRE DO NOT BURN GARBAGE OR FLAMMABLE FLUIDS The primary air which is controlled by the user burns the wood Secondary air is admitted into the firebox through the secondary air tubes at the top of the firebox This secondary air burns the impurities in the smoke released from the initial wood burning The temperature necessary for this combustion is maintained through the firebrick refractory If any more technical information is necessary contact your local dealer Under specific test conditions this heater has been shown to deliver heat at rates ranging from approximately 11 800 to 40 900 BTU HR These unit may also be used with optional room air blower To order optional motor assembly you must specify the stove model number and give the following part number Model 26 261 Motor Assembly MA 5126715 For operation and use of this electrical assembly see
19. EARANCE PIPE MASONRY FLUE Figure 22 1 CLEAN OUT DOOR 44 MASONRY CHIMNEY Rear exit into Masonry Fireplace using 6 Single Wall pipe minimum 24 ga blued or black pipe With standard close clearance shield and pipe shield NOTE For minimum clearances See Figure 23 INSTALLATION PREPARATION l Locate furniture and other materials away from the front of the fireplace to allow free access to the fireplace Thoroughly clean the fireplace or flue of ashes and soot Check the chimney and smoke chamber for excessive buildup of creosote or soot Also check for obstructions such as bird s nests If the chimney is excessively dirty clean it or have someone clean it professionally BEFORE installing or using the room heater If the fireplace has an ash dump or outside air provision these must be sealed off with metal or tightly packed non combustible insulation to prevent cold air from entering the fireplace chamber Iftop of rear flue exit with standard leg kit is above 24 Note A 24 flue exit height may be achieved by using the optional 2 legs Part FA FS261 to bring the rear exit down to acceptalble clearances Remove or wire open the fire place damper A nonconbustable sealing plate must be installed to close and seal the openig of the fire place A hole diameter of the pipe used must be cut into the sealing pl
20. ES Ashes should be placed in a metal container with a tight fitting lid The closed container of ashes should be placed on a non combustible floor or on the ground well away from all combustible materials pending final disposal If the ashes are disposed of by burial in soil or otherwise locally dispersed they should be retained in the closed container until all cinders have thoroughly cooled CREOSOTE FORMATION AND NEED FOR REMOVAL When wood is burned slowly it produces tar and other organic vapors which combine with expelled moisture to form creosote The creosote vapors condense in the relatively cool chimney flue of a slow burning fire As a result creosote residue accumulates on the flue lining When ignited this creosote makes an extremely hot fire 46 SECTION VII OPERATION This section of the manual is to help you get the maximum efficiency and maximum smoke particulate reduction from your heater If you should experience any difficulty or have questions concerning your heater contact your dealer for assistance The manufacturer recommends that for maximum performance burn seasoned hard wood Build a fire for maximum efficiency These models burn wood and extract heat so efficiently a large fire is not necessary A large fire not only wastes energy it usually results in the home being too warm for comfort The following steps will serve as a guide for operating your stove BUILDING A FIRE 1 Open the door
21. EW BUCK CAST COLLAR MANUFACTURES Part MAGCHIMCNB N INSTALLATION P E INSTRUCTION WALL PASS THROUGH CONNECTOR IN HOW TO LOCATE CHIMNEY EXIT AND INSTALL D Vertical Wall Exit using 6 DVL Close Clearance Pipe and Elbow and any Listed 2100 UL HT chimney and Listed 2100 UL HT T Box assembly With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 15 Figure 9 l Mark the plumb line on the wall directly behind the center of the heater See Page 15 Figure 10 NOTE When using DVL Close Clearance Pipe maintain manufacturers minimum clearances between pipe and ceiling Place the vertical portion of the heater pipe and the elbow in position and project a point onto the plumb line level with the center of the elbow Measure up so there will be at least 1 4 rise per foot of horizontal connector pipe maintaining clearances to the ceiling as noted in Page 15 Figure 10 This will give you the center of the hole for the chimney penetration After locating the center of the penetration install the tee box and chimney as per the chimney manufacturer s specifications Connect the DVL close clearance pipe to the tee box per manufacturer s instructions DVL close clearance pipe is to be connected with 3 sheet metal screws or rivets to New Buck Cast Collar after New Buck Cast Collar Part MA6CHIMCNB has been attached to st
22. Exit Installation HOW TO LOCATE CHIMNEY EXIT AND INSTALL B 1 Vertical Rear Exit using 6 DVL Close Clearance Pipe and any Listed 2100 UL HT chimney and Listed 2100 UL HT T Box assembly With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 37 Figure 31 1 Measure up so there will be at least 1 4 rise per foot of horizontal connector pipe maintaining clearances as noted in Page 37 Figure 31 This will give you the center of the hole for the chimney penetration 2 After locating the center of the penetration install the tee box and chimney as per the chimney manufacturer s specifications 3 Connect the DVL close clearance pipe to the tee box per manufacturer s instructions DVL close clearance pipe is to be connected with 3 sheet metal screws or rivets to New Buck Cast Collar after New Buck Cast Collar has been attached to stove See Page 37 Figure 32 36 ALCOVE INSTALLATION AND CLEARANCES B 1 Alcove Rear exit using 6 DVL Close Clearance pipe and any listed 2100 UL 103 HT TYPE Chimney With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles BACK WALL Up sw amp TY Y Yj I 2 A 2 5 Yj 2 2 GY Figure 31 K 7 amp PN ru l i a A B
