Home

User Manual Sunways Solar Inverter PT 30k english EN

image

Contents

1. 1 2 3 4 5 6 o o o00000 Ethernet Modem CAN CAN SO 2 54 Alarm HZZ UMORE Ethernet connection Modem connection CAN bus SO interface pulse output e g for large display Connection for temperature and irradiance sensor Connection for alarm relay au BRWDN 3 Installation Networking Solar Inverters via CAN bus The Solar Inverters can be networked with each other via the CAN bus interface Ethernet Modem CAN CAN Ethernet Modem CAN CAN Ethernet Modem Device 1 1 Terminating resistor connector a Use the Ethernet cable provided to network the Solar Inverters with each other Connect a terminating resistor connector 1 at Device 2 the first and last Solar Inverter in the series The pluggable terminating resistor connectors are included with the device The total length of the CAN bus network may not exceed 100 m Up to 99 PT and AT series devices can be net worked via a CAN bus 18 3 Installation SO interface The SO pulse output enables for example the con nection of a large display Sunways Display for displaying the momentary output the energy yields and the CO reduction You can use the SO int
2. 30 kW sun 500 V IP54 me 700 V IP54 28 kw 850 V IP54 5 500 V IP42 3 27 kw 700 V IP42 850 V IP42 a 26 kW gt 25 kW 9 lt 24 kW 23 kW 38 C 40 C 42 C 44 C 46 C 48 C 50 C 52 C ambient temperature C 66 8 Appendix 8 3 Installation methods and cable cross sections This IS an overview of the content of DIN 0294 8 EN60204 1 The information contained in the stand ard is relevant and must be used a The data are based on an ambient temperature of 30 C according to test conditions and a cable temperature of up to 70 C Number of wires under load 3 Line accumulation must be taken into account Reference installation methods A2 B2 C E for fixed installation of cables and lines in and on buildings according to DIN VDE 0298 4 2003 Installation method Diagram Rated current for the LS switch 10 mm Cu 16mm Cu 25 mm Cu Installation method A2 Installation in thermally insulated walls Multi core or sheathed cables Electrical conduits or ducts Direct installation ALLL Y p p 7 _ 63 A Installation method B2 Installation in electri cal conduits or enclosed electrical service ducts on or in walls or in ducts for underfloor installation Multi core or sheathed cables 67 63 A 80 A Installation method Diagram 8 Appendix Rated current
3. Solar generator 9 DC 12 L3 u PE Dc i a N DC actuator HERIC inverter i L1 L2 L3 PE N 1 3 Integration in solar system Solar generator configuration The technical data of the selected solar generator must be within the Solar Inverter s specifications see Technical Data Incorrect dimensioning can lead to reductions in the yield and to destruction of the device The Sundim design program from Sunways can be used for this purpose Sunways Sundim can be found on the enclosed CD ROM or on our website at www sunways de Be sure to take the following points into account before planning your system Watch the celestial alignment of the modules In Central Europe a maximum yield is achieved with a module tilt of 30 to the horizontal and direct south orientation of the solar generator field The output of the cells decreases as the module temperature increases Install your solar genera tor with sufficient ventilation from behind Check your solar generator approx every three years for soiling This occurs especially on the lower edge of the modules and forms a veil that cannot be washed off even by heavy rain Reduced yield can be prevented by cleaning with a wet cloth or a brush Avoid shading of individual modules or solar cells in your system This can lead to major reductions in yield 1 Product Descr
4. With DHCP If a DHCP server is present in your network you can activate DHCP on the Solar Inverter In this case the Solar Inverter obtains the network settings automat ically You can display the assigned IP address via the LCD display menu Settings Network Ethernet Without DHCP If there is no DHCP server in your network you must set an unused IP address on the AT Solar Inverter see section Solar Inverter network setting settings Ask your network administrator for suitable settings for IP address net mask and gateway After the network configuration is completed you can start the Sunways Browser by entering the IP address of the Solar Inverter in the address line of your web browser 50 6 System monitoring 6 7 Access via DSL router If a DSL connection or a network with Internet access is available you can make the Solar Inverter accessible via the Internet Requirement Your DSL modem or Internet router supports static IP address services e g www dyndns org Your router supports port forwarding 1 Connect your Solar Inverter with your DSL router Use a CATS Ethernet cable with 1 1 RJ45 sockets The master is connected to the network as standard 2 Register free of charge at www dyndns org for example 3 Create an alias for accessing your Solar Inverter e g pt sunways dyndns org You can then access your Solar Inverter via this address 4 Configure your DSL modem or Internet ro
5. DC load break switch 2 Solar generator connection Installation Extreme danger from electric shock Touching live parts can result in death AII electrical work must be carried out by a quali fied electrician while observing the VDE regula tions national and other regulations Ensure that the cables are installed securely 3 Installation G Any kind of soiling dust moisture etc has a negative effect on the terminals with regard to function over the intended period of use We recommend DC connection cables with cross sections between 16 mm and 35 mm The cables must be double insulated and UV resistant Radox cables from Huber amp Suhner for example are suitable The following sequence must be observed during assembly Strip the voltage free line and the cable ends 15 20 ir with end splice 15 mm without end splice 20 mm Apply a screwdriver at a slant A at the locking apply and push it in until it is vertical B and locks into place C 14 3 Installation AN CAUTION Please avoid squeezing the cable insulation or the end splice Improper connection may damage the equipment 3 Introduce the stripped cable into the cable clamp and push the screwdriver forward into the origi nal position String box The string box enables connection of up to 8 or 12 solar generator strings to DC bus line that can be connected directly to the Solar Inverter The str
6. Enter the default password or your chosen password Open the menu Settings Network Ethernet Enter an IP address suitable for use with your PC This means the first three number blocks must be identical and the last number block different HCP On P address 192 168 030 IG Example If your PC has the IP address 192 168 1 1 enter 192 168 1 2 for your Solar Inverter to access further settings Use ubnet mask 255 255 255 000 ateway 192 168 030 Enter the subnet mask 255 255 255 0 Enter the IP address of your PC in the gateway Confirm with 47 After the network configuration is completed you can start the Sunways Browser by entering the IP address of the Solar Inverter in the address line of your web browser 6 System monitoring 6 5 Network settings on the PC 5 Select Internet Protocol TCP IP and click Properties again To enable your PC to communicate with the Solar Inverter certain network settings are required j Local Area Connection Properties The procedure differs slightly depending on the Authentication operating system A configuration example for Windows XP is shown below M AB File and Printer Sharing for Microsoft Networks M E 008 Packet Scheduler a IP addresses may only be assigned once within the network 1 Select Start Settings 2 Select Network Connections 3 Double click on th
7. 411 SMTP Soc Warning SMTP no socket available 411 412 SMTP Kom Warning SMTP faulty communication with server 412 Fault during e mail delivery Re attempt e mail delivery If the fault recurs check the e mail settings via the Sunways Browser 42 5 Operation Display message 413 DNS failed Description Warning DNS has failed 413 414 HTTP Con Warning HTTP client connection has failed 414 415 HTTP Aut Warning HTTP client authorisation has failed 415 416 HTTP Tim Warning HTTP client timeout 416 417 HTTP Soc Warning HTTP client no socket available 417 418 HTTP Soc Warning HTTP client error with socket 418 419 HTTP Met Warning HTTP client incorrect method 419 420 HTTP Pro Warning HTTP client error with protocol 420 Cause and possible remedies Communication fault between the integrated web server and an Internet browser in conjunction with the Sunways Browser These warnings are non critical and can be ignored if they only occur occasionally These warnings have no influence on the energy production of the inverter 421 HTTP Wri Warning HTTP client write error 421 422 HTTP Rea Warning HTTP client read error 422 423 CAN Init Warning CAN initialisation error 423 CAN bus initialisation fault during device startup Restart the Solar Inverter If the error still occurs please contact the Technical H
8. Connecting a Sunways Modem DAWN MODEM 1 O 2 3 Telephone connection RS232 interface LVDS for AT and PT Solar Inverters Power supply device so 6 System monitoring 6 9 Dial up connection from a PC to the Solar Inverter To establish a connection between your Solar Inverter and a PC via the modem you have to estab lish a dial up connection in Windows The procedure under Windows XP is described below 1 Run the wizard for a new connection via Start Settings Network Connections Click Next to open the first selection screen 2 Select Connect to the network at my workplace New Connection Wizard Network Connection Type What do you want to do 3 Click Next select Dial up connection in the next screen and click Next New Connection Wizard Network Connection How do you want to connect to the network at your workplace 52 6 System monitoring 4 A list of installed modems appears Select the required modem and click Next New Connection Wizard Select a Device This is the device that will be used to make the connection You have more than one dial up device on your computer Select the devices to use in this connection amp Modem Standarc 0 bps Modem COM2 88 Modem Standard 56000 bps Modem COM1 lt Back Cancel 5 Enter a connection name and click Next New Connecti
9. Sunways Solar Inverter ei Q Ual PT 30k CEN english sunways Photovoltaic Technology Imprint All rights reserved Copyright by Sunways AG Photovoltaic Technology MacairestraBe 3 5 78467 Konstanz Germany This user manual may only be reprinted or copied in whole or in part with the express written approval of Sunways AG Any type of reproduction distribution or storage on data carriers in any form and of any kind not authorised by Sunways AG represents a violation of the applicable copyright laws and will be prosecuted We reserve the right to make technical changes which serve to improve the device or which increase the safety standard even without separate prior notice Publisher responsible for the content Sunways AG This user manual contains products and product names which are registered trademarks The mention of products and product names is used only for information purposes and does not represent product misuse The passage referring to these products in this user manual does not represent original documentation of the respective product Introduction Thank you for purchasing a PT Series Sunways Solar Inverter an innovative high quality product with unique features and a consistently high efficiency This Solar Inverter is equipped with HERIC topology and innovative PT circuitry and enables operation on a large number of silicon modules as accustomed from Sunway
