Home
        Arrow Storage Products 697.68887 Outdoor Storage User Manual
         Contents
1.       ANCHOR KIT  Model No  AK100    New concrete anchor system permits  anchoring any size Arrow building  directly to a concrete slab  Each kit  contains heavy duty  hot dipped  galvanized steel corner gussets and  perimeter clips which fit over the floor  frame and lag bolt into a concrete slab   Full assembly instructions and a 1 4   masonary drill bit are included     ATTIC KIT   WORKBENCH KIT    Heavy duty galvanized steel bars that  fit all 10  wide Arrow buildings  They  install quickly and easily to help  organize space and create more  useable space as an attic or  workbench  Will hold up to 250 Ibs    113kg  evenly distributed     Model No   AT101       Fits    10  Long  250 Ib   113kg  load  Fits all Arrow 10  wide buildings     Shipping Weight  16 Ibs   7kg           Must be drilled for use as workbench in Estator     Even weight distribution     SHELF UNITS    Heavy duty  galvanized steel shelf units help organize storage  space  They easily mount on the wall or sit on the floor  Fits all    SN  a    Arrow buildings      F    Model No  55404     Makes 8  to 12   20 30cm   wide shelves in any length      Brackets  braces   hardware included   Lumber is not included             Model No  SS900 A     Grey color     3 shelves     Holds up to 85 Ibs   38kg    even weight distribution       Some drilling required to fit buildings without mid wall bracing     THIS    PAGE    WAS    LEFT    BLANK    INTENTIONALLY    THIS    PAGE    WAS    LEFT    BLANK    INTENTIONALLY 
2.     BW36       1 Continue weather stripping andfas  6install the right and left roof    tening overlaps  panels at the rear gables  Follow  fastener sequence    2 Position a ridge cap 7843 on the   completed front roof section  T install the third ridge cap 6874    overlapping the second ridge cap   Align the holes and fasten using    3install 2 middle roof panels   bolts     Ainstall the second ridge cap 7843    overlapping the first ridge cap  Align  the holes and fasten using bolts     8Fasten the lower end of the pan     els to the side top angle using  screws     5 Temporarily remove right rear roof  panel  Install 4 middle roof panels   As each panel is fastened  carefully               RTS     7    X  raise 2nd ridge cap slightly away Replace ridge cap 6874 with an additional    from panels for fasteners and tape  ridge cap 7843 andinstall ridge cap 6874  to rear of building     IF YOU ARE BUILDING A 12x31  Replaceridge cap 6874 with 2 additional  ridge caps 7843 and install ridge cap  6874 to rear of building     ES      E Do not fasten  7843        Weather Stripping 7843 Weather Stripping this end  6874 7 9  Do not fasten G D41032x7 16  Bolt     thi                           5           ri v Bs  1 A   5  STEP NS SS    36    Step 25    BW37    1 Attach the side roof trim to the    lower end of the roof panels on each  side of the building using screws at  each panel overlap     NOTE  A single screw fastens both trim    pieces at the overlap        2 Position left and 
3.    Foundation       The Foundation For Your Building    Concrete Slab    The slab should be at least 3  to 4   8 10cm  thick     must be level and flat to provide good support for the frame   The following are the recommended materials for your foundation     2 x 4 s  bcm x 10cm   will be removed once the concrete cures      Concrete 6 Sheet of 6 mil plastic      We recommend for a proper strength concrete to use a mix of   1 part cement   3 parts pea sized gravel 6 2 1 2 parts clean sand    Preparethe Site Construct a Foundation   1  Dig a square  6   15cm  deep into the ground  remove grass     2  Fill up to 4   10cm  in the square with gravel and tamp firm    3  Cover gravel with a sheet of 6 mil plastic    4  Construct a wood frame using four planks of 2x4  bcm x 10cm   lumber    5  Pour in concrete to fill in the hole and the frame giving a  total of 4   8 10cm  thick concrete  Be sure surface is level     Allow 3   5 hours for construction and a week for concrete curing time     Note  Before beginning construction  check local building codes    regarding footings  location and other requirements   Welded Wire    Fabric           Reinforcing  Rods       Se Reinforcing  Rods    Note  Finished Slab dimensions  with lumber removed     Anchoring    Anchoring Down The Building    It is important that the entire floor frame be anchored after the building is erected     Below are recommended ways of anchoring     Arrow Anchoring Kit   Model No  AK4 or 60298  Anchoring into Wood
4.    I    4 Lower Door Track  us    Step 29    BWAI    1 Layout the door panels on a flat    surface  protecting the panels from  being scratched     2Bolt the middle stiles at the center    of the 3 door panels where indicated  with  10 32x3 8  bolts on the outside  and square nuts inside            the door panel bottom sec   tion  attach the right bottom brack   et to the lower right corner and the left  bottom bracket to the left side using   10Bx1 2  truss head screws into  end stiles     4            install bottom angle to the    bottom section using  10 32x3 8   bolts and square nuts  Insert vinyl  weather strip between angle and  bottom section and tighten bolts     B Fasten 2lifthandles to bottom sec     tion  just below the bottom of middle  stile using 1 4 20x1 2  hex head bolts  and 1 4 20 square nuts     Ginstall the  1 hinges at the upper    corners and to the middle stile of the  bottom section using  10Bx1 2  truss  head screws     NOTE  Be sure you fasten the lower part    of hinge to the top of each stile   The top hinge leaf is marked          Parts Needed For    Bottom Section Roll Up Door   5155 vinyi Weatherstap  1     PIER  1 Hinge  ET E            9286 Door Panel  Bottom   1         10 32x3 8  Bolt    se  amp  Square Nut               Raised  MIDDLE Rib On  STILE   Top   10Bx1 2  Truss          1 Hinge  Head Screw _ EA   7 E  _ S   SS 3    1 4 20x1 2  Hex  Head Bolt             1 4 20 Square             Nut Lift Handle     10 32x3 8  Bolt       BOTTOM S
5.    Owner s Manual  amp  Assembly Instructions    Model No     704880801        123111 697 68887             ll    VT1210       BUILDING DIMENSIONS   Size rounded off to the nearest foot     Approx   Size    12 x 10   12 x17   12 x24   12  x 31     3 7m x 3 1m  3 7m x 5 2m  3 7m x 7 3m  3 7m x 9 5m    Foundation  Size    141 1 8  x 111 3 4   141 1 8  x 198    141 1 8  x 284 1 4   141 1 8  x 370 1 2     3 58m x 2 84m  3 58m x 5 03m  3 58m x 7 22m  3 58m x 9 41m    Storage Area  Sq  Ft  Cu  Ft     110  194  278  362    801  1419  2037  2655    VT1217        gt         1224     697 68888           World s Leading Maker  of Storage Buildings     CAUTION  SOME PARTS HAVE SHARP EDGES  CARE  MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES  TO AVOID A MISHAP  FOR SAFETY SAKE  PLEASE READ  SAFETY INFORMATION PROVIDED IN THIS MANUAL  BEFORE BEGINNING CONSTRUCTION  WEAR GLOVES  WHEN HANDLING METAL PARTS     Exterior Dimensions   Roof Edge to Roof Edge     Width    146 1 8   146 1 8   146 1 8   146 1 8     Depth    117   203 1 4   289 1 2   375 3 4     Height    103 1 4   103 1 4   103 1 4   103 1 4        Interior Dimensions   Wall to Wall    Width Depth Height   141 1 8    141 1 8    141 1 8    141 1 8     111 3 4   198   284 1 4   370 1 2     102   102   102   102     BEFORE YOU BEGIN          Owner s Manual    Before beginning construction  check local building codes regarding footings  location  and other requirements  Study and understand this owner s manual    Important information 