23. HT chimney 10 C Vertical Wall Exit Using Single Wall Pipe and Elbow Listed 2100 UL 103 HT Chimney and T BOX assembly ose tte t tetti Poet cox Pte ee xa Mec o OR dena 12 D Vertical Wall Exit Using DVL Close Clearance Pipe Elbow Listed 2100 UL 103 HT Chimney and T BOX assembly 14 E Vertical Exit Into Masonry Flue Using Single Wall Pipe and Elbow sss 16 F Vertical Exit Into Masonry Flue Using DVL Close Clearance Pipe and Elbow 18 SECTION III Residential Freestanding Rear Installation eee 20 Minimum Clearances Floor Protection and Combustibles 20 Preparing Stove For Installations sso coto dye xe pr eset bet rin Ex Ue e I apelin 21 How to locate chimney exit and install iiec eec ette 22 A Rear Exit Into Masonry Flue Using Single Wall Pipe sees 3 2 B Rear Exit Into Masonry Flue Using DVL Close Clearance Pipe 24 C Rear Exit to Vertical then Horizontal DVL Close Clearance Pipe and Elbows 26 D Rear Exit Into Masonry Fireplace using Single Wall Pipe 28 SECTION IV Alcove Installation Vertical or Horizontal exit seen 30 Minimum Clearances Floor Protection and Combustibles eene 30 Preparing Stove
24. MODEL 261 NON CATALYTIC UNIT TOP EXIT OR REAR EXIT FEATURES PREPARATIONS INSTALLATION OPERATION MAINTENANCE SAFETY SAFETY NOTICE A IF THIS HEATER IS NOT PROPERLY INSTALLED A HOUSE FIRE MAY RESULT FOR YOUR SAFETY FOLLOW THE INSTALLATION INSTRUCTIONS CONTACT THE AUTHORITY HAVE JURISDICTION SUCH AS MUNICIPAL BUILDING DEPARTMENT FIRE DEPARTMENT FIRE PREVENTION BUREAU ect SHOULD BE CONSULTED BEFORE INSTALLATION TO DETERMINE THE NEED TO OBTAIN A PERMIT KEEP THESE INSTRUCTIONS FOR FUTURE USE TESTED AND LISTED BY ITS WAV WARNOCK HERSEY MIDDLETON WI MANUFACTURED BY NEW BUCK CORPORATION SPRUCE PINE NC 28777 Revised 10 2007 TABLE OF CONTENTS Important sos oce sente ERROR EE Putri 2 SECTION Te Introduction os on eos coeur RE dan ee RR ERR NES POEM ub E HUE DEAN 3 ots 5 SECTION II Residential Freestanding Vertical Installation eee 6 Minimum Clearances Floor Protection and 6 Preparing Stove For Installation 7 How to locate chimney o eet deena wees ceo a Pietas 8 A Vertical Exit Using Single Wall Pipe Listed 2100 UL 103 HT 8 B Vertical Exit Using DVL Close Clearance Pipe Listed 2100 UL 103
25. POSITION HEATER LOCATION IF When installing model 261 into mobile home heater must be secure to the structure of mobile home Install in accordance with 24CFR Part 3280 HUD 2 Place the protective floor pad in position See Page 42 Figure 35 For Clearances 3 Place the unit on the pad making sure the minimum clearance specifications are met This model is designed for connection to any Listed 6 2100 UL 103 HT TYPE chimney also any Listed 6 UL DVL Close Clearance Pipe Follow pipe manufacturers instructions carefully This room heater must be converted to 1 a chimney complying with the requirements for Type HT chimneys in the Standard for Chimneys Factory Built Residential Type and Building Heating Appliance UL 103 or 2 a code approved masonry chimney with a flue liner 4 Lightly mark with a pencil the location of the legs on the protective pad NOTE Position heater out of the way of the installation area Lay the heater on it side The following must be done Locate optional air inlet plate opening on outer bottom of unit With pliers or screwdriver pry twist out tab till it breaks loose This is where your outside air enters unit after installation is complete see Page 43 Figure 36 5 Obtain the outside air duct from the box Part PH 141434TEK Measure from center of front feet back to center of air inlet and from center of side legs to center of air inlet Use these measurements to center and mark th
26. RMAL AND IS NOT A CAUSE FOR ALARM IN SOME CASES THESE FUMES WILL ACTIVATE A SMOKE ALARM OPENING A WINDOW NEAR THE UNIT WILL ALLOW THESE FUMES TO ESCAPE DO NOT BUILD A LARGE ROARING FIRE UNTIL THIS CURING IS COMPLETE OR THE HEATER FINISH MAY BE DAMAGED The connector and or chimney should be inspected at least once a month during the heating season to determine if a creosote buildup has occurred CAUTION NEVER USE GASOLINE GASOLINE TYPE LANTERN FUEL KEROSENE CHARCOAL LIGHTER FLUID OR SIMILAR LIQUIDS TO START OR FRESHEN UP A FIRE IN THE HEATER KEEP ALL SUCH LIQUIDS WELL AWAY FROM THE STOVE WHEN IT IS IN USE ALL FLUIDS OF THIS TYPE GIVE OFF VOLATILE FUMES AND CAN AND WILL EXPLODE DON T TAKE A CHANCE WITH THE SAFETY OF YOUR HOME AND FAMILY SECTION RESIDENTIAL FREESTANDING VERTICAL EXIT INSTALLATION For optional vertical exit installation locations refer back to table of contents Section II MINIMUM CLEARANCES TO FLOOR AND COMBUSTIBLES See minimum floor protector measurements and also for minimum clearances to combustibles See Pages and Figures below A Vertical Exit Single Wall Pipe Page9 Figure3 B Vertical Exit DVL Pagell Figure5 C Vertical Wall Exit Single Wall Pipe Elbow 103 HT Chimney and T BOX Pagel3 Figure7 D Vertical Wall Exit DVL Pipe Elbow 103 HT Chimney and T BOX Pagel5 Figure9 E Vertical Exit to Masonry Flue Single Wall Pipe and Elbow Pagel7 Figurel1 Vertic
27. ROUGH FLOOR WHEN OUT SIDE AIR DUCT THROUGH FLOOR WHEN MOBILE HOME IS NOT UNDERPINNED MOBILE HOME IS UNDERPINNED HOW TO LOCATE CHIMNEY EXIT AND INSTALL Ceiling Exit Using Close Clearance listed chimney 1 Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit A small weight on a string will serve as a plumb bob Mark the ceiling where the string is suspended to locate the center of the chimney hole 43 2 After locating the center ofthe hole install the ceiling support box chimney flashing and rain cap using listed chimney only Only use pipe listed in this manual CAUTION REFER TO CHIMNEY MANUFACTURER S INSTRUCTIONS FOR ASSEMBLY AND DISASSEMBLY OF CHIMNEY PARTS BE SURE TO FOLLOW CHIMNEY INSTRUC TIONS FOR PROPER CLEARANCES TO COMBUSTIBLE AND PROPER AIR SPACING REQUIRED 3 Add additional pipe until both of the following are met a Chimney pipe 15 3 feet higher than roof at the point where it penetrates the roof b Chimney pipe height is at least 2 feet higher any part of the roof within 10 feet of the chimney See Page 43 Figure 38 4 Next install a New Buck Cast Collar Part MA6CHIMCNEB to the flue of the heater See Page 40 Figure 34 5 Using double wall chimney connector connect the heater to the chimney by following manufacturer s installation instructions exactly See Figure 39 Figure 39 lt 4 ROOF S