10. 2 AT 3600 3 v quipment info Selection of information Memora Memory Mode Solar system System info Solar system System info irmvare version Firmware ommunic 2 0003 Control 2 007 Monitoring 2 001 Solar system System info Firmware 34 5 Operation Display Description Memory card Menu selection Solar system System info Memory 1555A5 1000 12 Device mode Solar system System info Mode Settings General Choose language Display language Settings General Language LCD contrast 50 amp LCD contrast Settings General LCD contrast Date Time 15 11 2008 14 17 01 Set date time only possible with customer password Settings General Date Time Receipt time Off 01 00 Duration 02 00 Set receiving time starting time and duration in which the device can also be addressed in the night mode via the network only possible with cus tomer password Settings General Receiving time Firmware version Hew passvord Passvord EKEK 35 Firmware only possible with customer password Changing the customer password only possible with customer password Settings General Firmware Settings General Password Display Description 5 Operation Menu selection Settings Login ser Guest assvord XL RK E Password entr
11. PE Number of feed in phases 230 V single phase 3 Performance Stand by consumption lt 4W Night time consumption ow Maximum efficiency 97 5 European efficiency 97 0 MPP efficiency static 99 90 Switching concept HERIC topology three phase transformerless 64 8 Appendix Other DC switch Grid connection fuse layout Data interfaces Sensor interfaces Display Plant supervision Power supply unit protected on PCB IP degree of protection according to IEC 60529 Max relative humidity Cooling Ambient temperature Overload behaviour Dimensions height x width x depth weight Type of installation Noise development Standard warranty option Certificates 65 integrated 3 x 63 A 16 mm Ethernet CAN voltageless alarm relay SO pulse output modem irradiation temperature LCD backlit 128 x 64 pixels active alarm via e mail Sunways Browser Sunways Portal T2A 250 V IP 42 IP 54 optional 95 active cooling with fan 20 C 40 C at full load working point adjustment 100 x 60 x 40 cm 155 kg standing installation ca 72 dB A 5 years with maintenance contract up to 20 years CE DIN VDE 0126 1 1 8 Appendix 8 2 Derating curves The derating curves describe the relationship between the AC output power of the Solar Inverter and the ambient temperature The AC output power decreases with increasing ambient temperature Derating curves PT 30k
12. Solar system display only available on master Solar system Energy yield Select start data for system event display Start EE 11 2008 Display event list for entire system 10 39 919 Service 10 11 919 Service 08 02 919 Service 15 02 919 Service The event list shows the last 100 sys tem messages from the start date The heading always refers to the selected event The CAN comm mes sage displayed here may be older than 15 11 2008 Solar system Events Solar system Events Display event details error number Start 10 39 42 data starting time duration and Duration 0 1 00 34 number of occurrences per day oday 1 33 Solar system Events Display Description 5 Operation Menu selection History Solar system display only available on master 11 2008 Solar system daily yield for 1 week Solar system System history Yield for week Yield 11 2008 Solar system daily yield for 15 days Solar system System history 7ekwh Yield for 15 days 33kwh 0 01 41 15 111 Yield 2008 Solar system monthly yields Solar system System history 43dkWh Yield for month 242kWh FMANTTAFOND AC power 15 11 08 10kW Solar system AC output 5 min values SkW Solar system System history AC output System info Solar system display only available on master Device list for selecting a device AT 4500
13. After troubleshooting the Solar Inverter restarts automatically A monitoring phase and a neutral conductor were interchanged during connection of the AC side Display message Description 5 Operation Cause and possible remedies Inverter fault 301 HS temp 302 Choke temp 303 PCB temp Your Solar Inverter is designed for an ambient temperature of up to 40 C at full feed in power These warnings refer The maximum permissible ambient tem perature has been exceeded Warnings to violations of the temperature thresh The installation location may be old for the heat sink HS choke or PCB unsuitable Please try and find an The feed in power is reduced linearly in alternative installation location or order to prevent further temperature improve the ventilation of the instal increase lation space The air circulation requirement was not taken into account during installation Clean the Solar Inverter if dirt pre vents cooling Follow the installation notes in the manual 304 Mains rel The PT 30k Solar Inverter checks the Restart the Solar Inverter operation of the mains relay prior to every switch on An error was detected during this check If the error still occurs please contact the Technical Hotline The phone number is provided on the back of the manual 305 HS overtemp 306 Choke overtemp 307 PCB overtemp These error messages refer to violations of the temperature threshold for th
14. Inverter Overview Menu Home Displays the start page Solar Inverter Displays the instantaneous values stored operating data Solar Inverter status Solar System Displays a system overview with status total output yields and access to slaves only available if the device is con nected with the master Information Device information e g serial number Settings and software update for the device or the networked system Language selection The web pages are available in German English French Spanish and Italian Click on the respective country flag to select the language 6 System monitoring Setting the date time This function can be accessed via Settings Date Time If you have selected the correct time zone and an Internet connection is available you can auto matically synchronise the time of the Solar Inverter with a time server with the NTP button Alternatively you can transfer the PC time to the Solar Inverter 1 BerliniAmsterdam pibtime1 ptb de Please proceed with caution for time settings as they directly affect data logging For example if you set the time back by 1 hour then the existing data for the last hour will be overwritten Software update The software update is used to extend the func tionality of your Solar Inverter The communication software responsible for LCD display interfaces communication and Sunways Browser and the control software or the moni
15. The Solar Inverter is unable to send e mails via a direct connection Portal connection and active alerting is therefore not possible Connection via the Internet e g connection of the Solar Inverter to a DSL connection Connection via a Sunways Modem 45 6 2 Integrated data logger The data logger integrated in the PT Solar Inverter stores the operating data of your solar system In addition to 5 minute mean values energy yields are also stored as 5 minute daily weekly monthly and annual values In addition up to 100 error warning messages can be stored Each data record contains the data and time The data logger is designed as a circular buffer i e the oldest data are overwritten with new data Operating data 5 min mean values Number Value 2000 DC current 2000 DC voltage 2000 AC current L1 2000 AC current L2 2000 AC current L3 2000 AC voltage L1 2000 AC voltage L2 2000 AC voltage L3 2000 AC output 2000 Device temperature 2000 Module irradiance optional 2000 Module temperature optional Energy yields Number Value 2000 5 minute yield 800 Daily yield 800 Weekly yield 250 Monthly yield 20 Annual yield Status messages Number Value 200 Status changes 6 3 Direct Ethernet connection The Solar Inverters are equipped with an Ethernet interface as standard for system monitoring and configuration with a PC Connect your PC and the Solar Inverter with a crossed or 1 1 Ethernet connection cabl
16. damage may occur for which the transport company is generally responsible Please check the delivered Solar Inverter thoroughly Should you discover damage to the packing or the Solar Inverter please inform the transport company immediately Your specialist dealer will be happy to provide assistance if required A possible damage report must always be received by the transport company in writing at the latest seven days after receipt of the goods 2 Safety Precautions 2 1 General safety precautions Follow the instructions in the operating manual Safe handling and trouble free operation of the PT Solar Inverter requires knowledge of the basic safety precautions This user manual contains the key information on operating the system safely Each person concerned with the installation com missioning maintenance and operation of the Solar Inverter must have read and understood the entire user manual and in particular the chapter entitled Safety Precautions In addition the rules and regulations for accident prevention applicable for the operating site plant must be observed Dangers when handling the PT Solar Inverter The Solar Inverter has been built in accordance with the latest rules of technology and the recognized safety rules and may only be used for its intended use and in a safe state Improper use may lead to dangers to the life and limb of the user or others or can adversely affect the system or other prope
17. for the LS switch 10 mm Cu 16mm Cu 25 mm Cu Installation method C 5 7 63 A 80 A 100 A ON O Direct installation on or amp in walls slabs or in cable troughs Multi core or sheathed cables Installation method E 7 d 63 A 80 A 100 A Installation in air on sup I port cables or on cable aa racks and brackets Multi core or sheathed cables not applicable for installation on wooden walls 68 8 Appendix 8 4 General liability disclaimer Although information contained in this manual has been checked with the greatest care for its accuracy and completeness not liability whatsoever can be accepted for errors or omissions Sunways AG reserves the right to change the hardware and software features described here at any time without prior notice This manual may only be reproduced passed on copied or translated into other languages in whole or in part in any form or with any means the prior written approval of Sunways AG Sunways AG shall assume no guarantee for dam age caused by faulty or lost data due to incor rect operation or the malfunction of the Solar Inverter the software additional devices or PCs All rights reserved Sunways AG The products named on the cover page are pro tected by copyright and sold under licence No part of this document may be reproduced in any form without prior written approval of Sunways AG and the Sunways licensors Registered trademarks The Sunways lo
18. or GSM Internet dial in number Dial in number for your Internet provider ISP Outside line If you have a telephone system you may have to enter 0 for example A comma results in a dialling pause of 1 second Provider login User name defined by your Internet provider Provider password Password defined by your Internet provider PPP IP You can reach the Solar Inverter by entering this IP address in your web browser The address is set to 192 168 20 50 by default MSN MSN for the modem extension ISDN modem This is usually the extension number of without the area code SIM card PIN SIM card PIN for GSM modem Function buttons Click Send to save the settings in the Solar Inverter Click Read to display the current Solar Inverter settings Click Modem Test to test the connection between the modem and the ISP You receive a reply as to whether dialling in was successful Gi Before conducting the modem test the settings must be stored in the Solar Inverter by clicking Send Cheap ISP dial up numbers are available from www teltarif de internet or www billiger surfen de for example Here you will find not only tariff information but also the access data phone number user name password E mail settings To enable the Solar Inverter to send E mails the E mail settings must be stored via the Sunways Browser The settings can be accessed via Settings Network in the Email Settin
