Emerson Series 300 User's Manual
Contents
1. EMERSON Network Power Transfer Switch Position Source Accepted Normal O Emergency O Normal Oo Emergency Set Engine Exerciser Transfer Bypass Test Time Delay Press for 15 Sec Press until light FLASHES Transfer Switch Test Press and hold the door mounted Transfer Test button until the engine starts and runs This should happen within 15 seconds The transfer switch will operate to the Emergency position If the Transfer To Emergency Delay is used the transfer will occur after a time delay up to 5 minutes For immediate transfer press Bypass Time Delay button The Transfer Switch will operate back to the Normal position after the Retransfer To Normal Delay up to 30 minutes For immediate retransfer press Bypass Time Delay button Unloaded Running Engine Cooldown Delay allows engine to run unloaded for 5 minutes Checklist for Yearly Inspection A DANGER Hazardous voltage capable of causing shock burns or death is used in this switch Deenergize both Normal amp Emergency power sources before performing inspections O Clean the enclosure De energize all sources then brush and vacuum away any excessive dust accumulation Remove moisture with a clean cloth Check the transfer switch contacts De energize all sources then remove the transfer switch barriers and check contact condition Replace the contacts if they become pitted
2. engine starting contacts 1 2 inputs outputs 1 2 rating cover lights 1 4 5 1 load disconnect feature 5 4 lubrication 3 1 M maintenance preventive 3 1 manual load transfer 3 2 warning 3 2 manual operation 1 3 warning 1 3 motor load transfer feature 5 4 N nameplate cover O operation electrical 1 5 manual 1 3 illustration of 1 3 warning 1 3 sequence of 2 1 optional accessories programmable engine exerciser amp source availability signal contacts 5 2 5 3 serial communication module 5 5 strip heater 5 5 P parts 3 1 problem 3 2 programmable engine exerciser 5 2 5 3 R rating label cover remote control features 5 4 bypass transfer time delay 5 4 inhibit transfer to emergency 5 4 remote test 5 4 remote transfer to emergency 5 4 replacement parts 3 1 S service call 800 800 2726 ASCO set engine exerciser 5 1 5 2 5 3 settings changing 4 1 factory 4 1 frequency 4 1 phase 4 1 time delay 4 1 voltage 4 1 source accepted lights 1 4 1 5 7 terminal block 1 2 test functional 1 3 1 4 1 5 time delay adjustment 4 1 gen set cooldown 4 1 how to change 4 2 override momentary outages 4 1 transfer to emergency 4 1 transfer to normal 4 1 timer plant exerciser how to set 5 1 5 2 5 3 transfer switch position lights 1 4 1 5 transfer test 1 5 3 1 trouble shooting 3 2
3. Use extreme caution when using a meter to measure voltages in the following steps Do not touch power terminals shock burns or death could result Perform steps 1 through 6 at the right Observe the status lights See Figure 1 5 Black circle means light is on O White circle means light is off If necessary adjust voltage regulator on the generator according to the manufacturer s recommendations The Automatic Transfer Switch will respond only to the rated voltage specified on the Transfer Switch nameplate Also see page 4 1 for the HI LOW voltage adjust setting in the controller The LOW setting shifts all voltage settings down 4 2 for example 240 V to 230V 2 observe these lights Close the normal source circuit breaker The Normal Transfer Switch Position and the Normal Source Accepted lights should come on Source Accepted Normal Emergency O Use an accurate voltmeter to check phase to phase and phase to neutral voltages pres ent at the transfer switch normal source terminals Close the emergency source circuit breaker Start generator if necessary The Emergency Source Accepted light should come on Source Accepted Normal Emergency Use an accurate voltmeter to check phase to phase and phase to neutral voltages pres ent at the transfer switch emer gency source terminals Use a phase rotation meter to ch
4. it will be activated following the Load Disconnect Feature Delay Before Transfer delay The double throw Form C contact is rated for 28 VDC or 120 VAC 5 amperes resistive The contact operates prior to a selectable 0 3 10 or 20 second delay before transfer of the Automatic Transfer Switch The contact resets either immediately following transfer or after the same delay as set for pre signal before transfer Time delay between the load disconnect control signal and initiation of transfer is set on the controller with DIP switch S2 actuators 6 7 8 as shown below Delay Before Transfer LD TDBT S2 DIP SWITCH o acani Acuirzon a e eae isons Aa a Sa aa S 0 Shaded DIP switches are standard factory settings Delay After Transfer LD TDAT S2 DIP SWITCH enable Actuator 6 on mo disable Actuator 6 off D Enabling the Delay After Transfer will cause the control signal to reset after the same delay as set for the Delay Before Transfer REMOTE CONTROL FEATURES These remote control features require a customer supplied normally closed contact suitable for a 5 V dc low energy circuit Refer to the Wiring Diagram provided with the ATS Activate appropriate DIP switch S2 actuators below Remote Test terminals CP6 7 Remote Transfer to Emergency CP8 9 RTSW S2 DIP SWITCH RT E S2 DIP SWITCH
5. value The factory default is 0 This feature can be used to trim a clock that runs fast or slow For example if your clock runs 10 seconds slow per week change the fast slow adjust value to 10 and the unit will automatically add 10 seconds to the clock every week NOTE Adjustments are made Sunday morning at 2 AM If you want your exerciser period to start at 2 AM on Sunday you cannot use this feature and the adjustment must be set to 0 Date exerciser was set Weekly or Bi weekly Day of Week Start Time Run Time 0 23 hour TOT eee Sun through Sat B 2 ety 0 59 minute t bi weekly 0 59 minute 30 min is default setting CONTROL FEATURES continued LOAD DISCONNECT FEATURE Connect external circuits to the terminals indicated on the Wiring Diagram provided with the ATS INPHASE MONITOR FOR MOTOR LOAD TRANSFER Inphase monitoring logic controls transfer and retransfer of motor loads so that inrush currents do not exceed normal starting currents It avoids nuisance tripping of circuit breakers and mechanical damage to motor couplings The Motor Load Transfer feature is built into the controller DIP switch S1 actuator 5 activates this feature right ON left OFF FUNCTION S1 DIP SWITCH enable Actuator 5 on mo disable Actuator 5 off o 0 Shaded DIP switches are standard factory settings Note If the Motor Load Transfer feature is enabled
