Home
        Emerson V150 Instruction Manual
         Contents
1.    Packing Constructions    Carbon Steel Valve Bodies  Wire reinforced graphite  stem packing  AISI 4130 nitrided packing gland    Stainless Steel  Wire reinforced graphite stem  packing  316 SST nitrided packing gland    Dimensions    Contact your Emerson Process Management sales  office    Standard Flow Direction    Preferred Flow Direction  Preferred flow for optimal  sealing is forward into the integral seat    Flow Coefficients    Contact your Emerson Process Management sales  office    Maximum Ball Rotation  90 degrees    Actuator Mounting    The preferred mounting orientation is vertical  Other  orientations are acceptable    Approximate Weight    Contact your Emerson Process Management sales  office    Options    E Reduced port  W Double reduced ports    WE Expanded outlet  W Scraper seats  W HVOF  coating options  W Bi directional sealing  W High  cycle constructions  W Lockouts  W Spray and fused  coatings    1  The pressure temperature limits in this bulletin  and any applicable code or standard limitation  should not be exceeded     Instruction Manual Z500 Valve  D103803X012 April 2015   rev B    Table 2  Valve Body Materials  End Connections  and Ratings    Ratings  Bore   Sze NPS   End Connection   Valve Body Materials    w           T  AIN    Buttweld  Socketweld  FNPT   RF  RTJ    Buttweld  RF  RTJ    Buttweld  Socketweld  FNPT   72 RF  RTJ  Buttweld  RF  RTJ    SA105  F22  F91  and F316  RF  RTJ    CL150 through 1500    wI WI NINI NIN  D  CO  co  DM  A       
2.    a a  o o e d  E ae  moo a  A ae  E ae  rr ae  a ae  a ae  a ae  a ae  a ee  a a     continued     Z500 Valve Instruction Manual  April 2015   rev B D103803X012    Table 2  Valve Body Materials  End Connections  and Ratings  continued     EndConnection   Valve Body Materials    0 65  Buttweld  Socketweld  FNPT   Butteld  RE RT  CL2500 Buttweld  Socketweld  FNPT  SA105  F22  F91  and F316  RF  RT   Buttweld  RF  RT     CL3200 and CL4500 BUPENC AROE KE AEA F22  F91  and F316       1  Not available in CL4500     Table 3  Standard Construction Materials for NPS 1 2 through 36 Valves    zsm SSCS    End adapter F22  SA105  F91  and F316  Coatings HVOF chromium carbide    HVOF chromumearbide SSCS       Instruction Manual Z500 Valve  D103803X012 April 2015   rev B    Installation    A WARNING    Always wear protective gloves  clothing  and eyewear when performing any installation operations to avoid personal  injury     Personal injury or equipment damage caused by sudden release of pressure may result if the valve assembly is installed  where service conditions could exceed either the valve body rating or the mating pipe flange joint rating  To avoid such  injury or damage  provide a relief valve for overpressure protection as required by government or accepted industry codes  and good engineering practices     Check with your process or safety engineer for any additional measures that must be taken to protect against process  media     If installing into an existing application  
3.   Metal seated ball valves have high torques  Consult your Emerson Process Management sales office for more    information       Valves operate clockwise to close and counterclockwise to open  Gears and actuators are marked with arrows and    symbols to show valve position and operating direction  Lever operated valves have an integral lockplate so that  only the correct operating direction is possible  The lockplate has the    O    for open and the    C    for closed marked to  show proper position  The lever is always aligned with the ball bore for positive proof of ball position  Gears and  actuators have adjustable stops for proper ball positioning       The ball is mate lapped to the end adapter seat  The top of the stem is marked to show the proper orientation of the    lapped side of the ball       This valve should be either normally open or normally closed  Throttling with this valve is not recommended for    extended periods  Throttling for brief periods during startup or shutdown is allowed     Maintenance    Va    lve parts are subject to normal wear and must be inspected and replaced as necessary  The frequency of inspection    and replacement depends upon the severity of service conditions     A WARNING    Avoid personal injury from sudden release of process pressure  Before performing any maintenance operations     iF    Do not remove the actuator from the valve while the valve is still pressurized     Disconnect any operating lines providing air pressure  elec
