Home

Ford 2011 Escape Hybrid Automobile User Manual

image

Contents

1. Table A Table C DIP LENGTH OF THE DEFROST CYCLE Ts ACCORDING SWITCHES FCI20 FCI30 FCI40 FCI60 FCI 85 TO THE TIME OF T2 1 ON ON ON ON ON T2 Ts 2 OFF OFF OFF OFF OFF 3 ON OFF ON ON ON DE ai 210 4 OFF OFF OFF ON ON 5 lt T2 lt 6 195 5 ON ON ON ON ON 6 lt T2 lt 630 180 630 lt T2 lt 7 165 6 OFF OFF OFF OFF OFF ME SE es 7 ON ON ON ON ON a ig na 8 OFF OFF OFF OFF OFF 9 lt T2 lt 1030 e 9 OFF OFF OFF OFF OFF 10 90 T2 lt 1 es 10 OFF OFF OFF OFF ON o To 90 Table B LENGTHS OF TIMED PORTION OF FREEZING CYCLE Ta ACCORDING TO Table D THE DIP SWITCH SETTING COMBINATIONS ICE LEVEL SENSOR CONTROL TEMPERATURE RANGE ACCORDING Ta TO THE 8 AND 9 DIP SWITCH SETTING COMBINATIONS 3 4 5 6 7 min ON ON ON ON ON 0 2 DEAL OFF ON ON ON ON ON ON 1 ON OFF ON ON ON 2 OFF ON 1 5 OFE OFF ON ON ON 3 ON OFF 2 ON ON OFF ON ON 4 OFF OFF 25 OFF ON OFF ON ON 5 ON OFF OFF ON ON 6 OFF OFF OFF ON ON 7 ON ON ON OFF ON 8 OFF ON ON OFF ON 9 ON OFF ON OFF ON 10 OFF OFF ON OFF ON 11 ON ON OFF OFF ON 12 OFF ON OFF OFF ON 13 ON OFF OFF OFF ON 14 OFF OFF OFF OFF ON 15 ON ON ON ON OFF 16 OFF ON ON ON OFF 17 ON OFF ON ON OFF 18 OFF OFF ON ON OFF 19 ON ON OFF ON OFF 20 OFF ON OFF ON OFF 21 ON OFF OFF ON OFF 22 OFF OFF OFF ON OFF 23 ON ON ON OFF OFF 24 OFF ON ON OFF OFF 25 D
2. FCI 40 W FCI 60 FCI 60 W FCI 85 FCI 85 W Table B LENGTH OF TIMED PORTION OF FREEZING CYCLE ACCORDING TO DIP SWITH COMBINATIONS 1 2 3 4 1 2 3 4 1 ON ON OFF OFF 25 min OFF ON OFF ON 11 min 2 OFF OFF ON OFF 23 min ON ON OFF ON 9 min 3 ON OFF ON OFF 21 min 10 OFF OFF ON ON 7min 4 OFF ON ON OFF 19 min 11 ON OFF ON ON 5 min 5 ON ON ON OFF 17 min 12 OFF ON ON ON 3 min 6 OFF OFF OFF ON 15 min 13 ON ON ON ON 1 min 7 ON OFF OFF ON 13 min Table C LENGTH OF DEFROST CYCLE IN SEC ACCORDING TO THE AMBIENT TEMPERATURE AND TO DIP SWITCH SETTING COMBINATIONS 5 6 7 0 5 C 5 10 C 10 15 C 15 20 C 20 25 C 25 30 C 30 35 C 35 40 C ON ON OFF 180 sec 150 sec 120 sec 90 sec 90 sec 90 sec 90 sec 90 sec OFF OFF ON 210 sec 180 sec 150 sec 120 sec 120 sec 120 sec 90 sec 90sec ON OFF ON 240 sec 210 sec 180 sec 150 sec 150 sec 120 sec 120 sec 90 sec OFF ON ON 240 sec 210 sec 180 sec 150 sec 150 sec 120 sec 120 sec 120 sec ON ON ON 270 sec 240 sec 210 sec 180 sec 180 sec 150 sec 150 sec 150 sec 18 14 Wiring Diagram WIRING DIAGRAM SCHEMA ELETTRICO SCHEMA ELECTRIQUE SCHALTUNGSCHEMA AIR amp WATER COOLED RAFFREDDAMENTO AD ARIA ED AD ACQUA REFROIDISSEMENT A AIR ET A EAU LUFT UND WASSERGEKUHLT 220 240 50 1 O O amp O SE g be GE el He HE VIC 4 To UE CU tee Celelelyleletelet
3. WATER DRAIN WATER COOLED MODELS The water drain line from the condenser on water cooled versions is internally connected with the drain fitting of the unit It is strongly recommended therefore to install a vertical open vent to the high point of the drain line high enough to ensure good drainage and to direct the drain line to a trapped and vented floor drain receptacle This ensures proper flow of the drained water as in the case of poor drainage the water running out of the condenser may leak through the unit drain tubing into the ice storage bin or into the sump reservoir NOTE The water supply and the water drain must be installed to conform to the local codes In some cases a licensed plumber and or a plumbing permit is required mk D Final Checklist Is the machine in a room where the ambient temperatures are within a minimum of 10 C 50 F even in winter months Is there at least a 15cm 6in clearance around the unit for proper air circulation Is the machine level IMPORTANT Have all the electrical and plumbing connections been made and is the water supply shut off valve open Has the voltage been tested and checked against the rating on the data plate Has the water supply pressure been checked to ensure a water pressure of at least 1 bar 14psi Check all refrigerant lines and conduit lines to guard against vibration and possible failure Has the bin liner and cabinet been wiped clean Has the owner user been
4. Page 13 The electrical components in operation in this new situation are COMPRESSOR WATER INLET SOLENOID VALVE HOT GAS VALVE NOTE The length of the defrost cycle is non adjustable automatically determined by the microprocessor of The P C BOARD in relation to the time T2 necessary for the unit to reduce the evaporator temperature from 0 C 35 F to 1 3 C 8 5 F and of the ambient temperature as illustrated in Table C As shown it is possible to have a different length of the defrost cycle in connection with the different length of the second phase of the freezing cycle T2 relative to the ambient temperature situations shorter when the ambient temperature is high and longer in colder ambients so to partially compensate the length of the freezing cycle which is longer in high ambient temperatures and shorter in low ones H Check during the defrost cycle that the incoming water flows correctly into the sump reservoir in order to refill it and that its surplus overflows through the overflow drain tube l Check the texture of ice cubes just released They have to be the right shape with a small depression of about 5 6mm in their crown If not wait for the completion of the second cycle before performing any adjustment If the ice cubes require a correction to their shape it is possible to modity the length of the timed freezing cycle by changing the DIP SWITCH keys setting as illustrated in table B It the ice cubes are shallow and
5. R134A Ice Machines Technical Data air cooled eS zk Start Cycle End Cycle End Cycle 21 C amb 15 C w 21 C amb 15 C w 32 C amb 15 C w 32 C amb 15 C w Cond Evap Cond Evap Cond Evap Cond Evap EE EE 0 WS 6 5 27 Fra memoem 7 ar a a z jas ao 11 WS E 27 1 8 26 14 10 Operating Instructions FCI 40 60 85 Only For FCI 20 30 see previous section 10 1 Start Up After having correctly installed the ice maker and completed the plumbing and electrical connections perform the following Start up procedure A Remove the unit front panel and locate the control box B Through the control box cover locate the grooved head similar to a fillister screw head of the electronic program selector With the help of a regular screwdriver turn the selector head in the OPERATION position The screwdriver bit must fit the head slot end to end this to avoid damage to the selector head slot C Give power to the unit to start it up by switching ON the power line main disconnect switch NOTE Every time the unit returns under power after having been switched off both the water inlet valve and the hot gas valve get energized for a period of 5 minutes thus to admit new water to the machine sump reservoir to fill it up and eventually to wash off any dirt that can have deposited in it during the unit off period Fig 1 D During the water filling operation check to see that the incoming water dribbles throu
6. 10 C 26 C Evaporator Temp with Gas Pressure at 7 5 Bar Ambient Temp 21 C 6 C 25 C Evaporator Temp with Gas Pressure at 13 Bar Ambient Temp 32 C 10 C 28 C Evaporator Temp with Gas Pressure at 8 Bar Ambient Temp 32 C 7 C 24 C Heat Emission watts 1100 1400 Noise Level dBA at 2 meters 60 63 3 2 Start Up After having correctly installed the ice machine and completed the plumbing and electrical connections perform the following Start up procedure A Switch on the power to the machine The unit starts its first freezing cycle with the following components in operation COMPRESSOR WATER PUMP FAN MOTOR The condenser fan is controlled by a thermostat which is factory set B Check through the ice discharge opening that the spray plate is correctly seated and that the water jets uniformly reach the interior of the inverted cup molds also make sure that the plastic curtain is hanging freely and that water is not spilling through it excessively C The ice making process takes place thereby the water is sprayed into the molds which gets gradually refrigerated by the heat exchanged with the refrigerant flowing into the evaporator serpentine D When the evaporator temperature reaches a pre set value approximately 15 C the evaporator thermostat changes its contacts and starts the time clock when the first timed portion has elapsed the freezing cycle ends and the second timed portion starts the defrost
7. cloudy it is possible that the ice maker runs short of water during the freezing cycle second phase or the quality of the supplied water requires the use of an appropriate water filter or conditioner or the installation of the optional water drain valve kit KWD J To be sure of the correct operation of the ice level temperature sensor located in one side of storage bin liner during the defrost cycle place one shovel of ice cubes in contact with its probe for approx 30 sec 1 minute As the temperature of storage bin sensor reaches the value of 2 C 35 F the ice level control transmits a signal to the microprocessor of the P C BOARD in order to stop the ice maker operation at the end of the defrost cycle with the simultaneous glowing of the 3rd RED LIGHT to monitor the BIN FULL situation Fig 6 Page 13 With no more ice cubes in touch with the ice level control the temperature of its probe progressively rises to reach 4 5 C 40 F and at this point the ice machine restarts to initiate a new freezing cycle with the simultaneous extinguishing of the 3rd RED LIGHT NOTE The CUT IN RANGE OF THE ICE LEVEL CONTROL SENSOR can be adjusted as shown in table D its cut out setting remains however at 2 C 35 F 6 Principle of Operation 6 1 How it works In the cube ice makers the water used to make the ice is kept constantly in circulation by an electric water pump which primes it to the spray system nozzles from where it is diverted into the inve
