Home

Harbor Freight Tools 10 ft. x 12 ft. Greenhouse with 4 Vents Product manual

image

Contents

1. TI gt N N 111 x32 1 11 x65 1 11 x34 Front Rear Center Panel 58 Wall Panel Roof Window Panel PART Item 93358 61 N 63 64 65 70 71 T3 74 N O gt cO 20 76 TT 78 81 DESCRIPTION 111 XII 1 11 x 2 6 1 11 x14 o N N i Roof Panel Window Pane Front Corner Panel 2x Front Side Panel 6 5 15 x 2 10 M6 x 3 M6 x 3 4 Door Panel Normal Bolt Brace Bolt 2 E M6 1 7 Base Bolt n Base Nut 174 4 3 x Door Screw d A Window Screw o o OX m nd Cap Gutter End Cap Left Rail End Cap Right Rail End Spanner Wrench Hex Wrench AERE lt O x Double Brace Bolt 4 Front Rear Diagonal Strut 7 Side Diagonal Strut TT Bushing 5 gt For technical questions please call 1 800 444 3353 Grat nh S LA N O O Page 31 Limited 90 Day Warranty Harbor Freight Tools Co makes every effort to assure that its products meet high quality and durability standards and warrants to the original purchaser that this product is free from defects in materials and workmanship for the period of 90 days from the date of purchase This warranty does not apply to damage due directly or indirectly to misuse abuse negligence or accidents repairs or alterations outside our facilities criminal a
2. 41 to the Bottom Window Frame 40 using 2 Window Screws 71 The holes on the Window Brace 41 should face away from the window as shown below O Hold the assembled window level with the ground at the outer edge of the Crown 10 11 Slide the top edge of the Top Window Frame 38 into the slot at the top of the Crown 10 11 Top Window Grown see illustration to the left Align the window with the Window Frame 38 10 11 Brace 41 underneath it Slide the window into place over the Window Support Beam 42 Gradually lower it into place 5N Loosen the Nuts 67 holding the Window Support Beam 42 in place and slide the Window Support Beam 42 up to touch the window Secure it in place View from end of Crown 8 Repeat the steps in this phase for all four windows Item 93358 For technical questions please call 1 800 444 3353 Page 25 Azuuejo 10 sajyoud zi ju04J N LE p ip M9 i Q i s 02 MIN i gt uonej ejsu pue Ajquassy 100q LL aseyd Item 93358 For technical questions please call 1 800 444 3353 Page 26 Door Assembly and Installation Instructions Parts in this phase are fastened using 8 Normal Bolts 65 8 Nuts 67 and 40 Door Screws 70 6 Note The Door Screws 70 thread directly into the round portions in the center of the door frames Leave all Screws slightly loose until the doo
3. Meaning Insert 2 Brace Bolts 66 into the top of Bolts 66 then a this Rafter 15 before Normal Bolt 65 into attaching it to the frame the top of this Rafter 15 before attaching l it to the frame 1 Insert the required Bolts See note above and illustration on facing page into the slot in one of the Rafters 15 2 Attach the Rafter 15 to the Ceiling Plate 12 13 and the Crown 10 11 using Normal Bolts 65 in the slot or using the Bolts 65 already in place for the center Rafters 3 Make sure the Rafter 15 is completely seated over the Normal Bolts 65 on each end before tightening 4 Repeat above steps for all 10 Rafters 15 6 Connect 4 Side Braces 30 onto the underside of the roof as shown on the facing page with the arrows pointing towards the Crown Beams 8 9 Secure in place using Brace Bolts 66 at the Crown Beam and the inserted Brace Bolts 66 in the remaining holes Finger tighten first and install the Braces so that they are touching side by side as shown 50 m m Vievv from underneath Using 2 VVindovv Screvvs 71 each attach a VVindovv Stop 50 on the flat side of each VVindovv Support Beam 42 vvith its tab pointing avvay from the bolt slot openings as shovvn above Crown 10 11 View from underneath Place one of the bolt slots on a Window Support Beam 42 over one of the inserted Normal Bolts 65 and swing it over the inserted Norma
4. o D m G o et 47 a o o e c o o Note All Braces are installed inside the Posts but outside the Struts See diagram above shovvn from inside the greenhouse facing out to right to left Corner Outside greenhouse Corner Post 7 Post 7 D ax Inside greenhouse Meow tiran aba 1 Using a Normal Bolt 65 at top and the Brace Bolt 66 already in place at the bottom for each attach the Left and Right Doorway Posts 28 29 to the outside of the Front Floor Plates 1a 2a and to the inside of the Front Ceiling Plates 24 25 Install the Posts with the cut outs at top and oriented as shown in the illustration above Using Brace Bolts 66 connect the Front Braces 32 between the Corner Posts 7 and the Doorway Posts 28 29 Install Braces inside Posts but outside Struts as shown in the diagram at the top of this page Note Install the Braces on the walls so that they are level If the frame is level and all Braces are level the Braces should not interfere with one another 9 Connect the 4 remaining Rear 31 onto the rear wall as shown on the facing page with the arrows pointing towards the Corner Posts 7 Secure in place using Brace Bolts 66 at the Corner Post and the inserted Brace Bolts in the remaining holes Install Braces inside Posts but outside Struts as shown in the diagram at the top of this page Connect 4 Side B
