Home
American Standard Hampton 7225.733 User's Manual
Contents
1. 2 in a way that the male HANDLE BASE 9 square on the ADAPTER 1 fits in the female square of ly i j x M Push HANDLE 9 and ADAPTER 1 HANDLE BASE 2 IS onto VALVE STEM 3 Push HANDLE BASE 2 and E Check alignment if not ADAPTER 1 onto VALVE STEM 3 satisfactory aligned ae 2 9S m Push out ADAPTER 1 carefully Push CROSS HANDLE 4 5 onto HANDLE BASE 2 a Turn ADAPTER 1 either 45 or 90 so that male square on Install HANDLE SCREW 6 d tighten ADAPTER 1 catches different i ie tie ica female square in HANDLE BASE 9 Push INDEX CAP 7 8 in top of m Assemble and tighten HANDLE SCREW 6 CROSS HANDLE m Push INDEX CAP 7 in top of HANDLE 9 TEST INSTALLED FAUCET E Operate both HANDLES to flush water lines thoroughly Turn HANDLES into off position E Check SHOWER HEAD and SPOUT connections for leaks Operate Turn on water supplies and check all connections for leaks DIVERTER for proper operation Turn handles into OFF position SERVICE SPRING CLIP CARE B AN rotation proceed as follows DO SIMPLY RINSE THE PRODUCT CLEAN i f WITH CLEAR WATER DRY WITH A SOFT E s ee COTTON FLANNEL CLOTH a Pull out LEVER BALL from HANDLE BASE 90 EY ee ee DO NOT DO NOT CLEAN THE PRODUCT a Lift STOP WASHER turn 90 and replace WITH SOAPS ACID POLISH ABRASIVES Replace SPRING CLIP HARSH CLEANERS OR A CLOTH WITH A Reinstall HANDLE See step three WASHER COARSE SURFACE
2. If spout drips operate handles several times from OFF to ON position Do not force handles turn only 90 US60407REV 1 1 American Standard 060351 YYYOA SHOWER ARM AND FLANGE M953569 YYYOA SHOWER HEAD 013307 YYYOA METAL CROSS HANDLE 021470 YYYOA 908501 YYYOA BASE CROSS HANDLE 012316 0070A TRANSFER VALVE KIT 918428 0070A HANDLE SCREW 013311 YYYOA INDEX CAP A 7 042692 0070A PORCELAIN CROSS 021470 YYYOA INDEX CAP HANDLE 916503 YYYOA LEVER HANDLE BASE o 918428 0070A HANDLE SCREW 0060353 YYYOA PORCELAIN LEVER HANDLE 066081 YYYOA SPOUT SLIP ON For toll free information and answers to your questions call HOT LINE FOR HELP 1 800 442 1902 HAMPTON THREE HANDLE BATH SHOWER MODEL NUMBERS 012336 0020A TRANSFER VALVE SEAT KIT 012325 0070A TRANSFER VALVE SEAL KIT M962341 0070A GROUND JOINT INLET 994053 0070A CARTRIDGE 060453 YYYOA ESCUTCHEON KIT 923002 0070A ADAPTER 060354 YYYOA METAL LEVER HANDLE 021470 YYYOA END CAP 907520 YYYOA SPOUT ESCUTCHEON Replace the YYY with appropriate finish code CHROME 002 Weekdays 8 00 a m to 6 00 p m EST IN CANADA 1 800 387 0369 TORONTO 1 905 306 1093 Weekdays 8 00 a m to 7 00 p m EST IN MEXICO 01 800 839 12 00 Product names listed herein are trademarks of American Standard Inc Armerican Standard Inc 1999 US60407REV 1 1
3. Atntricam Standard HAMPTON THREE HANDLE BATH SHOWER SET WITH TRANSFER VALVE Installation Instructions 7225 703 7225 713 7225 723 7225 733 Thank you for selecting American Standard the benchmark of fine quality for over 100 years To ensure that your installation proceeds smoothly please read these instructions carefully before you begin ROUGHING IN DIMENSIONS NOTE NO CONCEALED PIPING FURNISHED 1 1 4 DIA HOLE FINISHED ALL 1 2 N PT SHOWER ARM at Pam reed 4 OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 65 AND 78 2 MIN 3 1 4 MAX 1 2 N PT TO 2 1 13 16 DIA HOLES SHOWER FOR VALVES ON 8 CENTERS 1 1 13 16 DIA HOLE FOR CENTER TRANSFER VALVE 