Home

Lightolier IS_CD7-STEM User's Manual

image

Contents

1. Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems IS_ CD7 STEM Page 3 of 5 Instruction Sheet for Assembly and Installation of CD7 Stem Mount PROCEDURE TO INSTALL STEM MOUNT FIXTURE CONT D Step 5 Secure Stems To Fixtures Slip LEADS into FIXTURE and fasten STEMS to FIXTURE NOTE Threads Must be fully engaged Slip CANOPY over STEM Step 6 Mount Fixture Simultaneously slip both STEMS into opening in MOUNTING PLATES Rotate STEMS slightly to Align GROOVE on BALL ALIGNER with TAB on inside of MOUNTING PLATES Fig 1 Make required electrical Connections per local codes Raise CANOPY up over MOUNTING PLATE and secure with two 2 6 32 SCREWS J BOX CENTER ear by others MOUNTING PLATE lt Q a ee i A 3 4 HOLE 8 32 SCREW BALL ALIGNER TOGGLE NUT 7 LN by E E by others A CANOPY TOGGLE por by others P BALL ALIGNER Figure 2 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group C1208 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems IS_ CD7 STEM Page 4 of 5 Instruction Sheet for Assembly and Installation of CD7 Stem Mount PROCEDURE TO INSTALL TANDEM MOUNT FIXTURE Step 1 Be Sure Electrical Power Is Off Step 2 Sloped Ceiling If installed on a sloped ceiling orient ball aligner slot
2. opening up toward the crest of the ceiling Step 3 Remove End Covers Remove LENS or LOUVER Place screwdriver thru slots in REFLECTOR and pull REFLECTORS out Unfasten 8 32 HEX NUTS on inside of FIXTURE and discard END COVERS Step 4 Remove Stem Bracket At each joint between fixtures only one stem is required Where STEM mounting is not required remove STEM BRACKET by unfastening three 3 8 32 PHILLIPS SCREWS on inside of FIXTURE From LOOSE PARTS BAG take COVER PLATE and attach in area where STEM BRACKET was mounted Use same 8 32 PHILLIPS SCREWS Step 5 Tandem Mount Fixtures Align FIXTURES together and slip two 2 10 24x1 2 SCREWS from loose parts bag thru END PLATES and firmly fasten together with two 2 10 24 HEX NUTS from loose parts bag Make required electrical connections COVER PLATE 8 32 HEX NUT EA L gt a A E gt loose parts bag aie END COVER LA 4 X Zo 8 32 PHILLIPS i e7 SCREW STEM BRACKET 10 24X1 2 SCREW FIXTURE Figure 3 631 Airport Road Fall River MA 02720 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group C1208 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems IS_ CD7 STEM Page 5 of 5 Instruction Sheet for Assembly and Installation of CD7 Stem Mount PROCEDURE TO INSTALL TANDEM MOUNT FIXTURE CONT D Step 6 Replace Reflectors Insert bottom edge of REFLECT
3. 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group C1208 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems IS_ CD7 STEM Page 2 of 5 Instruction Sheet for Assembly and Installation of CD7 Stem Mount PROCEDURE TO INSTALL STEM MOUNT FIXTURE Step 1 Be Sure Electrical Power Is Off Step 2 Sloped Ceiling If installed on a sloped ceiling orient slot opening up toward the crest of the ceiling Step 3 Mark Off Mounting Center Mark required distance from center of J BOX to MOUNTING CENTER as shown Fig 1 Drill two 2 3 4 0 holes at same angle as shown as the two 2 8 32 threaded holes on J BOX Fig 1 Step 4 Secure Mounting Plates Fasten to J BOX with two 2 8 32x1 SCREWS Secure MOUNTING PLATE at MOUNTING CENTER with two 2 8 32 TOGGLE BOLTS by others Fig 2 IMPORTANT Opening in MOUNTING PLATES must be Aligned in same direction Fig 1 MOUNTING J BOX 45 1 2 115 57cm for 4 Fixture NTE CENTER 94 1 2 240 03cm for 8 Fixture ________ From Center of J Box to Mounting Center 8 32 SCREW 3 1 4 8 26cm TAB MOUNTING TOGGLE PLATE BOLT BALL ALIGNER STEM by others Figure 1 631 Airport Road Fall River MA 02720 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group C1208
4. LIGHTOLIER Lighting Systems IS_ CD7 STEM Page 1 of 5 Instruction Sheet for Assembly and Installation of CD7 Stem Mount READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE PROCEEDING RETAIN THESE INSTRUCTIONS FOR MAINTENANCE REFERENCE This fixture is intended for installation in accordance with the National Electrical Code and local regulations To assure full compliance with local codes and regulations check with your local electrical inspector before installation To prevent electrical shock turn off electricity at electrical panel before proceeding DO NOT INSTALL THIS SYSTEM IN A WET OR DAMP LOCATION DO NOT ENERGIZE ANYTHING OTHER THAN THE FIXTURES IN THE SYSTEM DO NOT OVERLOAD FEED CABLE 10 AMP MAX FOR SJT 18 3 AND 7 AMP MAX FOR SJT 18 4 amp 18 5 CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY REINFORCING CEILING TO SUPPORT FIXTURE WEIGHT gt 9 22 86cm _ 3 1 4 Direct Lens ere Direct Louver Direct Indirect Louver SAMPLE RUNS H 45 1 2 115 57cem 4 Foot lt 49 124 46cm gt lt 94 1 2 240 03cm gt 8 Foot lt 8 248 92cm _ 94 1 2 240 03cm 49 124 46cm 98 248 92cm gt 20 Foot D 20 5 622 30cm gt 631 Airport Road Fall River MA 02720 e 508 679 8131 Fax 508 674
5. OR into channel Fig 4 against screw on left or right hand Side Snap top edge under clips fasten to FIXTURE HOUSING Insert lamps Replace LENS or LOUVER FIXTURE HOUSING REFLECTOR PENS Figure 4 Please consult factory regarding stem shortening 631 Airport Road Fall River MA 02720 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group C1208 Lightolier is a Philips group brand PHILIPS

Download Pdf Manuals

image

Related Search

Related Contents

Slant/Fin INTREPID Oil-fired Boiler User's Manual  User Manual    Adam Equipment 302666242 Postal Equipment User Manual    ポンプ取扱注意事項 (1/2)  Manual  

Copyright © All rights reserved.
Failed to retrieve file