Home
Chief Manufacturing SL-236 Projector User Manual
Contents
1. INSTALLATION INSTRUCTIONS SMART LIFT 236 Electric Ceiling Lift The Model SL 236 Electric Ceiling Lift is a reliable heavy duty video lift mechanism for LCD DLP projectors requiring an extended drop from their hidden location The ceiling lift is designed for home theater conference room or school applications The SL 236 provides an attractive solution to recess a projector in the ceiling The lift is suitable for finished or suspended ceiling with a finish kit The concealed bottom can be finished to match existing ceiling design and color to conform to room decor Plenum Rating requires use of Class II control wiring electrically hard wiring the unit and all open holes in the housing except joist tabs must be sealed using foil tape BEFORE YOU BEGIN e CAUTION To prevent damage to the ceiling lift which could affect or void the factory warranty thoroughly study all instructions and illustrations before you begin to install or operate the lift Pay particular attention to the Impor tant Precautions on Page 1 e CAUTION For smooth and reliable operation the lift must be installed square and parallel in all dimensions Avoid stressing or twisting the lift at any time during installation e Because of the size and weight of the lift Chief Manufacturing recommends that at least two people be available when installing the lift e If you have any questions concerning this installation contact Chief
2. Avoid stressing the lift at any time during installation Instruction Manual SMART LIFT 236 Electric Ceiling Lifts Installation in a Suspended Ceiling using threaded rods You can suspend the lift housing from three 3 8 in dia threaded rods not supplied by Chief Manufacturing First secure the rods to a structural cross brace in the ceiling Insert the rods through the three holes on the top side of the lift housing or through the holes of optional brackets SMA 651 and secure them to the housing using two jam nuts one inside one outside See Fig 3 CAUTION For smooth and reliable operation the lift must be installed square and parallel in all dimensions Avoid stressing or twisting the lift at any time during installation THREADED ROD Install the lift using threaded rods 1 With the lift in the fully retracted position remove the closure panel from the bottom of the lift 2 If you are using the SMA 651 install it now 3 Insert the 3 threaded rods through the top of the lift or SMA 651 4 Using nuts and washers secure the lift to the threaded rods Finish the suspended ceiling 1 Cut the grid to fit the perimeter of the lift and insert it into the side channel of lift the side channel of the lift will support the Figure 3 Threaded Rod Installation weight of the ceiling grid and tiles 2 Ifusing the SMA 620 see the SMA 620 instructions and install them now 3 Cut sur
3. EXTEND 0 5 125 17 LIMIT 0 3 AMP 60VDC RELAY COMMON BE Closes set of internal dry contacts RATED FOR 1 0 AMP 30VDC when unit reaches full retraction 0 5 AMP 125VAC 0 3 AMP 60VDC Instruction Manual SMART LIFT 236 Electric Ceiling Lifts SMART LIFT EXTERIOR 14 PIN TERMINAL FUNCTION DEFINITION DESCRIPTION WIRING OPTIONS NOTES This is an internal power supply for 24 VOLT AC 24 volt AC output powering external devices amp Remote Controllers Chief Mfg offers the RC 10 Radio 24 VOLT AC 24 volt AC common Frequency Remote Controller which runs COMMON off of this power supply Retracts unit to preset travel limit P If using Latching Switch be sure to disengage Switch prior to initiating any other function Momentary or Latching contact to Travel limits may be adjusted by customer within a preset maximum ied Ground terminals 9 or 11 Extends unit to preset travel limit If using Latching Switch be sure to EXTEND disengage Switch prior to initiating any Customer within a preset maximum other function range may adjust travel limits TEND in conjunction wi To Operate using Internal Power d none 1o Internal Power NOT TO BE USED AS GROUND FOR seein a ee terminals 9 amp 5 with FUNCTION OTHER THAN COMMON P EXTEND RETRACT TERMINAL 5 movement Jumper Wire Connect Momentary Switch to terminal Common to terminal 5 Connect 10 Connect other line
