Home
Craftsman AXS 706.59668 User's Manual
Contents
1. 706 596680 6 Drawer Chest 706 596690 7 Drawer Roll A Way Section 1612 1613 1614 1615 1616 1617 1618 1623 1624 1625 Owners Manual Craftsman 6 Drawer AXS Chest Description Chest Top and Facia Drawer and Work Surface Bottom Replacement Top Wiring Harness Harness Grommet Chest Top without Task Light Task Light Replacement Locking System Lock Replacement Striker Replacement Drawer Front Replacement CHEST TOP INSTALLATION AND REMOVAL With task light CRAFTSMAN decided 3 8 Wrench Chest Top Removal Chest Top Installation CH EST TOP AND FACIA Disconnect power from unit Connect wiring harness to top PARTS REPLACEMENT Remove enough drawers to reach the Position top on unit top back inside of the unit See Attach using 4 screws Drawer installation and removal e Make sure the back of the actuator Push actuator rod to back of unit to rod is inserted into the actuator rod disconnect from back of lock Move holder in the back of the unit actuator rod for access e Push actuator rod toward back of unit Remove 4 screws holding top in and line up with lock Insert the place actuator rod into the back of the lock Lift top off of unit enough to reach the Test lock operation wiring harness Reinstall drawers Disconnect wiring harness from unit Reconnect power to the unit Remove top from unit Chest Top with light Top Press to release Facia D
2. Disconnect power from unit Remove enough drawers to reach the top back inside of the unit See Drawer installation and removal Push actuator rod to back of unit to disconnect from back of lock Move actuator rod for access Remove 4 screws holding top in place Lift top off of unit enough to reach the wiring harness Disconnect wiring harness from unit Remove top from unit Press to release Chest Top installation Connect wiring harness to top Position top on unit Attach using 4 screws Make sure the back of the actuator rod is inserted into the actuator rod holder in the back of the unit Push actuator rod toward back of unit and line up with lock Insert the actuator rod into the back of the lock Test lock operation Reinstall drawers Reconnect power to the unit Top Disconnect actuator rod 7 Remove screws DRAWER AND WORK SURFACE INSTALLATION AND REMOVAL Note For pull out work surface without task light follow drawer removal instructions DRAWER Empty the drawer Fully extend the drawer Release Lever Style Lift or lower depending on the slide the release lever on both sides this allows the slides to ride over the stops Pull out to remove Tab Style Depress the release tabs on both sides this allows the slides to ride over the stops Pull out to remove To reinstall carefully align the slides and push the drawer into the unit until th
3. over the stops Pull out to remove Tab Style Depress the release tabs on both sides this allows the slides to ride over the stops Pull out to remove To reinstall carefully align the slides and push the drawer into the unit until the drawer stops PULL OUT WORK SURFACE WITH TASK LIGHT Removal Disconnect the power from the unit Remove enough drawers to gain access to connections in the back of the roll away behind the work surface Unplug work surface cord from back of roll away Remove and save back retaining clip Disconnect chain inside back of roll away Move chain toward large round part of slot Pull out to remove Remove the work surface See drawer removal instructions Retaining Installation To reinstall carefully align the slides and push the work surface into the unit until the work surface stops Depress release tabs in back corners of the extendable work surface Push the work surface into the unit to the fully retracted position Extend work surface far enough to gain access to connections in back Connect chain inside back of roll away Insert chain into the large round part of the slot Slide chain to small end of slot Insert retaining clip to hold chain in place Plug work surface cord into back of roll away Reconnect power to the unit See Connecting power Check work surface and task lighting for proper operation Reinstall drawers CRAFTSMA
