1. HP Performance Optimized Datacenter POD 240a Operations and Maintenance Manual Supported facility connections 24 Glossary AHJ Authority Having Jurisdiction door A hinged portion of an enclosure that covers an opening DX direct expansion ae environmental control system EPO emergency power off equipment A general term including fittings devices appliances luminaires apparatus machinery and the like used as a part of or in connection with a modular data center Source NEC HVAC Heating Ventilation and Air Conditioning IEC International Electrotechnical Commission ISO International Organization for Standardization labeled Equipment or materials to which has been attached a label symbol or other identifying mark of an organization that is acceptable to the authority having jurisdiction and concerned with product evaluation that maintains periodic inspection of production of labeled equipment or materials and by whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner Source NEC Glossary 25 listed Equipment materials or services included in a list published by an organization that is acceptable to the authority having jurisdiction and concerned with evaluation of products or services that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services and whose l
2. cold weather might cause damage to the supply and drain lines Evaluate the following for additional cold weather protection e Regional location of HP POD 240a e Exposure of supply and drain lines to extreme cold temperature Extreme cold weather can affect crane and lifting operations When temperatures drop below 10 F appropriate consideration must be made with respect to shock loading crane hydraulics and possible derating of the crane Areas prone to lightning or power surges The HP POD 240a structure and internal components are all bonded together A common Grounding Electrode Conductor Connection point is provided Properly bonding and grounding of the HP POD 240a minimizes the effects of a lightning strike A TVSS device is provided on the HP POD 240a input connection to protect the HP POD 240a electrical system from voltage transients If your site is in an area that is subject to frequent lightning strikes the HP POD 240a must be protected in accordance with NFPA 780 NEC NA and IEC EMEA and APJ HP recommends that you contact a certified lightning protection consultant Seismic activity If your site is in an area that has frequent seismic activity HP recommends that you contact a seismic activity consultant If your site is in an area that has high vibration level HP recommends that you contact a vibration isolation consultant There are no provisions for anchoring the HP POD 240a Environmental considerations 14
3. communication e ECS e EPO e Fire alarm e Phone 1 5 inch portal Sana vestibule communication Sana NOTE The connection portal location and configuration might look different depending on the portal location and configuration might look different depending on the HP POD 240a model Grounding requirements The HP POD 240a structure and internal components are all bonded together A common Grounding Electrode Conductor Connection point is provided A WARNING To avoid the risk of personal injury or electric shock the HP POD 240a must be properly grounded and each of the individual sections must be bonded together in accordance with NFPA 70 in accordance with NEC NA and IEC EMEA and APJ Z CAUTION You must remove any painted surface from all grounding surfaces Failure to do so results in an ineffective ground e Grounding and bonding of the HP POD 240a must comply with Article 250 of the NFPA 70 in accordance with NEC NA and IEC EMEA and APJ Required facility connections 20 e The HP POD 240a structural sections metal raceways wireways conduit boxes and other external intersystem components must be bonded with grounding conductors per NFPA 70 in accordance with NEC NA and IEC EMEA and APJ e Bonding of Piping Systems and Exposed Structural Steel must comply with NFPA 70 in accordance with NEC NA and IEC EMEA and APJ Ce E Grounding pad e A grounding pad is located on the underside of the HP P
4. equipment structure Enclosure of sufficient size to allow entry of personnel UL Underwriters Laboratory UPS uninterruptible power system VESDA Very Early Smoke Detection Apparatus Glossary 26
5. requirements see HP POD 240a dimensions and required clearances on page 8 Additional equipment space requirements Allow additional space required to accommodate any additional equipment that is to be installed such as a generator or UPS Future expansions When selecting a site location consider future space and accessibility requirements Adequate space around the HP POD 240a is necessary for airflow and cooling purposes When locating additional equipment in close proximity of the HP POD 240a for example additional HVAC DX generators and UPS devices consult with HP for site locations For specific space requirements see the HP POD 240a dimensions and required clearances on page 8 Space requirements and clearances 11 Preparing for delivery and assembly Shipping considerations The HP POD 240a is packaged for shipping such that exposure to weather does not result in damage to the components The HP POD 240a is shipped on air ride trailers to avoid vibrations during shipment The HP POD 240a components are shipped based on the assembly plan and available space at the customer site Depending on the site location additional restrictions and permits might be required which can effect the delivery time line Suggested assembly installation equipment Crane 2 Forklift 1 Scissor lift 2 Boom lift 1 Temporary flood light towers 2 Fuel spill containment kit Portable generator Safety for assem
