Home
Lochinvar TISUN SPS0250 User's Manual
Contents
1. Figure 9 1 SPS0250 20 Gr Gs G Go Ga 3 a 00000 12 t Lochinvar SLA SL PS Installation amp Operation Manual Commercial Solar Thermal Systems 8 Component breakdown continea SPS1000 Co a Pumpstation 1000 sq ft w flow sensor and CU Solar return ball valve 1 1 2 Fl x M36 x 1 5 incl CV Solar forw flow ball valve M28 x 1 5 x M36 x 1 5 incl CV PB Solar bleeder block M36 x 1 5 L 283mm OO 4 Nut M28 x 1 5mm A Go Clamp ring 22mm Nt M36 S28 Clamp ring 28mm O O g i Nut 1 1 2 x 16mm Nat M36 15x 28 7 for KVSR 287 S Clamp ring 28 7 mm Reducing socket 1 1 2 female x 1 male Reducing piece M36 x 1 5 male Reducing piece M36 x 1 5 KVSR 28 7 x D28mm Sealing kit 2x 1 1 2 2x 1 3x 3 4 1x 1 2 2x 1 AFM 34 Solar cross piece cpl USA w reducing pc and cap Flow sensor housing 0 50 10 5 gpm w fill flush valve USA Safety group KS0150 USA Solar control unit LCD plus USA 115 Volt w SD card UP 25 120U 1 1 2 180F12K9UL 115V 60Hz Sensor direct 0 50 10 5gpm Power cord USA w AC plug XYTP Control unit bracket Red thermometer handle L 92mm RAL 3020 Blue thermometer handle L 92mm RAL 5010 Thermometer D51 L 100 5 0 160 C 40 320 F i ae Wall bracket for pumpstation 1000 sq ft 28 Retaining cropped spring wire 2mm 29 Mounting kit 8x50 D10x50 anchors screws O 30 Insulation SPS1000 machined for pump and control unit
2. Xt Lochimar SLA SL PS Installation amp Operation Manual Commercial Solar Thermal Systems F Technical data for solar station continued SPS0250 SPS0500 SPS1000 Installation location forward flow and return ball valves GRAVITY BRAKES Seal O ring 70 EPDM 291 Opening pressure 2 x 200 mm WS using metal spring Can be positioned by moving thermometer handle to 45 F position Max temp 356 F SOLAR DIAL INDICATOR Scale 32 288 FF in 3 6 F increments THERMOMETER Diameter 2 Size 30 x 22 x2 1 Size 44 5 x 33 x2 1 1 2 FLAT SEALS FOR PUMP Material ATM 34 ligit giey Long term temperature Liquid 482 F water vapor 360 F Peak temp briefly 720 F Size 17 x 24x2 3 4 FLAT SEAL FOR SAFETY GROUP Material ATM 34 light grey Long term temperature Liquid 482 F water vapor 392 F Peak temp briefly 752 F Type SER RDT Series Solar 8010 compression 22 mm compres Series Solar 8010 compression 28 mm compres BLEEDER PIPE Connection M28 x 1 5 22 mm 3 8 female Connection M36 x 1 5 28 mm 3 8 female Length 9 25 ft 3 8 bleeder valve can be shut off manually 17 Lochimar SLA SL PS Installation amp Operation Manual X Commercial Solar Thermal Systems 8 Com ponent breakdown SPS0250 SPS0500 Name SPS0250 Pumpstation 250 sq ft w flow sensor and CU SPS0500 Pumpstation 500 sq ft w flow sensor and CU Solar return ball valve USA 1 1 2 x M28 x 1 5 Solar forw flow ball
3. may result in minor or moderate injury CAUTION used without the safety alert symbol indicates a potentially hazardous situation which if not CAUTION avoided may result in property damage NOTICE NOTICE indicates special instructions on installation operation or maintenance that are important but not related to personal injury or property damage Lochinvar EZ SL PS Installation amp Operation Manual Commercial Solar Thermal Systems General Information Before starting work the Installer must read understand and note these installation and operating instructions A WARNING The solar pump station may only be installed and maintained by trained professionals Trainees may only work on the product under the supervision of an experienced person A WARNING mn All instructions in this Installation amp Operation manual should be observed when using the solar WARNING station No other form of use is intended The manufacturer is not liable for any damage resulting from misuse of the solar station For safety reasons modifications or changes are not permitted The solar station must be installed as far away from the collectors as possible Extremely high temperatures may occur in the pipes near the collectors If installing in attic space ensure that the instruments do not overheat A WARNING m The pressure temperature operating parameters must be within the prescribed limits Excess operating te
4. the fault cannot be rectified please contact your nearest Lochinvar TiSUN customer service representative SL PS Installation amp Operation Manual 15 Lochinvar Wa Commercial Solar Thermal Systems Revision Notes Revision A ECO C06520 initial release Revision B ECO C07610 reflects formatting adjustments SL PS I O Rev B 3 11