4. e Service Extend CAUTION Closing the unit while the projector is running may cause premature bulb failure and may damage both the lift and pro jector Push Button Supplied Single Pole Single Throw SPST Switch Using Internal 24VAC Power Supply a Connect the green jumper wire supplied to terminals 2 amp 6 see Figure 17 b Connect the SPST switch supplied to terminals 1 amp 5 Supplied SPST Switch Using Internal 12VDC Power Supply a Connect the green jumper wire supplied to terminals 6 amp 10 see Figure 18 b Connect the SPST switch supplied to terminals 4 amp 5 Supplied SPST Switch Using External Power Supply a Connect the negative of your power supply to terminal 6 see Figure 19 Figure 18 12DC Internal b Connect the SPST switch supplied to terminal 5 amp the pos itive of your power supply 2 5 w i 11 12 13 14 15 16 17 19 20 5 30V 5 30V gt Olololojlolojlojlo lolo Figure 19 External Power Supply 16 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts Single Pole DOUBLE Throw SPDT Switch or 2 Dry Contact Closures Momentary or Latching a Connect the common wire from your switch to terminal 13 see Figure 20 b Connect the up wire from your switch to terminal 12 c Connect the down wire from your switch to terminal 11 Internal 12VDC Power Supply 2 5A
5. 650 Threaded Rod Adapter Simplifies installation using threaded rods Allows cable use for support installation Instruction Manual SMART LIFT 236 Electric Ceiling Lifts PRETEST THE LIFT BEFORE INSTALLING IMPORTANT Before mounting the lift in the ceiling perform the following test to be sure that it operates properly and has not been damaged during shipping 1 Attach supports not supplied to the top of the lift see Figure 1 2 Suspend the lift at least 3 1 2 feet high from a suitable structure 1 e saw horses ladders or tables see Figure 2 NOTE The supplied momentary push button and power cord can be used to pre test the lift see and OUTSIDE TERMINAL WIRING EXAMPLES on page 13 3 Cycle the lift through the show and service positions mak ing sure the unit operates smoothly Figure 2 Suspend the Unit Instruction Manual SMART LIFT 236 Electric Ceiling Lifts PREPARE THE CEILING OPENING AND INSTALL THE LIFT Because of the wide variety of possible mounting situations Chief Manufacturing can only provide general guidelines for preparing the location where the Smart Lift will be installed Study the following information carefully and adapt it as necessary to fit your specific installation WARNING Be especially aware of the weight of the lift and the potential for personal injury or of damage to the lift if it is not adequately mounted The lift without a
6. Manufacturing at 1 800 582 6480 CHIEF MANUFACTURING INC Fal E E ss 4 800 582 6480 952 894 6280 FAX 952 894 6918 oy C H F 8401 EAGLE CREEK PARKWAY Ideas Supporting Ideas SAVAGE MINNESOTA 55378 USA PART NO 8820 000008 Rev E 2008 Chief Manufacturing www chiefmfg com 04 08 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts A IMPORTANT WARNINGS AND CAUTIONS WARNING This is an electrical device All electrical installation procedures should be performed by a qualified elec trician WARNING Improper installation can result in serious personal injury Make sure that the ceiling structural mem bers can support a redundant weight factor five times the total weight of the equipment If the ceiling can not support this weight reinforce the ceiling before installing the lift WARNING Be aware during the installation that this is a motorized device and there are pinch points for people and for electrical wiring WARNING Be aware of the potential for personal injury or damage to the lift if it is not adequately mounted The lift without a projector weighs approximately 85 Ibs 38 5 kg WARNING Plenum rating requires the unit to be hard wired through the provided strain relief use of Class II control wiring and all open holes in housing except joist tabs must be sealed using foil tape WARNING Electrical outlets must be installed by a qualified electrician Follow all electrical codes CAU
