Home
Quantum Audio PX502 Network Card User Manual
Contents
1. 8 The Cabinet Setup screen allows you to configure the following information about the library see table 5 Table 5 Setting Up the Cabinet Cabinet Options Description Host bus Sets the SCSI ID for both the library and tape drives Stack role Assigns the library stack role as Master Slave or Stand alone solo There can be only one Master library in a multiple stack Once configured as a slave all library OCP functions can be controlled via the Master library OCP The library model number will also change to PX500S indicating a stacked library configuration The library model number is available from the home screen on the Master library OCP Enables or disables the left load port Left load port Right load port Enables or disables the right load port Drive FUP from tape Allows you to perform a tape drive firmware update from a firmware update tape cartridge Setting the Date and Time To set the date and time 1 From the Setup screen use the up and down arrows to highlight Date and Time and press Enter The Date and Time screen displays see figure 23 Figure 23 Date and Time Screen Select time zone USA Mountain andard UTC UTC Ve TT The Date and Time screen displays the following information about the library 14 PX502 Tape Library Quick Start Guide 2 Use the up and down arrows to view or edit the time zone date and time information Press Enter to acce
2. gt bay 2 Cover plate b Insert the tape drive s into the drive bay s slowly until the connectors are seated Refer to figure 14 for drive bay numbering see the Quantum PX500 Series Tape Drive Installation Instructions PN 81 81301 for information Figure 14 Installing the Tape Drives 0e Back of Library Tape Tape drive 2 drive 1 c Tighten the tape drive thumbscrews using a flat blade screwdriver d Repeat these steps to install another tape drive in a different location if desired The library chassis is installed in the rack Cabling the Library 1 Connect the SCSI cables and jumpers as shown in the following figures e Figure 15 SCSI System Controller Board e Figure 16 Surrogate SCSI System Controller Board 10 PX502 Tape Library Quick Start Guide e Figure 17 Native Fibre Channel System Controller Board NoTE Quantum ships sufficient SCSI cables and terminators with the libraries to set up two drives per SCSI bus One tape drive per SCSI bus may be necessary for optimum performance Refer to your tape drive documentation Note SCSI cable lengths should not exceed e 39 37 feet 12 meters between the host and the library for single drive per bus installations Figure 15 PX502 Cable Configuration SCSI Sy
3. the OCP asks you Are the packaging materials removed YES or NO CAUTION Pressing Yes when the internal packaging restraints are in place will damage the library robotics 4 Press NO to continue The OCP displays Doors opened magazines released pull magazines out before power shutoff The library waits approximately 30 seconds for you to open the doors remove both magazines from the library and remove the foam blocks Note If you are unable to remove the magazines before the library shuts down Turn on the library power and repeat the steps above 12 PX502 Tape Library Quick Start Guide 5 After the library has powered down remove the foam restraints by completing the following steps see figure 20 a Detach the tie band holding the two sides of the metal restraints together and remove it from the library b Remove the metal restraints from the library c Lift the left foam restraint slightly up and remove it from the library d Slide the right foam restraint to the right until you are clear of the robotics motor and remove the restraint from the library CaAuTION Avoid touching the printed circuit board CAUTION When removing the foam restraints ensure that the robotics umbilical cable is lying down in the correct position inside the platform and not across the robotics track Figure 20 Removing the Foam Restr
4. Once the location is determined attach the back brackets to each side of the library with four M5 x 8 Allen screws see figure 10 Note If your rack has a depth less than 27 in the back brackets and back clamps are not used WARNING The PX502 tape library weighs approximately 52 Ibs 23 6 kg At least two people are required to lift and install the library Figure 11 Installing the PX502 in the Rack PX502 Tape Library Quick Start Guide 3 Secure the back of the library to the rack with two mounting clamps refer to table 4 for information on the correct mounting holes to use and two M5 x 10 Allen screws on each clamp see figure 12 Note If the depth of the rack is less than 27 in do not install the back mounting brackets or clamps 4 Secure the mounting clamps to the rack rails with two PHILLIPS screws on each side see figure 12 Figure 12 Securing the Back of the Library Back mounting va clamp ra I E l PHILLIPS screws S NS M5 x 10 Pa Allen screws g Left hand back bracket shown 5 To install the tape drives into the library a Remove the tape drive cover plates if necessary some libraries ship with one tape drive installed by loosening the captive screws securing the plate to the library chassis see figure 13 Figure 13 Removing the Tape Drive Cover Plates Tape drive
