Home

Cooper Lighting CPP/CPS User's Manual

image

Contents

1. SD J METPIN Installation Instructions Small INDOOR CPP CPS Continuous Pendant Visor and Non Visor ee Warnin 8 Before starting any work ensure 2 eS oa that all sources of power are turned off All Vault w visor C Scroll w visor Roundel w visor work must meet local national codes and be a performed by a certified electrician Do not These installation instructions are valid with the above Ametrix styles mount fixtures vertically J box by others Swivel pendant shown End pendant Pendant tube assembly Center pendant assembly Power wire J from J box End screw 10 32 x 5 8 End screw 2x Fixture wire 10 32 x 3 8 Center cover plate Pan head screws 2x Ametrix Cooper Lighting 4675 Holly Street 1121 Highway 74 South Denver CO 80216 Peachtree City GA 30269 P 303 393 1522 P 770 486 4800 www ametrixlighting com www cooperlighting com ADY071477 REV A ECN080352 Printed in USA COOPER Lighting Installation Instructions Sheet 2 of 5 SSD AMETRIN Vault w visor C Scroll w visor Small INDOOR CPP CPS Continuous Pendant Visor and Non Visor Warning Before starting any work ensure that all sources of power are turned off All work must meet local national codes and be Roundel w visor These installation instructions are valid with the above Ametrix styles performed by a certified electrici
2. FSD AMETRIN ee Small INDOOR CPP CPS Continuous Pendant Visor and Non Visor Warning Before starting any work ensure that all sources of power are turned off All Roundel w visor work must meet local national codes and be Vault w visor C Scroll w visor al Ae i i performed by a certified electrician Do not These installation instructions are valid with the above Ametrix styles mount fixtures vertically Fixture wire 10 32 x5 8 End screw Choose first fixture in run First fixture depends on length of run refer to page four 4 for fixture identification The final fixture will have to have the extra wire capped off Secure fixture head to pendant assembly using 10 32x 5 8 end screw Securing first fixture to wired center yoke bracket Power wire from J box Fixture wire First fixture 10 32 x 5 8 End screw 6 32 x 3 8 Pan head screws Center cover plate Remove both 6 32 x3 8 Pan head screws and slide center cover plate down Run power wire from fixture through hub and into center yoke bracket Secure first fixture to center yoke bracket using 10 32 x5 8 end screw Securing additional fixtures in run Fixture wire 10 32 x 5 8 End screw Center cover plate Mount next center or end pendant depending on length of run Run new fixture wire into center yoke bracket Using 10 32 x5 8 end screws secure
3. new fixture head to both pendants Wiring fixtures to J box Power wire from J box Fixture wire Center cover plate 1 Attach wires and ensure connections are properly matched wire nuts by others 2 Replace center cover plate and secure using both 6 32 x 3 8 Pan head screws Ametrix Cooper Lighting 4675 Holly Street 1121 Highway 74 South Denver CO 80216 Peachtree City GA 30269 P 303 393 1522 P 770 486 4800 www ametrixlighting com www cooperlighting com ADY071477 REV A ECN080352 Printed in USA COOPER Lighting Installation Instructions Sheet 5 of 5 FD AMETRIX Vault w visor C Scroll w visor Small INDOOR CPP CPS Continuous Pendant Visor and Non Visor Warning Before starting any work ensure that all sources of power are turned off All work must meet local national codes and be Roundel w visor These installation instructions are valid with the above Ametrix styles performed by a certified electrician Do not mount fixtures vertically Pendant Row Breakdown Installation Sequence ee ee ee ae Sa a E Ps 46 4c OOCSC S E66 eeze ei mic eese a ee ae ey wo on 40 40 Ca oea od 12 oeae id Ce erpa ea eoo P15 142 eea e 16 2 _ 30 30 50 40 aes i72 Neacaeee P19 182 40 40 4040 98 030303040 a 20 8 80 40 40 40 30 P22 a8 4040304040 P23 as 04030A I O 24 234 204040404020 2 234 2040
