Home

Chief PLP2000B flat panel wall mount

image

Contents

1. INSTALLATION INSTRUCTIONS PLP Series Wall Mount The PLP Series wall mount accommodates large flat screens weighing up to 200 lbs 90 72kg The teardrop holes in the mount allow for quick connect disconnect of the screen thus simplifying installation and maintenance processes The top and bottom mounting brackets are adaptable to supporting framework with wood studs that are 16 on center or 24 on center The mount has integrated lateral shift allowing for four different mounting options For dual wood studs 16 on center the lateral shift is 4 5 inches For dual wood studs 24 on center the lateral shift is 0 5 inches The display can be pulled and tilted by hand into any position in the zero to 15 degree tilt range and remain stationary The bottom of the mount pulls forward 4 from the wall and locks into place for installation of cable connections The mount also uses Chief s exclusive Q Latch mounting system which offers quick connect disconnect display mounting The display is secured to the mount with a latching flag For additional security you can lock the latching flag in place by adding a padlock PLP Series CHIEF MANUFACTURING INC 1 800 582 6480 952 894 6280 FAX 952 894 6918 8401 EAGLE CREEK PARKWAY STE 700 SAVAGE MINNESOTA 55378 USA 03 08 CHIEF Ideas Supporting Ideas 8805 000183 Rev F 2008 Chief Manufacturing www chiefmfg com Installation Instructions
2. PLP Series IMPORTANT If the installation of this product requires OSHPD seismic approval refer to OSHPD pre approval documents and drawings before beginning installation OSHPD documents and drawings are available at www chiefmfg com and located on the product information page for the mount BEFORE YOU BEGIN e CAUTION To prevent damage to your monitor and PLP which could affect or void the Factory warranty thoroughly study all instructions and illustrations before you begin to install the mount Pay particular attention to the Warnings and Cautions in this document e The mount is designed to be installed using wall studs or supporting framework The fasteners used to anchor the mount must be capable of supporting five times the total weight of the equipment e The maximum weight to be installed on the PLP Series wall mount is 200 Ibs 90 72kg e Ifyou have any questions about this installation contact Chief Manufacturing at 1 800 582 6480 or 952 582 6480 A IMPORTANT WARNINGS and CAUTIONS WARNING CAUTION e WARNING WARNING WARNING WARNING WARNING WARNING e CAUTION A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions Improper installation can result in serious personal injury Make sure that the structu
3. Pilot Holes b Figure 4 Wood Studs 24 Apart on Center Installation Instructions PLP INSTALLATION Cont d Mount the PLP To mount the PLP do the following 1 Holding the PLP against the wall select the pair of mounting holes that best suits your situation see Figures 5 6 and 7 NOTE The mounting holes are slotted to allow for a small degree of lateral movement The mount can be centered or shifted to the left of center or right of center depending on stud location 2 Depending on your situation install the lag bolts and washers into the pilot holes previously drilled as described below Option A Install four 5 16 x 2 1 2 lag bolts 20 and four 5 16 washers 30 two top and two bottom into the mounting holes centering the PLP on dual wood studs 16 apart on center as shown in Figure 5 OR Option B Install four 5 16 x 2 2 lag bolts 20 and four 5 16 washers 30 two top and two bottom into the mounting holes that are right of center on dual wood studs 16 apart as shown in Figure 6 OR Option C Install four 5 16 x 2 1 2 lag bolts 20 and four 5 16 washers 30 two top and two bottom into the mounting holes that are left of center on dual wood studs 16 apart dual wood studs 16 apart on center as shown in Figure 6 OR Option D Install four 5 16 x 2 1 2 lag bolts 20 and four 5 16 washers 30 two top and two
4. KET NOT SHOWN THE CUSTOM INTERFACE BRAC KET NEEDED FOR YOUR DISPLAY WILL ADD BETWEEN 1 2 AND 2 IN DEPTH AND MAY AFFECTLOCATION OF DISPLAY ON THE MOUNT SEE PSB XXXX DRAWING ALSO Installation Instructions CONTENTS DIMENSIONAL DRAWING osise 3 TOOLS REQUIRED FOR INSTALLATION 4 PARTS CIS Lista las tanta EENET ERA PLP INSTALLATION Select Mounting Location eects 5 Mount the PLP 2 51 nu as aaah dbieivaess 6 ATTACH PSB TO THE DISPLAY 7 INSTALL THE DISPLAY a 7 REMOVE THE DISPLAY 7 TIET ADJUSTMENT piesaistei ernia 8 CABLECONNECTION aaa iya ca yapasun 8 TOOLS REQUIRED FOR INSTALLATION Drill and drill bit set e Socket wrench set NOTE Other tools may be required depending on your method of installation Figure 1 PLP Parts PLP Series PARTS LIST Prior to assembly unpack the carton completely Verify contents listed in Table and Figure 1 Read installation instructions completely If you are missing any of the listed parts contact Customer Service at 1 800 582 6480 Table 1 Parts List REF DESCRIPTION QTY 10 PLP Series Wall Mount 1 20 BOLT Lag 5 16 x 2 2 4 30 WASHER 5 16 4 20 4 Lag Bolts 7 V NA V 30 4 Washers k Installation Instructions PLP INSTALLATION Perform the following
5. display out see Figure 11 2 Lower center support bar to keep the display tilted up see Figure 12 3 Perform service For example Connect or disconnect the power audio video cables NOTE The service position is not recommended as a final display position 4 Raise the center support bar and reposition the display to desired position if necessary refer to TILT ADJUSTMENT procedure after service is completed WARNING Watch for pinch points Do not put your fingers between moveable parts PLP Series 1 Adjust pitch 2 If necessary tighten nut slightly to increase tension Figure 10 Tilt Display Down 1 Tilt display down see Fig 10 2 Pull bottom out See Fig 11 3 Lower support bar 4 Perform service 5 Return display to desired position 0 Tilt the display 0 to 8 to connect Center or disconnect cables Figure 12 Cable Connection
