Home
PRIMERGY BX620 S3 2-way Server Blade - Options Guide
Contents
1. 17 5 PIOCEESOIS i xg oS RERBA S NESR HSS CRESS 21 5 1 Installing a Second Processor 21 6 Main Memory ln Bm 29 6 1 Filing QUES uaa 28 3 Y Rx RO e mw o 30 6 2 Upgrading Exchanging Main Memory 32 7 Optional I O Module 35 7 1 Installing an VO Daughter Card 37 8 Storage Modules lll 39 8 1 Storage Module Variants 40 8 2 Replacing a Storage Module 47 BX620 S3 Options Guide Contents 9 Completion ree eene nnn nnn 49 9 1 Closing the Server Blade 49 Abbreviations ELLE 51 Related publications AAA 55 UC X ee ee ee a a ear AA 13217107 di 57 Options Guide BX620 S3 1 Preface The PRIMERGY BX620 S3 2 way server blade is an Intel based server blade that can be operated in the PRIMERGY BX600 S2 basic unit The PRIMERGY BX620 S3 server blade offers several new forward looking technologies such as dual core processors FBD memory modules with extended mirroring modular hard disk controller configuration and 2 5 inch SAS or SATA hard disks 1 1 Documentation Overview PRIMERGY manuals are available in PDF format on the ServerBooks CD which is part of the ServerView Suite provided with each server system These PDF files can also be downloaded from the Internet free of charge At http manuals fujitsu siemens c
2. Dummy heat sink I O daughter card Fibre Channel or Gigabit Ethernet optional Lithium battery on the system board d q o 0o01 BA oO DM 0 DIP switch on the system board il The memory modules the I O daughter card and the storage module must be installed in the server blade before it is placed in the basic unit DIP Switch Settings The server blade comes with the DIP switches set in the following positions Switch Function Default 1 Delete password OFF 2 Clear CMOS memory OFF 3 Restore system BIOS OFF 4 Not assigned OFF 5 Switch for keyboard mouse controller ON 6 Switch for keyboard mouse controller ON Table 1 Preset DIP switches BX620 S3 Options Guide 9 Notational Conventions Preface The switch settings have the following meanings Switch 1 ON Delete password enabled OFF Delete password disabled Switch 2 ON Clear CMOS memory enabled OFF Clear CMOS memory disabled Switch 3 ON Restore system BIOS enabled OFF Restore system BIOS disabled Switch 4 ON Top block swap enabled OFF Top block swap disabled Switch5 ON Keyboard mouse controller cannot be programmed normal operation OFF Keyboard mouse controller can be programmed Switch6 ON Keyboard mouse controller is connected to the power supply VCC5_SUS OFF Keyboard mouse controller is not connected to the power supply 1 4 Notational Convent
3. 8 Storage Modules In the BX620 S3 server blade the hard disk controller is mounted on a replaceable storage module which can be installed and removed on the front side of the server blade without having to take off the housing cover The following figure shows the position of the storage module in the open server blade Figure 22 Position of the storage module in the server blade There is a total of five variants of the storage module available one variant with a SATA hard disk controller and four variants with SAS hard disk controllers which can also have additional optional functions SAS SAS RAID SAS PCI X and SAS PCle The two PCI variants allow the installation of low profile PCI modules BX620 S3 Options Guide 39 Storage Module Variants Storage Modules 8 1 Storage Module Variants This section introduces the different storage modules and describes the instal lation of the optional extensions BX620 S3 SATA Storage Module Figure 23 BX620 S3 SATA Storage Module 1 SATA controller Connection to the system board Front panel 40 Options Guide BX620 S3 Storage Modules Storage Module Variants BX620 S3 SAS Storage Module This storage module supports RAID 1 with Advanced Error Logging Figure 24 BX620 S3 SAS Storage Module SAS controller 2 Connection to the system board 3 Front panel BX620