5. to the top of the Wall Panels 58 in the rear of the Greenhouse Refer to the locations marked with O and the inset on the facing page One at a time place each Transparent Panel 55 64 in its proper location on the Ceiling and Frame of the Greenhouse Then secure the Transparent Panel in place using the quantity and location of Panel Clips 53 To attach Panel Clips see illustration and instructions below A Place the two loose ends of the Clip into the groove in the frame B Swing the center portion of the Clip up against the Panel C Two edges of the Clip swing under the edge of the panel and the center edge holds the panel in place A 7 Cip Panel Be careful Panel Clip 53 ends may be sharp and may spring back Use and Maintenance 1 2 3 BEFORE EACH USE inspect the general condition of the Greenhouse Check for loose screws misalignment or binding of moving parts cracked or broken parts and any other condition that may affect the safe operation of the Greenhouse If a problem occurs with the Greenhouse have it corrected before further use Do not use damaged equipment TO CLEAN Wipe with a damp cloth using a mild detergent Do notuse cleaners that are combustible corrosive or not compatible with aluminum WHEN STORING Keep the Greenhouse in a box and in a clean dry location Item 93358 For technical questions please call 1 800 444 3353 Page 29 PLEASE READ THE FOLLOWIN
6. 65 to secure them in place 1 Use 1 Normal Bolt 65 each to attach the Front Gable Posts 20 23 to the outside top of the Front Ceiling Plates 24 25 in the positions shown on facing page The bottoms of the 2 outer Front Gable Posts 22 23 will be secured using the Normal Bolts 65 already in place The sloped ends of the Posts must be on the top and slant upward toward the center of the greenhouse Crown 10 11 Left handed Crown 2 Insert 2 Normal Bolts 65 into the slot in Beam 9 each Rear Gable Post 18 19 and use those Bolts to attach them to the top 2 holes of the Post Connectors 48 on the outside Once again the sloped ends of the Posts must be on the top and slant upward toward the center of the greenhouse The bottoms of those Rear Gable Posts 18 19 must be pressed down flat against the tops of the Side Posts 14 Note The only difference between Right and Right handed Left Handed Crown Beams is the location of the holes Crown Beam 8 The Beam edges with 3 drilled holes should align with the Side Ceiling Plate 12 13 and the edges with 4 holes should point down View from underneath 3 Attach the Right and Left Handed Crown Beams 6 With assistance raise the completed Crown 10 11 8 9 to the Greenhouse using 5 Normal Bolts 65 up underneath the tops of the Crown Beams 8 9 for each Beam The angled edges should meet at and bolt it in place on each end to the bottom
7. Floor Plates using Brace Bolts 66 Hold down Connectors 47 and Nuts 67 see inset on facing page Allow Rear Braces 31 to hang free 7 Repeat steps 2 through 6 for the left rear Corner Post 7 on the left side Keep in mind that the connections will be reversed compared to the right side a 12 Attach one Corner Post 7 on the outside of the front left Floor Plates 1a 3 using 2 Normal Bolts 65 2 Hold down Connectors 47 and 2 Nuts 67 View imsicl greenhouse Insert a Brace Bolt 66 through the second hole from the top of the Corner Post 7 over the Front Floor Plate 1a Place the bottom hole of the Corner Bracket 49 over the Bolt with it angled up towards the center of the greenhouse as shown above Secure it using a Nut 67 0 Fasten a Side Diagonal Strut 80 to the top hole on the Corner Post 7 over the Side Floor Plate using a Brace Bolt 66 and Nut 67 1 Secure the Struts 79 80 to the Floor Plates using Brace Bolts 66 Hold down Connectors 47 and Nuts 67 see inset on facing page Repeat steps 8 through 11 for the right front Corner Post 7 on the right side Keep in mind that the connections will be reversed compared to the left side BOTTOM For technical questions please call 1 800 444 3353 Page 11 old Bulla 94 uo SINN 1804 14 z ay u uBi GZ Ild 1uBu 1u044 ou 1sureDe s1s 1 1 hun v OU 2 re
8. as replacement parts month and year of purchase instead one stop arden 3491 Mission Oaks Blvd PO Box 6009 Camarillo CA 93011 800 444 3353