8. of the 6th RED LED The first portion length or time T1 non adjustable is equal to the time required by the temperature sensor to fall to 0 C 35 F When reached it is signalled by the glowing of the 5th RED LED NOTE If after 15 minutes the evaporator temperature has not yet reached the value of 0 C 35 F due to a partially or total shortage of refrigerant or to a too high condensing temperature etc the sensor through the P C BOARD causes the unit to stop the operation with the simultaneous glowing of the SECOND RED WARNING LED Fig 7 Page 13 After having eliminated the source of the unit trip off to restart the machine operation it is necessary first to rotate the program selector to the RE SET position then put it again on to OPERATION position or alternatively switch OFF and ON the unit at the power line Main Switch The second portion length of freezing cycle or time T2 non adjustable is equal to the time required by the evaporator temperature to go from 0 C 35 F to 13 C 8 5 F on models 20 30 40 and 60 or to 16 C 3 F on model 85 The sensor will light up the 4th RED LED NOTE In case the time T2 gets longer than 45 minutes the unit stops with the glowing of the second RED WARNING LED Also in this case after having eliminated the source of the trip OFF to restart the machine it is necessary first to rotate the program selector to the RESET position then put it again on OPERATION or switch OFF and ON the un
9. pipe This overflow limits the level of the sump water which will be used to produce the next batch of ice cubes Meanwhile the high pressure high temperature refrigerant discharged from the compressor flows through the hot gas valve directly into the evaporator serpentine by passing the condenser The hot gas circulating into the serpentine of the evaporator warms up the copper moulds causing the defrosting of the ice cubes The ice cubes released from the cups drop by gravity onto a slanted cube chute then through a curtained opening they fall into the storage bin NOTE The length of the defrost cycle factory set can vary in accordance with the actual ambient temperature as shown on Table C Page 18 For instance in a high ambient temperature situation it can be reduced to recover some of the time spent for the longer freezing cycle At the end of the defrost cycle both the hot gas and the water inlet valves close so the machine initiates another freezing cycle Operation Control Sequence At the start of the freezing cycle the evaporator temperature sensor controls the length of the first part of the freezing cycle As it reaches a pre determined temperature it supplies a low voltage current to the P C BOARD in order to activate the electronic timer which takes over the control of the freezing cycle for a pre fixed time according to the DIP SWITCH keys setting see Table B Page 18 NOTE The evaporator temperature sensor factor
10. situation occurs i e the condenser temperature gets below the pre fixed limit the temperature sensor changes again its electrical resistance reducing therefore the current flow to the P C BOARD to cause the fan motor to temporary cut off NOTE In case the condensor temperature probe senses that the condensor temperature has rised to 70 C 160 F on air cooled versions or 62 C 145 F on water cooled versions for one of the following abnormal reasons CLOGGED CONDENSOR Air cooled version FAN MOTOR OUT OF OPERATION Air cooled version INSUFFICIENT FLOW OF COOLING WATER Water cooled version AMBIENT TEMPERATURE HIGHER THEN 40 C 100 F it causes the total and immediate SHUT OFF of the machine in order to prevent the unit from operating in abnormal and dangerous conditions When the ice maker stops on account of this protective device there is a simultaneous glowing of the RED LED warning the user of the Hi Temperature situation After having eliminated the source of the condensor hi temperature to restart the machine it is necessary first to rotate for a while the program selector on RE SET position then to rotate it again on OPERATION position The same can be done by just switching OFF and ON the unit at main line switch The ice machcine resumes its normal operation by going through the 5 minutes water filling phase At the start of the freezing cycle the refrigerant suction or lo pressure lowers rapidly to 3 3 bar 45 psig
11. the 6th RED LED D Check to see through the curtained ice discharge opening that the spray system is correctly seated and that the water jets uniformly reach the interior of the inverted mould cups also make sure that the plastic curtain is hanging freely and there is no excessive water spilling through it E The ice making process takes place thereby with the water sprayed into the moulds getting gradually refrigerated by the heat exchange occurring with the refrigerant flowing into the evaporator serpentine During the freezing process when the evaporator temperature falls to 0 C 35 F the evaporator temperature sensor located in contact with the evaporator serpentine supplies a low voltage power signal to the electronic control device P C BOARD which in first instance generates the glowing of the 5th RED LED located in the front of the printed circuit board Fig 3 Page 13 F The unit remains however in its normal freezing cycle mode until the evaporator temperature detected by the sensor reaches the temperature of 13 C 8 5 F on models 20 30 40 and 60 and to 16 C 3 F on model 85 When the evaporator temperature falls below the above value the evaporator temperature sensor supplies a low voltage power signal to the P C BOARD in order to activate the electronic timer This takes over the control of the freezing cycle up to the complete formation of the ice cubes Fig 4 Page 13 with the lighting up of the 4th RED LED located ju
12. time T2 as shown in Table C At completion of the defrost cycle the P C BOARD puts the unit into a new freezing cycle Components Description EVAPORATOR TEMPERATURE SENSOR The evaporator temperature sensor probe located in contact with the evaporator serpentine detects the dropping of the evaporator temperature during the freezing cycle and signals it by supplying a current flow to the microprocessor of The P C BOARD According to the current signal and to how long after this is received the microprocessor may or not give the consent to the ice maker to complete the freezing cycle The low voltage current transmitted from the evaporator temperature sensor to the P C BOARD is signalled by the lighting up of the fourth Time T2 and fifth Time T1 RED LEDS placed in the front of the P C BOARD to inform the service engineer of the normal regular progression of the freezing cycle 10 6 5 ICE BIN LEVEL SENSOR The ice bin level temperature sensor secured to one of the storage bin walls stops the operation of the entire ice maker at the end of the defrost cycle when its sensing probe in contact with the stored ice reaches the temperature of 2 C 35 F lighting up in the meantime the third RED LED Once the ice is removed from the sensing probe its temperature progressively rises up and as it reaches the value of 4 5 C 40 F the ice bin level temperature sensor transmits a low voltage current flow to the P C BOARD to rest
13. Bar Ambient Temp 32 C 5 C 6 C Evaporator Temp with Gas Pressure at 8 Bar Ambient Temp 32 C 26 C 24 C Heat Emission watts 540 850 Noise Level dBA at 2 meters 55dBA 58 dBA 2 2 Start Up After having correctly installed the ice machine and completed the plumbing and electrical connections perform the following Start up procedure A Switch on the power to the machine The unit starts its first freezing cycle with the following components in operation COMPRESSOR WATER PUMP FAN MOTOR The condenser fan is controlled by a thermostat factory set at approximately 33 C B Check through the ice discharge opening that the spray plate is correctly seated and that the water jets uniformly reach the interior of the inverted cup molds also make sure that the plastic curtain is hanging freely and that water is not spilling through it excessively C The ice making process takes place thereby the water is sprayed into the molds which gets gradually refrigerated by the heat exchanged with the refrigerant flowing into the evaporator serpentine D When the evaporator temperature reaches a pre set value the evaporator thermostat changes its contacts the freezing cycle ends and the defrost harvest cycle starts Freezing time will range between 17 and 22 minutes depending on model see table in a 21 C ambient Longer time for temperature above shorter when below Average complete cycle range is about 17 to 25 minutes depending on mode
14. F20 F40 F60 F85 ei FCI20 FCI30 FCI40 FCI60 FCI85 Cube Ice Maker ke _ Z Ed EE TI I gt tn _ we Z ZZ m lt lt ZZ Ma lt I ke REFRIGERATOR Service Manual Foster Ice Cuber Machine CONTENTS a 10 11 12 13 14 15 16 General Information and Installation Instructions 1 1 Introduction 1 2 Unpacking and Inspection 1 3 Location and Leveling 14 Water Supply and Drain Connections 1 5 Final Checklist 1 6 Installation Practice F20 and F40 Technical Data and Operating Instructions F60 and F85 Technical Data and Operating Instructions 3 2 Cleaning Rinsing For F20 F40 F60 F85 3 3 F20 F40 F60 F85 Wiring Diagrams Technical Specification R22 Machines FCI 20 30 40 60 85 Operating Instructions Principles of Operation Wiring Diagrams Dip Switch Positions And Settings Plus Dip Switch Settings for FCI 20 30 R134A Machines Circuit Board and Component Sequence of Operation Technical Specification R134A Machines FCI 40 60 85 Operating Instructions Principles of Operation Components Description Dip Switch Settings Wiring Diagram Circuit Board and Component Sequence of Operation Mai
