1. Safety warnings Only APC Field Service Engineers or qualified APC trained personnel may perform a system start up A Before you proceed ensure that power is off by following the procedure in this section Ensure that all power is off 1 Open turn OFF the PDU main input 2 Set the upstream input circuit breaker utility or UPS to the OFF or Locked Out position InfraStruXure Site Planning Installation Start Up 29 Start Up Procedure InfraStruXure System Apply power to the system 1 Set the upstream input circuit breaker utility or UPS to ON 2 Ensure R S T clockwise phase rotation at the top of the main input switch on the PDU using a phase rotation meter 3 Close turn ON the main input switch on the PDU 4 Verify R S T clockwise phase rotation at the top of the primary winding of the transformer using a phase rotation meter 5 Verify that the proper voltage is present on the secondary winding of the transformer 200 or 173 V metered phase to phase using a true RMS voltmeter 30 InfraStruXure Site Planning Installation Start Up Start Up Procedure InfraStruXure System 6 Close turn ON the Main Output circuit breaker on the PDU When the Main Output circuit breaker is closed the power distribution circuit breaker panels are energized 7 Close turn ON the PDU distribution panel circuit breakers When the distribution panel circuit breakers are closed the PDU
2. within the PDU to the main input switch Torque specifications and tools required Before connecting to the terminals verify the torque specifications below by checking the specifications on the main input switch Terminal Torque Tools L1 L2 L3 200V input 8 13N m 6 mm Allen wrench 415V input 5 7 N m 3 Plus Driver PE 14N m 3 16 mm Allen wrench InfraStruXure Site Planning Installation Start Up 15 Installation Procedures Connect the Power Source to the PDU Connect input conductors A licensed electrician must connect input conductors to the PDU At the main input switch connect the input chy wiring according to the labels on the switch and the illustration on this page See the table Torque specifications and tools required on page 15 for information about connecting to each terminal Connect the conductors to the terminals according to the labels on the terminals Use copper conductors only Note This image is of a PDU with 200V input 16 InfraStruXure Site Planning Installation Start Up Connect User Contact Inputs and Output Relays to the User Connection Plate Overview Make contact closure connections NO or NC at the user connection plate to WA monitor dry contacts You can make SS i i a eight connections four contact inputs BETT and four output relays The figure at the right shows the location of t
3. www apc com InfraStruXure Installation and Start Up Large Data Centers 415 and 200V Input PL Ques Ald SS ltd 7 gt This manual is available in English on the enclosed CD AVIA IVO TARIF ED CD ROM DPSTKICRHET About this Manual This manual is intended for APC Field Service Engineers or APC trained installers of an InfraStruXure system for large data centers It covers basic installation and start up For information about installing specific components in your InfraStruXure system see the documentation included with each component Before installing or operating any component refer to the safety instructions in the component s manual The illustrations of products in this manual may vary slightly from the products in your InfraStruXure system You can check for updates to this manual by clicking on the User Manuals link on the Support page of the APC website www apc com In the list of InfraStruXure manuals look for the latest letter revision A B etc of the part number on this manual InfraStruXure Site Planning Installation Start Up i Contents Safety iia E Overview a a dd Save these instructions 0000 00 ooomocorarasa a 1 Safety symbols used in this manual 00cococcoo ooo om 1 Cross reference symbols used in this manual 000000 1 Warnings sa ARA AE Se AA a 2 Installation Maintenance 0oo ooo o
4. Manager o 0 33 Appendix A System Operation cccscsssesessesseneeees 3D How to Apply Power to the System zz 00 o aes 35 How to Ensure Total Power Off 0000 moon non nun nn 36 InfraStruXure Site Planning Installation Start Up v Overview Save these instructions This manual contains important instructions that must be followed during installation operation and maintenance of the InfraStruXure System Safety symbols used in this manual Indicates an electrical hazard which if not avoided could result in injury or death Indicates a hazard which if not avoided could result in personal injury or damage to product or other property Indicates a potential hazard which could result in damage to product or other property Indicates important information Indicates a heavy load that should not be lifted without assistance Indicates a standby state When in standby the unit is not operating but it may still contain hazardous voltage It is not safe to service until the equipment is disconnected from all sources of electrical power Cross reference symbols used in this manual Indicates that more information is available on the same subject in a different manual ii Indicates that more information is available on the same subject in a different section of this manual InfraStruXure Site Planning Installation Start Up 1 Warnings Installation Maintenan
