Home
Cornelius P/N 631500099 User's Manual
Contents
1. oc lt A Q AM m gt QAQ lt N U ker S Oo LO 3 E CD A Y O BIN STAT SUPPORT INSERT COIL AROUND Figure 3
2. 03 2 630460162 Rev C NZ Z Switches White Lead Condenser Sensor l Plug Bin Thermostat on Top Two Pins of Stacking Cable Plu IMI CORNELIUS INC 2001 2003 See note 1 ERROR DELAY CLEAN PRESSURE Transducer O B J9 5 lt Bridge 477 1 Thickness pot On sis FILL VALVE Off Manufacturing Date B 83 41 36430001 ss C DUMP VALVE Oe 6 GR ee FAN MOTOR AIR COOLED Fan 5 38 COMPRESSOR GR ii Gee WATER PUMP GR 3 Pump HOT GAS 2 NEUTRAL GR N Gas 5 25 1 POWER yay GR o YL 5 gt lt POSI 4 5 52 o q Transformer n Out FStack Triac Com 1 T 1 z O Figure 2 October 9 2003 630460162 Rev C NS RE RNN UMMMMMMMM MO COMM CMM MMi Od SN
3. Crnellus IMI CORNELIUS INC amp One Cornelius Place Anoka MN 55303 6234 Telephone 800 238 3600 Facsimile 800 535 4231 INSTALLATION INSTRUCTIONS BIN STAT KIT P N 631500074 631500099 631500108 631500109 AND 631500116 These Bin Stat kits apply to all X Series Ice makers Table 1 Loose Shipped Parts Item No Part No Name Qty 1 630000837 Thermostat Asy 1 2 07578 Screw TC 08 32 2 3 630460162 Installation Instruction Thermostat 1 4 630900895 Hex Nut 8 32 SS Keps 1 5 620045454 or Bin Stat Support 1 620045455 or 620045456 or 620045457 or 620050327 1 Disconnect power 2 Remove front cover of the unit and the electrical box cover plate For 22 wide units you will need to remove the Grill from the right side of the unit 3 To mount bin thermostat in electrical box A Route wires and connector through grommet in electrical box See Figure 1 B Attach bin thermostat to electrical box with two 08 32 TC screws provided see Figure 1 4 Connect the bin thermostat lead to the circuit board see Figure 2 5 Straighten approximately 12 of capillary tube to go through hole in chassis base Re coil the re mainder Do not disturb the tightly coiled end 6 Insert the 1 4 diameter wire Bin Stat support into the coiled end of capillary tube Carefully wrap 5 turns of free capillary tube tightly around the Bin Stat support Insert the assembly through the hole in the chassis base Route cap
4. illary tube to follow the Bin Stat support as closely as possible see Figure 3 7 Slip eye of Bin Stat support over the 8 32 weld stud in the chassis base If a nut exists on this weld stud remove before assembling the Bin Stat support Secure the Bin Stat support with the 8 32 Keps nut provided in the kit See Figure 3 8 Any excess capillary tubing must be carefully pulled back into the compressor compartment to pre vent ice from damaging it during dispenser operation October 9 2003 IMI CORNELIUS INC 2001 2003 1 630460162 Rev 9 Seal 1 2 diameter hole with sealant RTV 10 Turn bin stat adjustment screw clockwise until it stops Then turn it counterclockwise 1 8 of a turn 11 Reinstall the front cover of the electrical box and the ice machine and reconnect the power Verify that the Bin Stat is working by holding ice on the coiled bare capillary tube The bin stat will allow the ice machine cycle to complete and harvest ice Then the ice machine will shut down Remove the ice from the capillary tube and warm the tube with hand heat The ice machine should start in approxi mately 60 seconds Reinstall front cover and grill 22 units only IFO OO O OCO ELECTRICAL BOX ASY TO CIRCUIT BORD SCREW TC 08 3 dh THERMOSTAT KIT ASY 631500074 COIL TO CHASSIS BASE Figure 1 October 9 2003 IMI CORNELIUS INC 2001 20
Download Pdf Manuals
Related Search
Related Contents
Operating Instructions ND 280 KDDI株式会社プレゼンテーション資料 User Manual PCM-9388 MPC184 Security Co-Processor User`s Manual: PCI Interface 法政就業力通信(第54号_2015年9月) SONIM XP1520 BOLT SL English Manual de Operação PT Copyright © All rights reserved.
Failed to retrieve file