15. Page 18 If the ice cubes are shallow and cloudy it is possible that the ice maker runs short of water during the freezing cycle second phase or the quality of the supplied water requires the use of an appropriate water filter or conditioner To be sure of the correct operation of ice level control device place one hand between its sensing eyes to interrupt the light beam The RED LIGHT located in the front of the P C BOARD goes immediately OFF and after 60 seconds the unit stops with the simultaneous glowing of the 2nd YELLOW LIGHT to monitor the BIN FULL situation Fig 6 Page 20 Take the hand out from the ice level control sensors to allow the resumption of the light beam the RED LIGHT located in the front of the P C BOARD will glow immediately After approximately 6 seconds the ice maker resumes its operation with the immediate glowing of the FOURTH YELLOW LIGHT indicating UNIT IN OPERATION and the extinguishing of the BIN FULL YELLOW LIGHT NOTE The ICE LEVEL CONTROL INFRARED SYSTEM is independent from the temperature however the reliability of its detection can be affected by external light radiation s or by any sort of dirt and scale sediment which may deposit directly on the light source and on the receiver To prevent any possible ice maker malfunction due to negative affection of the light detector it is advisable to locate the unit where it is not reached by any direct light beam or light radiation also it is recomm
16. The length of the second portion of the freezing cycle is pre fixed and related to the setting of the first four DIP SWITCH keys which is made in relation with the different unit versions The DIP SWITCH keys setting is made in consideration of the type of condenser used In Table B page 18 are indicated the various lengths of the second portion of freezing cycle Time mode in relation to the different combinations of the DIP SWITCH KEYS In Table A page 18 is illustrated the DIP SWITCH keys combinations for the different unit versions as they are set in the factory The electrical components in operation during the freezing cycle are COMPRESSOR FAN MOTOR in air cooled version WATER PUMP CONTACTOR COIL and during the second phase of freezing cycle Time mode they are joined by the ELECTRONIC TIMER The refrigerant head pressure in the course of the freezing cycle ranges between 13 5 and 14 5 bars 190 205 psig being controlled by the temperature sensor probe located within the condenser fins Air cooled version or it is kept constant at 14 bars 195 psig by means of the water regulating valve water cooled version On the air cooled version the condenser temperature sensor when senses a rising of the condenser temperature beyond the pre fixed limit changes its electrical resistance and send a low voltage power signal to the Micro Processor of P C BOARD which in turn energizes through a TRIAC the FAN MOTOR When the opposite
17. UNZIONALE MACCHINA IN FUNZIONE TERMOSTATO VENTILATORE a D TERMOSTATO DI SCUREZZA E SAFETY THERMOSTAT CLEANING SWITCH E TERMOST MAGAZZNO INTERR LAVAGGIO GN THERMOSTAT TERMOSTATO EVAPOR EVAPOR THERMOSTAT 2 MORSETTERA INGRESSO TERMINAL BOARD FAN THERMOSTAT TERMOSTATO VENTILA TORE a 1 VENTILATORE FAN MOTOR TERMOSTATO DI MAX MOTOR COMPRESSOR HOT SOLENOID VALVE ELETTROVALVOLA GAS WATER SOLENOID VALVE ELETTROV ACQUA INTERRUTT LAVAGGIO CLEANING SMTCH MOTORE TIMER TIMER MOTOR ELETTROV ACQUA WATER INLET VALVE MOTORE POMPA PUMP MOTOR RELE COMPR COMPR RELAY COMPRESSORE COMPRESSOR F60 F85 JUST FOR AIR COOLED UNIT F20 F40 x 19262776 0 SOLO PER RAFFREDDAMENTO ARIA 19262775 0 F60 8 F85 A W W 4 Technical Specification R22 Machines MODEL FCI 20 FCI 30 FCI 40 FCI 60 FCI 85 Output kg 24nr 18 20 5 26 34 34 42 57 70 78 90 kg per cycle 0 28 0 38 0 42 0 6 0 42 0 6 0 82 1 2 0 82 1 2 22 25 23 5 24 5 15 75 19 15 20 5 23 6 15 25 18 75 Lc m m m m mo 5 Operating Instructions R22 Machines 5 1 Start Up Affer having correctly installed the ice maker and completed the plumbing and electrical connections perform the following Start up procedure A Give power to the unit to start it up by switching ON the power line main disconnect switch The 1st GREEN LED will glow NOTE Every time the unit returns under po
18. accumulator used to prevent any small amount of liquid refrigerant from reaching the compressor and through the suction line In both the accumulator and the suction line it exchanges heat with the refrigerant flowing into the capillary tube warmer before being sucked in the compressor and to be recirculated as high pressure high temperature gas The freezing cycle is controlled by the evaporator temperature sensor which has its probe in contact with the evaporator serpentine that determines the length of the cycle first portion When the temperature of the evaporator serpentine drops to a pre set value the evaporator sensor probe changes its electrical resistance allowing a low voltage current 8 10 volts to flow to the P C BOARD which in turn activates an electronic timer The timer which is built in the P C BOARD takes over from the evaporator temperature sensor the control of the freezing cycle up to its completion NOTE The change of the electrical potential of the evaporator sensor with the consequent activation of the timer Time mode is signalled by the glowing up of the RED LED located in the front of the P C BOARD ATTENTION In case after 15 minutes from the beginning of the freezing cycle the temperature of the evaporator sensor probe is higher then 0 C 32 F Shortage of refrigerant inoperative hot gas valve etc the P C BOARD switch OFF immediately the unit with the simultaneous blinking of the WARNING RED LED
19. art the operation of the unit NOTE The ice maker after the interruption of its operation due to the ice level control cut out always restarts from the beginning of the freezing cycle By changing the combination of the DIP SWITCH Keys numbers 8 and 9 it is possible to change the range of the ice level control temperature sensor This is shown in table D keeping its cut out temperature always at 2 C 35 F P C BOARD Data processor The P C BOARD fitted in its plastic box located in the front of the unit consists of two separated printed circuits one at high and the other at low voltage integrated with a program selector of six aligned LEDS monitoring to the service engineer the operation of the machine of one DIP SWITCH with ten keys of input terminals for the leads of the two sensor probes and of input and output terminals for the leads of the ice maker electrical wires The P C BOARD is the brain of the system and it processes through its microprocessor the signals received from the two sensors in order to control the operation of the different electrical components of the ice maker compressor water pump solenoid valves etc By turning the program selector it is possible to put the unit in the following different situations CLEANING RINSING The water pump is the only electrical component in operation and it must be used during the cleaning or the rinsing procedure of the water system of ice machine STAND BY The unit remai
20. bin When the light beam is interrupted the RED LED located in the front of the P C BOARD goes off in case the light beam is constantly interrupted for more than 60 seconds the ice machine stops with the glowing up of the 2nd YELLOW LED to monitor the situation of ice bin full The 60 seconds of delay prevent that an ice scoop movement or the ice dropping through the ice chute interrupting for a while the light beam can stop the operation of the unit As soon as the ice is scooped out with the resumption of the light beam between the two infrared sensor of ice level control the RED LED is lighted up and after 6 seconds the ice machine restarts again with the extinguishing of the 2nd YELLOW LED 12 5 E P C Board Data processor The P C BOARD fitted in its plastic box located in the front of the unit consists of two separated printed circuits one at high and the other at low voltage integrated with a program selector of two fuses one on power in 100m A and one on power out 16 A of five aligned LEDS monitoring the operation of the machine of two extra monitoring RED LEDS of one DIP SWITCH with ten keys of two small plugs located on its back side of input terminals for the leads of the sensor probes and input and output terminals for the leads of the ice maker electrical wires The P C BOARD is the brain of the system and it processes through its micro processor the signals received from the four sensors in order to control the operation of
21. cle As the electronic timer has carried the system throughout the third phase of freezing cycle or as soon as the second phase T2 is over when its length has been as long as 35 to 45 minutes the defrost cycle starts NOTE The length of the defrost cycle non adjustable is related to the length of the second phase of freezing cycle T2 as detailed in Table C Page 12 The electrical components in operation during this phase are COMPRESSOR WATER INLET SOLENOID VALVE HOT GAS SOLENOID VALVE The incoming water passing through the water inlet valve and its flow control runs over the evaporator platen and then flows by gravity through the dribbler holes down into the sump reservoir The overflow located in the sump tank limits the level of the water which will be used to produce the next batch of ice cubes Meanwhile the refrigerant as hot gas discharged from the compressor flows through the hot gas valve directly into the evaporator serpentine bypassing the condenser The hot gas circulating in the serpentine of the evaporator warms up the copper moulds causing the ice cubes to defrost The ice cubes released from the cups drop by gravity onto a slanted cube chute then through a curtained opening fall into the storage bin At the end of the defrost cycle both the hot gas and the water inlet valves close and the machine starts again a new freezing cycle Operation Control Sequence At the start of freezing cycle the evaporator tempe