6.    fasten using 2 bolts and nuts     4 Fasten side wall channels to the    corner panels using screws  Fasten  overlaps in corners using bolts     5 Fasten support column io side  frame and side wall channel using  bolts and nuts where shown  Fold  corner panel slightly away from col   umn to fasten bolts from outside  See  Step 12 for rear door installation          Parts Needed For    Frames  12x17  12x24  amp  12x31    The mid frame pieces give rigidity to  the side and rear wall         Rear Frame Assembly  1     7834 Right Front Frame  1       7837 Side Frame  2        6228 Frame Support  4      7835 Left Front Frame  1    7949 Side Wall Channel  1     7917 Truss Column  see below    7951 Support Column  1     7914 Side Frame  see below     Step 8        21                         5              side frame 7837 to the  Each side of building will have 2 column frontcorner panel using screws  Fas   assemblies and 2 extra side frames 7914  tan overlap in corner  Fasten oppo   site end to the frame support on truss  column  using 2nd set of holes  This  will leave a gap between side frame    NOTE  Before installing mid frames  decide at which location you  want the entrance door  Do not    IF YOU ARE BUILDING A 12x31  Each side of building will have 3 column  assemblies and 4 extra side frames 7914     install the 1x2 mid frame at 1 of 3  locations     1 Fasten a rear frame assembly to  the main wall panels using screws     2 Fastena right andleftfront frame  tothe front wal
7.   Wash off inked part numbers on coated panels with soap and water     Silicone caulking may be used for watertight seals throughout the building     Do not store swimming pool chemicals in your building  Combustibles and    corrosives must be stored in air tight approved containers        Keep this Owner s Manual and Assembly Instructions for future reference     ACCESSORIES           ROOF STRENGTHENING  heavy snow load  KITS Extra roof beams and gable braces    designed for added protection against heavy snow accumulation  Increases the strength of your roof by 50   qu    ANCHOR KIT    Model No  AK4   Anchor Kit contains heavy duty steel  augers  60   18m  of steel cable and 4 cable   clamps  No digging or concrete  tm    ARROW  pouring  just insert cable under roof  LARR  over roof beams  into augers and twist    augers into the ground  For buildings    larger than 10 x9   use 2 kits         FLOOR FOUNDATION KITS        MODELS FB47410  FB5465  FB106 A  FB109 A  FB1010 AND FB1014 A  A simple new floor frame system made of heavy duty  hot dipped  galvanized steel  Use as foundation for plywood  sand or stone     TOOL HANGING RACK    Model No  TH100   The perfect tool organizer  Twin  25 1 2   65cm  steel channels  plus five heavy duty snap in  amp     hangers and a small tool holder for     screwdrivers  pliers  etc  Holders  slide along channel for fully  adjustable spacing  Great for  garage  basement  or the back  of any door  Fits all Arrow  storage buildings            
8.   amp  screws     2install single roof beams 7833 to  the gable braces at the front section          and fasten a left gable assem   bly in the same manner     A Join left and right gables together    with a center gable brace using 3  bolts and nuts  at middle holes     5 Apply weather stripping along the  mating edge of the leftand right gables  as shown  Cut the weather stripping  to length           Weather Stripping  STEP  5    28      Parts Needed For 6    Roof Beams 12x17  12x24  amp  12x31                                       Right Gable Assembly  1      7833 Roof Beam  4      Left Gable Assembly  1      6382 Center Gable Brace  1     7833 Roof Beam Assembly  1     6372 Gable Strut  2        Ginsiall single roof beams to the left  side of building in the same manner   Slide a roof beam assembly 7833  over center gable flange and other end  over center gable braces on truss and  fasten using bolts  amp  nuts     TFasten a gable strut to the middle    roof beam behind the front gable by  placing tab on end of strut be weerrthe  roof beams  Align the tab with holes  and fasten strut with 2 bolts     Grasten the lower end of the strut to  center gable flange with 2 bolts     Qaithe truss assembly the gable struts    are attached between the middle roof  beam and center brace     NOTE    Do not tighten bolts and nuts  until all struts are assembled               10 32x7 16  Bolt    a eS           A E  gm    7833      EA ERR    6372       Right Gable Assembly  1   o Parts 
9.   ap       Assembly by Key No             es    o           gt     SS           ES              2  Omen N  E   X R  A  p N   6     ta     N NN      LU  S N N   V  iff CN f zs        Vi    hg     S N       ji 4  amp  Whe Ww                        Hardware for Roll Up Door       65101  16   1 4 20 Square Nut   Packed with Screws        66432  4   3 8 16x1 1 2  Hex  Head Bolt    67525  Inside  T  Handle     1     67504  Inside Latch Bar  Spacer  1     67491   2 Hinge   2     14    66464  2   1 4 20 1 1 2  Hex  Head Bolt       66433  4   3 8 16 Hex Nut    67483  Cable Lacer     2     67482  Keyed Cable     2     67493  Top Fixture   2     67500  Spring   2     65989  6   1 4 20x1 2  Hex  Head Bolt     Packed with Screws     66434 2   1110 32 x 2 1 2  Flat  Head Bolt    67484  Spring Clevis   2     67485  Left Bottom  Bracket 1     67494  Lift Handle   2     67528 Latch Set   1  Flat Latch Bar   4      Hooks   2  Strikers   2  Spring Latches   2  Latch Chains    65106  16    10 32 Square  Nut    65900A  38    10Bx1 2  Black  Truss Head Screw   Packed with Screws     67488  Heavy  S  Hook   4     67486  Right Bottom  Bracket  1     67496  Roller     8     67513  Spring Restraint  Cable  2     66431  8   1 4 20x5 8  Rib  Neck Bolt    T    66441  14    10 32x3 8  Bolt    67503  Stile Spacer   2     67490   1 Hinge     4     67497  Sheave     4     67526  Locking Handle     1     Step    TrussAssembly    BWIS    1 Assemble 1 2truss atatime  using   10 32x7 16  bolts and square nuts   
10.  8Ax5 16  Screw   um       Weather  Stripping    5th overlaps  Remember  the crimped 7828          rib is always overlapped by wide rib of STEP EJ  adjacent panel  Repeat procedure with 2 Ea  more middle roof panels working side to  side  EN       m  LEFT ROOF PANEL 1 T  5  MIDDLE ROOF PANELS    T RIGHT ROOF PANEL      T      vi                 gt                        FRONT d d L NEAR  1ST 2ND 4TH 5TH      7828 Middle Roof Panel  2     Parts Needed For      7843 Ridge Cap  1     Step 23 Ridge Caps 12x10    7827 Left Roof Panel  1       6874 Ridge Cap  1     BW35       1 Temporarily remove right rear roof  panel     2install 2 middle roof panels  Fas     ten 2nd roof panel rib overlaps with a  bolt and nut  Press 2 strips over the  bolt heads  Continue weather strip     ping     install the right and left roof pan     els at the rear gables  Follow fas   tener sequence     Z Position a ridge cap 7843 on the  completed front roof section     DBinstall the second ridge cap 6874    overlapping the first ridge cap  Align  the holes and fasten using bolts     6Fasten the lower end of the panels  to the side top angle using screws     Weather Stripping 7843 Do not fasten    Do not fasten 6874 this end  this end P T  10 32x7 16  Bolt    SS              7828           7827            2  5      7828 Middle Roof Panel  see below     St 2 4   Parts Needed For      7843 Ridge Cap  see below        Z4 Ridge Caps 12x17  12  24  amp  12  319 7877 Left Roof Panel  1       6874 Ridge Cap  1 
11.  Post   Recommended for use with any suggested base  Use 1 4  Wood Screws  There are 1 4   0 63cm  dia   Contains  4 Anchors with Cable  Clamps and holes provided in the frames for proper anchoring     installation instruction     OVER THE BEAMS  AND INTO THE GROUND       Arrow Anchoring Kit   Model No  AK100 or 68383  Anchoring into Concrete    Recommended for use with the concrete foundation  1  For poured concrete slab or footing or patio blocks   Contains  Corner gussets  perimeter clips  hardware  Use 1 4  x 2  Lag Screws    1 4  masonary drill bit and installation instruction  2  For Anchor Post of Concrete poured after building is    erected  Use 1 4  x 6  Lag Screws           Hardware for Building    T o    T    65004 65101 65106 65943   8Ax5 16  Screw  403  1 4 20 Square Nut  10   10 32 Square Nut  200   10 32x7 16  Bolt  194    190   Carton 4   Packed with Screws   184   Carton 4   184   Carton 4   Remove from bag of screws  and save for the Step 28             65989 65900   65914  1 4 20x1 2  Hex Head Bolt  10  65408 1H0Bx1 2  Black Screw  2   6Ax7 8 Screw  5    Packed with Screws   10 32x1 4  Bolts  4   Packed with Screws   Packed with Screws        T       66646 66444  Washer  600  Roof Trim Cap 66446  Arrow Logo  66610  No Slot    320   Carton 4   2 right  amp  2 left  Peak Cap  2   10 32  7 16  Bolt  2        67293 10  66265  7972 67545 21  Weather Stripping  1  Edge Trim  4   DoorHandleLockBracket 1  Weather Stripping  1   Carton 4   Carton 4              6609