9. the gutter opening up as shown above d Place the Side Ceiling Plate 12 13 then the Side Diagonal Strut 80 on the end of the Bolt and secure with a Nut 65 Secure the other end of that Side Ceiling Plate 12 13 similarly Item 93358 4 o Attach the Front Ceiling Plate 24 25 to the 2 Normal Bolts 65 put in place in step 1 on the outside of the greenhouse note orientation at right O Attach the remaining Side Ceiling Plate 12 13 along the other side according to steps 2 amp 3 with the gutter opening up s oA Ca 4 Meow tiran 3 nee 2 2 gpre nhouse Bolt 2 Post Connectors 48 to a Rear Brace 31 using Brace Bolts 66 through their bottom holes from the outside in Place Post Connectors on the outside of the greenhouse with the flat side against the Brace as shown above Only finger tighten for now Swing the Rear Braces 31 together and bolt the second Brace to the second from bottom holes on the Post Connectors 48 using Brace Bolts 66 from the outside in Only finger tighten for now Note The Rear Braces 31 will be under tension 8 For technical questions please call 1 800 444 3353 If you cannot attach the second Post Connector 48 or if they are not parallel Make sure that the arrows on both of the Rear Braces 31 are pointing towards the Corner Posts 7 Page 15 eseud siy e2e d ul Apeaufe oJe syny pue s
10. 3 0g jeuonippyv 29 SINN y pue 84 5108 9 ei1g ajqnoq 99 SYOg 92eJg Z 69 sog jeuuowN 8 Duisn p u 1se ose eseud 511 ui sued r l eseud ui esn joj eseyd siu Buunp S SOq Ojui peyesul ae 1 99 SUOg e eig pr M peuejufn eJ eq IIIA 31 u u pue pe y K 1104 DIIS JIM sod e pouasoo q Wi uje uu pun og ou jeu sus n UOHEOO aues y je poyoeye o 1 u u pue aq II A yog qie u v jeu Sues z eseud siu a10jaq avdejd ul aie Spied uonejejsu SOd 9 aseyd Item 93358 For technical questions please call 1 800 444 3353 Page 16 Post Installation Instructions Note All Posts 14 16 17 in this phase require extra Bolts to be inserted into their slot before assembly The small numbers under the main part number on the facing page are the type and number of hardware See the examples below 47 Post Part Number Inserted Bolt Part Numbers Meaning Insert 2 Brace Meaning Insert a Brace Bolts 66 into the Bolt 66 then a Double Rear Right Post 17 1 Brace Bolt 78 then before attaching it another Brace Bolt 66 into this Side Post 14 before attaching it 1 Loosen a Bolt on one of the Side Floor Plates 3 4 in an attachment location as shown Slide the slot in a Side Post 14 over the head of that Bolt 2 Insert the required Bolts See note above and illustration on fac
11. G CAREFULLY THE MANUFACTURER AND OR DISTRIBUTOR HAS PROVIDED THE PARTS LISTS IN THIS DOCUMENT AS AREFERENCE TOOL ONLY NEITHER THE MANUFACTURER OR DISTRIBUTOR MAKES ANY REPRESENTATION OR WARRANTY OF ANY KIND TO THE BUYER THAT HE OR SHE IS QUALIFIED TO MAKE ANY REPAIRS TO THE PRODUCT OR THAT HE OR SHE IS QUALIFIED TO REPLACE ANY PARTS OF THE PRODUCT IN FACT THE MANUFACTURER AND OR DISTRIBUTOR EXPRESSLY STATES THAT ALL REPAIRS AND PARTS REPLACEMENTS SHOULD BE UNDERTAKEN BY CERTIFIED AND LICENSED TECHNICIANS AND NOT BY THE BUYER THE BUYER ASSUMES ALL RISK AND LIABILITY ARISING OUT OF HIS OR HER REPAIRS TO THE ORIGINAL PRODUCT OR REPLACEMENT PARTS THERETO OR ARISING OUT OF HIS OR HER INSTALLATION OF REPLACEMENT PARTS THERETO Parts Lists Lengths given are rounded to the nearest inch Hardware lengths are approximate DESCRIPTION DESCRIPTION Front Left Rear Right 2 7 Floor Plate Gable Post Front Right Front Center Left Floor Plate Gable Post Front Center Right Gable Post Front Left Gable Post Front Right Gable Post Front Left Ceiling Plate Front Right Ceiling Plate cO 28 Upper Side Floor Plate 28 NO U c c NO NO N N N N N 20 Side Floor Plate 15 ARRENE Rear Left Floor Plate 1 5 Rear Right Floor Plate fo N gt N Co W N o o 5 51 Rig
12. Owner s Manual amp Safety Instructions Save This Manual Keep this manual for the safety warnings and precautions assembly operating inspection maintenance and cleaning procedures Write the product s serial number in the back of the manual near the assembly diagram or month and year of purchase if product has no number Keep this manual and the receipt in a safe and dry place for future reference ma ston Greenhouse a 12 L X 10 W X 102 H W m 1 ih IN 3 l l Shelving unit and pots not included ITEM 93358 Visit our website at http www harborfreight com Email our technical support at tech harborfreight com REV 12i When unpacking make sure that the product is intact and undamaged If any parts are missing or broken AWARNING please call 1 800 444 3353 as soon as possible Copyright 2006 by Harbor Freight Tools All rights reserved No portion of this manual or any artwork contained herein may be reproduced in Read this material before using this product any shape or form without the express written consent of Harbor Freight Tools Failure to do so can result in serious injury Diagrams within this manual may not be drawn proportionally Due to continuing SAVE THIS MANUAL improvements actual product may differ slightly from the product described herein Tools required for assembly and service may not be included Table of Contents 5050 ba l n 3 M
