Home
3Com 5500 Switch User Manual
Contents
1. C conventions used in this guide ii CoreBuilder 7000 Installation and Startup Guide li CoreBuilder 7000 Switch Module removing 2 1 CoreBuilder 7000HD i li User Guide ii CoreBuilder 7000HD User Guide ii D documentation related il E ejector handles 2 2 G guide conventions li organization scope i H how to read documentation ii icons notice ii installation memory upgrade 2 1 K key 2 3 L LAN Emulation iii LMA Logging in 2 9 M memory chipset memory SIMM removing 2 5 memory upgrade installing 2 1 verifying 2 9 memory upgrade installation guide N notice icons ii 0 organization of this guide i R related documentation ii S scope of this guide i T typographical conventions verifying memory upgrade 2 9 W who should use this guide i
2. HP OpenView is a registered trademark of Hewlett Packard Company SunNet Manager is a trademark of the Sun Microsystems Inc All other company and product names may be trademarks of the respective companies with which they are associated Document designed and written by Laura Novich photography by Oren Ben Ami Production by 3Com CONTENTS ABOUT THIS GUIDE Scope of This Guide i Who Should Use This Guide i Organization i Conventions ii Related Documentation ii INTRODUCTION General 1 1 Installation Upgrade Kit 1 1 Safety Precautions 1 2 ESD Safety Information 1 2 Information sur la pr vention de d charges lectrostatiques 1 3 Sicherheitsinformationen f r elektrostatische Entladungen 1 3 32MB Memory Upgrade SIMM 1 4 Inspecting the 32MB SIMM 1 4 Identifying the 32MB Memory Upgrade SIMM 1 4 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7000HD SWITCH MODULE 32Mb Memory Upgrade Steps 2 1 Step 1 Removing the CoreBuilder 7000HD Switch Module from the Chassis 2 1 Step 2 Removing the 16MB Memory SIMM 2 5 Step 3 Inserting the 32MB Memory SIMM 2 7 Step 4 Returning the CoreBuilder 7000HD Switch Module back to the Chassis 2 9 Verifying 32MB Memory Upgrade 2 9 INDEX ABOUT THIS GUIDE Scope of This Guide Who Should Use This Guide Organization The 32MB Memory Upgrade for the CoreBuilder 7000HD Switch Installation Guide provides all the information needed to mount the 32MB Me
3. slide the module with two fingers until it stops While inserting the module raise it up a little and slide it in Grab both ejector handles and push them inward This locks the module into the chassis You may have to apply considerable pressure to the handles An audible click indicates that the connectors have engaged Verify that the card has been properly installed by observing its LEDs Tighten the module s securing screws To verify that the switch module s memory has been upgraded successfully follow the steps below Reconnect all the cables to the switch module s ports according to the record you made of the cables Reconnect the power cable Login to the LMA with the username admin From the LMA of the CoreBuilder 7OOOHD Switch Module select option 1 SYS Platform config and then select option 4 SWM Switch modules The following information should be displayed Slot Slot status Switch type Switch mode Memory Clock 1 Occupied 32x32 ATM switch Active 32M 40MHz Free Active switch MAC address 00 c0O da 7f 81 5 Active switch sys up time 0 day s 19 06 19 6 Check that the memory shown is 32M 2 10 CHAPTER 2 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7OOOHD SWITCH MODULE INDEX Numbers 16MB memory SIMM removing 2 5 32MB memory upgrade verifying 2 9 32MB memory upgrade installation guide i 8 Port Board i A Administration Console iii assembly kit ATM switch il
4. 32 MB MEMORY UPGRADE 3 FOR THE COREBUILDER 7OOOHD SWITCH INSTALLATION GUIDE http www 3com com Part No DIA370U 1AAA02 Published November 1998 3Com Corporation 5400 Bayfront Plaza Santa Clara California 95052 8145 Copyright 1998 3Com Corporation All rights reserved No part of this documentation may be reproduced in any form or by any means or used to make any derivative work such as translation transformation or adaptation without written permission from 3Com Corporation 3Com Corporation reserves the right to revise this documentation and to make changes in content from time to time without obligation on the part of 3Com Corporation to provide notification of such revision or change 3Com Corporation provides this documentation without warranty term or condition of any kind either implied or expressed including but not limited to the implied warranties terms or conditions of merchantability satisfactory quality and fitness for a particular purpose 3Com may make improvements or changes in the product s and or the program s described in this documentation at any time If there is any software on removable media described in this documentation it is furnished under a license agreement included with the product as a separate document in the hard copy documentation or on the removable media in a directory file named LICENSE TXT or LICENSE TXT If you are unable to locate a copy please contact 3Com and