12.  holes  toward outside of building      Parts Needed For    Step 5 Floor Frame Assembly  12x17  12x24  12x31    BWI8    The rear floor frame is made up of 2  pieces  The holes in these pieces  will align when the pieces are posi   tioned with correct amount of over   lap  The illustration below shows the  proper overall length for the rear     1 Overlap right andleftrearframes   align holes  and fasten using 8 bolts  and nuts  Make 3 assemblies  Use 1  assembly for this step     2 Position floor frames as shown    and fasten at each corner using 2  bolts through the bottom and nuts on  top  When installing side frame 7914   be sure set of holes 1 in from end of  frames are installed toward rear of  building     NOTE  Position of holes  and fasten at    the 1st set of holes  See side  connection     4 Measure the floor frame diago     nally  When the measurements  are equal  the floor frame is square     5 Select location of side door on  either side  toward the rear of build   ing  Install lower door track and  ramp  notch toward outside  using  1 4  bolts and nuts  See Step 12 for  Rear Door Installation     NOTE  Do not fasten the floor frames to  your foundation at this time   You will anchor the building  after it is erected     3 Fasten side frames together witha    truss support using 4 bolts through  the bottom and nuts on top      10 32x7 16  Bolt    n li   ij     7857    amp   STEP     10 32 Square Nut       7834 Position with small holes  18     towardoutside of bui
13.  the 3rd hole onthe support angle of  the horizontal track using 3 8   16 x   1 1 2  hex head bolt  amp  3 8 16 hex nut     5 Position third door panel top sec   tion on second panel  Fasten top of  hinges to bottom of third door panel  using  10Bx1 2  truss head screws     OEngage roller with top fixture  slide  roller into horizontal track  Move as   sembly to line up with holes in end  stile and fasten with  10Bx1 2  truss  head screws                ROOF BEAM        10 32 Square Nut  1 4 20 Square Nut    el     10 32x7 16  Bolt    1 4 20x1 1 2  Hex  Head Bolt  67476    __ Be 1 4 20  1 2 Hex STEP    Head Bolt ES    67475  1 4 20x1 2  Rib  Neck Bolt     1 0 32x7 1 6  Bolt 7857    3 8 16x1 1 2  Hex  Sh  3rd HOLE pave Head Bolt    ss  d        3 8 16 Hex Nut     10Bx1 2  Truss  J Head Screw     amp   VL    Top Fixture          END STILE    Door Panel  Top  STEP        44    Roll Up Door       CAUTION   FROM THIS POINT ON  BE SURE CHECK  TO USE EXTHEME CAUTION Be sure that the lift cables do not rub and or the rollers do not  UNTIL THE DOOR IS PROPERLY bind in the track when door is opened or closed  Recheck the  SPRUNG AND OPERATING springs to be sure that there is equal tension on both springs  This       1 is extremely important for proper door operation   1 Attach  S  hooks to both springs  ADJUST    Fasten sheave and spring clevis to  opposite ends of springs using a 3 8   16x1 1 2  hex head bolt and 3 8 nut   Attach spring assemblies to spring    Springs by changing loca
14.  using  6Ax7 8  screws and spacers   Position spacer inside wall panel rib     3Fasten outer flange of door jamb to  wall panel using 3 screws     Asecure the door handle lock    bracket to the opposite door jamb at  the middle hole with a  no slot  bolt     Inside of  Building    26      7946 Door Jamb  2     7948 Door Wall Brace  1     Parts Needed For     7972 Door Handle Lock Bracket  1     Side or Rear Entry Door All Sizes       7 8   SCREW   TOP  amp  BOTTOM   OR    BOLT   AT CENTER     DOOR       PLASTIC SPACER BETWEEN    WALL PANEL RIB AND TRACK Drill 1 4     Hole  amp  Bolt       Ey Remove and reinset    screws from panel    ion of Sliding Doo        Direct     10 32x7 16    No Slot  Bolt    Step 1 4   Parts Needed For      7840 Right Track Support  1     Track Supports All Sizes    7841 Left Track Support  1     BW27         bolts from the inside and nuts out   side     NOTE    Flanges on track supports  zus   face towards front of building      10 32  7 16  Bolt       7840         Parts Needed For    Step 15 Truss 12x17  12 x24  amp  12    3 1   Truss Assembly  see below        IF YOU ARE BUILDING A 12x24  1 Position Truss Assembly on build  Install 2 trusses on truss columns       n IF YOU ARE BUILDING A 12x31  Ing by sliding truss upper chords over Install 3 trusses on truss columns  truss columns and fasten with 6 bolts   and nuts on each side      10 32x7 16  Bolt       27    Step 16    BW28    1Liftandfastena right gable assem   bly attop of lintel using bolts
15. 8 66242 66260 66382  Plastic Spacer  5  Door Slide  2  Handle  2  Lower Door Guide  2        11    Parts List    Carton  4 of the VT1217 can be deleted for a complete 12 x10  building  or more than one carton  4 may be used to extend depth in multiples of 7      Assembly Part Part  Key No  Number Description Carton 1 Carton 2 Carton 3 Carton 4    Truss Lower Chord  Truss Upper Chord  Center Gable Brace  Truss Diagonal   Mid Gable Brace  Outer Gable Brace  Splice Plate   Right Front Frame  Side Frame   Side Frame   Right Rear Frame  Left Rear Frame  Left Front Frame  Truss Support  Corner Wall Panel  Front Wall Panel  Main Wall Panel  Frame Support  Truss Column  Front Column   Lintel   Side Top Angle  Side Top Angle  Medium Wall Panel  Roof Beam   Roof Beam   Right Gable   Left Gable   Right Track Support  Left Track Support  Gable Strut   Left Roof Panel  Right Roof Panel  Middle Roof Panel  Ridge Cap   Ridge Cap   Side Roof Trim  Side Roof Trim   Left Rake   Right Rake   Spring Support Bracket  Right Door Jamb  Left Door Jamb  Lower Door Track  Ramp   Side Wall Channel  Side Wall Channel  Support Column  Door Track   Door Jamb   Door Wall Brace  Door   Door Handle Brace  Vertical Door Brace  Horizontal Door Brace  Splice Channel  Door Panel  Bottom   Bottom Angle   Vinyl Weatherstrip  Door Panel  Lock   Right Vertical Track  Left Vertical Track  Right Horizontal Tack  Left Horizontal Track  Door Panel  Top    BWI2                            WM oL a                          
16. AM              SLOTTED  HOLES AT  TOP  FASTEN    i  AT SCREWS TO FASTEN  OVERLAP TO GABLE    ROOF BEAM         SMALL      Parts Needed For      7828 Middle Roof Panel  2     Roof Panels 12x10       1 Position middle roof panel over   lapping rib of left corner roof panel   Fasten overlap at center of roof panel  rib using a bolt and nut  Fasten to roof    beams as before using screws   SLOTTED  HOLES AT  TOP    MIDDLE ROOF PANEL  SCREWS TO ROOF BEAM         2cut the weather stripping tape             into 4 strips  each strip being about 2  FASTEN SCREWS TO   5cm  long  AT ROOF BEAM  OVERLAP    SMALL               the joint at the peak with HOLES  weather stripping tape  Unrollthetape Follow Fastener Sequence SOON    and press it down over the opening at  the ridge as you install each roof  panel  Do notcutthe tape atthis time            Weather  Stripping    7828   8Ax5 16  Screw  Weather Stripping 27    g f   g      Crimped Rib is Always Overlapped d e    by Wide Rib of Adjacent Panel bs          10 32 Square Nut        Ainstall    middle roof panel on the    left side of building  At the top roof  beam end of panels  fasten 1st roof  panel rib overlaps with a bolt and nut   Press 2 strips over the bolt heads   Save the other 2 strips for the next  overlap  Remember  the crimped rib    is always overlapped by wide rib of      MIDDLE ROOF  T       adjacent panel  LEFT ROOF PANEL PANELS RIGHT ROOF PANEL    Step 22               BW34    1 Position middle roof panel over   lap