7. Maximum Terminal 4 Terminal 3 NOTE Non regulated open circuit voltage may exceed 18V Internal 24VAC Power Supply 1 2A Maximum Figure 20 Dry Contacts Terminal 1 Terminal 2 Internal Dry Contact Closures Common Terminal 12 Closed when lift reaches show position Terminals 16 and 17 Closed when lift is fully closed Terminals 18 and 19 Low Voltage Sensing a Connect the positive of your power supply to terminal 7 b Connect the negative of your power supply to terminal 8 NOTE The lift will complete a full cycle even if the supply is turned off before the lift reaches full extension NOTE When the lift is in the lowered position using this option the lift will ignore all other commands until it has completed its full cycle When the power supply is on the lift will extend When the power supply turns off the lift will retract Service position Momentary contact between terminals 9 amp 10 will lower the lift to the service position NOTE To stop the lift before it reaches the service position make a momentary contact between terminals 11 amp 13 17 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts SMART LIFT INTERIOR BOARD BOX TERMINAL FUNCTION DEFINITIONS FUNCTION DESCRIPTION WIRING OPTIONS NOTES This is an internal power supply for 1 24 VOLT 24 volt AC output powering external devices amp Remote Controllers Chief Mfg offers the RC 10 Radio 24
8. VOLT AC Frequency Remote Controller which runs 2 COMMON Oe ee off of this power supply powering external devices amp or used for initiating specific functions Extend Retract 5 or Voltage Sensor 7 Initiates movement if lift is static or To Operate using Internal Power Function operates on momentary switch stops movement if lift isin motion Source only RETRACT Direction of travel will be opposite Connect terminals 3 amp 6 with of last direction of travel Jumper Wire Connect Operating range is 5 30 Volts AC or DC Momentary Switch to terminal 4 Connect other line of Momentary Switch to terminal 5 Used in conjunction with Extend Retract when using an external power source to initiate movement EXTEND RETRACT COMMON To Operate using External Power NOT TO USED AS GROUND FOR Source FUNCTION OTHER THAN Connect External Power Supply s EXTEND RETRACT TERMINAL 5 Common to terminal 6 Connect initiating signal to terminal 5 When terminal senses voltage unit Voltage Sensing will extend Connect positive lead to terminal 7 Connect Ground of switching Operating range is 5 30 Volts AC or DC When terminal senses cessation of device to terminal 8 voltage unit will retract VOLTAGE SENSOR Single Pull Throw Latching Switch Connect terminals 3 amp 8 with NOT TO BE USED AS GROUND FOR VOLTAGE Used in conjunction with Voltage Jumper Wire Connect first FUNCTION OTHER THAN V
9. gt 7Y necessary i i SHOW POSITION 2 Lengthen stroke by turning the adjustment screw clockwise two turns check for the desired stroke length and repeat as necessary Adjust the Aim of the Projector sk Center the lens see Figure 12 The aim of the projector can be i adjusted in all directions as shown 1 Lower the lift to the show position 2 Pitch and forward Aft There are four 10 24 Nylock nuts Figure 11 Travel Adjustment two on each side on the outside of the carriage Loosen these nuts slightly tip the carriage in the slotted holes to the desired angle and tighten the nuts For forward and aft adjustment loosen the four pitch adjustment nuts Lift slightly moving for ward or aft until tray falls into desired notch and tighten the nuts ROLL HEIGHI r ADJUSTMENT NUTS CAUTION Each side must be adjusted equally Failure to adjust Le each side equally may result in equipment and lift damage ADJUSTMENT NUTS when the lift closes on 3 Roll Height There are four 1 4 20 nuts at the rear inside cor ners of the cradle assembly Slightly loosen these nuts gently raise or lower the cradle to the desired position and tighten the nuts 4 Yaw There are four 10 24 Nylock nuts two on each side on the top of the carriage Loosen these screws slightly turn the carriage in the slotted holes to the desired angle and tighten the nuts FORES APT ADJUSTME