5. SIMM has the 32MB label Figure 1 2 32MB Memory SIMM 32MB Memory Upgrade Steps Step 1 A No 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7OOOHD SWITCH MIODULE Removing the CoreBuilder 7000HD Switch Module from the Chassis Before starting make sure that you wearing the ESD wrist strap and that you are properly connected to grounding equipment as described in Safety Precautions on page 1 2 Disconnect the cables from the module ports Ensure that there is a record of where the cables are attached so that you can correctly re connect them to the module when finished With the 1 flathead screwdriver supplied loosen the two captive screws located on the far left and right of the module near the ejector handles Figure 2 1 Do not remove the screws 2 2 CHAPTER 2 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7OOOHD SWITCH MODULE oe Fe ee Figure 2 1 Loosening the Captive Screws 3 Grasp the ejector handles of the card and push them outward Figure 2 2 This ejects the card slightly You may have to apply considerable force to the handles in order to eject the card You will hear a click to indicate that the connections have separated and the card will slide slightly forward out of the CoreBuilder chassis 32MB Memory Upgrade Steps 2 3 Figure 2 2 Opening the Ejector Handles 4 Make sure that the screws have been loosened enough so that they float in the holes an
6. a copy will be provided to you UNITED STATES GOVERNMENT LEGEND If you are a United States government agency then this documentation and the software described herein are provided to you subject to the following All technical data and computer software are commercial in nature and developed solely at private expense Software is delivered as Commercial Computer Software as defined in DFARS 252 227 7014 June 1995 or as a commercial item as defined in FAR 2 101 a and as such is provided with only such rights as are provided in 3Com s standard commercial license for the Software Technical data is provided with limited rights only as provided in DFAR 252 227 7015 Nov 1995 or FAR 52 227 14 June 1987 whichever is applicable You agree not to remove or deface any portion of any legend provided on any licensed program or documentation contained in or delivered to you in conjunction with this User Guide Unless otherwise indicated 3Com registered trademarks are registered in the United States and may or may not be registered in other countries 3Com the 3Com logo Net Age NETBuilder II SuperStack Transcend and TranscendWare are registered trademarks of 3Com Corporation ATMLink CoreBuilder are trademarks of 3Com Corporation 3ComFacts is a service mark of 3Com Corporation CompuServe is a registered trademark of CompuServe Inc Microsoft MS DOS Windows and Windows NT are registered trademarks of Microsoft Corporation
7. clips outward to release the SIMM When pressed the SIMM releases and rises slightly Figure 2 7 Figure 2 7 Removing the 16MB SIMM 3 With your thumb and index finger remove the SIMM from the connector at a 45 degree angle Figure 2 8 32MB Memory Upgrade Steps 2 7 Inserting the 32MB Memory SIMM Remove the 32MB Memory SIMM from the packaging material Make sure that the front panel of the switch module is facing you and that the switch is on proper grounding material or an antistatic bag Make sure that you hold the SIMM as follows a The cutout on the gold connector edge is facing the front panel Figure 1 2 b The SIMM is held at a 45 degree angle Insert the SIMM with its gold connector into the black connector at a 45 degree angle Figure 2 9 2 8 CHAPTER 2 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7OOOHD SWITCH MODULE Pa Cutout Figure 2 9 Inserting the 32MB Memory SIMM 5 With one or two fingers not on the chips gently press down A click is heard when the SIMM is in place Figure 2 10 Figure 2 10 Pushing the 32MB SIMM in Place Step 4 Verifying 32MB Memory Upgrade Verifying 32MB Memory Upgrade 2 9 Returning the CoreBuilder 7000HD Switch Module back to the Chassis Orient the Switch Module so its labelling is upright and make sure the eject handles are in the outward position Insert the module into the chassis by placing it in the guides of the selected slot and