19. serial number etc to the Sunways Portal After activation the operating data are e mailed to the Sunways Portal on a daily basis before the master is switched off for the night Alternatively a shorter interval can be selected If a change is made to your solar system e g additional device then the change is automatically reported to the Sunways Portal A basis access for the Sunways Portal for displaying the yield data is available to every Sunways cus tomer free of charge Expanded functions e g the setpoint actual comparison in the Sunways Portal can also be purchased for a fee Gi The master sends the status messages of all Solar Inverters if they are CAN networked Requirements The master must be connected to the Internet via a network or modem Correct Email settings must be stored in the Sun ways Browser see Email settings Correct portal settings must be stored in the Sunways Browser 6 System monitoring Setup Check whether all requirements are met Configure the specified settings if necessary Open the settings page in the Sunways Browser This can be accessed under Settings System Monitor ing in the Sunways Portal section sunways maill me Portal connection Activation or deactivation of the portal connection Portal address Preset for the Sunways Portal Mailbox file Preset for the Sunways Portal System ID System ID assigned by the portal This is generated au
20. switch off thresholds have been defined for this purpose 21 Connecting 1 Establish the grid connection via the external circuit breaker 2 Switch on the solar generator voltage by closing the DC load break switch switching position 1 The Solar Inverter starts operating when suffi cient input voltage is available OO e DO THE E ojo gt ml p Blolololo olo 1 Loadbreakswitch The operating LED lights up in accordance with the operating state The commissioning menu opens when the Solar Inverter is connected for the first time Switching off 1 Disconnect the solar generator side by opening the DC load break switch switching position 0 2 Open the grid connection by switching off the circuit breaker 4 Commissioning 4 2 Commissioning menu Commissioning a single device The commissioning menu automatically opens the System with one Solar Inverter first time the Solar Inverter is connected It guides you through the standard settings Single device G For a better understanding of keyboard operation please also see the chapter Operation The commissioning of the Solar Inverter as 1 During initial start up the following appears on single device and the display as a master and slaves with several Commission
21. trans former housing and the electricity meter 8 Manual current and voltage measurements with multimeter and current probe for all strings 9 Insulation measurements for the individual strings 8 Appendix 8 1 Technical data Article no SI330P11A IP42 protection class SI330P21A IP42 protection class with DC overvoltage protection SI330P31A IP54 protection class SI330P41A IP54 protection class with DC overvoltage protection DC Input Rated DC power 31000 W Maximum DC current 75 0A Nominal DC voltage 700 V MPP voltage range 420 V 800 V Maximum voltage DC 1000 V Number of inputs per MPP tracker Number of MPP trackers 1 x Wago rail mounted terminal blocks 35 mm 1 AC output Rated AC output power Maximum AC power Nominal AC current Maximum AC current Current capacity at the feed in point Nominal frequency Frequency tolerance range Grid voltage AC voltage range Distortion factor at Pn Reactive power factor cos phi Grid voltage monitoring Earth fault protection Insulation frequency and DC current monitoring Required phases number of grid connections 30000 W 30000 W 43 5 A per phase ca 45 0 A per phase at least 100 A per phase 50 Hz 47 5 Hz 50 2 Hz according to DIN VDE 0126 1 1 400 V 20 15 according to DIN VDE 0126 1 1 lt 3 ca 1 according to DIN VDE 0126 1 1 RCD according to DIN VDE 0126 1 1 integrated according to DIN VDE 0126 1 1 3 L1 L2 L3 N
22. voltage 5 min values Solar Inverter History DC output 245Y 0 DC current 15 11 08 DC current 5 min values Solar Inverter History DC values 2A d AC current 15 11 08 AC current L1 5 min values Solar Inverter History AC values SA AC current L2 5 min values Switching between currents L1 L2 and sA AC current L3 5 min values L3 with 3 30 14 45 21 00 AC voltage 15 11 08 AC voltage L1 5 min values Solar Inverter History AC values 230 AC voltage L2 5 min values Switching between voltages L1 L2 and 2307 AC voltage L3 5 min values L3 with 1807 Information Device ifmwvare version Firmware Solar Inverter Information ommunic 2 0003 Firmware Control 2 007 Monitoring 2 001 Memory card Solar Inverter Information Memory Device mode Solar Inverter Information Type PT 33k Mode Install 30 10 2008 S H 1555A5 1000 12 32 5 Operation Display Description Menu selection Instantaneous values Solar system display only available on master Current system feed in power daily energy yield and system status 38 52kWh OK The screen automatically appears on the master if no key is pressed for several minutes Solar system Instantaneous values AC system yields and operating hours for today yesterday week and month Solar system Energy yield AC system yields and operating hours for year and total value Events
23. 10 Enter the following data Obtain an IP address automatically 12 Click Dial to establish the connection After Obtain DNS server address automatically the connection is established you can start the Sunways Browser by entering the IP address of 2x the Solar Inverter in the address line of your web General browser You can get IP settings assigned automatically if your network supports this capability Otherwise you need to ask your network administrator for the appropriate IP settings Obtain an IP address automatically 0 Use the following IP address lE address A nee In contrast to the normal IP address for a modem Use the folowing DNS server addresses connection the IP address of the Solar Inverter is set I n o De l to 192 168 20 50 by default Altemate DNS server i E 11 Enter customer as the user name and the standard password or the password you entered previously 54 6 System monitoring 6 10 Sunways Browser General information The Sunways Browser can be called up via a stand ard Internet browser e g Mozilla Firefox One of the four possible connections between a PC and the Solar Inverter is required for this purpose Direct connection via an Ethernet cable Connection via an existing internal Ethernet network Internet connection e g connection of the Solar Inverter via DSL Connection via a Sunways Modem After entering the IP address fo
24. AC yields and operating hours for to day yesterday week and month Solar Inverter Energy yield ear 397 186 9 398 187 1 AC yields and operating hours for current year and total value Solar Inverter Energy yield 30 5 Operation Display Description Menu selection Events Device Start EG 11 2008 Select start data for event display Solar Inverter Events 10 39 919 Service 10 11 919 Service 08 02 919 Service 15 02 919 Service Display event list Solar Inverter Momentanwerte The event list shows the last 100 sy stem messages from the start date The heading always refers to the se lected event The CAN comm message displayed here may be older than 15 11 2008 15 11 08 Start 10 39 42 Duration 01 00 34 oday 1 Display event details error number Solar Inverter Events data starting time duration and number of occurrences per day History Device 11 2008 Solar Inverter History Yield for week Daily yield for 1 week 11 2008 Solar Inverter History Yield for 15 days Daily yields for 15 days 43dkwh 242kWh Solar Inverter History Yield for month Monthly yields 31 AC output 5 min values Solar Inverter History AC output 5 Operation Display Description Menu selection DC voltage 15 11 08 DC
25. akage currents Be sure to make an earth ing connection before connecting the power supply circuit AC system 2 3 Basic safety measures Electrical work on the Solar Inverter must be con ducted by a qualified electrician while observing the VDE regulations national and other regulations The Solar Inverter may only be opened by persons authorised by Sunways AG to do so When circuit breakers are tripped the fault cause must be determined and eliminated before return ing the device to operation Check electrical equipment regularly Retighten loose connections Replace damaged lines cables immediately 2 Safety Precautions 2 4 Safety scheme The following parameters are monitored and displayed continuously and simultaneously by the inverter controller DC overvoltage Overvoltage L1 L2 L3 gt 10 Overvoltage L1 L2 L3 gt 15 Undervoltage L1 L2 L3 Stand alone operation Overfrequency L1 L2 L3 Underfrequency L1 L2 L3 Surge error brief overvoltage L1 L2 L3 DC share in AC current L1 L2 L3 AFI residual current jump gt 30 mA AFI residual current gt 300 mA Overtemperature of heat sink interior chokes When a malfunction occurs feeding is immediately interrupted and the Solar Inverter disconnects from the grid by triggering the mains contactor The potential free alarm relay is switched except for grid undervoltage L1 In addition the following protective equipment in accordance with o
26. alled upright to enable adequate free convection Solar Inverters may not be stacked in order to prevent excessive warming If several PT Solar Inverters are operated in an enclosed space adequate fresh air supply must be ensured Larger systems should be configured in collaboration with Sunways at the design stage 11 The ambient temperature must be within the range 25 to 40 C At ambient temperatures above 40 C the inverter automatically reduces its output The Solar Inverter should not be exposed to direct sunlight to protect it from unnecessary external warming Protection against moisture and foreign bodies The PT Solar Inverter is supplied with IP 42 protection rating for indoor installation The optional protection type IP 54 allows installa tion indoors and in roof covered areas outdoors however the Solar Inverter may not be directly exposed to rain Ceiling S wall side wn Adjacent device Installation Proceed as follows to install the Solar Inverter 1 The Solar Inverter is attached to the pallet with retaining claws Remove the retaining claws 2 Use a trolley for transporting the device to the installation site 3 Use the retaining claws to secure the Solar Inverter on the installation surface 3 Installation 3 2 Electrical installation Cable installation Extreme danger from electric shock Touching live parts can result in death Al
