Home
GE Monogram ZV1050SFSS 42" Island Chimney Hood
Contents
1. Step 12 Install filters Finalize Installation PRODUCT CLEARANCES The vent hood must be installed 25 1 2 min and 30 max above the cooking surface 30 is recommended for 8 ft ceilings 30 clearance will insure that the duct cover meets the ceiling The cooking surface should be at least 36 above the floor Installation will be easier if the vent hood is installed before the cooktop and countertop is installed Recommended Min y 9 ft to 10 ft ceilings may be 25 1 2 to 30 clearance The distance between the cooking surface and the bottom of the hood must be at least 25 1 2 The 30 recommended installation height above the standard 36 countertop will insure duct cover fit to the ceiling For 9 ft and 10 ft ceilings the hood may be lowered to 25 1 2 over the cooking surface IMPORTANT Clearances may vary due to type of cooking product and local codes Check with local inspectors to be sure standard is applicable When installing the Island Hood above a Monogram Professional Range or Cooktop installation clearance must be at least 30 Advance Planning TOOLS AND MATERIALS REQUIRED not supplied e Tape measure e Knife e Spirit level e Wire cutter e Wire stripper e Wire nuts e Electric drill and 5 32 bit e Phillips screwdriver e Flat blade screwdriver e Hammer e Pliers e Safety glasses e Tape to mount templa
2. between ceiling joists as shown 2x4 s are required to Berandi Cocking Cooktop support the weight Surface e The 2 x 4 cross framing can be installed standing or gt flat depending on duct run See illustration Countertop Approx 11 27 Side View 11 174 Top View of Support Framing Cross 7 1 4 Cross Framing Framing A a Ceiling Side View Support Typical Support Frame Mounting Frames The framing should be spaced 7 1 4 on the sides and 11 1 4 at the front centerline to accept mounting screws in the vent support frame E IMPORTANT The cross framing must be spaced 7 1 4 from centerline to centerline in order to accept the hood mounting screws Installation Instructions STEP 1 CONTINUED e Arrange cross framing in the ceiling to suit the existing structure See examples Secure each 2 x 4 block with at least four 4 10 wood screws 3 long not supplied Use 8 wood screws total for the two supports The cross framing must be accurately aligned to assure correct positioning of the hood e The cross framing must be level in all directions Check with a spirit level and adjust if necessary IMPORTANT The ceiling structure must be capable of supporting the weight of the hood approximately 300 pounds and any inadvertent user contact loads The hood support fr
3. CONTENTS Design Information Product Dimensions Duct Cover Accessories Product Clearances Advance Planning Tools and Materials Required Power Supply Duct Fittings Installation Instructions Step 1 Plan the location Ceiling Support Structure Ductwork PRODUCT DIMENSIONS This vent hood is designed to be used in vented ceiling mounted installations AA Height to Ceiling 91 2 20 to an 8 ft ceiling Using supplied duct cover 32 for 9 ft Ceiling Using ZX1059SFSS Accessory 44 for 10 ft Ceiling Using ZX10510SFSS Accessory This vent hood is supplied with a decorative duct cover to reach 8 ft ceiling height or between 711 and 871 DUCT COVER ACCESSORIES Order Accessory duct covers for 9 ft and 10 ft ceilings ZX1059SFSS For 9 ft ceiling height This kit includes a decorative duct cover and support frame to reach a 9 ft ceiling height ZX10510SFSS For 10 ft ceiling height This kit includes a decorative duct cover and support frame to reach a 10 ft ceiling height Order the accessory at the same time as the vent hood and have on site before installation begins Step 2 Remove Packaging Step 3 Check Installation Hardware Step 4 Mount Template Step 5 Install Support Frame Step 6 Secure Wiring Step 7 Size and Install Ductwork Step 8 Install Decorative Duct Covers Step 9 Install Hood Step 10 Connect Electrical Step 11 Slide Duct Cover Down
