Home

Harman Stove Company SF160 User's Manual

image

Contents

1. The Aquastat controls supplied with the Trident Boiler are designed only to maintain water temperature within the boiler The actual heating sys tem is controlled separately by your thermostat s opening zone valves or energizing circulation pump s Do not attach a thermostat to the sup plied controls Installation Getting Started The sheet metal sides and top are easily removed to reduce the chance of dents and or scratches in the finish Simply lift the top off and that will allow the sides to be pulled away and up for removal To re install slide the channel at the bottom of each side piece over the lip at the bot tom of the boiler and hold downward while mov an ing the side panel into place Then slide the top down over the sides ___ Pressure Relief Valve Domestic Hot Water Coil Option Temp Pressure Gauge Immersion Well Johnson Controls Aquastat and Terminal Block NOTE The sheet metal top holds the sides in place thus no bolts or screws are needed Shaker CAUTION BOILER SHOULD NOT BE INSTALLED CLOSER THAN 36 INCHES 915 MM TO ANY COMBUSTIBLE MA TERIAL FIG 1 Automatic Draft Control Locating Boiler Place the boiler as close to the chimney as possible while still maintaining the above men tioned clearances Bolt the shaker handle on to the block on
2. jumper in cooling posi tion Harman Stove Company recommends that 1 1 4 in pipe be used between the two boilers Also recommended is that the first section of pipe off of the top of the Trident Boiler be threaded galvanized or threaded black steel pipe The Harman Trident Boiler is supplied with a dual function aquastat The A350 is used to control the automatic draft control whether open to increase heat or closed to decrease heat The S350 is used as overheat protection Since a wood or coal fire is still producing heat when the draft is closed this overheat protection is required You could have the S350 energize a circulating pump or a zone valve separate from the heating system or it could be hooked up so that it flows the heated water throughout the system Either way it must be able to flow away from the boiler Figure 7 shows a typical schematic of the Trident boiler as a stand alone system Note the crossover pipe 12 is not totally necessary but is recommended to provide circulation within the boiler while the heating system is satisfied This will ensure an even temperature within the boiler The tempering valve shown 10 is to prevent excessive temperature of the domestic water Domestic Supply Expansion Tank Air Scoop Air Valve Flow Control Valve Shut Off Valve One Way Flow Check Valve Pressure Reducing Valve 30 Ib Pressure Relief Valve Circulator Pump Tempering Valve Domest
3. Cracked or defective chimney flue or liner Down Drafts Trees or other topographi cal barriers may impede on chimney performance causing air currents to be pushed downward into the flue This can also be caused by neighboring buildings or other chimneys Creosote and condensation If creo sote or condensation runs out of the chimney or stove pipe check the following Chimney cap or liner may be defective Boiler may be positioned too far away from the chimney which would not allow the chimney to warm Wood being burned may be green or wet Boiler may be over sized for the residence causing it to be burned on low too often Excessive Draft This can be controlled with a barometric damper in the stove pipe 12 Maintenance Maintenance The spiral chamber is basically self cleaning However if there is a draft problem and you have been burning wood for a long time with little demand the spiral chamber will need to be cleaned To clean the spiral chamber remove the stovepipe and scrape any creosote or debris from the top and front of the chamber The rear of the chamber should not have much accumulation If it does clean it out NOTE 1 4 to 1 2 of creosote in the spiral chamber is normal The pipes inside the firebox will accumulate creosote if the demand for heat is too low when burning wood 1 8 to 1 4 of creosote is normal on the pipes and firebox walls If more creosote has accumulated it should be scraped
