Home

Chief SWRD-18PLX rack accessory

image

Contents

1. INSTALLATION INSTRUCTIONS ror SWR DOORS ALL DOORS AND ACCESSORIES THAT REQUIRE GROUNDING MUST HAVE GROUND WIRES FIELD INSTALLED ALL PARTS ARE PRVIDED NOTE ALL DOORS AND ACCESSORIES MUST BE GROUNDED FOR UL COMPLIANCE CAUTION TO REDUCE THE RISK OF PERSONAL INJURY AND CONFORM TO THE UL LISTING THESE INSTALLATION INSTRUCTIONS MUST BE FOLLOWED SWR HINGE TO INSTALL THE TOP HINGE THE MALE HALF MOUNTS TO RACK FACING DOWN AND FACING UP ON THE BOTTOM HINGE FEMALE HALVES MOUNT TO DOOR Door Grounding The door ground stud is located next to the bottom hinge pivot pin Using the ground wire and kep nut provided attach one end of the ground wire to the door grounding stud and the other end to the base ground stud located on the inside bottom corner of the rack Refer to pictures below Rail Grounding Using the ground wire kep nut and bolt provided attach one end of the ground wire to teh bottom rail hole and the other end of the ground wire to the base ground stud which is located on the inside bottom corner of the rack Refer to pictures below NOTE ALL RACK ASSEMBLY AND INSTALLATION IS TO BE DONE BY QUALIFIED SERVICE PERSONNEL

Download Pdf Manuals

image

Related Search

Related Contents

  この製品は寒冷地用US一体形小便器(UFS8ー。CF他)` 感知  Lightolier EL4MF10LX228 User's Manual  user`s manual - UniPower LLC    Manual de Instalación    EFG 535    Changhong LED22B1000 21.5" HD-ready Black LED TV  

Copyright © All rights reserved.
Failed to retrieve file