27. an result in death AII electrical work must be carried out by a quali fied electrician while observing the VDE regula tions national and other regulations Note the AC terminal assignment An incor rect assignment can result in the device being destroyed Ensure that the cables are installed securely Ci 17 Any kind of soiling dust moisture etc has a negative effect on the terminals with regard to function over the intended period of use We recommend AC connection cables with the following cross sections 16 mm 16 mm solid copper cable flexible copper non metallic sheathed cable The following sequence must be observed during assembly 1 Strip the voltage free line and the cable ends 15 CEL ie with end splice 15 mm without end splice 20 mm 2 Introduce a screwdriver vertically into the locking device CAUTION Please avoid squeezing the cable insulation or the end splice Improper connection may damage the equipment 3 Introduce the stripped cable into the cable clamp and pull the screwdriver out again 3 3 Installing the communication system Interface overview The communication interfaces are located above the AC terminals
28. aster you have selected G In mixed systems containing AT and PT Solar Invert ers the Solar Inverter PT is always the master Commissioning the master 1 During initial start up the following appears on the display Commissioning ith 0K ommissioning Start gt gt Start commissioning with 2 Select required language with Choose language Confirm selected language with 3 Select Master with Commissioning Device mode Master Confirm with G The other devices in the CAN network are automati cally configured as slaves 4 Set the data and time centrally for all connected devices G Please proceed with caution for time settings as they directly affect data logging For example if you set the time back by 1 hour then the existing data for the last hour will be overwritten Select date with Change selected number with 42 and jump to next number with Save the set date with then set the time accordingly Date Time 15 11 2008 14 17 01 Save the set time with 5 CAN network list is set up G Depending on the size of the network it may take a moment until the master has found all slaves and added them to the list 4 Commissioning Devices total number of devices found in CAN network including master In network number of configured devices including master After the master has found all connected slaves th
29. d Interfaces rrad Si 0 1TC T emp none SO rate kWh 0 0 output On O O O 6 6 e so Fal Tal E S gt Assignment of sensor connection Sensor Sensor Solar Inverter connector pin connection connection assignment designation Pin 1 Plus signal Temp temperature Pin 2 Plus signal Solar irradiance Pin 3 Reference earth V Pin 4 Plus connection for V supply 5V Connecting the alarm relay The Solar Inverters are equipped with a potential free alarm relay as standard The relay can be designed as a make contact element or as a break contact element and is actuated for all malfunctions signalled by the device This ensures a faster more reliable indication of a possible fault in the PV sys tem on site For PV systems with several Solar Invert ers the individual relays can be switched in parallel and connected via a common indicator lamp The master also signals faults from other devices in the CAN network via the alarm relay It is therefore sufficient for simple alerting to connect the alarm relay of the master CAUTION The alarm relay is designed for 230 V 2 A Higher outputs voltages can result in the relay being destroyed The connected signalling device must be fused separately The terminals are intended for a cable cross section
30. diate danger from electric shock which will result in death injury or serious damage if the applicable safety regulations are not followed AN CAUTION This symbol indicates an immediate danger which can result in damage if the applicable safety regula tions are not followed Symbols used in this user manual Gi Information This symbol indicates important information which contributes to a better understanding of the Solar Inverter Warnings and symbols on device The following warnings on the housing of the Solar Inverter point out dangers Always observe the warnings exactly This symbol indicates that the user manual must be read and understood before putting the device into operation IMPORTANT Hot surface The housing can heat up during operation e i nu 5 Min The device must be disconnected from the mains supply and from the PV generator before opening the housing The device still carries life threatening voltage for approx five minutes internally and at the connection terminals of the PV generator fol lowing disconnection from the PV generator The energy storage capacitors are not completely dis charged until after this time You must wait at least five minutes after disconnecting the device from the mains supply and from the PV generator before opening the device Warning High leakage current earth connection essential before connecting supply WARNING High le
31. e heat sink HS choke or PCB Feed is stopped The Solar Inverter automatically switches back on again once the temperature at the corresponding measuring point has dropped again The maximum permissible ambient tem perature has been exceeded The installation location may be unsuitable Please try and find an alternative installation location or improve the ventilation of the instal lation space The air circulation requirement was not taken into account during installation Clean the Solar Inverter if dirt pre vents cooling Follow the installation notes in the manual 40 5 Operation Display message Description Cause and possible remedies Interface communication fault 401 SD Card The Solar Inverter cannot find an SD Restart the Solar Inverter card If the error still occurs please contact the Technical Hotline The phone number is provided on the back of the manual 402 SD Card The SD card is write protected Restart the Solar Inverter If the error still occurs please contact the Technical Hotline The phone number is provided on the back of the manual 403 CAN user Communication error with CAN user Check whether an error has occurred in the secondary CAN device Restart the slave and master if necessary 404 CAN Bus CAN bus not in operation No communication is possible via the CAN bus Check the bus cables and terminating resistor connectors Check whether th
32. e LAN connection through which you are connected to the Solar Inverter 6 Now assign an unused IP address 192 168 30 XXX and enter the subnet mask 255 255 255 0 Internet Protocol TCP IP Properties 192 168 30 1 255 255 255 0 Obtain DNS server address automatically 4 Click Properties in the Status window J Local Area Connection Status 7 Click OK to confirm your entries 48 49 System monitoring In the Status menu item you can check the correctness of your entries and the status of your connection L Local Area Connection Status Local Area Connection Status After the network configuration is completed you can start the Sunways Browser by entering the IP address of the Solar Inverter in the address line of your web browser For more complex network configurations please contact your network administrator 6 System monitoring 6 6 Connection via an existing Ethernet network If an existing home or company network is available you can integrate the PT Solar Inverter directly in the network as a network device Connect your PC and the Solar Inverter with a CAT5 Ethernet cable with 1 1 RJ45 sockets The master is connected to the network as standard Slave Master Max Ethernet connection 100m Hub Switch Router INVERTER INVERTER Max total CAN bus length 100 m
33. e maximum line lengths are within the permitted limits Check whether bus cables were installed parallel to power cables Separate bus lines and power cable from each other spatially if necessary 405 CAN user 41 CAN user does not respond Check whether an error has occurred in the secondary CAN device Restart the slave and master if necessary Display message 406 Solar 407 Temp Warning Description No sensor found on sensor channel 1 solar or 2 temperature 5 Operation Cause and possible remedies If a sensor is connected at Solar or Temp Check the connection to the sensor If no sensor is connected Check the sensor input configuration via the LCD display or the Sunways Browser 408 CAN comm Warning Communication malfunctions occur repeatedly on the CAN bus A malfunction occurs in the data trans mission on the CAN bus However a data exchange continues to be possible Check whether all bus line connec tors and terminating resistors are mounted properly Check whether bus cables were installed parallel to power cables Separate bus lines and power cable from each other spatially if necessary 409 CAN Cfg Warning The CAN bus is in configuration mode No measured values are transferred At least one device is specified under Settings Network CAN bus Close this menu in all devices 410 SMTP Ser Warning SMTP server cannot be reached 410
34. e of the type CAT5 with RJ45 sockets automatic detection or with the Ethernet cable provided The PC is connected to the master as standard Slave Master Max total CAN bus length 100m 5 INVERTER To always find the suitable configuration for installation and commissioning on the PC we recommend the use of a second network card e g PCBus PCMCIA which you can configure to match the default setting of the Solar Inverter The PC and the Solar Inverter must have suitable IP addresses and net masks The network set tings can be adjusted either directly on the Solar Inverter via the LCD display or on your PC If two network cards are used the IP addresses must be in separate subnets e g 192 168 30 XXX and 192 168 40 XXX 6 System monitoring Max Ethernet connection 100 m INVERTER Es 46 6 System monitoring 6 4 Network settings on Solar Inverter G The Solar Inverter is supplied with the following preset IP address 192 168 30 50 In the default setting the Solar Inverter does not support a DHCP Dynamic Host Configura tion Protocol Therefore the IP address is not assigned automatically It is possible to activate the DHCP protocol via the Settings menu IP addresses may only be assigned once within the network If required you can assign your own IP address for the Solar Inverter via the Settings menu 1 Open the menu Settings Login
35. erface on the master if you want to transmit the entire line yields as a sum to a large display The SO interface is adjusted via the display on the inverter Go to the menu Settings Network Interfaces Interfaces rrad i 0 1TC T emp none SO rate kWh SO output On un Temp Solar V Please note that the maximum pulse rate may not exceed 15 pulses sec Calculate the pulse rate depending on the size of the solar system using the following formula Pulse rate pulses kWh 50 000 system size kWp The pulse rate must be set on your Solar Inverter and on the large display 19 Temperature and irradiance sensor The optional addition of an irradiance sensor model Si 01TC K from Ingenieurb ro Mencke amp Tegtmeyer with an integrated PT 100 temperature sensor for temperature measurement enables the acquisition of irradiation data and the corresponding mod ule temperature and storage in the internal data memory as a 5 minute mean value This additional measuring device helps analyse the system output Based on the values any errors on the PV generator e g shading or failure of solar cells can be detected The sensor is activated via the display In the menu Settings Network Interfaces you can select the sensor type in the Irrad and Temp fiel
