Home

Peerless Industries DS-VW660 TV Mount User Manual

image

Contents

1. 3 Bear VIEWS ederet 4 4 AZ Wining Interiace to PT 4 IUSUM LE E et M ILU LN EE REVISION HISTORY Manual Date Comments C521M 6 95 Original version Pelco Manual C521M 6 95 This page intentionally left blank Pelco Manual C521M 6 95 INSTALLATION OPERATION MANUAL AZL AZMITH AND ELEVATION READ OUT METER 1 0 WARNINGS Prior to installation and use of this product the following WARNINGS should be observed 1 Installation and servicing should only be done by 3 Only use replacement parts recommended by Pelco Qualified Service Personnel and conform to all Local codes 4 After replacement repair of this unit s electrical components conduct a resistance measurement 2 Unless the unit is specifically marked as a NEMA between line and exposed parts to verify the exposed Type 3 3R 3S 4 4X 6 or 6P enclosure it is parts have not been connected to line circuitry designed for indoor use only and it must not be installed where exposed to rain and moisture Theproduct may bear the following marks This symbol indicates that dangerous voltage This symbol indicates that there are important constituting a risk of electric shock is present operating and maintenance instructions in the within this unit literature accompanying this unit CAUTION CAUTION TO REDUCE THE RISK OF ELECTRICAL RISK OF ELECTRIC
2. AZL Azmith and Elevation Read Out Meter Installation Operation Manual C521M 6 95 Pelco 300 Pontiac Way Clovis CA 93612 5699 USA 800 289 9100 or 1 559 292 1981 FAX 800 289 9150 or 1 559 292 3827 DataFAX 800 289 9108 or 1 559 292 0435 International customers call 1 559 292 1981 or FAX 1 559 348 1120 TABLE OF CONTENTS Section Page 1 0 WARNING E 1 2 0 SCOPE 5540 a Mn 2 3 0 DESCRIPTION m 2 4 0 INSTALLATION re 2 41 GONNECTORJINSTALLATIGON 2 ice ecu harenae e dete E peret edad cusa tes 2 42 JAZLMETER ADJUSTMEH 4 42 1 Preliminary RES 4 4 2 2 Pan 5 42 3 Tut Meter AdJUstment cum lu re t ctc b Gane 6 ES Idee 6 6 0 ct tare rnt erste ter ette same E exu Ed en 6 7 0 WARRANTY AND RETURN INFORMATION 7 GPelco and the Pelco logo are registered trademarks of Pelco Copyright 1995 Pelco All rights reserved ii Pelco Manual C521M 6 95 LIST OF ILLUSTRATIONS Figure Page 1 instalation Block Diag chests 2 2 74 111110
3. NOTES Pelco Manual C521M 6 95 7 0 WARRANTY AND RETURN INFORMATION WARRANTY Pelco will repair or replace without charge any merchandise proved defective in material or workmanship for a period of one 1 year after the date of shipment Exceptions to this warranty are as noted below e Two 2 years on all standard motorized and fixed focal length lenses e Two 2 years on Legacy Intercept 8500 CM9500 CM9750 Matrix and DF8 Fixed Dome products e Two 2 years WW5700 series window wiper excluding wiper blades e Two 2 years on cameras e Six 6 months on all pan and tilts scanners preset lenses used in continuous motion applications e g preset scan tour and auto scan modes Pelco will warranty all replacement parts and repairs for 90 days from the date of Pelco shipment All goods requiring warranty repair shall be sent freight prepaid to Pelco Clovis California Repairs made necessary by reason of misuse alteration normal wear or accident are not covered under this warranty Pelco assumes risk and shall be subject to no liability for damages or loss resulting from the specific use or application made of the Products Pelco s liability for any claim whether based on breach of contract negligence infringement of any rights of any party or product liability relating to the Products shall not exceed the price paid by the Dealer to Pelco for such Products In no event wi