4.  or packing rings        Check with your process or safety engineer for any additional measures that must be taken to protect against process  media     Instruction Manual Z500 Valve  D103803X012 April 2015   rev B    Figure 3  Sectional View    a LOCKPLATE             METAL BODY  SUPPORT BUSHING GASKET   HIGH CYCLE  BRACKET ONLY   SEAT HOLDER   STEM  ae ADAPTER  INTEGRAL    SIDE MOUNTED METAL SEAT              BRACKET UPSTREAM  SEAT  BELLEVILLE  SPRING STEM a END ADAPTER  PACKING STUD       AND BELLEVILLE  WASHERS      PACKING GLAND N    BALL  AL om  STUD NUT  VALVE BODY    X1207    Note      T gt  Seat holder is standard on welded and threaded end connections in 0 65  1 15  and 1 5 inch bores only  Bidirectional option must be specified for all other  constructions     11    Z500 Valve Instruction Manual  April 2015   rev B D103803X012      Loosen the packing studs      Remove the packing rings from the packing box  being careful not to damage the packing box      Inspect the clean packing box to ensure all surfaces are clean and undamaged      Insert the zero clearance washer  Us the packing flange to press the washer into position      Insert the bottom end ring of the stem packing  Use the packing flange to press the bottom end ring into position       Insert the die formed rings  Use the packing flange to press the ring into position     Dum BRWN  c    Figure 4  Assembly Steps       Figure 5  Insert Top End Ring       7  Insert the top end ring of stem packing  Use the 
5. Instruction Manual Z500 Valve  D103803X012 April 2015   rev B    Fisher   Z500 Severe Service Ball Valves       Contents Figure 1  Fisher Z500 Severe Service Ball Valve  Introduction 144644acccheeudda66040n aed eactdea 1  Scope of Manual             0  cc eee cece cee 1  DESCHPUON   a2 cen seb udeeeuGeeeed Aceeeeeeaes 1  Specifications          nonsen cee cence ees 1  NSCAUAUION 204 accdeeneetenesteeewenes ea Gin 5  ODGIGUON siers snem poe omea newer ae ete ees 7  Maintenant  Areucees 4 eco etude E aup 8  Troubleshooting           0 0 cece cece eee eee es 9  Packing Replacement               000 c eee eee 10  Actuator Mounting               cc eee eee eee 13  Parts Ordering          cece ccc cece eee eens 18  PARSLISC oueit enean E eek tanedeaamies cane 18  Introduction    Scope of Manual    This instruction manual provides installation  operation  maintenance  and parts information for the Fisher Z500  Severe Service Ball Valve  see figure 1      Do not install  operate  or maintain Z500 valves without being fully trained and qualified in valve  actuator  and  accessory installation  operation  and maintenance  To avoid personal injury or property damage  it is important to  carefully read  understand  and follow all the contents of this manual  including all safety cautions and warnings  If you  have any questions about these instructions  contact your Emerson Process Management sales office before  proceeding        Description    The Z500 severe service ball valve is a sp
6. als must be removed to allow a complete inspection     2  Inspect the actuator  if included  for damage and then cycle the valve with the actuator from open  the normal  shipping position  to closed to open to ensure proper functioning     CAUTION    Make sure the valve is installed in the correct orientation  Put the high pressure side  body side  on the upstream side  The  arrow on the valve should point from the high pressure to low pressure side when the valve is closed  The valve could be  damaged if installed incorrectly     Weld End Valves    Emerson Process Management is not responsible for improper installation or inspection of any valve which falls outside the  criteria presented in this instruction manual  Requests for additional information on unique situations should be directed  to your Emerson Process Management sales office     CAUTION    Weld fill between the valve and pipe should never be used to correct for improper pipe installation length or misalignment   Additional welding beyond what is required may cause the valve to reach higher temperatures and have a larger  heat affected zone  which can cause permanent damage to the valve or its components     For additional information  refer to ASME Boiler and Pressure Vessel Code Section IX     Instruction Manual Z500 Valve  D103803X012 April 2015   rev B    Procedure    Initial Preparation    1   2     Aa W    6     Ensure the valve is in the fully open position so that vital sealing areas of the ball are not 