17. ECTION  END STILE  RH          LH  Bottom Bracket     RH  Bottom Bracket   Shown      10Bx1 2  Truss  Head Screw    41    Step 30    BW42    T   with the key  unlock the outside    locking handle and rotate the han   dle to a vertical position  Insert the  square shank through the hole locat   ed in the center of door panel lock  section  Slide in the stile spacers  and insertthe  10 32  2 1 2  flat head  bolts through handle  spacer and stile   Secure with square nuts and tighten     2Turn the locking handle to a hori   zontal position  Slide the inside latch  bar spacer over the square shank of  the lock handle and slip the flat latch  bar over shank  Secure with the in   side  T  handle  Tighten set screw  in handle  Attach small  S  hooks to  holes on the flat latch bar  Slip oppo   site end of  S  hooks through latch  chains                  the spring latches to the    end stiles on the lock section  Attach   S  hooks to the holes on top of the  latches  Attach the latch chains to the   S  hooks so that the chain is taut     Hint  If chain is too tight  latches will  not engage strikes  on track  prop   erly  If chain is too loose  the lock  handle will not retract latches  Adjust  chains by changing the hole location  of  S  hook through chain     Attach  2 hinges to lock section at    the upper corners of end stiles  Fas   ten  1 hinge to the middle stile     Hint  When installing hinges  be sure    the hinge number is always on the  lower hinge leaf     42    Lock Se
18. Needed For o   Left Gable Assembly  1     Step 17   Roof Beams 12x17  12x24  amp  12  31   5 2 cemer Gavi erase tn     BW29   6372 Gable Strut  2        1 Fasten gables to rear frame using  all screws     2install single roof beams 7912 and    center gable brace to rear section in  the same manner     3Fasten roof beam assembly 7912  and struts as before     Arasten gable strut to rear of build   ing     GABLE       8Ax5 16  Screw         REAR FRAME  DOOR TRACK    NOTE  For rear entry door installation only  use 3 32  dia  drill to clear gable holes  through rear frame into track  STEP 1  3 STEP  Sois    STEP     10 32 Square Nut Fe Ea  Mo    7 3  10 32x7 16  Bolt  SS Sw              dE   2   3    S Se l            o a           amem A       z                Step 18    BW30     Lift and fasten a right gable as     sembly at top of lintel using bolts  amp   screws     2Lift and fasten a left gable assem   bly attop of rear frame using screws     Binstall single roof beams to gable  braces using bolts and nuts     Arasten gables to left side of build   ing in the same manner     Spread Two Halves  Of Roof Beams       Weather    Y  Stripping   STEP     uu   6         Right Gable Assembly  2      Left Gable Assembly  2      6382 Center Gable Brace  2     7833 Roof Beam  4      7833 Roof Beam Assembly  1     6372 Gable Strut  2       Parts Needed For    Roof Beams 12x10       8Fastena gable strut to the middle    roof beam behind the front gable by  placing tab on end of strut bet
19. Spade or Shovel    Hand Saw   Power Saw  e Lumber and or Concrete       Selecting and Preparing Your Site  Before assembly  you will want to decide on  a location for your building  The best location is a level area with good drainage      Allow enough working space for ease of moving parts into position during assembly  Be sure there  will be enough space at entrance for doors to open fully and enough space around the building to    be able to fasten the panel screws from the outside      Before you begin the first steps in assembling your parts  a foundation should be constructed and    an anchoring system should be ready to use     SAFETY FIRST           Safety precautions are important to follow throughout the construction of your building      Care must be taken when handling various Practice caution with the tools being used in the  pieces of your building since some contain assembly of this building  Be familiar with the  sharp edges  Please wear work gloves  eye operation of all power tools     protection and long sleeves when assembling  or performing any maintenance on your build     ing        v  safety edge      Keep children and pets away from worksite to  Do not attempt to assemble the building if parts   avoid distractions and any accidents which are missing because any building left partially   may occur  assembled may be seriously damaged by light    winds  Call 1 800 851 1085       un  Never concentrate your total weight on the      not attempt to assemble t
20. and helpful tips will make your construction easier and more  enjoyable     Assembly Instructions  Instructions are supplied in this manual and contain all  appropriate information for your building model  Review all instructions before you begin   and during assembly  follow the step sequence carefully for correct results     Foundation and Anchoring  Your storage building must be anchored to prevent wind  damage  A foundation is also necessary as a base in order to construct a square and level  building  Anchoring and foundation materials are not included with your building  We  recommend the combined use of an Arrow Floor Foundation Kit and an Arrow  Anchoring Kit as an effective method of securing your building to the ground  Available  by mail order or at your local dealer  or you may construct the foundation and anchoring  system of your choice  Your assembly instructions provide information on a few methods  commonly used to secure and level a storage building     Parts and Parts List  Check to be sure that you have all the necessary parts for your  building      All part numbers can be found on the parts  All of these numbers  before the    must agree with the  numbers on the parts list  The parts list is located on page 12     elf you find that a part is missing  include the model number of your building and contact   Arrow Group Industries  Inc  Customer Service Department  Route 50 East Breese  Illinois 62230   1 800 851 1085     Separate contents of the carton by 
21. ange to front wall panel  using screws and washers       7830 Right Door Jamb  1     7829 Left Door Jamb  1           Step 35 Spring Restraint Cable      Sizes    BW47       1 After door has been completely in     stalled  raise door to a full open posi   tion  Remove nut from bolt holding  the horizontal track to the spring sup   port bracket  but do not remove bolt     25   keyed end of spring restraint    cable over shaft of bolt  Replace nut  and tighten securely     StThread spring restraint cable  through spring  making sure cable  goes through spring loops on each  end of spring  Fasten to hole shown  on angle of the horizontal track using  a  10 32x3 8  bolt and square nut  through keyed end of cable     ARepeat above installation proce   dure for the other spring        NOTE  This spring restraint cable has been  manufactured in accordance with require   ments of the California Department of  Housing and Community Development  EN   10 32 Square Nut g       Spring Restraint Cable     QD  ae SSS     10 32x3 8  Bolt    47    VT1210 VT1217    697 68887    VT1224  697 68888    VT1231       SOME FACTS ABOUT RUST   Rusting is a natural oxidizing process that occurs  when bare metal is exposed to moisture  Problem  areas include screw holes  unfinished edges  or  where scrapes and nicks occur in the protective  coating through normal assembly  handling and  use  Identifying these natural rusting problem areas  and taking some simple rust protection precautions  can help to s