4. ex ample lets assume the reading is 330 see Fig 5b These two meter readings define the deflection range of the meter in our case 330 60 270 see Fig 5 and mirrors mechanical pan movement of the P T between its extremes This range must now be shifted in our case to the left by adjust ing the center scale potentiometer PAN pot see Fig 3 on the AZL back panel to obtain a bal anced meter deflection at both ends The simplest method of calculating what the balanced meter deflection should be at both ends is to subtract the deflection range from the total meter range and divide by 2 PAN LEFT 0 60 PAN RIGHT In our example 360 270 2 90 2 45 In other words the entire range should be shifted to the left enough so that the difference between the deflection range reading made at the PAN LEFT operation and 0 and the difference between the PAN RIGHT operation and 360 are equal and have a value of 45 In our example then we require the PAN RIGHT meter reading to be 360 45 or 315 The current meter reading is at 330 so you must now adjust the center scale pot PAN 1K pot see Fig 3 until you obtain a meter read ing of 315 This shifts or rotates the entire de flection range for a balanced meter deflection at both ends as indicated in Figure 54 Now adjust the full scale potentiometer PAN 5K Pot see Fig 3 on the back of
5. the AZL unit to obtain a reading of 360 Finally activate the PAN LEFT switch until the unit reaches the extreme left position Verify the meter reading to be 0 degrees Make minor ad justments as necessary Deflection Range 270 Center scale potentiometer adjustment for shifting deflection range for balanced reading Figure 5 Meter Adjustment Pelco Manual C521M 6 95 4 2 3 Tilt Meter Adjustment Use the same methods for the tilt adjustment as those just employed for the pan meter adjustment Once the procedure is complete the extreme electrical rotation limits can be reset down from the factory maxi mum settings 5 0 OPERATION When power is applied to the unit the power LED on the front panel lights The pan and tilt meters on the front of the AZL unit will give a direct visual real time readout in degrees of the physical orientation of the pan tilt to which it has been electrically connected 6 0 SPECIFICATIONS ELECTRICAL Input Voltage 120 VAC 50 60 Hz Power Cord 3 wire grounded 18 Awg Fuse Protection F1 3A F2 2 10ASB Connectors 14 pin AMP CPC connector 120 VAC convenience outlet GENERAL Construction Cover Steel powder coated black Chassis Metal sheet galvanized Panel Front Aluminum black white silk screen Rear Alodine aluminum plate Dimensions 3 0 H x 15 55 W x 10 19 D 7 62 cm x 39 50 cm x 25 88 cm Weight 12 16 5 4 kg Pelco Manual C521M 6 95
6. EDBACK nm Figure 4 AZL Wiring Interface to P T 4 2 AZL METER ADJUSTMENT are shown as circled numbers As shipped the pan tilt unit is mechanically configured to be resting at hori 4 2 1 Preliminary Remarks zontal in the tilt position and at approximately 180 in the pan position Figure 3 is a diagram of the internal wiring minus power supplies etc of that part of the AZL unit related to The meter adjustment procedure for both the pan and meter adjustment Shown there are the full and center tilt meters follows the same method Assuming you have scale pots for pan and tilt on the AZL as they would be already performed the connector and pot adjustments wired to the respective position feedback pots on a Pelco indicated in Section 4 1 the step by step procedure for P T1250DC PP Interconnections between the two units meter adjustment is as follows 4 Pelco Manual C521M 6 95 4 2 2 Pan Meter Adjustment 1 Turn on the power switch There should be a slight noticeable change in the meter reading Activate the PAN LEFT switch and observe the pan meter reading The AZL pan meter readout should approach 0 as the unit rotates The unit will stop at the extreme left position Note the meter reading For our example let s assume the reading is 60 see Fig 5a Note the meter reading and activate the PAN RIGHT switch until the unit reaches the extreme right position Note the meter reading For our
