Home

Arrow Storage Products 697.6889 User's Manual

image

Contents

1. op o pj om Es E ba amp e 5 gt gt T Ca E Q Un lt Parts List for Roll Up Door amp 1431 or 697 68890 BX14 Assembly Part Part Key No Number Description Carton 6 Carton 7 Carton 8 Bottom Angle Weather Strip Left Horizontal Track Right Horizontal Track Right Vertical Track Left Vertical Track Door Panel Door Panel Lock Section Door Panel Bottom Section Wall Panel Roof Panel Column Gusset Gable Truss Strut Inner Truss Bracket Outer Truss Bracket Vertical Brace Upper Chord Lower Chord Inner Diagonal Brace Outer Diagonal Brace Splice Plate Left Shear Plate Right Shear Plate Side Floor Frame Side Wall Channel Roof Beam Side Eave Channel Center Column Outer Truss Bracket Ridge Cap Side Roof Trim MOH 14 1 IE B3lLZ qm H B Bor 87 PSU Hardware for Roll Up Door T 66431 8 1 4 20x5 8 Rib Neck Bolt 66464 2 1 4 20x1 1 2 Hex Head Bolt 67483 Cable Lacer 2 67482 Keyed Cable 2 67492 3 Hinge 2 67513 Spring Restraint Cable 2 16 66432 4 3 8 16 1 sto Hex Head Bolt 65106 16 10 32 Square Nut 67484 Spring Clevis 2 67485 Left Bottom Bracket 1 67494 Lift Handle 2 67525 Inside T Handle 1 66433
2. Step 31 BX47 1 After door has been completely in stalled raise door to a full open posi tion Remove nut from bolt holding the horizontal track to the spring sup port bracket but do not remove bolt 25 keyed end of spring restraint cable over shaft of bolt Replace nut and tighten securely dThread spring restraint cable through spring making sure cable goes through spring loops on each end of spring Fasten to hole shown on angle of the horizontal track using 10 32x3 8 bolt and square nut through keyed end of cable ARepeat above installation proce dure for the other spring NOTE This spring restraint cable has been manufactured in accordance with require ments of the California Department of Housing and Community Development 10 32 Square Nut 10 32x3 8 Bolt Spring Restraint Cable lt pr SSS Spring Restraint Cable 47 VT1421 VT1431 697 68889 697 68890 SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and ou
3. Hinge Schedule Only Do Not Join Panels ee ee RR Top Section Intermediate Lock Section Bottom Section ege intermediate a Li 4 Bottom Section 9506 Door Panel 1 Parts Needed For 9507 Door Panel Lock section 1 9508 Door Panel Bottom Section 1 Roll Up Door 67667 Left Vertical Track 1 67666 Right Vertical Door Track 1 NOTE uo When rib neck bolts are inserted or 3 in the track use bolts with heads Hinge located on the inner side of the track to prevent interference with ES Insert Roller Shaft only in barrel hole shown the movement of the rollers 1 Repeat procedureforthe third door panel using hinges at end stiles and 1 hinge at middle stile LEFT TRACK SUPPORT 2insertthe roller shaft into the barrel B holes on the hinges furthest out from the face of the end stiles on all 3 panels Note that 1 hinge has only 1 barrel Insert rollers through the tabs on the bottom brackets on bot tom section 1 4 20x1 2 Hex Head Bolt SquareNut B s s STEP e 1 4 20x1 2 lt C77 Rib Neck Bolt Striker STEP Right Vertical Track 67666 dAtach right and left vertical tracks loosely to right and left track supports using 1 4 20x1 2 hex head bolts and square nuts Square Nut Attach spring latch strikers loosely to vertical tracks using 1 4 2
4. Top Fixture Adjustment Nu 0Bx1 2 PT Truss Head Screw Parts Needed For Roll Up Door 1 4 20 Square Nut 10 32 Square Nut ec3 1 4 20 Square Nut 4 1 4 20 Square Nut 3 8 16 Hex Nut 7817 Spring Support Bracket 2 67476 Right Horizontal Track 1 67475 Left Horizontal Track 1 9511 Truss Strut 2 9506 Door Panel 1 7817 ose Hex Head Bolt 10 32x5 16 Bolt 1 4 20 x 1 1 2 67476 Hex Head Bolt 3e 1 4 20x1 2 STEP Hex Head Bolt 67475 1 4 20x1 2 Rib Neck Bolt 1 4 20x1 2 Rib Neck Bolt TRUSS ASSEMBLY 1 4 m n Hex Head Bolt amp Square Nut 3 8 16 x 1 1 2 Head Bolt Sheave HOLE Roll Up Door CAUTION FROM 7HIS POINT BE SURE TO USE EXTREME CAUTION UNTIL THE DOOR IS PROPERLY SPRUNG AND OPERATING 1 Attach S hooks to both springs Fasten sheave and spring clevis to opposite ends of springs using a 3 8 16x1 1 2 hex head bolt and 3 8 nut Attach spring assemblies to spring support brackets 2Carefully raise the door to a fully open position and prop Make sure the door is level in the opening Slip the keyed end of the keyed cable over the studs of the bottom brackets Thread cable over front sheave around spring sheave and attach end to cable lacer Attach cable lacer with S hook in a convenient hole in horizontal track angle keeping equal tensio