4. controls on the firebox door are used to allow secondary air to pass over the fire when burning coal This helps to burn the gasses that are emitted from the coal as it is heated Your setting for these draft controls should be between 1 2 and 1 complete turn from closed Adjust both controls equally Loading Coal should never be added unless there is a reasonably hot fire The coal bed should be bright and vigorous If you have an active coal bed full loads can be added at any time If not add new coal in layers as described in starting a coal fire Shaking the Grates Shaking should be done only when there is a well established fire The frequency of shak ing will depend on the degree of burning Twice a day shaking is recommended The best results are achieved with short choppy strokes as op posed to long even strokes Full rocking of the grates may allow burning coal to fall into the ash pan The amount of shaking is critical too much can disrupt the fire bed and too little will restrict air flow The proper amount of shaking is normally achieved when hot red coals first start to drop through the grates into the ash pan Every effort should be made to not let a coal fire burn down too low This will cause the reloading process to be much longer with a real good chance of losing the fire altogether Do not shake or stir with a low fire Open the ash pan door to get maximum air flowing into the firebox Once burning is re
5. off of these surfaces NOTE Creosote in the firebox can be burned off by burning coal for a few days The fire bricks may become cracked during the course of normal operation A cracked brick that is still in place is still doing its job and need not be replaced immediately If a brick is broken and has fallen out of place it should be replaced before any further burning occurs The firebricks used in the Trident Boiler are available for replacement from your Harman dealer Gaskets on the doors are there to regulate air to the firebox If a gasket is failing you ll notice difficulty in controlling the fire Inspect the gaskets regularly and replace with Harman supplied mate rial only oO a E sf Sd CT CS _Kicwat Rating elecric onion o Too sis Warranty HARMAN 1 Year Limited Warranty commercial STOVE 5 Year Limited Warranty residential COMPANY Warranty is not transferable Harman Stove Company warrants its products to be free from defects in material and workmanship in normal use and service for five 5 years from the date of purchase If defective in material or workmanship and if removed by the owner within 60 months of the date of installation Harman Stove Company will at its option repair or replace the product as described below The warranty above constitutes the entire warranty with respect to Harman Stove Company product HARMAN STOVE COMPANY MAKES NO OTHER WARRANTY EXPRESSED OR IMPLIED INCLUDING
6. ANY WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE No employee agent dealer or other person is authorized to give any warranty on behalf of Harman Stove Com pany This warranty does not apply if the product has been altered in any way after leaving the factory Harman Stove Company assumes no liability for resultant damages of any kind arising from the use of its products In addition the manufacturer shall be held free and harmless from liability for damage to property related to the operation proper or improper of the product THERE ARE NO OTHER WARRANTIES WHICH EXTEND BE YOND THE DESCRIPTION ON THE FACE HEREOF THESE WARRANTIES APPLY only if the device is installed and operated as recommended in the manu al THESE WARRANTIES WILL NOT APPLY if damage is caused by abuse accident improper installation negligence or use beyond the rated capacity LABOR RESPONSIBILITY In furnishing replacement parts Harman Stove Company assumes no re sponsibility for labor expenses for service removal or re installation MAKING A CLAIM Any claim under this warranty shall be made to the dealer from whom this appliance was purchased Then contact is made with the manufacturer giving the model serial number date of pur chase dealers name and address plus a simple explanation of the nature of the defect SHIPPING COSTS The transportation charges are as follows 1 Customer Pre pays freight to Harman Stove Compa
7. Installation amp Operating Manual HARMAN STOVE COMPANY Trident Boilers SF160 E ae SF260 SF360 We suggest that our hearth products be installed and serviced by B rt ia jeaverton professionals who are y Oregon USA the National Fireplace u Cc US Institute NFI as NFI R3 Specialists OMNI Test Laboratories Inc SAFETY NOTICE PLEASE READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND OR USE YOUR NEW BOIL ER FAILURE TO FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE BODILY INJURY OR EVEN DEATH IF THIS HARMAN BOILER IS NOT PROPERLY INSTALLED A HOUSE FIRE MAY RESULT FOR YOUR SAFETY FOLLOW INSTALLATION DIRECTIONS CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA CONTACT YOUR LOCAL AUTHORITY SUCH AS MUNICIPAL BUILDING DEPARTMENT FIRE DEPARTMENT FIRE PREVENTION BUREAU ETC TO DETERMINE THE NEED FOR A PER MIT Cette guide d utilisation est disponible en francais Chez votre concessionnaire de Harman Stove Company SAVE THESE INSTRUCTIONS Congratulations You have just purchased the finest wood coal boiler available Harman Trident boilers are constructed of high quality materials and are manufactured by a highly skilled team of assemblymen Each boiler is inspected and pressure tested for quality assurance This manual is designed to provide all of the basic information needed for a safe and proper installation H