36. erting settings Sunways Portal connection General information Setup Servicing schedule Servicing interval Maintenance tasks Wiring Solar generator connection box Inverter Technical data Derating curves Installation methods and cable cross sections General liability disclaimer 51 52 55 55 55 56 56 56 56 57 57 58 59 59 59 60 60 60 62 62 62 63 63 63 63 64 64 66 67 69 1 Product Description 1 1 Proper use The Sunways Solar Inverter PT is the link between your solar generator and the public power grid The energy from the connected solar generator is converted to grid compliant AC current and fed into the grid Solar modules which require fixed earthing of the positive or negative terminal cannot be oper ated with the PT Solar Inverter If in doubt always ask your module manufacturer whether the modules can be used without earth reference 1 2 Function description Conversion from direct into alternating current The PT Solar Inverter converts the direct current produced by the solar generator into alternating current The alternating current is then fed into the public power grid as a three phase current Operating and display elements Various interfaces are available for system con figuration and monitoring Operator panel LCD display and keyboard for displaying operating and status values or for inputting system parameters Operating LED Integrated web server f
37. ese must be configured before commission ing of the master is continued The device list is updated and extended whenever a slave is configured n network 2 AT 5000 5 Confirm with Set password Select password Default password is KKAKKKAKKAKkk A new password can be set with 00 0 as an option New password Password Eee ze EEZ Confirm password with Completion of commissioning Commiss completion Confirm overview with 24 4 Commissioning Commissioning slaves After a master has been defined the display for requesting the CAN ID is automatically shown on the display on each slave 1 Request CAN ID Request next highest free ID from master with or next lowest free ID with The master assigns a free ID to the slave Con firm the ID with within 5 seconds an CTS Request further IDs AH ID mi et new ID Yes Ho Confirm CAN ID with within 5 seconds G The data for the individual slaves can be assigned in the Sunways Browser and in the menu of the master based on the IDs The CAN ID 1 is automatically assigned to the master This means the slaves can be assigned IDs between 2 99 Commissioning cannot continue until an ID has been requested from the master The PT Solar Inverter also recognises devices from the AT series 25 2 Completion of commissioning Commiss completion Confirm overview with 3 Carry o
38. firmation e mail and fill out the registration form Alternatively you can enter an existing user name with the correct password to assign the system to an existing user account 61 7 Maintenance 7 1 Servicing schedule Regular maintenance is required in order to ensure sound operation of the Solar Inverter Maintenance must be carried out according to the commissioning and maintenance protocol from Sunways AG DANGER Maintenance may only be carried out by quali fied staff Dangerous voltages Touching live parts can result in death All electrical work must be carried out by a quali fied electrician while observing the VDE regula tions national and other regulations The checks must be carried out based on the recognised state of the art and the regula tions specified by employers liability insurance associations The specified sequence of tasks and checks must be followed 7 2 Servicing interval The PT 30k Solar Inverter must be serviced annually The first service should be carried out no later than 12 months after commissioning The following maintenance tasks should be carried out once per calendar year The service must be carried out no later than 2 months after the month in which the device was commissioned At installation locations where the equipment is subject to soiling the filter mats may have to be replaced more frequently G The service can be undertaken by Sunways AG or a service
39. g Operation System monitoring 4 1 4 2 5 1 5 2 5 3 5 4 5 5 6 1 6 2 6 3 6 4 6 5 6 6 6 7 Content Connecting and disconnecting the Solar Inverter Connecting Switching off Commissioning menu Commissioning a single device Commissioning several networked devices Control elements Operator panel LCD display Keyboard Operating LED Standard screen single device Standard screen system Access rights Customer area Installer area Menu structure Overview of screen displays Fault displays Solar generator fault AC network fault Inverter fault Interface communication fault Service fault General Integrated data logger Direct Ethernet connection Network settings on Solar Inverter Network settings on the PC Connection via an existing Ethernet network Access via DSL router 21 21 21 21 22 22 23 26 26 26 26 26 26 27 27 28 28 28 29 30 37 37 38 40 41 44 45 45 45 46 47 48 50 51 Content 7 8 Maintenance Appendix 6 8 6 9 6 10 6 12 6 13 7 1 7 2 7 3 8 1 8 2 8 3 8 4 Connection via the Sunways Modem Dial up connection from a PC to the Solar Inverter Sunways Browser General information Access protection Overview Menu Language selection Setting the date time Software update Internet dial up via modem Modem settings E Mail settings Active alerting General information Al
40. go is a registered trademark of Sun ways AG Konstanz HERIC is a registered trademark of Fraunhofer Gesellschaft Munich 69 C amp F Werbung und Dokumentation Villingen Schwenningen www cundf de Sunways AG Photovoltaic Technology MacairestraBe 3 5 78467 Konstanz Germany Phone 49 0 7531 996 77 0 Fax 49 0 7531 996 77 444 email info sunways de www sunways de Technical Hotline Germany 49 0 7531 996 77 577 Spain 34 93 665 20 40 sunways Photovoltaic Technology 5D130612A 03 09
41. gs section Gi Requirements When dialling in via modem the correct dial up settings must be stored see Internet dial up via modem 6 System monitoring 192 168 110 208 SMTP provider SMTP server for sending e mails e g mail gmx net max 30 characters Alternatively an IP address can be entered SMTP user User name for your e mail provider generally your e mail address e g sunways gmx de max 50 characters SMTP password Password for your e mail provider Function buttons Via SMTP Test you can send a test e mail to the e mail address stored for active alerting G Before conducting the SMTP test the settings must be stored in the Solar Inverter with Send During the SMTP test an e mail is sent to the e mail address stored in the monitoring system active alerting Before starting the test check whether a valid e mail address is stored under active alerting If the configured SMTP server does not use a login the user and password fields must be left blank Click Send to save the settings in the Solar Inverter Click Read to display the current Solar Inverter settings 58 6 System monitoring 6 12 Active alerting General information With active alerting you can receive status mes sages errors and warnings for your solar system by e mail If a status message was active for longer than 15 minutes or occurred 5 times in one day you will receive an e mail at
42. i If the voltage on the AC connection exceeds the per missible value due to a long line length or an insuf ficient cable cross section the Solar Inverter will be disconnected from the grid In power grids with a low output and a high solar generator output this can lead to individual Solar Inverters being switched off and then on again several times 3 Installation Overview The grid connection of the Solar Inverter is made via 5 wires L1 L2 L3 N PE and an AC terminal strip on the underside of the device Feeding is always three phase via the AC terminal _ AC connection DC load break switch N A suitable circuit breaker is recommended as a line protection element in the grid feed direction PT 30k 3 x 63 A with slow blow characteristic C for terminal cross sections gt 16 mm A three pin circuit breaker or individual fuses can be used Suitable fuse protection must be provided to match the installation method Further details can be found in the Appendix L3L2L1 Mains fuse N Ae 21 o 3 Es 4 1 4 Gi A three phase meter must be used PE INVERTER Some grid operators require the use of a reverse current capable meter 16 3 Installation Installation Extreme danger from electric shock Touching live parts c
43. ing networked devices ith 0K ommissioning is described in detail below Start gt gt Start commissioning with 2 Select required language with Choose language Confirm selected language with 3 Select Single device with Commissioning Device mode Single device Confirm with 4 Set date and time a Please proceed with caution for time settings as they directly affect data logging For example if you set the time back by 1 hour then the existing data for the last hour will be overwritten 22 4 Commissioning 23 Select date with with Change selected number and jump to next number with Save the set date with then set the time accordingly Date Time 15 11 2008 14 17 01 Save the set time with Set password Select password Default password is Cs ib dl i de i A new password can be set with 00 00 as an option New passvord Passvord XXtXtXtXtkt Confirm password with Completion of commissioning Commiss completion ode Single device AH ID o of devices Confirm overview with Commissioning several networked devices System with several Solar Inverters slaves master Before commissioning all devices must be inter connected via the CAN bus interface See section Networking Solar Inverters via CAN bus Switch on all devices following installation Commis sioning begins with the m
44. ing box has protection rating IP65 and can therefore be installed near the solar generator The string box can be equipped with fuses or dummy sleeves String box options The Sunways string box is available with the follow ing options for upto 8or up to 12 PV strings with without DC overvoltage protection with without DC load break switch fuses for different currents Dummy sleeves Further information can be found in the Solar Inverter Accessories section at www sunways de Ei HH JH PO E E A DE E E iP PNET TTY HHHHH 12345678 15 Grid connection Extreme danger from electric shock Touching live parts can result in death AII electrical work must be carried out by a quali fied electrician while observing the VDE regula tions national and other regulations Note the AC terminal assignment An incor rect assignment can result in the device being destroyed No consumers may be connected to the supply line from the Solar Inverter to the mains fuse Always separate the solar generator side first by opening the DC load break switch and then the grid connection by switching off the correspond ing mains fuse G
45. iption Standard components of a solar system Depending on the recommendations of your PV planning expert your PV system consists of the fol lowing components AAAA fi X Cape oF i 5 WV gt wy wy wr fl fr 11 XX PST rl ag OO ES ZZ N m 3 Ac 1 Solar generator 2 Generator connection box string box 3 Solar Inverter with integrated DC load break switch 4 Mains fuse and energy meter Options 5 Irradiance sensor with integrated temperature sensor 6 PC for system monitoring 7 Large display 1 Product Description 1 4 Assembly description ON ADU BWN 600 478 Operator panel with LCD display operating LED and keyboard Filter Communication interfaces AC connection AC overvoltage protection Cat II DC overvoltage protection Cat Il optional DC load break switch DC connection 1 5 Scope of delivery The delivery consists of Sunways Solar Inverter of the PT series CAN terminating resistor connector connected Ethernet cable 3 m CAT 5e 1 1 Control cabinet key Manual Service folder CD ROM including Sunways Sundim design pro gram product and service information Checking delivery Before shipment our products are checked for proper condition Despite careful recyclable pack ing transport
