Home
Arrow Storage Products OB1014-C1 User's Manual
Contents
1. Adjustment Holes Allow 4 Doors to Meet Evenly Along Their Length Right Door Left Door 4 Keep this Owner s Manual and Assembly Instructions for future reference 33 SOME FACTS ABOUT RUST SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint CM1014 A1 OB1014 C1 697 68103 C1 697 68104 714740408
2. 8934 9367 1038 L 29 49 FrontFlo Front Floor STEP x 8934 ev Frame Assembly EN 119 3 8 3 0m 9367 4 m 9367 ran HOLES Mp OUTSIDE m 10387 EN gt Side Floor Frame 158 5 8 4 0m y 10387 Rear Floor Frame 119 3 8 Y 3 0m 8936 158 5 8 Sides 4 0m 4 0m 3 0m Front amp Rear 119 3 8 3 0m 5986 Rear Wall Angle 2 O Parts Needed For O 10389 Rear Wall Channel 2 O 10388 Side Wall Channel 4 Frame Assemblies O 10391 Side Wall Angle 4 The main frame pieces reinforce the walls These pieces will later be in stalled in the center and at the top edge of the side walls and the rear wall Proceed as follows 1 Overlap the rear wall channel pieces as shown in the figure and fasten the two pieces together with eight bolts as shown 2 Make two side wall channels by overlapping the side wall channel pieces as shown Fasten each set together with eight bolts as shown 3 Overlap the rear wall angle pieces as shown in the figure and fasten them together with one bolt in the center hole 4 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with one bolt thru the sec ond large hole from the end of each part 5 Set the assemblies aside You will use them later Rear Wall Channel 118 1 8 3 0m Side Wall Channels 157 3 8 4 0m Rear Wall Angle A y STEP EXE R
3. Watch the Weather Be sure the day you select to install your building is dry and calm Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground Teamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need Required Required Eye Goggles Work Gloves e No 2 Phillips Screwdriver Step Ladder Optional Time Savers Foundation Preparation With Hardened Magnetic Tip Utility Knife Scissors Wrench Nut Driver Hammer and Nails bos A Be ud or vari Electric Cordless Drill Spade or Shovel noe speed ari win Prins te at Carpenters Level Square Hand Saw Power Saw as much as 40 Tape Measure String for squaring frame e Lumber and or Concrete Selecting and Preparing Your Site Before assembly you will want to decide on a location for your building The best location is a level area with good drainage eAllow enough working space for ease of moving parts into position during assembly Be sure there will be enough space at entrance for doors to open fully and enough space around the build
4. A To support a plywood deck B To be filled with sand We recommend the combined use of 1 an ARROW FLOOR FRAME KIT and 2 an ARROW ANCHORING KIT as an effective method of securing the building to the ground Allow 1 2 hours for construction OPTION 2 Wood Platform If you decide to build your own foundation be sure to select the appropriate materials These are the recommended materials for your foundation 2 x 4 s bcm x 10cm Pressure Treated Lumber 6 5 8 1 5cm 4 x 8 122cm x 244cm Plywood exterior grade O 10 amp 4 penny Galvanized Nails O Concrete Blocks optional The platform should be level and flat free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the foundation follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6cm 61cm sections to construct inside frame see diagram FRONT 7m Secure plywood to frame using 4 penny galvanized nails DOOR Allow 6 7 hours for construction Note Platform Slab will extend 9 16 1 4cm beyond floor frame on all four sides Seal this 9 16 of wood with a roofing cement not included or bevel this 9 16 of OPTION 3 Concrete Slab concrete when pouring for good water drainage The slab should be at least 3 to 4 8 10cm thick It must be level and flat to provide good support for the frame The following are the recomme
5. NOTE Door Track Splice painted part The door track assembly supports the sliding doors and reinforces the front wall Itis made up of three pieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown GE 66769 2 Insert four screws from the under side only LongLeg Hint The holes in the top side ofthe doortrack assembly are forfastening the gable to the top of the front wall in a later step 118 1 6 3m 3 Position door slides onto the legs from the end of door track assembly as shown in the end view STEP STEP a 4 Set this piece aside for later use 118 1 8 3m oo END VIEW N 2108 118 1 8 3m 17 Front Floor Assembly 1 Faris Needed For Side Floor Assembly 2 Floor Frame 6 Rear Floor Assembly 1 1 Place the floor trame pieces that you assembled earlier on the foun dation Assemble the four corners of the floor frame using two screws at each corner as shown At the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago When Diagonal Measurements nally When the diagonal measure are Equal the Floor Frame ments are equal the floor frame is is Square square NOTE If using a wood platform or concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected If you have purchased a Floor Frame Ki