6. 0 HP POD 240a and support equipment sample offload plan ccccccccescsceeceseceeecesseeeesesseesesseeeeesseaaees 10 Site space and clearance requirements ccccccceesecceseeseceeecessseeesceseeeeeessaeeeesssseeeeseeseeeesessseeeessseegeeeneaeeeees 11 Additional equipment space requirements cccccccesssscceeesseeceeseseeeeeseeeceesseseeeesseseeesesaeeesesseseeeesseseeeeeensaaes 11 ERE a e A ENE EO E EEE E E E Saude T T 11 Freparing or war and asse MEIy siininienind esc ncn ccna tae en hinchada 12 Shipping considerations isses reesi EEEa aK EE EEE E AEAEE E N EEE E NEE ae 12 Suggested assembly installation equipment atacand ween Aen oaGaandeabnewiien 12 Safety for assembly scccivescccv dsccesusy ence a seadeddvadacdyaus HERE E E EE AE TN ERRE rE EE 12 Temporary lighting and Power messireisid eeneioe nun E EE EE NEER EEEE EEN EREE SE E 13 Storage FEQUIFEMENS siipess erorr Enrere n enn p EEr EA EEEE EEE bags segs KORE TEE E Ea E 13 Assembly prereguisiles saprenn n E E R N 13 Environmental NTN INS Ne va ecrccececsrercnnensrourciennniaenereconaneneseaemsmenneeseuenxenanactinesaciannmecansnencenmades 14 Environmental considerations ss snkerssiccaiansiannierssicenrenstacrkbasniteahensineese nnimeshenseaseeasniababenstdarseaghideaniqaneaanieaheents 14 MN ecco rors gchar canes vag asso uiaateng neste danv ats oon and ip pas etd casos theaeanasene amended 14 Areas prone to lightning OF power SUTGES cass ccssrisisndckectrassrioraki
7. 0 Includes fans and catwalk 23 000 IT section B without IT installed Includes racks PDUs and 50 000 dropboxes but has no IT installed sb IT section B with IT installed C 93 000 UPS encore B om em HVAC DX cradles 1 and 2 Each with 12 HVAC DXanda 18 000 per cradle catwalk Space requirements and clearances 10 Tock wig TE HVAC DX cradles 3 and 4 Each with 12 HVAC DX and a 18 000 per cradle catwalk hz dad recess wares S HP POD 240a electrical pull boxes For electrical service entry 14 Misc parts and pieces Gutter assembly condensation 1 000 piping and hardware The truck number does not reflect the actual order of the trucks arrival Site space and clearance requirements The selected site for the HP POD 240a must be large enough to install service maintain and potentially upgrade the unit and its payload Here are two examples for site clearances e Ifthe HP POD 240a is to be installed in a warehouse ensure that the warehouse doors are large enough to accommodate it e Ifthe HP POD 240a is to be installed outdoors ensure there is adequate clearance for all buildings utility lines or other site structures such as gates and headers Every site must have sufficient clearance for assembly maintenance and service such as handling devices such as a forklift scissor lift boom lift or crane Adequate space around the HP POD 240a is necessary for airflow and cooling purposes For specific space
8. D 240a Changes in ambient temperatures cause condensation in a HP POD 240a that is not operating If the HP POD 240a is placed in storage or is non operating mode for over 72 hours HP recommends using one of the following methods to minimize condensation and oxidation within the HP POD 240a Dessicant unit Dessicant material Heater with a fan Air conditioner with heater strip Consult with HP Services to determine the most effective method Assembly prerequisites Before installing the HP POD 240a verify that the following prerequisites have been met All components have been delivered to the facility The HP POD 240a and power distribution components are in final location Facility power water and drainage are at the final location Provisions for properly grounding the HP POD 240a have been made There are required clearances including overhead Coordination of all trade personnel required for assembly Completed Job Safety Analysis Required PPE and head protection on page 12 for all personnel is available Preparing for delivery and assembly 13 Environmental considerations Environmental considerations e Avoid placing the HP POD 240a directly along a drainage path or in an area prone to flooding e Verify that the HP POD 240a is properly grounded in accordance with NFPA 70 in accordance with NEC NA and IEC EMEA and APJ Cold weather The HP POD 240a requires a water supply and several water drains Extreme