4. E N Q IS a gt E o 2 U o Q 8 v H z yo E Si lt v lt gt v g Q Q A ES Oo gt o 4 9 o a s y z fos y 9 9 a 3 Phillips head decorative screws Template 0 0 04009 01 ORO 00000002000000 4 Machine Screws Eidos MOE Y 4 Lock Washers 4 Filters 4 Hex Head Lag Screws Service Safety Stop Screw Check service manual envelope taped to the side of the hood to be sure it contains one stop screw Leave this screw in the envelope Check contents of the accessory package g Screw Holes Mountin Decorate Duct Covers Attachment Support frames with 8 screws and 8 washers Hole Left Side crew S Installation Instruction STEP 4 MOUNT TEMPLATE e Align the template with the marks on the ceiling and tape in place Be sure the template is oriented correctly with the front of the hood e Use a plumb to check to be sure the mounting holes will provide parallel alignment with the countertop below e Center punch all hole locations e Drill pilot holes in the 4 screw locations Use a 5 32 bit and drill approximately 1 1 2 deep e Cut the 8 1 4 duct opening and approx 1 wire access hole STEP 5 INSTALL SUPPORT FRAME Frame Opening Check Level in Both Direction Install upper support frame e S
5. Installation Instructions If you have questions call 800 GE CARES or visit our website at www monogram com 42 Island Vent Hood Model ZV1050 Monogram We bring good things to life Design Information BEFORE YOU BEGIN Read these instructions completely and carefully o IMPORTAN T Save these instructions for local inspector s use e IMPORTANT observe all governing codes and ordinances Note to Installer Be sure to leave these instructions with the Consumer Note to Consumer Keep these instructions for future reference Skill Level Installation of this vent hood requires basic mechanical and electrical skills e Completion time 1 to 3 hours Proper installation is the responsibility of the installer Product failure due to improper installation is not covered under the Warranty CAUTION Due to the weight and size of this vent hood and to reduce the risk of personal injury or damage to the product we recommend at least three people install this hood PRUDENCE A cause du poids et de la taille de la hotte et pour r duire les risques de blessures ou de dommages de P quipement nous recommandons que trois personnes installent cette hotte WARNING To reduce the risk of fire or electrical shock do not use this range hood with any external solid state speed control device Any such alteration from original factory wiring could result in damage to the unit and or create an electrical
6. ame will be supported by the 2 x 4 min cross framing Ductwork e Use the shortest and straightest duct route possible For satisfactory performance duct run should not exceed 100 feet equivalent length for any duct configuration e Refer to Duct Fittings chart to compute the maxi mum permissible length for duct runs to the out doors e This vent hood must use 8 round duct The 8 round duct can transition to 3 1 4 x 12 e Install the house ductwork to run horizontally between ceiling joists or straight up through the roof Finish the Ceiling e Finish the ceiling surface Be sure to mark location of the ceiling joists and cross framing Check to be sure the ceiling is level use shims if necessary 2x 4 Min Cross Framing Support Frame Upper Half Opening Of Support Adjustment Slot Ceiling Joint Vent Straight Up Through The Ceiling 8 Round Duct Elbow Standing Vent Between Ceiling Joists Depending on available space Installation Instructions STEP 2 REMOVE THE PACKAGING The vent hood is packed separate from the decorative duct cover or accessory covers ZX1059SFSS or ZX10510SFSS e Remove the frame cover parts box and packaging e Remove junction box cover e Install strain relief onto junction box cover LU lt O oc lt I Z Q E lt ma F O LU I m D LU F YN v 5 lt yo Q a
