Home

Larkooler Liquid Cooling Kit

image

Contents

1. c le HI G G o0 KU3241 KU3241 User Manual KUBZAT Installation Installation Content KU3241 Specification P3 2 KU324 Product Components P3 3 Safety Note P4 4 How It Work P4 9 Power Supply Connection P5 6 Tube Connection P5 6 7 Running Test P 8 System Assembly and Completion 9 1 Completion P8 8 2 Maintenance P8 8 3 Trouble shooting P9 9 Warranty 0 1 Coverage P10 0 2 Warranty Conditions P10 ES J J KUBZAT Installation Installation 1 Specifications Heat Exchange Radiator PUMP 1 Dimension 1 Dimension 310 L X 124 W X 35 H mm 119 2 L X 78 W X 117 4 H mm 2 Weight 680g 2 Power Consumption 10 8W 3 Mater ial 3 Operating Voltage DC 12V Copper tube and aluminum fin 4 Flow Rate 450L Hr 4 Fan Speed 5 Max Mater Lift 2 1M 1200 RPM 7V 1500 RPM 12V 5 Operating Temperature 0 C 40 C CPU Water Block Reservoir 1 Dimension 1 Dimension 60 L X 54 W X 14 H mm 75 L X 100 W X 35 H mm 2 Material Copper 2 Material Acrylic 3 Weight 330g 3 Capacity 140ml 4 Application Intel LGA 1366 LGA 1156 LGA 775 AMD AM3 AM2 AM2 K8 Tube Coolant 1 Dimension 1 Capacity 500 C C ID 9 5mm 0D12 5mm 2 Material Pure Water 2 Material PU 3 Anti Freeze 2 C 3 Life 1 Year 4 Life 2 Years 4 Maximum Temperature 50 C 2 List of Product Components T O a
2. n pump the water would circulate in the pipes the heat of the chips wi be transmitted to the heat exhaust and transpired by the radiator ie KUBZAT Installation 9 Power Supply Connection Remove side panel threat fan wiring Connect the fan wiring with power as shown on picture screws on I O supp y bracket until locked in Connect the pump connector cable onto the computer 6 Tube Connection Determine the length of the tube required between the Water Blocks before cutting and connecting the water lines Ihe ends of the tube should be even and smooth the tube should be fixed to the bottom of the connecter to avoid leakage Avoid curving or bending of the tube to allow coolant running smooth y The order of tube connection does not affect the cooling effect KU3241 Installation STEP2 e First set in the clamp on one end of the Connect the pump tubing adapter with tube connect the tube with tubing the tube use pliers to move the clamp adapter and use pliers to move the clamp onto proper location onto proper location STEP4 Allow the two internal ly connected Connect heat exhaust radiator tubing tubes to go through the holes on the adapter with the tube and use pliers back of the housing to move the clamp onto proper location pa eco A RAS i a C NC Tube connection completed EU 3 NEC A 3 E a 1 KUBZAT I
3. nstallation Installation 7 Running Test Please disconnect all powers inside the main frame including hard drives and CD ROM Test Run the system for 20 mines check if all parts are correctly connected i EPS 24pin Insert ATX jumper wire into the 4 and 6 socket of the power supply connector of ATX motherboard STEP2 STEP3 Loosen the nozzle socket plug of the e Press the power button to start The reservoir pour in some coolant to pump will start operating after the water tank started which will slightly lower the water level in the reservoir then fill in the reservoir with coolant oo Wu KU9241 Installation Installation 8 Completing The System Installation 8 1 Completion e After system test run is complete you can start using the KU3241 water cooling system Before starting the computer remove ATX jumper from the ATX Main Frame power sockets 8 2 Maintenance We value the reliability and convenience during the development of this product however you would still need to note the fol lowing 1 Check regularly whether there are any color or quality changes of the water lines if so replace the lines regularly 2 Check regularly if there are any damages or worn parts in the system replace immediately 3 Check the water volume and quality in the system regularly should there be quality or color changes replace the coolant immediately recommended change time eve