22. arts Needed For     7560 Ramp  1   Step 12   8530 Splice Channel  1     Rear Entry Door All Sizes     7951 Support Column  1   BW25   7958 Door Track  1        Using the previous side entry door  steps and this illustration  you can  install the entry door at 2 locations  along the rear wall  Whichever you  choose  the door will always slide  towards the corner of the building     1 Install lower door track and ramp  using 1 4  bolts and nuts     2Fasten splice channel  upside  down  to rear frame and to support  column using bolts and nuts  and to  wall panel using screws  Fasten sup   port column to rear frames using bolts  and nuts  Fold rear wall panel slightly  away from column to tighten bolts  and nuts     3Position door track to the inside of  the rear frame  butted up against sup   portcolumn  With short flange of track  at bottom  fasten frame to track using  4 screws at the 2nd  3rd  4th and 5th    hole in from support column  STEP STEP         3j  2     Step 13  Ten 7951    pu   E       E  li i   7  Door Location  Option                    7517 a  STEP   e  ES INSIDE OF  BUILDING 25    8530          Step 13    BW26    The door jambs reinforce the door  opening and provide an attractive  trim  Follow these steps for both door  jambs     1 Place door wall brace behind wall    panel in the direction of sliding door   Fasten panel to brace using screws     2 Overlap rib of wall panel with a    door jamb and fasten attop to angle   middle to brace  and bottom to frame 
23. atch strikers loosely  to vertical tracks using 1 4 20x1 2     rib neck bolts and square nuts       1 4 20x1 2  Rib Neck Bolt       itt the bottom section and insert    the rollers into the vertical tracks  Slide Square Nut  the panel down and level across top   Shim to level if necessary     Dinsert lock section into vertical  tracks  Attach hinges from  1 to  2  panel by inserting  10Bx1 2  truss  head screws at bottom edge of lock  section  Do not fasten the last door    panel at this time    2 Lock Section    7848        1 Bottom Section    Step 32      Parts Needed For 6      7913 Spring Support Bracket  2      67476 Right Horizontal Track  1     67475 Left Horizontal Track  1     Horizontal Track Roll Up Door    7857 Truss Support  2        7847 Door Panel  Top   1        1 Install spring support brackets to    the roof beams using  10 32x7 16   bolts and  10 32 square nuts     2 Attachthe right and left horizontal    trackto right  amp  left vertical track using  bolts and nuts shown loosely     3Fasten horizontal tracks loosely to  spring support brackets using 1 4   20x1 2  hex head bolts and 1 4 20  square nuts  Remove lower bolt at  gable end of roof beam  Position  truss support with 2   5cm  flange  against roof beam  Replace bolt to  fasten support  brace and roofbeam   Fasten opposite end to vertical track  angle at the 3rd hole in from the end  using  10 32x7 16  bolt and  10 32  square nut  Tighten all bolts and nuts     Z Attach the sheave  pulley wheel   to
24. ction Roll Up Door    Inside  T  Handle      Parts Needed For 6      7848 Door Panel  Lock   1        Middle Stile   10 32 Square Nut       Locking Handie       Stile Spacer  STEP  Inside Latch Bar Spacer  l   S  Hook Middle Stile         Set Screw    Flat Latch Bar        Latch Chain    End Stile           S  Hook    Center of  10Bx1 2  Truss Head Screw  End Stile  Spring Latch  Latch Chain                                                                Hinge Location Only        Do Not Join Panels Together     3 Top Sect          3 Top Section           2    1 D  2     2 Lock Section        16     1  D  1              Step 31   Parts Needed For e   67510 Right Vertical Track  1     Vertical Tracks Roll Up Door     67509 Left Vertical Track  1        BW43    NOTE    When rib neck bolts are inserted  2 Hinge  in the track  use bolts with heads    located on the inner side of the  track to prevent interference with  the movement of the rollers              Insert Roller Shaft    1Insertthe roller shaft into the barrel only in barrel hole    shown    holes on the hinges furthest out from              the face of the end stiles on both ISTEP  B    panels  Note that  1 hinge has only E  one barrel  Insert rollers through the Left Track Support    tabs on the bottom brackets on bot    CE  tom section           B      2 Attach right and left vertical tracks  loosely to right and left track supports  using 1 4 20x1 2  hex head bolts and  square nuts    Square Nut B   SAttach spring l
25. er until a wall panel is attached   FRONT    2 Attach the front wall panels to the           front corner panels  as shown  7822  S N   3 Attach the main wall panels to the   rear corner panels  as shown                 Be careful to install the correct    panel in each position as shown        4 Double check the part numbers of  the wall panels  before proceeding     The floor frame must be square  and              holes will not align                                   Wash   8Ax5 16  Screw p   7824  7825  LIke 7825  id  10 32 Square Nut       STEP              10 32x7 16                              Parts Needed For 6    Frames 12x10    Hear Frame Assembly    7834 Right Front Frame  1     7835 Left Front Frame  1     7837 Side Frame  2     7950 Side Wall Channel  1     7949 Side Wall Channel  1     7951 Support Channel  1       The mid frame pieces give rigidity to  the side and rear wall     NOTE  Before installing mid frames  decide at which location you    want the entrance door  Do not  install the 1x2 mid frame at 1 of 3  locations        1 Fasten a rear frame assembly to  the main wall panels using screws     2 Fastena right and left front frame  to the front wall panels the same way                  7951        10 32  7 16  Bolt 7834       L    7950  Cre 295    1 em    T  id 16  Screw            zi    patos lt    V    Oi mE 2225  ve t o gt     i ehhh       20       3 Fasten side frame to the corner  panels using screws  Where rear  frame overlaps side frame in corner
26. he building on a  roof of the building  When using a step ladder windy day  because the large panels acting as a  make sure that it is fully open and on even  sail   can be whipped about by the wind making  ground before climbing on it  construction difficult and unsafe      lt   JA  4    CARE  amp  MAINTENANCE          Finish  For long lasting finish  periodically clean and wax the exterior surface  Touch   up scratches as soon as you notice them on your unit  Immediately clean the area with  a wire brush  wash it and apply touch up paint per manufacturer s recommendation     Roof  Keep roof clear of leaves and snow with long handled  soft bristled broom  Heavy  amounts of snow on roof can damage building making it unsafe to enter  In snow country   Roof Strengthening Kits are available for most Arrow Buildings for added protection  against heavy snow accumulation     Doors  Always keep the door tracks clear of dirt and other debris that prevent them from  sliding easily  Lubricate door track annually with furniture polish or silicone spray  Keep  doors closed and locked to prevent wind damage     Fasteners  Use all washers supplied to protect against weather infiltration and to protect  the metal from being scratched by screws  Regularly check your building for loose screws   bolts  nuts  etc  and retighten them as necessary     Moisture  A plastic sheet  vapor barrier  placed under the entire floor area with good  ventilation will reduce condensation     Other Tips        
27. l panels the same way     3 Attach 4 frame supports to the    middle of the 2 truss columns using  2 bolts and nuts on each        Fasten side frame 7914 to the rear  corner panel using screws  Be sure  set of holes 1 in from end of frame is  installed toward rear of building   Where rear frame overlaps side frame  in corner  fasten using 2 bolts and  nuts  Fasten opposite end to frame  supporton truss column  using 2 bolts  and nuts in the 1st set of holes  Fas   ten truss support to truss column at  bottom with 1screw at the 1sthole on  column  Support column assembly  with step ladder        ego    7834       t  1  1  Hu     10 32 Square Nut                        and truss column     6 Fasten side wall channel to the  rear corner panel using screws     7 Fasten support column to side  frame and side wall channel using  bolts and nuts where shown  Fold  corner panel slightly away from col   umntofasten bolts from outside  See  Step 12 for rear door installation                             1stSET    OFHOLES         OF HOLES    Fora 12x24 building repeat  column procedure here    7914            8Ax5 16  Screw     e  Support this truss column with a    step ladder until next step           Parts Needed For 6    Frames 12x10    e 7834 4 Right Front Frame  1     7835 Left Front Frame  1       7831 Lintel  1        Rear Frame Assembly  1     7838 Side Top Angle  2        7958 Door Track  1       The top frame pieces give rigidity to  the side walls and provide a surface  for at