28. S CEILING SUPPORT BOX ha DVL CLOSE xK CLEARANCE PIPE CEILING NEW BUCK CAST COLLAR Part MAGCHIMCNB 44 FINAL CHECK 1 Recheck the specified clearances 2 Remove all foreign material from the firebox area 3 Open the primary air draft 4 Plug the power cord into a 115V AC outlet when using with optional motor 5 Place crumpled pieces of newspaper in the stove Light it and close the doors Ensure that the stove draws properly through the primary draft 6 Check for smoke leaks around the doors 7 Open the doors and check for smoke escaping from the front of the stove Smoking usually indicates a defective or poorly positioned chimney Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near the open damper with a poker or fire tong Once the chimney heats up a proper draft can usually be obtained If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem contact your dealer for assistance CAUTION THE UNIT IS PAINTED WITH SPECIALLY FORMULATED HIGH TEMPERATURE PAINT THAT CURES DURING THE FIRST TWO OR THREE FIRINGS YOU MAY NOTICE A SLIGHT SMOKING EFFECT AND AN ODOR OF BURNING PAINT WHEN YOU BUILD THE FIRST FIRES THIS IS NORMAL AND IS NOT A CAUSE FOR ALARM IN SOME CASES THESE FUMES WILL ACTIVATE A SMOKE ALARM OPENING A WINDOW NEAR THE UNIT
29. T MANTEL OR lt gt MANTEL SUPPORTS 14 1 2 MINIMUM NEW BUCK CAST COLLAR MASONRY Part MA6CHIMCNB FLUE LINERS Figure 18 a CLEAN OUT DOOR li Y 4 MASONRY CHIMNEY 23 HOW TO LOCATE CHIMNEY EXIT AND INSTALL B Rear exit into Masonry Flue 6 Using DVL Close Clearance Pipe With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 25 Figure 19 1 Before connecting these units to masonry chimney determine that the masonry flue pass through connector thimble meets the NFPA 211 Code and local building codes and isa minimum of 18 from the ceiling If the connector thimble does not meet these codes the pass through connector must be modified Connectors may pass through walls or partitions constructed of combustible material 1f the connector 15 a Either listed for wall pass through or is routed through a device listed for wall pass through and is installed in accordance with the conditions of the listing b Selected or fabricated in accordance with the conditions and clearances as stated in the NFPA 211 Code Any unexposed metal that is used as part of a wall pass through system and is exposed to flue gases shall be constructed of stainless steel or other equivalent material that will resist corrosion softening or cracking from flue gases at temperatures up to 1800 F In addition a connector to a masonry chimney shall exte
30. WILL ALLOW THESE FUMES TO ESCAPE DO NOT BUILD A LARGE ROARING FIRE UNTIL THIS CURING PROCESS IS COMPLETE OR THE HEATER FINISH MAY BE DAMAGED 45 a SECTION VI ur WOOD HEATER SAFETY Certain safety hazards are inherent in any wood heater installation You should be aware of these so that a safe and proper installation can be made 1 FAULTY CHIMNEY An older masonry chimney should be thoroughly checked to be sure there are no holes or weak spots which could allow sparks or hot gases to escape 2 HEAT CONDUCTION Placing combustible materials too close to a heater or chimney can be a fire hazard By keeping these particular hazards in mind as you install and use your room heater you can ensure a safe reliable installation The chimney and chimney connector should be inspected once every two months Any build up of soot should be removed to prevent the risk of a chimney fire To remove chimney or chimney connector Remove screws or fasteners Remove pipe and clean with steel brush Replace chimney or chimney connector and replace screws and or fasteners CAUTION NEVER USE GASOLINE GASOLINE TYPE LANTERN FUEL KEROSENE CHARCOAL LIGHTER FLUID OR SIMILAR LIQUIDS TO START OR FRESHEN UP A FIRE IN THE HEATER KEEP ALL SUCH LIQUIDS WELL AWAY FROM THE STOVE WHEN IT IS IN USE ALL FLUIDS OF THIS TYPE GIVE OFF VOLATILE FUMES AND CAN AND WILL EXPLODE DON T TAKE A CHANCE WITH THE SAFETY OF YOUR HOME AND FAMILY DISPOSAL OF ASH
31. al Exit to Masonry Flue DVL Pipe and Elbow 19 Figurel3 Floor Protection When installing freestanding heater a floor protector must be use Floor protection must be 3 8 minimum thickness non combustible material or equivalent R 0 06 How to use alternate materials and how to calculate equivalent thickness An easy means of determining if a proposed alternate floor protector meets requirements listed in the appliance manual is to follow this procedure 1 Convert specification to R value R value is given no conversion is needed K factor is given with a required thickness T in inches C factor is given R 1 C 2 Determine the R value of the proposed alternate floor protector Use the formula in step 1 to convert values not expressed as For multiple layers add R values of each layer to determine the overall R value 3 Ifthe overall R value of the system is grater than the R value of the specified floor protector the alternate is acceptable Example The specified floor protector should be 3 4 thick material with a K factor of 0 84 The proposed alternate is 4 brick with a C factor of 1 25 over 1 8 mineral board with a K factor of 0 29 Step a Use formula above to convert specification to R value R 1 K x T 1 0 84 x 75 0 893 Step b Calculate of proposed system 4 brick of C 1 25 therefore Rbrick 1 C 1 1 25 0 80 1 8 mineral board of K 0 29 therefore Rmin bd 71 029 x0
32. ances See Page 23 Figure 17 1 Before connecting these units to masonry chimney determine that the masonry flue pass through connector thimble meets the NFPA 211 Code and local building codes and isa minimum of 18 from the ceiling Ifthe connector thimble does not meet these codes the pass through connector must be modified Connectors may pass through walls or partitions constructed of combustible material 1f the connector is a Either listed for wall pass through or is routed through a device listed for wall pass through and is installed in accordance with the conditions of the listing b Selected or fabricated in accordance with the conditions and clearances as stated in the NFPA 211 Code Any unexposed metal that is used as part of a wall pass through system and is exposed to flue gases shall be constructed of stainless steel or other equivalent material that will resist corrosion softening or cracking from flue gases at temperatures up to 1800 F In addition a connector to a masonry chimney shall extend through the wall to the inner face or liner but not beyond and shall be firmly cemented to masonry EXCEPTION A thimble may be used to facilitate removal of the chimney connector for cleaning in which case the thimble shall be permanently cemented in place with high temperature cement 2 Once the through the wall thimble codes are met simply connect the Single Wall Pipe minimum 24 ga blue or black pipe or DVL Close C