4. Timer oF CLS sars Clock St E gt CO re Alarm Set E an pa Q x re Gi 7 Light Temp inside Date Temp outside Accessory required CRAFTSMAN DRAWER AND WORK SURFACE PARTS REPLACEMENT Work Surface Drawer Slide Sears Roebuck and Co Hoffman Estates IL 60179 USA SLIDE REPLACEMENT Tools Required Drill 5 32 Drill bit Rivet gun Removal Installation Remove drawer or work surface from Separate slide drawer member from unit See drawer and work surface installation and removal unit member See drawer and work surface installation and removal Carefully drill out rivet holding slide Install new slide unit member Install drawer member to drawer or work back hanger first surface Rivet unit member in place as shown Rotate front of slide drawer member Install drawer member Install back down and out hanger first Pull slide forward to remove Install rivet to hold slide drawer Carefully drill out rivet holding slide member in place unit member in place Reinstall drawer or work surface into Pull slide unit member forward to unit See drawer and work surface remove installation and removal Back hanger Unit Right side Hanger pointed up Left side Slide Drawer F1613 2 DRAWER AND WORK SURFACE REPLACEMENT Tools Required Drill 5 32 Drill bit Rivet gun Crosstip screwdriver Removal Remove drawer or work sur
5. place e Make sure the back of the lock rod is inserted into the lock rod holder in the back of the unit e Push the lock rod toward the back of unit the and line up with lock Insert the lock rod into the back of the lock Test lock operation Reinstall drawers Reconnect power to the unit retaining clip screws F1616 DRAWER INSTALLATION AND REMOVAL Empty the drawer Fully extend the drawer Release Lever Style Lift or lower depending on the slide the release lever on both sides this allows the slides to ride over the stops Pull out to remove Tab Style Depress the release tabs on both sides this allows the slides to ride over the stops Pull out to remove To reinstall carefully align the slides and push the drawer into the unit until the drawer stops CRAFTSMAN TASK LIGHT REPLACEMENT Tools Required Screwdriver Crosstip Removal Installation Disconnect power from the unit Plug in new light Fully extend task light assembly Position new light in unit in same Make note of light orientation orientation as original light Remove 6 mounting screws to Fasten new light in place with 6 new remove light mounting screws Unplug light Reconnect power to unit Press to i Mounting screws F1617 CRAFTSMAN LOCKING SYSTEM Parts Replacement Actuator Channel Actuator Rod Bracket Actuator rod ACTUATOR ROD A
6. AWER Empty the drawer Fully extend the drawer Release Lever Style Lift or lower depending on the slide the release lever on both sides this allows the slides to ride over the stops Pull out to remove Tab Style Depress the release tabs on both sides this allows the slides to ride over the stops Pull out to remove To reinstall carefully align the slides and push the drawer into the unit until the drawer stops PULL OUT WORK SURFACE WITH TASK LIGHT Removal Disconnect the power from the unit Remove enough drawers to gain access to connections in the back of the roll away behind the work surface Follow drawer removal instructions Unplug work surface cord from back of roll away Remove and save back retaining clip Disconnect chain inside back of roll away Move chain toward large round part of slot Pull out to remove Remove the work surface See drawer removal instructions Retaining Installation To reinstall carefully align the slides and push the work surface into the unit until the work surface stops Depress release tabs in back corners of the extendable work surface Push the work surface into the unit to the fully retracted position Extend work surface far enough to gain access to connections in back Connect chain inside back of roll away Insert chain into the large round part of the slot Slide chain to small end of slot Insert retainin
7. N STRIKER REPLACEMENT Tools Required Screwdriver Removal Drawer installation and removal Remove drawer from unit Empty the drawer Turn drawer upside down e Fully extend the drawer Depress 2 detents Push striker in to Release remove Installation stops Pull out to Sears Roebuck and Co Hoffman Estates IL 60179 USA Depress detents Lever Style Lift or a lower depending on the slide the release lever on both sides this allows the slides to ride over the stops Pull out to remove Tab Style Depress the release tabs on both sides this allows the slides to ride over the Turn drawer right side up remove Position striker in drawer Push striker toward back of drawer until striker snaps into place Reinstall drawer To reinstall carefully align the slides and push the drawer into the unit until the drawer stops F1624 CRAFTSMAN DRAWER FRONT REPLACEMENT Tools Required Crosstip screwdriver Removal Installation Remove retaining screw s Position drawer front on drawer Slide drawer front assembly as assembly indicated to unhook mounting tabs Insert mounting tabs into notches on Pull out to remove drawer Slide drawer front over to attach Install retaining screw s to hold drawer front in place Mounting D YP 1 Notch Retaining screws drawer only Drawers 4 inches deep or more only Sears Roebuck and Co Hoffm