6. Track Rear Wall Angle Rear Wall Channel Front Wall Channel Roof Beam Bracket Roof Beam Side Wall Channel Side Wall Angle Side Floor Frame Hear Floor Frame Front Floor Frame Gable Brace Roof Beam Brace Ramp Quantity in Carton MONNMNAAAOWANNNNNH NNNANNA NPONNHAHANNAOAND PL List O as NOTES Step 1 S014 The front floor frame is made up of three pieces The side floor frames and the rear floor frame are made up of two pieces The holes in these pieces will align when the pieces are positioned with correct amount of overlap The illustrations below show the proper overall length forthe sides rear and front Proceed as follows 1 Place the front floor frames as shown Center the ramp with drain holes facing outside on top of the two front floor frames Join the frames by inserting eight screws 2 Overlap the side floor frames and the rear floor frames as shown The holes in these pieces will align when the pieces are positioned with cor rect amount of overlap See the illus trations below for the proper overall length of the side and rear floorframes Join the frames by inserting four five bolts into each frame set as shown 3 Double check the length of each and set these pieces aside for later use 14 8934 Ramp 1 9367 Front Floor Frame 2 8936 Rear Floor Frame 2 10387 Side Floor Frame 4 Parts Needed For Floor Frame Assemblies
7. building must be anchored to prevent wind damage A foundation is also necessary as a base in order to construct a square and level building Anchoring and foundation materials are not included with your building We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground Available by mail order or at your local dealer or you may construct a foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these numbers before the must agree with the numbers on the parts list The parts list is located on page 12 elf you find that a part is missing include the model number of your building and contact Arrow Group Industries Inc Customer Service Department Route 50 East Breese Illinois 62230 1 800 851 1085 Separate contents of the carton by the part number while reviewing parts list The first few steps show how to join related parts to make larger sub assemblies which will be used later eFamiliarize yourself with the hardware and fasteners for easier use during construction These are packaged within the carton Note that extra fasteners have been supplied for your convenience PLAN AHEAD
8. made of heavy duty hot dipped galvanized steel Use as foundation for plywood sand or stone ATTIC WORKBENCH KIT Heavy duty galvanized steel bars that fit all 10 wide Arrow buildings They install quickly and easily to help organize space and create more useable space as an attic or workbench Will hold up to 250 Ibs 113kg evenly distributed Model No Fits AT101 Shipping Weight 10 Long 250 Ib 113kg load Fits all Arrow 10 wide buildings 16 lbs 7kg Must be drilled for use as workbench in Estator Even weight distribution SHELF UNITS Heavy duty galvanized steel shelf units help organize storage space They easily mount on the wall or sit on the floor Fits all Arrow buildings N Model No SS404 Makes 8 to 12 20 30cm wide shelves in any length Brackets braces hardware included Lumber is not included Model No SS900 A Grey color 3 shelves Holds up to 85 Ibs 38kg even weight distribution Some drilling required to fit buildings without mid wall bracing PO THIS PAGE WAS LEFT BLANK INTENTIONALLY PO THIS PAGE WAS LEFT BLANK INTENTIONALLY Foundation The Foundation For Your Building OPTION 1 ARROW FLOOR FRAME KIT order FB1014 A or 68387 A Arrow has the best base for your building in this simple kit It keeps stored items above the ground This kit should be used with one of the following