4. S3 Options Guide 41 Storage Module Variants Storage Modules BX620 S3 SAS PCI X Storage Module This storage module supports RAID 1 with Advanced Error Logging and allows the installation of a low profile PCI X card Figure 25 BX620 S3 SAS PCI X Storage Module SAS controller Connection to the system board Front panel PCI X riser card AJOIN How to install a PCI card is described under BX620 S3 SAS PCI Express Storage Module on page 43 42 Options Guide BX620 S3 Storage Modules Storage Module Variants BX620 S3 SAS PCI Express Storage Module This storage module supports RAID 1 with Advanced Error Logging and allows the installation of a low profile PCI Express card Figure 26 BX620 S3 SAS PCI Express Storage Module SAS controller Connection to the system board Front panel AJOI N PCI Express riser card BX620 S3 Options Guide 43 Storage Module Variants Storage Modules To install a PCI card in the storage module proceed as follows Undothe screw which secures the front panel of the storage module Figure 27 Opening the front panel gt Open out the front panel to the left Figure 28 Installing the PCI Card Pushthe PCI card into the slot on the riser card 1 gt Secure the PCI card with a screw 2 How to install the storage module in the server blade is d
5. PRIMERGY BX620 S3 2 way Server Blade Options Guide Edition November 2006 Comments Suggestions Corrections The User Documentation Department would like to know your opinion of this manual Your feedback helps us optimize our documentation to suit your individual needs Fax forms for sending us your comments are included in the back of the manual There you will also find the addresses of the relevant User Documentation Department Certified documentation according to DIN EN ISO 9001 2000 To ensure a consistently high quality standard and user friendliness this documentation was created to meet the regulations of a quality management system which complies with the requirements of the standard DIN EN ISO 9001 2000 cognitas Gesellschaft f r Technik Dokumentation mbH Copyright and Trademarks Copyright O 2006 Fujitsu Siemens Computers GmbH All rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software names used are trademarks of their respective manufacturers Contents 1 PERCE 1523459932959 a 5 1 1 Documentation Overview 5 1 2 Extensions and Conversions 7 1 3 Structure of the Server Blade 8 1 4 Notational Conventions 10 2 PTOCOQUES uou aaa e 11 3 Notes on SAIC cerrara AAA 13 4 Preparation lt lt 222i bce or sa dass 17 4 1 Opening the Server Blade
6. Related publications on page 55 BX620 S3 Options Guide 35 Optional I O Module Gigabit Ethernet I O modules The Gigabit Ethernet I O module PCI X provides two 1 Gbit s Ethernet ports Figure 18 Gigabit Ethernet daughter card PCI X The Gigabit Ethernet I O module PCle provides two 1 Gbit s Ethernet ports In addition this module supports TOE TCP IP Offload Engine and iSCSI Bild 19 Gigabit Ethernet daughter card PCle 36 Options Guide BX620 S3 Optional I O Module Installing an I O Daughter Card Connecting these additional Ethernet ports requires at least one Ethernet pass thru blade or an Ethernet switch blade in the NET3 slot of the basic unit for more information see the Operating Manual PRIMERGY BX600 S2 Basic Unit see Related publications on page 55 7 1 Installing an I O Daughter Card ATTENTION e Please observe the safety information in the chapter Safety Instruc tions on page 13ff Remove the server blade from the basic unit and open it as described in the chapter Preparation on page 17f Figure 20 Slot for I O daughter card Place the l O daughter card on the two sockets arrows BX620 S3 Options Guide 37 Installing an I O Daughter Card Optional I O Module Figure 21 Installing an I O daughter card Fasten the I O daughter card with three screws 38 Options Guide BX620 S3
7. ailable on the supplied ServerBooks CD You can order an additional copy of the ServerBooks CD by sending an e mail to the following address quoting your server data Reklamat PC LOG fujitsu siemens com Further sources of information Technical Manual for the relevant rack Manual for the monitor Manual on ServerView Server Management Manual on the RemoteView Remote Test and Diagnostics System Documentation for boards and drives Documentation for your operating system Information files on your operating system See also chapter Related publications on page 55 6 Options Guide BX620 S3 Preface Extensions and Conversions 1 2 Extensions and Conversions Second Processor If only one processor is installed in your server blade you can upgrade it to include a second one You may only use processors of the same type in the server blade The second processor must have the same clock frequency as the first Extension of the Main Memory The main memory sockets are suitable for Fully Buffered DIMM FBD 533 MHz memory modules Memory modules must be installed in pairs The two memory modules of one bank must always have the same capacity Optional I O Modules The server blade can be equipped with a 2 Gbit s FC I O module or an additional 1 Gbit s Ethernet I O module To be able to use the additional I O functionality at least one FC pass thru blade or switch blade or Ethernet LAN