9. E DSA SILO RI S CTE PATIOS Olen TASER TT Na eTE RA SON eeE NET Tree 25 Contents 4 Overview About this document This document outlines the site requirements for an HP Performance Optimized Datacenter POD 240a The customer must provide a qualified architectural or consulting engineering team to generate site specific documents for each HP POD 240a installation including final site drawings The customer s site installation design must comply with all local and national regulations ordinances codes and the specifications listed in this document Site assessment HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP POD 240a Consult with HP to schedule a site assessment For more information see the Site Assessment Checklist in the HP Performance Optimized Datacenter POD 240a Site Preparation Guide Overview 5 Site requirements HP Site Preparation Drawing Package HP provides detailed schematic engineer drawings of the HP POD 240a in the HP Site Preparation Drawing Package included on the documentation CD Site preparation NOTE The weight provided is an estimate The total weight of the HP POD 240a will differ based on the IT equipment installed The structural design of the HP POD 240a site pad design is based on specific weight load locations accounting for the HP POD 240a structural footing and supported IT infrastructure The HP POD 240a must be insta
10. HP Performance Optimized Datacenter POD 240a Site Requirements Guide Part Number 663155 001 October 2011 Edition 1 Copyright 2011 Hewlett Packard Development Company L P The information contained herein is subject to change without notice The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services Nothing herein should be construed as constituting an additional warranty HP shall not be liable for technical or editorial errors or omissions contained herein Contents RTT AR E E A A A A A A A A A A A A 5 About this docum ntase aa EErEE ie EE E EA aaie a NNE aieia S EE eir sa 5 SEO EE NE E thot ET E T 5 E E E 6 HP Site Preparation Drawing Package ssssssessseissesssissstssstrs stts aurea erie ae ace see 6 Sile preparalo ckscccceassaaeevccceccdecansuves iE TEE edegucceaban sedeecdecandacbansedd EEO deve cececadssueees OAO EESE 6 Early infrastructure requirements ccccccccssssceceeseseeceessseeeeceeeeecessaseecesseseeeeceeseeeesseseeeeeseseeesenssaeeeeesieeeeeaas 6 RTT oat Le ee er eee ee erreer eee rere eee eee 7 Other Structures 5522s ecccaeeetountai vance cane eae ae eco ee ee nee 7 pee reguirement ond Chest eee ee 8 HP POD 240a dimensions and required clearances ccccccesssceceesseecessnseeeccseeeeeescnseesessuseeesesseeeeesenseeeeseeaes 8 AP POD 2400 Weighs iiaeia i ei aN ease SAS a EEE S AAE sere E EERS OE SESE 1
11. OD 240a at the outside corner of each IT section under the electrical panel e Grounding pads are located inside the HP POD 240a at ceiling level to bond the sections together and bond the IT racks Grounding lugs e Grounding lugs cannot be attached to any painted surface e Grounding lugs must be compression type 2 hole lug Ground rod system or Customer must provide an effective grounding system with ground rod or ground well ground well PA IMPORTANT Before installing the HP POD 240a consult your local AHJ for applicable codes and to review site specific location guidelines If needed obtain any necessary permits The grounding electrode conductor connections are located on IT sections A and B of the HP POD 240a The following figure shows the location for one of the IT sections Side view shown Required facility connections 21 End view shown AHN INEM Grounding electrode conductor connection Required facility connections 22 Supported facility connections Humidifier A dedicated water supply and approved drainage is required for the humidifier For more information about the humidifier see the HP Performance Optimized Datacenter POD 240a Operation and Maintenance Manual provided with the HP POD 240a End view shown Humidifier drain and water supply on IT section A Humidifier drain and water supply on IT section B NOTE Confirm w
12. Utilities Proximity to utilities and drains Consider proximity to required utilities such as power water and network connections While required utilities can be brought to nearly any selected site there is a potential for increased costs and decreased efficiency when the HP POD 240a is located further from the utility source For utility clearance information see HP POD 240a dimensions and required clearances on page 8 System utilities The site location must accommodate the following utilities e Water supply on page 15 e Drainage on page 16 e Power on page 17 Water supply The HP POD 240a requires supply water for the humidifier The supply water must meet the following requirements Pressure between 0 1 and 0 8 MPa 1 and 8 bars Temperature between 1 and 40 C Instant flow rate no lower than the rated flow of the fill solenoid valve G3 4M Hardness no greater than 40 fH equal to 400 ppm of CaCO3 125 to 1250 5 en e Do not treat the water with softeners because softeners might produce foam which affects the operation of the unit e Do not use well water industrial water water from cooling circuits or water contaminated by any chemicals or bacteria e Do not add disinfectants or anti corrosive compounds to the water which are potential irritants For additional dimensions see the HP Site Preparation Drawing Package on page 6 Utilities 15 Water quality Water must be maintained