22. condensing pressure between 13 5 and 14 5 bars 190 205 psig In the water cooled models the discharge pressure is kept constant at the value of 14 bars 195 psig by means of the water regulating valve located in the water supply line to the condenser In case of condenser clogging such to prevent the proper flow of the cooling air or fan motor out of operation the condenser temperature rises and when it reaches 70 C 160 F the condenser temperature sensor shuts off the ice maker with the consequent light up of the RED WARNING LIGHT Fig 3 Page 20 The same happen even for the water cooled version where the condenser probe is placed in contact with the refrigerant liquid line When its temperature reaches 62 C 145 F it trips off automatically the machine After having diagnosed the reason of the rise in temperature and removed its cause it is necessary to turn the head of the selector always using an appropriate screwdriver first on the RE SET position then return it on previous OPERATION position thus to put the machine in condition to initiate a new freezing cycle The same can also be done by just switching OFF and ON the unit at main line switch In both cases the machine restarts with the usual 5 minutes water filling phase in order to provide enough water into the sump tank Check to see through the ice discharge opening that the spray systems are correctly seated and that the water jets uniformly reach the interior of the inv
23. denser temperature sensor probe located within the condenser fins air cooled version or in contact with the tube coil water cooled version detects the condenser temperature variations and signals them by supplying current at low voltage to the P C BOARD In the air cooled versions in relation to the different current received the micro processor of the the P C BOARD supplies through a TRIAC the power at high voltage to the fan motor so to cool the condenser and to reduce its temperature rises and reaches 75 C 170 F the current arriving to the micro processor is such to cause an immediate and total stop of the machine operation 12 3 Ambient Temperature Sensor The probe of this sensor located in the front of the ice maker condenser air cooled version and in the water supply line to the condenser water cooled version has the function to detect the ambient or the water temperature and by changing its own electrical resistance supplies a different current flow to the P C BOARD This different current flow received by the P C BOARD is processed by the micro processor in order to extend or shorten the defrost cycle length longer in cold ambient situations shorter in warm ones 12 4 Ice Bin Level Light Control The electronic ice bin level control located into the storage bin has the function to stop the operation of the ice machine when the light beam between the light source and the sensor is interrupted by the ice cubes stored in the
24. e machine will restart automatically in three to four minutes Note The bin thermostat is factory set at 1 C 35 F CUT OUT and 4 C 39 F CUT IN The set temperature can be adjusted if required by using a flat bladed screwdriver turn towards the to increase the bin temperature and towards the to decrease the bin temperature See fig 1 Refit the bottom front panel then instruct the owner user on the general operation of the machine and about the cleaning and care it requires BIN LEVEL k MN Oe NIVEAU CUVE CUBE SIZE O TAILLE GLACON The machine may stop working if the condenser temperature exceeds the pre set temperature of the Over Temperature Thermostat non adjustable due to a very high ambient temperature condenser fan failure dirty blocked condenser To restart the machine depresses the protruding button on the Alarm Reset 19262777 0 Fig 1 3 F60 and F85 Technical Data and Operating Instructions 3 1 Technical Data Model F60 F85 Output kg 24hr 60 83 Bin storage capacity kg 27 27 Cubes per cycle 48 48 Cubes kg per cycle 0 84 0 84 Cycle time minutes 19 0 15 5 Amps start run 19 4 1 26 5 5 Watts consumption 30 C Ambient Temp 630 780 Water consumption Water Temp at 15 C Air Temp 21 C 12 0 16 0 Refrigerant R134A R134A Refrigerant charge grams 450 grms 540 grms Evaporator Temp with Gas Pressure at 10 5 Bar Ambient Temp 21 C
25. e sure the ice cubes are the proper texture and do not have an acid taste Attention If the ice cubes are cloudy white and have an acid taste discard them immediately by pouring warm water over them to prevent them from being used Once you are satisfied that all of the cleaning solution has been removed from the machine rinse the storage bin with clean water and wipe clean Remember To prevent the accumulation of undesirable bacteria it is necessary to sanitize the interior of the storage bin with an anti algae solution each week Diagram F20 8 F40 A W Wiring WRING DIAGRAM MACHINE OPERATING G GREY GRIGIO SCHEMA ELETTRICO MACCHINA IN FUNZIONE S weit Ce A BLUE AZZURRO M BROWN MARRONE GV YELLOW GREEN GIALLO VERDE MRING DIAGRAM MACHINE OPERATING SCHEMA ELETTRICO MACCHINA IN FUNZIONE TIMER FAN THERMOSTAT TERMOSTATO VENTILATORE TERMINAL BOARD MORSETTIERA INGR ol d S sany D RELE COMPRESSORE COMPRESSOR RELAY VAP THERMOSTAT TERMOSTATO EVAP a E 3 ome a si CLEANING SWITCH R z S a INTER LAVAGGIO S S lt S SS o 3 z 5 dt vw H 4 g x K ge as sz SR BIN TEMP CONTROL a a s BB gs i z ZS e TERMOSTATO MAGAZZINO B S g SP S Fi S S eu is S o N s E cij i s E si l us x I 6 2 fe tee ar u D ELECTRIC DIAGRAM MACHINE OPERATING EVAP THERMOSTAT FAN THERMOSTAT ve SCHEMA F
26. ele Lele A K i AH SES h e NI D l 6 Ja Ja Ja JB Nin KA a pa 30de Om yN ee 00 o Kg 1 Printed Circuit Board 10 Stand By 19 Water Inlet Valve 2 Fuse 11 Rinsing 20 Fan Motor 3 Rinsing 12 Sensors 21 Compressor 4 Freezing Oper 13 Evaporator Temperature 22 Contactor 5 Too High Temperature 14 Condenser Temperature 23 Autotransformer 6 Bin Full 15 Ambient Temp 24 Fuse 7 Power On 16 Ice Level Sensor 25 Terminal Board 8 Reset to High Temp 17 Water Pump 9 Freezing Oper 18 Hot Gas Valve JUST FOR AIR COOLED UNIT USED ONLY UNIT 240V 19 15 Circuit Board and Component Seguence of Operation Fig ABB 1 Fig ABB 2 START UP Fig ABB 3 LED BLINKING EVAPORATOR Fig ABB 4 TEMPERATURE HIGH o N e o0o0c Z T SET o pa TRTE m Na jo We LED CONSTANT CONDENSER TEMPERATURE HIGH Fig ABB 5 Fig ABB 6 Fig ABB 7 Fig ABB 8 STAND BY CLEANING A COMPRESSOR G DP SWITCH O WATER INLET VALVE B ICE LEVEL SENSOR H ELECTRIC TIMER P HOT GAS VALVE C SENSORS I MICRO PROCESSOR Q CONTRACTOR COIL D EVAP TEMPERATURE L TRANSFORMER R FAN MOTOR E COND TEMPERATURE M RELAY S WATER PUMP F AMBIENT TEMP N TRIAC T P C BOARD 20 16 Maintenance and Cleaning Instructions 16 1 General The periods and the procedures for maintenance and clea
27. ended to keep the bin door constantly closed and to follow the instructions for the periodical cleaning of the light sensor elements as detailed in the MAINTENANCE AND CLEANING PROCEDURES Remove in installed the refrigerant service gauges and re fit the unit service panels previously removed 15 11 Principle of Operation 11 1 11 2 11 3 How it works In the cube ice makers the water used to make the ice is kept constantly in circulation by an electric water pump which primes it to the spray system nozzles from where it is diverted into the inverted mould cups of the evaporator A small guantity of the sprayed water freezes into ice the rest of it cascades by gravity into the sump assembly below for recirculation Freezing Cycle The Hot refrigerant gas discharged out from the compressor reaches the condenser where being cooled down condenses into liquid Flowing into the liquid line it passes through the drier filter then it goes all the way through the capillary tube where due to the heat exchanging action it loses some of its heat content so that its pressure and temperature are lowered as well Next the refrigerant enters into the evaporator serpentine which has a larger I D then the capillary and starts to boil off this reaction is emphasized by the heat transferred by the sprayed water The refrigerant then increases in volume and changes entirely into vapour The refrigerant vapour then passes through the suction
28. erted mould cups also make sure that the plastic curtain is hanging freely and there is no excessive water spillage through it The ice making process takes place thereby with water sprayed into the moulds that gets gradually refrigerated by the heat exchange with the refrigerant flowing into the evaporator serpentine During the freezing process when the evaporator temperature falls below an established value the evaporator temperature sensor supplies a low voltage power signal to the electronic control device P C BOARD in order to activate an electronic timer This one takes over the control of the freezing cycle up to the complete formation of the ice cubes Fig 4 Page 20 NOTE The length of the entire freezing cycle if govened by the evaporator temperature sensor which has its probe placed in contact with the evaporator serpentine Non adjustable in combination with the electronic timer Adjustable incorporated in the P C BOARD The timer adjustment is factory set in consideration of cooling version and ice cube size Medium Large It is possible however to modify the timed length of the freezing cycle by changing the DIP SWITCH keys setting In Table B Page 18 are shown the various time extensions of the freezing cycle second phase in relation with the different DIP SWITCH settings After about 15 18 minutes from the beginning of the freezing cycle in an hypothetic ambient temperature of 21 C the defrost cycle takes place with
29. gh the evaporator platen dribbler holes down into the sump reservoir to fill it up and also that the incoming surplus of water flows out through the overflow pipe into the drain line During the water filling phase the components energized are THE WATER INLET SOLENOID VALVE THE HOT GAS SOLENOID VALVE THE WATER DRAIN SOLENOID VALVE On request NOTE If in the 5 minutes length of the water filling phase the machine sump reservoir does not get filled with water up to the rim of the overflow pipe it is advisable to check 1 The water pressure of the water supply line that must be at least 1 bar 14 psig Minimum Max 5 Bar 70 psig 2 The filtering device installed in the water line that may reduce the water pressure below the Minimum value of 1 bar 14 psig 3 Any clogging situation in the water circuit like the inlet water strainer and or the flow control 10 2 At completion of the water filling phase 5 minutes the unit passes automatically into the freezing cycle with the start up of COMPRESSOR WATER PUMP FAN MOTOR in air cooled version controlled by the condensing temperature sensor located within the condenser fins Fig 2 Page 20 Operational Checks Install if necessary the refrigerant service gauges on both the high side and low side Schrader valves to check the compressor head and suction pressures NOTE On air cooled models the condenser temperature sensor which is located within the condenser fins keep the head