46. issible limit of 15 264 5 V the Solar Inverter stops feed ing and does not start up again until the voltage value falls below the maximum limit value Ask your power supply company PSC about grid stability and design Ensure that the cross sections of the feed lines are adequate depending on country specific standards and guidelines 207 UAC1 gt 10 208 UAC2 gt 10 209 UAC3 gt 10 AC overvoltage for 10 minutes Your Solar Inverter continuously moni tors the voltage levels for feed phases L1 L2 and L3 If the permitted limit value of 10 253 V is exceeded for 10 minutes on average the Solar Inverter stops feed ing and restarts after approx 1 minute Ask your power supply company PSC about grid stability and design Ensure that the cross sections of the feed lines are adequate depending on country specific standards and guidelines 38 5 Operation Display message 210 UAC1 gt 10 211 UAC2 gt 10 212 UAC3 gt 10 Warnings Description AC overvoltage warning This warning appears if a voltage of more than 253 V 10 is measured on a mains phase The Solar Inverter switches if the limit is exceeded for more than 10 minutes Cause and possible remedies Ask your power supply company PSC about grid stability and design Ensure that the cross sections of the feed lines are adequate depending on country specific standards and guidelines 213 Frq1 lt Min 214 Frq2 lt Min 215 Fr
47. k Finish lt Back Cancel The connection window appears automatically once the connection has been established Alter natively via the icon on your desktop or via Start Settings Network Connections Further settings are required in the Properties section Connect Sunways PT 2x4 User name customer Password eseese is I Save this user name and password for the following users Meonly Anyone who uses this computer Dial for 234567 X Cancel Properties Help 6 System monitoring 9 First click the Networking tab and select Internet Protocol TCP IP Select Properties The password matches the customer password on the device zix General Options Securty Newokin advanced ax Type of dial up server am calling Settings This connection uses the following items Internet Protocol TCP IP fl QoS Packet Scheduler 8 File and Printer Sharing for Microsoft Networks BI Client for Microsoft Networks User name customer Password fresesoso Install Uninstall Properties TT Save this user name and password for the following users S Description Transmission Control Protocol Intemet Protocol The default Meon wide area network protocol that provides communication Anyone who uses this computer across diverse interconnected networks da fore Fl Cancel Properties Help
48. l electrical work must be carried out by a quali fied electrician while observing the VDE regula tions national and other regulations Sectional diagram 1 Bars with foam rubber 2 Strain relief device 3 Cable brackets 4 Cable Proceed as follows to install the cables 1 Release the bolts on the bars and push them apart 12 7 13 Installation Route the cable at the rear of the Solar Inverter via the cable brackets Introduce the cable in the opening between the two bars Open the strain relief device and guide the cable through it Install the cable see Solar generator connection and Grid connection sections Pull back the cable slightly and attach it with the strain relief device Push the bars back together and secure them with the bolts Solar generator connection Extreme danger from electric shock Touching live parts can result in death All electrical work must be carried out by a quali fied electrician while observing the VDE regula tions national and other regulations Execute the direct current wiring in accordance with the system dimensioning of your planning expert Prepare all solar generator cables before con necting the solar generator to the Solar Inverter Check each solar generator string for proper operation with an open circuit voltage and short ci
49. of 0 2 mm to 1 5 mm When dimensioning the cross section also take the current consumption of the connected signalling device into account 3 Installation Wiring diagram for a single device J fe J j e je e e e Alarm Alarm ule 2 2 ululels 2 e Lal e ow ow 1 Indicator lamp red 2 Indicator lamp green a The Solar Inverter is supplied by the feed in phase from the AC grid If the feed in phase fails the alarm relay cannot switch even in the event of a fault 20 4 Commissioning 4 1 Connecting and disconnecting the Solar Inverter AN CAUTION Ensure proper mechanical and electrical installa tion before commissioning the Solar Inverter Check the electrical lines to ensure that they are in sound condition Always separate the solar generator side first by opening the DC load break switch and then the grid connection by switching off the correspond ing mains fuse G The Solar Inverter is supplied from the grid The Solar Inverter switches on automatically when suf ficient solar generator output is available Corre sponding switch on and
50. olar Inverter operation VDE 0126 1 1 The monitoring device has detected a sudden relative fault current Check your PV system for possible increase of gt 30 mA or an absolute fault insulation faults current of gt 300 mA 105 1 DC max Your PT 30k Solar Inverter is approved The maximum solar generator current for a maximum DC current of 75 A If the threshold is exceeded the Solar Inverter limits the DC current by moving the operating point permitted for the inverter was reached Check whether the module intercon nection generates an input voltage of less than 420 VDC at full load and rewire the modules according to the min DC input voltage of 420 VDC AC network fault 201 UAC1 lt Min 202 UAC2 lt Min 203 UAC3 lt Min AC undervoltage Your Solar Inverter continuously moni tors the voltage levels for feed phases L1 L2 and L3 If the voltage falls below the minimum permissible limit of 20 184 V the Solar Inverter stops feeding and does not start up again until the voltage value exceeds the minimum limit value Ask your power supply company PSC about grid stability and design Ensure that the cross sections of the feed lines are adequate depending on country specific standards and guidelines 204 UAC1 gt Max 205 UAC2 gt Max 206 UAC3 gt Max AC overvoltage Your Solar Inverter continuously moni tors the voltage levels for feed phases L1 L2 and L3 If the voltage falls exceeds the maximum perm
51. on Wizard Connection Name Specify a name for this connection to your workplace Type a name for this connection in the following box Company Name fs unways PT For example you could type the name of your workplace or the name of a server you will connect to lt Back Cancel 6 Specify the phone number for your Sunways Solar Inverter New Connection Wizard Phone Number to Dial What is the phone number you will use to make this connection Type the phone number below Phone number 01234567 You might need to include a 1 or the area code or both If you are not sure you need the extra numbers dial the phone number on your telephone If you hear a modem sound the number dialed is correct lt Back Cancel 53 When entering the telephone number you may have to include one or more digits to connect to an outside line An outside line is usually obtained by placing a 0 before the actual tel ephone number Click Next Click the checkbox to place a shortcut on your desktop and click Finish New Connection Wizard Completing the New Connection Wizard You have successfully completed the steps needed to create the following connection Sunways PT Share with all users of this computer The connection will be saved in the Network Connections folder IT Add a shortcut to this connection to my desktop To create the connection and close this wizard clic
52. or display and configura tion via a web browser Interfaces Bus interface for connecting a Sunways Modem analog modem ISDN modem or GSM GPRS modem Ethernet interface for connecting a PC or for integration in existing networks CAN bus interface for interconnecting several Solar Inverters SO pulse output for controlling large displays Alarm relay for realising simple monitoring locally Interface for connecting a irradiation and tem perature sensor Data logging The PT Solar Inverter is equipped with internal data logging for recording and saving system data 5 minute mean values of voltages currents output temperature and irradiance if sensor is installed 5 minute daily monthly and annual energy yield values Memory for malfunction messages Grid monitoring The PT Solar Inverter assumes the task of grid monitoring for the protection of the device and persons In case of abnormal grid conditions feed ing is immediately interrupted and the Solar Inverter disconnects from the grid Solar Inverter configuration The basic configuration of the PT Solar Inverter is shown in the block diagram The solar generator voltage connected to the inverter input is initially adapted by the DC actuator and then converted to alternating current by the high efficiency HERIC inverter The AC connection is made with 5 wires due to the 3 phase feed and passive grid monitoring 1 Product Description Block diagram Grid
53. otline The phone number is provided on the back of the manual 424 NTP failed 43 Time synchronisation with the NTP server has failed Firewall port 123 is blocked Select alternative time server Display message Description 5 Operation Cause and possible remedies Service fault 9xx Service A service fault has occurred fault 9xx Service warning Disconnect the Solar Inverter from the grid and from the solar generator and reconnect it If the error occurs again please contact the Technical Hotline The phone number is provided on the back of the manual 44 6 System monitoring 6 1 General The basis for the system monitoring is the data logger integrated in the PT Solar Inverter The Solar Inverters of the PT series offer a wide range of monitoring options for your solar system The Sunways Browser can display instantaneous values stored operating data and settings With active alerting the master can send errors which have occurred in the solar system to a selected recipient by e mail Via the Sunways Portal connection the PT Solar Inverter can send the operating data of your solar system to the Sunways Portal on a daily basis without additional hardware This enables you to track your yields via the Internet One of the three possible connections between a PC and the Solar Inverter is required for this purpose Direct connection via an Ethernet cable or inter nal network G
54. partner as part of a service agreement 62 7 Maintenance 7 3 Maintenance tasks Wiring Visual inspection and measurement of all AC and DC cables between the module and the public grid of the energy supplier terminals and transitions Solar generator connection box Extreme danger from electric shock The main DC switch in the inverter must be in the 0 position Measurement configuration at the inverter output of the module connection box close the DC fuse holder for the string to be measured record the result fold out the fuse holder and measure other strings in the same way if required 1 Check the open circuit voltage for each string 2 Check the short circuit current for each string 3 Measure the DC voltage 4 Measure the mains voltage 5 Connection test 6 Check the MPP status 7 Check the MPP voltage 63 Inverter 1 Clean the filters If the filters are too dirty replace them In each case two filter mats at the top only for IP 54 versions and two filter mats in the base of the Solar Inverter should be replaced To replace the filter mats in the base release the bolts at the side and fold the module downwards 2 Check the connectors Done and OK 3 Connection bolts checked and OK 4 Visual inspection of the interior for assessing the electrical components 5 Check overvoltage protection 6 Software updates if new software is available 7 Grid connection Visual inspection of the