6. A ache NOT AVAILABLE Contact ratings Bras 20 Kae Deo Bn CLT AS VAST CSISUNE Figure 5 3 Source availability signal contacts Programmable Engine Exerciser The module includes a programmable engine exerciser DIP Switch Settings in the Controller that provides for weekly or biweekly operation This see page 4 2 optional exercise timer may have to be turned on seman S1 DIP S2 DIP enabled by setting the S1 DIP switch actuator 7 to off SWITCH SWITCH and S2 DIP switch actuator 5 to off A backup battery in Opt Timer Actuator Actuator Enabled 7 off 5 off the controller see page 4 2 and page 5 3 must be oni rene roa ie pt Timer Actuator ctuator turned on to maintain the settings and to allow Disabled 7 off 5 on mo programming with the normal and emergency power Exercise turned off page 5 1 without ie o TE Load The programmable engine exerciser incorporates a 7 Boa ae day or 14 day time base Proper controller settings must with ars ee be made to determine whether or not the test will be Load on done with or without load transfer S1 DIP switch actuator 8 0 Shaded DIP switches are standard factory settings See next page for instructions on setting the timer 5 2 CONTROL FEATURES continued How to Set Optional Programmable Engine Exerciser part of Acc 11BG module A DANGER Hazardous voltage capable of causing shock burns or deat
7. Sat 15 00 Fill in your settings for future reference NOTE When choosing bi weekly operation the exerciser will always run on the week designated 1 on the date display Run Time Display The Run Time Display shows the run time for the engine exerciser The default setting from the factory is 30 min Time Display The Time Display shows the present system time The format is hours minutes seconds NOTE During total power outages power to the accessory is maintained by a battery in the Controller see page 4 2 Be sure that the 9 volt alkaline battery is fresh and enabled jumper in ON position so that the time and date settings are not lost Date Display The Date Display shows the present system date The format is day of week week month day of month year NOTE Week is either week 1 or week 2 This is used in conjunction with the bi weekly timer Daylight Savings Time Adjust Display This display shows whether the automatic daylight saving time adjustment is active The factory default is NO If enabled the unit will automatically adjust for daylight saving time at 2 AM on Sunday as follows Part No 629857 001 629857 002 Start first Sunday in April 2nd Sunday in March Stop last Sunday in Oct first Sunday in Nov Part no on back of circuit board New DST starts in 2007 Fast Slow Adjust Display This display shows the automatic fast slow adjustment
8. TIMER 0 minutes Oto5 Transfer to Emergency N E full cow minutes B Ee Override Momentary 4 seconds non adjustable lt Emergency S Outages TIMER 30 minutes 1 second to Retransfer to Normal E N full cw 50 minutos P1 Unloaded Running adj ae Ey Engine Cooldown 5 minutes non adjustable Sensor Adjustments Voltage and frequency sensor pickup and dropout points are set to customer specifications if none specified standard factory settings are used To change a setting follow procedure on page 4 2 Use Tables 4 2 and 4 3 for settings and corresponding DIP switch actuators NOTICE Any change in these settings may affect the normal operation of the automatic transfer switch This change could allow the load circuits to remain connected to a low voltage source Table 4 2 Voltage and Frequency Settings E Shaded DIP switches are standard factory settings of nominal S1 DIP DESCRIPTION LABELS SETTING FACT SET ADJ RANGE SWITCH 95 Actuator 3 off w PU N Pickup 90 90 Actuator 3 on m v Actuator 1 off 90 Actuator 2 off Sa Normal Source Voltage 85 Actuator 1 on r Actuator 2 off v PONN Dropout a Actuator 1 off 9 80 Actuator 2 on Y Actuator 1 on m Qe Actuator 2 on mm Emergency Source Pickup 90 non adjustable Voltage Dropout 75 non adjustable Pickup 95 non adjustable Dropout 85 n
9. or worn excessively Reinstall the barriers carefully Maintain transfer switch lubrication Under normal operating conditions no further lubricating is required Renew factory lubrication if the switch is subjected to severe dust or abnormal operating conditions or if TS coil is replaced Order lubricant kit 75 100 3 1 O Check all cable connections amp retighten them Torque to values shown on transfer switch label Replacement parts When ordering parts provide the Serial and Catalog Nos from the transfer switch nameplate Contact ASI In the US call 1 800 800 ASCO 2726 DISCONNECTING THE CONTROLLER The harness disconnect plugs are furnished for repair purposes only and should not have to be unplugged If the controller must be isolated follow these steps carefully Disconnecting the Plugs 1 Observe the position of the transfer switch a If the transfer switch is in the Normal position place standby engine starting control in the off position Then open the emergency source circuit breaker b If the transfer switch is in the Emergency position open the normal source circuit breaker Place the engine starting control in the fest or run position 2 Separate the quick disconnect plugs by squeezing the latches Do not pull on the harness wires 3 Label remove and tape the signal wires connected to the engine start terminals on the transfer switch TB1 and TB3 or TB1 and TB2 Reconnecting the Plugs 1