5. Additional insulation D 42mm DN32 Additional insulation L 190mm machined Cover white alu bottom RAL9006 Type B Cover white alu top RAL9006 Type B Cover white alu RAL9006 Type B w control unit cutout Figure 9 2 SPS1000 25 GD 33 2 5 31 GD gpm 13 O O H00 G Lochinvar EE S PS Installation amp Operation Manual Commercial Solar Thermal Systems 9 Service A WARNING patie and lock the solar control and pump to prevent them from accidentally being switched back on again by mistake before any maintenance or repair work Serviceis not permitted until components and solar liquid have cooled Air separator m The solar station features an air separator Open bleeder valve until the solar liquid exits free of air bubbles m Check system pressure and top off solar liquid if required Flat seal screw connections m The screw connections may have to be retightened as the seals settle Note tightening torque requirements in the Technology installation and commissioning section of this manual Clamp ring screw connections mE Use an open ended wrench to retighten clamp ring screw connections if required approx 33 Ft lb m When tightening the clamp ring screw connection use two wrenches one wrench to prevent the pumping station from turning Disassembling the solar station Wall bracket for repairs and service only m Use a screwdriver or similar tool to remove the reta
6. L VALVE OPEN DRAINING FLOW CHECK OPEN BALL VALVE 1 2 OPEN SERVICE BALL VALVE CLOSED Figure 4 2 Return multi functioning instruments SETTING FOR OPERATIONS FLOW CHECK CLOSED BALL VALVE OPEN DRAINING FLOW CHECK OPEN BALL VALVE 1 2 OPEN SERVICE FILLING FLUSHING BALL VALVE CLOSED Lochinvar Eas Commercial Solar Thermal Systems SL PS Installation amp Operation Manual 4 Commissioning the solar system General mE Before commissioning all piping connections and saftey equipment should be checked to ensure that they are correctly installed m All pre fitted solar station screw connections are firmly tightened in the factory so that they do not usually need retightening Seal integrity must be tested when commissioning and a pressure test must be completed Fill the complete solar system with Lochinvar TiSUN solar liquid only The mixing ratio should be adapted to local conditions Never flush or pressure test the complete solar system with just water Flushing the system with water only can cause a freezing hazard Filling flushing and bleeding There is one fill valve with hose connection for filling flushing and draining the solar system on both the safety group and sensor measurement section m Connect the pressure hose forward flow to the safety eroup s filling connection under the pressure gauge and open fill flush valve m Connect the flushing hose return to the
7. SL PS I O Rev B Commercial Solar Thermal Systems Solar Pump Station Installation and Operation Manual SPS0250 SPS0500 amp SPS1000 This manual must only be used by a qualified heating installer service technician Read all instructions before installing Perform steps in the order given Failure to comply could result in severe personal injury death or substantial property damage Save this manual for future reference Contents HAZARD DEFINITIONS cccccccssseseeeeeeeeeeeeeeeeeaes 2 6 VFS FLOW SENSOR fo ooscscseccasteacceccancasseestioneseadevtedouers 9 1 GENERAL INFORMATION 7 TECHNICAL DATA FOR SOLAR STATION 10 11 Included COMPONENTS ccc cccececeeeseeeeeeeeeeeeeseeeeeeeeeeeeeeess 3 4 8 COMPONENT BREAKDOWN 2 INSTALLING THE SOLAR STATION asec rE EEEE 12 Installing the solar station on a Wall sseeeeeeeeeeees 5 BF eeri e E E 12 Installing the relief valve snnsnnennnnnnennnenesernn nn nerereenene 5 S eO O O E E A E T 13 Installation wall bracket for expansion tank 000 5 9 SERVICE Installation connection lines to tank and collector 5 Air separator stn aceadesteaenccdussceeienctintoctcunsatoedeineincubimeuateedeecees 14 FP OWN E EA E EEA TA A ET 5 Flat seal screw CONNECTIONS ccccceeceeccesseeeceeseeeeeeeees 14 Clamp ring screw CONNECTIONS cceeceeeeeeeeeeeeeeees 5 Clamp ring screw CONNECTIONS cc
