Home

Premier Mounts PCC-1-1-2

image

Contents

1. Installation Instructions PCC PCP CHEESEBROUGH UNIVERSAL PIPE CLAMPS WARNING The ceiling truss should be capable of supporting a weight of at least five 5 times the projector s or monitor s weight If it cannot the ceiling truss must be reinforced Proper installation procedures by qualified personnel as outlined in the installation instructions must be adhered to Failure to do so could result in a serious personal injury PCC 1 or 2 1 1 or 2 Truss tube 2 Cheesebrough upper clamp 3 Security bolt 4 Security nut 5 1 4 or 2 Pipe Coupling 6 1 or 2 NTP National Tapered Pipe customer length requested 7 allen locking screw PCP 1 or 2 1 1 4 or 2 Truss tube 2 Cheesebrough upper clamp 3 Security bolt 4 Security nut 5 2 Pipe nipple 6 1 Y2 or 2 upper mating coupling from mounting devise Instructions Step 1 Loosen the Cheesebrough 2 securing clamp nut to fully open position Step 2 Place the upper clamp body over the 1 or 2 ceiling truss tube and place the 2 clamp nut to secure the clamp assembly to the truss Step 3 Once you have the PCC or PCP at the desired position on the truss tube firmly tighten the 2 clamp nut to secure the clamp assembly to the truss Step 4 Thread the mating 1 4 or 2 NTP National Tapered Pipe fully into the clamps pipe or coupling assembly Step 5 Recheck all mating points for security of install Progressive Marke
2. ting Products Inc 2980 A Enterprise Street Brea Ca 92821 Ph 800 368 0700 Fax 800 932 4888 E mail pnpi pmail com Web Site www pmpi com

Download Pdf Manuals

image

Related Search

Related Contents

Mini Cooper S  MTD Series 400 Lawn Mower User Manual  Dreamer Series User Manual    Sony Projector VPL-CX120/CX125 User's Manual  AV-28RT4BU AV-28RT4SU AV-28RT4BU AV-28RT4SU  Aluratek ADPF01F digital photo frame  Manual de usuario para la presentación de proyectos y puestas en    HP Monitors  

Copyright © All rights reserved.
Failed to retrieve file