9. track with two screws Do the same for the bottom into frame Repeat steps 2 through 4 for the opposite door jamb 23 O Parts Needed For O 8576 Right Gable 2 8577 Left Gable 2 Gable Assemblies 6 6635 Roof Beam Bracket 4 The gables go on top of the front and rear walls to support the roof beams NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing 1 Attach the four roof beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable 8577 6635 Roof Beam Brackets Washer __ I 6635 Roof Beam Brackets 24 e Parts Needed For e Left Gable Assemblies 2 Right Gable Assemblies 2 Gables Braces 0 9009 Gable Brace 2 1 Lift and fasten a right and left gable under angle at corner to the door track and rear wall angle with screws Hint On the front gable leave out 2 screws closest to center gable leg On the rear gable use a bolt and nut at the overlapping rear wall angle 2 Join the left and right gables together with a gable brace using a bolt and nut in the second hole from the bottom only Repeat Steps 1 amp 2 for the opposite side of building 3 Fasten the track supports to the front gable assembly only as shown tw Track Supports 6228 STEP 9009 Gable Brace Is 25 Step 13 SP2
10. 6 1 Wrap the weather stripping tape around the two joined edges of the large left and right gables See dia gram Cut the weather stripping to length and repeat on next gable set 2 Spread the two halves of the double roof beam and fasten to the gable brace of the front gable 3 Fasten the other end of the double roof beam to the gable brace of the rear gable 4 Fasten the single roof beams small holes on top as shown using bolts and nuts 5 Fasten a roof beam brace to the double roof beam behind the front gable by placing the tab on the end of the brace between the roof beams Align the tab with the fourth hole and fasten the brace with a bolt and nut 6 Fasten the lower end of the roof beam brace to the track support with a bolt and nut 7 Fasten a roof beam brace be tween the rear gable and the roof beam at the third hole as shown 26 Parts Needed For Roof Beam Braces Spread Two Halves Of Roof Beams Main Roof Beam Assembly 1 Single Roof Beam Assemblies 2 9204 Roof Beam Brace 2 Step 14 0 9984 Right Roof Panel 1 Right Roof Panel SP27 Installing the roof panelsis best done with a step ladder Install the first roof panel at the back right corner of the building Each screw and bolt in the roof requires a washer NOTE Measure the building diagonally again and make adjustments to make sure the building is square and level This will make
11. Owner s Manual amp Assembly Instructions SPOI Model No CM1014 AI OB1014 C1 697 68103 C1L 697 68104 World s Leading Maker of Storage Buildings CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ 714740408 SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES BUILDING DIMENSIONS Size rounded off to the nearest foot WHEN HANDLING METAL PARTS Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Opening Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height Width Height 10 x14 121 x 160 1 4 129 769 123 1 4 162 3 4 81 3 8 118 1 4 157 1 2 801 8 55 1 2 60 3 0m x 4 0m 307cm x 407cm 12 0m 21 8m 313cm 413cm 207cm 300cm 400cm 204cm 141 152cm BEFORE YOU BEGIN Owner s Manual Before beginning construction check local building codes regarding footings location and other requirements Study and understand this owner s manual Important information and helpful tips will make your construction easier and more enjoyable Assembly Instructions Instructions are supplied in this manual and contain all appropriate information for your building model Review all instructions before you begin and during assembly follow the step sequence carefully for correct results Foundation and Anchoring Your storage
12. and washers 3 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts STEP Peak Cap Cut Weather Stripping and Fold Under T T Y STEP et o 3 N 2 O Parts Needed For O 6893 Left Side Roof Trim 2 Step 18 6015 Side Roof Trim 2 Roof Trim 6892 Right Side Roof Trim 2 SP31 1 Attach the right left and side roof trim pieces to the lower end of the roof panels on each side of the build ing using screws at each panel over lap NOTE A single screw fastens both trim pieces at the overlap 2 Using your thumb and index fin ger overbend the bottom flange of the roof panel rib at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw 6892 Roof Trim Ris 6893 29 Tuck Flange XS Inwardto Fit Inside of Roof Trim Cap 31 3719 Door Handle Brace 2 Parts Needed For 10475 Right and Left Doors 2 10497 Horizontal Door Brace 4 Door Assembly 66278 Vertical Door Brace 2 The steps on this page tell how to assemble the right door You will perform exactly the same procedures for the left door Each bolt and screw in the door requires a washer Pro ceed as follows 1 Attach the door handle brace and handle to the door with 1 bolt as shown Don t tighten the bolt yet 2 Swing the door handle brace up to the hole on the cent