8. T 32 F U 0 5 V 3V 180 F 0 0 32 68 104 140 176 212 Temperature F Temperature output signal V on Figure 6 3 VFS 2 40 flow output signal 4 0 35 VFS 2 40 output signal flow 3 0 Assignment of measurement range 0 53 10 6gpm is equal to 0 5 3 5V Flow rate calculation Q 0 53gpm U 0 5 V 3V 10gpm Flow output signal V Flow gpm Figure 6 4 VFS 2 40 temperature output signal 4 0 S 35 VFS 2 40 output signal temperature 30 gt 25 Assignment of measurement range 32 212 F is equal to0 5 3 5V 7 Temperature rate calculation T 32 F U 0 5 V 3V 180 F a 2 0 o 145 w E 1 0 A 0 5 0 0 32 68 104 140 176 Temperature F Figure 6 5 VFS flow sensor A Pa 2 OO Vv GND SL PS Installation amp Operation Manual 212 item Pin Configuration Temperature signal 0 5 to 3 5 relative to pin 3 Flow pressure signal 0 5 to 3 5 relative to pin 3 GND UV A Voltage Supply 5 VDC PELV GRUNDFOS 7 FOS DIRECT SENSORS Manufacturer Declaration of the suitability for Solar Thermal Systems With the development of the dual sensor for measurement of flow and temperature Grundfos Direct Sensors offer completely new options for energy management solutions The sensors canbe used te confirm the Solar Thenmal function by measuring the solar yield in kWh Defects and or poor installation can be detected
9. Volumetric flow rate GPM Max residual delivery height Figure 5 2 Solar group with Grundfos UPS 25 99U pump pressure drop of components SPS0500 and GF Sensor 0 5 10 5 GPM residual delivery height N N w O ol oO ol oO l l Residual delivery height Ft ol l 25 3230 35 40 45 50 55 60 Volumetric flow rate GPM Figure 5 3 Solar group with Grundfos UP 25 120U pump A pressure drop of components SPS1000 and GF Sensor 0 5 10 5 GPM residual delivery height Ta O oO oO oO oa N oa oa Residual delivery height Ft N 30 35 40 45 50 55 60 65 70 75 80 85 Volumetric flow rate GPM Lochinvar PE Commercial Solar Thermal Systems 6 VFS flow sensor mE Vortex flow sensor for liquid media Measures flow rate and temperature for BTU metering energy balance etc Zero wear no moving parts Figure 6 1 VFS 1 12 flow ouput signal 4 0 3 5 gt 3 0 Assignment of measurement range 0 26 3 17 gpm is equal to 0 5 3 5V 7 Flow rate calculation Q 0 26gpm U 0 5 V 3V 2 91gpm oy 2 0 a 1 5 gt 40 5 e 05 0 0 0 0 26 0 53 0 79 1 06 1 32 1 59 1 85 2 41 2 38 2 64 2 91 3 17 Flow gpm Figure 6 2 VFS 1 12 temperature output signal 4 0 3 5 VFS 1 12 output signal temperature 3 0 Assignment of measurement range 32 212 F is equal to 0 5 3 5V Temperature rate calculation
10. ccceceeeeeeeeeeeeeeeeeeeeees 14 3 TECHNOLOGY INSTALLATION AND Disassembling the Solar Station cccccceeessessseeeeeeeeees 14 COMMISSIONING Draining the system ccccccccscssseseeeeeeeeeeesaesaeesseeeeeeeeess 14 Clamp ring screw CONNECTIONS ccecceeeeeeeeeeeeeeeeeeeeeeeeees 6 10 FAULTS CAUSES AND RECTIFICATIONS Operation multi function ball valve and check valve 6 Pump doesn t run when power is switched on 65 15 4 COMMISSIONING THE SOLAR SYSTEM Motor DIOCK CC i aesscconsecsesisseneieonted ear ei 15 GON EE TAANE EERTE TETT 7 AAEE E E E E 15 Flat seal screw CONNECTIONS cccsceececceeeeeeeeseeeeeeaeeeess T Revision Notes ssccccesseeeeceeeseeceseseeeeseaees Back Cover Filling flushing and DIC CING cccccsseeseeeeeeeeeeeeeeeeeeeees 7 5 PRESSURE LOSS AND RESIDUAL DELIVERY HEIGHT cece ccceceeeeeeeeeeeaeeeeees 8 Hazard definitions The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product A DANGER en indicates an imminently hazardous situation which if not avoided will result in death or serious A WARNING WARNING indicates a potentially hazardous situation which if not avoided could result in death or serious injury A CAUTION CAUTION indicates a potentially hazardous situation which if not avoided
11. exits free of bubbles m If necessary increase the test pressure again to 60 psi and check the system for leaks If the pressure gauge shows the pressure dropping substantially you have a leak in the system m Set the operating pressure to 60 psi as prescribed by the system manufacturer E Start up the circulation pump at maximum speed and allow liquid to circulate for at least 15 min m Remove the filling station hoses and screw the caps on the flushing and filling valves m Check the system again for leaks Use the red and blue thermometer handles to fully open the forward flow and return ball valves Activate speed control on solar control unit The highest speed level should be set on the pump phase control Note The minimum speed set on the solar control unit must not fall below the pump s minimum nominal speed Note instructions for pump and solar control unit m Once the installation settings have been completed and checked fit the solar station s front insulation shell E Refer to the collector manufacturer s recommendations for minimum flow requirements Lochinvar EEE S PS Installation amp Operation Manual Commercial Solar Thermal Systems 5 Pressure loss and residual delivery height Max residual delivery height Solar group with Grundfos UPS 25 58U pump and GF sensor 0 5 3 GPM residual delivery height pressure drop of components Residual delivery height Ft 1 5 2 0 25