5. Each wall panel has a crimped rib on 1 side The crimped rib should go under the rib of the panel that follows it 1 Fasten the wall panels at the top and bottom with screws 2 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs using screws and bolts with nuts 3 When you have attached all wall panels in the correct positions the building will look like this 4 Fasten right and left track sup ports to the front columns using 5 bolts from the inside and nuts out side NOTE Flanges on track supports must face towards front of building Detail Showing Center of Panel Screwed to Wall Channel Crimped Rib Underneath Bolt and nut does not go thru wall channel at overlap S t 12 Parts Needed For 9477 Door Jamb 2 ep Wall Channel Door Jamb 9466 Wall Channel 2 BX28 The door jambs reinforce the door opening and provide an attractive trim Follow these steps for both door jambs Piace wall channels behind wall panel large hole towards door open ing Loosen wall panel and fasten wall channels to side wall channels using 1 screw under panel Replace panel and fasten wall channels to panel using 3 screws 2 Overlap the rib of wall panel with a door jamb and fasten top to side eave channel and bottom to side floor STEP frame using 6Ax7 8 screws and spacers Positon spacer i
6. Step 5 BX21 1 Fasten side floor frames together with a column gusset using 2 bolts from the bottom and nuts on top At 1 rear of building repeat procedure li 9490 2 Position center column assem blies where floor frames are joined and fasten to gusset with 8 bolts Repeat procedure on sides of build ing for the 14x31 NOTE Support center columns with stakes or other means until wall panels are attached 3 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE Do not fasten the floor frames to your foundation at this time You will anchor the building after it is erected he floor frame must be square and levelor holes will not align 21 Parts Needed For 9471 Wall Panel 2 9473 Front Wall Panel 2 Corners 9472 Corner Panel 4 NOTE The remainder of the building assembly reguires many hours and more than one person Tie down and support assembly before the end of the work day A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall re duires a washer 1 Position a corner panel at the corner of the floor frame as shown The widest part of each corner panel must be placed along the side of the building for all 4 corners Fasten the corner panel to the floor frame with 4 screws Su
7. 4 3 8 16 Hex Nut T 65900A 51 10 1 2 Black Truss Head Screw 67488 3 6 x 1 5 16 Heavy S Hook 4 67486 Right Bottom Bracket 1 67496 Roller 10 67526 Locking Handle 1 66434 2 10 32 2 1 2 Flat 66441 14 Head Bolt 10 32x3 8 Bolt 65989 6 65101 16 1 4 20x1 2 Hex 1 4 20 Square Nut Head Bolt 67503 67504 Stile Spacer Inside Latch Bar 2 Spacer 1 67490 67491 1 Hinge 2 Hinge 5 2 67497 67500 Sheave Spring 4 2 67528 Latch Set 1 Flat Latch Bar 4 Hooks 2 Strikers 67665 2 Spring Latches Adjustable Top Fixture 2 Latch Chains 2 6947 Column Gusset 2 6964 Lower Chord 2 6963 Upper Chord 2 7022 Eave Bracket 4 6962 Vertical Brace 2 7004 Right Shear Plate 2 7003 Left Shear Plate 2 6965 Inner Diagonal Brace 2 6958 Inner Truss Bracket 4 6966 Outer Diagonal Brace 2 6959 Outer Truss Bracket 4 9497 Outer Truss Bracket 4 6967 Splice Plate 1 Parts Needed For Truss Assembly Step 1 BXI7 1 Assemble 1 2 truss at a time At tach column gusset to lower chord securely using 1 4 20x1 2 hex head bolts and square nuts All other con nections are to be made loosely 2 Fasten lower chord to upper chord and eave bracket to upper chord 3 Fasten vertical brace to lower chord 4 Fasten right shear plate and left shear plate to vertical brace and upper chord 5 Fasten inner diagonal brace to u
8. THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit Model No AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete foundation 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 Lag Screws 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 Lag Screws Hardware for Building KIT 1 65101 1 4 20 Square Nut 132 14x21 65408 65958 65914 254 14x31 10 32x1 4 Bolts 3 8 32x7 8 Bolt 2 6Ax7 8 Screw 4 WASHER KIT 65989 65106 1 4 20x1 2 Hex Head Bolt 10 32 Square Nut 10 32x7 16 Bolt Washer 132 14 21 501 14 21 498 14 21 960 14x21 254 14x31 673 14x31 670 14x31 1400 14x31 HARDWARE SUB KIT Remove from bag and save for Step 24 65004 8 5 16 Screw 813 14x21 65103 65900A 66098 1092 14x31 8 32 Hex Nut 2 10Bx1 2 Black Screw 2 Plastic Spacer 6 REMAINING HARDWARE PIECES e 7022 EaveBracket WeatherStripping Roof Trim Cap 66446 Arrow Logo 4 14x21 67293 1 2 right amp 2 left Peak Cap 2 8 14x31 67545 1 14 21 2 14x31 7972 66242 66260 66382 Door Handle Lock Bracket 1 Door Slide 2 Handle 2 Lower Door Guide 2 11 BX12 Parts List Carton 1 through 5 contains the VT1421 Carton 6 on Page 14 contains the Roll up Door for this building and parts for VT1431 Assembly Part Par
9. and during assembly follow the step sequence carefully for correct results Foundation and Anchoring Your storage building must be anchored to prevent wind damage A foundation is also necessary as a base in order to construct a square and level building Anchoring and foundation materials are not included with your building We recommend the combined use of an Arrow Floor Foundation Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground Available by mail order or at your local dealer or you may construct the foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these numbers before the must agree with the numbers on the parts list The parts list is located on page 12 elf you find that a part is missing include the model number of your building and contact Arrow Group Industries Inc Customer Service Department Route 50 East Breese Illinois 62230 1 800 851 1085 Separate contents of the carton by the part number while reviewing parts list The first few steps show how to join related parts to make larger sub assemblies which will be used later Familiarize yourself with the hardware and fasteners for easier use during construction The
