Home
GE Surface Time-Saving Wellheads Brochure
Contents
1. GE Oil amp Gas Time Saving Wellheads Pressure Control S95 Safe Time Saver Wellhead System The S95 Safe Time Saver Wellhead System is an economical solution for applications with drilling working pressures up to 5 000 psi and frac pressures up to 10 000 psi Its field proven design is ideal for development programs running 9 5 8 or smaller surface casing Well cost is reduced with rig time savings of 18 to 31 hours and safety is improved by eliminating field welding and flange nipple up A choice of fluted or solid hangers for production casing is available to suit well characteristics and a variety of frac and completion configurations will accommodate any stimulation or completion method The S95 system offers the utmost flexibility and ease of use in the industry for maximum efficiency in drilling fracturing and production operations Features e Time saving No waiting on cement because the surface casing is run and cemented with the head installed No field welding Quick connect BOP adapter reduces nipple up and nipple down time Ideal for programs running 9 5 8 or smaller surface casing Well control Back pressure valve preparation is standard in casing hangers Lock ring is available for casing hanger retention before removing the BOP e Improved safety No field welding Mandrel hangers run through the BOP reducing risk of injury Quick connect BOP adapter makes up easily without the u
2. se of hammer wrenches or special tools All seals can be tested externally Choice of casing hangers One piece mandrel casing hanger Fluted casing hanger with separate packoft e Choice of tubing heads and completions T PC 05 0048 tubing head TD PC 05 0049 dual completion tubing head MTH2 PC 04 0397 tubing head fa Optional Lock Ring j _ Related Systems e S95 SH safe time saver multi bowl system PC 07 0362 for programs running 9 5 8 surface casing with intermediate AND production casing 295 4036 Availability Surface Casing l Production Casing 4 1 2 8 5 8 Si F 5 1 2 4 1 2 5 9 5 8 5 1 2 7 S95 Safe Time Saver Wellhead System Equipment Options 7 1 16 5 000 psi 4 1 16 or 5 1 8 5 000 psi or 10 000 psi MTH2 S95 Tubing Head 7 595 Tubing Head Optional Lock eda S95 Packoff Optional Lock Ring S95 Fluted po Hanger S95 Casing Hanger S95 Casing Head Split Support Ring SS Landing Ring Lf 295 3978 GE imagination at work Emergency Alternative E E E E E E E E E E E WD Optional Lock Ring S95 Emergency Packoff S95 Emergency D Casing Hanger Jd EE E E E E E E E E E HE E E EE E HE 32 E H m E E E E E E E E E E E E E HEE E E uE E E geoilandgas com pressurecontrol GE 2013 All rights reserved 10 13 PC 07 0361 rev 2
Download Pdf Manuals
Related Search
Related Contents
制度に基づく 温室効果ガス吸収プロジェクト計画書別紙 モニ Lincoln Electric METALUX 248PG User's Manual ERC ロゴプリント使用上の注意 MANUEL D`INSTRUCTION - Dent-r-med Istruzioni per l`uso Frigorifero Manual de instrucciones Frigorífico 2013 TRANSIT CONNECT Owner`s Manual - Dealer e Production Flash Programming Copyright © All rights reserved.
Failed to retrieve file