8. before replacing the storage module non hot plug All variants of the storage module are installed and removed in the same way This section shows the steps using a BX620 S3 SAS PCI X module fitted with a Fibre Channel PCI controller as an example BX620 S3 Options Guide 47 Replacing a Storage Module Storage Modules Removal Figure 33 Removing the Storage Module Installation Undo the two screws 1 which fasten the storage module to the frame of the server blade Undo the screw 1 on the front panel of the storage module Open out the front panel in the direction of the arrow 1 This unlocks the storage module gt Pull the storage module out of the server blade chassis 2 To install a storage module follow the steps in the opposite order 48 Options Guide BX620 S3 9 Completion ATTENTION Please observe the safety information in the chapter Safety Instruc tions on page 13ff 9 1 Closing the Server Blade Figure 34 Closing server blade Place the cover of the server blade on the housing at a distance of 1 2 cm from the frame such that the cover lies flush with the edges on both sides gt Push the cover forward in the direction of the arrow 1 until it engages gt Insert the server blade in the basic unit To insert the server blade follow the procedure described in the section Removing the Server Blade from
9. cted LAN line of category 5 for 10 100 Mbps Ethernet and or category 5e for Gigabit Ethernet The requirements of the specification ISO IEC 11801 must also be taken into account Route the cables in such a way that they do not form a potential hazard tripping and cannot be damaged When connecting the device refer to the relevant notes in the Operating Manual Do not connect or disconnect any data transmission cables during a thunderstorm lightning hazard Be careful to ensure that no objects e g jewelry paper clips etc or liquids get inside the device electric shock short circuit In emergencies e g damaged casing control elements or cables penetration of liquids or foreign bodies switch off the device immedi ately unplug it from the grounded power outlets and contact your customer service center ATTENTION e Proper operation of the device in accordance with IEC60950 EN 60950 is only ensured if the casing is completely assembled and the rear covers for the installation openings are in place electric shock cooling fire protection interference suppression Install only system extensions that satisfy the requirements and rules governing safety electromagnetic compatibility and telecommunica tions terminal equipment If you install other extensions you may damage the system or violate these safety regulations Options Guide BX620 S3 Notes on Safety Batteries Information on which system
10. e Operating Manual for the server blade and the Service Supplement Shutdown the server blade correctly switch it off and remove it from the basic unit as described in the chapter Preparation on page 17f gt Extend or upgrade your server blade as described in the relevant chapter The installation and removal of the hot plug components is described in the Operating Manual supplied with the server blade Close the server blade place it back in the basic unit and switch on the server blade as described in chapter Completion on page 49f gt Start the operating system and if necessary configure it as required see the Operating Manual BX620 S3 Options Guide 11 3 Notes on Safety il The following safety instructions can also be found in the manual entitled Safety This device complies with the relevant safety regulations for data processing equipment including electronic office machines for use in an office environment If you have any questions as to whether you can set up the device in your particular environment please contact your sales outlet or our customer service centre ATTENTION e The activities described in this manual should only be performed by engineers service personnel or technical specialists e Equipment repairs should only be performed by qualified staff e Anyfailure to observe the guidelines in this manual and any unautho rized opening or improper repairs could endange