10. locations across the back of the lift see Figure 6 and Figure 7 The lift requires support on two opposing sides only Figure 6 Mounting Locations 4 After installing the lift use the test push button to carefully operate the lift all the way up and down to be sure the clear ances are adequate Be prepared to stop the lift immediately if the lift begins to sound labored or if one side or the other side begins to travel slower 1 4 Dia Lag Screw Alternate 1 4 Dia Bolt Thru 5 To maintain plenum rating seal any openings in the lift hous ing except joist tabs using foil tape The bottom of the lift may be painted or textured as necessary to match the ceiling Lift Housing Joist Sheetrock Finish Ceiling Compound NOTE Bead flange setback allows finish compound to hide Bead Flange lift housing seam Figure 7 Mounting Method Instruction Manual SMART LIFT 236 Electric Ceiling Lifts CONNECT POWER TO THE LIFT WARNING Plenum rating requires hard wiring and use of Class II control wiring Follow all local building and electrical codes NOTE If the lift is cycled up and down repeatedly the thermal overload on the motor may stop operation Operation will resume when the thermal overload cools and resets 5 to 15 minutes Non Plenum Rated Installation 1 Plug the lift s power cord supplied into an electrical outlet Plenum Rated Installation WARNING A licensed electrician should
11. of Momentary Switch to terminal 6 Initiates movement if lift is static or Function operates on momentary switch EXTEND stops movement if lift is in motion To Operate using External Power only RETRACT Direction of travel will be opposite Source of last direction of travel Connect External Power Supply s Operating range is 5 30 Volts AC or DC initiating signal to terminal 6 RETRACT Immediately reverses direction of ERROR travel when triggered while unit is Chief Mfg offers the SS 10 Pressure retracting Sensitive Safety Strip to provide this function EXTEND MOEDA Please specify how many inches required Immediately reverses direction of terminals 9 or 11 i y y travel when triggered while unit is bo spall enue pine zone ERROR The SS 10 must be ordered with the ST 15 extending Termi erminals powering external devices amp used for initiating specific functions 10 12 VOLT DC 12 volt DC Extend Retract 6 Extends unit to maximum limit Feature not available on all models bypassing normal use travel setting Momentary or Latching contacts 1 1 Service Extend to Ground terminals 3 10 13 or If using Latching Switch be sure to Often used for servicing projectors 20 disengage Switch prior to initiating any in ceiling lifts other function 20 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts Closes set of internal dry contacts RATED FOR 1 0 AMP 30VDC when unit reac
12. CALL CHIEF LIFTING BRACKET DAMAGED CALL CHIEF BINDING MECHANISM MAKE SURE CABLES ARE ROUTED PROPERLY SEE INSTALL AND ROUTE CABLES PAGE 11 LIFTING LINKS OUT OF ADJUSTMENT CALL CHIEF LIFTING BRACKET DAMAGED CALL CHIEF DAMAGED HINGE ASSEMBLY CALL CHIEF 22 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts PAGE LEFT BLANK INTENTIONALLY 23
13. L DISTANCE ROLL ADJUSTMENT PITCH ADJUSTMENT YAW ADJUSTMENT INTERNAL HEIGHT ADJUSTMENT INTERNAL FORE AFT ADJUSTMENT INTERNAL LEFT RIGHT ADJUSTMENT COLOR MAXIMUM WEIGHT CAPACITY NET WEIGHT OUTPUT RELAYS INTERNAL POWER SUPPLY CURRENT DRAW FUSE FD 11 06 x 26 35 x 28 85 SP 12 25 x 25 12 x 28 31 9 25 x 20 50 x 22 75 23 87 x 23 87 25 50 x 28 00 36 00 70 10 2 00 3 00 1 2 INCREMENTS 2 00 1 2 INCREMENTS WHITE 35 SS 1 0 AMP 30VDC 0 5 AMP 125VAC 0 3 AMP 60VDC 12VDC 2 5A MAX 24VAC 1 2A MAX SA 4A BUSSMAN TYPE GDB A NOTCH MAY BE REQUIRED TOWARD THE REAR OF THE OPENING TO CLEAR THE TERMINAL BLOCK SEE DIMENSIONAL DRAWINGS Instruction Manual SMART LIFT 236 Electric Ceiling Lifts ACCESSORIES Control ASP 401 Rocker Switch with Wall Plate Simple lift control RC 10 Radio Frequency Remote Control Multiple code settings Single button control of the lift IR 10 Infra Red Remote Control Discrete UP DOWN SERVICE commands Used with most universal remotes Installation Ceiling Track ZE Ze Securely attaches the suspended ceiling grid to the lift 1 p Includes 8 clips SMA 601 Single Column Mounting Plate _ Attaches to any 1 1 2 NPT extension column Allows 3 fore aft and 3 left right adjustment Permits slight roll pitch and yaw adjustment Allows 2 height adjustment after installation SMA