13. bly National state regional and local safety regulations must be enforced at all times to prevent work related injuries Before installation HP recommends reviewing the following OSHA safety sections Equipment safety Crane forklift scissor lift boom lift and tools Traffic safety Assembly and personnel safety Electrical safety Fuel spill containment safety PPE and head protection All contractors must adhere to OSHA requirements for the use of PPE to reduce employee exposure to hazards The construction area around the HP POD 240a construction site is a required hard hat area and all personnel who enters the construction site must wear a hard hat safety vest and any additional OSHA HP and customer required PPE Preparing for delivery and assembly 12 Temporary lighting and power Proper temporary lighting and power must be installed and maintained in all construction work areas When using temporary lighting Label panels and breakers that are used for temporary lighting and power The location of panels must be shown on the construction site plan and posted at the entrance to work area Lamps for general illumination must be protected from breakage and metal shell sockets must be grounded Temporary lights must not be suspended by cords unless they are so designed Storage requirements Z CAUTION The HP POD 240a must maintain 20 relative humidity to minimize condensation and oxidation within the HP PO
14. board and the HP POD 240a Utilities 17 Transformers and switchboards The input power for the Critical IT Loads requires a source of 380 415V 3phase Wye power This may require custom transformer s be provided to derive this power if it does not already exist at the source In addition to the overall loading and KVA size considerations should be given to the Harmonic Content of the installation when specifying the K Factor of the transformer s Alternatively Harmonic Mitigating Transformers might be used to passively cancel the harmonics generated by the IT Equipment HP offers several powerhouse solutions that include automatic transfer switching UPS backup transformers and output distribution switchboards to supply your power needs On site connections may include e Main facility power to the primary side of the transformer e Transformer to the switchboard e Switchboard assembly to the HP POD 240a For connection information see the HP Site Preparation Drawing Package on page 6 Preparing the site for power e The customer must provide and submit the following fully coordinated drawings showing the exact routing plan view sections and elevations for approval before beginning site preparation o Coordinated underground conduit routing drawings o Site pad drawings e The HP POD 240a requires an external transformer and switchboard If the customer provides their own transformer and switchboard they must also provide HP with
15. earances 8 End 2 view clearances shown 09m 3 1 2 25m 10 2 80 m 9 23 8 1 57m S 2 h D A 62 Side view clearances shown 1 58 m 5 2 1 4 ia 12 19 m 40 6 27 m 20 67 8 Space requirements and clearances 9 End 1 view clearances shown HP POD 240a weight For information on the trucks deliverables and the approximate weight of the contents see the HP POD 240a and support equipment sample offload plan on page 10 The exact number of required trucks and the components included on each truck might be different depending on the power redundancy in configuration NOTE Allow additional space required to accommodate any additional equipment that is to be installed such as a generator or UPS HP POD 240a and support equipment sample offload plan This is a sample of trucks and weights for the HP POD 240a structure and equipment that is delivered to the customer site Each offload plan will vary based on the components purchased the configuration of the HP POD 240a redundant and non redundant The exact number of required trucks and components included on each truck may differ based on the specific customer POD solution 2 Fuel tank for Generator P 1 Se 55 OE Opra a e ass IT section A without IT installed Includes racks PDUs and 50 000 dropboxes but has no IT installed lob IT section A with IT installed C 93 00
16. isting states that either the equipment material or service meets appropriate designated standards potential of not more than 42 4 V DC or peak supplied by a primary battery or by an isolated secondary circuit and where the current capacity is limited by an overcurrent device such as a fuse or by the inherent capacity of the secondary transformer or power supply or a combination of a secondary winding and an impedance A circuit derived from a line voltage circuit by connecting a resistance in series with the supply circuit to limit the voltage and current is not identified as a low voltage limited energy circuit or has been tested and found suitable for a specified purpose Source NEC The means for identifying listed equipment might vary for each organization concerned with product evaluation some of which do not recognize equipment as listed unless it is also labeled Use of the system employed by the listing organization allows the authority having jurisdiction to identify a listed product NA North American NEC National Electrical Code NFPA National Fire Protection Association overcurrent protection A device designed to open a circuit when the current through it exceeds a predetermined value The ampere rating of the device is selected for a circuit to terminate a condition where the current exceeds the rating of conductors and equipment due to overloads short circuits and faults to ground PPE personal protective