5. at the time of installation do NOT install the PX502 tape library too high in the rack The weight of the library may cause the rack to become top heavy and unstable if installed in the top of an empty rack Begin installing the PX502 tape library from the bottom of the rack if more than one library is installed Installing the Library Installing the PX502 tape library consists of the following steps Note If this is an upgrade to an existing library system see Multiple Library Stacks on page 15 e Installing the Rack Mount Shelves e Installing the Library Chassis e Cabling the Library PX502 Tape Library Quick Start Guide Table 3 Library Mounting Hardware Qty 16 Figure Description Allen head screws M5 x 10 for shelf assembly PN 90 87203 01 T nuts M5 PN 74 87575 01 4 metric and 4 standard Rail adapters both metric and standard holes are included 8 total adapters see figure 6 PN 74 88052 01 metric PN 74 88053 01 standard 4 sets 2 sets Right and left support shelves left shown PN 74 88055 01 shelf PN 74 88056 01 extender Front and back rail mounting hardware M4 x 12 allen screws and mounting plates PN 74 88054 01 plate PN 90 87203 03 screws Back bracket hardware M5 x 8 allen screws and mounting plate PN 74 88057 01 bracket PN 90 87275 01 screws 2 set
6. rack see table 4 Note If the depth of the rack is less than 27 in do not install the back mounting brackets or clamps PX502 Tape Library Quick Start Guide Table 4 Back Mounting Bracket Orientation Back mounting bracket ee 1 Holes X 2 Holes Back mounting clamp Rack Depth Back Mounting Back Mounting Bracket Clamp Mounting Position 1 2 Holes Holes 24 to 25 in Back bracket and N A N A clamp not required 25 to 26 in Back bracket and N A N A clamp not required 26 to 27 in Back bracket and N A N A clamp not required 27 to 28 in se holes A and C 28 to 29 in se holes B and D Figure 10 Installing the Back Mounting Brackets Back mounting bracket screws Pa Right hand back bracket shown Note If this is a multiple stack configuration refer to Multiple Library Stacks on page 15 for information on preparing the library chassis for passing tape cartridges from one unit to another 2 Install the library into the rack as shown in figure 11 and secure the library to the rack with four PHILLIPS screws 30 to 31 in se holes D and F 31 to 32 in se holes E and G U U 29 to 30 in Use holes C and E U U U 32 to 33 in se holes F and H KKK mK K KOK 33 to 34 in Use holes G and I 34 5 to 35 5 in Use holes F and H 35 5 to 36 5 in Use holes G and I
7. Quantum oviding Necessary Tools Taking ESD Precautions erates T2 Unpacking the PX502 Tape Library 2 Installing the Library Locating the Mounting Position 3 Installing the Library Initial Configuration Multiple Library Stacks Introduction The PX502 tape library is an automated storage and retrieval device consisting of up to two tape drives and up to 32 SDLT cartridges or 38 LTO tape cartridges see Notational Conventions This instruction uses the following conventions Note Notes emphasize important information related to the main topic CAUTION Cautions indicate potential hazards to equipment and are included to prevent damage to equipment WARNING Warnings indicate potential hazards to personal safety and are included to prevent injury This document explains how to unpack the PX502 tape library and install it in a standard 19 in rack Once the library is unpacked and installed set up the library using the instructions in the PX500 Series User s Guide PN 81 81290 This installation procedure will take approximately 4 hours to complete NOTE It is recommended to review the entire document prior to beginning the installation Figure 1 PX502 Tape Library PX502 Tape Library Quick Start Guide Choosing a Location When choosing an installation site for the PX502 consider the following requirements e
8. Rack Space Requirements Environmental Conditions Rack Space Requirements Table 1 contains the rack requirements for the PX502 tape library Table 1 Rack Requirements Dimensions PX502 Depth 31 in 78 7 cm Width 19 in 48 3 cm Height 6 75 in 17 cm 4U Weight 52 lbs 23 6 kg Air Clearance Open 4 in 10 cm behind unit for proper air flow Environmental Conditions The installation site must have the following environmental conditions e Humidity 20 80 non condensing e Temperature 10 C 35 C 50 F 95 F e Altitude 500 to 10 000 feet 152 to 3048 meters These environmental conditions apply when the PX502 tape library is in operation Note For additional specifications refer to the Quantum PX500 Series User s Guide PN 81 81290 Preparing for the Installation Before you begin the installation procedure in this section make the following preparations as described in this section e Providing Necessary Tools e Taking ESD Precautions Providing Necessary Tools Provide the following tools for unpacking and installing the PX502 tape library e 1 PHILLIPS screwdriver e 2 PHILLIPS screwdriver e 1 flat blade screwdriver e Allen wrench 2 5mm and 3mm included in accessory kit e Antistatic wrist strap included in accessory kit Taking ESD Precautions Some components within the PX502 tape library contain static sensitive parts T