10. 0 1X i F type 3R blank solid 1000 E 230 M 460 accessories G type 4 1200 F 240 N 480 ordered L type 12 H 380 Q 575 blank open type J 400 R 600 available 600 1000 A sizes only neutral Controller connections power connections membrane controls Transfer Switch terminal block TB for engine start and switch position contacts power connections neutral lt a connections lt 600 ampere size in typical enclosure with location of customer connections neutral connections Controller power connections membrane controls Transfer Switch terminal block TB for engine start and switch position contacts power connections neutral connections 800 and 1000 ampere sizes in typical enclosure with location of customer connections membrane Controller controls neutral connections power connections SS Se Transfer Switch 1 D ji H il i J I terminal block TB for engine start and switch position contacts power connections neutral connections 1200 ampere size in typical enclosure with location of customer connections SECTION 1 Series 300 Automatic Transfer Switches are factory wired and tested Installation requires skid removal then securing the enclosure to the supporting foundation Remove the Shipping Skid Open the front door and remove the four lag screws 2 in front 2 in rear securing enclosure to the wood skid Sup
11. BOOZAGSOO2B yi Frraeseret ov anwee o a ASTA HIGH VOLTAGE 1 9 volt alkaline battery J5 battery harness E35 plugs m Ta P1 a retransfer wE to normal time delay P2 transfer to emergency time delay S3 DIP switch S1 DIP switch 12sec 678 rotnun A6 S2 DIP switch Figure 4 2 Location of potentiometers clockwise to increase P1 or P2 potentiometer counterclockwise to decrease Figure 4 3 Changing time delay potentiometers DIP switches SW1 SW2 SW3 actuator 8 on each DIP switch off lt gt on Figure 4 4 Setting DIP switch actuators SECTION 5 CONTROL FEATURES ENGINE EXERCISERS These timers periodically exercise the emergency engine generator plant They can be set to exercise with or without load transfer or they can be completely disabled The engine generator should be exercised under load once a week for a minimum time period of 20 minutes or follow the recommendations of the engine generator set manufacturer Refer to page 4 2 for location of DIP switches battery provide
12. ERATION 2 1 TESTING amp SERVICE 3 1 Preventive Maintenance 3 1 Transfer Test 0 cece eee eee 3 1 Disconnecting the Controller 3 1 Manual Load Transfer 3 2 Trouble Shooting 000 ee 3 2 ADJUSTMENTS 000 000 ee 4 1 Time Delay and Sensor Adjustments 4 1 How to Change a Setting 4 2 CONTROL FEATURES 5 1 Engine Exercisers 5 1 5 2 5 3 Motor Load Transfer 5 4 Load Disconnect amp Remote Control 5 4 INDEX rrira ay anai ya back of manual 381333 201 G For sales or service call 1 800 800 2726 ASCO www ascopower com A ASCO POWER TECHNOLOGIES CANADA PO Box 1238 17 Airport Road Brantford Ontario Canada N3T 5T3 EMERSON Network Power Catalog Number Identification A typical Catalog Number is shown below with its elements explained The example is for a Series 300 ATS with switched neutral 3 pole 600 ampere 480 V in a Type 1 enclosure Nameplate The Transfer Switch nameplate includes data for each specific ASCO Series 300 ATS Use the ATS only within the limits shown on this nameplate H 300 B 3 600 N 1 C Neutral Phase Poles Amperes Voltage Controller Enclosure B switched 2 single 600 C 208 K 415 1 standard C type 1 C overlapping 3 three 800 D 220 L 44
13. For immediate retransfer press the Bypass Time Delay button Bypass Time Delay The unloaded running delay keeps the generator running for 5 minutes cool down period Then the generator should stop and the Emergency Source Accepted light should go off Source Accepted Normal Emergency O SECTION 2 SEQUENCE OF OPERATION Lights show position of transfer switch Lights show the sources accepted Light for built in Transfer To Emergency The sequence for load transfer to emergency source begins automatical ASCO Power Transfer Switch engine exercise timer EMERSON Network Power gt blinks rapidly when button is held 5 sec ly when normal source voltage falls below the preset dropout point or Transfer Switch Position while being set Source Accepted gt blinks slowly when when Transfer Test button is pressed An under voltage condition on any Normal Emergency button is released set and during 20 min exercise period Normal Emergency phase of the normal source is de tected by the sensor Transfer Test When the normal source voltage fails or Press for 15 Sec gt stays on after engine stops exerciser is enabled for weekly operation Bypass Time Delay Set Engine Exerciser Press until light FLASHES the Transfer Test button is pressed the SE relay de energizes and relay NR begins its timing
14. Observe the position of the transfer switch a Ifthe transfer switch is in the Normal position be sure that the standby engine starting control is still in the off position The emergency source circuit breaker still should be open b If the transfer switch is in the Emergency position normal source circuit breaker still should be open 2 Reconnect the signal wires connected to the appropriate engine start terminals on the transfer switch See Section 1 Engine Starting Contacts 3 The harness plugs and sockets are keyed Carefully align the plugs with the sockets and press straight in until both latches click 4 Restore the opposite source as follows a Ifthe transfer switch is in the Normal position place the standby engine starting control in the automatic position Then close the emergency source circuit breaker b If the transfer switch is in the Emergency position close the normal source circuit breaker The load will be automatically retransferred to the normal source after the Retransfer to Normal Delay For immediate retransfer press Bypass Time Delay button Place the engine starting control in the automatic position TESTING amp SERVICE continued MANUAL LOAD TRANSFER This procedure will manually transfer the load if the controller is disconnected Do not manually operate the transfer switch until both power sources are disconnected open both circuit breakers TROUBLE SHOOTING Note the contr