7. also refer to the WARNING at the beginning of the Maintenance section in this  instruction manual     A WARNING    When ordered  the valve configuration and construction materials were selected to meet particular pressure  temperature   pressure drop  and controlled fluid conditions  Responsibility for the safety of process media and compatibility of valve  materials with process media rests solely with the purchaser and end user  To avoid possible personal injury and because  some valve trim material combinations are limited in their pressure drop and temperature ranges  do not apply any other  conditions to the valve without first contacting your Emerson Process Management sales office     A WARNING    The valve drive shaft is not necessarily grounded to the pipeline when installed  Personal injury or property damage could  result from an explosion caused by a discharge of static electricity from valve components if the process fluid or the  atmosphere around the valve is flammable  If the atmosphere around the valve or the process fluid is flammable   electrically bond the drive shaft to the valve     A WARNING    Personal injury could result from packing leakage  Valve packing was tightened before shipment  however the packing  might require some readjustment to meet specific service conditions  Check with your process or safety engineer for any  additional measures that must be taken to protect against process media   When a valve is shipped bare stem    a  Valve is ship
8. applicable torque after everything is aligned properly     Figure 14  Handlever Assembly       12  Insert the lever through the hole on the stem adapter  Thread in the set screw on top of the stem adapter to hold  the lever in place     Instruction Manual Z500 Valve  D103803X012 April 2015   rev B    Table 5  Packing Flange Bolt Torque Values    BOLT SIZE RECOMMENDED TORQUE    Ibf   ft Ibf    in       Table 6  Assembly Stand Off    NOMINAL BALL SIZE   STANDOFF MINIMUM STANDOFF MAXIMUM    o nm   m               N           F    N    a A E a E  088 0 0388 re  D 080 ta 80  e f a   oa   o o a o o o    altel      1  Contact your Emerson Process Management sales office for additional sizes     a          17    Z500 Valve Instruction Manual  April 2015   rev B D103803X012    Parts Ordering    A serial number is assigned to each valve and stamped on the nameplate  Always refer to the valve serial number when  corresponding with your Emerson Process Management sales office regarding spare parts or technical information     A WARNING    Use only genuine Fisher replacement parts  Components that are not supplied by Emerson Process Management should  not  under any circumstances  be used in any Fisher valve  because they will void your warranty  might adversely affect the  performance of the valve  and could give rise to personal injury and property damage     Pa rts List Key Description    7 Valve Body Gasket  8 End Adapter    a 9 Body Bolts  Note 10   Body Nuts  Contact your Emerson Pr
9. ct your Emerson Process Management sales office for written  guidance based on pipe and valve materials       Apply post weld heat treat in accordance with valve material and code requirements  Only local post weld heat treat    on each end of the valve must be used     Final Inspection after Post Weld Heat Treatment    After post weld heat treat  verify valve body studs and packing studs are tight     CAUTION    Before cycling the valve in the line  make sure the line is clean of weld slag and other debris that could damage the valve   Cycle the valve after installation to ensure proper functioning     ls    Cycle the valve to verify proper operation  Ensure that the torque required to cycle the valve has remained within  acceptable limits     2  Verify that the body and packing bolting are tightened to the correct torque per tables 4 and 5     3  Install proper insulation as required for insulated piping systems     Operation    1     No routine maintenance or lubrication is required  No tightening of body studs should be necessary  Packing  bolting may be retightened if a stem packing leak is noted during operation     N    Z500 Valve Instruction Manual  April 2015   rev B D103803X012      Actuators supplied with the valve may require maintenance per the actuator manufacturer s recommendations  For    valves supplied with gears  the grease in the gearbox might need to be cleaned out and replaced periodically  Use  only high temperature grease recommended for gearboxes     