9. acks Note If the library is NOT being installed with other libraries to operate in a multiple library stack it is not necessary to complete the following instructions If the library will be installed in a rack with other PX500 Series libraries you must prepare each chassis prior to installation Preparing the library chassis for installation into a multiple library stack consists of NOTE It is recommended to place the Master library in the middle of the library stack for improved performance e Removing the FlexLink cover plates e Installing the alignment hardware To prepare the library chassis for multiple stack operation 1 Remove two PHILLIPS screws securing each FlexLink cover located on the top and bottom of the library using a 1 PHILLIPS screwdriver see figure 25 Note Remove the bottom FlexLink cover on every library except the bottom library in the stack Remove the top FlexLink cover on the bottom library in the stack 15 PX502 Tape Library Quick Start Guide Figure 25 Removing the FlexLink Remove only the top Cover FlexLink cover on the bottom library in the Note Install only the bottom alignment hardware on stack the top library in the stack and the top alignment hardware on the bottom library in the stack Figure 26 Installing the Alignment Hardware Screws Top alignment hardware i FlexLink cover FlexLink cover Rem
10. aints i SS il Tie band A Metal restraint e7 7 en i l restraints EO 2 Metal restraint Note Save the robotics restraints and re usable tie wrap for later shipping or relocation of the library e Install the tape cartridge magazines Note Refer to the PX500 Series User s Guide PN 81 81290 for more information on loading the tape cartridge magazines f Close the front doors g If you have removed the top cover for better access install the top cover back on the library 13 PX502 Tape Library Quick Start Guide Setting the Library Options To set the library options 1 Turn on the library by pushing power button located on the bottom left hand corner of the OCP see figure 18 2 The OCP asks you Are the packaging materials removed YES or NO 3 Press YES to continue 4 The OCP asks again Are you sure the packaging materials are removed YES or NO 5 Press YES to continue The library continues the boot process When complete the Home screen displays 6 Press Setup from the Home screen The OCP displays the Setup screen see figure 21 Figure 21 Setup Screen Setup menu Kab inet Li brary Enter 7 From the Setup screen use the up and down arrows to highlight Cabinet and press Enter The Cabinet Setup screen displays see figure 22 Figure 22 Cabinet Setup Screen Cabinet setup bu role oad port ieee port LOR
11. aution Lift the library chassis at the sides Avoid putting the weight of the library chassis on the front bezel 2 With the help of a second person lift the library chassis up and out of the shipping carton 3 Place the library on a table approximately waist high Figure 2 Unpacking the PX502 Accessory kit oa Foam PX502 tape library Front bezel Lift point 4 Remove the antistatic sheet a Cut the tape strips securing the sheet b Fold the sheet down c With the help of a second person lift the library up off of the antistatic sheet d Place the library on the table or desk next to the antistatic sheet e If this is a multiple library stack refer to Multiple Library Stacks on page 15 before proceeding The PX502 is ready to install Installing the Library Installing a PX502 tape library in a rack consists of the following steps e Locating the Mounting Position e Installing the Library e Initial Configuration Locating the Mounting Position The PX502 tape library is designed to fit in a standard 19 inch wide rack It is important to the library installation to locate the hole pattern in the rack rails see figure 3 The library must be installed at the beginning of the hole pattern Refer to table 2 for information on common rack hole types PX502 Tape Library Quick Start Guide Table 2 Figure Rack Hole Types Des
12. cription Square rack holes are the most Aga common type of rack holes They can accept either cage nuts which mount from the back of the rail or Cage nut clip nuts which clip on from the side of the rack rail Through holes require clip nuts to Clip nut accept mounting hardware Threaded holes require neither cage or clip nuts to accept mounting hardware Note The rails within the rack have a hole pattern that repeats throughout the rail X marks the screw positions Install nut clips included in the accessory kit on the rails if necessary Figure 3 Rail Hole Pattern Ol A Front panel screws mounting positions Back panel screw 4U mounting positions 1 PX502 System 4U AA Z Front panel oae a mounting positions 1U 1 75in 44 45mm The marks above X Hole pattern indicate the location of Top of rack mounting hardware on the F rack rails Ensure that any necessary mounting hardware is installed on the 7 625 in 15 9 mm rack rails prior to installing q 5in 12 7 mm the chassis 625 in 15 9 mm 312 in 7 92 mm 625 in 15 9 mm __ 625 in 15 9 mm a 5in 12 7 mm WARNING If the rack is empty