17. ith AHJ that condensate water and rain water can be mixed in the same drainage Supported facility connections 23 HP POD 240a security The HP POD 240a is equipped with standard key lock hardware at each personnel entry door and six external electrical cabinets Each personnel entry door includes a door access contact that can be connected to the customer facility security system Conduit and junction boxes are provided for customer installed controlled access systems Additional options for controlled access security includes e Electronic card reader e 12 digit security code keypad e Magnetic lock on each entry door Fire safety and security notifications Dry contacts are provided to enable the connection between the HP POD 240a fire alarm system and the customer facility fire system If the HP POD 240a is connected to the customer facility systems then the HP POD 240q initiated alarms notify the facility systems The customer must provide an independent connection for each system listed in the following table Smoke has been detected in the HP POD 240a Fire suppression The suppression system alarm has been activated and system optional gas will be dispersed to suppress a fire A security breach has occurred EPO The EPO system has been activated by an EPO button or thermal event and shut down the HP POD 240a The electrical layout of the fire alarm system is as described in the schematic drawing that is supplied with the
18. lled on a surface capable of supporting the following weights e HP POD 240a with 24 HVAC DX units 117 526 kg 259 100 Ib e HP POD 240a with 24 HVAC DX units and IT equipment installed Approximately 183 750 kg 405 100 lb The site pad must be level with less than 0 5 degrees differential from extreme to extreme Shimming is allowed when shims are used directly under the HP POD 240a load pads and are placed in increments across the length of the HP POD 240a ensuring the HP POD 240a is level The customer is responsible for adequately protecting the surrounding environment during excavation IMPORTANT The HP POD 240a is designed for ground level installation If you install the HP POD 240a on an elevated surface make sure the minimum height requirements for circuit breaker actuators are considered per local and national electric code requirements The area in front of the outside panels must include a work platform For HP POD 240a load specifications and load distribution see the HP Site Preparation Drawing Package on page 6 e External top view Load distribution within IT sections e External bottom view Load bearing footprint e External bottom view Load bearing footprint weights e External bottom view Load distribution pads site dependant Early intrastructure requirements The following work is expected to be complete on site prior to the HP POD 240a assembly e Customer power equipment and feeder
19. llel power paths from independent power sources switchboards and transformers if required IMPORTANT All 3 phase WYE feeders for the HP POD 240a require that the neutrals and the equipment grounding conductors remain isolated Bonding of the two conductors is allowed at the power source only Power feeder requirements Feature Specification NEMA 3R Mechanical power for 4 x 300A feeders at 480VA 3 phase 3 wire with cooling system equipment ground conductor components 2 x 3 conduit fittings per feeder provided Critical power for IT 4 x 1000A feeders at 415Y 240V 3 phase 4 wire equipment with equipment ground conductors 4 x 4 conduit fittings per feeder provided Total critical power e 2N Redundant 1 2 MVA required for HP POD e Non redundant 2 4 MVA 240a full capacity External power source When determining the final location of the power connections consider the following e Distance between the facility utilities and the location of the transformer and switchboard e Distance between the transformer and switchboard and the HP POD 240a e Distance between the UPS Generator locations and the HP POD 240a switchboard e Requirements for routing electrical feeders underground or overhead The facility power connection must be installed in compliance with local electrical codes and regulations HP reference electrical installation design is based on a maximum distance of 15 2 m 50 ft or line of sight between the switch