10. over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included ATTIC KIT WORKBENCH KIT Heavy duty galvanized steel bars that fit all 10 wide Arrow buildings They install quickly and easily to help organize space and create more useable space as an attic or workbench Will hold up to 250 Ibs 113kg evenly distributed Model No AT101 Fits 10 Long 250 Ib 113kg load Fits all Arrow 10 wide buildings Shipping Weight 16 Ibs 7kg Must be drilled for use as workbench in Estator Even weight distribution SHELF UNITS Heavy duty galvanized steel shelf units help organize storage space They easily mount on the wall or sit on the floor Fits all SN CS Arrow buildings F Model 55404 Makes 8 to 12 20 30cm wide shelves in any length Brackets braces hardware included Lumber is not included Model No SS900 A Grey color 3 shelves Holds up to 85 Ibs 38kg even weight distribution Some drilling required to fit buildings without mid wall bracing THIS PAGE WAS LEFT BLANK INTENTIONALLY THIS PAGE WAS LEFT BLANK INTENTIONALLY Foundation The Foundation For Your Building Concrete Slab The slab should be at least 3 to 4 8 10cm thick It must be level and flat to provide good support for the frame The following are the recommended materials f
11. sides and rear of building are straight not bowed inward or outward the full perimeter of the floor frame Shim under with wood shin gles if necessary Asquare the front of building as pre viously done for base DB Anchor frontframe to concrete with 1 4 diameter expandable anchor bolts or other means where shown Gu w Left Track Right Track Support 107 Support 32 2 72m d NOTE The 107 2 72m door opening must be held for proper door alignment Measure between the left and right track support L nd uareness CH Use String To Straighten a Side Before Anchoring UI Step 17 Parts Needed For e 9492 Right Roof Panel 2 Left Right Roof Panels 9493 Left Roof Panel 2 BX33 Installing the roof panels is bestdone with an 8 step ladder Each screw and bolt in the roof requires a washer LEFT ROOF PANEL RIGHT ROOF PANEL SCREWS TO ROOF BEAM SCREWS TO ROOF BEAM 1 Position right and left roof panels sorte HOLES at the front corners and fasten to the AT TOP gable and roof beams using screws 4 hown Do not 7 FASTEN LU FASTEN AT FASTEN and bolts as sho not faste e EE P e the lowerendofthe panels to the side eave channel at this time SMALL HOLES Hint Follow the fastener sequence AT BOTTOM shown for proper alignme
12. 0x1 2 rib neck bolts and square nuts Bi itt the bottom section and insert therollers into the vertical tracks Slide the panel down and level across top Shim to level if necessary Ginsert lock section into vertical tracks Attach hinges from 1 to 2 panel by inserting 10Bx1 2 truss head screws at bottom edge of lock STEP section Door Panel 9506 Position third door panel and fas ten in the same manner Do not Door Panel Lock Section STEP fasten the last door panel atthis time 9507 Step 28 BX44 1 Install spring support brackets to the roof beams using bolts shown 2aAttach the right and left horizontal track to the right and left vertical track using bolts and nuts shown 3Fasten track struts to open hole on truss assembly using 1 4 20x1 2 hex head bolt and square nut Fas ten opposite end to spring support bracket and horizontal track using 1 4 20x1 2 rib neck bolt and square nut Aattach the sheave pulley wheel to the 3rd hole on the support angle of the horizontal track using 3 8 16 x 1 1 2 hex head bolt and 3 8 16 hex nut 5 Position fourth door panel on third door panel Fasten top of hinges to bottom of fourth door panel using 10Bx1 2 truss head screws GEngage roller with top adjustable fixture slide roller into horizontal track Move assembly to line up with holes in end stile and fasten with 10Bx1 2 truss head screws Door Panel Top 9506
13. 10Bx1 2 truss head screws into end stiles di oosely install bottom angle to the bottom section using 10 32x3 8 bolts and square nuts Insert vinyl weather strip between angle and bottom section and tighten bolts 5 Fasten 2 lift handles to bottom sec tion just below the bottom of middle stile using 1 4 20x1 2 hex head bolts and 1 4 20 square nuts install the 1 hinges at the upper corners and to the middle stile of the bottom section using 10Bx1 2 truss head screws NOTE Be sure you fasten the lower part of hinge to the top of each stile The top hinge leaf is marked Parts Needed For Roll Up Door Door Panels 4 9479 Bottom Angle 1 9504 Weather Strip 1 32 Bolt amp Square Nut 1 Hinge me e Raised MIDDLE Rib On 10 1 2 m STILE 1Hinge Top Truss Head Screw Ne e _ ec ME H gt 1 4 20 SS 9508 Lt de S LiftHandle 4 D 5 sa 4 4 20x1 2 He b Head Bc pel SS 4 DT VOR 10 32x3 8 Bolt BOTTOM SECTION END STILE RH LH Bottom Bracket RH Bottom Bracket 1 gt 9 Truss Head Screw 41 Parts Needed For Roll Up Door 9507 Door Panel Lock Section 1 1With the key unlock the outside locking handle and rotate the han dle to a vertical position Insert the square shank through the hole locat ed in the center of door panel