74 FOR HEAD CLEARANCE 18 OPTIONAL UNION INLET 1 2 14 N PT BOTTOM OF TUB i Required ee 3 Flat Blade Screwdriver Phillips Screwdriver TE Adjustable Wrench Plumbers iia or Caulking ZN Channel Locks Hex key a with Fitting Certified to comply with ANSI A112 18 1M U S Patent No 5 819 789 US60407 REV 1 1 T ff h d cold SE AA SPOUT CAUTION supplies before beginning i IMPORTANT DO NOT REMOVE PLASTER GUARDS 2 UNTIL STEP 2 Prepare water supplies per Roughing in Dimensions Apply sealing tape to all threaded connections Install VALVE 1 at indicated height and depth Make sure the outlet ma
4. PE ELBOW and 1 2 C W T SPOUT NIPPLE Final length of SPOUT NIPPLE to be 1 from finished wall 6 lt A ROUGH IN Push SPOUT ESCUTCHEON 6 onto filler pipe flush against finished wall ays Wa NIPPLE Push TUB SPOUT 7 onto filler pipe until tight against SPOUT ESCUTCHEON 6 X 4 Tighten clamp screw in SPOUT 7 to secure TUB SPOUT 7 to rough in nipple E PIPE CAP CLAMP SCREW 3 FINISHING INSTALLATION SHALLOW ROUGH IN DEEP ROUGH IN E Remove caps from roughing in nipples MORE THAN 2 1 2 LESS THAN E Remove PLASTER GUARD by turning counter clockwise and pulling 2 1 2 i SLEEVE E If VALVE BODY is roughed in SHALLOW more than 2 1 2 E SLEEVE screw SLEEVE in ESCUTCHEON facing front of ESCUTCHEON I E if VALVE BODY is roughed in DEEP less than2 1 2 screw SLEEVE in ESCUTCHEON facing back of ESCUTCHEON L i E Assemble RUBBER RING to ESCUTCHEON RUBBER i RING VALVE E Screw ESCUTCHEON and SLEEVE onto VALVE COVER against wall BODY Enie CUTGHE N E Install SHOWER ARM SHOWER ARM FLANGE and TUB SPOUT 4 INSTALL HANDLES FOR LEVER HANDLES Turn VALVE into OFF position FOR CROSS HANDLES Push ADAPTER 1 into HANDLE BASE 9 a A in a way that the male square on the Turn VALVE into OFF position S E ADAPTER 41 fits in he female square of the Push ADAPTER 1 into HANDLE BASE
5. rked SHR is pointing upward Mount VALVE 1 to cross brace with wood screws Slip COUPLING NUT over supply pipe and thread UNION SWIVEL to pipe Connect HOT 6 water supply to LEFT valve inlet and COLD 7 water supply to RIGHT valve inlet Prepare SHOWER RISER 4 and ELBOW 3 Connect to TOP outlet marked SHR of VALVE BODY 1 Prepare TUB FILLER PIPE 8 ELBOW 10 and roughing in NIPPLE 9 Connect to BOTTOM outlet of VALVE BODY 1 Add cross braces to wall structure and secure piping Cap NIPPLES 9 amp 5 and open supply lines and check for leaks Remove PLASTER GUARDS 2 Use spline on end of PLASTER GUARD 2 to open both VALVES and check for leaks Operate transfer valve and check for leaks Close both valves and turn off water supplies Replace PLASTER GUARDS 2 Finish wall construction UNION SWIVEL 7 COUPLING NUT 2 INSTALL TRIM SHOWER AND TUB SPOUT T leon NOTE PROTECT FINISH ON SHOWER AND TUB TRIM WHEN INSTALLING Remove PLASTER GUARDS 1 from valve body by unthreading and pulling off Remove rough in nipple from shower elbow f N ROUGH IN Apply Salin tape to threads on both ends of SHOWER ARM 2 and install N NIPPLE SHOWER ARM 2 with SHOWER ESCUTCHEON 3 into shower elbow Thread SHOWER HEAD 4 onto end of SHOWER ARM 2 Push SHOWER ESCUTCHEON 3 against finished wall Tighten SET SCREW 5 SD Remove pipe cap from tub filler pipe Prepare TUB FILLER PI
Download Pdf Manuals
Related Search
Related Contents
Super Sports 3X 取扱説明書 Copyright © All rights reserved.
Failed to retrieve file