15. Operator s Manual A DANGER DANGER is used in this manual to warn of a hazardous situation which if not avoided will result in death or serious injury WARNING is used in this manual to warn of a hazardous situation which if not avoided could result in death or serious injury A CAUTION CAUTION is used in this manual to warn of a hazardous situation which if not avoided could result in minor or moderate injury a _ 600 800 1000 A sizes ASCO Power _ 50 Hanover Road Florham Park New Jersey 07932 1591 USA Technologies ASCO Series 300 Automatic Transfer Switches H design 600 through 1200 A Refer to the outline and wiring drawings provided with your ASCO Series 300 ATS for all installation details Rating Label Each automatic transfer switch contains a rating label to define the loads and fault circuit withstand closing ratings Refer to the label on the transfer switch for specific values Do not exceed the values on the rating label Exceeding the rating can cause personal injury or serious equipment damage An experienced licensed electrician must install the Automatic Transfer Switch ATS i gt TABLE OF CONTENTS section page INSTALLATION 0 00 e eee 1 1 Mounting and Line Connections 1 1 Engine Starting Contacts 1 2 Input Output Label 1 2 Functional Test 5 1 3 1 4 1 5 SEQUENCE OF OP
16. The load should transfer to emergency source when meter needle is near 0 volts If transfer does not occur Motor Load Transfer feature is not operating 4 Release the Transfer Test button The load should retransfer back to the normal source after the Retransfer to Normal Delay if used The retransfer should occur when the needle is near 0 volts If retransfer does not occur after the time delay the Motor Load Transfer feature is not operating 5 For immediate retransfer press the Bypass Time Delay button Then disconnect the voltmeter If the problem is isolated to circuits on the controller or the transfer switch call your local ASCO Power Technologies sales office representative or ASI In the United States call 1 800 800 2726 Furnish the Serial No Bill of Material BOM No and Catalog No from transfer switch nameplate 3 2 SECTION 4 ADJUSTMENTS Time Delay Adjustment Standard time delays are set to customer specifications if none specified standard factory settings are used To change a setting follow procedure on page 4 2 Use Table 4 1 as a guide to time delay values and their cor responding adjustment DIP switch or potentiometer Table 4 1 Time Delay Settings FACTORY ADJUSTMENT S3 DIP ADJUSTMENT DESCRIPTION ABELS IESETTING RANGE SWITCH POTENTIOMETER Override Momentary TEs EEA 1 second Actuator 1 on Normal Source Outages 3 seconds Actuator 1 off
17. V voltage phase 4 1 voltage pickup and dropout settings 4 1 Copyright ASCO Power Technologies L P 2011
18. ay transfer of the load to the emergency source For immediate transfer press Bypass Time Delay button ER relay energizes the TS coil is energized the transfer switch operates and all switch contacts mains controls auxiliaries reverse position The transfer switch is now supplying the load from the emergency source The transfer switch will remain in the Emergency position until the normal source is restored If the Transfer Test button is used the transfer switch will remain on emergency until the retransfer to normal delay times out Press to cancel the active exercise period 20 min engine exercise stops engine now or after cooldown See See page 5 1 for complete instructions Hold 5 sec to set period immediately engine starts and weekly thereafter Figure 2 1 Membrane controls and indicator lights Retransfer to Normal The sequence for load retransfer to the normal source automatically begins when the voltage sensor detects restoration of the normal source The voltage level must rise above the preset pickup point on all phases before the sensor will accept the normal source When the normal source is accepted by the sensor relay SE begins its timing cycle adjustable 1 sec to 30 min retransfer to normal delay For immediate retransfer press Bypass Time Delay button SE relay is provided with a time delay on pickup to prevent immediate load retransfer to the normal source The delay insures t
19. ce contacts lower DOWN closes the Emergency source contacts upper left side of transfer switch maintenance handle storage clips N Figure 1 3 Maintenance handle amp storage location 3 Return the transfer switch to the Normal position Observe that window indicators right side show the top shaft O open and the bottom shaft C closed Note If Normal and Emergency connections are reversed this operation is also reversed 4 Remove the maintenance handle and store it on the frame left side in the clips provided NOTICE Verify that the maintenance handle has been removed before proceeding Now continue to 2 Voltage Checks on next page Emergency fe contacts 8 amp af window indicators contact position O is open indicators right side C is closed Gl Normal _ D contacts Figure 1 4 Maintenance handle operation and contact position indicators 1 3 INSTALLATION continued asco t EMERSON Power Transfer Switch Network Power Transfer Switch Position Normal 3 Source Accepted Normal oO Emergency Emergency Transfer Bypass Test Time Delay Press for 15 Sec Set Engine fazazlo Press until light FLASHES Figure 1 5 St andard controls and indicators 2 Voltage Checks First check nameplate on transfer switch rated voltage must be the same as normal and emergency line voltages A DANGER
20. cycle 1 or 3 seconds momentary normal source outage delay The NR relay is provided with a time delay on dropout to override momentary outages and prevent nuisance starting of the engine driven generator If the normal source voltage returns above the sensor dropout setting before the time delay expires the NR relay timing cycle is reset to zero and relay SE energizes Hold 15 sec to start the engine generator and to transfer the load to emergency page 5 1 If the normal source voltage does not return above the sensor dropout setting before the time delay expires the NR relay de energizes and signals the engine driven gen erator to start At the same time a voltage and frequen cy sensor begins monitoring the emergency source The sensor will accept the emergency source only when both voltage and frequency reach preset pickup points Usual ly about ten seconds elapse from dropout of the NR relay to acceptance by the sensor This time span occurs be cause the engine driven generator must crank start and run up to nominal pickup points For this reason if the Transfer Test button is pressed it must be held for 15 sec onds If the emergency source is available immediately the sensor may accept it as soon as NR relay drops out When the emergency source is accepted by the sensor relay ER begins its timing cycle transfer to emergency delay ER relay is provided with an adjustable 0 to 5 minutes time delay on pickup to del