7. connection of equipment grounding conductor can result in a risk of electric shock Check with a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded ADVERTISSEMENT Le mauvais branchement du fil de mise la terre peut causer un choc lectrique En cas de doute consulter un lectricien qualifi ou un technicien pour d terminer si l appareil est la terre Advanced Planning DUCT FITTINGS This Hood Must Use 8 Round Duct It Can Transition to 3 1 4 x 12 Duct Use this chart to compute maximum permissable lengths for duct runs to outdoors Note Do not exceed maximum permissable equivalent lengths Maximum duct length 100 foot for range hoods Flexible ducting If flexible metal ducting is used all the equivalent feet values in the table should be doubled The flexible metal duct should be straight and smooth and extended as much as possible Do NOT use flexible plastic ducting Note Any home ventilation system such as a ventilation hood may interrupt the proper flow of combustion air and exhaust required by fireplaces gas furnaces gas water heaters and other naturally vented systems To minimize the chance of interruption of such naturally vented systems follow the heating equipment manufacturer s guidelines and safety standards such as those published by NFPA and ASHRAE Total Equivalent Quantity Equivalent Duct Piece Dimensions Len
8. ecure the upper support frame to the ceiling joists and cross framing with the 4 lag screws provided For maximum rigidity and strength the screws must be driven into the center of the joists and or cross framing Check to be sure the support frame is level vertically and horizontally Wire Access Holes Lower Support 30 Recommended Countertop Install lower support frame e Insert lower support frame or accessory support frame ZX1059SFSS or ZX10510SFSS into the upper support frame and loosely secure with 8 screws and washers 4 on the front and 4 on the back sides e Adjust the lower support frame up or down to the desired height above the countertop Tighten screws IMPORTANT Again check to be sure the support is level in both directions There is no way to level the hood after the hood is secured to the frame Installation Instructions STEP 6 SECURE WIRING e Route house wiring through the ceiling hole and pull a length to reach the hood junction box approximately 6 below the support Ceiling O Left Side View Support Frames e Tape the wire to the left side of the frame support to prevent damage during installation and service 10 STEP 7 SIZE AND INSTALL DUCTWORK 7 m Ceiling A House Duct Duct Connection ToHood Bottom S
9. filter and pull the knob forward until the filter rests on the slots e To remove the filters grasp the knob and push the filter towards the rear and tilt downwards e Remove the protective film covering the control panel on the front face of the hood and any other packaging materials e Check all 4 lamps to assure tightness in sockets e Refer to the Owner s Manual for operating instructions e Clean the hood with an approved stainless steel cleaner 13 Notes 14 Notes 15 Note While performing installations described in this book safety glasses or goggles should be worn For Monogram local service in your area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Monogram We bring good things to life General Electric Company Pub No 49 80153 Louisville KY 40225 Dwg No 164D4290P110 N D 538 11 02 Printed in Italy
10. gth Used Length Round 1 ft straight per foot length 1 ft 3 1 4 x 12 per foot straight length 90 elbow 15 ft 45 elbow 3 1 4 x 12 90 elbow 3 1 4 x 12 45 elbow 3 1 4 x 12 90 flat elbow 20 ft 8 round to 3 1 4 x 24 transition 3 1 4 x 12 to 8 round transition 8 round to 3 1 4 x 12 transition 90 elbow 3 1 4 x 12 to 8 round transition 90 elbow Round wall cap with damper 3 1 4 x 12 wall cap with damper Round roof cap Round roof vent D 2 E A z SN A A Q iz a E ST Actual length of straight duct plus duct fitting equivalent Equivalent length of duct pieces are based on actual tests conducted by GE Evaluation Engineer ing and reflect requirements for good venting performance with any ventilation hood Total Duct Run Installation Instructions STEP 1 ADVANCE PLANNING Ceiling Plan the location Hood Determine the exact location of the vent hood Ducting e Use a plumb bob to check location to be sure Centerline countertop cooktop location below the hood will align exactly e The hood should project forward 1 1 2 beyond the front edge of the cooking appliance See illustration e Observe the recommended space 30 between the cooking surface and bottom of hood Ceiling support structure e At the hood location install 2 x 4 min cross framing