14. NT NUTS Figure 12 Projector Adjustment 13 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts OUTSIDE TERMINAL WIRING EXAMPLES The information on the following pages cover the most common wiring options e Supplied Momentary Push Button e Discrete Extend and Retract for switch or dry contacts e 12 Volt out supply e 24 Volt out supply e Two dry contact closures e Service Extend CAUTION Closing the unit while the projector is running may cause premature bulb failure and may damage both the lift and pro jector Push Button Supplied Single Pole Single Throw SPST Switch Using Internal 24VAC Power Supply a Connect the green jumper wire supplied to terminals 1 amp 5 see Figure 13 b Connect the SPST switch supplied to terminals 2 amp 6 Supplied SPST Switch Using Internal 12VDC Power Supply a Connect the green jumper wire supplied to terminals 5 amp 9 see Figure 14 b Connect the SPST switch supplied to terminals 6 amp 10 Supplied SPST Switch Using External Power Supply a Connect the negative of your power supply to terminal 5 see Figure 15 Figure 14 12DC Internal b Connect the SPST switch supplied to terminal 6 amp the pos itive of your power supply AC DC 5 30V 5 30V Figure 15 External Power Supply 14 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts Single Pole Double Throw SPDT Switch or 2 Dry Contact Closures Momentary or Latchin
15. OLTAGE SENSOR Sensor when using an external Switch Terminal to terminal 4 SENSOR TERMINAL 7 COMMON power source to initiate movement Connect other Switch Terminal to terminal 7 Extends unit to maximum limit Feature not available on all models SERVICE bypassing normal use travel setting EXTEND Momentary or Latching contact to Ground terminals 3 10 13 or 20 using Latching Switch be sure to Often used for servicing projectors disengage Switch prior to initiating any in ceiling lifts other function 18 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts Extends unit to preset travel limit Tne Ache Sea bone IO 11 TREA AE one prior to initiating any range may adjust travel limits Momentary Latching contact to i 10 13 or 20 Retracts unit to preset travel limit SO aa If using Latching Switch be sure to 12 RETRACT Travel limits may be adjusted by disengage Switch prior to initiating any customer within a preset maximum other function range fam EXTEND Immediately reverses direction of Chief Mfg offers the SS 10 Pressure 14 ERROR travel when triggered while unit is Sensitive Safety Strip to provide this ae Monrentary contact to Ground ae fy ho ach terminals 3 10 13 20 nt 15 a A The SS 10 must be ordered with the ST 15 ERROR orn Terminals retracting EXTEND 16 LIMIT RELAY e aerate aia RATED FOR 1 0 AMP 30VDC
16. ON 16 Supplied SPST Switch Using Internal 24VAC Power Supply 16 Supplied SPST Switch Using Internal 12VDC Power Supply 16 Supplied SPST Switch Using External Power Supply 16 SPDT Switch or 2 Dry Contact Closures Momentary or a 17 Internal 12VDC Power Supply 1 2 A Maximum 17 Internal 24VAC Power Supply 2 5 A Maximum 17 Internal Dry Contact CIOSUIES isiin 17 LOW Voltage Sensing cccccceccecceeseeeeeseeeeeeseeeeeeeeseaeeeeseaeseeeseas 17 SEVICE POSION a 17 INTERIOR TERMINAL DESIGNATIONS ccecececceeeaeeeeeeeeeeeane ees 18 EXTERIOR TERMINAL DESIGNATIONG cccceccceeeeeeeeeeeeeeeeae ees 20 TROUBLESHOOTING A 22 SMART LIFT 236 Electric Ceiling Lifts Instruction Manual SMART LIFT 236 Electric Ceiling Lifts DIMENSIONAL DRAWING SP MAXIMUM AVAILABLE SPACE FOR PROJECTOR AND EQUIPMENT HxWxD 9 25 x 20 50 x 22 75 FD Instruction Manual SMART LIFT 236 Electric Ceiling Lifts SPECIFICATIONS OVERALL DIMENSIONS CLOSED HxWxD MAXIMUM AVAILABLE SPACE FOR PROJECTOR AND EQUIPMENT HxWxD CLOSURE PANEL SIZE WxD RECOMMENDED CEILING OPENING SIZE WxD AVAILABLE TRAVE
17. TION Test the lift for shipping damage See PRETEST THE LIFT BEFORE INSTALLING on page 6 CAUTION For smooth and reliable operation the lift must be installed square and parallel in all dimensions Avoid stress ing or twisting the lift at any time during installation CAUTION Changes or modifications not approved by Chief Manufacturing could void user s warranty CAUTION Improper weight distribution could lead to equipment damage Make certain projector weight is centered on cra dle when mounted TOOLS REQUIRED FOR INSTALLATION Phillips screwdrivers No 1 and No 2 Electric drill and bit set Pliers heavy duty Electrical wire cutter stripper If suspended from threaded rods Socket set with extension and open wrenches NOTE Other tools may be required depending on the method of installing the lift in the ceiling Instruction Manual CONTENTS DIMENSIONAL DRAWING csiiiiiiceiraittinaaadaseaatinineandinintantua nena 3 SPECIFICA IONS 4 PENG eee 5 PRETEST THE LIFT BEFORE INSTALLING 6 PREPARE THE CEILING OPENING AND INSTAL FHE EIET siasnderaniinasvernctun sac 7 Cen eral GUIS IMCS a tunnat 7 Installation in a Suspended Ceiling using threaded rods 8 Installation in a Wood Fr