21. d and jumper block in the controller BUILT IN ENGINE EXERCISER DIP Switch Settings The engine exerciser included in ASCO Series 300 FUNCTION S1 DIP S2 DIP Automatic Transfer Switches provides a once a week SWITCH SWITCH 20 minute exercise period It occurs immediately when as tides A a Actuator ae o the Set Engine Exerciser push button is pressed and SiT ae ren aa xe tor held for at least 5 seconds and then at the same time Disabled 7 off J 5o0n Lt or weekly thereafter A 9 volt alkaline battery Duracell Exercise Actuator MN1604 Everready 522 or Panasonic 6AM6 is MT 8 off e furnished and installed in the controller to maintain the Exercise Actuator setting The battery jumper block must be shifted to the with Load 8 on o ON position See Figure 4 2 on page 4 2 E shaded DIP switches are standard factory settings Fill in day and time set Week Day______ Time status light Press to cancel an active exercise Bypass Set Engine o period stops generator Time Delay Exerciser Press and hold for 5 sec or until status light blinks rapidly to set exercise period immediately Press until If Exercise with Load is set retransfers load to light FLASHES and every week hereafter generator starts Normal then stops generator after min cooldown If Exerciser with Load is set i transfers load to Emergency Figure 5 1 Operator panel pushbuttons and light Select be
22. disable Actuator 3 on m ov disable Actuator 2 on enable Actuator 3 off o enable Actuator 2 off N Bypass Transfer Time Delay CP12 13 Inhibit Transfer to Emergency CP10 11 TD E N BYP S2 DIP SWITCH N E INHIB S2 DIP SWITCH disable Actuator 1 on disable Actuator 4 on MES enable Actuator 1 off enable Actuator 4 off gt CONTROL FEATURES continued OPTIONAL STRIP HEATER Accessory 44 Accessory 44 Strip Heater is designed to keep ambient temperatures within the Automatic Transfer Switch thermostat enclosure at acceptable levels This accessory consists of a mounting bracket with strip heater thermostat and dial terminal block A transformer with fuses is included when the power for the assembly is derived from voltages above 120 V ac The 120 V ac customer powered assembly does not include a transformer This optional accessory is available factory installed or in kit form turn counterclockwise to lower temperature turn clockwise to raise temperature Turn the thermostat s dial to required setting as shown Figure 5 4 Thermostat AVAILABLE KITS Controls Strip Heater Accessory 44 Description Accessory Kit Description Accessory Kit Programmable Engine Exerciser 11BG K629830 120 volt amp Source Availability Contacts customer supplied voltage 44A K613127 001 wi
23. e neces _ closed on normal sary auxiliary connections by i referring to Section 5 Control terminal block for engine start and auxiliary circuit connections i o Optional COMMON TS Auxiiary Contacts Feature 14AA amp 14BA A 10 amps 32 V DC y 10 amps 250 V AC general purpose t FEATURE 14B TT Features Connections to Controller Figure 1 1 Engine start and auxiliary circuit for other Control Features terminal block TB located on the transfer switch located on bottom of Controller Load Disconnect Programmable Feature Engine Exerciser Remote Control Features Connections Connections connection refer to the Wiring Diagram amp see Wiring Diagram if provided page 5 4 for DIP switch settings amp refer to page 5 4 refer to Each control contact must be suitable for factory for DIP switch settings page 5 3 for a 5 V DC low energy circuit use only 10 11 12 13 14 15 16 RUUT LOAD OPTIONAL MOMENTARY MAINTAINED INHIBIT BYPASS DISCONNECT ENGINE TEST OPEN TO TRANSFER TRANSFER CONTACTS EXERCISER SWITCH TRANSFER TO TO TIME DELAY EMERGENCY EMERGENCY i N OUTPUT INPUT CONTACTS FOR CONTACTS 5VDC 5mA FACTORY 120VAC 5A USE 493192 Figure 1 2 Input output label on the Controller showing possible connections to the lower terminal block 1 2 INSTALLATION continued Functional Test The Functional Test consists of three checks manual operation voltage checks and elect
24. e used between the enclosure and the door This connection provides proper grounding which does not rely upon the door hinges Harnesses The transfer switch is connected to the left side of the controller by a plug in harness two plugs INSTALLATION continued Engine Starting Contacts Customer connections for engine control contact and TS auxiliary contacts connections are located on terminal block TB which is mounted on the front lower left side of left of the transfer switch Refer to wiring diagram transfer switch provided with the Series 300 ATS and connect the engine start wires to the appropriate terminals See Figure 1 1 and Table A COMMON Engine Starting r r Signals Table A Engine start connections q FEATURE 7 5 amps 32 V DC closes to start 5 amps resistive 28 V DC Terminals FEATURE 8 or 120 V AC max When normal on transfer opens to start f source fails switch a COMMON Feature 14A amp 14B 10 amps 32 V DC 10 amps 250 V AC general purpose FEATURE nl closed on emergenc FEATURE 14A closed on normal i contact closes TB1 and TB2 contact opens TB1 and TB3 S TS Auxiliary Contacts y o Auxiliary Circuits h Connect auxiliary circuit wires to appropriate terminals on transfer switch terminal block TB as shown on the wiring diagram provided Taaa a with this Series 300 Automatic 1 FEATURE 14AA Transfer Switch Make th