13. dation 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 Lag Screws 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 Lag Screws SP11 65103 8 32 Hex Nut 192 66045 Handle 2 66769 Door Slide 4 Hardware Remove from bag of screws and save for the last step T 65900A 10Bx1 2 Black Screw 8 65923 Packed with Screws 8 32x3 8 Bolt 192 66646 65109 Washer 453 8 32 Acorn Nut 4 12 sheets of 40 Packed with Screws ES I E 66183 66382 Roof Trim Cap Lower Door Guide 4 2 right amp 2 left 67545 21 Weather Stripping 1 T 65004 8Ax5 16 Screw 438 VS 67468 Peak 2 Arrow Logo 6228 Track Support 2 11 Part Number 8576 8577 10497 7743 9984 9983 10475 10475 9369 9373 6515 6020 3719 6278 6403 6892 6893 6015 6869 6797 9366 5986 10389 9365 6635 10386 10388 10391 10387 8936 9367 9009 9204 8934 Parts List Part Description Right Gable Left Gable Horizontal Door Brace Roof Panel Right Roof Panel Left Roof Panel Right Door Left Door Door Jamb Front Wall Panel Wall Panel Corner Panel Door Handle Brace Vertical Door Brace Door Track Splice Rt Side Roof Trim Lt Side Roof Trim Side Roof Trim Ridge Cap Ridge Cap Door
14. ear Wall Channel 118 1 8 3 0m Side Wall Channels 157 3 8 4 0m 2 Assemblies Rear Wall Angle 118 1 8 3 0m Side Wall Angles 157 3 8 4 0m 2 Assemblies Step 3 SO16 The roof beams join the two gables and supportthe roof panels The main roof beam is made up of four pieces overlapped back to back at the cen ter The left and right roof beam as semblies are made up of two pieces Hint These pieces are force fitted so you may have to press hard to join them together 1 Place the end of one roof beam inside a second roof beam so thatthe six holes in each piece align Make four sets of roof beams by repeating this procedure Do not insert bolts yet 2 Take two of the pressed together roof beams and join them as shown toformthe main roof beam assembly Hold the assembly together and fas ten with 14 bolts Build only one Doubled Beam Assembly 3 Fasten the other two pressed together roof beams with eight bolts to make the left and right roof beam assemblies 4 Set these pieces aside for later assembly Parts Needed For 0 10386 Roof Beam 8 Roof Beam Assemblies Roof Beam 159 3 8 4 0m ASSEMBLED END VIEW Build one Doubled Main Roof Beam Assembly for Peak in Roof 159 3 8 4 0m Build two Single Beam 159 3 8 Assemblies for Break Roof utn 4 0m O Parts Needed For O 6403 Door Track Splice 1 Door Track Assembly 9366 Door Track 2
15. er of the door and insert a screw 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above and below center connection using 2 screws 4 Insert a second bolt in the door handle and tighten both bolts D Put a horizontal door brace onto the top edge and bottom edge and fasten with 1 bolt in the center 6 Attachthelower door guides and bolts as shown 7 Repeat steps 1 through 6 for the left door 32 Y 10475 RightDoor 10475 Left Door NEN STEP STEP END VIEW SHOWING O Parts Needed For O Right Door Assembly 1 Door Installation amp Adjustment Left Door Assembly 1 1 From inside the building put the bottom ofthe right door assembly on your left when you are inside the building behind door jamb into the front frame track 2 Position the top of the door so that the holes in the door line up with the holes in the door slides 3 Fasten the door to the door slides usingtwo 10Bx1 2 screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Horizontal Door Brace Gable Door Track DoorSlide 1 4 Front Floor Frame Assembly Door Slide 10Bx1 2 Screw 4 STEP 3
16. f the wall panels and set each one alongside the building 2 Fasten the wall panels at the top and bottom with screws Fasten the center of each panel to the wall channel with screws 4 Fasten overlapping ribs as before Crimped Rib STEP Underneath 2 Detail Showing Center of Panel Screwedto Wall Channel Bolt and nut does not go thru wall channel at overlap Panels rest on frame as shown A tfl OTT Use bolts andnuts thru wall angle overlap atthe top of panel at rear S 1 0 O Parts Needed For O 0 9369 Door Jamb 2 tep Front Channel Door Jamb 9365 Front Wall Channel 2 The door jambs reinforce the door opening and provide an attractive 9365 trim Follow these steps for both door jambs 1 Fasten the front wall channels in their positions between the end of the side wall channel and the cor ner panel using screws Do not put a screw in the hole at the end be hind the door opening at this time INSIDE OF BUILDING 2 bots VIEW Tt DoorTrack 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown TIONS ZEN FrontWallChannel Cross Section 3 S Top View Front Wall Channel nn ne of i p 9 bes amb to the tront wall panel an e x J p Screw Screw front wall channel with two screws Nut 9369 N 4 Fastenthe top ofthe doorjamb to the door