6. bottom into the mounting holes centering the PLP on dual wood studs 24 apart on center as shown in Figure 7 3 Tighten all lag bolts PLP Series Option A Figure 5 Mounting Holes 16 Apart on Center Option A Option B Figure 6 Mounting Holes 16 Apart on Center Options B and C x r Option D Figure 7 Mounting Holes 24 Apart On Center Option D Installation Instructions PLP Series ATTACH PSB TO THE DISPLAY To attach the PSB to the display do the following Display e To help your identify the correct PSB that matches the model number of your display refer to the cross reference chart at www chiefmfg com e To download the corresponding PSB installation instructions refer to www chiefmfg com OR e Contact Customer Service at 952 582 6480 if you have any questions about how to select the PSB that matches the model number of your display INSTALL THE DISPLAY To install the display do the following NOTE Verify that all power audio video cables are disconnected from the display and the latching flag is lowered in the down position before attempting to mount the display 1 With the aid of another person lift the display up to the mount on the wall aligning mounting buttons with the teardrop slots on the mount and lowe
7. procedures to mount the PLP Select Mounting Location To select the mounting location do the following WARNING It is the responsibility of the installer to verify that the wall to which the mount is anchored will safely support the combined load of all attached components and equipment 1 Determine the exact mounting location to install the wall mount prior to installation keeping in mind the screen size NOTE Mount the PLP on dual wall studs or some other equivalent supporting framework that is vertical or horizontal 2 Using a stud sensor locate the two wood studs where you will mount the PLP as follows e Refer to Figure 3 for wood studs that are 16 apart on center OR e Refer to Figure 4 for wood studs that are 24 apart on center 3 Using a nail as a temporary hook hang the mount on the wall using the triangular hole located in the center of the mount see Figure 2 4 Use a pencil to mark the mounting holes where the four pilot holes will be drilled into the center of the wood stud Make sure the mounting holes are square and straight Remove the mount from the wall placing it on the floor or a table 5 Drill pilot holes using a 7 32 drill PLP Series Hang the mount on the wall temporarily using a nail in the center hole Level the mount before drilling pilot holes Wood Studs ge Wall Pilot Holes Pilot Holes
8. r the display firmly into place Figure 8 2 Raise the latching flag to secure the display see Unlock Figure 9 If the flag does not fully engage check to ensure the mounting buttons are fully seated in the slots NOTE A padlock may be installed through the hole in the latching flag for additional security Latching Flag REMOVE THE DISPLAY To remove the display from the mount do the following Teardrop Slot 1 Disconnect all power audio video cables 2 Lower the latching flag to unlock the display refer to Figure 9 Raise Latching Flag to Lock Figure 9 3 With the aid of another person lift the display up and out of the teardrop slots in the mount to remove the display Installation Instructions TILTADIJUSTIENIT To tilt the display 0 to 15 down do the following 1 Manually tilt the display 0 to 15 down into the desired position 2 If desired tighten the nut see Figure 10 to increase the amount of tension needed to hold the mount in the position set in Step 1 NOTE Tighten the nuts only to adjust the amount of tension needed to manually tilt and hold the mount in place Do not over tighten the nuts Over tightening the nuts may cause excessive wear and may damage your mount 3 Repeat Steps and 2 until the desired tension is obtained CABLE CONNECTION To install or remove cables do the following 1 Manually tilt display down slightly see Figure 10 and then pull bottom of
9. ral members can support a redundant weight factor five times the total weight of the equipment If not reinforce the structure before installing the mount Be aware of the potential for personal injury or damage to the equipment if it is not installed correctly Consider the weight of the mount without the display The installer is responsible for verifying that the display to which the wall mount is fastened will safely support the combined load of all attached components or other equipment The combined weight of the display placed on the wall mount must not exceed 200 Ibs 90 72kg the maximum support weight of the mount Watch for pinch points Do not put your fingers between movable parts Make sure the flag securing the display is completely lowered at all times except when removing or installing the display The flag must be all the way down when installing removing cables Check the unit for shipping damage before you begin the installation Installation Instructions DIMENSIONAL DRAW ING 26 00 gt TOP MOUNTING BUTTON ON PSB XXXX DRAWING G O ES HERE 16 00 24 00 gt 16 00 1 83 18 38 15 51 17 00 13 19 5 oll 424 FAC E TIL jm 15 DOWN 7 UP FOR SERVICE 5 16 x 1 SLOT 5 16 x 6 SLOT 5 16 x 1 SLOT PLP Series NOTE CUSTOM INTERFACE BRAC

Download Pdf Manuals

image

Related Search

Related Contents

cougar 450m datasheet  Arat NS1247 holder  Product Manual - Drive Medical  CNR-SW2 Manual v1.0  TEFAL FV1115E0 Instruction Manual  119 The Color Table Editor    C.A 6471 (Erste Schritte)  SISTEMA DE VIDEOVIGILÂNCIA Manual de utilizador  Samsung SCH-F679 User Manual  

Copyright © All rights reserved.
Failed to retrieve file