30. given the User Manual and been instructed on the importance of periodic maintenance checks 0 Has the owner user been given the name and telephone number of the authorised Service Agency in case of breakdown o PONOR ONE 1 6 Installation Practice D e 8 Hand shut off valve 4 Ka Water filter Ke o Water supply line flexible hose 3 4 in male fitting Vented drain Open trapped vented drain Drain fitting Main switch Power line 3 OC DONS OP OM Warning This ice maker is not designed for outdoor installation and will not function in ambient temperatures below 10 C 50 F or above 40 C 100 F The ice maker will malfunction with water temperature below 5 C 40 F or above 40 C 100 F 2 F20 and F40 Technical Data and Operating Instructions 2 1 Technical Data Model F20 F40 Output kg 24hr 19 5 34 5 Bin storage capacity kg 6 5 15 Cubes per cycle 16 24 Cubes kg per cycle 0 28 0 42 Cycle time minutes 20 7 17 5 Amps start run 11Amps 2Amps 17Amps 3 3Amps Watts consumption 30 C Ambient Temp 320w 450w Water consumption Water Temp at 15 C Ambient Temp 21 C 8 5 8 5 Refrigerant R134A R134A Refrigerant charge grams 250 grms 320 grms Evaporator Temp with Gas Pressure at 10 5 Bar Ambient Temp 21 C 7 C 9 C Evaporator Temp with Gas Pressure at 7 5 Bar Ambient Temp 21 C 27 C 24 C Evaporator Temp with Gas Pressure at 13
31. harvest cycle Freezing time will range between 20 and 22 minutes depending on model see table in a 21 C ambient Longer time for temperature above shorter when below Average complete cycle range is about 23 to 25 minutes depending on model see table above E Check during the first defrost harvest cycle that the incoming water flows correctly into the sump reservoir in order to re fill it and the surplus overflows down the overflow drain tube During this cycle the components energised are COMPRESSOR HOT GAS SOLENOID WATER INLET SOLENOID VALVE TIMER MOTOR ON FAN MOTOR if ambient temperature exceeds 30 C MARCHE ALARM RESET Note During the defrost cycle the water inlet solenoid valve is energised The O water flows through the valve to the back side of the evaporator platen and then down to fill up the icemaker sump tank for the next freezing cycle CLEAN R A Z ALARME NETTOYAGE C Check the texture of the ice cubes just released The correct size has a small depression about 5 6mm in their crown If not wait for the second defrost harvest cycle before making any adjustments 3 3 Adjustments G If after the second harvest the cubes are not correct adjustment to the cube size thermostat may be necessary Using a flat bladed screwdriver turn towards the to increase the cube size and towards the to decrease the cube size See fig 2 H To check the bin full thermostat hold a handful of ice against
32. ip Switch Settings FCI 20 and FCI 30 R134A Machines IT IS IMPORTANT TO NOTE THAT THE OPERATING INSTRUCTION AND PRINCIPLE OF OPERATION FOR THE FCI 20 AND FCI 30 ARE THE SAME AS THE R22 MACHINES 12 Circuit Board and Component Seguence of Operation Fig 1 Fig 2 nei WATEA ORADI YALYE TEMPERATURE TeMPenaTunE ICH iz gree H SENSORS SENSORS EH Te RARNTDA TVAPORATOR SELECTOR S aa SR Fig 3 Fig 4 WATER es NALNE TEMPERATURE TEMPERATURE SEMSOAS SENSORS ELECTRONIC CARD PHASE 3 OF FREEZE CYCLE Fig 5 Fig 6 WATEA ORAIN VALVE TEMPERATURE TEMPERATURE BEEN EF SE SENSOAS SENSORS WATEA H VALVE EVAPORATOR s za SS ELECTADHIC CARD Fig 7 SE Fig 8 PESE EK H TEMPERATURE E TEMPERATURE SENSORS Eh SENSDAJ EYAPORATOR SELECTOR EVAPORATOR ELECTRONIC DA STAND BY Fig 9 oe VALVE TEMPSAATUNE too pili JI ELECTRONIC BU 13 9 Technical Specification R134A Machines MODEL FCI 20 FCI 30 FCI 40 FCI 60 FCI 85 Output kg 24hr 18 26 34 57 76 Ice prod per cycle 0 28kg 0 42kg 0 42kg 0 86kg 0 86kg 11amp 2amp 1tamp 2 2amp 17amp 3 3amp 19amp 4 1amp 26amp 5 5amp Watts consumption 320 340 450 630 780 30 C ambient 7 5 litre per hr 5 6 litre per hr 6 2 litre per hr 11 0 litre per hr 14 5 litre per hr Noise level dBA lt 70 dB lt 70 dB lt 70 dB lt 70 dB lt 70 dB
33. it at power line Main Switch The third portion or time Ta added time of the freezing cycle is controlled by the electronic timer of P C BOARD As the evaporator temperature reaches the value of 13 C 8 5 F or to 16 C 3 F the sensing probe of the evaporator sensor in contact with the serpentine changes its electrical resistance causing a low voltage current to flow to the P C BOARD which thereby activates an electronic timer NOTE The activation of the timer Time mode of P C BOARD is signalled by the glowing of fourth RED LED located in the front of the P C BOARD ATTENTION In case the length of the second portion of freezing cycle or time T2 lasts as long as between 35 and 45 minutes the third portion or time Ta gets skipped by the P C BOARD which puts the unit directly in the defrost or harvest cycle The length of the third portion of the freezing cycle adjustable is pre fixed and related to the setting of the DIP SWITCH keys 3 4 5 6 and 6 2 6 3 7 The DIP SWITCH keys setting is made in consideration of the model and of the type of condenser used air or water cooled In Table B page 12 are indicated the various lengths of the third portion of freezing cycle Time mode in accordance with the different combinations of the DIP SWITCH KEYS In Table A page 12 are indicated the DIP SWITCH keys combinations for the different models and versions as they are set in the factory The electrical components in operati
34. l see table above E Check during the first defrost harvest cycle that the incoming water flows correctly into the sump reservoir in order to re fill it and the surplus overflows down the overflow drain tube During this cycle the components energised are COMPRESSOR HOT GAS SOLENOID WATER INLET SOLENOID VALVE The FAN MOTOR and the WATER PUMP are also in operation if ambient temperature exceeds 33 C Note During the defrost cycle the water inlet solenoid valve is energised The water flows through the valve to the back of the evaporator platen and then down to fill up the icemaker sump tank for the next freezing cycle F Check the texture of the ice cubes just released The correct size has a small depression about 5 6mm in their crown If not wait for the second defrost harvest cycle before making any adjustments 2 3 Adjustments G If after the second harvest the cubes are not correct adjustment to the evaporator thermostat may be necessary Remove the front panel and locate the cube size thermostat using a flat bladed screwdriver turn towards the to increase the cube size and towards the to decrease the cube size See fig 1 ON ALARM RESET MARCHE SS CLEAN R A Z ALARME NETTOYAGE H To check the bin full thermostat hold a handful of ice against the bulb of the storage bin thermostat the ice maker will switch off in about one to two minutes Once the machine has stopped remove the ice and dispose of it th
35. ly 6 Use a clean damp cloth to wipe the surfaces inside the storage bin and the exterior of the cabinet 7 See the data plate on the rear of the machine and check that the local mains voltage corresponds with the voltage specified on the plate CAUTION INCORRECT VOLTAGE APPLIED TO THE MACHINE WILL INVALIDATE THE WARRANTY 1 3 Location and Leveling Warning This Ice Cuber is designed for indoor installation only Extended periods of operation at temperatures exceeding the following limitations will constitute misuse under the terms of the Manufacturers Limited Warranty resulting in Loss of warranty coverage 1 Position the machine in the selected permanent location The criteria for the location includes a Minimum room temperature 10 C 50 F and maximum room temperature 40 C 100 F b Water inlet temperatures minimum 5 C 40 F and maximum 40 C 100 F c Well ventilated location for air cooled models Clean the air cooled condenser at regular intervals d Service access adequate space must be left for all service connections through the rear of the ice maker A minimum clearance of 15cm 6in must be left at the sides of the machine for routing cooling air drawn into and exhausted out of the compartment to maintain proper condensing operation of the air cooled models NOTE With the machine in built in conditions the ice product is gradually reduced in respect of the levels shown in the table up to a maximum of 10 at room te
36. mperatures higher than 32 C The daily ice making capacity is directly related to the condenser air inlet temperature water temperature and also the age of the machine To keep the CUBER at peak performance levels periodic maintenance checks must be carried out as indicated in the Cleaning Section of this manual 2 Level the unit in both left to right and front to rear directions 3 ELECTRICAL CONNECTIONS See data plate for current requirements to determine wire size to be used on electrical connections All ice makers require solid earth wire The F series ice machines are supplied from the factory pre wired and are fitted with a suitably fused thirteen Amp UK plug The FCI models have a power cable that requires electrical connections to be made to the cable at the back of the machine making sure that it is connected to its own circuit and individually fused see data for the correctly fuse size The maximum allowable voltage variation should not exceed 10 and 6 of the data plate rating Low voltage can cause faulty functioning and may be responsible for serious damage to the overload switch and motor windings NOTE All external wiring should conform to national state and local standards and regulations Check voltage on the line and the ice machines data before connecting the unit 1 4 Water Supply and Drain Connections GENERAL When choosing the water supply for the ice cuber consideration should be given to a Length of ru