13. aintenance 29 Specifications 4 jig e 32 5 Pans LISIS r r ae 30 one stop gert WARNING SYMBOLS AND DEFINITIONS This is the safety alert symbol It is used to alert you to potential personal injury hazards Obey all safety messages that follow this symbol to avoid possible injury or death A DANG ER Indicates a hazardous situation which if not avoided will result in death or serious injury AWARN NG Indicates a hazardous situation which if not avoided could result in death or serious injury Indicates a hazardous situation which if not avoided A CAUTION could result in minor or moderate injury NOTICE CAUTION Addresses practices not related to personal injury Page 2 For technical questions please call 1 800 444 3353 Item 93358 IMPORTANT SAFETY INFORMATION The warnings precautions and instructions discussed in this manual cannot cover all possible conditions and situations that may occur The operator must understand that common sense and caution are factors which cannot be built into this product but must be supplied by the operator Assembly Installation Precautions 1 Assemble only according to these instructions 6 Improper assembly can create hazards Wear ANSI approved safety goggles and 7 heavy duty work gloves during assembly This unit contains pi
14. be held responsible for personal injury damage to the greenhouse or other property damage that occurs as a result of improperly anchoring the greenhouse Be certain to check with local authorities to obtain all required building permits and to familiarize yourself with any building codes that may apply Decide on a location for the greenhouse The location should optimally be a level well lit area that is sheltered from the wind The door of the greenhouse should not open towards the prevailing wind if possible IMPORTANT ASSEMBLY TIPS Assemble Bolts with their heads facing the outside of the greenhouse unless stated otherwise Tighten Nuts 67 only about 1 4 turn past finger tight be careful not to overtighten Lay out all parts by number prior to assembly At least two assistants will be necessary during assembly Assemble on a clear calm day Wind will damage the Greenhouse and make assembly difficult Item 93358 For technical questions please call 1 800 444 3353 Page 5 69 SINN eseg zc pue 89 syog eseg ze Guisn p u lse aJe oseud siu ui sued v M 9p Ajquiassy seg oseyd Item 93358 For technical questions please call 1 800 444 3353 Page 6 Base Assembly Instructions 1 Item 93358 Excavate an area for the base of the greenhouse The area must be 10 2 wide by 12 2 long by 5 deep The floor of the hole must be level and square The diagonal dimensions from corner to co
15. ctivity improper installation normal wear and tear or to lack of maintenance We shall in no event be liable for death injuries to persons or property or for incidental contingent special or consequential damages arising from the use of our product Some states do not allow the exclusion or limitation of incidental or consequential damages so the above limitation of exclusion may not apply to you THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS To take advantage of this warranty the product or part must be returned to us with transportation charges prepaid Proof of purchase date and an explanation of the complaint must accompany the merchandise If our inspection verifies the defect we will either repair or replace the product at our election or we may elect to refund the purchase price if we cannot readily and quickly provide you with a replacement We will return repaired products at our expense but if we determine there is no defect or that the defect resulted from causes not within the scope of our warranty then you must bear the cost of returning the product This warranty gives you specific legal rights and you may also have other rights which vary from state to state Record Serial Number Here Note Some parts are listed and shown for illustration purposes only and are not available Note If product has no serial number record individually