4. r 6 months 4 Make sure no foreign substance is in the system these substances may cause blockage to the water block causing system circulation problems 5 f system has been moved transported or has not been used for a long time please check system before using ES KUBZAT Installation Installation 8 3 Trouble Shooting We list the common issues and their solutions as follows if there is a system problem please refer below If the issues persist contact us for technical support Common Issue Solution Water line leakage G Check if all connections are locked tight Check if water line is plugged incorrectly and all bolts and screws are tightly locked n Mother board water splash Dry the mother board for 8 12 hrs or blow dry the mother board Bad heat transmittance s the pump connected to power and running Q Are the water lines bend to stop circulation Q s the CPU Water Block correctly installed onto the CPU Are there obstructions near the BA2 241 system to stop the exhaust fan from releasing air ls the heat of the system released s the fan speed too slow f you are cooling multiple locations CPU display card bridges you need another cooling component Water circulation stopped Check if pump is connected to power or iS slow Is it turned on G Check if water volume in the tank is sufficient QG Check if water lines are bend G Check if system water is clean and has no foreign objec
5. the user or damages caused during transportation is not covered under warranty Manufacture Date ver 1 1 EM 1 o a
6. ts Pump is too loud G Check if water volume in the tank is sufficient G Check if there is air in the pump The order of connecting G Depending of personal convenience no strict order is required and the order does not affect the heat transmitting effect oo Wa KUBZAT Installation Installation 9 Warranty 9 1 Coverage Larkooler values the quality and safety of our products and strict quality control measures are in place Within one 1 year of purchase is our warranty period if you encounter any issues during such time a free service will be carried out The warranty only covers Larkooler products themselves other issues caused by the user or by applying our products onto hardware that is not recommended or by the user modified our product are not covered by the warranty and Larkooler cannot be held responsible As for damages caused by natural forces and other issues Larkooler should not be held responsible are not covered by the warranty and Larkooler will not be responsible to any of such issues 9 2 Terms and Conditions 1 Warranty period starts from the date users purchase the product from the distributer 2 Warranty only covers Larkooler products other products such as motherboard CPU and VGA card are not covered 3 Warranty is only valid under normal usage circumstances issues caused by the user for instance by modifying the product are not covered by Larkooler 4 Misuse maintenance failure by
7. v KU9241 Installation 3 safety Notes 1 Read this instruction carefully before installing and running this product 2 If you are new to the water cooling system we suggest you ask for help 3 Please disconnect all powers of the computer before installing this product 4 Please note all safety issues common with all electronics to avoid damages 5 The product ts suitable for home or office use only no other special applications such as medical are allowed 6 Only use Larkooler coolant 7 Please place In open space avoid direct sunlight and heat sources 8 Backup the data on the computer before installing 9 All water lines must be locked tightly into place to avoid damages 10 If there is problemwith the water cool ing system or the motor makes unusual noises turn off computer for a system check see Trouble Shooting 11 If leakage appears shut down system for repair and checking see Trouble Shooting 12 Conduct regular checks on the water volume in the system 13 We suggest installing a temperature controlling program on your computer or activate the function in the BIOS when the CPU temperature reaches over 65C turn off for maintenance check 14 Do not drink the coolant place the coolant out of reach of children 4 How It Works KU3241 Water cooling system uses the heat exchange theory when the computer starts the water cooling system would start under the diving power of the circulatio

Download Pdf Manuals

image

Related Search

Related Contents

Foremost TENA3022 Instructions / Assembly  カタログ(PDF) - 株式会社エフ・エム・アイ  M-Cab 5m USB 3.0 A/micro-B    Ateca AT14AA flat panel wall mount  Manual MLC - Paumaq Máquinas e Ferramentas  Ultrawick Premium  Eglo 83046A Installation Guide  User Manual PVI-3.8_4.6-I-OUTD EN  Bedienungsanleitung  

Copyright © All rights reserved.
Failed to retrieve file