33. ate to faciltate a place for the stove pipe to go throu into the fireplace flue Note the pipe must go above the damper 2 to have proper flow See Page 29 Figure 24 Once all codes are met and stove is in proper location measure from back of stove to where the center of the flue is and cut pipe accordingly Simply connect the Single Wall Pipe minimum 24 ga blued or black pipe per chimney manufacturers instructions a Maintain 1 4 rise per foot horizontal length from the appliance to the chimney b Connect each section so the crimped end faces towrds stove c Secure each section to each other using at least three 3 sheet metal screws or rivets d Use three 3 sheet metal screws to fasten pipe to New Buck Cast Collar collar on heater See Page 21 Figure 16 SIDE WALL BACK WALL Figure 23 Ma NOTE For minimum mantel height See Page 29 Figure 24 A B D C E F MODEL 261 13 16 16 10 s 3 PROTECTOR NOTE AII clearances to combustibles with all low clearance shields and single wall pipe with elbows and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE Model 261 comes standard with low clearance shields 28 D Rear exit in to Masonry Fireplace using 6 single wall pipe minimum 24 ga blued or black With standard close clearance shield and pipe shield NOTE For minimum clearances Page 29 Figure 23 also Fi
34. comes standard with low clearance shields 33 2 Vertical Exit Installation HOW TO LOCATE CHIMNEY EXIT AND INSTALL A 2 Vertical Wall Exit using 6 DVL Close Clearance Pipe and Elbow and any Listed 2100 UL HT chimney and Listed 2100 UL HT T Box assembly With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 35 Figure 29 1 Mark the plumb line on the wall directly behind the center of the heater See Page 35 Figure 30 NOTE When using DVL Close Clearance Pipe maintain manufacturers minimum clearances between pipe and ceiling 2 Place the vertical portion of the heater pipe and the elbow in position and project a point onto the plumb line level with the center of the elbow 3 Measure up so there will be at least 1 4 rise per foot of horizontal connector pipe maintaining clearances to the ceiling as noted in Page 35 Figure 29 and Figure 30 This will give you the center of the hole for the chimney penetration 4 After locating the center of the penetration install the tee box and chimney as per the chimney manufacturer s specifications 5 Connect the DVL close clearance pipe to the tee box per manufacturer s instructions DVL close clearance pipe is to be connected with 3 sheet metal screws or rivets to New Buck Corporation Cast Collar after New Buck Cast Collar Connector has been attached to stove See Page 35 Figure 30 34 ALCOVE INSTALLATION AND CLEARAN
35. d as those items designed to be removed from the stove including those removable with common hand tools The costs of parts only are included The customer pays any labor or transportation charges required PROCEDURE Should you feel that your BUCK STOVE 15 defective you should contact any Buck Stove dealer for the name of your nearest authorized Buck Stove service representative who will instruct you on the proper procedure depending on which Warranty Time Period Period I or Period II applies 50 If for any reason you are dissatisfied with the suggested procedures you may contact us in writing at New Buck Corporation Customer Service Department P O Box 69 Spruce Pine NC 28777 CONDITIONS AND EXCLUSIONS A B Replacement of parts may be in the form of new or fully reconditioned parts at NBC s option There is no other express warranty All implied warranties of Merchantability and Fitness for Use are limited to the duration of the Express Warranty New Buck Corporation is not liable for indirect incidental or consequential damages in connection with the use of the product including any cost or expense of providing substitute equipment or service during periods of malfunction or non use Some states do not allow the exclusion of incidental or consequential damages so the above exclusion may not apply to you D All warranty repairs under this warranty must be performed by an authorized Buck Stove service re
36. e placement of the out side air duct Predrill 4 1 8 holes into the bottom of the heater to attach outside air duct to the heater with screws provided attach test fit and temporally leave the outside air duct on the bottom of the heater 6 Measure the location of the outside air duct that s temporally attached to heater using the legs feet for reference measuring points to find the center of out side air duct Use these measurements to mark the center location of the out side air duct onto the protective pad see Page 43 Figure 37 Note Be sure to measure one more time for floor joist and or obstacles beneath floor where hole is to be cut 7 Now mark the outside air duct opening on to the pad Cut a 4 1 4 diameter hole in the pad and continue through the floor 8 Remove outside air duct from the heater Slide the outside air duct through the hole in the pad and floor 41 9 Now reposition the heater on the pad being sure to line the feet up with the reference marks 10 Slide the outside air duct up to the bottom of the heater and attach it with the screws supplied with the kit using a wrench or ratchet See Page 43 Figure 38 Note If the mobile home is underpinned you must provide extra pipe NOT INCLUDED IN PACKAGE too extend out side air ducting through underpinning or foundation of mobile home The inlet of the outside air duct must be in the same atmospheric as pressure the exhaust See Page 43 Figure 38 Ver