16. d of the left Bolt and the Rear Right Post 17 over the right Bolt 10 The slanted ends of the Posts must be on top and slant towards the center of the greenhouse Retighten the Bolts 11 Slide 2 Brace Bolts 66 into the slot of each Rear Post 16 17 12 Slide one more Brace Bolt 66 into the top of each Rear Post Attach the Rear Posts to the Rear Braces 31 using those Bolts 13 The frame should now rest square Measure diagonally from corner to corner at the top If the measurements are not equal adjust the frame as needed until square Some Nuts 67 may need to be loosened to adjust the frame Tighten all Nuts after adjustment Item 93358 For technical questions please call 1 800 444 3353 Page 17 Grey parts are in place before this phase and then re attached at the same location lt Means that the nearby Bolt will be removed AR aa sou 6 4 30 Xi Laj and 66 Nuts 67 Additional Bolts and Nuts are already o e 0 m S z N 20 Brace Bolts 66 in place before this phase O amp o c o 0 C O L o HI Kan E o 0 A o e d o o m N o 0 Je an Page 18 For technical questions please call 1 800 444 3353 Item 93358 Brace Installation Instructions K AR j 00 o O q chhi s f ro m H
17. eces with sharp edges 8 The machined edges of the aluminum parts and the ends of the panel clips may be sharp Handle all parts carefully Keep assembly area clean and well lit Keep bystanders out of the area during assembly Use Service Precautions 1 Item 93358 This product is not a toy Do not allow 3 children to play in or climb on this product Although this greenhouse does include some caps 4 there are still some exposed sharp edges In addition protective covers may fall off in time Children must be supervised if allowed near the greenhouse SNOW DEBRIS ACCUMULATION HAZARD The heavy weight of accumulated snow or other debris can cause parts of this greenhouse to buckle suddenly Do not allow debris to accumulate on top of the greenhouse If snowfall is expected place additional supports not provided underneath the Crown NEVER enter a greenhouse with accumulated debris on top one stop gert For technical questions please call 1 800 444 3353 Do not assemble when tired or when under the influence of alcohol drugs or medication Product capabilities apply to properly and completely assembled product only Locate the Greenhouse on a flat level surface A concrete foundation is recommended for a high quality installation WARNING The brass bushings inside the Rollers of this product contain lead a chemical known to the State of California to cause birth defects or
18. flange with bolt holes should face inside the greenhouse 2 Place the Front Left Floor Plate 1a on top of the Base Plate 44 Lay the Front Right Floor Plate 2a on top of it and line up the 2 holes where the Plates overlap 3 Fasten the Front Floor Plates 1a 2a together and secure to the Base Plate 44 using a Hold down Connector 47 over one of the Bolts 65 see inset on facing page Item 93358 4 For technical questions please call 1 800 444 3353 Place the Side Floor Plates 4 on the Side Base Plates 43 on the front right and rear left corners as illustrated Lay the Upper Side Floor Plates 3 on top so that the three holes line up where the Plates overlap Fasten the Side Floor Plates 3 4 together and secure to the Base Plates 43 using 3 Hold down Connectors 47 on each side of the greenhouse in the places illustrated see illustration and inset on facing page Lay the Rear right Floor Plate 6 on top of the Rear left Floor Plate 5 so that the 2 holes line up where the Plates overlap Fasten the Rear Floor Plates 5 6 together through those holes Place the assembled Rear Floor Plates 5 6 on top of the Base Plates 44 Secure the Rear Floor Plates 5 6 to the Base Plates 44 using 2 Hold down Connectors 47 in the locations shown see illustration and inset on facing page Page 9 67 29 INN UM u sed P log 1340 08 62 11 15 o 99 1log e eJg ues
19. ht handed Crown Beam Left handed Crown Beam Left Door Rail Right Door Rail Rear Crown with Brackets O Left Doorway Post NO Co Right Doorway Post O NO cO Front Crown Side Ceiling Plate with Brackets Plain Side Ceiling Plate cO NO Side Brace DO Side Post Front Brace AE lt Side Door Frame Rafter Door Slider o Rear Left Post Top Door Frame N Rear Right Post Center Door Frame Rear Left Gable Post N N N N N N lt Page 30 For technical questions please call 1 800 444 3353 Item 93358 Lengths given are rounded to the nearest inch Hardware lengths are approximate DESCRIPTION ottom Door rame lt 2 10 TO op Window rame ide Window rame Co 1 11 T TO N o 1 11 indow Brace 10 Window Support Beam 2 Hi o D UU C o D U 0 D 5 11 ront Rear Base 4 11 late U TI Base Plate Corner Connector Base Plate End Connector O Hold down Connector 48 Post Connector 9 Corner Bracket FD remo eS ASAIN SNA 50 Window Stop Door Bottom Slider 52 E U U D Q O o musu anel Connector NO anel Clip 1 11 x T 9 1 11 55 Rear Side Panel ront Rear Top anel