5. Route and Attach Overhead Wiring For dual feed devices within a redundant system attach a power cable from each PDU into two different Rack PDUs in the NetShelter VX Enclosure oooo0000000000000 _jooooo0 oooo0000000000000 _jJooo00 For single feed devices within a redundant system with an Automatic Transfer Switch connect a power cable to the Automatic Transfer Switch A and B feeds and connect the Automatic Transfer Switch power cord to a Rack PDU in the NetShelter VX Enclosure Soooooooonooocono ooo00 For dual feed devices in a redundant system with an Automatic Transfer Switch connect a power cable from each PDU to the Automatic Transfer Switch s A and B feeds and another power cable from one PDU to a Rack PDU and the Automatic Transfer Switch s power cord to asecond Rack PDU in the NetShelter VX Enclosure poco oooO ooooo ooop0op00000000000 _joonno Lay the cables neatly in the Shielding Trough to minimize cable build up InfraStruXure Site Planning Installation Start Up 23 Installation Procedures Route and Attach Overhead Wiring 5 From each NetShelter VX Enclosure run the power cable of the appropriate APC power management device out the roof of the enclosure through the notch in the rear side of the Shielding Trough to the connector of the appropriate power cable from the PDU Plug the two connectors together a
6. The trough attaches to the top of the PDU and accommodates power cables as they exit from the roof of the PDU e The NetShelter Shielding Trough is 610mm in length and is not adjustable Each Shielding Trough has an opening in each side through which you route data cables to the Shielding Partitions Shielding Trough accessories APC offers the following accessories for Shielding troughs e Shielding Trough Covers for both 600 mm wide AR8174BLK and 750 mm wide AR8175BLK enclosures Contact APC for more information e Shielding Trough End Caps AR8167BLK to place on the ends of Shielding Troughs at the end of rows Contact APC for more information InfraStruXure Site Planning Installation Start Up 19 Installation Procedures Install Shielding Troughs Shielding Partitions and Cable Ladders Shielding Partitions There are two types of Shielding Partitions each of which forms a side wall of a trough for data cables You can customize the width of the trough for each row of your system wider for rows carrying many data cables narrower for rows carrying fewer e As the back wall use a Shielding Partition that contains an opening for routing data cables e As the front wall use a solid Shielding Partition to hide data cables for a clean appearance Cable Ladders for overhead wiring across rows After installing the Shielding Troughs and Shielding Partitions install the Cable Ladders between rows of enclosu
7. input conductors 1 Remove the rectangular input gland plate by loosening the captive screws using a Phillips or standard screwdriver In the top of the PDU for overhead wiring In the bottom of the PDU for wiring under a raised floor InfraStruXure Site Planning Installation Start Up 13 Installation Procedures Connect the Power Source to the PDU MAY H li 000 2 Create an appropriately sized hole in the gland plate for the conduit The input gland plate has two knock outs Use J either as starter hole for creating a hole for your conduit Use a knock out punch to create a i larger hole 3 Re attach the gland plate 4 Install a lock nut and bushing to the conduit 5 Thread the conduit through the hole 14 InfraStruXure Site Planning Installation Start Up Installation Procedures Connect the Power Source to the PDU Install a circuit breaker Make sure the cables used for power input are sufficiently protected by a appropriately rated circuit breaker See Electrical Requirements and Specifications on page 8 Route the input conductors to the main input circuit switch 1 Route the input conductors to the main input circuit switch of the PDU as follows For overhead wiring run the input conductors directly to the main input switch For wiring under a raised floor run the input conductors through the wireway