25. eck phase rotation of emer gency source it must be the same as the normal source Shut down the engine genera tor if applicable The Emergen cy Source Accepted light should go off Then put the starting control selector switch on the generator set in the automatic position Close enclosure door Source Accepted Normal Emergency O Now continue to 3 Electrical Operation on next page INSTALLATION continued ASCO Power Transfer Switch EMERSON Network Power press this button ource Accepted Normal Ols Emergency Transfer Switch Position Normal O Emergency O Press for 15 Sec Transfer Bypass Test Time Delay Set Engine Exerciser oO Press until light FLASHES Figure 1 6 Standard controls and indicators 3 Electrical Operation This procedure will check the electrical opertion of the Automatic Transfer Switch See Figure 1 6 Close the transfer switch enclosure door and tighten the screws before you test electrical operation Transfer Test Both normal and emergency sources must be available and the emergency source generator if used must be capable of being started in this procedure Perform steps 1 through 8 at the right Observe the status lights Black circle means light is on O White circle means light is off NOTE If Motor Load Transfer feature is activated then transfer may not occur immediately after
26. ent potentiometer or DIP switch for the setting that you want to change Refer to Table 4 1 and Table 4 2 on page 4 1 and Figure 4 2 Figure 4 3 Figure 44 on page 4 2 Use a small screwdriver to turn the potentiometer clockwise to increase the time delay or counter clockwise to decrease it See Figure 4 3 Use a ball point pen or similar pointed tool to slide the switch actuators left or right so they match the illustration next to the setting left off right on Recheck the setting See Figure 4 4 Install the cover on the controller by hooking it on the left side and latching the right side Reconnect both harness plugs to the controller by aligning and pressing straight in until latches click Close the transfer switch enclosure door 9 Close the enclosure door then restore both sources a If the transfer switch is in the Normal position first close the normal source circuit breaker then close the emergency source circuit breaker b Ifthe transfer switch is in the Emergency position close the normal source circuit breaker The load will be automatically retransferred to the normal source Then close the emergency source circuit breaker 10 Turn the engine starting control to automatic continued cover thumb latch e hook on A ee left side tits se resonesuen BESOS
27. h is used in this transfer switch Deenergize both Normal and Emergency power sources before programming the exerciser Fast Slow Adjust Daylight Saving Time Adjust Navigating the Menu Use the UP and DOWN arrow keys to move through the displays Changing the Parameters Use the UP and DOWN arrow keys to move though the displays to the parameter to be changed Push the ENTER key to start the editing process The first parameter will flash Use the UP and DOWN arrow keys to adjust the parameter to the desired value and press the ENTER key to save the value The next parameter will now flash Repeat the process until each parameter is properly configured Engine Exerciser Display The Engine Exerciser Display shows the status of the engine exerciser When the unit is shipped from the factory the programmable engine exerciser is Disabled and must be set to Enabled by the customer When the engine exerciser is running this display will count down the remaining time until the end of the exercise period Start Time Display The Start Time Display shows the engine exerciser start time There are four parameters that determine the start time weekly Every or bi weekly Alt operation day of week Sun through Sat start hour 0 through 23 start minutes 0 through 59 For example if the user wants the exerciser to run every other Saturday at 3 PM the proper configuration would be Alt
28. hat the normal source has stabilized before reconnection of vital loads If the normal source voltage falls below the present dropout point before the time delay expires the timing cycle is reset to zero If the emergency source fails for more than 4 seconds during the timing cycle ER relay drops out and the load is immediately retransferred to the normal source if that source is acceptable SE relay energizes and ER relay is dropped out The TS coil is energized the transfer switch operates and all switch contacts mains controls auxiliaries reverse position The transfer switch is now supplying the load from the normal source again Upon retransfer to the normal source NR relay begins its timing cycle unloaded running delay engine cooldown NR relay is provided with a 5 min time delay on pickup to keep the engine running for a cool down period NR relay energizes after the time delay and signals the engine driven generator to shut down All circuits are reset for any future normal source failure Activation of standard control features shown in Section 5 will alter the sequence of operation and introduce additional time delays during transfer operations SECTION 3 TESTING amp SERVICE PREVENTIVE MAINTENANCE For high reliability and long life for the ATS Operate the switch at least once a month Perform this 4 step Electrical Operation Test test with load transfer ASCO Power Transfer Switch
29. low either Exercise without Load or Exercise with Load according to the setting of DIP switch S1 actuator 8 The load transfers from the Normal source to Emergency source generator and back again if Exercise with Load is selected Exercise without Load DIP Switch S1 Actuator 8 off o How to Set Built In Timer Step Function Explanation Push Button Status Light Set Engine j gt blinks rapidly Exercise the generator now and i Gente 0o00 SEREK CTOIRE Pend every week at this time hereafter hold 5 sec blinks slowly 2 release 00800 exercise period now active Generator starts and runs press Bypass i Time Delay stayson cancel active exercise period Generator stops stays on generator off Exerciser enabled repeats every 7 days Exercise with Load DIP Switch S1 Actuator 8 on os How to Set Built In Timer Step Function Explanation Push Button Status Light Set Engine blinks rapidly Exercise the generator now and 1 Fxerciser 0o00 SET ExeErcise penod every week at this time hereafter hold 5 sec blinks slowly Generator starts and runs 2 release 000000 EXECS Penod NOW AIVE the load transfers to Emergency The load retransfers to Normal then cancel active exercise period generator runs for 5 minute cooldown light blinks slowly during cooldown 3 press Bypass blinks slowly Time Delay 008 00 4 stay