37. n b Water clarity and purity c Adequate water supply pressure Since water is the most important single ingredient in producing ice you cannot emphasize too much the three items listed above Low water pressure below 1bar may cause the malfunction of the machine Water containing excessive minerals will tend to produce cloudy coloured ice cubes plus scale build up on parts of the water system WATER SUPPLY Connect the male fitting of the solenoid water inlet valve using the flexible tubing supplied to the cold water supply line with regular plumbing 2 fittings and a shut off valve installed in an accessible position between the water supply line and the unit WATER SUPPLY WATER COOLED MODELS The water cooled versions require two separate inlet water supplies on models 40 and 60 one to supply water for the ice production and one for the water cooled condenser Connect the male fitting of the condenser water inlet solenoid valve using the second flexible tubing supplied to the cold water supply line with regular plumbing fittings and a shut off valve installed in an accessible position between the water supply line and the unit WATER DRAIN The recommended drain tube is a plastic or flexible tube with 18mm 3 4in I D that runs to an open trapped and vented drain When the drain is along run allow 3cm pitch per metre 1 4in per foot A vertical open vent at the unit drain connection is also required for proper sump drainage
38. n the freeze time so adjustments to the cube size thermostat may need to be made to increase the freeze temperature Decreasing the defrost time will increase the freeze time so adjustments to the cube size thermostat may need to be made to decrease the freeze temperature Cleaning Rinsing For F20 40 60 85 Remove the bottom front panel and locate the changeover switch Remove the top cover to gain access to the evaporator Wait till the machine finishes its freeze cycle and then turn off the electrical supply to the machine Prepare the cleaning solution as per the manufactures instructions on the Ice Machine Cleaner Warning The Ice Machine Cleaner contains Phosphoric and Hydroxyacetic acids These compounds are corrosive and may cause burns if swallowed If swallowed DO NOT induce vomiting drink lots of water or milk and contact your Doctor immediately In case of external contact wash off with clean water Scoop out all of the ice cubes stored in the bin in order to prevent them from being contaminated by the cleaning solution then drain the water from the sump reservoir by removing the plastic overflow pipe Once the water has drained from the sump replace the pipe Remove the evaporator cover and slowly pour the solution onto the evaporator platen Use a soft brush if necessary to remove stubborn deposits Press the switch to the clean position and restore the electrical supply to the machine Leave the machine in the cleaning rinsi
39. ng mode for at least twenty minutes then turn the machine off at the electrical supply to the machine It may be necessary to clean the water spray separately If required remove the spray plate from the machine mix a solution of the cleaner in a bowl or bucket and immerse the plate in it When clean thoroughly rinse with clean water and re fit it into the machine Drain the cleaning solution from the sump reservoir by removing the plastic overflow pipe Once the solution has drained from the sump replace the pipe Pour two to three litres of clean water over the evaporator platen to rinse of the remaining solution and ensure sufficient water is in the reservoir Ensure that the switch is still in the CLEAN position and turn on the electrical supply to the machine Leave the machine in the cleaning mode for at least five minutes to thoroughly rinse the entire water system Drain the rinsing water from the sump reservoir by removing the plastic overflow pipe Once the rinsing water has drained from the sump replace the pipe and thoroughly wipe the interior of the machine Replace the evaporator cover and top service panel turn on the electrical supply to the machine with the switch still in the wash position Leave the switch in this position for approximately five minutes to allow the water reservoir to fill up Change the switch setting to the freeze position to start the freeze process At the completion of the freezing and harvest cycle mak
40. ning are given as guides and are not to be construed as absolute or invariable Cleaning especially will vary depending upon local water and ambient conditions and the ice volume produced and each ice maker must be maintained individually in accordance with its particular location reguirements 16 2 Icemaker The following maintenance should be scheduled at least twice per year on these ice makers 1 Check and clean the water line strainer 2 Check that the ice maker is levelled side to side and in front to rear directions 3 Clean the water system the evaporator the bin and spray platen using a solution of Ice Machine Cleaner Refer to procedure 15 3 cleaning instructions and after cleaning will indicate frequency and procedure to be followed in local areas NOTE Cleaning reguirements vary according to the local water conditions and individual user operation Continuous check of the clarity of ice cubes and visual inspection of the water spraying parts before and after cleaning will indicate freguency and procedure to be followed in local areas 4 With the ice machine and fan motor OFF on air cooled models clean condenser using vacuum cleaner soft brush or non metallic brush 5 Check for water leaks and tighten drain line connections Pour water down bin drain line to be sure that drain line is open and clear 6 Check size condition and texture of ice cubes Perform adjustment of DIP SWITCH keys as required 7 Check the ice level control sens
41. ns under electrical power but OUT of operation It can be used by the service engineer in order to stop the unit during the service and inspection operations IN OPERATION The unit is running through the freezing and defrost cycles stopping automatically only at full bin situation RE SET To be selected to resume the unit operation when the ice maker shuts off due to the intervention of the security of the P C BOARD in relation to exceeding the time of freezing cycle portion T1 and T2 The six LEDS not visible through the panel placed in a vertical row in the front of the P C BOARD monitor from the top to the bottom the following situations GREEN LIGHT Unit under electrical power RED LIGHT Unit shut off due to P C BOARD security T1 gt 15 or T2 gt 45 RED LIGHT Unit shut off at full storage bin RED LIGHTEvaporator sensor at 13 C 85 F or 16 C 3 F RED LIGHTEvaporator sensor at 0 C 35 F RED LIGHT Unit in freezing cycle mode The microprocessor of the P C BOARD has also the important function to establish the length of the defrost cycle Ts in relation with the duration of the second phase of the freezing cycle or time T2 as shown in Table B Page 12 Dip Switch The P C BOARD which controls the entire operation of the ice maker has a DIP SWITCH with ten switching keys which allow set up of the microprocessor program in order to extend or to shorten the length of freezing cycle in relation to the different models and versi
42. ntenance and Cleaning Instructions All Models 8 9 9 11 12 13 14 14 16 16 17 17 18 18 19 20 21 22 1 General Information and Installation Instructions 1 1 Introduction The Electronic Cubers are quality designed engineered and manufactured Their ice making systems are thoroughly tested providing the utmost in flexibility to fit the needs of a particular user These icemakers have been engineered to our own rigid safety and performance standards The VDE SEV WFC seals signify that it is listed with them and that it complies with the materials and manufacturing standards of them D Note To retain the safety and performance built into this icemaker it is important that installation and maintenance is conducted as outlined in this manual 1 2 Unpacking and inspection i Visually inspect the exterior of the packaging and pallet Report any damage to the delivery carrier and your distributor 2 a Cut and remove the plastic strip securing the carton to the pallet b Cut open the top of the carton and remove the polystyrene protection sheet c Pull out the polystyrene posts from the corners and then remove the carton 3 Remove the front and rear panels of the unit and inspect for any concealed damage Report the damage to the distributor 4 Remove all internal support packing and masking tape 5 Check that refrigerant lines do not rub against or touch other lines or surfaces and that the fan blade moves free
43. o extend or to shorten the length of freezing and defrost cycles in relation to the different models and versions of ice machines The DIP SWITCH first four keys setting determines the length of the 2nd phase of freezing cycle controlled by the electronic timer as detailed in Table B The DIP SWITCH keys 5 6 and 7 setting determines the length of the defrost cycle according to the ambient temperature sensor as specified in table C The 8th DIP SWITCH key allows to make a rapid check up of the P C BOARD output connections compressor water pump fan motor water inlet and hot gas solenoid valves energizing them in rapid sequence 2 seconds one by one DURING THE AUTOMATIC OPERATION OF THE ICE MAKER THIS KEY MUST BE SET IN OFF POSITION ATTENTION The check up of the P C BOARD output must be performed in a very short time in order to avoid frequent starts and stops every few seconds of the electrical components which may damage them especially the compressor The 9th key allows the operation of the water pump even during the defrost cycle On B 90 it must be set all the time to OFF position The 10th key is used to supply power to the water pump during the first 15 20 seconds of the defrost cycle to drain out all remaining water from the sump tank in the unit equipped with the solenoid drain valve i e the KWD drain system 13 Dip Switch Settings FCI 40 60 85 Table A Dip switch 1 FCI 40 ON