8. S 629 or with a code approved masonry chimney The minimum recommended height for any chimney is 16 ft 4 8m above the flue collar Do not re duce flue diameter Nominal size flue is 8 X 8 in or equivalent up to 8 X 12 in Codes also require that the chimney must extend a minimum of Installation 3 feet 0 9m above the point at which they exit Plumbing from the roof it must also extend 2 feet 0 6m The Harman Trident Boiler can be used as above the highest point within a 10 ft 3m radius a Stand Alone boiler or as an add on to an exist ing hot water heating system The diagrams in this manual are meant to FLUE THAT IS SERVING ANOTHER APPLIANCE show the necessary equipment and piping Your system may look very different However if config More than 10ft 3 m ured properly the same results will be achieved Height neces Fig 6 shows a typical plumbing diagram OH Gm ay eee for tying into an existing system This method i mgu provides water circulation between the two boilers with a circulating pump In this setup the domes 21t 0 6 m min tic water coil in the existing boiler will be heated making it unnecessary to install a water coil in the Trident Boiler Tying in to an existing boiler must be done in the return line between the circulator and the existing boiler Run a pipe from there to a small circulator and then into the 1 1 4 in fitting on the FIG 5 rear of the Trident Boiler Next run
9. a pipe from the THE 2 FOOT 3 FOOT 10 FOOT RULE 1 1 4 in fitting on the top of the Trident Boiler to a TS Tee fitting in the supply line of the existing boiler Limit connector pipe to 8 ft or less with This Tee fitting must be installed between the ex no more than two elbows All horizontal sections isting boiler and the Flow Control Valve as shown should have 1 4 in rise per foot The chimney in Fig 6 An air valve should be installed on this must be capable of providing a draft reading of at line also least 06 in of water column A barometric damper can be installed to prevent excessive and erratic draft All connector pipe should be secured with sheet metal screws at each joint Air Valve a a 3 a Return from System Notice The Aquastat controls supplied with the Trident Boiler are designed only to maintain water temperature within the boiler The actual heating sys tem is controlled separately by your Main Existing Circulator Trident thermostat s opening zone valves or energizing circulation pump s Existing Boiler Additional Circulator Do not attach a thermostat to the sup plied controls FIG 6 Installation The circulator installed between the two boilers may be hooked up to run continuously during the heating season or an additional S350 control not supplied could be installed to turn it on and off automatically This control must be used as a close on rise of temperature
10. ayer the kindling in a criss cross type pattern to allow maximum air flow Next lay some larger pieces of wood on top of the kindling approximately 2 in diameter Using a match or lighter light the paper just inside the door Close and latch the firebox door and al low the fire to burn a few minutes After about five minutes close the ash pan door and re open the firebox door an inch or two to allow the smoke to clear Add 4 or 5 larger logs about 4 in diameter to the well established fire and close the firebox door Leave the ash pan door open for about five minutes only Now open the firebox door using the same method as before always closing the ash pan door before opening the firebox door Now you can load the firebox to the desired level You may load wood to the top of the firebox Close and latch the door The ash pan door may again be opened to speed the ignition process Do not leave the boiler unattended with any door open After the wood is burning well close the ash pan door The automatic draft control will now regulate the fire based on temperature demand The idle air adjuster must be tuned to where the fire doesn t go out during long periods with no demand Experience will dictate the best setting for your installation Normally the two manual draft controls on the firebox door are kept closed while burning wood 10 Operation Starting a Coal Fire Make sure the boiler and all piping is full of wate