11. i oxidant compound and aluminum to copper connectors ATTENTION Si le cablage de la maison n est pas du type a deux fils avec un fil de terre Vinstallateur doit fournir un circuit de terre Quand les fils de la maison sont en aluminium il prendre soin d utiliser de la pate antioxidation approuv e par UL et des connecteurs pour l aluminium cuivre e Install strain relief onto the knockout of the junction box cover e Insert house wiring through strain relief and tighten e Connect white leads to branch circuit white lead e Connect black leads to branch circuit black lead e Connect green yellow leads to branch circuit green or bare ground lead e Secure all connections with wire nuts on each electrical connector e Push wires into junction box and replace cover Be sure wires are not pinched 12 STEP 11 SLIDE DUCT COVER DOWN a e 1 Install Decorative Screw e Hold the decorative duct cover and remove the decorative stop screw from the support frame Keep the screw e Slide the lower duct cover down onto the hood e Install the decorative screw in the lower left hole on the duct cover as shown Installation Instructions STEP 12 INSTALL FILTERS FINALIZE INSTALLATION Filter Slots e Remove protective film on the filters e Tip the filter into the lower slots at the rear of the opening Lift the
12. ous or explosive materials or vapors e Structural framing installation work and electrical wiring must be done by qualified person s In accordance with all applicable codes and standards including fire rated construction e Sufficient air is needed for proper combustion and exhausting of gases through the flue chimney of fuel burning equipment to prevent back drafting Follow the heating equipment manufacturer s guideline and safety standards such as those published by the National Fire Protection Association NFPA and the American Society for Heating Refrigeration and Air Conditioning Engineers ASHRAE and the local code authorities e Local codes vary Installation electrical connections and grounding must comply with applicable codes In the absence of local codes the vent should be in stalled in accordance with National Electrical Code ANSI NFPA 70 1990 or latest edition CAUTI O N To reduce risk of fire and to properly exhaust air be sure to duct air outside Do not vent exhaust air into spaces within walls or ceilings or into attics crawl spaces or garages P R U D E N C En faut prendre soin d installer un conduit vers l ext rieur pour r duire le risque d incendie et pouvoir vacuer l air correctement Il ne faut pas vacuer l air correctement Il ne faut pas vacuer Pair dans l espace entre les parois d un mur un plafond ou un grenier un espace sanitaire ou un garage Design Information
13. safety hazard ADVERTISSEMENT Pour r duire le risque d incendie ou de choc lectrique il ne faut pas utiliser cette hotte avec un r gulateur de vitesse lectronique externe Toute modification de ce type du branchement d usine peute endommager Pappareil ou cr er un risque de choc lectrique TO REDUCE THE RISK OF FIRE USE ONLY METAL DUCTWORK WARNING TO REDUCE THE RISK OF FIRE ELECTRICAL SHOCK OR INJURY TO PERSONS OBSERVE THE FOLLOWING A Use this unit only in the manner intended by the manufacturer If you have any questions contact the manufacturer B Before servicing or cleaning unit switch power off at the service panel and lock service panel to prevent power from being switched on accidentally If the service panel cannot be locked fasten a tag or prominent warning label to the panel ADVERTISSEMENT POUR R DUIRE LE RISQUE D INCENDIE DE CHOC ELECTRIQUE OU DE BLESSURES IL FAUT OBSERVER LES REGLES SUIVANTES A Utiliser cet appareil uniquement de la mani re pr vue par le fabricant En cas de question consulter le fabricant B Avant toute intervention ou nettoyage couper Valimentation lectrique au disjoncteur et verrouiller le panneau du disjoncteur pour viter la mise sous tension accidentelle S il n est pas possible de verrouiller le panneau du disconcteur attacher un placard ou une tiquette tr s visible au panneau e For general ventilating use only Do not use to exhaust hazard