30. ol features that are activated or furnished on the switch and review their operation Refer to Section 5 Control Features 1 Open normal and emergency source circuit breakers 2 Use the maintenance handle to manually operate transfer switch to the opposite source See page 1 3 Manual Operation Test 3 If the transfer switch is in the Emergency position manually start the engine generator and then close the emergency source circuit breaker Proceed with care The automatic transfer switch is energized Table 3 1 Trouble Shooting Checks PROBLEM CHECK IN NUMERICAL SEQUENCE 1 OPERATION 2 GEN SET 3 VOLTAGE Gen Set does not start when the Transfer Test button is pressed and held for 15 seconds or when the normal source fails Hold the Transfer Test button 15 sec or the outage must be long enough to allow for the 1 or 3 sec Momentary Normal Source Outage Delay plus engine cranking and starting time Starting control must be in automatic position Batteries must be charged and connected Check wiring to engine starting contacts Transfer switch does not transfer the load to emergency source after the gen set starts Wait for Transfer to Emergen cy Delay 0 to 5 min to time out For immediate transfer press the Bypass Time Delay button If Motor Load Transfer is active wait for inphase con dition see below Generator output circuit breaker must be closed Generator frequency mu
31. on adjustable Emergency Source 60 H A Fr n Z ctuator 4 O A eid 60 50 60 50Hz gt 60Hz Z 50 Hz Actuator 4 on mk 3 phase Actuator 6 off D Voltage Phases 3 1 3 1 3 1 phase Actuator 6 on o If dropout voltage is set to 90 the pickup voltage must be set to 95 Table 4 3 Transformer Voltage Adjust Low setting shifts all voltage settings down 4 2 for example 240 V to 230 V or 480 V to 460 V DESCRIPTION LABELS FACTORY SETTING ADJUSTMENT S3 DIP SWITCH LOW Actuator 2 off N Voltage Adjust 4 2 LOW HI Actuator 2 on n ADJUSTMENTS NOTICE Do not make any setting changes while the controller is energized How to Change a Setting 1 Prevent the transfer switch from operating by discon necting one source first then the other as follows a If the transfer switch is in the Normal position open the emergency source circuit breaker Turn the engine starting control to off Then open the normal source circuit breaker b Ifthe transfer switch is in the Emergency position open the normal source circuit breaker Turn engine starting control to test or run Then open the emergency source circuit breaker Disconnect both harness plugs from controller by squeezing the latches Do not pull on the wires Remove cover from the controller by releasing latch on right side with your thumb See Figure 4 1 Locate the appropriate adjustm
32. porting Foundation The supporting foundation for the enclosure must be level and straight Refer to the applicable enclosure outline drawing included with the Series 300 for all mounting details including door opening space If bottom cable entry is used the foundation must be prepared so that the conduit stubs are located correctly Refer to the enclosure outline drawing for specified area and location Provide cable bending space and clearance to live metal parts When a concrete floor is poured use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment Mounting Refer to the applicable enclosure outline drawing furnished with this switch and mount the Series 300 according to details and instructions shown on diagram Line Connections Refer to the Wiring Diagram provided with your Series 300 ATS All wiring must be made in accordance with the National Electrical Code and local codes It is unnecessary to remove pole covers from the transfer switch If you do remove them reinstall them carefully A DANGER De energize the conductors before making any line or auxiliary circuitry connections Be sure that Normal and Emergency line connections are in proper phase rotation Place engine generator starting control in the OFF position Make sure engine generator is not in operation INSTALLATION Testing Power Conductors Do not connect the power conductors to the ASCO Series 300 t
33. ransfer switch until they are tested Installing power cables in conduit cable troughs and ceiling suspended hangers often requires considerable force The pulling of cables can damage insulation and stretch or break the conductor s strands For this reason after the cables are pulled into position and before they are connected they should be tested to verify that they are not defective or have been damaged during installation NOTICE Protect the automatic transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the ATS Connecting Power Conductors After the power cables have been tested connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with this Series 300 Make sure the lugs provided are suitable for use with the cables being installed Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the Series 300 Be careful when stripping insulation from the cables avoid nicking or ringing the conductor Remove surface oxides from cables by cleaning with a wire brush When aluminum cable is used apply joint compound to conductors Tighten cable lugs to the torque specified on rating label Controller Ground A grounding wire must be connected to the controller s lower left mounting stud Because the controller is mounted on the enclosure door a conductive strap must b