18. amework or Side Mounted to Joists 9 CONNECT POWER TO THE LIED 10 Non Plenum Rated Installation cccccecsseeeeseeseeeeeeeeeeeeteeees 10 Plenum Rated Installation 10 OPTIONAL INSTALLING WIRING COVER cccccesceeseeeeeeeeeeeaeeees 11 INSTALL THE PROJECTOR ON THE LIFT ninia ieii 12 Install and Route Cables iii ciivivunicacissaneeveodevishoaiievedestaviaieneleeuss 12 ADJUSTMENTS aA 13 AGUS UAV 13 Adjust the Aim of the Projector ccccceecesseeeeeeeeeeseeeeeeaneeeeees 13 OUTSIDE TERMINAL WIRING EXAMPLES oeenn 14 POUSA BUNON sarira 14 Supplied SPST Switch Using Internal 24VAC Power Supply 14 Supplied SPST Switch Using Internal 12VDC Power Supply 14 Supplied SPST Switch Using External Power Supply 14 SPDT Switch or 2 Dry Contact Closures Momentary or 15 Internal 12VDC Power Supply 2 5A Maximum 15 Internal 24VAC Power Supply 1 2A Max 15 Internal Dry Contact Closures ccccececeeeeceeeseeeeeeeaeeseeeaseneeees 15 SENICE POSITION aroak ride 15 INSIDE TERMINAL WIRING EXAMPLES cccccsecceeeeseeeeeeeeeeeeeees 16 PUSA BUM
19. disconnect and terminate the leads to the power cord receptacle and using the access holes provided for a strain relief hard wire the unit to a power source WARNING Failure to disconnect and terminate power leads properly may result in equipment damage or personal injury 1 Disconnect and terminate the electrical leads from the power cord receptacle at the interior junction box see Figure 8 2 Remove the electrical knockout and install the strain relief provided 3 Hard wire the unit to a 110V 60 Hz or 230V 50 Hz as appro priate 15 amp power source 4 Replace interior outlet in a horizontal position as noted on the stickers found on the outlet cover plate 10 Terminate Power Leads Electrical Junction Box Inside iit Figure 8 Disconnect and Terminate Power Cord Leads ional In Ilina Wiring Cover 5 Place switch hole cover behind the cover plate and attach Opt ona sta g g with two Phillips head screws from the kit An optional wiring cover may be installed to further protect 6 Replace cover plate and attach using two Phillips head wiring from mechanical damage screws removed in Step 4 WARNING Make sure that power to SL 236 is OFF before 7 Remove three Phillips head screws from SL 236 proceeding 8 Place motor wiring cover in place and attach with three 1 Remove the control harness See Figure 9 Phillips head screws removed in Step 7 2 Using four Phillips head screws attach co
20. e lift not secured by the bracket The bracket may be removed for esthetic purpose by removing four roll height adjustment nuts see ADJUSTMENTS Install and Route Cables CAUTION Do not attach cables to lower lifting arms or sides of cradle This may result in damage when lift retracts NOTE Two routing paths are provided one on each side to sepa rate electrical and video cables 1 Lower lift to service position 2 Route and secure all electrical and video cables using ties and eyelets provided see Figure 10 leaving some slack between securing points 3 Plug the projector s power cord into one of the two outlets inside the lift One outlet is switched and the other is continu ously live The switched outlet is marked with an S THUMBNUTS _ _ YAW ADJUSTMENT i BRACKET se ZA eE PROJECTOR _ CRADLE _ Figure 9 Install Projector Figure 10 Cable Routing Example 12 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts ADJUSTMENTS Adjust Travel An access hole is located in the corner below the terminal block a see Figure 11 Using a Phillips screwdriver inserted in the access hole adjust the stroke of the lift mechanism as follows CAUTION Do not over adjust exceed maximum travel stroke length SSI 1 Shorten stroke by turning the adjustment screw clockwise one wy f ARIS or two turns check for the desired stroke length and repeat as