8. ND ACTUATOR CHANNEL REPLACEMENT ACTUATOR ROD AND ACTUATOR CHANNEL REMOVAL Disconnect power from the unit Remove work surface Roll away only Remove pull out work surface Roll away only See drawer and work surface installation and removal Remove enough drawers to reach the top back inside of the unit See drawer and work surface installation and removal Push actuator rod to back of unit to disconnect from back of lock Rotate actuator rod straight down Pull out to remove ACTUATOR CHANNEL REMOVAL Move actuator channel fully to the right to remove from mounting flanges Remove lock bar through top of unit Move actuator channel fully to right to remove ACTUATOR CHANNEL INSTALLATION Install slot in actuator channel over pin on lock bar Move actuator channel fully to the right Insert top flanges on actuator channel into mounting flanges on inside top of unit ACTUATOR ROD INSTALLATION Insert actuator rod into hole in actuator channel as shown Insert back of actuator rod into actuator rod holder in top back of unit Push actuator rod toward back of unit and line up with lock Insert actuator rod into back of lock Test lock operation Reinstall drawers Reconnect power to the unit Actuator rod to actuator channel Flexible tab in front Lockbar ees ye a ae i ee 3 v i ee a W i Pa Sears Roebuck and Co Hoffman Estates IL 60179 USA F1618 2 ACTUATOR
9. ROD BRACKET INSTALLATION AND REMOVAL Removal Disconnect power from unit For roll aways remove work surface See drawer and work surface installation and removal Remove enough drawers to reach the top back inside of the unit See Drawer and Work surface installation and removal Remove top from unit See top installation and removal for your unit Pull actuator rod bracket forward Lift out to remove Installation Insert actuator rod bracket into hole in back corner of unit Ensure actuator rod bracket snaps into place Note The flexible tab should be in front Reinstall top in unit Insert back of actuator rod into actuator rod holder in top back of unit Push actuator rod toward back of unit and line up with lock Insert actuator rod into back of lock Test lock operation Reinstall drawers Reconnect power to the unit LOCK BAR INSTALLATION AND REMOVAL Removal Disconnect power from the unit For roll aways remove work surface See drawer and work surface installation and removal Remove all drawers Remove actuator rod and actuator channel See actuator rod and actuator channel installation and removal Remove top from unit See top removal for your unit Lift lock bar out through hole in top of unit Removal Insert lock bar through hole in top of unit Slide lock bar down through lock bar guide Reinstall top on unit Rein
10. an Estates IL 60179 USA F1625
11. arness to top Position top on unit Attach using 4 screws Position lock in unit Install retaining clip to hold lock in place Make sure the back of the lock rod is inserted into the lock rod holder in the back of the unit Push the lock rod toward the back of unit the and line up with lock Insert the lock rod into the back of the lock Test lock operation Reinstall drawers Reinstall work surface Reconnect power to the unit screws DRAWER AND WORK SURFACE INSTALLATION AND REMOVAL Note For pull out work surface without task light follow drawer removal instructions DRAWER Empty the drawer Fully extend the drawer Release Lever Style Lift or lower depending on the slide the release lever on both sides this allows the slides to ride over the stops Pull out to remove Tab Style Depress the release tabs on both sides this allows the slides to ride over the stops Pull out to remove To reinstall carefully align the slides and push the drawer into the unit until the drawer stops PULL OUT WORK SURFACE WITH TASK LIGHT Removal Disconnect the power from the unit Remove enough drawers to gain access to connections in the back of the roll away behind the work surface Unplug work surface cord from back of roll away Remove and save back retaining clip Disconnect chain inside back of roll away Move chain toward large round part of slot Pull
12. e drawer stops PULL OUT WORK SURFACE WITH TASK LIGHT Removal Disconnect the power from the unit Remove enough drawers to gain access to connections in the back of the roll away behind the work surface Unplug work surface cord from back of roll away Remove and save back retaining clip Disconnect chain inside back of roll away Move chain toward large round part of slot Pull out to remove Remove the work surface See drawer removal instructions Retaining Installation To reinstall carefully align the slides and push the work surface into the unit until the work surface stops Depress release tabs in back corners of the extendable work surface Push the work surface into the unit to the fully retracted position Extend work surface far enough to gain access to connections in back Connect chain inside back of roll away Insert chain into the large round part of the slot Slide chain to small end of slot Insert retaining clip to hold chain in place Plug work surface cord into back of roll away Reconnect power to the unit See Connecting power Check work surface and task lighting for proper operation Reinstall drawers CRAFTSMAN LOCK REPLACEMENT Removal Disconnect power from unit For roll aways remove work surface See drawer and work surface installation and removal Remove enough drawers to reach the lock retaining clip behind the lock Remove lock reta