44. om being contaminated with the cleaning solution then flush out the water from the sump reservoir by removing the plastic plug 5 Remove the evaporator cover then slowly pour onto the evaporator platen the cleaning solution With the help of a brush dissolve the most resistant and remote scale deposits in the platen 6 Set the program selector head on CLEANING RINSING Fig 11 Fig 9 21 13 Fig 11 6 R134A Machines Fig 8 NOTE With the system in CLEANING RINSING mode the water pump is the only component in operation to circulate the cleaning solution in the entire water system 7 Let he unit remain in the CLEANING RINSING mode for about 20 minutes then turn the program selector on STAND BY again 8 Flush out the cleaning solution from the sump reservoir then pour onto the evaporator cavity two or three litres of clean potable water to rinse the mould cups and the platen If necessary remove the water spray platen to clean it separately as per step 3 of paragraph B 9 Turn again the program selector on CLEANING RINSING The water pump is again in operation to circulate the water in order to rinse the entire water system 10 Flush out the rinsing water from the sump reservoir then turn the program selector on RESET HI TEMPERATURE position and immediately afterwards to FREEZING OPERATION NOTE By setting the selector on RE SET first and then to FREEZING OPERATION the ice maker will perform the 5 minute
45. on during the freezing cycle are COMPRESSOR FAN MOTOR in air cooled version WATER PUMP and during the timed phase of freezing cycle Time mode they are joined by the ELECTRONIC TIMER On the air cooled versions the refrigerant head pressure is gradually reduced from a value of approx 15 bars 210psig generally recorded at the beginning of the freezing cycle with the unit at 21 C 70 F ambient temperature to a minimum value of approx 11 bars 155psig just at the end of the freezing cycle a few seconds before the starting of the defrost cycle The above values are in relation as well to the ambient temperature of the ice maker site and are subject to rise with the increase of this temperature On the water cooled versions the refrigerant head pressure ranges between 13 5 and 14 5 bars 190 205psig being controlled by the automatic high pressure control that energises a water solenoid valve located on the inlet water line to the condenser which modulates the cooling water rate to the condenser With the unit installed in standard location 21 C ambient temperature at the start of the freezing cycle the refrigerant suction or low pressure lowers rapidly to 3 5 bars 50psig then declines gradually in relation with the growing of the ice thickness to reach at the end of the cycle approx 1 0 to 1 3 bars 14 I8psig on 20 30 and 65 and at approx 0 6 bars 8 5psig on 40 with the cubes fully formed in the cup moulds Defrost or Harvest Cy
46. ons of ice machines and to modify the sensing range of the ice bin level temperature sensor The 1st DIP SWITCH key is used to supply power to the water pump during the first 15 20 seconds of the defrost cycle to pump out all remaining water from the sump tank in the unit along with the water drain valve The 2nd DIP SWITCH key allows a rapid check up auto diagnosis to be made of the P C BOARD output connections compressor water pump fan motor water inlet and hot gas solenoid valves energising them in rapid sequence 2 seconds one by one DURING THE AUTOMATIC OPERATION OF THE ICE MAKER THIS KEY MUST BE SET IN OFF POSITION ATTENTION The check up of the P C BOARD output must be performed in a very short time in order to avoid frequent start and stop every few seconds of the electrical components which may damage them especially the compressor The setting of the DIP SWITCH keys 3 4 5 6 and 7 determines the length of the 3rd phase of freezing cycle controlled by the electronic timer as detailed in Table B Page 12 The DIP SWITCH keys 8 and 9 setting determines the range between cut in and cut out temperature of the ice bin level temperature sensor as specified in Table D Page 12 The 10th DIP SWITCH key is used to change the setting of the evaporator temperature sensor from 13 C 8 5 F OFF position 20 30 40 and 60 to 16 C 3 F ON position on model 85 11 7 Dip Switch Positions
47. or to test shut off Put a shovelful of ice cubes in contact with the control sensor during the defrost cycle This should cause the ice maker to shut off at the end of the defrost cycle and the light up the 3rd RED LED Within a few seconds after the removal of the shovelful of ice from the sensing probe the ice maker restarts in freezing cycle NOTE The RANGE OF THE ICE LEVEL CONTROL SENSOR can be adjusted as shown on table D of PRINCIPLE OF OPERATION its cut out setting remains however at 2 C 35 F 8 Check for refrigerant leaks 16 3 Cleaning Instructions of Water System 1 Remove the rear and top panels to gain access either to the control box or to the evaporator 2 Wait till the end of defrost cycle then with the help of a normal screwdriver turn the program selector head on STAND BY position to temporarily stop the operation Fig 10 Fig 8 R134A Machines Fig 7 Fig 10 3 Prepare the cleaning solution by diluting in a plastic container one or two litres of warm water 45 50 C with 0 1 0 2 litres of Ice Machine Cleaner WARNING The Ice Machine Cleaner contain Phosphoric and Hydroxyacetic acids These compound are corrosive and may cause bums if swallowed DO NOT induce vomiting Give large amount of water or milk Call Physician Immediately In case of external contact flush with water KEEP OUT OF THE REACH OF CHILDREN 4 Scoop out all the ice cubes stored into the bin in order to prevent them fr
48. rature sensor controls the length of the first T1 and second T2 portion of the freezing cycle As it senses the predetermined evaporating temperature of 13 C 8 5 F 16 C on 85 it supplies a low voltage current to the P C BOARD in order to activate the electronic timer which takes over the control of the remaining portion of the freezing cycle for a pre fixed time Ta subject to the DIP SWITCH keys setting see Table B Page 12 NOTE The evaporator temperature sensor factory pre set is the same for all models and is not adjustable in the field During the normal operation mode the length or the total time of the freezing cycle is equal to the sum of the three partial times i e Tc T1 T2 Ta In case the length of the second portion of the freezing cycle or time T2 gets long as to be between 35 and 45 minutes the total length of the freezing cycle will be limited to Tc T1 T2 skipping the added time Ta controlled by the electronic timer If instead the time T2 gets longer than 45 minutes the unit stops immediately with the lighting up of the warning RED LIGHT The same could happen in case the time T1 1st portion of freezing cycle gets longer than 15 minutes Once completed the freezing cycle 2nd or 3rd phase this last one is dependent on the length of the second phase of freezing cycle T2 the system goes automatically into the defrost cycle Ts The defrost cycle also has a prefixed length that can vary in relation to the
49. rted mould cups of the evaporator A small quantity of the sprayed water freezes into ice the rest of it cascades by gravity into the sump assembly below for recirculation 6 2 Freezing Cycle The hot gas refrigerant discharged out from the compressor reaches the condenser where being cooled down condenses into liquid Flowing into the liquid line it passes through the drier filter then it goes all the way through the capillary tube where due to the heat exchanging action it loses some of its heat content so that its pressure and temperature are lowered as well Next the refrigerant enters into the evaporator serpentine which has a larger LD than the capillary and starts to boil off this reaction is emphasised by the heat transferred by the sprayed water The refrigerant then increases in volume and changes entirely into vapour The vapour refrigerant then passes through the suction accumulator used to prevent any small amount of liquid refrigerant reaching the compressor and through the suction line In both the accumulator and the suction line it exchanges heat with the refrigerant flowing into the capillary tube warmer before being sucked into the compressor and recirculated as hot compressed refrigerant gas The freezing cycle is controlled by the evaporator temperature sensor which has its probe in contact with the evaporator serpentine which determines the length of the first and second portion of it and it is signalled by the glowing
50. s WATER FILLING phase i e the water inlet solenoid valve opens to allow the incoming water to rinse again the water system and to properly fill up the sump reservoir for the next freezing cycle 11 Replace the evaporator cover and the unit service panels 12 At completion of the freezing and harvest cycle make sure of proper texture and clearness of the ice cubes and that they do not have any acid taste ATTENTION In case the Ice cubes are cloudy white and have an acid taste melt them Immediately by pouring on some warm water In order to prevent somebody using them Wipe clean and rinse the inner surfaces of the storage bin REMEMBER To prevent the accumulation of undesirable bacteria it is necessary to sanitise the interior of the storage bin with an anti algae disinfectant solution every week 22
