Home

GE Level Crossing Installation Guide

image

Contents

1. until the arrow on the back of the module A is aligned with the top of the housing Lock the LED signal module in place by tightening metal tabs over the rim of the module or fastening a ring holder over the module as applicable Connect the wires to the AAR terminals Page 2 GE Lighting Solutions Risk of Electric Shock Install unit in enclosure tested to be suitable for wet locations only Installation Instructions cont d RG6 Pixelated LED Signals 12 300mm Railway Grade Crossing Ensure arrow ff points upward for proper beam alignment A B Check label for required voltage This product is intended solely for the use of rail signaling and is not intended for use in any other applications NOTE If you prefer to have this Installation Instructions document in other languages visit our official website at www gelighting com installation GE Lighting Solutions e 1 888 MY GE LED e www gelightingsolutions com 1 888 69 43 533 OF 41 216 266 2419 GE Lighting Solutions LLC is a subsidiary of the General Electric Company The GE brand and logo are trademarks of the General Electric Company 2013 GE Lighting Solutions LLC Information provided is subject to change without notice All values are design or typical values when measured under laboratory conditions RAIL135 R130816
2. GE Lighting Solutions Installation Instructions RG6 Pixelated LED Signals 12 300mm Railway Grade Crossing Impact Test Resistance Lenses BEFORE YOU BEGIN pare ii Wiring Read these instructions completely and carefully ll Oe wy AX WARNING AVERTISSEMENT e Follow all National Electric Codes NEC and local codes Risk of Electric Shock Disconnect Before Servicing or installing product Risque de choc lectrique Couper l alimentation avant le d pannage ou avant l installation du produit Operating Specifications Nominal Input Voltage 10V AC DC Voltage Range 8V to 14V AC DC Nominal Power Consumption 8 4W DC 10 7W AC e Always use a sun shielding apparatus such as a visor or hood over the signals e Donot attempt to open the LED module No assembly is required e Performance and behavior of the lamp including sidelights is guaranteed only when operated in the voltage range stated above Visor Hood Testing When testing the lamp before installation first check the electrical characteristics on the label on the back of the lamp see box B below to avoid damaging the lamp Installation Steps NOTE Failure to properly follow these instructions may cause signal to malfunction Remove the incandescent bulb reflector and lens assembly from the housing Feed wires of the LED signal module through the conduit in the housing Insert the LED signal into the lens slot and rotate it

Download Pdf Manuals

image

Related Search

Related Contents

Tripp Lite 1-Year Extended Warranty  Guide de la psychiatrie publique à Paris  QUICK START GUIDE  Autres Films de la Collection UN FILM POUR EN PARLER  StarTech.com High-definition PCIe capture card – HDMI VGA DVI & component – 1080P at 60 FPS  Samsung DM-V65 User Manual  

Copyright © All rights reserved.
Failed to retrieve file