11. e same capacity speed and organization The arrow in figure 14 indicates the order in which the DIMM slots must be filled The same color means the same capacity speed and organization of the DIMM modules 30 Options Guide BX620 S3 Main Memory Fitting Rules Memory Mirroring Memory mirroring requires that branches 0 and 1 are fitted with two identical pairs of DIMM modules The memory mirroring functionality is configured in the system BIOS The following tables show the configurations for memory mirroring The same color means the same capacity speed and organization of the DIMM modules Branch 0 Branch 1 Channel 0 Channel 1 Channel 0 Channel 1 Slot 0 Slot 1 Slot 0 Slot 1 Slot 0 Slot 1 Slot 0 Slot 1 Table 2 Memory mirroring with four DIMM modules Branch 0 Branch 1 Channel 0 Channel 1 Channel 0 Channel 1 Slot 0 Slot 1 Slot 0 Slot 1 Slot 0 Slot 1 Slot 0 Slot 1 Table 3 Memory mirroring with eight DIMM modules BX620 S3 Options Guide 31 Upgrading Exchanging Main Memory Main Memory 6 2 Upgrading Exchanging Main Memory Remove the server blade from the basic unit and open it as described in the chapter Preparation on page 17f Figure 15 Removing a memory module gt Flip the fastening tabs on each side of the slot outward 1 gt Ifa memory mod
12. er blade control panel Removing the Server Blade from the Basic Unit gt Press the two touch points 1 to unlock the ejection levers Open out the two ejection levers 2 simul taneously to disengage the server blade Figure 3 Removing the server blade BX620 S3 Options Guide 17 Opening the Server Blade Preparation were 422254544 Figure 4 Removing the server blade gt Pull the server blade out of the basic unit 18 Options Guide BX620 S3 Preparation Opening the Server Blade Removing the Cover Figure 5 Removing the cover gt Press the two touch points 1 of the cover simultaneously to disengage it and slide back the cover as far as it will go in the direction of the arrow 2 Take off the cover The server blade components are now freely accessible see figure 1 on page 8 BX620 S3 Options Guide 19 5 Processors ATTENTION Make sure you observe the safety notes in the chapter Notes on Safety on page 13 Processors are components which are extremely sensitive to electro static discharge and must be handled with caution When you take a processor out of its protective wrapper or out of a Socket place it on an insulated antistatic surface with the smooth side down Never slide a processor over a surface 5 1 Installing a Second Processor If only one processor is installed in your server blade you can upg
13. escribed in the section Replacing a Storage Module on page 47 44 Options Guide BX620 S3 Storage Modules Storage Module Variants BX620 S3 SAS RAID Storage Module This storage module supports RAID O 1 as standard and optionally RAID 5 with a 256 MB DDR2 Cache iTBBU card Figure 29 BX620 S3 SAS RAID Storage Module SAS controller Connection to the system board Riser card for a BBU card Front panel oy RR oO nmm Socket for the RoMB activation key BX620 S3 Options Guide 45 Storage Module Variants Storage Modules To install a BBU card in the storage module proceed as follows oe Figure 30 Installing the RoMB Activation Key Place the RoMB activation key into the round socket arrow ATTENTION The labeling of the RoMB activation key must must face upward 46 Options Guide BX620 S3 Storage Modules Replacing a Storage Module Figure 31 Installing the BBU Card gt Push the BBU card into the slot on the riser card 1 as far as it will go gt Let the two ejection tabs on the right and left engage in the notches of the BBU card 2 How to install the storage module in the server blade is described in the following section 8 2 Replacing a Storage Module ATTENTION e Please observe the safety information in the chapter Safety Instruc tions on page 13ff e You must switch off the server blade