20. ing page into the slot in the Side Post 3 Attach the top of the Side Post 14 to the Ceiling Plate 12 13 using a Normal Bolt 65 in the slot or using the Bolt already in place for the center Post 4 Repeat above steps for all 10 Side Posts 14 on the left and right sides of the greenhouse 5 Slide a white Bushing 81 over all 4 inserted Double Brace Bolts 78 Place the center hole of each Side Diagonal otrut 80 over the end of each Double Brace Bolt and secure with a Nut 67 6 Loosen a Bolt on the Rear Floor Plate 5 6 in a location that a Side Post 14 attaches and slide a Side Post over the head of that Bolt Insert 4 Brace Bolts 66 into the slot of that Post 66 1 14 mu farther th St exteng a an ha 66 the Post m Wl EE ae l i 14 Mew tiran outside grannouse 7 Remove the 2 Brace Bolts 66 connecting the Post Connector 48 near that Side Post Slide the heads of those Bolts into the Side Post and insert them through the Post Connector Align the top of the Post vvith the center of the Connector as shovvn above and press it in place Reattach the Rear Braces 31 to the Brace Bolts 66 and secure them 8 Repeat steps 6 amp 7 for another Side Post 14 and Post Connector 48 9 Loosen the Bolts 66 where the Rear Diagonal Struts 79 connect to the Rear Floor Plate 5 6 Slide the slot in the Rear Left Post 16 over the hea
21. l Bolt 65 on the other Rafter 15 as shown in the diagram above Note that the Window Stop 50 and flat side of the Window Support Beam 42 are both facing the inside of the greenhouse Thread Nuts 67 onto the Normal Bolts 65 and finger tighten them for now Item 93358 For technical questions please call 1 800 444 3353 Page 23 Phase 10 Window Assembly and Installation Parts in this phase are fastened using 16 Normal Bolts 65 16 Nuts 67 and 8 Window Screws 71 Attach the Side Window Frames 39 to the Top Window Frame 38 as shown to the left The threaded shafts of the Bolts should extend out the bottom of the window 2 Insert Normal Bolts 65 into the holes at other end of the Side Window Frames 39 so that the threads stick out the bottom of the window View from underneath window flat side of pieces 3 Remove the protective film from both sides of the Window Pane 61 Slide the Window Pane 61 into the three EO 4 Sli EN ide the Bottom Window Frame 40 mp onto the 2 Normal Bolts 65 and the lt Window Pane 61 Secure it in place i i with Nuts 67 Press on the heads of aO the Bolts through the Window Pane to allow the Nuts to thread on properly awYr e gr 67 i 39 Si 65 View from underneath window flat side of pieces Page 24 For technical questions please call 1 800 444 3353 Item 93358 5 Attach the Window Brace
22. lider 51 over the edge of the Front Floor Plate 1a 2a see illustration above Carefully slide the door over and align the other top Roller and bottom Slider as you did the first ones Assemble and install the second door by following the previous steps Once both doors are installed tighten all Door Screws 70 Install a Normal Bolt 65 and Nut 67 into the hole on the end of each Door Rail 26 27 and in the hole on the end of each Front Floor Plate 1a 2a to prevent the doors from sliding off the rails Attach the Left and Right Rail End Caps 74 75 onto the ends of the Door Rails Page 27 uone 2o7 ZS 4o 2 uuo2 Joued uone 2o7 cs 4112 jeued X EL GI 89 p s no uo j e e SU ZL oSeUd Item 93358 For technical questions please call 1 800 444 3353 Page 28 Transparent Panel Installation Instructions Note Remove the protective film from both sides of each panel before installing it 1 Panel Clips 53 are used to secure the Transparent Panels in place on the Greenhouse their locations are marked with X on the facing page The Roof Panels 60 and the Roof Window Panel 59 will need to be placed as shown in the insets on the facing page The top edges of these panels need to be placed up under the edge of the Crown 10 11 or the Window Support Beam 42 The Panel Connectors 52 are used to connect the Rear Top and Center Panels 56 57
23. of the the top of the roof The Beams are placed on the Beams using 2 Normal Bolts 65 as shown above outside of the Ceiling Plates 12 13 and the Corner Attach an End Cap 72 to the top outer Brackets 49 and on the inside of the Posts 16 23 corner of each Crown Beam 8 9 A 4 Assemble the Front Crown 11 to the brackets on the Rear Crown 10 using 6 Normal Bolts 65 Item 93358 For technical questions please call 1 800 444 3353 Page 21 u peuejuBn e4 aq II A 31 u u pue pe u 1104 au 1940 p S IM e peuesoo aq Un uyeeujepun yoq v zey suea rd eseud 5111 a10jaq eoejd ul aje Spied s9 99 99 SL s9 99 99 GL S9 99 99 GL eseud siy alojaq avdejd ul Apeauje aje SUN pue syyog jeuonippy SA915S MOPUIM 9 pue 29 SINN rr 99 5108 e e1g oz 49 syog JEWION yz Duisn p u 1se sue eseud siu ui sued uonej ejsu o eJ4g pue JayeY 6 eseud Item 93358 For technical questions please call 1 800 444 3353 Page 22 Rafter and Brace Installation Instructions Note All Rafters 15 require extra Bolts to 5 The small numbers under the main part number on the facing page are the type and number of hardware in the order they are inserted from the TOP of the Rafter See the examples below be inserted into their slot before assembly Rafter Part SEET Inserted Bolt Part unos Meaning Insert 2 Brace
