Home

Chief NS1F2828 racks

image

Contents

1. DANGER IMPROPER WIRING CAN LEAD TO DEATH OR SEVERE PERSONAL INJURY Grounding must be installed by qualified personnel using a UL Recognized No 12AWG Green and Yellow grounding wire connected to grounding lug on rack Installation Instructions NS1F12 20 28 36 41 Completing Installation 1 Remove and save 1 4 nut from the grounding lug on rack rail See Figure 8 Attach grounding wire from door to the grounding lug See Figure 8 Replace and tighten nut onto grounding lug See Figure 8 Add grounding wire o e Figure 8 Change optional logo panel by removing and saving 4 nuts from studs at inside top of front See Figure 9 Remove blank paneland replace with optional personalized logo panel See Figure 9 Replace and tighten four nuts removed in Step 4 front view of rack Figure 9 LOADING THE RACK Load Distribution 1 2 A CAUTION BEGIN PLACEMENT OF LOAD AT BOTTOM OF RACK Load rack moving from bottom toward top of rack Loading rack incorrectly may result in instability causing possibly injury and or damage to components Begin placement of components into the rack at the lowest point Continue placing items into the rack moving from the bottom upward A CAUTION DISTRIBUTE LOAD CORRECTLY Load rack with 2 3 total weight of components in the lower
2. damage to equipment or voiding of factory warranty It is the installer s responsibility to make sure all components are properly assembled and installed using the instructions provided WARNING Exceeding the weight capacity can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the combined weight of all components located within the rack does not exceed 500 Ibs 226 8 kg Use with products heavier than the maximum weight indicated may result in instability or collapse of the rack causing possible injury IMPORTANT Minimum spacings between the Accessories and components and the ITC AV Rack Enclosure shall be maintained for safe operation of the equipment when installed in accordance with the National Electric Code ANSI NFPA 70 2008 Operating temperature inside rack shall not exceed 104 F Tighten Fastener Apretar elemento de fijaci n Befestigungsteil festziehen Apertar fixador Serrare il fissaggio Bevestiging vastdraaien Serrez les fixations Open Ended Wrench Llave de boca Gabelschlissel Chave de bocas Chiave a punte aperte 4 Steeksleutel Cl a fourche Loosen Fastener Aflojar elemento de fijaci n Befestigungsteil l sen Desapertar fixador Allentare il fissaggio Bevestiging losdraaien Desserrez les fixations Phillips Screwdriver
3. Destornillador Phillips Kreuzschlitzschraubendreher Chave de fendas Phillips Cacciavite a stella Kruiskopschroevendraaier Tournevis a pointe cruciforme Installation Instructions NS1F12 20 28 36 41 KEAT T cate taiea iii r HE RT JEEN 7 RA W OVERALL DEPTH USABLEDEPTE WTEC ettii aier UD Ee CAPACI US vei atoms POIMIA 01 We IEE Wi a 1 IH HH Les 220 11 TI Hale na anil anal 164404 IHH C HH LES 20 u EERTE Halen ipa O deep O40063 A0 IH J Sen Les 200 T FENIE lal asap aana eaaa 541063 stanesay 100 HH BCA ii TUE Hall 0 TEANTA SR IIU3l LA HD IHH1 HH es 200 E TEIE Hale PO EAMA D30141 AALS IHH HHB te 11 Tree Hat 0504 anil anal 1644013 ASLELILE J EILLIS LLEA u TIL Hal isan dene O40013 041043 IHH sen tas 226 i TEE aap isan senna 41613 stares IHH C Sunes 06 i TIL Hat 050 f TOATA OTLAN LA HUD IHHIH HHB 1441 11 TENE Hat PA 04 BEANIA D31041 Al ARA B 4 f o o O Ooo j 1 H I i H i i H H i i H 1 H 3 H H H TOP VIEW t A Ram E i f i H 3 H H H 3 g BOTTOM VIEW i j FRONT VIEW SIDE VIEW REAR VIEW NS1F12 20 28 36 41 Installatio
4. INSTALLATION INSTRUCTIONS Knockdown Racks Our Mounts Your Vision CHIEF NS1F12 20 28 36 41 NS1F12 20 28 36 41 Installation Instructions DISCLAIMER Milestone AV Technologies and its affiliated corporations and subsidiaries collectively Milestone intend to make this manual accurate and complete However Milestone makes no claim that the information contained herein covers all details conditions or variations nor does it provide for every possible contingency in connection with the installation or use of this product The information contained in this document is subject to change without notice or obligation of any kind Milestone makes no representation of warranty expressed or implied regarding the information contained herein Milestone assumes no responsibility for accuracy completeness or sufficiency of the information contained in this document Chief is a registered trademark of Milestone AV Technologies All rights reserved A IMPORTANT WARNINGS AND CAUTIONS WARNING A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions CAUTION A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions LEGEND WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury
5. e 5 2 Repeat for back of S1 rack See Figure 5 Figure 5 NS1F12 20 28 36 41 Installation Instructions Attaching Optional Side Panels Optional Doors IMPORTANT If installing doors not included and side panels not included on an S1 rack the doors must be installed before installing the side panels 1 If desired add optional door s not included to the rack following instructions included with the door s IMPORTANT If the door s are to be attached with the pull ring handle on the right side the grounding screw washer and wire already installed on the door must be removed and reinstalled on the opposite end of the door before the door is installed See instructions included with the door s 2 If desired add optional side panels not included to the rack following instructions included with the panel s NOTE If NOT adding door s proceed to Step 4 of Completing Installation section front view of rack Grounding screw and nut installed at factory __ Earthing symbol IEC 60417 No 5019 affixed adjacent to grounding terminal Locations of grounding lugs meio zY gt al Selo s sac T eeej o gt fpe gt 5 5 CEO EAEE Figure 6 A Figure 7
6. half of rack Loading rack incorrectly may result in instability causing possible injury and or damage to components NS1F12 20 28 36 41 Installation Instructions USA International CHIEF Our Mounts Your Vision Europe Chief Manufacturing a products division of Milestone AV Technologies Asia Pacific 8800 002167 Rev00 2012 Milestone AV Technologies a Duchossois Group Company www chiefmfg com 04 12 p TI U gt TI U gt TU 6436 City West Parkway Eden Prairie MN 55344 800 582 6480 952 225 6000 877 894 6918 952 894 6918 Franklinstraat 14 6003 DK Weert Netherlands 31 0 495 580 852 31 0 495 580 845 Office No 1 on 12 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong 852 2145 4099 852 2145 4477 Pa s i 2 J T CoysuneR
7. n Instructions PARTS AND TOOLS REQUIRED N oS tsa L e 7 16 e 13mm use to adjust levelers a 2 F 2 Alignment panel B 1 x Top assembly d J E L p c 2 H Rack rail 1 left ey ile E E Hi z D 2 Cross brace Rack rail right a J 18 Geo H 22 1 4 20 10 32 x 3 4 1 4 20 x 5 8 ASSEMBLY NOTE If optional casters will be added to the base assembly install them now following instructions included with the optional casters Leave levelers installed and adjust them using a 13mm wrench so they are as close to the floor as possible yet still allow movement of the rack on the casters Adding Rack Rails 1 Place base assembly upright onto foot levelers or optional casters 2 Lower one left rack rail C into one corner of base assembly A See Figure 1 IMPORTANT Partial install of Phillips truss head machine screw H should be done BY HAND before completing Steps 4 through 6 3 Partially install by hand one 1 4 20 x 5 8 Phillips truss head machine screw H approximately five turns into the base assembly A See Figure 1 4 Install two 10 32 x 3 4 Phillips head screws G through base assembly A into rack rail C and tighten See Figure 2 Tighten Phillips truss head machine screw H which was partially installed in Step 3 See Figure 2 Repeat Steps 2 5 for three remaining corners of base assembl
8. y Indicates LEFT rack rail NOTE Rack rail indicator L or R must be upright when rack rail is installed oero Ov Z SNS SN WSSS a SNS S SNS r 026000006 006000 A e KS S SWS S SXS S SXS S SNS SF ft Figure 1 Figure 2 Installation Instructions NS1F12 20 28 36 41 Attaching Top Assembly 1 Place top assembly B onto the four installed rack rails See Figure 3 2 Insert and tighten two 10 32 x 3 4 Phillips head screws G through top assembly B into rack rail See Figure 3 3 Insert two 1 4 20 x 5 8 Phillips truss head machine screws H through top assembly B and rail rack into two 1 4 20 keps nuts J See Figure 3 Figure 3 CAUTION Install alignment panels and cross braces VERTICALLY CENTERED on the rack rails BEEORE loading components into the rack Attaching Cross Braces 1 Attach cross brace E to side of S1 rack using four 1 4 20 x 5 8 Phillips truss head machine screws H with four 1 4 20 keps nuts J See Figure 4 2 Repeat for opposite side of S1 rack See Figure 4 Figure 4 Attaching Alignment Panels 1 Vertically center the alignment panel F on the rack rails and attach using four 10 32 x 3 4 Phillips head screws G See Figur

Download Pdf Manuals

image

Related Search

Related Contents

00 - O2  Kapitel 4  Oki BISM2 User's Manual  Olympus CAMEDIA C-120 Basic manual    第一種フロン類充填回収業者登録申請書(pdfファイル:148KB)    - Index of  Instrucciones de Operación Operating Instructions  Manual de usuario  

Copyright © All rights reserved.
Failed to retrieve file