14. extensions are suitable can be obtained from the customer service center or your sales outlet The components marked with a warning label e g lightning symbol may only be opened removed or exchanged by authorized qualified personnel with the exception of the hot plug hot swap components If you cause a defect on the device by installing or exchanging system extensions the warranty will be invalidated Only set the resolutions and refresh rates specified in the operating manual for your monitor Otherwise you may damage the monitor If you are in any doubt contact your sales outlet or customer service center CAUTION Incorrect replacement of batteries may lead to a risk of explosion The batteries may only be replaced with identical batteries or with a type recommended by the manufacturer see the service supplement see Related publications on page 55 Do not throw batteries into the trash can They must be disposed of in accordance with local regulations concerning special waste The battery must be disposed of in accordance with local regulations concerning special waste Replace the lithium battery on the system board in accordance with the instructions in the service supplement see Related publications on page 55 All batteries containing pollutants are marked with a symbol a crossed out garbage can In addition the marking is provided with the chemical symbol of the heavy metal decisive for the classificati
15. ions The following notational conventions are used in this manual Italics indicate commands menu items or software programs quotation marks indicate names of chapters and terms that need to be emphasized indicates activities that must be performed in the order given ATTENTION indicates that if you ignore the information given at this point your health the correct functioning of your System or the security of your data may be at risk Li indicates supplementary information remarks and tips Options Guide BX620 S3 2 Procedure ATTENTION e The activities described in this manual should only be performed by engineers service personnel or technical specialists e Equipment repairs should only be performed by qualified staff e Anyfailure to observe the guidelines in this manual and any unautho rized opening or improper repairs could endanger the user through electric shock fire hazards or damage the equipment e Please note that any unauthorized opening of the device will result in the invalidation of the warranty and exclusion from all liability First of all please familiarize yourself with the safety instructions in the chapter Notes on Safety on page 13ff Make sure that all the manuals you need see Additional Server Blade Documentation on page 5 are available printing out the PDF files if necessary You will definitely need th
16. king sure the marks on the processor point to the corresponding marks on the socket a 24 Options Guide BX620 S3 Processors Installing a Second Processor Figure 10 Closing the locking frame of the processor socket Close the locking frame of the processor socket 1 swivel the locking lever downward 2 and lock it under the small clip a that is attached to the socket BX620 S3 Options Guide 25 Installing a Second Processor Processors Installing the Heat Sink Figure 11 Removing the plastic cover Pick up the heat sink and remove the transparent protective cover over the thermal paste on the bottom of the heat sink 26 Options Guide BX620 S3 Processors Installing a Second Processor oes Figure 12 Fastening the processor heat sink gt Place the heat sink on the CPU and fix it by fastening the four premounted screws in diagonally opposite sequence ATTENTION If you do not add a second CPU to the server blade a dummy heat sink must be installed in the second CPU socket to make sure that all server blade modules are cooled sufficiently To install the dummy heat sink follow the procedure for removing it in reverse see page 22 BX620 S3 Options Guide 27 6 Main Memory ATTENTION Please observe the safety information in the chapter Notes on Safety on page 13ff The server blade supports up to 32 GB main memory It offer