13. face from unit See Drawer and Work surface installation and removal Carefully drill out rivets holding slides to drawer Rotate front of slide down and out Pull slide forward to remove Drawers only Remove striker See striker replacement Remove drawer front See drawer front replacement Right side Slide Striker Left side Slide Installation Install slides on new drawer or work surface Install back hangers first Install rivets to hold slides in place Drawers only Install striker See striker replacement Install drawer front See drawer front replacement Drawers and work surface Install drawer or work surface in unit See drawer and work surface installation and removal Hanger pointed up Drawer front DRAWER FRONT INSTALLATION AND REMOVAL Tools Required Crosstip screwdriver Removal Remove retaining screw s Slide drawer front assembly as indicated to unhook mounting tabs Pull out to remove Installation Position drawer front on drawer assembly Insert mounting tabs into notches on drawer Slide drawer front over to attach Install retaining screw s to hold drawer front in place Mounting tab Notch Retaining Screws drawer only Drawers 4 inches deep or more only DRAWER AND WORK SURFACE INSTALLATION AND REMOVAL Note For pull out work surface without task light follow drawer removal instructions DR
14. g clip to hold chain in place Plug work surface cord into back of roll away Reconnect power to the unit See Connecting power Check work surface and task lighting for proper operation Reinstall drawers CRAFTSMAN BOTTOM REPLACEMENT Tools Required Socket Wrench 5 16 Socket Removal Disconnect power from the unit Remove contents from drawers Carefully lay the chest on its back Take care to prevent scratches or damage to the unit Remove 5 screws holding bottom on unit Remove bottom from unit Remove counterweight from plastic bottom ANANN a SS SY WV LO NN NIS ZN Aa S Installation JY Install counterweight in new plastic bottom Position new chest bottom on chest Attach using 5 new mounting screws Return the chest to its upright position Reconnect power to the unit Counterweight Mounting screws F1614 CRAFTSMAN TOP WIRING HARNESS HARNESS GROMMET Parts Replacement Roll away top Wiring harness Sears Roebuck and Co Hoffman Estates IL 60179 USA Sx Harness grommet WIRING HARNESS REPLACEMENT HARNESS GROMMET REPLACEMENT Tools Required 3 8 Wrench WIRING HARNESS AND HARNESS GROMMET REMOVAL Disconnect power from unit Remove pull out work surface and enough drawers to reach the top back inside of the unit See drawer and work surface installation and removal Remove lock and top from rol
15. ining clip Pull lock out to remove Installation Position lock in unit Install retaining clip to hold lock in place Make sure the back of the actuator rod is inserted into the actuator rod holder in the back of the unit Push actuator rod toward back of unit and line up with lock Insert the actuator rod into the back of the lock Test lock operation Reinstall drawers Actuator rod holder Lock retaining clip Sears Roebuck and Co Hoffman Estates IL 60179 USA Rekeying MASTERLOCK ONE KEY lock The MASTERLOCK ONE KEY learning lock system allows the chest and cabinet to be keyed alike The lock can also be keyed to most house keys Insert current key and turn lock to the right until access notch appears at top of lock Depress and hold catch through access notch using re keying tool provided Remove key Insert new key Release catch Turn lock to center position Remove key Note Catch must be depressed to insert or remove key in right hand position Catch may be released between keys Access Re keying tool F1623 DRAWER AND WORK SURFACE INSTALLATION AND REMOVAL Note For pull out work surface without task light follow drawer removal instructions DRAWER Empty the drawer Fully extend the drawer Release Lever Style Lift or lower depending on the slide the release lever on both sides this allows the slides to ride