10. exposed to weld spatter     Never make arc strikes on the valve body or end adapter except inside the groove intended for butt welding or  inside the corner of the joint for socket welding  Arc strikes made on areas which are not intended to be welded can  cause a localized increase in hardness and micro cracks  and can otherwise compromise the intended mechanical  properties of the material       Attach the welding ground strap to the side of the valve being welded     Install the valve into the piping system prior to welding in order to minimize piping loads  Orient the valve with the    stem vertical  if possible  and install the piping such that pipe loads are minimized on the valve       Weld the valve into the line using welders and procedures fully qualified per ASME Boiler and Pressure Vessel Code    Section IX   Ensure that the valve body temperature always remains below 427  C  800  F      Post Weld Heat Treatment    CAUTION    Depending on valve body materials used  post weld heat treating may be required  If so  damage to internal parts is  possible  Do not place the entire valve in a stress relief furnace  or cover the entire valve with stress relieving blankets  as  this could damage the valve  Contact your Emerson Process Management sales office for additional information        _    N      Weld the valve into the line using qualified welders and procedures per Section IX of the ASME Boiler and Pressure    Vessel Code  If specific procedures are required  conta
11. lit body bolted design  full or reduced port  with a blowout proof stem  It can  be lever operated  gear operated  or actuated  The Z500 severe service ball valve line is a simplistic two piece floating  ball design with integral metal seat meant to provide tight metal seating shutoff in high temperature  high pressure   corrosive  and erosive applications across all industries     Specifications    Specifications for these valves are shown in table 1     ay    EMERSON    www Fisher com Process Management    Z500 Valve  April 2015   rev B    Table 1  Specifications    Instruction Manual  D103803X012       Valve Sizes    Z500  NPS W 1 2  W 3 4  E 1  E 1 1 2  E 2  E 3   E 4  E 6  ES  E10  M 12  m 14  m 16  m 18  W 20   E 24  E 26  E 28  E 30 and  E 36    Maximum Working Pressures      Forged Steel Valves  Consistent with applicable  pressure temperature ratings in table 2 per ASME  B16 34  but do not exceed the material temperature  capabilities shown below     Shutoff Classification        Z500  Valves are tested to API 598 in the preferred  flow direction     Class V type B per FCI 70 2 in reverse flow in  bi directional design  Must be specified   For other  shutoff requirements  please contact your Emerson    Process Management sales office    Construction Materials  See table 3    Temperature Capabilities      Welded and Threaded Ends  SA105   800  F  F22  1000  F  F91 1200  F  F316 1400  F    Flanged End Connections  SA105   600  F  F22 800  F   F91 1000  F  F316 1000  F 
12. ocess Management sales office for part number wy  ren  information  eae    13 Mounting Bracket  14 Support Bushing  15 Stem Adapter  Key Description 16 Handle Lever  17 Lever Cap Screw  1    If you need a valve body as a replacement part  order by valve 18    Lock Plate  size  serial number  and desired valve body material  Contact your 19 Plate Cap Screw  Emerson Process Management sales office for assistance  20 Packing Nuts  2 Mounting Bolts 21 Belleville Washer  3 Mounting Nuts 22 Packing Bolts  4 Belleville Spring 23 Packing Gland  5 Upstream Seat   Guide 24  Stem Packing  6 Ball Seat Holder for Bidirectional Shutoff  not shown     18   Recommended spare parts    Instruction Manual  D103803X012    Figure 15  Fisher Z500 Valve Assembly    En  2  EJ       Z500 Valve  April 2015   rev B    Z500 Valve Instruction Manual  April 2015   rev B D103803X012    Neither Emerson  Emerson Process Management  nor any of their affiliated entities assumes responsibility for the selection  use or maintenance  of any product  Responsibility for proper selection  use  and maintenance of any product remains solely with the purchaser and end user     Fisher is a mark owned by one of the companies in the Emerson Process Management business unit of Emerson Electric Co  Emerson Process Management   Emerson  and the Emerson logo are trademarks and service marks of Emerson Electric Co  All other marks are the property of their respective owners     The contents of this publication are presented fo
13. packing flange to press the top end ring into position     Instruction Manual Z500 Valve  D103803X012 April 2015   rev B    Figure 6  Use Packing Flange       8  Bolt up the packing flange  Use Belleville washers in the same orientation as removed  Contact your Emerson  Process Management sales office for additional information  Make sure that the markings on the studs and nuts are  facing out  Tighten the nuts in a star pattern  figure 2   Tighten the nuts with applicable torque  table 5      Figure 7  Bolt Up the Packing Flange       Actuator Mounting    CAUTION    Never use a hammer or excessive force to install the stem adapter on the valve  Improper installation can cause permanent  damage to the valve     