24. other reproductive harm California Health amp Safety Code S 25249 5 et seq Use as intended only Inspect periodically replace damaged parts immediately and do not enter greenhouse if parts are loose or damaged For your safety service and maintenance should be performed regularly by a qualified technician A SAVE THESE INSTRUCTIONS Page 3 Specifications Overall Dimensions 1201 2 W x 1441 2 L x 123 H Materials Aluminum Frame Transparent Polycarbonate Sheets Aluminum Thickness 0 038 Polycarbonate Sheet Thickness 0 165 one stop gert Page 4 For technical questions please call 1 800 444 3353 Item 93358 Assembly Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this document including all text under subheadings therein before set up or use of this product IMPORTANT READ THE FOLLOWING CAREFULLY BEFORE PROCEEDING The first step in assembly is to assemble a proper base The greenhouse must be properly supported to help prevent property damage and injury in the event of strong winds or inclement weather Wind and ground conditions may vary from site to site and may affect the practicality and effectiveness of anchoring methods substantially If you have any doubt regarding the stability of the base foundation you are to use consult a professional It is always your responsibility to ensure that the greenhouse is properly anchored Harbor Freight Tools cannot
25. r is mounted on the rail 1 Place the Side Door Frame 33 with the rubber flap down Attach mwan three Center Door Frames 36 to the Side Door Frame 33 Assemble them with the rounded portion facing the front away from the flap as shown to the right 2 Using 2 Normal Bolts 65 and 2 Nuts 67 attach the Door Slider 1 34 to the Door Frame 35 br 40 oriented shown the nis 3 Attach the Top Door Frame 35 to d i Door Frames 33 with the Door Slider 34 at top and the rounded portion facing the front ER view from behind Insert a Door Bottom Slider 51 into each end of the Bottom Door Frame 37 Make sure that the Sliders are assembled the correct way with the gap facing the back of the door see diagram Attach the Bottom Door Frame 37 to the Side Door Frames 33 using 2 Screws 70 on each side the one on the top into the Bottom Door Frame 37 and the bottom one into the Door Bottom Slider 51 Item 93358 10 For technical questions please call 1 800 444 3353 Remove the protective film from both sides of four Door Panels 64 Slide the Door Panels into the door between the Door Frame 35 37 pieces Attach the other Side Door Frame 33 to the Center Door Frames 36 in the same way side view Raise the assembled Door up and insert the first roller of its Door Slider 34 onto the Door Rail 26 27 Carefully align the first Bottom Door S
26. races 30 onto each side wall as shown on the facing page with the arrows pointing towards the Corner Posts 7 Secure in place using Brace Bolts 66 at the Corner Post and the inserted Brace Bolts in the remaining holes Install Braces inside Posts but outside Struts as shown in the diagram at the top of this page Place the Gutter End Caps 73 onto the ends of the Side Ceiling Plates 12 13 oriented with a gap in the bottom to allow water to drain out of the gutters Item 93358 For technical questions please call 1 800 444 3353 Page 19 Grey parts are in place before this phase loosened a Post will slide over the bolt 2 Means that the bolt underneath will be head and then it will be re tightened er 9 gt 5 bo o t o o um ao M L Do zZ 2 nal cO O cm T o 5 5 lt o 0 o m E z cO co Gable and Crown nstallat a lt o D lt L o o E o O i 2 c o 20 C Oo O lav LI o HI Kan E o 0 A Phase 8 Page 20 For technical questions please call 1 800 444 3353 Item 93358 Gable and Crown Installation Instructions Note Leave Bolts 65 finger tight 5 Press the Crown Beams 8 9 down against until step 5 of this phase the tops of the Posts 16 23 while tightening all Bolts
27. rner should each be 15 5 Assemble the Base outside the hole as shown below Note that the angled edges of the Base Plates 43 44 need to face the corners of the base Use Base Bolts 68 Base Nuts 69 and Connectors 45 46 to secure the pieces together For technical questions please call 1 800 444 3353 With assistance lower the Base into the hole The diagonal dimensions from outside corner to outside corner must be equal for the base to be square Fill the hole around the outside of the base with soil This base will need to be filled with about 40 cubic feet of gravel or another appropriate fill material not provided The gravel should reach up to about 1 below the lip of the base Page 7 Ion Floor Plate Installati Phase 2 Page 8 o o 5 Ka Q K lt d o L o Q o o S Q E o pus ul o T a Q 2 o o Hold dovvn Connector 47 attachment a Slide Connector 47 under lip b Insert Regular Bolt 65 For technical questions please call 1 600 444 3353 All parts in this phase Item 93358 are fastened using 16 Normal Bolts 65 and 16 Nuts 67 Floor Plate Installation Instructions Front Floor Plate 1a 2a Rear Side Floor Plates Cross Section 1 When placing the Floor Plates 1a 6 on top of the Base Plates 43 44 align them as illustrated above The lip should extend slightly over the edge of the Base Plate and the raised