8. 5 Connect input conductors ccoo 16 Connect User Contact Inputs and Output Relays to the User Connection Plate lt lt lt 0 lt 0 OVER Ai eee 17 How to connect contacts to the PDU Monitoring Unit 18 Install Shielding Troughs Shielding Partitions and Cable Ladders 0 ccc eee e eee eee Shielding Troughs and Shielding Partitions for overhead Wiring along rowS 000 e cee e eee ees 19 Cable Ladders for overhead wiring across rows 20 Install InfraStruXure Rack Mount DeviceS Install the Rack Automatic Transfer Switches ATS 21 Install the Rack Power Distribution Units PDU 21 Install the InfraStruXure Manager and Hub or Switch 21 Install the APC Environmental Monitoring Unit 21 Route and Attach Overhead Wiring Route and attach power cables to equipment racks 22 Wiring Under the Floor Alternative Route Data Cables to the InfraStruXure Manager Hub or Switch 2 0 cece eee eee Connect network cables to InfraStruXure components 27 Route network cables to the InfraStruXure Manager hub or switch 0 cece eee eee es 28 Safety warnings acae aaas ed ware ana 29 Ensure that all power is off s saa 0000s eee eee 29 Apply power to the system 1 000 cece eee es 30 InfraStruXure Site Planning Installation Start Up 19 CONTIG UMAU ON need Configure the InfraStruXure
9. ber and press the ENTER key Press the Down arrow key to enter a unique Name for the contact and to configure the Normal state of the contact Open or Closed The default Normal state is Open Press the ENTER key to select the item you wish to configure You will be prompted for your password to configure these items 3 Connect contact wires 300 V rated cabling required to the terminal block on the user connection plate You will need a 2 5 mm standard screwdriver 4 Run the wires from the terminal block out the roof or under the floor of the PDU to your contact s location Ensure that wires are properly retained and away from high voltage lines and breakers InfraStruXure Site Planning Installation Start Up Install Shielding Troughs Shielding Partitions and Cable Ladders Shielding Troughs and Shielding Partitions for overhead wiring along rows If you ordered APC Shielding Troughs Shielding Partitions and Cable Ladders to route overhead wiring for your system assemble the Shielding Troughs and the Shielding Partitions along the rows of enclosures and assemble the Cable Ladders between rows TR For information on grounding the Shielding Troughs and Shielding Partitions see the e instruction sheet 990 1393B included with the Shielding Troughs and Shielding See also Partitions Shielding Troughs There are two types of Shielding Troughs e The PDU Shielding Trough 610mm in length is not adjustable
10. ce Only a certified electrician can do following e Connect the PDU to its power source e Install a customer specified hard wired power cable Only a certified electrician or an APC Field Service Engineer can perform maintenance of the PDU When connecting the PDU to utility a circuit breaker must be installed to protect the PDU against short circuit current Determine the type of circuit breaker that you need to install Input Voltage Circuit Breaker Size 200 V 200A 415V 100A Maintenance performed while the PDU is receiving input power APC does not recommend that you perform maintenance of the PDU while it is receiving input power However due to the critical nature of data center loads this may occur If you must perform maintenance while the PDU is receiving input power observe the following precautions to reduce the risk of electric shock 1 Never work alone 2 Perform the maintenance only if you are a certified electrician who is trained in the hazards of live electrical installation 3 Know the procedure for disconnecting electricity to the PDU and the data center in case of an emergency 4 Wear appropriate personal protective equipment 5 Use double insulated tools 6 Always follow local and site regulations when working on the PDU Total power off procedure 1 Set the PDU Main Input to Off 2 Set the upstream power source circuit breaker to Off Register equipment with the fire department Follo
11. e Site Planning Installation Start Up 35 How to Ensure Total Power Off 1 Open turn OFF the main circuit breaker on the power source feeding the PDU 2 Open turn OFF the main input switch on the PDU 3 Set the Main Output circuit breaker on the front of the PDU to OFF 36 InfraStruXure Site Planning Installation Start Up www apc com APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways e Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests www apc com Corporate Headquarters Connect to localized APC Web sites for specific countries each of which provides customer support information www apc com support Global support searching APC Knowledge Base and using e support e Contact an APC Customer Support center by telephone or e mail Regional centers Direct InfraStruXure Customer Support Line 1 877 537 0607 toll free APC headquarters U S Canada 1 800 800 4272 toll free Latin America 1 401 789 5735 USA Europe Middle East Africa 353 91 702000 Ireland Japan 0 35434 2021 Australia New Zealand South Pacific area 61 2 9955 9366 Australia Local country specific centers go to www apc com support contact for contact information Contact the APC representative or other distributor from whom y