21. g These terminals can be used with any latching contacts momentary contacts or a wall switch Common NOTE The connection between the ground 9 and any other ter minal connection must be broken open before completing the next circuit a Connect the common wire from your switch to terminal 9 see Figure 16 b Connect the up wire from your switch to terminal 3 Connect the down wire from your switch to terminal 4 Internal 12VDC Power Supply 2 5A Maximum Terminal 10 FETO 10 12114 Om Terminal 9 NOTE Non regulated open circuit voltage may exceed 18V Internal 24VAC power supply 1 2 A max Terminal 1 Terminal 2 Internal dry contact closures Figure 16 Dry Contacts Common Terminal 12 Closed when lift reaches show position 14 Closed when lift is fully closed 13 Service Position Momentary contact between terminals 9 amp 11 will lower the lift to the service position NOTE To stop the lift before it reaches the service position make a momentary contact between terminals 3 amp 9 15 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts INSIDE TERMINAL WIRING EXAMPLES The information on the following pages cover the most common wiring options e Supplied Momentary Push Button e Discrete Extend and Retract for Switch or Dry Contacts e 12 Volt out supply e 24 Volt out supply e Two dry contact closures e Voltage Sensing
22. hes full retraction 0 5 AMP 125VAC 0 3 AMP 60VDC Closes set of internal dry contacts when unit reaches full extension To Motor JE __11 __ 5 4 2 1 Circuit Board Connector B Circuit Board Inside Terminal Block Connector A 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 17 18 19 20 1 2 3 4 5 129106 5 1 43 8 7 1412 13 Terminals on outside terminal block Green Brown Extend limit switch NC 21 Instruction Manual TROUBLESHOOTING SMART LIFT 236 Electric Ceiling Lifts SYMPTOM POSSIBLE CAUSE CORRECTIVE ACTION LIFT DOES NOT RESPOND LIFT WILL NOT LOWER RAISE CONTROL BOX CLICKS MOTOR SILENT LIFT WILL NOT LOWER RAISE CONTROL BOX CLICKS MOTOR HUMS PROJECTOR CRADLE BOTTOM PANEL LOWER ON ONE SIDE PROJECTOR CRADLE BOTTOM PANEL SIGNIFICANTLY LOWER ON ONE SIDE HOOKS ON LIFTING BRACKET DO NOT CATCH THE ROLLERS ON THE PROJECTOR CRADLE 12V TRIGGER OPTION BEING USED NORMAL OPERATION SEE NOTES ON LOW VOLTAGE SENSING PAGE 16 OVERHEATED MOTOR LET MOTOR COOL FOR 5 15 MINUTES FAILED MOTOR CALL CHIEF FOR VERIFICATION BINDING MECHANISM MAKE SURE CABLES ARE ROUTED PROPERLY SEE INSTALL AND ROUTE CABLES PAGE 11 NORMAL OPERATION A DIFFERENCE OF UP TO 3 16 WITHIN THE FINAL 4 OF TRAVEL IS NORMAL WHEN THE LIFT IS EXTENDED BEYOND 4 UP TO 3 8 DIFFERENCE IS NORMAL LIFTING LINKS OUT OF ADJUSTMENT CALL CHIEF LIFTING BRACKET DAMAGED CALL CHIEF DAMAGED HINGE ASSEMBLY
23. projector weighs approximately 85 Ibs 38 5 kg The General Guidelines below and the information on the following pages covers the most common mounting situa tions e Suspend the lift from threaded rods that secure to the structural cross brace e Side mount the lift to the ceiling joists or secure the lift to a wood framework mounting to the joists General Guidelines e Carefully determine the position of the ceiling opening and its distance from and orientation toward the screen e f possible prepare an area above the ceiling that is sufficiently larger than the lift Leaving at least an 8 access to all sides and above the top of the lift for any future maintenance or repair WARNING Improper installation can result in serious personal injury To avoid such injury make sure that the ceiling structural members can support a redundant weight factor five times the total weight of the equipment you intend to support overhead If they cannot the ceiling must be reinforced before you install the lift WARNING Improper installation can result in serious injury Plenum rated installations require electri cally hard wiring the unit through the provided strain relief the use of Class 2 control wiring and all open holes in the housing except joist tabs must be sealed using foil tape You must adhere to all local codes CAUTION For smooth and reliable operation the lift must be installed square and parallel in all dimensions