13. e e Setting Network Information Turning on the Library To turn on the library 1 Verify that e Power cables are firmly in place e All doors are closed and latched 2 Turn on the library by pushing power button located on the bottom left hand corner of the OCP see figure 18 11 PX502 Tape Library Quick Start Guide Figure 18 Turning on the Library _ 1_ocp ooo Q Power button The power up sequence can take several minutes The first message displaying will be Are the internal packaging materials removed Continue with Removing the Remaining Packing Materials Removing the Remaining Packing Materials Now that you have installed the library chassis and powered on the system you MUST remove the remaining packing materials from the library chassis before the library is operational 1 Put onan antistatic wrist strap and clip it to the library chassis CAUTION Take standard ESD precautions when performing this procedure 2 IF there is space above the library to remove the top cover remove the twelve PHILLIPS screws securing the top cover and FlexLink cover to gain further access to the internal packaging restraints see figure 19 If there is no space above the PX502 library to remove the top cover continue with Step 3 Figure 19 Removing the Top Cover Optional Step 3 When the library powers on for the first time
14. elves The metal fold T nuts must be oriented as must be toward shown to properly fit in the the outside of J shelf adjustment slot the self as shown yors Jo yorg Fi M5 x 10 Allen screws Front of rack T nuts must be oriented as The metal fold shown to properly must be toward fit in the shelf the outside of adjustment slot the self as shown Back of rack M5 x 10 Allen screws yoes Jo JUOI4 c Determine the type of rail adapter required for your rack Each rail adapter is marked with the specific hole type supported either metric or standard see figure 6 PX502 Tape Library Quick Start Guide Figure 6 Rail Adapter Types Use the rail adapters with S blocks on rails with square S WO hole patterns of circle pegs opposite blocks r on rails with non threaded circle hole patterns Use the rail adapters with J A Use the rail adapters with g small circle pegs on rails 5 with threaded circle hole el patterns M6 on one side and e i M5 on the other side d Attach the appropriate rail adapter to the front and back of the rack mount shelves right and left with 2 M5 x 10 Allen screws per adapter see figure 7 Figure 7 Assembling the Left Hand Rack Mount Shelf Arrow must point up M5 x 10 Allen screws Ms x 10Allen Arrow must Rail adapter screws poi
15. nt up Rail adapters M5 x 10 Allen screws FlexLink opening located towards the screws v back for the right o hand shelf 2 Install the left and right rack mount shelves into the rack the rack mount shelves adjust 27 in to 36 in and secure with the following parts in four locations see figure 8 e Mounting plate e 2MA4 x 12 Allen screw Norte The rack mount shelves must be installed on the inside rack rails PX502 Tape Library Quick Start Guide Figure 8 Installing the Rack Figure 9 Tightening the Rack Mount Shelves Mount Shelves Mounting plate M4 x 12 Allen screws A Tighten screws to secure both rack mounting rails ZA LE P Left shelf 1 Right shelf ie 3 Once the rack mount shelves are secured to the rack tighten the Allen screws securing the adjustable shelves right and left together see figure 9 Installing the Library Chassis WARNING The PX502 tape library weighs approximately 52 Ibs 23 6 kg At least two people are required to lift and install the library 1 The back mounting brackets are lettered A through I so the correct mounting position is easily determined The mounting positions differ depending on the depth of the
16. o avoid damaging these parts while performing installation procedures always observe the following precautions e Keep the PX502 turned off during all installation procedures e Use an antistatic wrist strap included in the accessory kit e Keep static sensitive parts in their original shipping containers until ready for installation Look for the ESD sticker to identify static sensitive parts e Avoid touching connectors and other components Note Dry climates and cold weather heating environments have lower relative humidity and are more likely to produce static electricity Unpacking the PX502 Tape Library This section explains how to unpack the PX502 tape library and move it to its final installation location Note Inspect the outer library packaging for damage If there is any damage evident on the library packaging do not continue with the installation and contact Quantum customer support PX502 Tape Library Quick Start Guide By following these instructions you help ensure that the system will continue to be safeguarded after it arrives at the installation site Note Unpack the library as close to the installation location as possible Unpack and remove the following components from the packing materials see figure 2 1 Remove the accessories kit and set it aside WARNING At least two people are required to move the library chassis C