17. ment BX620 S3 Options Guide 53 Abbreviations SCSI Small Computer System Interface SCU Server Configuration Utility SFP Small Form Factor Pluggable TOE TCP IP Offload Engine USB Universal Serial Bus VGA Video Graphics Adapter VPD Vital Product Data WOL Wakeup on LAN 54 Options Guide BX620 S3 Related publications The current versions of the manuals can be downloaded from the Internet free of charge At http manuals fujitsu siemens com you will find an overview page showing the online documentation available on the Internet You can go to the PRIMERGY Server documentation by clicking on industry standard servers 1 Sicherheit 2 Ergonomie 3 Garantie 4 DataCenter Rack Technisches Handbuch Technical Manual 5 PRIMECENTER Rack Technisches Handbuch Technical Manual 6 Integrated SAS for RAID Users s Guide 7 LSI Logic MegaRAID SAS Device Driver Installation 8 LSI Logic MegaRAID SAS Software Users s Guide 9 PRIMERGY BX600 S2 Basic Unit Operating Manual 10 PRIMERGY BX620 S3 Operating Manual 11 PRIMERGY ServerView Suite ServerStart Benutzerhandbuch 12 ServerView Server Management User Guide BX620 S3 Options Guide 55 Related publications 13 ServerView Web Extension User Guide 14 PRIMERGY ServerView Suite RemoteView User Guide 15 PRIMERGY RemoteDeploy User Guide 16 PRIMERGY BX Blade Server Systems LAN Switch Blade User In
18. om you will find an overview page showing the online documentation available on the Internet You can go to the PRIMERGY Server documentation by clicking on industry standard servers Concept and Target Groups This Options Guide shows you how to extend and upgrade your system Caution The activities described in this manual may only be performed by specialist personnel with technical training The installation and removal of the hot plug components is described in the Operating Manual supplied with the system Additional Server Blade Documentation The PRIMERGY BX620 S3 documentation comprises the following additional manuals The Security manual printed copy always supplied with the server also available as a PDF file on the supplied ServerBooks CD The Guarantee manual printed copy always supplied with the server also available as a PDF file on the supplied ServerBooks CD BX620 S3 Options Guide 5 Documentation Overview Preface The Operating Manual for PRIMERGY BX620 S3 PDF file available on the supplied ServerBooks CD The BIOS Setup manual PDF file available on the supplied ServerBooks CD The Ergonomics manual PDF file available on the supplied ServerBooks CD The ServerView Suite manual printed copy always supplied with the server also available as a PDF file on the supplied ServerBooks CD The Service Supplement for PRIMERGY BX620 S3 PDF file av
19. on as a pollutant Cd Cadmium Hg Mercury Pb Lead BX620 S3 Options Guide 15 Notes on Safety Modules with Electrostatic Sensitive Devices Modules with electrostatic sensitive devices are identified by the following sticker A Figure 2 ESD label When you handle components fitted with ESDs you must always observe the following points Switch off the system and remove the power plugs from the power outlets before installing or removing components with ESDs You must always discharge static build up e g by touching a grounded object before working with such components Any devices or tools that are used must be free of electrostatic charge Wear a suitable grounding cable that connects you to the external chassis of the system unit Always hold components with ESDs at the edges or at the points marked green touch points Do not touch any connectors or conduction paths on an ESD Place all the components on a pad which is free of electrostatic charge il For a detailed description of how to handle ESD components see the relevant European or international standards EN 61340 5 1 ANSI ESD S20 20 Options Guide BX620 S3 4 Preparation ATTENTION Please observe the safety information in the chapter Notes on Safety on page 13ff 4 1 Opening the Server Blade gt Exit all applications and shut down the server blade correctly Press the On Off button on the serv
20. pass thru blade or switch blade must be installed in the NET3 and or NETA slots of the PRIMERGY BX600 S2 basic unit Storage Modules The hard disks are controlled by a storage module controller that can be plugged into the motherboard and which may also have additional functions SATA only offers one storage module variant while SAS offers a total of four different variants SAS SAS RAID SAS PCI X and SAS PCle The two PCI variants allow the installation of low profile PCI modules Storage modules can be installed replaced via the front of the server blade without having to take off the housing cover However they cannot be replaced while the system is running non hot plug the server blade must be switched off BX620 S3 Options Guide 7 Structure of the Server Blade Preface 1 3 Structure of the Server Blade E UIT i t Figure 1 PRIMERGY BX620 S3 server blade figure 1 shows the positions of the most important components of the BX620 S3 2 way server blade 8 Options Guide BX620 S3 Preface Structure of the Server Blade Sockets for FBD memory modules Heat sink of the first processor Control panel board with foil cable 2 5 inch hard disk module 1 SAS or SATA 2 5 inch hard disk module 2 SAS or SATA Storage module Socket for second processor