11. e breaker in the off position The sensor wires attach to the A350 Controller on the terminals marked sen and com Make sure the sensor is submerged fully into the well and secured with the set screws Setting The Aquastat Inside the A350 control you will see a square jumper and a differential dial Be sure the jumper is in the Heating position The differen tial dial is set to determine how low below the temperature set point you want the water tem perature to go before the Automatic Draft Control opens A good initial setting for this dial is 5 Be sure the 120V wires are attached to the common and the normally open terminals and replace the cover The external dial is set for the water tem perature you wish to maintain a good setting is 180 Inside the Y350 control ensure that your wires are connected to the 120VAC terminals and replace the cover Inside the S350 control which is used as overheat protection you ll see two dials offset and differential There is also a jumper which in this case gets placed in the cooling position The offset dial sets the number of degrees above the A350 setpoint that you want the overheat dump to activate A good set point would be 20 That would mean that if the water reaches 200 using the A350 setpoint of 180 the S350 would close it s contacts and energize the overheat dump zone The differential dial sets the point that the overheat dump would st
12. ers manufactured by Harman Stove Company No other commitments verbal or otherwise shall apply except by a written adden dum_to this warranty 14
13. ic Hot Water Coil best seen in Fig 2 12 Crossover Pipe Return DOONAN FIG 7 Operation Automatic Draft Control The heat output is regulated by the auto Starting a Wood Fire Make sure the boiler and all piping is full matic draft control on the bottom door The electric of water and that all air has been purged from the motor A opens and closes the flapper door B Opening and closing the flapper door regulates the air flow into the firebox The maximum air flow can be adjusted by turning the adjusting bolt C Turn counter clockwise for more air and clockwise for less air Adjust this bolt only while the flapper door is in the closed position Otherwise motor damage could occur The idle air adjuster D controls the mini mum amount of air that enters the firebox Adjust ment is made by turning the adjuster vertical for zero idle air or horizontal for maximum idle air It is best to start out with a medium setting as shown in Figure 9 system Never start a fire without water in the system An explosion will occur Turn on electrical power to the boiler This should cause the automatic draft control to open Open the ash pan door to allow free air move ment With the firebox door open crumble ap proximately 8 sheets of newspaper and place on the grates Lay some small kindling on top of the newspaper Be sure this kindling is dry and no more than 3 4 in in diameter L
14. ny 2 Harman Stove Company Pre pays charges for the repaired or replacement unit NOTE Prior approval by phone or in writing shall be made before shipping the appliance to manufacturer THIS WARRANTY IS LIMITED TO DEFECTIVE PARTS REPAIR AND OR REPLACEMENT AT HARMAN OPTION AND EXCLUDES ANY INCIDENTAL AND CONSEQUENTIAL DAMAGES CONNECTED THERE WITH WARRANTY EXCLUSIONS 1 Labor 2 Firebricks 3 Door Packing 4 Paint 5 Acts of God PLEASE READ THE LITTERATURE BY THE MANUFACTURER FOR THE VARIOUS ACCESSORY DEVICES THESE DEVICES ARE WARRANTED BY THE MANUFACTURER NOT BY HARMAN STOVE COMPANY FURTHERMORE THEESE ACCESSORY DEVICES MUST BE INSTALLED AND USED ACCORD ING TO THE RECOMMENDATIONS OF THE MANUFACTURER Some states do not allow the exclusion or limitation of incidental or consequential damages so the above limitation or exclusion may not apply in your state This warranty gives you specific legal rights You may also have other rights which vary from state to state which may be enforceable in a court of law REMEDIES The remedies set forth herein are exclusive and the liability of seller with respect to any contract of sale or things done in connection therewith whether in contract in tort under any warranty or oth erwise shall not except as herein expressly provided exceed the price of the equipment or part of which such liability is based CLARIFY The above represents the complete waranty given in connection with boil