55. q3 lt Min 216 Frq1 gt Max 217 Frq2 gt Max 218 Frq3 gt Max Grid frequency Your Solar Inverter continuously moni tors the grid frequency for feed phases L1 L2 and L3 If the value for a phase is outside the permitted range the Solar Inverter stops feeding and does not start up again until the value is within the tolerance range Restart time approx 45 s Tolerance range 47 5 to 50 2 Hz Ask your power supply company PSC about grid stability and design 219 IDC1 gt Max 220 IDC2 gt Max 221 IDC3 gt Max DC share in AC current Your Solar Inverter continuously moni tors the quality of current fed in If a DC share of 1 A is found in the current fed in the Solar Inverter stops feeding Restart the Solar Inverter If the error still occurs please contact the Technical Hotline The phone number is provided on the back of the manual 222 Uexternal 223 Surgef 39 External conductor voltage outside toler ance range Invalid phase shift between L1 L2 and L3 Your Solar Inverter continuously moni tors the quality of the AC grid During high voltage peaks on the phase feeding in the Solar Inverter stops feeding and attempts a restart Ask your power supply company PSC about grid stability and design Ensure that the cross sections of the feed lines are adequate depending on country specific standards and guidelines The Solar Inverter has detected a high voltage peak on a phase feeding in
56. r the Solar Inverter in the address line of the browser the following functions are available Display of the operating mode and instantane ous values for a single device or for a CAN net worked system Display of energy yields as 5 minute daily monthly annual and total values 5 minute mean values of solar generator current and voltage grid current and voltage and feed in power Settings e g for date time interface configura tion alerting options communication param eters etc 55 Communication software update LCD dis play interfaces communication and Sunways Browser and the control software control and monitoring Access protection The Sunways Browser is provided with password protection so that unauthorised persons cannot access your Solar Inverter The following user data are set in the delivered state customer KFKAKAKAKA A User Password Authentication Required xj A username and password are being requested by http pti The site says user emBetterwebserver It is recommended that you change this pass word to an 8 digit character password This password is identical to the password entered via the LCD display for settings and commissioning If you cannot remember the password you can request a device specific password from the Tech nical Hotline so that you can access your Solar Inverter again In this case you should be able to present proof of purchase of the Solar
57. rcuit current measurement Check the rating plate on the Solar Inverter to ensure that it is approved for the maximum solar generator voltage The positive and negative lines must be kept electrically separate from the earth potential Touchable live parts of the solar generator e g metal frame carrying structure etc should be earthed connection with PE Check the solar generator for freedom from short circuits to earth Before connecting the solar generator to the Solar Inverter the integrated DC load break switch must be opened position 0 After the PV solar generator is connected to the Solar Inverter and the DC load break switch is switched on the direct generator voltage is present internally Always separate the solar generator side first by opening the DC load break switch and then the grid connection by switching off the correspond ing mains fuse Overview The solar generator can be directly connected to the Solar Inverter with a string Use the DC terminals accessible from inside for the connection Gi 1 The solar generator strings must be identically dimensioned and comply with the specifications of the Solar Inverter No external DC load break switch is required A DC load break switch as required in accordance with DIN VDE 0100 712 is integrated in the Solar Inverter
58. red Night Night mode Start Device initialisation phase COM Upd The communication software is being updated DSP Upd The control software is being updated The graphic in the lower section of the screen shows the output curve for the current day as a bar graph The current period is shown as a flashing bar as it is still increasing 27 Standard screen system This screen shows the system data for a CAN net worked system V plant 3 3KW oday 38 52kWh tatus OK Next to the total current system output you also see the energy yield of your solar system and any status messages of all connected devices These are provided with the inverter number M means that the error has occurred in the master G The various functions are accessed via the menu The main menu is opened from the standard screen by pressing twice You can always return to the standard screen by pressing and holding the key If a status message is shown then you can open the error list directly with You can access other instantaneous values from the standard screen with and 5 2 Access rights Operation of the Solar Inverter is divided into vari ous areas protected with passwords The password has 8 digits or characters The password can be entered in the menu item Set tings Login G After a correct password entry the login remains active for 5 minutes The device then switches back to guest mode Pressing an
59. rty In case of malfunctions which can impair safety the system must be shut down immediately and secured against being switched on again The malfunction must then be eliminated immediately Warranty and liability The Sunways AG General Terms and Conditions of Sale and Delivery always apply Warranty and liabil ity claims for personal injury or damage to property are excluded if they were caused by one or more of the following Improper use of the Solar Inverter Improper installation commissioning operation and maintenance Operation of the Solar Inverter with defective and or non operational safety and protective equipment Failure to observe the information in the user manual regarding installation commissioning operation and maintenance Unauthorised constructional modifications Insufficient monitoring of wearing parts Improperly conducted repairs Emergencies caused by external influence or force majeure 2 Safety Precautions 2 2 Explanation of symbols and warnings To help you quickly understand this manual and safely use the Solar Inverter the following warnings and symbols are used Warnings and symbols used in this user manual DANGER Dieses Symbol weist auf eine unmittelbar drohende Gefahr hin die wenn die Sicherheitsbestimmungen nicht befolgt werden Tod K rperverletzung oder schwere Sachsch den zur Folge haben wird Extreme danger from electric shock This symbol indicates an imme
60. s without the use of a transformer This user manual contains explanations on using the Sunways Solar Inverter You will learn to recognise the many possibilities of the Solar Inverter Informa tion is provided on safety installation commission ing operation and system monitoring Please observe the safety precautions exactly to ensure increased safety at the operating site of the Solar Inverter Content 1 2 3 Product Description Safety Precautions Installation 1 1 1 2 1 3 1 4 1 5 2 1 2 2 2 3 2 4 3 1 3 2 3 3 Proper use Function description Integration in solar system Solar generator configuration Standard components of a solar system Assembly description Scope of delivery General safety precautions Warranty and liability Explanation of symbols and warnings Warnings and symbols used in this user manual Symbols used in this user manual Warnings and symbols on device Basic safety measures Safety scheme Mechanical installation Requirements for installation location Installation Electrical installation Cable installation Solar generator connection String box Grid connection Installing the communication system Interface overview Networking Solar Inverters via CAN bus SO interface Temperature and irradiance sensor Connecting the alarm relay Ce 10 10 11 11 11 12 12 12 13 15 16 18 18 18 19 19 20 4 6 Commissionin
61. se note the serial number of the device and the error number before contacting the Techni cal Hotline The Technical Hotline can be contacted on 49 0 7531 996 77 577 during weekdays Cause and possible remedies Solar generator fault 101 U DCmax Your PT 30k Solar Inverter is approved The maximum DC voltage was exceeded for a maximum solar generator open circuit voltage of 1000 V All DC input components are adequately dimensioned Check the dimensioning of your PV generator with a safety factor If the threshold is exceeded the Solar Inverter stops feeding Too many modules are connected in series Reduce the number of modules and re commission the system 102 Insulation Before each connection your Solar Inverter checks the PV system for a possible earth fault or insulation faults The Solar Inverter has discovered an insulation fault in the PV system during run up Should this kind of error be detected no feeding takes place The mode of operation is compliant with DIN VDE 0126 1 1 37 Check your PV system for possible insulation faults damaged DC cables etc The measured insulation resistance must be at least 1000 kQ Display message 103 AFI gt 30mA Description Your Solar Inverter is equipped with a 5 Operation Cause and possible remedies A sudden fault current increase has 104 AFI gt 0 3A AC DC sensitive AFI according to DIN occurred during S
62. the digit to be changed key Scroll up key Scroll down key Select menu item key Back one menu level key Select menu item and confirm your entries key Cancel Operating LED The combined red green LED indicates the Solar Inverter status LED off Solar Inverter is not active night mode LED green continuously lit Solar Inverter is active and feeds into power grid MPP mode LED green flashing Solar Inverter is active and feeds into power grid although with current output or temperature limitation LED red continuously lit A fault has occurred malfunction LED red flashing Warning 26 5 Operation Standard screen single device The standard screen is always shown when no keyboard entry is made for more than 1 minute It can also be called up manually with the menu item Solar Inverter Instantaneous Values C pover 3 3KW oday 38 52kWh tatus MPP The standard screen shows the main data at a glance The first line shows the current feed in power The second line shows the energy fed in dur ing the current day The status line indicates the device status with the following messages MPP Feeding in MPP mode AC cur lim Feeding with AC current limitation DC cur lim Feeding with DC current limitation Temp lim Feeding with temperature limitation Output lim Feeding with output limitation Feed Feeding Warning A warning is active Error An error has occur
63. the next full hour under the e mail address stored in the Solar Inverter G The master sends the status messages of all Solar Inverters if they are CAN networked Requirements The master must be connected to the Internet via a network or modem When dialling in via modem the correct dial up settings must be stored see Internet dial up via modem Correct e mail settings must be stored in the Sunways Browser see Email settings 59 Alerting settings The alerting settings can be accessed with the but ton Settings System Monitoring in the Active Alerting section PT Inverter System monitoring Mozilla Firefo DI Activated Z info sunways del Active Email alerting Activation or deactivation of the active alerting function Email address In the Email address field enter the e mail address to which messages should be sent Function buttons Click Send to save the settings in the Solar Inverter Click Read to display the current Solar Inverter settings 6 13 Sunways Portal connection General information The operating data of your solar system can be transferred to the Sunways Portal for remote moni toring via the Internet This is possible without using a Sunways Communicator The portal connection is configured via the Sunways Browser Following activation the master auto matically sends a registration e mail containing the system data e g number of devices