21. r the user through electric shock fire hazards or damage the equipment e Please note that any unauthorized opening of the device will result in the invalidation of the warranty and exclusion from all liability Before Setting Up ATTENTION e During installation and before operating the device observe the instructions on environmental conditions for your device e Ifthe device is brought in from a cold environment condensation may form both inside and on the outside of the machine Before operating the device wait until it is absolutely dry and has reached approximately the same temperature as the installation site Failure to observe these guidelines can lead to material damage of the device ATTENTION e Transport the device only in its original packaging or in packaging which protects it from knocks and jolts BX620 S3 Options Guide 13 Notes on Safety Installation and Operation A AN ATTENTION e Read the notes on installation and operation in the manual PRIMERGY BX600 S2 Basic Unit see Related publications on page 55 When installing the server blade in the basic unit beware of the energy hazard at the midplane conctacts A short circuit on these contacts may damage the system Data cables must be adequately shielded to avoid interference For the LAN wiring the requirements according to standards EN 50173 and EN 50174 1 2 apply The minimum requirement is the use of a prote
22. rade it to include a second one ATTENTION e Always use processors of the same type All processors must have the same frequency capacity and organization For multi processor operation use a suitable multi processor operating system e The Clovertown processor is only comlpiant with server blades with part number A3C40083121 You will find the part number on a label on the back side of the server blade or with ServerView field Model in the server list gt Open the server as described in section Opening the Server Blade on page 17 BX620 S3 Options Guide 21 Installing a Second Processor Processors Removing the Dummy Heat Sink Figure 6 Removing the dummy heat sink gt Undo the two screws which fasten the dummy processor heat sink and remove it 22 Options Guide BX620 S3 Processors Installing a Second Processor Installing the Processor v e Figure 7 Releasing the locking lever of the processor socket gt Press the locking lever of the processor socket out of its locking position arrows and swivel it upward Figure 8 Opening the locking frame of the processor socket Open up the locking frame of the processor socket and take off the black protective cover arrow BX620 S3 Options Guide 23 Installing a Second Processor Processors 4 Figure 9 Inserting the processor Place the processor in the socket ma
23. s eight DIMM slots which can be fitted with FBD533 PC2 4200F memory modules FBD Fully Buffered DIMM in pairs The main memory is divided into two branches with two channels each Two DIMM slots are assigned to each of the four channels The first slots of each channel logical slot 0 belong to memory bank 1 the second slots of each channel logical slot 1 belong to memory bank 2 The following figure shows the distribution of the main memory from a logical point of view FB DIMM 4 FB DIMM 4 FB DIMM 2 FB DIMM 2 Bank 2 Slot 1 Bank 1 Slot 0 I Memory Controller Figure 18 Main memory distribution logical view Because in the basic configuration of the server blade the FB DIMM 1 slots are fitted with 1 GB 2 GB 4 GB or 8 GB memory the memory can be expanded up to three times for slots FB DIMM 2 FB DIMM 3 and FB DIMM 4 ECC with memory scrubbing and ChipKill is standard Maximum performance is reached if all DIMM slots of a memory bank are fitted with DIMM modules of the same capacity BX620 S3 Options Guide 29 Fitting Rules Main Memory 6 1 Fitting Rules Slot 1 S ET rr soo T rr po soi rr A Memory Controller Figure 14 Fitting sequence The DIMM modules must only be fitted in pairs within a branch and must occupy the same slot position logical slot O or slot 1 The DIMM modules of a pair must have th