14. 947 Column Gusset 1 6938 Rear Frame 1 6939 Rear Frame 1 1 Fasten front frames at the top to front wall panels with 3 screws Do not fasten hole nearest door opening at this time 2 Fasten front columnsto the frame at bottom and channel with 2 bolts Hint Pull front wall panel slightly away to tighten bolts d Position lintel across top of front frames and fasten with 2 bolts and nuts on both sides 4 Position column gusset over rear columns and fasten with 8 bolts At tach rear frames to gusset using 2 bolts and opposite end to wall panel using 3 screws 25 Step 10 26 1 Position Truss Assembly on build ing by sliding column gussets over center columns and fasten with 8 bolts and nuts on each gusset 2 Position right and left side eave channels over eave brackets and fasten with a bolt and nut Front and rear frames overlap side eave chan nels Fasten overlaps with 3 bolts and nuts Fasten corner panels to channels using 4 screws NOTE On the 1431 fasten the side eave channels over eave brackets using bolts and nuts 26 Parts Needed For Truss Top Frames Truss Assembly 1 14x21 2 14x31 9484 Right Side Eave Channel 2 9485 Left Side Eave Channel 2 9463 Side Eave Channel 2 14x31 Parts Needed For 9470 Wall Panel 17 14x21 8 14x31 9486 Right Track Support 1 Step 1 1 Walls Panels Track Supports 9487 Left Track Support 1 BX27
15. Owner s Manual amp Assembly Instructions BXI Model VT1421 697 68889 1431 U 697 68890 World s Leading Maker of Storage Buildings CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES WHEN HANDLING METAL PARTS 704910801 BUILDING DIMENSIONS Size rounded off to the nearest foot gt Exterior Dimensions Interior Dimensions Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height 14 x21 164 255 1 2 291 2527 169 260 3 4 116 164 2551 2 114 1 2 14 x31 164 370 1 2 422 3663 169 375 3 4 116 164 370 1 2 114 1 2 4 3m x 6 4m 4 17 6 49 27 0 71 6n 4 29 6 62 2 95m 4 17m 6 49m 2 91m 4 3 9 5 4 17mx9 41m 39 2 103 7 4 29 9 54 2 95 4 17 9 41 2 91 BEFORE YOU BEGIN Owner s Manual Before beginning construction check local building codes regarding footings location and other reguirements Study and understand this owner s manual Important information and helpful tips will make your construction easier and more enjoyable Assembly Instructions instructions are supplied in this manual and contain all appropriate information for your building model Review all instructions before you begin
16. enough working space for ease of moving parts into position during assembly Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside Before you begin the first steps in assembling your parts a foundation should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions are important to follow throughout the construction of your building Care must be taken when handling various Practice caution with the tools being used in the pieces of your building since some contain assembly of this building Be familiar with the sharp edges Please wear work gloves eye operation of all power tools protection and long sleeves when assembling or performing any maintenance on your build ing v safety edge Keep children and pets away from worksite to Do not attempt to assemble the building if parts avoid distractions and any accidents which are missing because any building left partially may occur assembled may be seriously damaged by light winds Call 1 800 851 1085 Never concentrate your total weight on the Do not attempt to assemble the building on a roof of the building When using a step ladder windy day because the large panels acting as a make sure that it is fully open and on even sail can be whipped about by the wind making ground before climbing on it constr
17. ft Gable 2 6955 Inner Gable Bracket 4 9496 Outer Gable Bracket 4 9490 Center Column 6 14 21 10 14 31 2Align the holes on the center columns back to back and fasten together using 6 bolts and nuts Make 3 assemblies for the 14x21 Make 5 assemblies for the 14 31 3Set these pieces aside for later as sembly Step 3 BX19 The roof beams join the gables to the truss and supports the roof panels 1 Align the holes on a left and right roof beam back to back and fasten together using 8 bolts and nuts Make 10 assemblies 2 On the 14x31 fasten roof beams together in the same manner Make 5 assemblies Parts Needed For 9502 Right Roof Beam 10 9503 Left Roof Beam 10 Roof Beam Assemblies 9462 Roof Beam 10 14x31 Assembled End View Small Holes on Top Align End Holes 9 Before Tightening Bolts and Nuts 19 S 4 Parts Needed For tep Floor Frame Assembly BX20 1 Place the floorframe pieces onthe foundation Assemble the 4 corners of the floor frame using 3 bolts from the bottom with nuts on top at each corner as shown 9481 Front Frame 1 9480 Front Frame 1 9475 Side Floor Frame 4 6939 Rear Frame 1 6938 Rear Frame 1 9460 Side Floor Frame 2 14x31 20 Center Column Assembly 3 14 21 Gusset Center Column Center Column Assembly 5 14x31 Parts Needed For 6947 Column Gusset 3 14x21 5 14x31