15. op With the differen tial set at 15 using the temperatures above the circuit would re open stopping the overheat dump at a water temperature of 185 The 120V wiring is attached on the normally open and the common position The normally closed position is not used Re install the covers onto the three Con trols Optional Items There is a domestic hot water coil available for your Trident Boiler The coil installs in the front of the boiler and allows your domestic water to be heated by the heating system water Install the coil now by removing the round plate and replac ing it with the coil and it s round plate Be sure to tighten the bolts evenly to ensure a good seal If electric back up is desired install now There will be two additional control boxes to add to your aquastat which will require the use of a longer din rail The two heating elements will install into the front of the boiler as shown in Fig 1 Venting The Harman Trident Boiler must be in stalled into a chimney approved for solid fuel burning appliances In the U S the boiler must be connected to 1 a prefabricated chimney comply ing with the requirements for Type HT chimneys in the Standard for Chimneys Factory Built Resi dential Type and Building Heating Appliances UL 103 Or 2 a code approved masonry chimney with a flue liner In Canada with prefabricated chimney systems tested and listed to the High Temperature Chimney Standard ULC
16. owever there are many skills needed that can not be learned by reading this manual Harman Stove Company recommends that the installation be performed by a plumbing and heating expert The Harman Trident Boilers are designed to operate safe easy and automatically You may however need to learn a few basic skills to maintain a fire Especially if this is your first venture into solid fuel burning If you have any problems re read these instructions If you can not resolve the issue s Contact your Harman Stove dealer TABLE OF CONTENTS Packing List Installation Aquastat Wiring Venting Plumbing Operating Instructions Starting a Wood Fire Starting a Coal Fire Loading Fuel Shaking Ashes Safety Tips Maintenance Specifications Warranty Packing List The Following items are supplied with your Harman Trident Boiler Please notify your Harman Dealer if you are missing any items Shaker Handle Johnson Controls Aquastat 3 pieces A350 Controller w Sensor wire 350 Stage Module Y350 Power Supply Immersion Well Din Rail and 2 End Clamps Terminal Box Terminal Block and 2 8 32 nuts Pressure Relief Valve 30 psi Temperature Pressure Gauge Automatic Draft Control Assembly 1 pc Flex Conduit w 2 90 Fittings w nuts and 3 Chase Nipples w nuts 2 Manual Draft Control Knob Assembly 3 Brass Coil Spring Handle Ash Pan Warranty Registration Form Notice
17. r and that all air has been purged from the system Never start a fire without water in the system An explosion will occur Turn on electrical power to the boiler This should cause the automatic draft control to open Open the ash pan door to allow free air move ment Use the same procedure as starting a wood fire except do not load the larger diameter wood Use wood about 2 in diameter maximum This size will form a very hot charcoal bed in less time Again the ash pan door may be opened periodi cally to speed the ignition process DO NOT LEAVE THE BOILER UNATTENDED WITH ANY DOOR OPEN When you have accumulated a substantial charcoal bed start adding a thin layer of coal Pea or Nut sized coal is better for starting than Stove coal When the first layer is burning with some blue flame continue to add thin layers of coal until there is a solid bed of burning coal Let each layer burn a blue flame before adding another layer Ad ditional coal can be layered in until the bed is ap proximately 10 inches deep By now you should have the ash pan door closed and the automatic draft control will continue to regulate the fire The idle air adjuster may need to be set for slightly less air for coal than wood Here again experience will dictate the best setting The maxi mum air bolt can be turned all the way counter clockwise to allow for a quicker recovery Never adjust this bolt with the flapper open The two manual draft
18. stored close the ash pan door and add a layer of coal to the fire bed Follow the instructions under Starting a Coal Fire When the new coal is thoroughly ignited and there is a substantial bed of hot coals the grates may then be shaken Ashes and Ash Removal Ashes should never be allowed to accu mulate above the top of the ash pan Ashes in contact with the bottom of the grates act as insu lation which intensifies the heat on the grates and causes them to sag or warp Also too much ash accumulation will restrict air flow which will make fire maintenance more difficult Place ashes in a sealed metal container outside until they are cooled enough for final disposal Coal produces considerably more ash than wood so the intervals between emptying are much shorter 11 Safety Tips When opening the firebox door it should be cracked slightly open for a few seconds to allow air in to burn any gases which may be present This will also allow smoke to be drawn away from the door Whenever the ash pan door is open it should be closed before opening the firebox door The firebox should never be filled with excessive coal to where the flue exit is blocked or impeded in any way Burning coal produces Carbon Monoxide If the flue exit is blocked the Carbon Monoxide can be forced out of the boiler into the room with possible FATAL consequences With the exception of start up or freshening of the fire or performing ash remo