7. SHOCK SHOCK DO NOT REMOVE COVER NO DO NOT OPEN USER SERVICEABLE PARTS INSIDE REFER SERVICING TO QUALIFIED SERVICE PERSONNEL Please thoroughly familiarize yourself with the information in this manual prior to installation and operation Pelco Manual C521M 6 95 1 2 0 SCOPE The information contained within this manual covers the AZL Azmith and Elevation Read Out Meter 3 0 DESCRIPTION The AZL is used to provide a visual read out in de grees of the mechanical position of DC based pan tilts such as Pelco s P T1250DC PP equipped with position feedback pots The AZL consists of two easily read Simpson meters mounted on the front panel of the unit along with the power switch and power on indicator The fourteen pin CPC connector on the back panel of the unit provides the necessary wiring interface for the unit This wiring interface is usually integrated with controller wiring at the point where the cabling con nection is made to the P T reference Figure 1 s simpli fied diagram The rest of the back panel consists of installation set up pots for initial meter calibration A power input cord input line fuse and a convenient power outlet plug round out the back panel connections 4 0 INSTALLATION Installation consists of installing the interconnecting cable between the AZL and the P T in use and initial adjustment of the meters for operation 4 1 CONNECTOR INSTALLATION Reference Figure 2 and Figure 3 Befor
8. e connecting the wiring set the meter module full scale adjust ment pots these are the 5K pots on the back of the AZL unit at the full CW clockwise position and set the center scale adjustment potentiometers these are the 1K pots on the back of the AZL unit at approxi mately center Now reference the AZL wiring diagram in Figure 2 The wiring for connector pins 2 and 9 go to the pan feedback and tilt feedback lines respectively on the P T which in the case of a PT1250DC PP share corre sponding numbered pinouts For the rest of the AZL wiring we have pin 10 which is AZL common that is wired to feedback common pin 10 on the P T and pin 11 AZL B 5VDC that is wired to feedback on the P T We assume of course that any other additional wiring needed for the system in question has already been done or is also being done at this time controller wiring for example Once the wiring inter face is in place the next thing to consider is AZL meter adjustment P T CONTROLLER Figure 1 Installation Block Diagram Pelco Manual C521M 6 95 690902 dWV 104400 NIGg M 21 23 141100 SONSINSANOO Figure 2 AZL Wiring Diagram Pelco Manual C521M 6 95 Figure 3 AZL Front and Rear Views D PT1250DC PP FEEDBACK B e O FEEDBACK 2 PAN FEEDBACK gt FE
9. ll Pelco be liable for any special incidental or consequential damages including loss of use loss of profit and claims of third parties however caused whether by the negligence of Pelco or otherwise The above warranty provides the Dealer with specific legal rights The Dealer may also have additional rights which are subject to variation from state to state If a warranty repair is required the Dealer must contact Pelco at 800 289 9100 or 559 292 1981 to obtain a Repair Authorization number RA and provide the following information 1 Model and serial number Date of shipment P O number Sales Order number or Pelco invoice number 3 Details of the defect or problem Ifthere is a dispute regarding the warranty of a product which does not fall under the warranty conditions stated above please include a written explanation with the product when returned Ship freight prepaid to Pelco 300 West Pontiac Way Clovis CA 93612 5699 Method of return shipment shall be the same or equal to the method by which the item was received by Pelco RETURNS In order to expedite parts returned to the factory for repair or credit please call the factory at 800 289 9100 or 559 292 1981 to obtain an authorization number CA number if returned for credit and RA number if returned for repair Goods returned for repair or credit should be clearly identified with the assigned CA RA number and freight should be prepaid All mercha
10. ndise returned for credit may be subject to a 20 restocking and refurbishing charge Ship freight prepaid to Pelco 300 West Pontiac Way Clovis CA 93612 5699 Pelco Manual C521M 6 95

Download Pdf Manuals

image

Related Search

Related Contents

セラミック電気管状炉  AM_26738_BA_Eurotops_FRA_01  Manual de instrucciones  Descargar Manual - Siisa  Gembird MHS-5.1-001 headset  59RP - Grand Banks Yachts  Fluke 183-185  

Copyright © All rights reserved.
Failed to retrieve file