14. te e Gloves to protect against sharp edges e 120V 60Hz 15 or 20 Amp 2 wire with ground Properly grounded branch circuit e Strain relief for junction cover e Plumb e Center punch POWER SUPPLY IMPORTANT Please read carefully WAR N l N G FOR PERSONAL SAFETY THIS APPLIANCE MUST BE PROPERLY GROUNDED ATTENTI 0 N POUR DES RAISONS DE S CURIT CET APPAREIL DOIT TRE CORRECTEMENT MIS LA TERRE Remove house fuse or open circuit breaker before beginning installation Do not use an extension cord or adapter plug with this appliance Follow National electrical codes or prevail ing local codes and ordinances Electrical supply This vent hood must be supplied with 120V 60Hz and connected to an individual properly grounded branch circuit and protected by a 15 or 20 amp circuit breaker or time delay fuse e Wiring must be 2 wire with ground e If the electrical supply does not meet the above requirements call a licensed electrician before proceeding e Route house wiring in the ceiling as close to the installation location as possible Allow an additional 3 feet length from ceiling joists to reach the junction box on the hood e Connect the wiring to the house wiring in accor dance with local codes Grounding Instructions The grounding conductor must be connected to a ground metal permanent wiring system or an equip ment grounding terminal or lead on the hood WAR N l N G The improper
15. ugh the hood and hood support e Check hood level in both directions e Check to be sure that the duct is positioned over the hood connector e Seal the duct connection with duct tape Note Do not drive screws through this duct connec tion Doing so will prevent proper damper operation INSTALL DECORATIVE DUCT COVERS gan a cra il oa Bottom Duct Cover Bottom Duct Cover fl j Stop Screw OS Install Stop Screw in Hole of Upper Inner Duct Cover e Slide the lower decorative duct over the installed upper duct and push to the top keeping the bottom slotted hole to the left e Install the decorative stop screw in center hole of upper inner duct cover The decorative screw will act as a stop screw and prevent the lower decorative duct cover from sliding down CAUTI 0 N The stop screw must be installed Failure to do so could result in personal injury or damage to the duct cover PR U D EN CE La vis sup rieure doit tre en place afin d viter les blessures ou d endommager le capot antipoussiere Stop Screw Install 4 Lock Washers and 4 Machine Bolts to Seal Duct Connection Installation Instructions STEP 10 CONNECT ELECTRICAL Verify that power is turned off at the source WAR N l N G If house wiring is not 2 wire with a ground wire a ground must be provided by the installer When house wiring is aluminum be sure to use UL approved ant
16. upport Frame Flange e Measure from house duct flange to bottom of support frame Dim A Add at least 1 for duct overlap at the top Subtract 1 3 4 for hood insertion into the bottom of the frame to determine required duct length e Cut the 8 duct length required Note The bottom of the duct must be external female connection to the top of the hood The bottom end should be flared slightly to facilitate installation of the hood e Install duct up through support frames and attach to house ducting with sheet metal screws e Seal the connection with duct tape Installation Instructions Install Screw on Each Side e Pretap or drive decorative screw into the screw holes on the support frame This will make screw installa tion easier e Separate the two decorative duct covers e Select the inside cover top which has two screw holes in the top e Slide the decorative duct cover over the support frame and push to the ceiling e Attach to the hood support at the top with 2 supplied decorative screws e Locate the 3rd decorative screw in the hardware package Set aside STEP 9 INSTALL HOOD Note AT LEAST THREE PEOPLE ARE REQUIRED TO COMPLETE THIS INSTALLATION e Lift the hood up to the support frame Carefully align the hood mounting holes to support frame holes and at the same time the hood duct connector into the duct e Install screws thro
Download Pdf Manuals
Related Search
Related Contents
MANUAL DE INSTALACAO E CONFIGURACAO Guide de l`expert -Vague C - évaluation des établissements Thesis Copyright © All rights reserved.
Failed to retrieve file