20. ndsiaderenaksalaaudirianaseeasaaansbrrnenantaahedant 14 SEISMIC CICHIVITY EET E E E IAIA EE A E OE TEET 14 A P P E P A A A TE ETA A EA TE A FE TET 15 Proximity to utilities and Arains ccccccccseesscceesenseeeesseeeceeseeeeecssaeeesessaseesesseseeeccssseeesessseeeeessseeeeseneeesensas 15 System Utili ESen ne R E E e Eeee E erae E td Puen ca deaed iets ta toc EE nE NEEE 15 Water SUPPI Yens eee E A A a E E 15 Drainage erener e e e ee EA a T E E eS 16 BOWED ssenarinin sues Gand a E E AEE EEEE EE EEEE A NETANE a EEA E 17 Required facility CONN SHORE sacs ccaerc2ssoqncnesaeqsaceneenntsnnenrennneannnennenimnnmsneniaeneenenpeneeeinnenmnanieemeninctedes 19 Connections to central facility infrastructure ccccccecsceceesssceceeseseecesseeececsseeeeesceseeeesseseceeesssseeeecessaeeeensaaes 19 Network Connections lt 55 545002 cciceeeshorageateverasanns Grae nee ou Eee EE EE EEN E 19 Connection porals seers ree ae e Aa E EEn E EE E EE E e E E EE R i 19 Grounding Foe WIRING FIRS errre sie E a EEA TE EEEE TEESE oe ee eS 20 epee cece ticity Coneco ssr a ote e Pere re Dery ner oFene te ener err et ane errr 23 FTW ITILGl ME vnssers cote t vung adolnebisnet tus neee o E EE AEE RE E a e E e r ATE 23 FAP POD 2400 SEGUTITY orreec EET R A OEE EAR RE E LRE ETA ERA O aia 24 Contents 3 Fire safety and security notifications ccccccccsssseecesssseeceessececcssteeecessseecesseueeeccssaeeecessaseesessuseeeeseeeteseneas 24 Seo 5 Reed NCUA E ON nN SCT
21. per the following acceptable water quality standards Type of water introduced Drinking water Do not use demin or softened water Instant water fill flow rate 0 6 I min 0 16 gpm If your water is out of range consult a water quality expert Drainage The following figure illustrates the drain locations on the HP POD 240a Side view shown 0O Callout Component Description Quantity per Total quantity side per HP POD 240a Condensate drain Removes condensation and water perme a a Humidifier drain Removes excess water pulled from the 1 i interior of the HP POD 240a by the humidifier m 3 Rain water drain Removes rain water from the HP POD 2 Pp a ao eter a Utilities 16 Power IMPORTANT To provide power to the HP POD 240a external transformers and switchboards may be required This equipment must be designed and installed to adhere with local state and national codes and installed by contractors with licensing required by the local jurisdiction city township and state For all site preparation drawings see the HP Site Preparation Drawing Package on page 6 included on the documentation CD Power requirements The HP POD 240a can be installed as a single source 1N load by providing all required feeders from one common power sources and from common switchboards and transformers if required A fully redundant 2N installation can be achieved by feeding the para
22. s e Underground construction requirements Site requirements 6 Site pad Operational clearance around the HP POD 240a Power on page 7 Water supply on page 15 Drainage on page 16 Site pad on page 7 Other structures on page 7 The structural design of the HP POD 240a site pad design is based on specific weight load locations accounting for the HP POD 240a structural footing and supported IT infrastructure Other structures If a customer provided vestibule or other structure will be installed at the HP POD 240a site the following specifications must be maintained Flashing must be installed to the exterior of the HP POD 240a in the location where the other structure will be attached to protect the HP POD 240a and ensure a waterproof barrier Access catwalks and or landings might be required to maintain the required egress from the HP POD 240a HVAC DX service area Access catwalks and or landings might be required to maintain the required access to the HP POD 240a electrical panels Site requirements 7 Space requirements and clearances HP POD 240a dimensions and required clearances NOTE Shaded areas indicate required clearances Top view clearances shown T ines 16 43 m 53 10 3 4 1 36m 4 51 2 1 04m 3 5 End 1 view clearances shown 9 53 m 31 3 6 27 m em 3 94 m 02 111 8 nisin _ 6 46m 2 21 4 Space requirements and cl
23. the engineering drawings IMPORTANT To provide power to the HP POD 240a external transformers and switchboards may be required This equipment must be designed and installed to adhere with local state and national codes and installed by contractors with licensing required by the local jurisdiction city township and state Utilities 18 Required facility connections Connections to central facility infrastructure The HP POD 240a is designed to function standalone but may be connected to existing facility systems with additional engineering and costs e HP POD 240a Environmental Control System o Operational status o Power consumption o Environmental status e Life safety systems o EPO o Fire detection o Fire suppression e Site communication o Phone o Security e Networking o IT connections Network connections For information on the network connections see the HP POD 240a Networking Guide Connection portals The networking and connection portals are located on the cargo end of the HP POD 240a There are eight portals per IT section and each of the different sized portals are used for different connections Required facility connections 19 End view shown Connection portal Connection point Quantity per IT Total quantity per diameter section HP POD 240a 3 inch portal Networking connection for all IT P 1 5 inch portal Communication connection for all

Download Pdf Manuals

image

Related Search

Related Contents

【組立方法】  TABS  Epson EB-485W Lamp Warranty  Guida Motorola RAZR V3xx  Olympia Becco 94g Black  Clearspan Cooldek Install  Manual de Utilização do INotes R8.5.1  M-Cab PC Power Supply, 350W  

Copyright © All rights reserved.
Failed to retrieve file