28. lding      8532 Right Rear Frame  1     8531 Left Rear Frame  1       7914 Side Frame  see below      7857 Truss Support  see below     7517 Lower Door Track  1              Notch toward outside    mE         7837 Side Frame  2     7834 Right Front Frame  1     7835 Left Front Frame  1       7560 Ramp  1        IF YOU ARE BUILDING A 12x24   Fasten additional side frame 7914 andtruss  support 7857 to side frame 7914 using the  side connection  Position rear frame atrear  of assembly and fasten using the rear  corner connection     IF YOU ARE BUILDING A 12x31   Fasten 2 additional side frames 7914 and  truss supports 7857 to side frame 7914  using the side connection  Positon rear  frame atrear of assembly and fasten using  the rear corner connection               nif Rear Frame 140 7 8   3 6m    Slot       of building                 T  10 32x1 4  Bo    P  ae  ae        7517 i  Side Frame      Parts Needed For     7824 Corner Wall Panel  4         7825 Front Wall Panel  2   Step 6 Corners All Sizes    7822 Main Wall Panel  2         19       Narrow  Side        Each screw and bolt in the wall re  T24    quires a washer  Wide Side    REAR  1 install a corner wall panel at the 7824  corner of the floor frame as shown   The widest part of each corner panel  must be placed along the side of the  building for all 4 corners  Fasten the SIDE TOP VIEW SIDE  corner panel to the floor frame with 4  screws     Support the corner panel with a ste STEP i  PP            7824 qd 7824    ladd
29. oles         Assembled    End  View         10 32 Square Nut  A 7912   10 32x7 16  Bolt    16    5 Hi ig       8531 Left Rear Frame  1       Parts Needed For   Sess caer       Step 4    Floor Frame Assembly 12x10   7835 Left Front Frame  1       7517 Lower Door Track  1          7560 Ramp  1       The rear floor frame is made up of 2 2 Position floor frames as shown 4 Select location of side door on    pieces  The holes in these pieces and fasten at each corner using 2  either side  toward the rear of build   will align when the pieces are posi  bolts through the bottom and nuts ing  Install lower door track and  tioned with correct amount of over  on top  ramp  notch toward outside  using  lap  The illustration below shows the 1 4  bolts and nuts  as shown  See    proper overall length for the rear     Measure the floor frame diago  Step 12 for Rear Door Installation     1   nally  When the diagonal mea   Overlaprightandleftrearframes    urements are equal  the floor frame NOTE    align holes  and fasten using 8 bolts is square  Do not fasten the floor frames to  and nuts  Make 3 assemblies  Use 1 your foundation at this time  You    assembly for this step     will anchor the building after it is  erected        he floor frame must be square  7560 and levelor holes will not align   ZAIN ERE IT   l     CHi Rear Frame 140 7 8  3 6m  SSS  v     7517 Side Frame MT        Slot        Notch toward outside  of building     10 32  7 16  Bolt    7837       7634    Position with small
30. on all connections loosely    2 Attach truss lower chord to truss  upper chord    3 Attach 2 center gable braces to  the upper and lower chords at the  opposite end of truss       Attach 2 truss diagonals to upper  and lower chords    5 Attach 2 mid gable braces to  upper and lower chords    6 Attach 2 center gable braces to  upper and lower chords at middle of  truss    7 Attach 2 outer gable braces to    upper and lower chords  Mount with  short leg of brace           5            7856 Truss Upper Chord  2       6382 Center Gable Brace  8      7739 Truss Diagonal  4     6381 Mid Gable Brace  4     6380 Outer Gable Brace  4      7738 Splice Plate  1      Parts Needed For    12x17  12x24  amp  12x31  ONLY    8 Square up 1 2 truss  adjust and  tighten     9 Make other half and square     10 Splice both halves together with    splice plate and fasten center gable  braces together  using 3 bolts and  nuts     11            pieces of edge trim in    half and slip overthe bottom edges of  gable braces  This trim is a must to  protect against injury from the sharp  edge    Make 1 assembly for the 12x17  Make 2 assemblies for the 12x24  Make 3 assemblies for the 12x31    NOTE   The day before construction ofthe building  complete the sub   assemblies so they will be ready  EXAMPLE  Truss  floor  frames  roof beams  gables  side and overhead doors  Setthe  assemblies aside  so they will not get damaged    The remainder of the building assembly requires more than  1 work session and m
31. onally  For Squareness    Use String To Straighten  Side Before Anchoring       Left Track 95  Right Track  Support  2 41m  Support    31      Parts Needed For 6    Step 20    BW32    Installing the roof panels is best done  with a step ladder  Each screw and  bolt in the roof requires a washer    Support lintel by propping up at cen   ter with a wood 2x4 until sag is gone  and there are no buckles in gables     1 Position a right roof panel at the  frontleft corner and fasten to the gable  and roof beams using screws and  bolts as shown  Do not fasten the  lower end ofthe panels to the side top  angle at this time     Hint  Follow the fastener sequence  shown  for proper alignment     7826  1st PANEL          lt     7827  2nd PANEL    d    LEFT CORNER ROOFPANEL  SCREWS TO ROOF BEAM        n SLOTTED  HOLES AT  TOP    NOTE  If roof beam holes do not line up    with the roof panel holes  shift the  FASTEN  AT    building from left to right     may not be level  Shim the  corners until holes line up        AT  BOTTOM    Corner Roof Panels All Sizes     8Ax5 16  Screw   V Me                     7826 Right Roof Panel  2     7827 Left Roof Panel  1        2install the left roof panel forthe right    side in the position shown  Remove  lintel support     3Temporarily install a second right  roof panel loosely as shown  for re   moval later  Do not fasten left rear  panel at this time     6 thru 9    10 thru 13  14 thru 17  x 3    7826       RIGHT CORNER ROOF PANEL  SCREWS TO ROOF BE
32. or Track  1        5 Fasten side top angles 7915 to    the side walls and provide a surface Repeat side top angle assembly using 2 the truss column using ascrew andto  for attaching the gables which sup  additional angles 7915     port the roof     1 Fasten front columns to the bot   tom and mid front frames with bolts  andnuts  Flange with 2 holes at each  end must be facing outside  Fold  front panel slightly away from column  to tighten bolts and nuts    2 Fasten right and left front frame  to the top of front wall panels using 4  screws    3 Position lintel across top of frames  and columns and fasten with bolts     4 Position rear frame assembly    across top of main wall panels and  fasten using screws                          e      10 32 x7 16     IF YOU ARE BUILDING A 12x31  Repeat side top angle assembly using 4    additional angles 7915               SIDETOP  ANGLE       LONG  FLANGE    SHORT  FLANGE                      Ar      E  qp F    Bolt       rear corner panels using screws     6 Fasten side top angles 7838  under 7915 and fasten to front corner  panels using screws  Fasten over   lap  2 1 2  6cm  with 2 bolts and nuts   Side angles overlap front and rear  frames in the corners  Fasten sup   port column to side top angle using a  bolt and nut     T Position doortracktothe inside of  side top angle  butted up against sup   port column   With short flange of  track at bottom  fasten angle to track  using 4 screws at the 2nd  3rd  4th  and 5th hole in from sup