64. tomatically after portal activation and sent to the Solar Inverter It can take up to 4 minutes before the Solar Inverter displays the system ID Portal Email Preset for the Sunways Portal Alternatively you can enter a different address if you wish to analyse the operating data yourself 60 6 System monitoring Email interval Select the e mail interval If you operate the system on a DSL modem you can set a short interval If you use a modem connection select a longer interval e g daily to avoid excessive telephone charges User Email Enter an e mail address for the confirmation e mail sent by the portal It contains a link for activating your system in the Sunways Portal User SMS As an option you can specify an SMS number to which an SMS message is sent after your system is successfully set up in the portal Function buttons With Portal Test you can test the portal connec tion You receive an e mail at the address specified under User e mail and an SMS if you have entered your mobile phone number under User SMS G Before the portal test you must transmit the settings to your Solar Inverter via Send If the test was suc cessful a message is sent to the user e mail address or the user SMS address Click Send to save the settings in the Solar Inverter To view your system data in the Sunways Portal you require a user account This will be issued to you if you follow the link in the con
65. toring software can be updated 1 Select Settings Software Update This func tion requires entry of a password default or the password you entered previously 56 6 System monitoring 2 The upper screen section shows the current software versions If a new version is available on our website www sunways de you can download the file and load it via the Sunways Browser Select the file on your hard disk via the Browse button and confirm with OK 3 Then select the software you want to update communication software control software or monitoring software 4 Click Update to copy the software update to the Solar Inverter 5 Click Reboot to reboot the device and load the new software PT Inverter Software update Mozilla Firefox Alternatively the system update may be distributed to the slaves via the software master Please con tact our Technical Hotline for further information The phone number is provided on the back of the manual 57 6 11 Internet dial up via modem Modem settings If you use a modem to connect to the Internet the modem must be set up via the Sunways Browser First establish a connection between your PC and the Solar Inverter see section Direct Ethernet con nection Enter the following settings via Settings Modem in your web browser PT Inverter Modem settini 10071920789 192 168 020 050 Modem type Select the modem type analog ISDN
66. ut commissioning for all other slaves as described above Later commissioning If you add new devices or replace existing ones in your solar system then you can display the device list in the display on the master under Settings Network CAN bus The new device can then be put into operation in accordance with the descrip tion for commissioning slaves 5 Operation 5 1 Control elements Operator panel The Solar Inverter is controlled via the operator panel at the front 1 LCD display illuminated 2 Operating LED 3 Keyboard LCD display A graphics capable monochrome dot matrix display is integrated in the operator panel In standard mode the current output daily yield and status are displayed The bar graph shows the output curve for the current day A bar represents a value averaged over 15 minutes Press any key to activate the display light If no key is pressed with approx 1 minute the display light goes out Gi Important The LCD display is not a calibrated measuring device A deviation of several percent is inherent in the system Exact accounting of the data with the power supply company requires a calibrated meter Keyboard The keyboard can be used to navigate in the menu edit text fields select entries from lists and enter numbers consecutively and digit by digit User entries can only be made if the value to be changed is selected The cursor changes visibly in the editing mode and indicates
67. uter such that the IP address is regularly reported to www dyndns org follow the procedure described in the manual for your DSL modem or Internet router for this purpose 5 Configure your DSL modem or Internet router such that it accepts requests from the Internet via Port 80 for example and forwards them internally to the Solar Inverter port forwarding 6 Also note that the port for access from the Inter net set in your firewall must be enabled Ci Instructions for configuring common DSL routers are available for download from the Sunways AG website 51 6 8 Connection via the Sunways Modem A modem connection can be used to bridge longer distances during system monitoring and configura tion Connect the Sunways Modem with the Solar Inverter The Sunways Modem is available as an analog ISDN and GSM type ISDN ISDN analog analog analog GSM GSM analog oc E Bull gt Z max 100 m LN 1 Connect your the Solar Inverter and your PC with a crossed or 1 1 Ethernet connection cable type CAT5 with RJ45 sockets G In a networked system only the master should be connected to the remote modem as standard 2 Connect an external modem to your PC or if available use the internal modem of the PC For commissioning please refer to the Sunways Modem user manual a The following modem combinations are permitted ISDN ISDN analog analog analog GSM GSM analog
68. vervoltage category Il and Ill is provided on the grid and on the solar generator side Grid side varistors These protect the power semiconductors in case of high energy short term voltage peaks in the grid and dissipate the energy in the choke in case of a grid disconnection Overvoltage protection on the generator side Optional protection Class II against atmospheric overvoltages e g caused by remote strikes dur ing thunderstorms 10 3 Installation 3 1 Mechanical installation Requirements for installation location DANGER The Solar Inverter may not be installed in rooms subject to explosion hazards The Solar Inverter may not be exposed to caustic gases No combustible materials may be stored within 3 metres of the Solar Inverter Mechanical load bearing capacity Note during installation that the Solar Inverter weighs 155 kg The installation surface must be firm and able to carry this weight in the long term Thermal interaction The installation surface must consist of flame retardant material not suitable surface of wood or plastic suitable e g concrete as the frame of the Solar Inverter can heat up to a maximum of 85 C A minimum distance of 1m to other devices cabinets ceilings cable ducts etc must be main tained to the sides of the housing A minimum distance of 0 5 must be maintained between the rear panel of the Solar Inverter and the wall see Fig The Solar Inverter must be inst
69. y key during the login period extends resets the period to gt 5 minutes Customer area The customer password must be entered to access this area All settings can be made which are required for installation and commissioning of the Solar Inverter G The password for the customer area is KREKEKKEERER The password is preset and is directly confirmed with As an option you can assign a personal password in the Commissioning menu Digits between 0 9 and letters between a z and A Z are permitted 5 Operation Installer area In this area the installer can make special settings on the Solar Inverter which are available after consult ing the Technical Hotline Request a device specific password from the Technical Hotline These pass words are only relevant for the Sunways Browser All commissioning procedures are accessible from the customer area Technical Hotline 49 0 7531 996 77 577 28 5 Operation 5 3 Menu structure The menu provides access to all Solar Inverter screens Open the main menu by pressing the left arrow key twice from the standard screen START VW Standard screen Instantaneous value 1 Instantaneous value 2 Cooling system Instantaneous values Energy yield Events History Information Yield for week Yield for 15 days Yield for month Total output DC values AC values Instantaneous values Solar Inverter Energy yield Solar s
70. y to access advanced set tings necessary for commissioning Settings Login Settings Network only possible with customer password Interfaces trad i 0 1TC T emp none 50 rate kWh 0 SO output On Setting of the irradiation and temper ature sensor and configuration of the SO pulse output Settings Network Interfaces HCP On P address 192 168 030 IG Network settings Screen 1 Activate DHCP for the automatic IP address set ting or enter IP address manually Settings Network Ethernet ubnet mask 255 255 255 000 atewau 192 168 030 Network settings Screen 2 Settings Network Ethernet AN ID Have CAN bus ID for the slave assigned by the master Settings Network CAN bus 36 5 Operation 5 5 Fault displays The Solar Inverter indicates faults in the LCD display and saves them in the internal error memory The fault indication consists of a number and a short description Based on the first number you can quickly recognise which area the fault has occurred in Solar generator fault AC network fault Inverter fault Interface communication fault Service fault Ore Br If an error is shown in the standard display the full error message can be found in the menu under Solar Inverter Events Display message Description G A restart may be attempted in the event of an error message Plea
71. ystem Events Settings History System information Yield for week Yield for 15 days Yield for month Total output General information Login Networking Commissioning G The areas highlighted in grey are only available in the master after entry of customer password Standard password 29 Language LCD contrast Date Time Receiving time Firmware Password Ethernet CAN bus Interfaces 5 4 Overview of screen displays Display Description 5 Operation Menu selection Instantaneous values Device Current feed in power daily energy yield and device status MPP Feeding in MPP mode The screen appears automatically it no key is pressed within 1 minute Solar Inverter instantaneous values AC pover 3 3KW Today 38 52kWh Status MPP ITA DC 14 8 Li 11 1 L2 11 0 L3 10 5 Display of voltages and currents from solar generator and grid Solar Inverter Instantaneous values Actual values 2 Temp inv 30 C Temp module 18 C Irrad 1684 m Module temperature and irradiance values if sensor if connected Solar Inverter Instantaneous values ooling system Temp inv 56 C Fan 1 23 Temp L 35 C Fan 2 0 Display of heat sink and choke tempe rature and load of the two fans Solar Inverter Instantaneous values

Download Pdf Manuals

image

Related Search

Related Contents

OPeraçõeS BáSICaS  Avaya Business Communications Business Communications Manager - Contact Center User's Manual  ST Installation Manual  How to Use Your TurboLaw Toolbar  ARTIGOS DE SECRETÁRIA 2013  

Copyright © All rights reserved.
Failed to retrieve file