19. tems page 7 Lay the din rail on a flat surface with the flat side down Secure one end clamp on the left side Slide the A350 controller onto the rail from right to left until it is against the end clamp Slide the Y350 onto the rail and guide the plug in connector joining it to the A350 Next install the S350 again guiding the plug in connector carefully Install the other end clamp to the right side of the din rail Remove the covers from all three controls by loosening four screws each Install the terminal box to the controls using 3 chase nipples and locknuts supplied with the kit Using the four holes in the terminal box mount the terminal box and controls to the boiler sheet metal side as shown in Fig 1 Using 2 8 32 nuts install the terminal block onto the studs located inside the terminal box Wiring Diagram JUMPERS IN IJ HEATING POSITION JUMPERS IN Ej COOLING POSITION m F E E IMMERSION WELL r 4__ 24 VAC TO OVERHEAT CIRCULAR RELAY OR ptf ZONE VALVE l OR 6 i Se ZEREN E TO 120 VAC OVERHEAT Sie try WHITE CIRCULATING PUMP azo aFzo 120 VAC TO 120 VAC DRAFT MOTOR LINE IN FIG 3 SF160 260 360 Installation Wiring and Electrical Following the wiring diagram run all wires to their designated connections Save the main power for the last hook up and leave th
20. the side of the boiler using the 2 5 16 X 3 4 in bolts and lock washers Assembly Install the Temperature Pressure Gauge into the pipe stub in the center of the round plate on the front of the boiler FIG 1 Install the A350 sensor wire all the way into the immersion well and screw the well into one of the top holes on the face of the boiler Turn the pressure relief valve into the stub on top of the boiler next to the supply outlet fit ting NOTE Use teflon tape to seal the threads on all fittings Any unused fittings must be plugged Bolt the two manual draft controls FIG 2 through the holes in the top load door FIG 2 The draft control knob should spin freely and open to a distance of approximately 3 8 in from the door surface while being able to close against the door surface Installation Bolt the Automatic Draft Control through the 1 2 in hole in the center of the bottom door Be sure to hold the Draft Control straight while tightening Feed the two wires from the draft mo tor through the flexible conduit and a 90 fitting Secure the fitting to the draft motor and that end of the conduit at this time Check the flapper door on the Automatic Draft Control assuring that it moves freely Install the 3 brass coil spring handles onto the door latches and the shaker handle Start the spring handle onto the shaft and twist it coun ter clockwise while pushing Aquastat Installation See optional i
21. val the ash pan door should be kept closed Never install a Harman Trident Boiler into a chimney with a history of down drafts Keep Children Away May Cause Seri ous Burns CAUTION All surfaces of the boiler are hot Do not touch Keep children away Serious burns will result if touched This is a heat producing appliance DANGER Fire Hazard Do not use chemicals or flammable liquids to start or freshen up a fire Severe burns or a house fire may result Do not burn Garbage Gasoline Thinners Oil Kero sene Etc An explosion a house fire or serious personal injury could result Keep all such liquids well away from this boiler During the first few hours of burning a blue smoke may be observed rising from the boiler This is the paint going through the curing process It is advisable to increase the amount of fresh air in the room during this break in period This can be achieved by opening doors and windows Don t be alarmed this is normal and will only last a short while Chimney Problems Not Enough Draft Chimney is too low The general rule for chimneys is 16 feet tall and two feet higher than anything ten feet around it Air may be leaking in around a loose fitting clean out door Too many elbows in connector pipe or seams and joints of connector pipe are not secured properly Improperly sized chimney or stovepipe Chimney may be blocked with creosote or bird nests or similar obstructions

Download Pdf Manuals

image

Related Search

Related Contents

NWZ-B170 Series  US Robotics Gigabit Ethernet PCI Card  Manual de Instrucciones      全文 - 新エネルギー・産業技術総合開発機構  Excerpt from Lumix LX3 Book  VPN Client User Guide - RMA  Polar FT40 Manual do utilizador  Íntegra - Inmetro  

Copyright © All rights reserved.
Failed to retrieve file