51. st above the previous lighted one NOTE The length of the entire freezing cycle is the sum of the lengths of three phases two of which T1 T2 controlled by the evaporator tempemtum sensor which has its probe placed in contact with the evaporator serpentine non adjustable and ONE Ta by the electronic timer Adjustable incorporated in the P C BOARD The lengths of the first two phases related to the evaporator temperature and controlled by its sensor are TI The time elapsed since the beginning of freezing cycle up to when the evaporator reaches the temperature of 0 C 35 F T2 The time required for the evaporator to fall from 0 C 35 F to 13 C 8 5 F or to 16 C 3 F The third time Ta Time added is in relation to one of the different combinations of the five keys 3 4 5 6 and 7 of the DIP SWITCH located in the front of the P C BOARD The combination is factory set in consideration of the ice maker type and of its cooling version It is possible however to vary the timed length of the freezing cycle by changing the DIP SWITCH keys settings In Table B are shown the various time extensions of the freezing cycle third phase Ta in relation with the different DIP SWITCH keys settings G After about 20 22 minutes from the beginning of the freezing cycle in a hypothetic ambient temperature of 21 C 70 F the defrost cycle takes place with the hot gas and the water inlet valves being simultaneously activated Fig 5
52. the bulb of the storage CUBE SIZE bin thermostat the ice maker will switch off in about one to two minutes AON Once the machine has stopped remove the ice and dispose of it the machine will O restart automatically in three to four minutes Note The bin thermostat is factory set at 1 C 35 F CUT OUT and 4 C 39 F CUT IN The set temperature can be adjusted if required by using a flat bladed TAILLE GLACON NIVEAU CUVE screwdriver turn towards the to increase the bin temperature and towards the to decrease the bin temperature See fig 2 19262778 0 Refit the bottom front panel then instruct the owner user on the general operation Fig 2 of the machine and about the cleaning and care it reguires 9 The machine may stop working if the condenser temperature exceeds the pre set temperature of the Over Temperature Thermostat non adjustable due to a very high ambient temperature condenser fan failure dirty blocked condenser To restart the machine depress the protruding button on the Alarm Reset Changes to the defrost time Under normal circumstances no adjustments should be necessary The fixed time can be adjusted by releasing the tension on the cam screw turning the dial anti clockwise to increase the defrost time and clockwise to decrease the defrost time retighten the screw when the adjustment has been completed Note If adjustment are made it will effect the freeze cycle Increasing the defrost time will shorte
53. the different electrical components of the ice maker compressor water pump solenoid valves etc By turning the program selector it is possible to put the unit in the following different situations CLEANING RINSING The water pump is the only electrical component in operation and it must be used during the cleaning or the rinsing procedure of the water system of ice machine STAND BY The unit remain under electrical power but OUT of operation It can be used by the service engineer in order to stop the unit during 17 the service and inspection operations IN OPERATION The unit is running through the freezing and defrost cycle stopping automatically only at full bin situation RE SET HI TEMPERATURE To be selected to resume the unit operation when the ice maker shuts off due to the intervention of the condenser temperature sensor too high condensing temperature The five LEDS placed in a row in the front of the P C BOARD monitor the following situations GREEN LIGHT Unit under electrical power YELLOW LIGHT Unit shut off at full storage bin RED LIGHT Unit shut off due to hi condensing temperature Blinking Unit shut off due to hi evaporating temperature YELLOW LIGHT Unit in freezing operation YELLOW LIGHT Unit in cleaning rinsing mode 12 6 DIP SWITCH The P C BOARD which controls the entire operation of the ice maker has a DIP SWITCH with ten switching keys which allow to set up the micro processor program in order t
54. the hot gas and the water inlet valves being simultaneously activated Fig 5 Page 20 The electrical components in operation are COMPRESSOR WATER INLET SOLENOID VALVE HOT GAS VALVE and if installed WATER DRAIN SOLENOID VALVE NOTE The length of the defrost cycle is determined by the DIP SWITCH keys setting in conjunction with the ambient temperature sensor located just in front of the condenser The length of defrost cycle can be adjusted by changing the combination setting of keys 5 6 and 7 of DIP SWITCH as illustrated on Table C Page 18 As shown per each individual key combination it is possible to have a different length of the defrost cycle in relation to the different ambient temperature situations shorter when the ambient temperature is high and longer in colder ambient s to partially compensate for the length of the freezing cycle which is longer in high ambient temperatures and shorter in low ones Check during the defrost cycle that the incoming water flows correctly into the sump reservoir in order to refill it and that the surplus overflows through the overflow drain tube Check the texture of ice cubes just released They have to be in the right shape with a small depression of about 5 6mm in their crown If not wait for the completion of the second cycle before performing any adjustment If required the length of the timed freezing cycle can be modified by changing the DIP SWITCH keys setting as illustrated in Table B
55. then it declines gradually in relation with the growing of the ice thickness to reach at the end of the cycle approx 1 bar 14 psig with the cubes fully formed in the cup moulds The total length of the freezing cycle ranges from 15 18 minutes Defrost or Harvest Cycle As the electronic timer has carried the system throughout the second phase of freezing cycle the defrost cycle starts ATTENTION In case the unit is be able to reach 0 C 32 F evaporating temperature within 15 minutes or after 45 minutes from the beginning of the freezing cycle it has not yet reached the evaporator temperature of 15 C 5 F the machine goes straight into the defrost cycle omitting the timed portion of the freezing cycle related to the setting of the first four DIP SWITCHES NOTE The length of the defrost cycle is pre determined by the setting of the DIP SWITCH KEYS NO 5 6 and 7 and it is related as well to the 16 11 4 ambient temperature as detailed in Table C Page 18 The electrical components in operation during this phase are COMPRESSOR WATER PUMP WATER INLET SOLENOID VALVE HOT GAS SOLENOID VALVE The incoming water passing through the water inlet valve and the flow control runs over the evaporator platen and then flows by gravity through the dribbler holes down into the sump reservoir The water filling the sump reservior forces part of the surplus water from the previous freezing cycle to go out to the waste through the overflow
56. wer after having been switched off both the water inlet valve and the hot gas valve get energised for a period of 5 minutes thus to admit new water to the machine sump reservoir to fill it up and eventually to wash off any dirt that may be deposited in it during the unit oft period Fig 1 Page 13 B During the water filling operation check to see that the incoming water dribbles through the evaporator platen dribbler holes down into the sump reservoir to fill it up and also that the incoming surplus of water flows out through the overflow pipe into the drain line During the water filling phase the components energised are THE WATER INLET SOLENOID VALVE THE HOT GAS SOLENOID VALVE WATER DRAIN VALVE NOTE If in the 5 minutes length of the water filling phase the machine sump reservoir does not fill up to the rim of the overflow pipe it is advisable to check 1 The water pressure of the water supply line that must be at least 1 bar 14 psig Minimum Max 5 bar 70 psig 2 The filtering device installed in the water line that may reduce the water pressure below the Minimum value of 1 bar 14 psig 3 Any clogging situation in the water circuit like the inlet water strainer and or the flow control 5 2 Operational Checks C At completion of the water filling phase 5 minutes the unit passes automatically into the freezing cycle with the start up of COMPRESSOR WATER PUMP FAN MOTOR in air cooled version Fig 2 Page 13 and the glowing of
57. y pre set is the same for all the models and is not adjustable in the field Once completed the freezing cycle 2nd phase the system goes automatically into the defrost cycle which has also a pre fixed length that can vary depending upon the actual ambient temperature as shown in Table C Page 18 At completion of the defrost cycle the P C BOARD command the unit to start again a new freezing cycle 12 Components Description 12 1 Evaporator Temperature Sensor The evaporator temperature sensor probe located in contact with the evaporator serpentine detects the dropping of the evaporator temperature during the freezing cycle and signals it by supplying a current flow to the micro processor of the P C BOARD According to the current received the evaporator sensor supplies power to the P C BOARD first when it reaches 0 C 32 F second at 15 C 5 F in this second case its supply power to the electronic timer built into the P C BOARD so that it may take control of the length of the 2nd phase of freezing cycle The length of the timed phase is pre fixed by the setting of the keys 1 2 3 and 4 of the DIP SWITCH The activation of the electronic timer 15 C 5 F is monitored by the lighting up of the RED LED placed in the front of the P C BOARD This lighting up occurs usually in the mid period of the freezing cycle and signals the switching from the first to the second phase of the freezing cycle 12 2 Condenser Temperature Sensor The con

Download Pdf Manuals

image

Related Search

Related Contents

Handbuch des BlackBerry Curve 9300 - Hilfe  Internal Report Title - Current students  Manual  Metra 99-3014G car kit    照明器具取扱説明書 型番:YCL-369  Kicker Tabor Premium Headphones Owner's Manual  〇 〇 〇 〇 ・ ・ ・ ・ ・ ・ ・ 〇 ・ ・ ・ ・ 〇 〇 〇 〇 〇 〇 〇  

Copyright © All rights reserved.
Failed to retrieve file