37. essed as For multiple layers add R values of each layer to determine the overall R value 3 Ifthe overall R value of the system is grater than the R value of the specified floor protector the alternate is acceptable Example The specified floor protector should be 3 4 thick material with a K factor of 0 84 The proposed alternate is 4 brick with a C factor of 1 25 over 1 8 mineral board with a K factor of 0 29 Step a Use formula above to convert specification to R value R 1 K x T 1 0 84 x 75 0 893 Step b Calculate R of proposed system 4 brick of C 1 25 therefore Rbrick 1 C 1 1 25 0 80 1 8 mineral board of K 0 29 therefore Rmin bd 1 029 x0 125 0 431 Step c Compare proposed system R of 1 231 to specified R of 0 893 Since proposed system R is greater than required the system is acceptable Definitions Thermal conductance Btu W hr fP CF m CK Thermal conductance Btu inch W Btu hr ft Cf m CK HCF Thermal conductance ft hr F n K Btu W 39 Select an installation location that will give the best airflow from the front of the heater tothe remainder of the home PREPARING THE STOVE FOR INSTALLATION 1 Inspect the unit for any obvious physical damage 2 Plug the power cord into a 115V AC outlet to test the motor and fan when optional motor is being used Do not run power cord under unit or in high traffic areas
38. f 1 231 to specified of 0 893 Since proposed system R is greater than required the system is acceptable Definitions Thermal conductance C Btu W hr fP CF m CK Thermal conductance Btu inch W Btu hr ft Cf m CK HCF Thermal conductance ft hr F m K Btu W 20 Select an installation location that will give the best airflow from the front of the heater tothe remainder of the home PREPARING THE STOVE FOR INSTALLATION 1 Inspect the unit for any obvious physical damage 2 Plug the power cord into a 115V AC outlet to test the motor and fan when optional motor is being used Do not run power cord under unit or in high traffic areas 3 Check the primary air draft control to ensure that it slides freely 4 Remove any items from within the firebox Spread a dropcloth on the floor behind the heater Next tilt the heater so that the back is on the drop cloth 5 Then obtain four legs attach the legs to holes in bottom of unit with bolts and washers supplied with the leg kit See Figure 15 i Wm Kf BK Lon rd LL Figure 15 6 Reposition the heater to the upright position 7 Next fasten New Buck s Cast Collar Part number MA6CHIMNEB to the flue exit of stove to be used using the J hook s provided Position collar with gasket towards the unit tighten the J hook s Firmly secured See Figure 16 8 Fasten New Buck s
39. floor protector must be use Floor protection must be 3 8 minimum thickness non combustible material or equivalent R 0 06 How to use alternate materials and how to calculate equivalent thickness An easy means of determining if a proposed alternate floor protector meets requirements listed in the appliance manual is to follow this procedure 1 Convert specification to R value R value is given no conversion is needed K factor is given with a required thickness T in inches C factor is given R 1 C 2 Determine the R value of the proposed alternate floor protector Use the formula in step 1 to convert values not expressed as For multiple layers add R values of each layer to determine the overall R value 3 Ifthe overall R value of the system is grater than the R value of the specified floor protector the alternate is acceptable Example The specified floor protector should be 3 4 thick material with a K factor of 0 84 The proposed alternate is 4 brick with a C factor of 1 25 over 1 8 mineral board with a K factor of 0 29 Step a Use formula above to convert specification to R value R 1 K x T 1 0 84 x 75 0 893 Step b Calculate R of proposed system 4 brick of C 1 25 therefore Rbrick 1 C 1 1 25 0 80 1 8 mineral board of K 0 29 therefore Rmin bd 71 029 x0 125 0 431 Step Compare proposed system R of 1 231 to specified of 0 893 Since proposed system R is greater than re
40. flue gases at temperatures up to 1800 F In addition a connector toa masonry chimney shall extend through the wall to the inner face or liner but not beyond and shall be firmly cemented to masonry NOTE When using DVL Close Clearance Pipe maintain manufacturers minimum clearances between pipe and ceiling EXCEPTION A thimble may be used to facilitate removal of the chimney connector for cleaning in which case the thimble shall be permanently cemented in place with high temperature cement 2 Once the through the wall thimble codes are met simply connect the DVL Close Clearance pipe or Shielded Single wall Pipe with elbow to the wall pass through connector per chimney manufacturers instruction a Maintain 1 4 rise per foot horizontal length from the appliance to the chimney b Connect each section so the crimped end faces downward c Secure each section to each other using at least three 3 sheet metal screws or rivets d Use three 3 sheet metal screws to fasten pipe to New Buck Cast Collar on heater after New Buck Cast Collar Part MA6CHIMCNB has been attached to stove See Page 19 Figure 14 F Vertical exit using 6 DVL Close Clearance pipe with Elbow into masonry flue With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles BACK WALL Figure 13 SIDE WALL PROTECTOR A B C D E E G H MODEL 261 14 4 14 7
41. gure 24 NOTE Optional 2 legs Part FA FS261 Are available when installing Model 261 into a masonry fireplace with existing height of only 24 WITH 2 LEGS THE TOP OF THE REAR EXIT ON THE STOVE IS BELOW 24 FROM FLOOR OR HEARTH ENABLING TO INSERT PIPE INTO MOST MASONRY FIREPLACE Figure 24 Remove or wire open the fire place dampper NOTE MINIMUM CLEARANCES FROM TOP OF UNIT TO MANTEL OR MANTEL SUPPORTS 14 1 2 MINIMUM SINGLE WALL PIPE NEW BUCK CORP ot CAST COLLAR Part MA6CHIMCNB SEALING ENT 7C PLATE HEARTH 29 SECTION Alcove Installation Vertical or Horizontal Exit For optional Vertical exit or Horizontal exit installation locations refer back to table of contents Section IV MINIMUM CLEARANCES TO FLOOR AND COMBUSTIBLES See minimum floor protector measurements and also for minimum clearances to combustibles A vertical exit Page 33 Figure 27 or Page 35 Figure 29 or B rear exit Page 37 Figure 31 Floor Protection When installing freestanding heater a
42. himney Improperly sealed trim kit or direct connect kit Manual damper in chimney is closed Wet or unseasoned wood being burned Poor chimney draft 48 SOLUTION Check for and remove obstruction a Check trim kit gasketing seal to fireplace and gasket as necessary to seal unit Gasket under front bottom of stove if needed b Check seal if using direct connect and correct Open manual damper and wire shut with stainless steel wire or remove damper Burn dry seasoned wood Improper chimney height or wrong size flue is being used Cooler temperatures caused by external chimney 2 High fuel consumption 3 Backpuffing 4 Smoke rollout when heater door is opened POSSIBLE CAUSE Improper regulation of draft or inlet air Improper door fitting Gusts of Wind Wind gusts blowing down the chimney Opening heater door too fast 49 SOLUTION a Close inlet air control as much as possible to maintain desired heat output b Check gaskets reinstall fiberglass gasketing round doors and glass as necessary Check door gasket check adjustment of door latch a Smoke shelf in chimney is filled with creosote amp ash b Chimney may need wind diverter Raise chimney for better draft a Smoke shelf in chimney is filled with creosote amp ash b Chimney may need wind diverter Raise chimney for better draft