1  Mount the stem adapter ontop of the stem with the two keys  Make sure it fits onto the stem easily without  hammering     2  Position the mounting bracket onto the body  Use anti seize lubricant on the bracket studs and nuts  Make sure the  markings on the studs and nuts are facing out  Leave the nuts     Z500 Valve Instruction Manual  April 2015   rev B D103803X012    Figure 8  Mount the Stem Adapter       Figure 9  Position the Mounting Bracket       3  Place the actuator on top of the mounting bracket and stem adapter  in the fail position  Make sure the actuator is  properly aligned with the stem adapter  If not  loosen the mounting bracket to assure proper alignment and  retighten the mounting bracket  Use anti seize lubricant on the actuator studs and nuts  En
14. ped in the open position with exposed stem   b  Valve will include two stem keys   When a valve is shipped with mounting kit only    a  Valve will ship in the in open position   b  Valve will have the mounting finger tight to the valve    c  Customer shall ensure proper mounting of the actuator    Z500 Valve Instruction Manual  April 2015   rev B D103803X012    d  Customer shall ensure valve stem has not been pushed or forced down into the valve  e  Customer shall ensure no binding occurs when mounting the actuator  i  Customer shall ensure the correct alignment is done when mounting the actuator  ii  No hammering or forcing down of the stem adapter is allowed  f  Customer shall ensure all bolts are torqued down appropriately  g  Customer shall ensure the actuator mounting surface is completely flush with the mounting bracket  For  additional information on actuator mounting  refer to the Actuator Mounting section in this instruction manual    on page 13     h  Customer shall ensure the mounting can allow for or can accommodate expansion of the stem or adapter at high  temperatures  See table 6     When a valve is shipped with actuator   a  Valve will be shipped in the required fail position  b  All bolting will be torqued as required    c  Emerson recommends that the customer not remove the actuator for final installation in the line    1  Inspect the valve prior to installation into the piping system to ensure there is no shipping damage  End protectors  and shipping materi
15. r informational purposes only  and while every effort has been made to ensure their accuracy  they are not  to be construed as warranties or guarantees  express or implied  regarding the products or services described herein or their use or applicability  All sales are  governed by our terms and conditions  which are available upon request  We reserve the right to modify or improve the designs or specifications of such  products at any time without notice     Emerson Process Management  Marshalltown  lowa 50158 USA  Sorocaba  18087 Brazil  Chatham  Kent ME4 4QZ UK  Dubai  United Arab Emirates  Singapore 128461 Singapore    www Fisher com E M ERSON        2015 Fisher Controls International LLC  All rights reserved                
16. r solenoid or quick exhaust valve  Refer to actuator  manufacturer s specifications     Valve will not Rotate      Valve body ID or bore is clogged   Flush or clean valve ID and try to cycle valve      Actuator is not operating correctly or has failed   Replace or repair actuator and try to cycle valve       Stem keys have sheared   Remove stem adapter and determine why keys sheared  insert new keys  reassemble and  try to cycle valve     Valve Stem Packing Leaking       Packing flange bolting is loose   Tighten packing bolting  See Packing Replacement section  step 7 on page 13 of  this instruction manual        Packing is damaged or improperly installed   Depressurize valve  remove old packing and replace with new  assembly per assembly instruction steps 3 to 5        Actuator misalignment   Check for actuator misalignment     Valve Body Gasket Leaking     Body bolting is loose   Tighten body bolting per table 4 and figure 2        Body gasket damaged   Contact your Emerson Process Management sales office     Table 4  Body Bolt Torque Values  BOLT SIZE RECOMMENDED TORQUE    a a       Z500 Valve Instruction Manual  April 2015   rev B D103803X012    Figure 2  Bolting Tightening Pattern    OID Ore  ee     OH    Valve Leaking through Ball or Seating Area         Valve body ID or bore is clogged   Flush or clean valve ID and try to cycle valve      Valve is not fully closed   Close valve  taking care not to over torque       Actuator travel stops are not set correctly   Set stop