12. he user connection plate on the roof of the PDU enclosure You can make connections from inside the enclosure or you can remove the user connection plate and make your connections Remove the plate using a Phillips or standard screw driver to loosen the two captive screws Use the knockout in the plate to route cables to and from the user connections on the plate If you remove the plate make sure that you do not disturb the existing connections Output relay specifications Nominal switching capacity 1A at 30VDC Maximum switching power 30W Maximum switching voltage 60VDC Maximum switching current 2ADC Maximum carrying current 2ADC Surge ratings 2kV per Bellcore TA NWT 001089 1 5kV per FCC part 68 InfraStruXure Site Planning Installation Start Up 17 Installation Procedures Connect User Contact Inputs and Output Relays to the User Connection Plate How to connect contacts to the PDU Monitoring Unit 18 To connect and monitor your contacts 1 Choose the numbers of the contacts to which you will connect 2 From the PDU display interface a b C Press the ESC or ENTER key to go to the top level menu screen Select Contacts on the top level menu screen and press the ENTER key Press the ENTER key to select the number of the contact you are connecting The continue arrow will appear next to the contact number Press the Up or Down arrow key to select the appropriate contact num
13. hts to ensure that the floor and subfloor can support the total weight of the configuration If you are placing equipment on a raised floor consult the flooring manufacturer for loading requirements before installing equipment For assistance in planning your configuration call APC Customer Support in Japan at the number listed on the back cover of this manual Component Maximum Unpacked Maximum Packaged InfraStruXure PDU 550kg 591kg NetShelter VX Seismic Enclosure empty 235kg 253kg NetShelter VX Enclosure empty 163kg 180kg 6 InfraStruXure Site Planning Installation Start Up Heat Output Consider the heat dissipation ratings of equipment to determine cooling requirements Additional cooling equipment may be required Heat output of the InfraStruXure PDU is shown below InfraStruXure PDU Heat Output 200V input 3496 BTU hr 1 025kW 415V input 3746 BTU hr 1 098kW InfraStruXure Site Planning Installation Start Up Electrical Requirements and Specifications Procedures requiring a licensed electrician A licensed electrician must connect utility power The following procedures require a licensed electrician e connection of utility conductors installation of a 200 or 100 amp circuit breaker e connection to the main input switch e connection to a branch circuit ED To connect utility power see the utility connection instructions included with your lt A documentation See also Electrical requireme
14. lect line Press to mute alarm gt Press for 10 seconds t o invert display www apc com Rack Power Distribution Unit A mm E 000 o O starus i 12 13 InfraStruXure PDU InfraStruXure Site Planning Installation Start Up 27 Installation Procedures Route Data Cables to the InfraStruXure Manager Hub or Switch Route network cables to the InfraStruXure Manager hub or switch Overhead routing 1 Install Shielding Partitions and Cable Ladders See Install Shielding Troughs Shielding Partitions and Cable Ladders on page 19 2 Run the Cat 5 network cables provided from each APC device to the InfraStruXure Manager hub or switch a Start with the device farthest from the enclosure housing the InfraStruXure Manager and hub or switch and use the longest supplied Cat 5 cable b Bundle cables together and run the bundles in the data cable troughs along rows and across Cable Ladders if necessary 3 Connect each APC device s network cable to any available station port in the InfraStruXure Manager hub or switch Station ports are those with an x after the number e g 2x En After you have connected the components to the hub connect the InfraStruXure I Manager to the hub For instructions see the manual included with your InfraStruXure See also Manager 28 InfraStruXure Site Planning Installation Start Up Start Up Procedure
15. nal component and not all InfraStruXure systems will include it Install the Rack Power Distribution Units PDU Install Rack PDUs in the rear of the NetShelter VX enclosure in the channel directly behind the rear vertical mounting rails For overhead wiring make sure that the power cord is pointing toward the roof of the enclosure For wiring under the floor make sure that the power cord is pointing toward the floor rae SS See the installation instructions in the manual included with your Rack PDU See also The Rack PDUs is an optional component and not all InfraStruXure systems will include it Install the InfraStruXure Manager and Hub or Switch Install the InfraStruXure Manager in the enclosure closest to the PDU The CATS data cables included with your configuration are of varying lengths based on the distance components will be installed from the PDU en See the installation instructions in the manual included with your InfraStruXure lt A Manager See also Install the APC Environmental Monitoring Unit Install the Environmental Monitoring Unit according to the installation instructions included with the device The Environmental Monitoring Unit is an optional component and not all InfraStruXure systems will include it InfraStruXure Site Planning Installation Start Up 21 Route and Attach Overhead Wiring Route and attach power cables to equipment racks If you ordered overhead wiring connect the p
