Home

GE ABHG Installation Guide

image

Contents

1. B Power cord Option power input from top A Install 1 2 conduit or B install AC power cord with strain relief B Power cord Option power input from side Remove knockout in endcap Using UL listed wire connectors connect AC source green and A Install 1 2 conduit or B install AC power cord with to fixture green ground and AC black and red to fixture strain relief Plug unused hole on top with appropriate fitting black and red Reattach endcap Optional Installation 0 10V Volt Dimming 0 10V Dimmer Line Run wires from controller through a different Neutral i knockout than the AC input wire At output side of a LED driver make appropriate connections using 0 10 twist on wire connectors Follow lighting controller installation instructions LED Driver Note Daisy chaining the 0 10V wires from fixture to fixture for the 347 480V versions of ABHG is not allowed Optional Mounting Methods Rod Mount Kit f Attach to structural member Attach two rod mount brackets to fixture using four Secure 1 2 threaded rods into structural members in 10 32 x 3 8 pan head screws per bracket ceiling Place a nut on each threaded rod where fixture should hang Slide fixture onto threaded rods and tighten second nut onto rods to secure fixture 0 Ne N Pendant Mount Kit NOTE Pendant Mount Kit cannot be used with the 6 module fixture Attach pendant mount bracket assembly to four mounting in
2. generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense Save These Instructions Use only in the manner intended by the manufacturer If you have any questions contact the manufacturer Prepare Electrical Wiring Electrical Requirements e The LED driver must be supplied with 120 480 VAC 50 60 Hz per product label and connected to an individual properly grounded branch circuit protected by a 15 or 20 ampere circuit breaker Grounding Instructions e The grounding and bonding of the overall system shall be done in accordance with National Electric Code NEC Article 600 and local codes imagination at work Unit Installation 1 Carefully unpack unit and properly inspect for defects before installing Wear work gloves to prevent dirt and oil from being transferred to the luminaire 2 Select the appropriate mounting method based on the ordering number logic chosen Chain or cable is covered here Other options are covered in the section Optional Mounting Methods 7 Attach to Fixture Weight f structural member f ABHG series j 7 LED Modules Max Weight Mounting 1 module 13 Ibs j nae 2 modules 17 lbs 3 module
3. GE Installation Guide Lighting Solutions Albeo LED Luminaire Modular High amp Low Bay Lighting ABHG Series UL Certified BEFORE YOU BEGIN Read these instructions completely and carefully WARNING AVERTISSEMENT RISK OF ELECTRIC SHOCK RISQUES DE DECHARGES ELECTRIQUES e Turn power off before inspection installation or removal e Coupez l alimentation avant d inspecter installer ou d placer le luminaire e Properly ground electrical enclosure e Assurez vous de correctement mettre la terre le bo tier d alimentation lectrique RISK OF FIRE RISQUES D INCENDIE e Follow all NEC and local codes e Respectez tous les codes NEC et codes locaux e Use only UL or IEC approved wire for input output connections e N utilisez que des fils approuv s par UL ou IEC pour les entr es sorties de Minimum size 18 AWG connexion Taille minimum 18 AWG This device complies with part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation CAN ICES 3 A NMB 3 A This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed o provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment
4. g 1 888 MY GE LED 1 888 69 43 533 www gelighting com The GE brand logo and Albeo are trademarks of the General Electric Company 2013 GE Information provided is subject to change without notice All values are design or typical values when measured under laboratory conditions ALB006 012114
5. s 31 Ibs 4 modules 36 Ibs Chain or Cable Mounting Please O Direct Mounting Hang two chains follow all UL NEC and minimum load cables from a structural member rating guidelines when selecting and of the ceiling Fixture must be installing a cable or chain supported independently of an NOTE When selecting chain a outlet box Tighten adjustment joint in a circular chain link shall screws on all four mounting inserts be welded A joint in a chain link of then attach chain or cable to another shape shall not be located mounting inserts on both ends of within 30 degrees of the vertical fixture unless welded Electrical Connections 120 277V Attach to ural member Fra Ti 5 Indirect Mounting for Uplighting Hang two chains cables from a structural member of the ceiling Fixture must be supported independently of an outlet box Attach chain or cable to eye bolt mounts on both ends of fixture Option power input from top A Install 1 2 conduit or B install AC power cord with strain relief B Power cord Option power input from side Remove knockout in Connect the green ground black line and white endcap and A Install 1 2 conduit or B install AC power neutral wires of the AC line to the similarly colored cord with strain relief Plug unused hole on top with wires of the fixture s power supply using UL listed appropriate fitting wire connectors Reattach endcap Electri
6. serts on the fixture with 8 10 32 x 3 8 through conduit top plate and locking nut if used Philips pan head screws Connect the AC input wires to the fixture wires coming from the strain relief in the main bracket assembly bottom plate N Slide top plate into main bracket Align top tabs of end O Fasten endplate to bracket with a 8 32 x 1 4 Philips pan plate with slots in main bracket and push endplate into head screw Fasten endplate to mounting hub with a place 6 32 x 1 2 hex head screw Troubleshooting Symptom Solution Luminaire will not turn on e Check that the color of the supply side wires match the color of the wires they are connected to e Check that all wire connectors are properly connected e Verify that your input voltage is within specs e If you are using any additional controls i e wireless controls motion sensors please also verify that those are working properly and that the unit is setup to interface with the controllers Mounting insert slides e Check that the mounting insert is properly tightened using the adjustment screws provided from side to side Endplate of Pendant Mount Kit e Check that the top plate is properly slotted in main bracket does not snap in place e Check that endplate tabs are properly aligned in pendant mount bracket assembly e Check that endplate is pushed firmly into place Conforms to the following standards UL 1598 Suitable for Damp Locations cus GE Lightin

Download Pdf Manuals

image

Related Search

Related Contents

A 25 - Leroy Merlin  「レシピア」誕生!調理の動線にこだわった  Fresh_Whole_Blood_Transfusion_17_Jul_12    Elite Series EL-2800M-PMCL EL-2800C-PMCL  Bosch 2609255043  MATRIX Encastrable  非破壊テスターDPG100 取扱い説明書  

Copyright © All rights reserved.
Failed to retrieve file