24. terface Description User Guide 17 PRIMERGY BX Blade Server Systems RemoteView Management Blade User Interface Description User Guide 56 Options Guide BX620 S3 Index A additional documentation 5 D daughter card Ethernet 36 Fibre Channel 35 documentation overview 5 dummy heat sink 22 E electrostatic sensitive devices ESD 16 ESD electrostatic sensitive devices 16 Ethernet daughter card 36 Tochterkarte 36 extensions and conversions 7 F FBD 29 fitting rules 30 Fibre Channel daughter card 35 fitting rules FBD module 30 Fully Buffered DIMM 29 H heat sink 26 dummy module 22 install 26 O module 35 information material 6 L lithium battery 15 M main memory upgrade 7 meaning ofthe symbols 10 N notational conventions 10 P processor upgrade 7 S server blade close 49 components 8 open 19 remove from basic unit 17 storage modules 39 SAS PCI Express 43 SAS PCI X 42 SAS RAID 45 SATA 40 T Target Group 5 Tochterkarte Ethernet 36 BX620 S3 Options Guide 57 pee A o a o a iE LE eee Fujitsu Siemens Computers GmbH User Documentation 33094 Paderborn Germany Fax 49 700 372 00000 e mail manuals fujitsu siemens com http manuals fujitsu siemens com Comments Suggestions Corrections Submitted by Comments on PRIMERGY BX620 S3 2 way Server Blade BX620 S3
25. the Basic Unit on page 17f in reverse BX620 S3 Options Guide 49 Abbreviations ASR amp R Automatic Server Reconfiguration and Restart BIOS Basic Input Output System CD Compact Disk COM Communication CPU Central Processing Unit DBMS Database Management System DC Dual Core DDR Double Data Rate RAM DIMM Dual Inline Memory Module DVD Digital Versatile Disk ECC Error Correcting Code EDC Error Detection Code EMC Electromagnetic Compatibility BX620 S3 Options Guide 51 Abbreviations ESD FBD FC FSB GAM HDD HU yo IDE iSCSI LAN LCD Electrostatic Discharge Fully Buffered DIMMs Fibre Channel Front Side Bus Global Array Manager Hard Disk Drive Height Unit Input Output Identification Integrated Drive Electronics Internet Protocol Internet Small Computer System Interface over IP Local Area Network Liquid Crystal Display 52 Options Guide BX620 S3 Abbreviations LED Light Emitting Diode MRL Manually Retention Latch NIC Network Interface Card NMI Non Maskable Interrupt PCI Peripheral Component Interconnect PDA Prefailure Detection and Analyzing POST Power On Self Test PSU Power Supply Unit RAID Redundant Arrays of Independent Disks ROM Read Only Memory SAN Storage Area Network SAS Serial Attached SCSI SATA Serial Advanced Technology Attachment SCA Single Connector Attach
26. ule was already installed in the slot remove it from the slot 2 Figure 16 Installing a memory module gt Flip out the fastening tabs on both sides of the slot gt Carefully press the memory module into the slot 1 until the fastening tabs on both sides of it engage 2 32 Options Guide BX620 S3 Main Memory Upgrading Exchanging Main Memory Close the server blade insert it in the basic unit and switch on the server blade as described in chapter Completion on page 49ff BX620 S3 Options Guide 33 7 Optional I O Module The PRIMERGY BX620 S3 server blade can be equipped with an additional I O module For this purpose the server blade has a special slot for a daughter card see figure 20 on page 37 The following I O daughter cards are available for the BX630 S3 server blade 2Gbit s Fibre Channel I O module Gigabit Ethernet I O module PCI X Gigabit Ethernet I O module PCle Fibre Channel I O module Figure 17 FC daughter card The FC daughter card provides two independent serial 2 Gbit s FC ports It is equipped with a QLogic ISP2312 chip and supports the storage subsystems S80 FibreCAT CXx00 AX100 Symmetrics and FC4700 Fibre Channel functionality requires at least one Fibre Channel pass thru i blade or a Fibre Channel switch blade in slot NETS of the basic unit for more information see the Operating Manual PRIMERGY BX600 S2 Basic Unit see
Download Pdf Manuals
Related Search
Related Contents
MDL 100 MDL 150 MDL 200 MDL 300 MDL 400 MDL 500 ECORegion OWNER`S GUIDE DE GUIA DEL manual técnico de instalación vers. 15 Cables Direct URT-601.5G networking cable QNAP TS-410 Turbo NAS BORELLITH PRETECTION DU BÉTON Propriétés Protection et USER MANUAL Safe-Off Option - Mid-Island Electrical Supply Copyright © All rights reserved.
Failed to retrieve file