8. d do not catch on the front panel 5 Keeping the ejectors in the openmost position remove the switch module by sliding it outwards 6 If you experience difficulty in removing the switch insert the special key in the space above the switch module on the right side near the black handle of the power supply Figure 2 3 2 4 CHAPTER 2 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7OOOHD SWITCH MODULE ee Figure 2 3 Inserting the Special Key 7 Raise the key and slide the switch module out Figure 2 4 Figure 2 4 Sliding the Switch Module Out 8 Using both hands pull the switch module out 32MB Memory Upgrade Steps 2 5 Only use the special key provided if you have difficulty in removing gt the switch module 9 Place the switch module on a grounded surface or antistatic bag with all components facing up Step 2 Removing the 16MB Memory SIMM 1 The memory SIMM is located on the lower left corner of the module when the front panel is facing you Figure 2 5 On the top of the memory SIMM there are two metal spring clips one on each side of the SIMM that hold the SIMM in place Figure 2 6 16MB Memory SIM Front Panel Figure 2 5 Position of 16MB SIMM in CoreBuilder 7OOOHD Switch Module Front View 2 6 CHAPTER 2 32MB MEMORY UPGRADE INSTALLATION ON THE COREBUILDER 7OOOHD SWITCH MODULE aT a TS Metal Spring A a Clip Figure 2 6 Side View of the Memory SIMM 2 With your thumbs push the
9. er Figure 1 1 Installation Upgrade Kit Safety Precautions Before working with any component in the CoreBuilder 7000 System read and adhere to the following safety precautions ESD Safety Information Electrostatic Discharge ESD can damage components on the system module ESD which occurs when the module or a component is improperly handled can cause complete or intermittent failures CAUTION To prevent ESD related damage m Always wear the ESD wrist strap supplied ensuring that the strap is firmly secured to your wrist The other end should be connected to a grounded surface Connect the clip on the end of the wrist strap to a grounding point on an anti static table or to a grounded distribution rack m Keep the 32MB Memory SIMM in its antistatic shielded bag until you are ready to install it m When working with CoreBuilder 7000 components always place the component on the antistatic bag that it was shipped in Safety Precautions 1 3 Information sur la pr vention de d charges lectrostatiques Les d charges lectrostatiques peuvent endommager des l ments du module Ces d charges qui surviennent lors d une manipulation inad quate du module peuvent entrainer une d faillance temporaire ou permanente ATTENTION Pour viter des dommages lectrostatiques m Assurez vous d tre bien branch la terre Utilisez un sous pied et un tapis reli la terre ou portez un bracelet mis la terre et veill
10. ez ce que le contact dermique soit bon m Conservez le module dans un sac antistatique jusqu son installation Sicherheitsinformationen f r elektrostatische Entladungen Elektrostatische Entladungen ESD k nnen einzelne Baugruppen oder das gesamte Modul besch digen ESD k nnen vorkommen wenn das Modul nicht richtig gehandhabt wird und k nnen eine dauerhafte oder zeitweilige Fehlfunktion bewirken 1 4 CHAPTER 1 INTRODUCTION A VORSICHT Zur Verh tung von Schad n durch ESD m Vergewissern Sie sich da Sie richtig geerdet sind Benutzen Sie ein FuBband und eine geerdete Matte oder tragen Sie ein geerdetes Handgelenkband mit gutem Hautkontakt m Lassen Sie das Modul bis zur Installation in der Anti Statik Tasche 32MB Memory Upgrade SIMM Inspecting the 32MB SIMM Identifying the 32MB Memory Upgrade SIMM 32MB label This section explains how to handle and identify the 32MB Memory Upgrade SIMM Before touching the memory SIMM make sure that you are using the ESD wrist strap and that it is connected as described previously The SIMM should only be held from the sides Carefully remove the SIMM from the antistatic bag and inspect it for damages If the SIMM appears to be damaged return it to the antistatic bag and contact your 3Com Representitive To accurately identify the product as 32MB check for a label with the inscription 32MB on the upper component side of the SIMM Figure 1 2 Make sure the