43. learance pipe to the wall pass through connector per chimney manufactures instruction a Maintain 1 4 rise per foot horizontal length from the appliance to the chimney b Connect each section so the crimped end faces towrds stove c Secure each section to each other using at least three 3 sheet metal screws or rivets d Use three 3 sheet metal screws to fasten pipe to New Buck Cast Collar on heater after New Buck Cast Collar Part MA6CHIMCNB has been attached to stove See Page 23 Figure 18 22 A Rear exit into Masonry Flue using 6 Single Wall pipe minimum 24 ga blued or black pipe With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles BACK WALL Figure 17 4 5 lt E Q Sa E e N 24 A Y A _ gt A B C D E E G MODEL 261 13 13 13 16 8 3 10 NOTE clearances are to combustibles with all low clearance shields and single wall pipe and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE Model 261 comes standard with low clearance shields CEILING NOTE MINIMUM CLEARANCES FROM 8 TOP OF UNI
44. ly cemented in place with high temperature cement Once the through the wall thimble codes are met simply connect the DVL Close Clearance Pipe with elbows to the wall pass through connector a Maintain 1 4 rise per foot horizontal length from the appliance to the chimney b Connect each section so the crimped end faces downward c Secure each section to each other using at least three 3 sheet metal screws or rivets d Use three 3 sheet metal screws to fasten DVL Close Clearance Pipe to New Buck Cast Collar on heater after New Buck Cast Collar Part MA6CHIMCNB has been attached to stove See Page 27 Figure 22 26 C Rear exit Vertical then to Horizontal into Masonry Flue using 6 DVL Close Clearance pipe and Elbows With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles BACK WALL Figure 21 SIDE WALL PROTECTOR 7 A B D E EFG MODEL 261 13 13 13 16 8 3 10 NOTE All clearances are to combustibles with all low clearance shields and double wall pipe with elbows and minimum floor protector NOTE Model 261 comes standard with low clearance shields NOTE Maintain Manufactures Minim Clearances CEILING DVL CLOSE CL
45. m 24 ga blued or black pipe and any Listed 2100 UL 103 HT chimney With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 9 Figure 3 1 Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit A small weight on a string will serve as a plumb bob Mark the ceiling where the string is suspended to locate the center of the chimney hole 2 After locating the center of the hole install the ceiling support box chimney or chimney connector flashing and rain cap per the chimney manufacturer s instructions and local building codes for installation through combustible walls or ceilings 3 Now connect the stove and ceiling support box using minimum 24 ga blued or black steel connector pipe DO NOT USE GALVANIZED PIPE Connect each section so the crimped end faces downward and secure each section to each other using at least three 3 sheet metal screws or rivets Single wall pipe 15 to be connected with 3 sheet metal screws or rivets to New Buck Cast Collar after New Buck Cast Collar Part MA6CHIMCNB has been attached to stove See Page 9 Figure 4 A Vertical exit using 6 Single Wall pipe minimum 24 ga blued or black pipe and any listed 2100 UL 103 HT TYPE Chimney With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles
46. m blued or black steel connector pipe DO NOT use galvanized pipe Connect each section so the crimped end faces downward and secure each section to each other using three 3 sheet metal screws or rivets Single wall pipe is to be connected with 3 sheet metal screws or rivets to New Buck Cast Collar after New Buck Cast Collar Part MA6CHIMCNB has been attached to stove See Page 13 Figure 8 C Vertical wall exit using 6 Single Wall Pipe minimum 24 ga blued or black pipe and elbow pipe and any listed 2100 UL 103 HT TYPE Chimney and Listed 2100 UL HT T Box assembly With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles BACK WALL SIDE WALL PROTECTOR LX A B C D E E G H MODEL 26113 7 15 12 8 3 16 10 NOTE clearances are to combustibles with all low clearance shields and single wall pipe with elbow and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE Model 261 comes standard with low clearance shields LISTED 2100 UL 103 HT TYPE i CHIMNEY REEFER TO CEILING NOTE Maintain 18 Minimum Clearance MANUFACTURERS E INSTALLATION INSTRUCTION CENTER LINE CONNECTOR ee udi ELBOW C MARK PLUMB je LISTED 2100 UL 103 HT LINE ON WALL d TYPE CHIMNEY T BOX Figureg 2 EO C ASSEMBLY REEFER TO N
47. mly See Figure 2 8 Fasten New Buck s Flue Collar Plate to the exit not used for burning stove Firmly secure the Flue Collar Plate Bracket with the nut and washer provided See Figure 2 NEW BUCK CAST COLLAR hy MA6CHIMCNB 1 H 1 7 1 9 mi FLUE COLLAR PLATE BRACKET FLUE COLLAR PLATE Figure 2 9 Now the stove is ready to be positioned in the predetermined location PREPARING THE ROOM HEATER LOCATION 1 Select an installation location that will give the best airflow from the front of the heater to the remainder of the home 2 Place the protective floor pad in position Place the unit on the pad making sure the minimum clearance specifications are met 4 If connecting to an existing masonry flue first ensure that the flue conforms to the NFPA 211 Code and or consult your local code for proper procedures NOTE This model is designed for connection to any Listed 2100 UL 103 HT chimney also any Listed UL DVL Close Clearance Pipe or Shielded Single wall Pipe Follow pipe manufactures instructions carefully CHIMNEY This room heater must be converted to 1 a chimney complying with the requirements for Type HT chimneys in the Standard for Chimneys Factory Built Residential Type and Building Heating Appliance UL 103 or 2 a code approved masonry chimney with flue liner HOW TO LOCATE CHIMNEY EXIT AND INSTALL A Vertical Exit using 6 Single Wall minimu