33. ore than 1 person  Do not continue  beyond this point if you do nothave enough time to complete  the wall assembly and can tie down the assembly overnight   Complete the roof and doors on the following day        Short  Mounting    Core    P  IMPORTANT   Square Up  Half Truss OR  Edge Trim    Mounting Flange of Brackets  Must Face Towards Center    Of Truss Assembly         10 32x7 16  Bolt        6381 Mid Gable Brace  4   Step 2    Parts Needed For      6380 Outer Gable Brace  4     1    7942 Right Gable  2   Gables      Sizes   7943 Left Gable  2     BWI6       The gables go on top of the front and  rear walls to support the roof beams   The gables are packed nested to   gether and might be mistaken as 1  piece  Carefully separate them be   fore continuing   10 32 Square Nut        1 Position mid and outer gable  braces on right and left gables     Short mounting flange of brace must  face center of gable  Fasten using T   10 32x7 16  bolts  washers and 6380 qo  square nuts  Assemble 2 sets of    o  gables   10 32  7 16  Bolt      7042          Short Mounting Flange  Must Face Towards  Center of Gable      7833 Roof Beam  2   All Sizes   St 3   Parts Needed For e    7912 Roof Beam  2   1217           Roof Beam Assemblies    7912 Roof Beam  4   1224     7912 Roof Beam  6   1231        The roof beams join the gables to the  truss and supports the roof panels     TaAlign the holes on 2 roof beams     back to back and fasten using 4  10   32x7 16  bolts and square nuts  Small H
34. ping rib of left corner roof panel   Fasten overlap at center of roof panel  rib using a bolt and nut  Fasten to roof  beams as before using screws     2cut the weather stripping tape    into 8 strips  each strip being about 2    5cm  long     3Cover the joint at the peak with  weather stripping tape  Unroll the tape  and press it down over the opening at  the ridge as you install each roof  panel  Do notcutthe tape at this time     Alnstall a middle roof panel on the    left side of building  At the top roof  beam end of panels  fasten 1st roof  panel rib overlaps with a bolt and nut   Press 2 strips over the bolt heads     Weather Stripping     10 32x7 16  Bolt j       Save the other strips for the 2nd  4th and      Parts Needed For      anels 12x17  12x24  amp  12x31      7828 Middle Roof Panel   see below        IF YOU ARE BUILDING A 12x24   Cut 12 2   bcm  strips  There are 3 extra  middle roof panels on each side of building   Fasten 7th and 8th panel overlap and apply  strip over head of bolt  along with ridge caps     IF YOU ARE BUILDING A 12x31   Cut 16 2   bcm  strips  There are 6 extra  middle roof panels on each side of building   Fasten 7th  8th  10th  amp  11th panel overlap  and apply strip over head of bolt  along with  ridge caps     MIDDLE ROOF PANEL  SCREWS TO ROOF BEAM    SLOTTED  HOLES AT  TOP    FASTEN       7828                   SCREWS TO  ROOF BEAM    SMALL  HOLES    At Upper Chord  fasten rib with bolt   washer  amp  nut before screws are used   7 V 
35. port column   See Step 12 for rear door installation     23      Parts Needed For      Walls      Sizes      7822 Main Wall Panel  see below       7823 Medium Wall Panel  1        Each wall panel has a crimped rib on  1 side  The crimped rib should go  under the rib of the panel that follows  it  Leave out 1 main wall panel at the  side or rear entry door location     1 Fasten the main wall panels atthe  top and bottom with screws     2 Fasten center of each panel to the  mid frames with screws  Fasten over     lapping ribs using 2 screws and a    bolt with nut at the center     3 At the rear center of the building     fasten the medium wall panel in the  same manner        SCREWS TO FRAME    WIDE RIB 2   NARROW RIB  Hien A  HAS BEAD   X         S SCREW  TO RIB    SCREWS TO  FRAME            BOLT TO    PANEL    SCREW      7 TO RIB  VM i   SCREWS TO FRAME    MEDIUM WALL PANEL  24    I  ERR a   5       sy Square      pes a    Crimped Rib  Underneath     10 32x7 16  Screw    Washer  Tee        8Ax5 16  Screw    7822    IF YOU ARE BUILDING A 12x24  Install 3 additional main wall panels on  each side of the building     IF YOU ARE BUILDING A 12x31  Install 6 additional main wall panels on  each side of the building                  LEER    At the truss columns  fasten rib with bolt   washer  amp  nut before screws are installed     Detail Showing  Center of Panel Screwed  to Side Frame        Bolt and nut  does not go  thru side frame  atoverlap      7517 Lower Door Track  1     P
36. r re   quires a washer      8Ax5 16  Screw of  1 Attach the door handle brace and m a    handle to the door with 1 bolt as        m  shown  Dont tighten the bolt yet  zl    2 Swing the door handle brace up to    the hole in the center of the door and  insert a screw     SHold the vertical door brace  against the center of the inside sur   face of the door and turn the screw to  hold the vertical door brace and door  handle brace in place  Fasten to door  above and below center connection  using 2 screws     Ainsert a second bolt in the door  handle and tighten both bolts            a horizontal door brace onto    the top edge and bottom edge and  fasten with 7 bolt in the center     Gattach the lower door guides as    shown  END VIEW  SHOWING     Horizontal  Door Brace    39      Parts Needed For    Step 28 Side or Rear Entry Door      Sizes      Door Assembly  1        1 Position door slides onto the legs   from the end of door track  as shown  in the end view     2From inside the building  put the    bottom of the door behind door jamb  into the lower door track     3Position the top of the door so that    the holes in the door line up with the  holes in the door slides                    the door      the door slides  using a  10Bx1 2  screw     NOTE  he 4 holes in the top of door allo    you to adjust the door   Place the door slide in the  middle 2 holes        STEP  1      Adjustment Holes Allow  END   ij TOBE          Door to Meet Evenly    VIEW jl Along Its Length    
37. right rake to the  ends of roof  noting that rake slips  under ridge cap  butfits on top of side  roof trim  Fasten rake to the center of  roof panel rib using a bolt                Left Rake    M    ls     Peak Cap       Arrow Logo  Goes on Front  of Building    7846    Right Rake      Parts Needed For    Trim 12x10        10 32x7 16              5220 Side Roof Trim  2     6014 Side Roof Trim  2        7846 Right Rake  2      7845 Left Rack  2        Fasten roof panel rib  rake  peak    cap and ridge cap together using bolts  and nuts  Fasten remaining peak cap  in the same manner     Ausing your thumb and index finger     overbend the bottom flange of the side  roof trim at the corner inward enough  so the right and left roof trim caps fit  onto right and left corners     5 Fasten rake to side trim using ascrew  into roof panel     6Fasten the roof trim caps to the side  trim using a screw     3    7845         Su    5220    6014 Side Roof Trim  Roof Trim Cap    Tuck Flange   Inward to Fit     Inside of           Roof Trim Cap   8Ax5 16  Screw    37      5220 Side Roof Trim  see below        Parts Needed For       6014 Side Roof Trim  2   Step 26 Trim 12x17  12x24  amp  12x31    FEN RAS    BW38        Attach the side roof trim to the    lower end of the roof panels on each  side of the building using screws at  each panel overlap     NOTE    A single screw fastens both trim  pieces at the overlap        2Position left and right rake to the    ends of roof  noting that rake 