16. nd twist them clockwise to lock 0 0 WOK 000 000 000 24 InfraStruXure Site Planning Installation Start Up Wiring Under the Floor Alternative Make sure all wire connections and circuit breaker connections are properly torqued A A licensed electrician must route and connect the power cables for wiring under the floor If you are routing power cables under a raised floor to the enclosures you must provide the appropriate power cables and equipment for installation and a licensed electrician must route and connect the power cables to the PDU circuit breakers To wire each power cable to an enclosure 1 Push out a knock out filler in the floor of the PDU to create an opening for the cable 2 From the Rack PDU or Rack ATS in each enclosure thread the appropriate power cable for your application from the enclosure to the PDU 3 Atthe PDU route the cable through the opening you created in step 1 and then up through the wireway at either side of the PDU This will allow you to connect the cable to the upper circuit breaker panel InfraStruXure Site Planning Installation Start Up 25 Installation Procedures Wiring Under the Floor Alternative 26 4 At the circuit breaker panel cut the wires to the proper 7 length and connect the power cable s individual wires a If you have branch current monitoring lt gt 7 installed route each lt 2 phase conduc
17. nt NetShelter VX Seismic Enclosures see the installation manual included with your enclosures See also 4 Bolt enclosures to the floor InfraStruXure Site Planning Installation Start Up 9 Site Preparation Basic Installation Procedure 6 10 11 12 13 10 Connect the power source to the PDU A licensed electrician must connect the power source ea See page 13 for detailed instructions Connect user contact inputs and output relays to the user connection plate See page 17 for detailed instructions Install Shielding Troughs Shielding Partitions and Cable Ladders ED For instructions see the manuals included with your Shielding Troughs Shielding Partitions and Cable Ladders See also Install the Rack Automatic Transfer Switches ATS Rack Power Distribution Units and other InfraStruXure rack mount devices For instructions see the manuals included with your Rack ATS Rack PDU or other InfraStruXure rack mount device See also Route and attach PDU power cables to each Rack ATS and or Rack PDU See page 22 for detailed instructions Route and attach communication cables to the InfraStruXure Manager hub or switch E See page 27 for detailed instructions Start the system Only qualified APC trained personnel may perform a system start up See page 29 for detailed instructions Configure the InfraStruXure Manager For instruc
18. nts 200 V Input 415V Input Service distribution breaker 200A 100A Conductors to Main Input switch 3W G 3W G Recommended wire sizing L1 L2 L3 60mm 38mm G 14mm 8 mm l Provided by customer 2 Consult national and local codes for requirements specific to your installation 3 CV or CVT cable 8 InfraStruXure Site Planning Installation Start Up Basic Installation Procedure This section provides the basic steps that you need to perform when installing InfraStruXure power and rack components Follow the references provided with each step for detailed instructions Engineer present N Do not begin installing your InfraStruXure system without an APC Field Service 1 Unpack the components according to the unpacking instructions included on the outside of the packaging or in the installation manual included with the component Make sure that all boxes and packaging are empty before discarding them 2 Determine the correct placement of your system components by studying your APC InfraStruXure configure to order CTO report Move the InfraStruXure PDU and enclosures to their final location floor structure has a kg m rating that will support the full weight of the If installing InfraStruXure on a raised floor make sure that the raised A InfraStruXure installation See Weight Considerations on page 6 3 Join adjacent NetShelter enclosures Yo For instructions on joining adjace