48. n accordance with the conditions and clearances as stated in the NFPA 211 Code Any unexposed metal that is used as part of a wall pass through system and is exposed to flue gases shall be constructed of stainless steel or other equivalent material that will resist corrosion softening or cracking from flue gases at temperatures up to 1800 F In addition a connector toa masonry chimney shall extend through the wall to the inner face or liner but not beyond and shall be firmly cemented to masonry EXCEPTION A thimble may be used to facilitate removal of the chimney connector for cleaning in which case the thimble shall be permanently cemented in place with high temperature cement Once the through the wall thimble codes are met 1 Mark the plumb line on the wall directly behind the center of the heater See Page 27 Figure 22 NOTE When using DVL Close Clearance Pipe maintain manufacturers minimum clearances between pipe and ceiling 2 Place one elbow on to the New Buck Cast Collar then vertical portion of the heater pipe and the next elbow in position and project a point onto the plumb line level with the center of the elbow 3 Measure up so there will be at least 1 4 rise per foot of horizontal connector pipe maintaining clearances to the ceiling as noted in Page 27 Figure 22 This will give you the center of the hole for the chimney penetration 4 After locating the center of the penetration The thimble shall be permanent
49. nd through the wall to the inner face or liner but not beyond and shall be firmly cemented to masonry EXCEPTION A thimble may be used to facilitate removal of the chimney connector for cleaning in which case the thimble shall be permanently cemented in place with high temperature cement 2 Once the through the wall thimble codes are met simply connect the Single Wall Pipe minimum 24 ga blued or black pipe or DVL Close Clearance pipe to the wall pass through connector per chimney manufacturers instruction a Maintain 1 4 rise per foot horizontal length from the appliance to the chimney b Connect each section so the crimped end faces towrds stove c Secure each section to each other using at least three 3 sheet metal screws or rivets d Use three 3 sheet metal screws to fasten pipe to New Buck Cast Collar on heater after New Buck Cast Collar Part MA6CHIMCNB has been attached to stove See Page 25 Figure 20 24 B Rear exit into Masonry Flue using 6 DVL Close Clearance pipe With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles Figure 19 SIDE WALL PROTECTOR ee A B C D E MODEL 261 13 13 13 16 8 3 10 NOTE clearances are to combustibles with all low clearance shields and Double wall pipe and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE M
50. odel 261 comes standard with low clearance shields CEILING NOTE MINIMUM CLEARANCES FROM 8 TOP OF UNIT TO MANTEL OR MANTEL SUPPORTS 14 1 2 MINIMUM NEW BUCK CAST COLLAR MASONRY Part MAGCHIMCNB FLUE LINERS Figure 20 SS CLEAN OUT _ 3 DOOR C Y 4 MASONRY CHIMNEY 25 HOW TO LOCATE CHIMNEY EXIT AND INSTALL C Rear Exit to Vertical then to Horizontal into Masonry Flue using 6 DVL Close Clearance pipe and Elbow s With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 27 Figure 21 Before connecting these units to masonry chimney determine that the masonry flue pass through connector thimble meets NFPA 211 Code and local building codes maintain manufacturers minimum clearances from the ceiling If the connector thimble does not meet these codes the pass through connector must be modified Connectors may pass through walls or partitions constructed of combustible material if the connector is a Either listed for wall pass through or is routed through a device listed for wall pass through and is installed in accordance with the conditions of the listing b Selected or fabricated i
51. or chimney connector flashing and rain cap per the chimney manufacturer s instructions and local building codes for installation through combustible walls or ceilings Now connect the stove and ceiling support box using DVL close clearance pipe or Shielded Single wall pipe Connect each section per manufacturer s instructions and secure each section to each other using minimum 3 sheet metal screws or rivets DVL close clearance pipe or Shielded Single wall pipe is to be connected with 3 sheet metal screws or rivets to New Buck Cast Collar after New Buck Cast Collar Part MAGCHIMCNB has been attached to stove See Page 11 Figure 6 B Vertical exit using 6 DVL Close Clearance pipe or Shielded Single wall pipe and any listed 2100 UL 103 HT TYPE Chimney With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles Figure 5 Figure 6 BACK WALL B LISTED 2100 UL 103 STORM COLLAR SIDE WALL PROTECTOR A lt t FLASHING RADIATION SHIELD a A _ P LISTED 2100 UL 103 HT TYPE gt _ INSTALLATION CEILING CEILING SUPPORT BOX MS DVL CLOSE CLEAR ANCE PIPE OR SHIELDED NEW BUCK CAST COLLAR Part MAGCHIMCNB
52. ove See Page 15 Figure 10 D Vertical wall exit using 6 DVL Close Clearance pipe with elbow and any listed 2100 UL 103 HT TYPE Chimney With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles BACK WALL Figure 9 77 7 SIDE WALL PROTECTOR SSS A B C D E G H MODEL 261 14 4 14 7 8 3 16 NOTE clearances are to combustibles with all low clearance shields and double wall pipe with elbow and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE Model 261 comes standard with low clearance shields LISTED 2100 UL 103 HT TYPE CHIMNEY REEFER TO A MANUFACTURERS CEILING NOTE Maintain Manufactures Minimum Clearances INSTALLATION INSTRUCTION DVL CLOSE mee CENTER LINE CLEARANCE OF ELBOW PIPE n LISTED 2100 UL 103 HT MARK PLUMB C TYPE CHIMNEY T BOX LINEONWALL ASSEMBLY REEFER TO NEW BUCK CAST COLLAR MONACHUS ES Part 4 MAGCHIMCNB EDEN INSTRUCTION Figure 10 gg o WALL PASS THROUGH CONNECTOR IN HOW TO LOCATE CHIMNEY EXIT AND INSTALL E Vertical exit into masonry flue using 6 Single Wall pipe minimum 24 ga blued or black pipe with Elbow With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 17 Figure 11