17. ing to be able to fasten the panel screws from the outside Before you begin the first steps in assembling your parts a foundation should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions are important to follow throughout the construction of your building eCare must be taken when handling various pieces of your building since some contain sharp edges Please wear work gloves eye protection and long sleeves when assembling or performing any maintenance on your build ing A i safety edge Keep children and pets away from worksite to avoid distractions and any accidents which may occur Never concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it ePractice caution with the tools being used in the assembly of this building Be familiar with the operation of all power tools Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085 Do not attempt to assemble the building on a windy day because the large panels acting as a sail can be whipped about by the wind making construction difficult and unsafe 5 CARE amp MAINTENANCE Finish For long lasting finish periodically clean and wax the exterior surface Touch u
18. nded materials for your foundation 1 x 4 s 2 5cm x 10cm will be removed once the concrete cures O Concrete 6 Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of 1 part cement O 3 parts pea sized gravel O 2 1 2 parts clean sand Prepare the Site Construct a Foundation 1 Dig a square 6 15cm deep into the ground remove grass 2 Fill up to 4 10cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 4 Construct a wood frame using four planks of 1x4 2 5cm x 10cm lumber 5 Pour in concrete to fill in the hole and the frame giving a total of 4 8 10cm thick concrete Be sure surface is level Note Finished Slab dimensions with lumber removed Allow 3 5 hours for construction and a week for concrete curing time B Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model No AK4 or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 Wood Screws There are 1 4 0 63cm dia Contains 4 Anchors with Cable Clamps and holes provided in the frames for proper anchoring installation instruction C qm Ban a OVERTHE BEAMS AND INTO THE GROUND Arrow Anchoring Kit Model No AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete foun
19. p scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snow on roof can damage building making it unsafe to enter In snow country Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation will reduce condensation Other Tips Wash off inked part numbers on coated panels with soap and water Silicone caulking may be used for watertight seals throughout the building Do not store swimming pool chemicals in your building Combustibles and corrosives must be stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future reference ACCESSORIES ROOF STRENGTHENING heav
20. t you need to install it at this time The floor frame must be squar and level or holes will not align O Parts Needed For Corners 6515 Wall Panel 2 9373 Front Wall Panel 2 6020 Corner Panel 4 NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall re quires a washer 1 Position a corner panel at the corner of the floor frame as shown The widest part of each corner panel must be placed along the side of the building for all four corners Fasten the corner panel to the floor frame with one screw Support the corner panel with a step ladder until a wall panel is attached 2 Attachthe front wall panels to the frontcorner panels as shown Asmall gap will exist between front wall panel and ramp 3 Attach the wall panels to the rear corner panels as shown NOTE Be careful to install the correct panel in each position as shown 4 Double check the part numbers of the wall panels before proceeding The floor frame must be square and level or holes will not align 6020 Wide Side SIDE 6020 9373 Panels rest on frame as shown Narrow Side E C E 9373 6020 19 Par