28. s Jooq WD y Jo ols eui Au pz Dua y9 00J4 BY uo speeu 1108 v PIIS 9 08 Z esou uo SinN OU 4914 1 Speau jog ou HEM 3y 5 o Mou smoys eDed SIY JO eu u uoneJisni eu 1 UMOUS SE USN SI pue juBu eu Inun GZ ag L dee A 1461 KA JUOJ4 p y uo syog 29 SINN 7 pue G9 5108 jeuuoN 7 Duisn pouajsey aJe SIN BuiureujeJ y uejui oseud siy u sed 42 Wey 1008 10614 y ysuleBe sesseud y Inun pz omg S nn yel JUOJ4 OU Ul syog 29314 BuiureujaJ ou JO speau out 92 WE JOOG 497 94 UO 101S eu aPIIS t Z ou Jo speeu y 4 AO 22 UE 100q WD out uo jOIS v EPIS Z MOU JO 9SOO SINN IS nq 2109 uoee ojuo 9 INN peau uAous se GZ yz Sa eld 192 1401 jo 1401 ou Ul sejou je u6noJuuj GQ syog BWJON L juoid Ajgquossy azejq Guijia9 xy aseyd Item 93358 For technical questions please call 1 800 444 3353 Page 12 Phase 4b Ceiling Plate Assembly Side Parts in this phase are fastened using a total of 12 Normal Bolts 65 and 12 Nuts 67 1 Inserta Plain Side Ceiling Plate 13 in the brackets 3 Repeat the two previous steps for the on the end of a Side Ceiling Plate with Brackets 12 remaining Plain Side Ceiling Plate 13 and Side Ceiling Plate with Brackets 12 4 Attach an End Cap 72 to the top outer corner of each Corner Po
29. st 7 at this point 2 Secure in place with 6 Normal Bolts 65 and 6 Nuts 67 The heads of the Bolts should all face the gutter side of the Ceiling Plates as shown in the inset above Item 93358 For technical questions please call 1 800 444 3353 Page 13 Grey parts are in place before this phase Means that the nearby Bolt attached at the same location will be removed and then re x map n p t c is phase Plate Installat ing and 10 Nuts 67 5 ul o ul MN 2 ul 0 o m 8 Brace Bolts 66 2 Normal Bolts 65 lace before th Ceil in p Mona Parts in this phase are fastened using Phase 5 Add Page 14 or technical questions please call 1 800 444 3353 Item 93358 Ceiling Plate Installation Instructions 1 Insert one Normal Bolt 65 through the Corner Bracket 49 and the upper hole in the Corner Post 7 at both front corners of the greenhouse from the inside out as shown above This is for the later attachment of the Front Ceiling Plate 24 27 Fran Fi Meow insice greenhouse 2 To attach one end of a Side Ceiling Plate 12 13 a Remove the Nut 67 where the Side Diagonal Strut 80 connects to the Corner Post 7 in one corner marked A in the illustration above b Temporarily disconnect that Side Diagonal Strut 80 from the Brace Bolt 66 but leave the Bolt in place c Orient
30. u q dij apun 7p JOJOBUUOD epis e 9jeld oseg 08 62 NAS YPM juouyoeye Lp 10 99UU0D UMOP PIOH eseud 5111 ol10ojaq pid ul aie syed 29 SINN 9z pue 84 Syog aoe1g lqnoq z 99 5108 29219 99 5108 jeuuoN 01 Guisn p u lse aie oseud siu u sueg uonej ejsu Sod 193U109 eseud Item 93358 For technical questions please call 1 800 444 3353 Page 10 Corner Post Installation Instructions 1 Item 93358 There are 4 Corner Posts 7 to be attached to the Floor Plates 1 6 The end with 2 holes should be at the bottom as shown in the illustration in the center of this page Attach one Corner Post 7 on the outside of the right rear Floor Plates 3 6 using 2 Normal Bolts 65 2 Hold down Connectors 47 and 2 Nuts 67 see inset facing page Meow asie greenhouse 3 Fasten a Corner Bracket 49 to the top of the Corner Post 7 over the Rear Floor Plate 6 using one Normal Bolt 65 for now Install it angled up towards the center of the greenhouse as shown above Install a Double Brace Bolt 78 through the bottom hole of the Corner Bracket 78 Place a Rear Brace 31 over it with the arrow pointing towards the Bolt Also place Front Rear Diagonal Strut 79 over the Bolt and thread on Nut 67 hand tight Fasten a Side Diagonal Strut 80 to the free top hole on the Corner Post 7 using Brace Bolt 66 and Nut 67 Fasten Struts 79 80 to

Download Pdf Manuals

image

Related Search

Related Contents

KVM-0811 / KVM-1611 8/16-Port PS2 KVM Switch  CEI - IEC Normen Shop  instructions d`utilisation du kit de nettoyage des bougies d`allumage  卒業論文 題目:蛍光ガラス線量計小型素子システム(Dose Ace)の 高  User Manual  MODE D`EMPLOI - Chien de France - Chiens-de  Pacific Hemostasis ®  Hunter Fan 44806 Fan User Manual  

Copyright © All rights reserved.
Failed to retrieve file