Home

Chief RSMA280 project mount

image

Contents

1. INSTALLATION INSTRUCTIONS SSB 280 SSM 280 SLB 280 and SLM 280 Interface Brackets SSB 280 SSM 280 SLB 280 and SLM 280 Interface Brackets are designed for use with Chief Series Projector Mounts See the specific installation instructions provided with the mount for additional installation information Unpack carton and verify kit contents If any listed parts are missing immediately contact a Chief Customer Service representative WARNING IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY AND DAMAGE TO EQUIPMENT DO NOT substitute hardware Use only hardware supplied by manufacturer 1 Interface Bracket 4 Screw Phillips Pan Head Machine M4 x 25mm 4 10 24 Thumb Nuts 4 Screw Phillips Pan Head Machine M5 x 25mm All Points Security Kit 4 Washer M4 5 32 Security Hex Key 4 Washer M5 Spacer 500 x 316 x 500 Verify correct size screw and washer needed to install bracket Sr Ne oao we 1 1 4 Towards front q Towards front of projector of projector SLB 280 SLM 280 Note SSB style interface bracket connections are circled Note SSM style interface bracket connections are circled Only used when installing SLB SSB interface brackets NOTE Specific to SSB style and SSM style interface bracket installation All appropriate screws come pre installed in the circled locations above DO NOT attempt to substitute and USE ONLY this pre installed hardware for SSB style
2. and SSM style interface bracket Installation Instructions WARNING OVER TIGHTENING OF SCREWS CAN DAMAGE PARTS AND CAN LEAD TO SERIOUS PERSONAL INJURY AND DAMAGE TO EQUIPMENT DO NOT over tighten screws when installing interface brackets NOTE Step 1 is only required when installing an SLB SSB interface bracket If an SLM SSM bracket is being installed proceed to step 2 Screw thumb screws onto 10 24 x 5 8 Phillips pan head screws DO NOT fully tighten thumb screws atthis time Turn projector upside down on a flat surface Place spacers onto the bottom of the projector aligning the spacers with the threaded inserts in the projector oo TS Place the interface bracket onto the spacers aligning the mounting holes in the bracket with the spacers and threaded inserts in the bottom of the projector and ensuring that triangle in bracket points towards front of projector 5 Position M4 x 25mm mounting screws OR four M5 x 25mm mounting screws with four M4 OR four M5 flat washers into the bracket mounting holes and threaded inserts Tighten all fasteners at this time securing the bracket to the projector NOTE Security screws can be substituted when mounting Interface bracket to projector by using the parts and installation instructions in the All Points Security Kit Chief is a registered trademark of Milestone AV Technologies All rights reserved aw nae hs lt CONSUMER Milestone AV Technologies and its affiliated corpor
3. ations and subsidiaries collectively Milestone intend to make this manual accurate and complete However Milestone makes no claim that the information contained herein covers all details conditions or variations nor does it provide for every possible contingency in connection with the installation or use of this product The information contained in this document is subject to change without notice or obligation of any kind Milestone makes no representation of warranty expressed or implied regarding the information contained herein Milestone assumes no responsibility for accuracy completeness or sufficiency of the information contained in this document AN Chief Manufacturing a products division of Milestone AV Technologies 8802 002087 Rev01 iC ae l f 8401 Eagle Creek Parkway Savage MN 55378 2011 Milestone AV Technologies P 800 582 6480 952 894 6280 F 877 894 6918 952 894 6918 a Duchossois Group Company Our Mounts Your Vision 12 11

Download Pdf Manuals

image

Related Search

Related Contents

Specifications: Input: 5.0V/1A Output: 5.0V/1A Battery: 2X Samsung  02_Installation Setup.fm - Drake Support  Speco Technologies CVC-57PH/HR User's Manual    Hitachi DS 14DSAL Cordless Drill User Manual  1, 2, 3 Plouf dans le bain  TL-ー 30LED 取扱説明書  PCAM Installer User`s Manual  Apostila de biossegurança  GC Initial IQ • One Body, Press-over-Metal  

Copyright © All rights reserved.
Failed to retrieve file