16. isconnect actuator rod Information Center Remove screws Sears Roebuck and Co Hoffman Estates IL 60179 USA F1612 2 INFORMATION CENTER INSTALLATION AND REMOVAL Tools Required Screwdriver Crosstip Tape Removal Installation Disconnect power from the unit Plug in information center Remove enough drawers to reach the Position information center in unit retaining screw under the information Tighten retaining screw enough to center See removing and installing hold information center in place Do drawers not overtighten Loosen do not remove the retaining Reinstall drawers See Removing screw under the information center and installing drawers Pull the information center straight out Reconnect power to unit to remove Set information center as desired Note Tape wire to unit before unplugging the information center This will prevent the wire from retracting into the unit Unplug the information center See information center operation Tape wire in Press to place before release disconnecting Loosen retaining screw FACIA INSTALLATION AND REMOVAL Tools Required 3 8 Wrench drill 5 32 drill bit Rivet gun Pliers To remove facia Remove enough drawers to reach the top back inside of the chest Remove lock See lock installation and removal Remove chest top See chest top installation and removal Carefully drill out 2 rivets ho
17. l away See roll away top removal and installation Remove harness grommet from roll away WIRING HARNESS REMOVAL For units with accent lighting under rolil away remove bottom drawer and disconnect accent lighting Remove wiring harness through hole in roll away top Insert assembly into track in unit WIRING HARNESS AND HARNESS GROMMET INSTALLATION Insert new wiring harness assembly into mounting track through hole in top of roll away connector should be on top Slide wiring harness assembly to bottom of roll away Install harness grommet over connector Insert into hole in top of roll away Reinstall top and lock If unit has accent lighting reconnect accent lighting Test lock operation Reinstall drawers Reconnect power to the unit Harness Grommet TOP INSTALLATION AND REMOVAL Tools Required Screwdriver Crosstip Roll away top removal Disconnect power from unit Remove pull out work surface See drawer and work surface installation and removal Remove enough drawers to reach the top back inside of the unit See Drawer and Work surface installation and removal Remove lock retaining clip Pull lock out to remove Remove 4 screws holding top in place Lift top off of unit enough to reach the wiring harness Disconnect wiring harness from unit Remove top from unit Press to release Lock rod holder Lock rod Roll away top installation Connect wiring h
18. lding facia to chest Remove facia To reinstall facia Position facia on unit Make sure connector is on top of chest Attach using 2 rivets supplied Reinstall lock chest top and drawers LOCK INSTALLATION AND REMOVAL LOCK INSTALLATION AND REMOVAL Lock To remove lock Actuator Remove enough drawers to reach the iod lock retaining clip behind the lock holder Remove lock retaining clip Pull lock out to remove To reinstall lock Position lock in unit Install retaining clip to hold lock in place retaining Make sure the back of the actuator clip rod is inserted into the actuator rod holder in the back of the unit Push actuator rod toward back of unit and line up with lock insert the actuator rod into the back of the lock Test lock operation Reinstall drawers CONNECTING POWER Ensure that the unit and power cord are clean and dry Insert the round end of the power cord connector into the jack in the back of the unit Plug the cord into an appropriate electrical outlet Fuse block REMOVING AND INSTALLING DRAWERS Empty the drawer Fully extend the drawer Release Lever Style Lift or lower depending on the slide the release lever on both sides this allows the slides to ride over the stops Pull out to remove Tab Style Depress the release tabs on both sides this allows the slides to ride over the stops Pull out to remo
19. out to remove Remove the work surface See drawer removal instructions Retaining Installation To reinstall carefully align the slides and push the work surface into the unit until the work surface stops Depress release tabs in back corners of the extendable work surface Push the work surface into the unit to the fully retracted position Extend work surface far enough to gain access to connections in back Connect chain inside back of roll away Insert chain into the large round part of the slot Slide chain to small end of slot Insert retaining clip to hold chain in place Plug work surface cord into back of roll away Reconnect power to the unit See Connecting power Check work surface and task lighting for proper operation Reinstall drawers CRAFTSMAN CHEST TOP WITHOUT TASK LIGHT Tools Required Screwdriver Crosstip Chest top removal Disconnect power from unit Remove pull out work surface See drawer installation and removal Remove enough drawers to reach the top back inside of the unit See Drawer installation and removal Remove lock retaining clip Pull lock out to remove Remove 4 screws holding top in place Remove top from unit Lock rod holder Sears Roebuck and Co Hoffman Estates IL 60179 USA Lock rod Chest top installation Position top on unit Attach using 4 screws e Position lock in unit Install retaining clip to hold lock in