18. ing Tape d m psa C BC ala ASS SS SL N EBS Parts Needed For Step 19 Ridge Cap BX35 install ridge cap on the com pleted roof section using bolts and nuts Do not fasten the ends of the ridge cap at this time 9509 Ridge Cap 1 35 Parts Needed For Step 20 Roof Panels amp Ridge Cap 9491 Roof Panel 6 BX36 9509 Ridge Cap 1 1 install 4 roof panels working side to side NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up 2Unroll the weather stripping tape press it down firmly but do not cut dinstall the second ridge cap over lapping the first ridge cap Align the holes and fasten using bolts Ainstall 2 more roof panels Fasten 5th top overlap and cover with weather strip over head of bolt E 9491 36 Parts Needed For Roof Panels Ridge Caps 9509 Ridge Cap 1 9512 Ridge Cap 1 1431 9491 Roof Panel 4 14x21 12 14x31 Step 21 BX37 1 Install 2 more roof panels 2install the third ridge cap overlap ping the second ridge cap as before Temporarily remove the rear corner roof panels and install the remaining 2 roof
19. lock section Slide in the stile spacers and insertthe 10 32x2 1 2 flathead bolts through handle spacer and stile Secure with square nuts and tighten 2Turn the locking handle to a hori zontal position Slide the inside latch bar spacer over the square shank of the lock handle and slip the flat latch bar over shank Secure with the in side handle Tighten set screw in handle Attach small S hooks to holes on the flat latch bar Slip oppo site end of S hooks through latch chains dAttach the spring latches to the end stiles on the lock section Attach S hooks to the holes on top of the latches Attach the latch chains to the S hooks so that the chain is taut Hint If chain is too tight latches will not engage strikes on track prop erly If chain is too loose the lock handle will not retract latches Adjust chains by changing the hole location of S hook through chain Attach 2 hinges to lock section at the upper corners of end stiles Fas ten 1 hinge to the middle stile Hint When installing hinges be sure the hinge number is always on the lower hinge leaf 42 1810 32 x 2 1 2 10 32 Square Nut Flat Head Bolt Locking Handle MIDDLE STILE STEP Stile Spacer Inside Latch Bar Spacer A Hook MIDDLE STILE A STEP 2 Set Screw Inside T Handle Flat Latch Bar Latch Chai atc ain S Hook 10Bx1 2 Truss HeadScrew Sg Spring Latch
20. m to the ends of roof noting that trim slips under ridge cap butfits on top of side rooftrim 3Fasten roof panel rib trim peak cap and ridge cap together using bolts and nuts Fasten the remaining peak cap in the same manner 38 Ausing your thumb and index finger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 5Fasten trim to side trim using a screw and washer into roof panel 6Fasten the rooftrim caps to the side trim using a screw Arrow Logo Goes on Front of Building Parts Needed For 9498 Door 1 9499 Horizontal Door Brace 2 Side Door Assembly 9500 Vertical Door Brace 2 NOTE To assemble door to slide from left to right opening position door with handle holes on left side of door Position handle holes on right side if door is to slide from right to left opening Each bolt and screw in the door re quires a washer 1 Hold the vertical door brace against the inside surface of door align holes and fasten with 3 screws 2Repeat Step 1 for remaining verti cal door brace the handle to the door with 2 bolts and nuts as shown horizontal door brace onto the top edge and bottom edge and fasten wi
21. n on both springs so that door hangs level Once cable is installed remove prop and lower door SAdjust vertical tracks so rollers seat in U of track and bottom rollers fit snug against bottom brackets but not too tight so rollers will operate freely When complete tighten all track bolts Aadiust striker plates for proper en gagement with the latches Adjust the top adjustable fixture in or out and tighten the nut and bolt to hold the fourth door panel against the lintel NOTE Recheck all door fasteners and hardware to be sure that each fastener is tight and secure CHECK Be sure that the lift cables do not rub and or the rollers do not bind in the track when door is opened or closed Recheck the springs to be sure that there is equal tension on both springs This is extremely important for proper door operation ADJUST Springs by changing location of S hooks to another hole on support angle of the horizontal track S Hook 3 8 16 1 1 2 Spring Hex Head Bolt Spring Clevis LH ASSEMBLY Cable Lacer S mes Keyed Cable Step 30 Needed ror 9488 Right Door Jamb 1 Right Left Door Jambs 9489 Left Door Jamb 1 BX46 1 Position right and left door jambs to right and left track supports with notched end on top facing inside building 2Fasten long flange to track support and short flange to front wall panel using screws and washers eee