4. 40404020 P26 254 3040 4040 4030 Custom row configurations are available however pricing may be affected Pendant Row Breakdown Installation a4 4C AC 40 AC AOAC O 2 28 9 0403030304040 30 29 9 3040 40 40 4040 30 a 309 4040 4030 404040 32 319 4040 40 40 404040 a3 319 40404040404040 34 325 2040 4040 40 40 4020 as 345 3040404040404030 3e 355 _ 4C 40 40 40 30 40 40 40 3s 380 4040 40 30 30 30 40 4040 39 39 0 3040 40 40 40 40 40 40 30 390 3040 4040 4040 404030 an 400 40 40 40 40 80 40 40 40 40 a2 0 4C 40 40 40 40 40 40 40 40 as 426 4040 40 40 30 30 30 40 4040 a 48 6 3040 40 40 40 40 40 40 40 30 46 4040 4040 40 30 40 40 40 a 456 4040 40 40 40 40 40 40 4040 48__ _47 1_ 4C 40 40 40 30 30 30 40 40 40 40 a9 48 1 80 40 40 40 40 40 40 40 40 4C 30 P80 49 1 4C 40 40 40 40 30 40 40 40 40 40 ADY071477 REV A ECN080352 Printed in USA a COOPER Lighting
5. an Do not mount fixtures vertically PP Exploded assembly PP mounting 8 32 x1 2 plate Screw 2x PP canopy Pendant yoke 10 32 x5 8 End Screw 1 Secure pendant yoke to pendant tube using both pendant nuts prior to installation PS mounting 8 32 x1 2 plate Screw 2x PS canopy 10 32 x5 8 End screw 1 Secure pendant yoke to pendant tube using both pendant nuts prior to installation 1 Mounting power side pendant to J box Run wiring into pendant tube 8 32 x1 2 Screw J box by others PS mounting plate These instructions are valid for both PP and PS mounting assemblies Secure both pendant assemblies to ceiling before attaching fixture head Remove canopy and allow it to slide down pendant Refer to power orientation supplementary sheet for power location Run wiring from j box down pendant tube and using 8 32 x1 2 Pan head screws secure mounting plate to j box Reinforce J box with additional bracing 2 Mounting non power side pendant 8 32 x1 2 Screw 2x These instructions are valid for both PP and PS mounting assemblies 1 To secure non power pendant remove canopy and allow it to slide down pendant 2 Replace 8 Pan head screws with appropriate fasteners by others Use additional bracing to secure pendant 3 Secure mounting plate on center using dimensions provided on next page Ametrix 4675 Holly Str
6. eet Denver CO 80216 P 303 393 1522 www ametrixlighting com Cooper Lighting 1121 Highway 74 South Peachtree City GA 30269 P 770 486 4800 www cooperlighting com ADY071477 REV A ECN080352 Printed in USA g COOPER Lighting SD J METPIY Installation Instructions SS Small INDOOR CPP CPS Continuous Pendant Visor and Non Visor Warnin 8 Before starting any work ensure that all sources of power are turned off All Vault w visor C Scroll w visor Roundel w visor work must meet local national codes and be 7 Taat 7 z performed by a certified electrician Do not These installation instructions are valid with the above Ametrix styles mount fixtures vertically Center dimensions for PP and PS mounting assemblies i 2ft fixture 28 733 40 3ft fixture 1036 22 4ft fixture 52 1343 PS Pendant Swivel mounting plate dimensions aa fiteom 49 43 3 n ae 4 86 oy a 127 84 105 71 Ametrix 4675 Holly Street Denver CO 80216 P 303 393 1522 www ametrixlighting com Cooper Lighting 1121 Highway 74 South Peachtree City GA 30269 P 770 486 4800 www cooperlighting com ADY071477 REV A ECN080352 Printed in USA COOPER Lighting Installation Instructions Sheet 4 of 5

Download Pdf Manuals

image

Related Search

Related Contents

Westinghouse 52-Inch Instruction Manual  Manual de Instrução AMASSADEIRA SEMI RÁPIDA  Intel Pentium 4 641  Betriebsanleitung  Candice Olson 8218-5H Instructions / Assembly  マニュアルダウンロード 3.1MB  Smeg ST48 Instructions for Installation and Use  

Copyright © All rights reserved.
Failed to retrieve file