53. presentative Repairs or attempted repairs by anyone other than an authorized service representative are not covered under this warranty addition these unauthorized repairs may result in additional malfunctions the correction of which is not covered by warranty OTHER RIGHTS This warranty gives you specific legal rights and you may also have other rights which vary from state to state 51
54. quired the system is acceptable Definitions Thermal conductance Btu W hr fP CF m CK Thermal conductance Btu inch W Btu hr ft Cf m CK HCF Thermal conductance ft hr F m K Btu W 30 Select an installation location that will give the best airflow from the front of the heater to the remainder of the home PREPARING THE STOVE FOR INSTALLATION 1 Inspect the unit for any obvious physical damage 2 Plug the power cord into a 115V AC outlet to test the motor and fan when optional motor is being used Do not run power cord under unit or in high traffic areas 3 Check the primary air draft control to ensure that it slides freely 4 Remove any items from within the firebox Spread a dropcloth on the floor behind the heater Next tilt the heater so that the back is on the drop cloth 5 Then obtain four legs attach the legs to holes in bottom of unit with bolts and washers supplied with the leg kit See Figure 25 1 EN Figure 25 6 Reposition the heater to the upright position 7 Next fasten New Buck s cast collar Part number MA6CHIMCNB to the flue exit of stove to be used using the J hook s provided Position collar with gasket towards the unit tighten the J hook s Firmly See Figure 26 8 Fasten New Buck s Flue Collar Plate to the exit not used for burning stove Firmly secure the Flue Collar Pla
55. ration Cast Collar after New Buck Cast Collar Connector has been attached to stove See Page 33 Figure 38 32 ALCOVE INSTALLATION AND CLEARANCES 1 Alcove Vertical exit using 6 DVL Close Clearance pipe and any listed 2100 UL 103 HT TYPE Chimney With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles Figure 27 Figure 28 BACK WALL 7 ft p Bc y t3 LISTED 2100 UL 103 HT TYPE x O 2 Yj 4 STORM COL E G 2 0 22 4 ELIGE Di p e a Eg FLASHING RADIATION LISTED 2100 UL 103 HT INSTALLATION SHIELD gt A ww CEILING CEILING SUPPORT BOX H Nx DVL CLOSE CLEARANCE PIPE OR SHIELDED SINGLE WALL L NEW BUCK CORP r SIDE CAST COLLAR WALL Part MA6CHIMCNB 2 emn e Y A B C D E F G H MODEL 261 13 4 7 16 8 3 47 84 m A E NOTE clearances are to combustibles with all low clearance shields and double wall pipe and minimum floor protector NOTE Model 261
56. re met simply connect the chimney collar with elbow to the wall pass through connector using 24 ga minimum blue or black steel connector pipe as follows a Maintain 1 4 rise per foot horizontal length from the appliance to the chimney b Connect each section so the crimped end faces downward c Secure each section to each other using at least three 3 sheet metal screws or rivets d Use three 3 sheet metal screws to fasten pipe to New Buck Cast Collar onto heater after New Buck Cast Collar Part MA6CHIMCNB has been attached to stove See Page 17 Figure 12 E Vertical exit into masonry flue using 6 Single Wall pipe minimum 24 ga blued or black pipe with elbow With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles BACK WALL Figure 11 SIDE WALL PROTECTOR Ss A B C D E E G H MODEL 261 13 8 13 12 8 3 16 10 NOTE clearances are to combustibles with all low clearance shields and single wall pipe with elbow and minimum floor protector NOTE Floor protector must extend length of horizontal flue pipe to wall NOTE Model 261 comes standard with low clearance shields NOTE Maintain 18 Minimum Clearance CEILING SINGLE WALL B CONNECTOR ELBOW X NEW CAST COLLAR MASONRY Part MA6CHIMCNB FLUE Ne LINERS _
57. te Bracket with the nut and washer provided See Figure 28 NEW BUCK CAST COLLAR he TOP EXIT ft 7 4 FLUE COLLAR PLATE BRACKET FLUE COLLAR PLATE Figure 26 9 Now the stove 15 ready to be positioned in the predetermined location 31 1 Vertical Exit Installation HOW TO LOCATE CHIMNEY EXIT AND INSTALL 1 Vertical Exit using 6 DVL Close Clearance pipe or Shielded Single wall pipe and any Listed 2100 UL 103 HT chimney With standard close clearance shield and pipe shield NOTE For minimum clearances See Page 33 Figure 27 1 Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit A small weight on a string will serve as a plumb bob Mark the ceiling where the string is suspended to locate the center of the chimney hole 2 After locating the center of the hole install the ceiling support box chimney or chimney connector flashing and rain cap per the chimney manufacturer s instructions and local building codes for installation through combustible walls or ceilings 3 Now connect the stove and ceiling support box using DVL close clearance pipe or Shielded Single wall pipe Connect each section per manufacturer s instructions and secure each section to each other using minim 3 sheet metal screws or rivets DVL close clearance pipe or Shielded Single wall pipe is to be connected with 3 sheet metal screws or rivets to New Buck Corpo
58. tical exit using 6 DVL Close Clearance pipe and any listed 2100 UL 103 HT TYPE Chimney With standard close clearance shield and pipe shield Model 261 minimum clearance to combustibles FREESTANDING MOBILE HOME INSTALLATION Figure 35 BACK WALL x lt E E 72 24 A gt A B C D E MODEL 261 14 4 14 7 8 3 16 NOTE All clearances are to combustibles with all low clearance shields and double wall pipe or shielded single wall pipeand minimum floor protector NOTE Model 261 comes standard with low clearance shields 42 Optional air inlet plate opening on outer bottom of unit Cw Pry and twist out inner tab till it breaks loose Outer Bottom Of Unit q Figure 36 Take measurements from bottom of heater and use them to locate the opening for the out side air duct place them onto protective pad Zu 4 1 4 OUT SIDE AIR a DUCT HOLE ig B j 5 PROTECTIVE PAD A MEASUREMENT d ines MEASUREMENT Figure 37 Figure 38 SS m 24 min 610mm 36 TYP iD 36 we FLASHING FLASHING RADIATION RON SHIELD 20 ft MAX ED 4 7 i 1 i Y M A OUT SIDE AIR DUCT TH
Download Pdf Manuals
Related Search
Related Contents
alinorm 04/27/26 - CODEX Alimentarius EnGenius ESR-9752 router HP Slate 6 VoiceTab II Quick Start Guide triton Manual de instrucciones Sensor 4000TOC Transmisor M300 TOC Manuel d`utilisation Nokia 6303i classic KUDA 078250 holder USER MANUAL Livret d`information Plateformes CLEF 2011 Copyright © All rights reserved.
Failed to retrieve file