17. s and cycle  checking for leaks      Seat or Ball is damaged   Contact your Emerson Process Management sales office for repair        Belleville spring is collapsed     Contact your Emerson Process Management sales office for repair     Note    If you need additional trouble shooting assistance  please contact your Emerson Process Management sales office     Packing Replacement    A WARNING    Avoid personal injury from sudden release of process pressure  Before performing any maintenance operations      Do not remove the actuator from the valve while the valve is still pressurized        Disconnect any operating lines providing air pressure  electric power  or a control signal to the actuator  Be sure the  actuator cannot suddenly open or close the valve        Use bypass valves or completely shut off the process to isolate the valve from process pressure  Relieve process pressure  from both sides of the valve  Drain the process media from both sides of the valve        Vent the power actuator loading pressure and relieve any actuator spring precompression      Use lock out procedures to be sure that the above measures stay in effect while you work on the equipment      Always wear protective gloves  clothing  and eyewear when performing any maintenance operations        The valve packing area may contain process fluids that are pressurized  even when the valve has been removed from the  pipeline  Process fluids may spray out under pressure when removing the packing hardware
18. sure the markings on  the studs and nuts are facing out  Ensure the mounting can allow or can accommodate expansion of the stem or  adapter at high temperature  Reference table 6     4  Tighten the actuator and mounting bracket studs to the applicable torque after everything is aligned properly     5  Install the actuator hand wheel  if present  with key and retention plate  Install the indicator plate on top of the  actuator     Instruction Manual Z500 Valve    D103803X012 April 2015   rev B    Figure 10  Place the Actuator on Top of the Mounting Bracket       Y       Hand Lever    6     Position the mounting bracket onto the body  Use anti seize lubricant on the bracket studs and nuts  Make sure the  markings on the studs and nuts are facing out  Leave the nuts finger tight     7  Insert the support bushing into the allotted slot of the mounting bracket   8  Mount the stem adapter on top of the stem with the two keys  Make sure it fits onto the stem easily without    hammering  Make sure the mark is facing the lapped side of the ball end adapter     Z500 Valve Instruction Manual  April 2015   rev B D103803X012    Figure 12  Stem Adapter       9  Place the lock plate on top of the mounting bracket  Note the orientation of the open    O    and closed    C     markings     Figure 13  Lock Plate       10  Thread on the socket head cap screws  using anti seize lubricant  from the underside of the mounting bracket     11  Tighten the mounting bracket and lockplate bolting to the 
19. tric power  or a control signal to the actuator  Be sure the  actuator cannot suddenly open or close the valve     Use bypass valves or completely shut off the process to isolate the valve from process pressure  Relieve process pressure  from both sides of the valve  Drain the process media from both sides of the valve     Vent the power actuator loading pressure and relieve any actuator spring precompression   Use lock out procedures to be sure that the above measures stay in effect while you work on the equipment   Always wear protective gloves  clothing  and eyewear when performing any maintenance operations     The valve packing area may contain process fluids that are pressurized  even when the valve has been removed from the  pipeline  Process fluids may spray out under pressure when removing the packing hardware or packing rings     Check with your process or safety engineer for any additional measures that must be taken to protect against process  media     If valve maintenance is required  contact your Emerson Process Management sales office     Instruction Manual Z500 Valve  D103803X012 April 2015   rev B    Troubleshooting    Operation      Stem adapter actuator may be misaligned   Remove actuator and stem adapter  then reassemble per assembly  procedures for actuators       Over tightened stem packing   Loosen packing to hand tight  cycle valve and retighten per procedures following  torque table 5       Inadequate air supply   Increase air supply or install large
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
ASTAT S - Gepowercontrols.com  manual do proprietário  Samsung D880 Uživatelská přiručka  Tarjeta Adaptadora de Perfil Bajo PCI Express a 8 Puertos Serie  Bedienungsanleitung  AH-7KP  ~~~YH2633-1/YH2633R-1 第2リニューアル版のお知らせ!!~~~  Samsung Galaxy Grand Neo Наръчник за потребителя    Copyright © All rights reserved. 