12. flushing connection on the sensor measuring section and open fill flush valve m Refer to Technology installation and commissioning Operation multi function ball valve and check valve on page 6 m Open the supply ball valve by turning the red thermometer handle counter clockwise until it stops m Close return ball valve by turning the blue thermometer handle clockwise until it stops m If necessary the supply and return check valve can be opened by moving the thermometer handles to the 45 position m Put sufficient solar liquid in the tank of a filling and flushing pump not supplied The mixing ratio should be adapted to local conditions in terms of freeze protection m Fill the solar system via the filling and flushing pump and then flush the solar circuit for at least 15 min to purge all of the air out of the circuit m Close the fill flush valve return with the filling and flushing pump running and increase the system pressure to 60 psi The system pressure can be read at the pressure gauge m Close the fill flush valve forward flow and switch off the filling and flushing pump m Open return ball valve by turning the blue thermometer handle 90 counter clockwise until it stops m The solar system features an air separator Open the bleeder valve until the solar liquid exits free of air bubbles m Only if collector bleeder is installed Bleed the system on the collector until the solar liquid
13. ght 14 Width 9 75 Width 9 75 Depth 7 5 Depth 7 5 SPS0250 VFS 1 12 sensor SPS0500 VFS 2 40 sensor VES 2 40 sensor Materials Grivory PPS Seal material EPDM Nominal size DN 15 DN20 Measuring range 26 3 17 GPM 5 10 5 GPM Nominal size DN20 Measuring range 5 10 5 GPM FIOW SENSOR AND MEASURING SECTION Output signal Q 0 5 to 3 5 V proportional to GPM Output signal T 0 5 to 3 5 V proportional to 32 212 F Max pressure 145 psi Power supply 5 V DC Temperature measuring range 32 F to 212 F 145 psi Temp min max 73 F 248 F FILLING AND FLUSHING Forward Flow G3 4 with seal cap and Solar 1 2 fill and flush valve CONNECTIONS Return G3 4 with seal cap and Solar 1 2 fill and flush valve SAFETY GROUP Multi function instruments fitted on right including ball valve flow check and thermometer handles FORWARD FLOW BALL VALVE Complete ball valve 1 22 mm compression Complete ball valve 1 1 2 28 mm compression RETURN BALL VALVE Complete ball valve 1 22 mm compression Complete ball valve 1 1 2 28 mm compression SOLAR PRESSURE GAUGE 0 145 psi 2 diameter EN 837 1 CL 2 5 Designation SVE SOL 100 1 2 Solar Designation SVE SOL 3 4 Solar Standard certificate DIN EN 12164 CW 617N pn EN 12164 CW 617N T V SV 07 2008 TUV SV 07 2008 SOLAR SAFETY VALVE Nominal pressure 145 psi Response pressure 145 psi Max temp 320 F Glycol water mixture max 50
14. immediately so that system suppliers and system operators can rely on a guaranteed solar yield over years As the manufacturer we hereby confirm the suitability of Grundfos Direct Sensors in solar thermal systems All sensors of the serios VFS and RPS generate a temperature signal over the range 0 100 C ever the following operating conditions Media iemperature Operation 100 C 120 C max 4 weeks during lifetime Very short term temperatura load 25 to 160 C Ambient air temp operation 25 to 60 C Ambient air temp peak 55 to 90 C Humidity 0 95 rel non condensing Max system pressure operation 10 bar Media Up to 40 Glycol in Water 20 C Yours faithfully Grundfos Sensor A S Hcl Dr Per E Andersen Senior Development Engineer Sensors Lochinvar SLA SL PS Installation amp Operation Manual X Commercial Solar Thermal Systems r Technical data for solar station SPS0250 SPS0500 SPS1000 i a a Sewers PUMP T HOLDING PLATE FOR WALL With 2 slot holes 5 apart for M6 screws With 2 slot holes 5 apart for M6 screws MOUNTING Plastic 8x40 mm anchors MOUNTING MATERIAL FOR WALL 6x50 mm clipboard screws M6 8 zn DIN 912 washers CENTER SPACING OF THE PIPING Forward flow return spacing 5 Forward flow return spacing 5 Material EPP Thermal conductivity 0 041 W mK Max temp 250 F INSULATION Short term max temp 355 F MOUNTING Height 14 Hei