34. rical operation NOTICE Do these checks in the order presented to avoid damaging the automatic transfer switch Read all instructions on the Wiring Diagram and labels affixed to the automatic transfer switch Note the control features that are provided and review their operation before proceeding 1 Manual Operation Test A detachable maintenance handle is provided on the frame of the Transfer Switch for maintenance purposes only Manual operation of the transfer switch should be checked before it is energized operated electrically Do not manually operate the transfer switch until both power sources are disconnected open both circuit breakers 1 After deenergizing both power sources open the enclosure door Locate and remove the mainte nance handle from the clips on the left side of the transfer switch frame Insert the handle into the hole in the molded hub on the left side of the operator See Figures 1 3 and 1 4 and Table B 2 Move the maintenance handle up or down as shown to manually operate the transfer switch It should operate smoothly without any binding If it does not check for shipping damage or construction debris Table B Maintenance handle positions ATS Position Handle Indicators UP E 0 if tacts open Normal upper con if N C N rA lower contacts closed E LN E C Emergency AS upper contacts closed x N 0 down lower contacts open j7 handle UP closes the Normal sour
35. s on generator off Exerciser enabled repeats every 7 days NOTE Every time SET ENGINE EXERCISER push button is pressed held 5 seconds the exercise period is changed 5 1 CONTROL FEATURES continued Optional Accessory 11BG SOURCE AVAILABILITY SIGNAL amp PROGRAMMABLE ENGINE EXERCISER MODULE ASCO Tecnologie 8 ENGINE EXERCISER 8 2 line display connections for source availability signal contacts CON OO RWH 3 buttons SN a Q yo Figure 5 2 Accessory 11BG module mounted behind operator interface and connected to the controller includes source availability signal contacts and a programmable engine exerciser OCATED ON INSIDE OF DOOR BEHIND OPERATOR INTERFACE Source Availability Signal Contacts a ON ENGINE EXERCISER MODULE The module provides one Form C contact each for the f D eek Sia ye Ts NORMAL AVAILABLE normal and emergency sources signal the acceptability of the source as sensed by the controller The signal PAE rye SOURCE contacts operate in conjunction with the Source oe CRE oo ope AEE SIGNALS X Sone 2 AMPS 30 VDC resistive Accepted lights on the operator interface Field wiring eee ND 0 5 AMP 125 VAC resistive E M 4 T ENERGENCY AVAILABLE contacts shown de energized terminals are provided as shown in Figure 5 3 and the i Sp p COMMON wiring diagram a 2 6 aaa
36. st be at least 57 Hz Voltmeter should read at least 90 of nominal phase to phase voltage between transfer switch terminals EA and EC or EL1 and EL2 for 2 pole switches These are factory settings Transfer switch does not transfer the load to normal source when normal returns or when Transfer Test button is released Wait for Retransfer to Normal Delay 1 sec to 30 min to time out For immediate re transfer press Bypass Time Delay button If Motor Load Transfer is active wait for in phase condition see below Voltmeter should read at least 90 of nominal phase to phase voltage between transfer switch terminals NB and NC NC and NA and NA and NB or NL1 and NL2 for 2 pole switches Gen Set does not stop after load retransfer to the normal source Wait for the 5 minute Unloaded Running Delay to time out Starting control must be in automatic position Trouble Shooting the Motor Load Transfer Feature refer to page 5 4 A DANGER Use extreme caution when using a meter to measure voltages in the following steps Do not touch power terminals shock burns or death could result 1 Connect a voltmeter set for twice system phase to phase voltage between Transfer Switch terminals NA and EA 2 Manually start generator Voltmeter needle should sweep back and forth at a regular rate between 0 and about twice system voltage 3 Press and hold Transfer Test button
37. the respective time delays Transfer will only occur when the phase relation ship between sources is correct This completes the Functional Test of the ASCO Series 300 Automatic Transfer Switch Leave the engine generator starting control in the automatic position observe these lights The normal source must be available and the generator must be ready to start Check that the Normal Source Accepted light is on Source Accepted Normal Emergency Press and hold the Transfer Test button until the engine starts and runs This should happen within 15 sec Transfer Test The Emergency Source Accepted light should come on Source Accepted Normal Emergency The transfer switch should transfer to the Emergency position The Emergency Transfer Switch Position light should come on and the Normal light should go off Transfer Switch Position Normal Emergency If the transfer to emergency delay is used the transfer should occurs after a time delay up to 5 minutes For immediate transfer press the Bypass Time Delay button Bypass Time Delay The transfer switch should transfer back to the Normal position The Normal Transfer Switch Position light should come on and the Emergency light should go off Transfer Switch Position Normal Emergency If the retransfer to normal delay is used the retransfer should occur after a time delay up to 30 minutes
38. thout transformer Serial Communication Module 72A K601110 208 480 volt ATS derived voltage 44G K613127 002 with transformer 380 volt ATS derived voltage 44G K613127 with transformer 550 600 volt ATS derived voltage 44G K613127 003 with transformer A accessories 5 2 5 5 auxiliary circuits 1 2 battery 4 2 5 1 buttons push 3 1 bypass time delay 1 5 2 1 3 1 C cable lugs 1 1 preparation 1 1 catalog number inside cover cleaning 3 1 connections engine control contact 1 2 line 1 1 contact position indicators 1 3 contacts auxiliary 1 2 engine control 1 2 main 1 3 3 1 source availability signal 5 2 control features 5 1 load disconnect 5 4 motor load transfer 5 4 plant exerciser 5 1 5 2 5 3 controller 4 1 4 2 codes cover cover removal 4 2 disconnecting 3 1 time delay potentiometers 4 2 D DIP Switches 4 1 4 2 5 1 5 2 5 4 E electrical operation 1 5 engine exerciser 5 1 5 2 5 3 engine starting contacts 1 2 F features see control features frequency pickup and dropout settings 4 1 functional test 1 3 1 4 1 5 Printed in U S A INDEX G ground controller 1 1 H handle maintenance 1 3 warning 1 3 harness 1 2 disconnect plugs 3 1 HELP 800 800 2726 ASCO customercare asco com inphase monitor 5 4 inspection 3 1 installation 1 1 L labels