22. nside wall panel rib and channel or frame dFasten door jamb at middle holes using 8 32x7 8 bolts spacers and hex nuts Spacer is positioned be tween wall panel rib and wall chan nel AF asten outer flange of door jamb to wall panel using 4 screws STEP 1 EN N STEP Ny Top View SE 28 Paris Needed For Right Gable Assembly 1 Gable Roof Beams Roof Beam Assembly 2 1Liftandfastena right gable assem bly at top of lintel using bolts and nuts 25 the 2 halves of a roof beam assembly andfastenthe roof beam to the outer gable bracket using 2 bolts and nuts Hint The holes along the length of the beam must be on the top surface and 4 hole cluster must be fastened toward truss the outer end of the roof beam to the outer truss bracket of the truss using 2 bolts and nuts Repeat Steps 2 through for the next roof beam assembly Roof Beam Assembly 8 Left Gable Assembly 2 Parts Needed For Gables Roof Beams Right Gable Assembly 1 9462 Roof Beam Assembly 5 14x31 1 Lift and fasten a left gable assem bly in the same manner Quoin the left and right gables to gether using a bolt and nut in the third hole from the bottom oi the weather stripping along the mating edge of the left and right gables as shown Cut the
23. nt 2install the right and left roof pan els for the rear corners in the position shown STEP P TRA DX Step 18 BX34 1 Position a roof panel overlapping rib of left corner roof panel Fasten overlap at center of roof panel rib using a bolt and nut Fasten to roof beams as done before using screws 2install a roof panel on the left side of building Repeat procedure with 2 more roof panels working side to side At the top beam end of panels fasten 2nd roof panel rib overlaps with a bolt and nut 3Cut the weather stripping tape into 6 strips each strip about 2 bcm long Press 2 strips over the bolt heads on overlaps at the top of pan els Save the other 4 strips for the rest of roof Acover the join at the peak with weather stripping tape Unroll the tape and press it down over the open ing at the ridge as you install each roof panel Do not cut the tape at this time Crimped Rib is Always Overlapped by Wide Rib of Adjacent Panel Weather Stripping Parts Needed For Roof Panel Roof Panels 9491 Roof Panel 4 ROOF PANEL SCREWS TO ROOF BEAM SLOTTED d m HOLES AT K TEN SCREWS TO ROOF BEAM AT OVERLAP FASTEN FIRST SMALL HOLES AT BOTTOM Follow Fastener Sequence NOTE On the 1431 cut the weather stripping tape into 10 strips EA NN ES T WeatherStripp
24. or your foundation 2 x 4 s 5cm x 10cm will be removed once the concrete cures Concrete Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of 1 part cement 3 parts pea sized gravel 2 1 2 parts clean sand Prepare the Site Construct a Foundation 1 Dig a square 6 15cm deep into the ground remove grass 2 Fill up to 4 10cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 4 Construct a wood frame using four planks of 2x4 5cm x 10cm lumber 5 Pour in concrete to fill in the hole and the frame giving a total of 4 8 10cm thick concrete Be sure surface is level Allow 3 5 hours for construction and a week for concrete curing time Note Before beginning construction check local building codes regarding footings location and other requirements Welded Wire Fabric Reinforcing Rods Reinforcing Rods Note Finished Slab dimensions with lumber removed Anchoring Anchoring Down The Building lt is important that the entire floor frame be anchored after the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model No AK4 or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 Wood Screws There are 1 4 0 63cm dia Contains 4 Anchors with Cable Clamps and holes provided in the frames for proper anchoring installation instruction OVER
25. panels Fasten 7th top over lap and cover with weather strip over head of bolt dinstallthe corner roof panels Fas ten ridge cap using bolts and nuts AF asten the lower end of the panels to the side eave channels using screws and black washers the 1431 install 2 more roof panels 2install the third ridge cap overlap ping the second ridge cap as before Install 6 more roof panels while fas tening 8th and 9th top overlap and cover with weather strip over head of bolt Fasten ridge cap using bolts and nuts Sinstall2 roof panels andthe fourth ridge cap Temporarily remove the rear corner roof panels and install the remaining 2 roof panels Fasten 11th top overlap and cover with weather strip over head of bolt Ainstall the corner roof panels Fas ten ridge cap using bolts and nuts 5 Fasten the lower end of the panels to the side eave channels using screws and black washers 9512 1431 oe 9509 e Cut Weather Stripping and Fold Under 7023 Left Roof trim 2 7024 Right Roof Trim 2 Parts Needed For Roof Trim 9510 Side Roof Trim 6 9513 Side Roof Trim 2 1431 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap NOTE A single screw fastens both trim pieces at the overlap 2Position left and right roof tri