19. oo ee 2 Maintenance performed while the PDU is receiving input power cc cece 2 Total power off procedure cocoa a 2 Register equipment with the fire department 0000 2 Site Preparatorias DIMENSIONS io nn InfraStruXure PDU zn nun 0 nn nn ee 3 NetShelter VX Seismic Enclosure 00e eee e eee oro 3 NetShelter VX Enclosure 0c cee eee nn nn nn nn nn 4 Space Considerations 00c csc e eee eee Weight Considerations oooo ooo co eee Heat Output HL es Electrical Requirements and SpecificationS Procedures requiring a licensed electrician 00000005 8 Electrical requirements 000 cece ee 8 Basic Installation Procedure 000ooooooooommcosa 3 on O u 9 Installation Procedures u 22ununnnonnnunnnnnunnnnnnnnnnnnnnn LL Join Adjacent Enclosures and Bolt Enclosures to the Floor Join adjacent enclosures zoo soon nn nn nn nn 11 Bolt Enclosures to the Floor zu ccc ooo 11 InfraStruXure Site Planning Installation Start Up 11 Start Up Procedure iii 29 Ensure Total Power Off 0oooooo ooo mmm 12 Connect the Power Source to the PDU 0200222 13 Access the PDU Main Input switch 0 00ooo ooo 1 13 Attach conduit to the PDU for the input conductors 13 Install a circuit breaker 2c cc nunnn nun nun 15 Route the input conductors to the main input circuit switch 15 Torque specifications and tools required 00000 0000 04 1
20. ou purchased your APC product for information on how to obtain local customer support Entire contents copyright 2004 American Power Conversion All rights reserved Reproduction in whole or in part without permission is prohibited APC the APC logo InfraStruXure NetShelter PowerChute and Symmetra are trademarks of American Power Conversion Corporation and may be registered in some jurisdictions All other trademarks product names and corporate names are the property of their respective owners and are used for informational purposes only UN 990 1789 001 KO 1 9 001 03 2004
21. power cables and connected equipment are energized InfraStruXure Site Planning Installation Start Up 31 Configure the InfraStruXure Manager After you complete the installation and system start up configure the InfraStruXure Manager oo XA See also For instructions see the manual included with your InfraStruXure Manager If you use PowerChute Network Shutdown PCNS software with your InfraStruXure UPS your UPS must have a connection to the User LAN public network for PCNS to function correctly If the Network Management Card installed in your UPS is connected to the InfraStruXure Manager s APC LAN you must install a second Network Management Card in your UPS and connect it to the User LAN public network to use PCNS InfraStruXure Site Planning Installation Start Up 33 Appendix A System Operation How to Apply Power to the System 1 Close turn ON the main circuit breaker of the power source supplying power to the PDU 2 Close turn ON the main input on the PDU 3 Power the PDU distribution circuit breakers a Set the Main Output circuit breaker on the PDU to ON Note After the Main Output circuit breaker has been closed both PDU distribution panels will be energized b Close turn ON the PDU distribution panel circuit breakers When the distribution panel circuit breakers are closed the PDU power cables and connected equipment are energized InfraStruXur
22. res You can also run Cable Ladders across Shielding Troughs in the same row using the hardware provided in the ladder kit E For more information on installing the Cable Ladders see the instruction sheet included NoE mitades 990 1576 See also Use wide Cable Ladders 305 mm where many power cables or data cables will run between rows use narrow Cable Ladders 152 mm where few power cables or data cables will run between rows The Cable Ladders are 2946 millimeters long You can adjust the length of the Cable Ladders in the following ways e Cut the ends with a hacksaw to shorten them e Insert the connectors only partially into the side rails to extend them Do not change the spacing between rows or the length and position of the Cable Ladders from the layout you planned with your APC representative when you placed your order For overhead wiring each PDU power cable is provided at a pre determined length Changes to the physical configuration of your system could cause some PDU power cables to be too short or too long 20 InfraStruXure Site Planning Installation Start Up Install InfraStruXure Rack Mount Devices Install the Rack Automatic Transfer Switches ATS Install a Rack ATS in the top of each enclosure for overhead wiring and in the bottom of each enclosure for wiring under the floor See the installation instructions in the manual included with your Rack ATS See also The Rack ATS is an optio