21. the roof panels fit better and holes will align Don t anchor the floor frame NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels and find the right roof panel part number 9984 2 Position the right roof panel at the back right corner and fasten to the gable with six bolts and nuts and roof beams using six screws Do not fas ten the lower end of the panel to the side wall angle at this time Screws 27 Step 15 SP28 1 Install a left roof panel 9983 at the left rear corner of the roof 2 Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the open ing at the ridge as you install each roof panel Do not cut the tape at this time 3 Install two roof panels 7743 work ing side to side Do not fasten the lower end of the panels to the side wall angles at this time Continue weather stripping the ridge opening NOTE Narrow roof panel crimped rib is overlapped by wide rib of adjacent panel where possible 4 Install the first ridge cap 6797 on the completed roof section using bolts and nuts Do not fasten the ends of the ridge cap at this time 5 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts 28 Parts Needed For Ridge Cap amp Panels Screws To Roof Beam Fastenat 9 Overlap With Bolt Screws To Roof Beam Do not fasten at this
22. time STEP 7748 a 9983 LeftRoofPanel _ LA 9983 Left Roof Panel 1 7743 Roof Panel 2 6797 Ridge Cap 1 0 Fasten At Overlap With Bolt 7743 RoofPanel STEP 3 St ep 1 6 O Parts Needed For O E Ridge Cap amp Panels 6869 Ridge Cap 1 SP29 1 Install the second ridge cap 6869 overlapping the first ridge cap while installing four roof panels 7743 Hint The bolts on the ridge cap need to be left loose to move the ridge cap to the side and overlap the ribs of the next roof panel Continue weather strip ping the ridge NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up 7743 Roof Panel 29 6797 Ridge Cap 1 Parts Needed For 7743 Roof Panel 2 Step 17 9983 Left Roof Panel 1 Ridge Cap amp Panels 9984 Right Roof Panel 1 SP30 1 Install the third ridge cap 6797 overlapping the second ridge cap while installing the remaining two roof panels 7743 Hint The bolts on the ridge cap need to be left loose to move the ridge cap to the side and overlap the ribs of the next roof panel Continue weather stripping the ridge 2 Install the left 9983 and right roof panel 9984 as you unroll the weather stripping tape and press it down Fasten the lower end of the panels to the side wall angles using screws
23. ts Needed For e Mid Frames Rear Wall Channel Assembly 1 Side Wall Channel Assembly 2 The mid frame pieces give rigidity to the side and rear walls 1 Fasten the rear wall channel across the middle of the rear wall using screws 2 Fasten the side wall channels across the middle of the side panels using screws Fasten overlaps in rear corners with bolts and nuts at two locations See the figure NOTE The wall channels behind the front wall panels will be installed in a later step Step 8 Parts Needed For e Door Track Assembly 1 Rear Wall Angle Assembly 1 Top Frames O Side Wall Angle Assembly 2 The top frame pieces give rigidity to the walls and provide a surface for attaching the gables which support the roof 1 Fasten the rear wall angle across the inside top of the rear wall using screws 2 Fasten the side wall angles across the inside top of the side panels us ing screws Side wall angles must overlap rear wall angle in corners 3 Fasten the door track assembly holes on top across the top of the front wall panels using screws See the figure Wall Angles Must Face Inside LongL Building T on Top Opening facing in Short Leg on Bottom 21 Parts Needed For e 6515 Wall Panel 10 Wall Panels Each wall panel has a crimped rib on one side The crimped rib should go under the rib of the panel that follows it 1 Locate all o
24. y snow load KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation Increases the strength of your roof by 50 ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18m of steel cable and 4 cable clamps No digging or concrete ARROW pouring just insert cable under roof i over roof beams into augers and twist augers into the ground For buildings larger than 10 x9 use 2 kits Model No AK100 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included Model No AK600 Earth Anchor Kit anchors any size Arrow building to the ground Each kit contains heavy duty hot dipped galvanized steel corner gussets and 4 earth anchors TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 65cm steel channels plus five heavy duty snap in e Ar hangers and a small tool holder for d screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arrow storage buildings MODELS FB47410 FB5465 FB106 A FB109 AandFB1014 A A simple new floor frame system
Download Pdf Manuals
Related Search
Related Contents
ADA890 MANUEL STATION DE SERVICE GP 800 ie Guía rápida para usuario del MilkSense & Bscale Garmin GPS 158 Owner's Manual GoPhone a toda velocidad USB 3.0 Display Device Data Sharing Cooper Lighting QCT2075 User's Manual Copyright © All rights reserved.
Failed to retrieve file