15. ining springs to the front The solar station is now loose Ensure A CAUTION that it does not slide forward and out of the wall bracket 14 Draining the system Fit corresponding drainage hoses on to the filling and flushing connections and guide these into a collecting vessel m Open the check valves by placing the red and blue thermometer handles in their 45 position m Open the fill flush valve return under the pump m Open the fill flush vlave forward flow on the safety group m Optional Open the fill flush valve at lowest point of system as close to the tank connection as possible Open bleeder equipment at highest point above collectors Commercial Solar Thermal Systems 10 Faults causes and rectification Pump doesn t run when power is switched on m Check solar control unit for correct settings and tight wire connections m Check fuses m Check pump voltage refer to the pump rating plate for requirements Motor blocked m Close shut off instruments upstream and downstream of pump at high liquid temperatures and system pressures Allow pump to cool first m Fully unscrew bleed screw and check ease of movement of pump rotor by turning the slotted shaft end with a screwdriver use force to turn if necessary Pump Noise In the event of cavitation caused by insufficient inlet pressure increase primary system pressure within allowable range m Check speed setting If
16. lar circulation pump m VFS sensor flow sensor m 145 psi relief valve with pressure gauge m Multi function instruments Flow Check Thermometer Fill Valve EPP two part bracket with mounting kit Installation kit m Wall and tank bracket with mounting kit Solar Control unit m LCD Plus solar control unit with integrated energy balance function E 2 collector and 2 tank sensors Pt 1000 Technical documentation m Operation and installation instructions with appendix for pump and solar control unit Figure 1 1 SPS0250 SPS0500 Lochinvar EE S PS Installation amp Operation Manual Commercial Solar Thermal Systems 2 Installing the solar station Installing the solar station on a wall E Remove front insulation shell The solar pump station forms a single unit with the wall bracket and rear insulation shell Secure both components as a complete unit at the intended location working the front and using anchors and screws suitable for the wall construction type Installing the relief valve m The solar station is equipped with a solar safety relief valve which meets the relevant requirements Fit the enclosed relief valve to the outlet of the return instruments above the pump using the 3 4 union nuts A gasket is enclosed with the solar station for use when installing the relief valve m The enclosed discharge connection bracket should be fitted to the safety valve so that there is n
17. mperatures should be avoided for continuous operation The provisions stated in DIN EN 12976 1 should be observed when installing solar systems The expansion tank should be regularly checked according to DIN 4807 Solar systems should be grounded to protect against lightning The system s electrical connection for sensors and voltage supply should only be established by a trained professional The relevant specifications VDE 0100 VDE 0185 VDE 0190 etc should be observed as well as special local construction requirements Grey cable tank black cable collector The solar pump station s componentry varies depending on type and equipment m The diagrams used are examples Subject to technical changes and further developments A properly sized expansion tank must be used to avoid damage to the solar thermal system A WARNING Thermal expansion tanks should be sized to account for 1 5 times the solar system circuit volume A WARNING The expansion tank may be hot ensure that scalding does not occur A WARNING Failure to heed these instructions especially the safety instructions can result in the destruction of and defects on the expansion tank endanger persons and impair the operation A WARNING 4 Lochinvar EE S PS Installation amp Operation Manual Commercial Solar Thermal Systems 1 General Information Included Components Solar Station Figure 1 2 SPS1000 m Grundfos so