11. mory SIMM on the CoreBuilder 7000HD Switch Module This document provides a step by step installation procedure for the 32MB Memory SIMM The 32MB Memory Upgrade for the CoreBuilder 7000HD Switch Installation Guide is intended for anyone moderately familiar and handy with common household tools No prior knowledge of 3Com s CoreBuilder networking equipment is necessary to understand this manual The 32MB Memory Upgrade for the CoreBuilder 7OOOHD Switch Installation Guide is organized so that the information needed can be accessed directly The parts of the document are described below Chapter 1 Introduction This chapter presents the Memory Upgrade SIMM and assembly kit combined as 3C37041 at a glance describes required materials and explains the safety precautions that must be followed when installing the 32MB SIMM Chapter 2 32MB Installation on the CoreBuilder 7OOOHD Switch Module This chapter describes a photo illustrated procedure of the various Stages required to mount the 32Mb Memory SIMM on the CB7000HD Switch Module il ABOUT THIS GUIDE Conventions Table 1 lists the icons and typographical conventions used in this guide Notice icons indicate statements that you need to read before continuing in the guide Table 1 describes these icons Table 1 Notice Icons Icon Type Description Information Information notes call attention to important Note features or instructions Caution Cautions alert you to pe
12. rsonal safety risk system A damage or loss of data Warning Warnings alert you to the risk of severe personal injury Related Documentation The complete documentation for the interface boards and the CoreBuilder 7OOOHD which they serve includes CoreBuilder 7OOOHD Installation and Startup Guide DUA3700 0BAAO03 CoreBuilder 7OOOHD User Guide DUA3700 0AAAOS5 Table 2 describes important information in the CoreBuilder 7000HD documentation to help you locate the information you need Table 2 CoreBuilder 7000 7000HD Documentation Road Map If you want to Read Get an overview of the CoreBuilder 7000 ATM Installation and Startup switch including system components Guide Learn about various configurations in which Installation and Startup you can install your CoreBuilder 7000 ATM Guide switch Install and power up your CoreBuilder 7000 Installation and Startup ATM switch Guide Learn about how you administer and manage Installation and Startup the CoreBuilder 7000 ATM switch Guide User Guide Related Documentation Table 2 CoreBuilder 7000 7000HD Documentation Road Map continued If you want to Learn about ATM and how it is implemented in the CoreBuilder 7000 ATM switch Learn about LAN Emulation and how it is implemented in the CoreBuilder 7000 ATM switch Find out what type of configuration tasks you can perform on the CoreBuilder 7000 ATM switch Perform configuration or adminis
13. tration tasks using the Administration Console Get assistance Read User Guide User Guide User Guide Installation and Startup Guide User Guide Technical Support Appendix in any guide iv ABOUT THIS GUIDE oot te e e 990 000 General INTRODUCTION The CoreBuilder 7OOOHD Switch Engine 32MB Memory Upgrade Kit 3C37041 increases the ATM switching capacity measured in calls by a factor of four to five This upgrade is available in conjunction with the CoreBuilder 7000 family software version 4 0 and replaces the existing 16MB memory included on the switch board Installation of the memory upgrade is simple and no other modifications are required Software version 4 0 automatically recognizes the larger memory and immediately utilizes it for additional call capacity Included with this kit is an ESD wrist strap to prevent damage to the SIMM and to the switch from electrostatic emmisions Installation Upgrade Kit In order to help you 3Com supplies all the tools necessary for the upgrade in the installation upgrade kit The installation upgrade kit supplied with the 32MB SIMM contains the following items see Figure 1 1 ESD wrist strap A 1 flat head screwdriver Release key to be used to remove the switch board from the chassis according to the instructions on the following pages 1 2 CHAPTER 1 INTRODUCTION E ay Ni eee Special Key ESD Wrist Strap 1 Flat Head Screwdriv
Download Pdf Manuals
Related Search
Related Contents
取扱説明書 FVH75663SEL 轟轟肪燃焼動き歩数計 FB Installation Guide ( PDF) 取扱説明書 Divozon 350 FT Danby DPF074B1WDB Refrigerator User Manual Copyright © All rights reserved.
Failed to retrieve file