26. pper chord and lower chord 6 Fasten 2 inner truss brackets to upper chord and lower chord and inner diagonal brace as shown Mounting Flange of Brackets Must Face Towards Center Of Truss Assembly IMPORTANT Square Up Half Truss Ao me 6967 a 7 1 T Fasien outer diagonal brace to upper chord and lower chord 8 Fasten 2 outer truss brackets to upper chord lower chord and outer diagonal brace 9 Fasten 2 outer truss brackets to upper and lower chords 10 Square up 1 2 truss adjustand tighten all fasteners 11 Assemble the other halfoftruss 1 2Splice both halves together with the splice plate and join the 4 10 32x7 16 bolts and square nuts through vertical brace Make 1 assembly for the 14x21 Make 2 assemblies for the 14x31 Leave Hole On This Side Open For Track Strut 7022 17 Parts Needed For Step 2 BX18 Gables Column Assemblies The gables go on top of the front and rear walls to support the roof beams The center columns support the truss and the framework NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing washers and nuts where shown mu 1 Attach the inner andoutergable brackets to the gables using bolts Mounting leg of bracket must face toward outside of building Attach Narrow Flange of Gable Brackets to Gable 18 9494 Right Gable 2 9495 Le
27. pport the corner panel with a step ladder until a wall panel is attached 2 Attach the front wall panels to the front corner panels as shown 3 Attach the wall panels to the rear corner panels as shown NOTE Be careful to install the correct panel in each position as shown 4 Double check the part numbers of the wall panels before proceeding The floor frame must be square and levelor holes will not align Narrow 9472 Side Wide Side 9472 SIDE TOP VIEW SIDE STEP ES 9472 ee 9472 FRONT STEP Crimped Rib Underneath 9482 Right Front Wall Channel 2 9465 Support Column 2 Parts Needed For 9483 Left Front Wall Channel 2 9476 Side Wall Channel 6 9469 Side Door Channel 2 9468 Corner Door Channel 2 6942 Right Rear Wall Channel 2 9461 Side Wall Channel 4 14x31 6943 Left Rear Wall Channel 2 Mid Frames Step 7 BX23 The mid frame pieces give rigidity to the sides and rear wall NOTE Before installing side wall channels decide at which location you want the side entrance door Do not install the 1x4 side wall channels at 1 of the 4 corner loca tions 1 Fasten side wall channels to center columns using 2 bolts and to corner panels using 4 screws 2 Overlap with the right and left front wall channels and fasten to front wall panel using 3 screws Do not fasten hole nearest door open ing 3 Ove
28. rlap with right and left rear wall channels and fasten to column and wall panel 4 Fasten overlaps using 4 bolts and nuts in each corner assembly 5 install support column to side floor frame and side door channel fastening channel to center column Install 2nd support column to side floor frame and corner door chan nel Fasten channel to corner panel and left rear wall channel On the 1431 attach the side wall channel between the center columns using bolts and nuts 23 9484 Right Side Eave Channel 1 Parts Needed For e I Side Door Frames 9467 Ramp 1 9464 Lower Door Track 1 1 Position right side eave channel against support columns Fasten channel to corner panel Fasten col umns to side eave channel using 2 bolts and nuts on each column LongLeg on Top ech Short Leg 2 Position lower door track inside on Bottom the side floor frame Overlap with ramp and fasten from the bottom us ing 3 10 32x1 4 slotted head bolts and square nuts Opening Facing In 3 Position track inside right side eave channel directly over lower door track and ramp and fasten using 4 screws where shown 9484 Notch Toward Outside of Building 1 2 Between Ramp amp Panel 24 9481 Front Frame 1 Parts Needed For 9480 Front Frame 1 9478 Front Column 2 Front Rear Frames 6
29. se are packaged within the carton Note that extra fasteners have been supplied for your convenience PLAN AHEAD Watch the Weather Be sure the day you select to install your building is dry and calm Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground Teamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need Eye Goggles Work Gloves No 2 Phillips Screwdriver Step Ladder Optional Time Savers With Hardened Magnetic Tip Utility Knife Scissors Wrench Nut Driver Note A power screwdriver or vari Pliers Electric Cordless Drill able speed drill with Phillips tip at C e Square tachment can speed assembly by Carpenter s Leve q as much as 40 Tape Measure String for squaring frame Foundation Preparation Hammer and Nails Spade or Shovel Hand Saw Power Saw e Lumber and or Concrete Selecting and Preparing Your Site Before assembly you will want to decide on a location for your building The best location is a level area with good drainage Allow
30. stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future reference ACCESSORIES ROOF STRENGTHENING heavy snow load KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation Increases the strength of your roof by 50 qu ANCHOR KIT Model No AK4 Anchor Kit contains heavy duty steel augers 60 18m of steel cable and 4 cable clamps No digging or concrete tm ARROW pouring just insert cable under roof LARR over roof beams into augers and twist augers into the ground For buildings larger than 10 x9 use 2 kits FLOOR FOUNDATION KITS MODELS FB47410 FB5465 FB106 A FB109 A FB1010 AND FB1014 A A simple new floor frame system made of heavy duty hot dipped galvanized steel Use as foundation for plywood sand or stone TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 65cm steel channels plus five heavy duty snap in amp hangers and a small tool holder for N screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arrow storage buildings ANCHOR KIT Model No AK100 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit
31. t 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint 704910801
32. t Key No Number Description Carton 1 Carton 2 Carton 3 Carton 4 Carton 5 12 Left Roof Trim Right Roof Trim Track Wall Panel Corner Panel Front Wall Panel Door Jamb Right Door Jamb Left Door Jamb Right Gable Left Gable Door Horizontal Door Brace Ridge Cap Side Roof Trim Lintel Side Floor Frame Side Wall Channel Right Side Eave Channel Left Side Eave Channel Right Roof Beam Left Roof Beam Rear Frame Rear Frame Right Rear Wall Channel Left Rear Wall Channel Column Gusset Gable Truss Strut Inner Gable Bracket Inner Truss Bracket Outer Truss Bracket Vertical Brace Upper Chord Lower Chord Inner Diagonal Brace Outer Diagonal Brace Splice Plate Left Shear Plate Right Shear Plate Spring Support Bracket Lower Door Track Support Column Wall Channel Ramp Corner Door Channel Side Door Channel Front Column Front Frame Front Frame Right Front Wall Channel Left Front Wall Channel Right Track Support Left Track Support Center Column Outer Gable Bracket Outer Truss Bracket Vertical Door Brace Track Strut Roof Panel Right Roof Panel Left Roof Panel Wall panel HANNAN zz M h PO PP 14 2 2 17 13 NE N N UE EA AN 9 NE
33. th 2 bolts and nuts on each D Attach the lower door guides as shown END VIEW SHOWING Horizontal Door Brace Washer 39 Step 24 BX40 1 Position door slides onto the legs from the end of door track as shown in the end view 2From inside the building put the bottom of the door behind door jamb into the lower door track 3Position the top of the door so that the holes in the door line up with the holes in the door slides AFasten the door to the door slides using 10Bx1 2 screws 5 Position door handle lock bracket aligned with handle holes against door jamb Using a pencil mark through holes onto jamb remove bracket and drill 2 1 4 diameter holes in jamb Fasten bracket to door jamb using 2 bolts and nuts Parts Needed For Door Assembly 1 Door Installation 7972 Door Handle Lock Bracket 1 Horizontal Door Brace Track STEP A 3 Door Slide d n if H H fj i i i H n 2 STEP PP v 2 E END VIEW Lower Door Track OF TRACK DoorSlide Screw Step 25 BX41 1 Layout the door panels on a flat surface protecting the panels from being scratched 2Bolt the middle stiles at the center of the 4 door panels where indicated with 10 32 3 8 bolts onthe outside and square nuts inside the door panel bottom sec tion attach the right bottom brack et to the lower right corner and the left bottom bracket to the left side using
34. uction difficult and unsafe lt N 4 CARE amp MAINTENANCE Finish For long lasting finish periodically clean and wax the exterior surface Touch up scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snow on roof can damage building making it unsafe to enter In snow country Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation will reduce condensation Other Tips Wash off inked part numbers on coated panels with soap and water Silicone caulking may be used for watertight seals throughout the building Do not store swimming pool chemicals in your building Combustibles and corrosives must be
35. weather stripping to length Alnstall roof beam assemblies to the left side of building in the same manner Slide a roof beam assem bly over center gable flange and other end over shear plates on truss and fasten as before Repeat roof beam procedure for the opposite end of building Note that 4 hole cluster in roof beam assembly must be fastened toward truss NOTE On the 1431 attach the roof beams between the truss assemblies as before Weather Stripping Tape 30 Parts Needed For 6954 Gable Truss Strut Step 15 Gable Truss Strut eerie tet BX31 Fasten gable truss strut to the middle roof beam behind the front gable by placing tab on the end of the strut betweenthe roof beams Align the tab with the holes and fasten the strut with 2 bolts and nuts 2Fasten the lower end of the strut to the center gable flange with 2 bolts Repeat Steps 1 and 2 for the oppo site end of building 9A the truss assembly the gable struts are attached between the middle roof beam and the vertical brace NOTE Do not tighten bolts and nuts until STEP all Struts are assembled 3 bied 6954 6954 EUR Im RC _ a a SE re 31 Squaring the Building 1 Square the building on the founda tion and at the top by measuring diagonally from corner to corner as previously done 2Use string to check and see if the

Download Pdf Manuals

image

Related Search

Related Contents

  Black Sprayable Seam Sealer TDS  Tripp Lite Empty UPS Chassis for SU80KX2, SU100KX2 and SU120KX2 UPS Systems  4.4 mm MULTIPOINT CLICK4MOVE™ Videoscope  Cooper Lighting Lumiere Boca 632 User's Manual  GoVideo DDV2001 VCR User Manual  GE ZKD910 User's Manual  

Copyright © All rights reserved.
Failed to retrieve file