23. rewired power cables of the PDU as follows 1 Install the Shielding Troughs Shielding Partitions and Cable Ladders so that you can route power cables from the PDU to the NetShelter VX Enclosures en For installation instructions see the manual included with your Shielding Troughs Shielding Partitions and Cable Ladders See also 2 Find the numbers that indicate the enclosure to which each power cable will supply power These numbers appear on the roof of the PDU where the power cables exit and on the ends of each power cable The enclosures are not numbered Consult your APC InfraStruXure Configure To Order CTO report to determine the enclosure associated with each power cable 3 Beginning with the power cables for the enclosures farthest from the PDU run each power cable within the Shielding Trough along the row and if necessary across one or more Cable Ladders to the enclosure to which it will provide power Ensure that the connector at the end of each power cable always lies on top of any longer power cables in the Shielding Trough 4 Connect the appropriate power cable to APC power management equipment in the enclosure in one of the four following ways For single feed devices without redundancy attach a power cable directly to a Rack PDU installed in a NetShelter VX Enclosure ooopo00000r000000 _jooo00 22 InfraStruXure Site Planning Installation Start Up Installation Procedures
24. tions see the manual included with your InfraStruXure Manager See also InfraStruXure Site Planning Installation Start Up Installation Procedures Join Adjacent Enclosures and Bolt Enclosures to the Floor Join adjacent enclosures en To join NetShelter VX Enclosures see the installation manual included with your lt A enclosures See also Bolt Enclosures to the Floor Gp Proper anchoring hardware must be in place before starting this procedure To bolt the PDU and enclosures to the floor follow these steps for each enclosure 1 Remove the front and rear skirts on the enclosure 2 Insert two bolts through each plate and the holes in the plinth using the bolt plate included Screw the bolts into the pre installed anchoring hardware in the floor 3 Tighten the bolts to 81 n m using a torque wrench InfraStruXure Site Planning Installation Start Up 11 Ensure Total Power Off 1 Set the main input switch on the PDU to OFF 2 Open turn OFF the main output circuit breaker on the PDU 12 InfraStruXure Site Planning Installation Start Up Connect the Power Source to the PDU Access the PDU Main Input switch Open the back doors of the PDU unlock the top smaller door using the provided red key Loosen the two captive screws holding the larger hinged door in place using a Phillips or standard screw driver Attach conduit to the PDU for the
25. tor through a current sensor If it is a multi circuit cable route the L1 L2 and L3 wires through separate current sensors b Connect the L1 L2 and L3 wires to the circuit breaker s The illustration at right 0060000000000000dP0000000000000000665 00000000000000000060000000000000000000 shows a single circuit cable connecting to a Wis a Ae BEN Een i ERORA ANINI I single pole breaker however you can also ANILA SoboaNoco connect a multi circuit cable to a four pole breaker 900500 oaNooo c Connect the neutral wire Ab TN IL La to the closest open termination point on the Neutral Bar d Connect the PE wire to the closest open termination point on the PE Bar 5 Connect the neutral wire to the neutral bar and the PE wire to the isolated ground bar InfraStruXure Site Planning Installation Start Up Route Data Cables to the InfraStruXure Manager Hub or Switch Connect network cables to InfraStruXure components Connect a Cat5 network cable provided to the network or 10Base T port on each of your APC InfraStruXure devices The following devices need to be connected Automatic Transfer Switch A B AO Fass O O Input Ho Output TOD BO Preference Configuration Rack PDU Press to se
26. w local code ordinances and register all fire code compliant equipment with the fire department 2 InfraStruXure Site Planning Installation Start Up Site Preparation Dimensions InfraStruXure PDU Shielding Partitions Sx oN 580mm A Shielding Trough LI 85mm 580mm With trough 2243mm Without trough 2058mm 597mm gt ee NetShelter VX Seismic Enclosure Base Enclosure Shielding Partitions m nn 580mm Shielding Trough EA 2070mm 185mm 597mm en InfraStruXure Site Planning Installation Start Up 3 Site Preparation Dimensions NetShelter VX Enclosure Base Enclosure Shielding Partitions If 597mm 122mm 2070mm Shielding Trough Lem ha a 1071 9mm 4 InfraStruXure Site Planning Installation Start Up Space Considerations Study the figures below to determine your space requirements for installing the InfraStruXure PDU Symmetra PX UPS and XR Battery Enclosure Consult your local and national codes for additional requirements gt 300mm Ceiling Clearance a gt 600mm Rear Clearance gt 1000mm Front Clearance InfraStruXure Site Planning Installation Start Up 5 Weight Considerations Use the Maximum Packaged weights to determine what methods you will use to move equipment into your data center Use the Maximum Unpacked weig
Download Pdf Manuals
Related Search
Related Contents
CME WIDI-X8 User`s manual BT 3200 Cordless Telephone User Manual Revolabs FLX2 – Espanol - Quick Setup Guide Samsung PL90 Brugervejledning 中毒事故の防止に関する注意喚起について (PDFファイル 317.2KB) PCX440np PDF Manual Cognac - Communauté de communes de Haute FA-FACE-F14E User`s Manual Fujitsu Intel Xeon 5120 Rexel 30443EAST Copyright © All rights reserved.