24. rounding ceiling tile to appropriate size 4 Make sure the unit is level square parallel and there is no stress applied to the box chassis 5 Using the test push button carefully operate the lift all the way up and down to be sure the clearances are adequate Be pre pared to stop the lift immediately if the lift begins to sound labored or one side begins to travel slower 6 Replace surrounding ceiling tile ae Figure 4 Remove Ceiling Retainer 7 With lift at least partway open remove four screws securing g 9 ceiling tile retainer on bottom of tray see Figure 4 and remove ceiling tile retainer SL236 shown with ceiling tile and grid installed in 8 Cut ceiling tile to fit inside ceiling tile retainer include grid bottom panel pieces if necessary see Figure 5 and install ceiling tile grid by sliding it into the open end of the ceiling tile retainer CAUTION Make sure all parts assemble easily without distort ing any parts when installing tile in the ceiling tray Any parts protruding from the tray will cause damage when the unit closes 9 Install ceiling tile retainer and secure using four screws Figure 5 Grid Intersection Instruction Manual SMART LIFT 236 Electric Ceiling Lifts 11 After installing the lift use the test push button to carefully operate the lift all the way up and down to be sure the clear ances are adequate Be prepared to stop the lift immediately if the lift begins to so
25. und labored or if one side or the other side begins to travel slower 12 To maintain plenum rating seal any openings in the lift hous ing except joist tabs using foil tape Installation in a Wood Framework or Side Mounted to Joists A suitable framework must be constructed to support the lift in the ceiling Refer to for dimensions of the lift The lift housing has mounting tabs to assist in side mounting the lift to the ceiling joists or otherwise securing it to a wood framework MOUNTIG HOLES IN BACK The ideal lift installation time is after the sheetrock has been installed but before the sheetrock has been mudded or finished MOUNTING TABS BOTH SIDES amp FRONT 1 Remove the closure panel from the bottom of the lift to gain access to the front and back mounting holes CAUTION For smooth and reliable operation the lift must be installed square and parallel in all dimensions Avoid stressing the lift at any time during installation 2 Position the lift in the desired location making sure the unit is level square parallel and there is no stress applied to the box chassis 3 Secure the lift to the joists or wood framework Drive at least six 1 4 x1 1 4 in lag screws through the mounting tabs around the inside of the lift housing and mounting holes across the back of the lift There are 8 tab locations three in each side and two in one end and 3 mounting hole
26. ver included in 9 Remove three Phillips head screws from SL 236 kit over hole created in Step 1 10 Place control wiring cover in place and attach with three 3 Make control connections directly to the control box See Phillips head ieee in Step 9 Inside Terminal Wiring Examples sections 4 Remove and save two Phillips head screws from opposite corners of cover plate and remove cover plate from SL 236 See Figure 9 NOTE Some components not shown for clarity an aie arness Za Switch Hole Cover Motor Wiring Control Wiring Cover Ov OR Figure 9 Cover fF a A a x3 11 Instruction Manual SMART LIFT 236 Electric Ceiling Lifts INSTALL THE PROJECTOR ON THE LIFT CAUTION Improper projector weight distribution could lead to equipment damage Make certain projector weight is centered on cradle when mounted 1 Install the SLB bracket on the projector see the SLB manual for details 2 Remove the yaw adjustment bracket from the lift see Figure 9 3 Place the yaw adjustment bracket over the studs on the SLB as shown selecting the set of holes that best centers the weight of the projector 4 Install tapered thumb nuts minimum 3 making sure the tapered end is toward the projector 5 Reinstall the yaw adjustment bracket with projector attached NOTE If desired the projector can be set directly on the bottom plate of th
Download Pdf Manuals
Related Search
Related Contents
descargar manual Monster Cable 132825-00 flat panel wall mount Manual Linha TK - características v1docx wake V取扱説明書 Bibliographie - Gériatrie 5% Cuivre 認定 - 川崎ものづくりブランド Shure SE425-CL headphone User manual User`s Manual FC400G 無試薬形遊離塩素計 Copyright © All rights reserved.
Failed to retrieve file