17. ove only the bottom FlexLink cover on the top library in the stack 2 The alignment hardware installed on the top and bottom of the libraries in a multiple stack allow the FlexLink bays to align correctly when installed in a rack Install the following alignment hardware see figure 26 a Install the top alignment hardware with two Allen head screws NS a 4 Screws b Install the bottom alignment hardware with one Bottom alignment hardware Allen head screw 2 The libraries are prepared for installation in a multiple stack UKTI AAA AA A A TTT Quantum 81 81292 03 B01 United States of America European Headquarters Asia Pacific Quantum Corporation Quantum Corporaton Quantum Corporaton 141 Innovation Drive 3 Bracknell Beeches Level 3 Irvine CA 92612 Old Bracknell Lane West 200 Creek Street U S A Bracknell Brisbane Qld 4000 phone 949 856 7800 Berkshire RG12 7BW Australia fax 949 856 7799 United Kingdom phone 61 7 3839 0950 phone 44 1344 353500 fax 61 7 3839 0955 fax 44 1344 353510 2007 Quantum Corporation Quantum the Quantum logo and the DLTtape logo are all registered trademarks of Quantum Corporation SDLT and Super DLTtape are trademarks of Quantum Corporation Other trademarks may be mentioned herein which belong to other companies 81 81292 03 B01 March 2007
18. pt the new settings 3 When you are finished viewing editing the date and time information press Exit to return to the Setup screen Setting Network Information To view or edit the network information Note If you are using DHCP you do not have to setup the following network information Once the library is on line it is ready to use Note The library must be offline to change these settings 1 From the Setup screen use the up and down arrows to highlight Network and press Enter The Network screen displays see figure 24 Figure 24 Network Screen Hetwork setup FOHCF IF addr Subnet mask Default gateway Enit Enter The Network screen allows you to view or edit the following network settings e DHCP default setting e IP address e Subnet mask e Default gateway 2 Use the up and down arrows to select the network setting you wish to view or edit and press Enter When you are finished viewing editing the network information press Back then Exit to return to the Setup screen 3 For the network information such as the IP address to be active or take effect you must power down the library by holding down the power button located on the front of the library after changing any of the network settings see figure 18 The library shuts down 4 Push the power button to start the library The PX502 tape library is initially configured and ready for use Multiple Library St
19. s Back clamp hardware M5 x 10 and back clamp PN 90 87343 08 screws PN 74 88058 01 clamp Installing the Rack Mount Shelves Before installing the rack mount shelves you must collect the following information e Type of rack mount rails square hole through hole or threaded hole e Depth of rack 34 in 86 3 cm minimum depth recommended however rack depths of 24 in 60 9 cm to 36 in 91 4 cm are supported 1 Assemble the rack mount shelves left and right a Determine the mounting hole locations The holes used to attach the two halves of the rack mount shelves differ depending on the depth of the rack see figure 4 PX502 Tape Library Quick Start Guide Figure 4 Rack Mount Shelf Depth Requirements Left shelf oriented with FlexLink opening toward front of rack yoe Jo yorg x O g y 9 Use these holes for rack 5 depths of 27 in 68 5 cm on to 36 in 91 4 cm Use these holes for rack depths of 24 in 60 9 cm to 28 in 71 1 cm Right shelf oriented with FlexLink opening toward back of rack Back of rack Use these holes for ra depths of 24 in 60 9 cm to 28 in 71 1 cm yoes JO JUOI4 Use these holes for rack depths of 27 in 68 5 cm to 36 in 91 4 cm b Loosely attach the adjustable rack mount shelves extenders and shelves with 4 M5 x 10 Allen screws and T nuts see figure 7 Figure 5 Assembling the Left and Right Rack Mount Sh
20. stem Controller Board SCSI host SCSI System Controller Board aan 1 gt i o o Ethernet Power Back of Library Figure 16 PX502 Cable Configuration Surrogate Ethernet Surrogate System SCSI host Controller Board s og o Back of Library Note When operating in surrogate mode the SCSI host connection must be made to tape drive 1 Figure 17 PX502 Cable Configuration Native Fibre Channel Ethernet Fibre Channel host SAN Back of Library i Power Fibre Channel Fibre Channel host SAN host SAN LTO Tape drives shown SDLT drives have a single FC port 2 Connect one end of an AC power cable to each installed power supply and to a wall outlet Initial Configuration Initially configuring the library consists of the following steps e Turning on the Library e Removing the Remaining Packing Materials e Setting the Library Options e Setting the Date and Tim
Download Pdf Manuals
Related Search
Related Contents
Emerson EZL Series Pressure Reducing Regulator for Low Pressure Applications Data Sheet Using The NEOMaTe STUDIO PAR 64 CAN Les engrenages et les poulies NGUELE YVES GABIN & KEVIN PLISSION CAS Gestor de paquetes Synaptic: guía del usuario - Versuky LD 安定化光源 取扱説明書 Hitachi EH-150 User's Manual User Manual Not for Reproduction Copyright © All rights reserved.
Failed to retrieve file