20. recorded temperatures An audible beep will sound when temperature is reset Setting the alarm Press and hold for at least two seconds Second resets to zero and hour begins to flash Adjust hour using and Pressing toggles to next field Repeat to adjust minute Toggling past minute exits set mode Turning alarm on or off When the alarm is activated the display will show the indicator 22 Press to activate or deactivate the alarm Press to silence alarm when ringing Timer function Press to enter timer mode e Press to start timer Each time is pressed starts or stops timer Press and hold for at least two seconds to reset timer to zero Count down timer function Press and hold for at least two seconds Display shows 00 00 00 and hour begins to flash e Adjust hour using and Pressing toggles to next field Repeat to adjust minute and second Toggling past second exits set mode Note To set timer to 24 hours toggle display to 00 00 00 Press to start count down Each time is pressed starts or stops timer Alarm sounds when timer reaches 00 00 00 Press any button to silence the alarm Clock When in Timer or Count down timer mode press to display current time Press to return to timer or count down timer Alarm aie AM PM Activated Temp y
21. stall actuator channel and actuator rod Test lock operation Reinstall drawers Reconnect power to the unit TOP INSTALLATION AND REMOVAL ROLL AWAYS CHESTS WITHOUT TASK LIGHT Tools Required Screwdriver Crosstip Removal Disconnect power from unit For roll aways remove work surface See drawer and work surface installation and removal Remove enough drawers to reach the top back inside of the unit See Drawer and Work surface installation and removal Remove lock retaining clip Pull lock out to remove Remove 4 screws holding top in place For roll aways lift top off of unit enough to access the wiring harness Disconnect wiring harness from unit Remove top from unit Press to release Actuator rod holder Installation Actuator rod For roll aways connect the wiring harness to unit Position top on unit Attach using 4 screws Position lock in unit Install retaining clip to hold lock in place Make sure the back of the actuator rod is inserted into the actuator rod holder in the back of the unit Push the actuator rod toward the back of unit the and line up with lock Insert the actuator rod into the back of the lock Test lock operation Reinstall drawers Reinstall work surface Reconnect power to the unit Lock retaining clip Remove screws CHEST TOP INSTALLATION AND REMOVAL With task light Tools Required 3 8 Wrench Chest Top Removal
22. ve To reinstall carefully align the slides and push the drawer into the unit until the drawer stops INFORMATION CENTER OPERATION The information center is equipped with a battery backup to maintain memory only The display will not function while power is disconnected from the unit Outside temperature display requires optional outside temperature sensor Display backlight Pressing turns the display backlight on for 15 seconds Setting the current time Press and hold for at least two seconds Second resets to zero and hour begins to flash Press to set am pm or 24 hour mode as desired Note The am pm indicator is not shown in 24 hour mode Adjust hour using and O Pressing toggles to next field Note To toggle to minute without changing hour press then then Cee Adjust minute using and Press to toggle to next field Repeat to adjust Month Day and Year Toggling past year exits set mode Day of week is displayed according to Month Day and Year Temperature Display Pressing toggles inside and outside temperature displays between Celsius and Fahrenheit Pressing toggles inside and outside temperature displays between ACT Actual temperature MIN Minimum recorded temperature since last reset MAX Maximum recorded temperature since last reset Press and hold for at least two seconds to clear inside and outside minimum and maximum
Download Pdf Manuals
Related Search
Related Contents
取扱説明書/742KB Trust GXT 24 Unified Services Router Release Notes - D-Link Honeywell TP9600 User's Manual MAAX 105707-000-001-001 Instructions / Assembly m。nt-beーー QBU-BT Driver Manual.. - Electro Optical Components, Inc. USER MANUAL - Brillian Technology 詳細情報 (HTML形式) KMK/JŻ IDE User's Manual Copyright © All rights reserved.
Failed to retrieve file