38. slips  under ridge cap  but fits on top of side    roof trim  Fasten rake to the center of IF YOU ARE BUILDING A 12x24  roof panel rib using a bolt  Install additional side roof trim 5220 towards  rear of building   3   IF YOU ARE BUILDING A 12x31  Fasten roof panel rib  rake  peak Install 2 additional side roof trim 5220 pieces  cap and ridge cap together using towards rear of building     bolts and nuts  Fasten remaining  peak cap in the same manner     Ausing your thumb and index finger     overbend the bottom flange of the  side roof trim at the corner inward  enough so the right and left roof trim  caps fit onto right and left corners     5Fasten rake to side trim using a PA    screw into roof panel         6Fasten the roof trim caps to the side  trim using a screw  Ne                SSS  Arrow Logo LA NA n 5220  353  Goes on Front _ AP    7846  STEP ISS  of Building 6014 Cr 4    Tuck Flang    5 V    Inward to Fit STEP  Roof Trim Cap         Screw Inside of Eg Ea  KA Roof Trim Cap    t  Zs  Sy    Peak Cap  38      7945 Door  1   Step 27    Parts Needed For e   3719 Door Handle Brace  1             7947 Vertical Door Brace  1   Side or Rear Entry Door All Sizes    6264 Horizontal Door Brace  2     BW39       NOTE  To assemble door to slide from  left to right  opening   position    door with handle holes on left side  of door  Position handle holes on  right side if door is to slide from  right to left  opening      7947                      Each bolt and screw in the doo
39. taching the gables which sup   port the roof     1 Fasten front columns to the bot   tom and mid front frames with bolts  andnuts  Flange with 2 holes at each  end must be facing outside  Fold  front panel slightly away from column  to tighten bolts and nuts    2 Fasten right and left front frame  to the top of front wall panels using 4  SCrews    3 Position lintel across top of frames  and columns and fasten with bolts     a q 5  8532    Dg 2  7834 7958    hn e                                      4 Position rear frame assembly    across top of main wall panels and  fasten using screws     5 Fasten side top angles to the    corner panels using screws  Fasten  support column to top angle using a  bolt     6 Position door trackto the inside of  side top angle  butted up against sup   port column  With short flange of  track at bottom  fasten angle to track  using 4 screws at the 2nd  3rd  4th  and 5th hole in from support column   See Step 12 for rear door installation             7831  8Ax5 16  Screw  EH  SIDE TOP  ANGLE e    FANGE SIEF ccs E    SHORT dm dp i    ol d 7839       7838  m   omm   10 32x7 16  Bolt SS  STEP      Parts Needed For 6  Frames    Step 10    BW23    The top frame pieces give rigidity to    IF YOU ARE BUILDING A 12x24        7839 Front Column  2     7834 Right Front Frame  1    7915 Side Top Angle  see below     7835 Left Front Frame  1     12x17  12x24  amp  12x31     7831 Lintel  1         Rear Frame Assembly  1       7838 Side Top Angle  2     7958 Do
40. the part number while reviewing parts list  The first few steps  show how to join related parts to make larger sub assemblies which will be used later      Familiarize yourself with the hardware and fasteners for easier use during construction  These are  packaged within the carton  Note that extra fasteners have been supplied for your convenience     PLAN AHEAD           Watch the Weather  Be sure the day you select to install your building is dry and calm   Do not attempt to assemble your building on a windy day  Be careful on wet or muddy    ground     Teamwork  Whenever possible  two or more people should work together to assemble  your building  One person can position parts or panels while the other is able to handle    the fasteners and the tools     Tools and Materials  These are some basic tools and materials you will need for the  construction of your building  Decide which method of anchoring and the type of  foundation you wish to use in order to form a complete list of the materials you will need       Eye Goggles   Work Gloves    No  2 Phillips Screwdriver   Step Ladder Optional Time Savers   With Hardened Magnetic Tip    Utility Knife   Scissors   Wrench   Nut Driver    Note  A power screwdriver or vari  e Pliers     Electric   Cordless Drill  able speed drill with Phillips tip at  C        Square  tachment can speed assembly by   Carpenter s Leve q    as much as 40     Tape Measure   String  for squaring frame     Foundation Preparation    Hammer and Nails    
41. tion of  S  hooks to another hole on  support angle of the horizontal track           support brackets   2 Carefully raise the door to a fully 3 8 16x1 1 2  Sui  S  Hook  open position and prop  Make sure Hex Head       Spring Clevis      the door is level in the opening  Slip  the keyed end of the keyed cable  overthe studs of the bottom brackets   Thread cable over front sheave   around spring sheave and attach end sheave  to cable lacer  Attach cable lacer   with  S  hook in a convenient hole in   horizontal track angle  keeping equal   tension on both springs  so that door   hangs level  Once cable is installed    remove prop and lower door     SAdjust vertical tracks so rollers seat    in  U  of track and bottom rollers fit  snug against bottom brackets  but  not too tight  so rollers will operate Keyed Cable  freely  When complete  tighten all  track bolts        Aadiust striker plates for proper en   gagement with the latches  Adjust  the top fixture up or down and tighten       LH ASSEMBLY        the screws to hold the third door panel    _          against the lintel  ESTER   Cable Lacer 2    S  Hook Keyed Cable    NOTE  Recheck all door fasteners and    hardware to be sure that each  fastener is tight and secure  45         Parts Needed For 6    Step 34 Front Door Jambs      Sizes    BW46    1 Position right and left door jambs  to right and left track supports with  notched end on top  facing inside  building     2Fasten long flange to track support    and short fl
42. top rust from developing  or stop it  quickly as soon as it appears     1  Avoid nicking or scraping the coating surface   inside and out     2  Use all the washers supplied  In addition to pro   tecting against weather infiltration  the washers pro   tect the metal from being scraped by the screws     3  Keep roof  base perimeter and door tracks free of  debris and leaves which may accumulate and retain  moisture  These can do double damage since they  give off acid as they decay     4  Touch up scrapes or nicks and any area of visible  rust as soon as possible  Make sure the surface is  free of moisture  oils  dirt or grime and then apply an  even film of high quality touch up paint     704880801    
43. ween  the roof beams  Align the tab with  holes and fasten strut with 2 bolts     DB Joinlefttand right gables together    with acenter gable brace using 3  bolts and nuts  at middle holes                weather stripping along  the mating edge ofthe left and right  gables as shown  Cut the weather  stripping to length     O Fasten the lower end ofthe strut to  center gable flange with 2 bolts     NOTE  Do not tighten bolts and nuts    7 install single roof beams to the  left side of building in the same  manner  Slide a roof beam as   sembly over center gable flange  and fasten     until the strut is assembled at rear       10Repeat Steps 8  amp  9 for rear of  building         BE e    CE Eu    48Ax5 6 Screw   6372 STEP  2    ty    7833       Step 19 Squaring the Building All Sizes       BW31    1 Square the building on the founda   tion and at the top  by measuring  diagonally from corner to corner as  previously done     20   string to check and see if the   sides and rear of building are straight  NOTE   not bowed inward or outward  The 95   2 41m  door opening  must be held for proper door         evel the full perimeter of the floor alignment  Measure between  the left and right track support     frame  Shim under with wood shin   gles if necessary        4 square the front of building as pre   viously done for base     BAnchor front frame to concrete with    1 4  diameter expandable anchor  bolts or other means  where shown                                  Measure Diag
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
詳細情報 (HTML形式)  Sanyo SAP-C18AP User's Manual    Le magazine de mon village/www.rousset  Faria Instruments Commander User's Manual  Manual de Usuario (ESP)  73S8009CN Demo Board User Manual    Copyright © All rights reserved. 
   Failed to retrieve file