18. o risk of scalding should liquid escape Follow local codes for drainage piping The following information should be noted The safety valve must be easily accessible No valves should be placed between relief valve and pump station The relief valve should be piped to a suitable drain as close as possible to the pump station with no reducing couplings or other restrictions The piping must be sloping away from the pump station at all times m Dirt traps or other constrictions are not permitted between the collectors field and safety valve Installation wall bracket for expansion tank Lochinvar TISUN accessories m Fit the wall bracket for the expansion tank if equipped to the right of the solar station Ensure that the corrugated stainless steel hose is long enough for the connection between the pump station and the expansion tank not forgetting the expansion coupling Installation connection lines to tank and collector A Piping m Connect the lines between the solar pump station and tank Connect supply and return lines to the collectors B Clamp ring screw connections E Refer to Section 3 Technology installation and commissioning on page 6 Lochinvar EEO Commercial Solar Thermal Systems SL PS Installation amp Operation Manual 3 Technology installation and commissioning Clamp ring screw connections m Cut the copper pipe to length and deburr First slide the clamp ring nut
19. over the pipe then slide the clamp ring Insert the prepared pipe into the screw connection until its stop is reached m Tighten clamp ring nut by hand Use open ended wrench to tighten clamp ring screw connection approx 33 Ft lb re tighten if necessary When tightening the clamp ring screw connection use two wrenches using one wrench to prevent the pumping station from turning Flat seal screw connections All pre fitted solar station screw connections are firmly tightened in the factory so that they do not need to be retightened Torque levels when tightening flat seal screw connections using AFM 34 flat seals s 2mm 3 4 screw connection 26 Ft Ib 1 screw connection 40 Ft Ib 1 1 4 screw connection 66 Ft lb 1 1 2 screw connection 96 Ft Ib Operation multi function ball valve and check valve m The forward flow ball valve must be open for filling flushing and bleeding solar systems with a filling and flushing pump The return ball valve should be closed m Both flow checks should be opened in order to drain the solar system thermometer handles in 45 position m The two mult function ball valves must be fully open in order to operate the solar system turn the red and blue thermometer handles counter clockwise until the stop is reached Figure 4 1 Forward flow multi functioning instruments SETTING FOR OPERATIONS FILLING FLUSHING DRAINING FLOW CHECK CLOSED BAL
20. valve USA M28 x 1 5M28 Solar bleeder block M28 x 1 5 L 283mm Nut M28 x 1 5mm Clamp ring 22mm Clamp ring 22 3 mm USA Nut 1 1 2 x 16mm Reducing socket 1 1 2 female x 1 male Sealing kit 2x 1 1 2 2x 1 3x 3 4 Ix 1 2 Solar cross piece cpl USA 145 psi safety valve cpl Flow sensor housing 0 26 3 17 gpm cpl w fill flush valve USA Flow sensor housing 0 50 10 5 gpm cpl w fill flush valve USA SPS0250 UPS 25 58U 1 1 2 180 F12K03 115V60Hz SPS0500 UPS 25 99U 1 1 2 180 F12K09 115V 60Hz Solar control unit LCD plus USA 115 Volt w SD card SPS0250 Sensor direct 0 26 3 17 gpm w cable SPS0500 Sensor direct 0 50 10 5 gpm w cable Power cord USA w AC plug XYTP Control unit bracket Red thermometer handle L 92mm RAL 3020 Blue thermometer handle L 92mm RAL 5010 Thermometer D51 L 100 5 0 160 C 40 320 F Wall bracket for pumpstation 250 500 sq ft Retaining clamp cropped Spring wire 2mm Sealing kit 2x 1 1 2 2x 1 3x 3 4 1x 1 2 Mounting kit 8x50 D10x50 anchors screws Insulation SPS0250 machined for pump and control unit Insulation SPS0500 machined for pump and control unit 25 Additional insulation D 42mm DN32 26 Additional insulation L 190mm machined Cover white alu RAL9006 Type C Cover white alu bottom RAL9006 Type B Cover white alu top RAL9006 Type B Cover white alu RAL9006 Type B w control unit cutout Item O ON N Aa N N N NM O ININININ m p
Download Pdf Manuals
Related Search
Related Contents
AURABOX 14-(110-53)-q.cdr Ova-Easy 380 Advance User Manual Jabra JX10 Burgundy SEPARATED AT BIRTH SEPARATED AT BIRTH Manual - Policomp TABLA DE PROGRAMAS MANUAL TECNICO Copyright © All rights reserved.
Failed to retrieve file