Home
Implementing a Time Optimal Task Sequence For Robot
Contents
1. Table 2 Parameters represented by the numerical identifier n Setting s n all 213 bi1 1 2 c ll d 1 3 aa Aia g 2 3 h 3 Table 3 Settings used to test the model can handle different configurations especially the extremes where all components are picked up using only gripper tools or suction cup tools Although there are two cost functions being tested in the model the evaluation crite rion is always the total cycle time of the assembly which is equal to the makespan Minimising travel time is done so as to see if it can aid in finding a better makespan quicker For each test the used objective function is clearly stated as makespan or travel time and the value presented is the total cycle time of the solution 6 2 Model Settings There are three parameters of the model which can be set by the user before launch ing the search procedure Table 2 is used as a reference for the setting combinations in Table 3 A parameter is on if its identifier is present in the table and is turned off if represented with a dash The parameters in Table 2 are those described in Sec tion 5 Parameter 1 allows for using domain consistency or bound consistency for the ALLDIFFERENT constraints The number of precedence constraints between nodes is determined by parameter 2 and is described in Section 5 3 1 Parameter 3 is described in Section 5 2 and describes how values can be r
2. o a 3 The Vehicle Routing Problem 3 1 The Travelling Salesperson Problem 3 2 Generalismg the TSP 0000 eee BA RUE 3 3 Defining the Vehicle Routing Problem 34 Variations of the VRP o o ss soo eee 3 4 1 Capacitated Vehicle Routing Problem 3 4 2 Vehicle Routing Problem with Time Windows 3 4 3 Pick up and Delivery Problem 3 5 Common Approaches to Solve the VRP 3 5 1 Genetic Programming 3 5 2 Ant Colony Optimisation o JIA NA Be ee EM SARI 3 5 4 Constraint Programming 3 5 5 Large Neighbourhood Search and Other Hybrid Methods 3 6 The Job Shop Problem ees 3 7 The VRP of the Thesis Project so sosse sr sr rr sera 4 Constraint Programming 4 1 Constraint Satisfaction Problems lll 4 2 Constrained Optimisation Problems 4 3 Propagation ou A Sus RI qe ees AA Consisteney e sir Ru VE RM ee Enos ASS wSearch 4 cue xu uns ge bo miror UL EU ew 454 Branching 4 5 04 RR gom RR Re xg 4 5 2 H rlsliCs o Ee puce Reb ER rex 45 3 Exploration 5 X WEAR ub ike 40 RECON vu et ss Sure eei wor ERE ERO Ies bie A 47 Global Constraints eee ee eee 4 7 1 The AllDifferent Constraint ALLDIFFERENT 4 7 2 The Element Constraint ELEMENT 4 7 3 The Count Constraint COUNT
3. UNPIPSALA UNIVERSITET UPTEC IT 14 011 Examensarbete 30 hp Juni 2014 Implementing a Time Optimal Task Sequence For Robot Assembly Using Constraint Programming Joakim Ejenstam UNIVERSITET Teknisk naturvetenskaplig fakultet UTH enheten Bes ksadress ngstr mlaboratoriet Lagerhyddsvagen 1 Hus 4 Plan O Postadress Box 536 751 21 Uppsala Telefon 018 471 30 03 Telefax 018 471 30 00 Hemsida http www teknat uu se student Abstract Implementing a Time Optimal Task Sequence For Robot Assembly Using Constraint Joakim Ejenstam Assembly lines in a lean production environment may persist for months or years but due to the rapid change in demands on the consumer market they can be subject to quick changes Robots have been proved to handle tasks that previously were limited to human workers this is the goal of the flexible two armed robot developed by ABB When installing a new robot into an assembly line there are several parameters which make it a difficult job for programmers even experienced ones to install che robot These problems lead to long installation processes that can take weeks and there are great benefits of automating the process of finding good solutions to the problem In this thesis a constraint programming approach is presented as a way to solve the complex sequencing problem when installing a two armed robot into a new environment When benchmarked against a reference case s
4. 3 4 1 Capacitated Vehicle Routing Problem The capacitated vehicle routing problem CVRP is perhaps the most common variant of the VRP sometimes the VRP is defined as the CVRP It adds the notion of goods that need to be distributed to the nodes in the problem For each vehicle a capacity is defined and for each customer visit a demand is defined A positive demand indicates that a vehicle needs to deliver the specified amount of goods to the customer special capacity constraints where customers can have negative demands are described in Section 3 4 3 Depending on the problem the vehicle fleet can be heterogeneous or homogeneous meaning that the capacity of each vehicle is either unique or identical Apart from the fleet being heterogeneous or homogeneous each vehicle can carry either one or several goods up to its capacity The objective is the same as in the original VRP with the added constraint that the cu mulative demand on a vehicle route R cannot at any node exceed the vehicle s capacity Or 3 4 2 Vehicle Routing Problem with Time Windows Vehicle routing problems with time windows VRPTW are another variation which is most common in industrial applications and other applications such as home care Scheduling It adds specific time intervals where the customers can be served This 15 variant of the VRP arises in many transportation and supply route optimisation prob lems It is present when customers can only be served d
5. The possibility to combine these move operators also exists so that the best combination can be found Different combinations of these operators can be chosen and the ordering can be fixed or randomised during the search The approach is set by the user Node that the performance of the local search depends on the initial solution given It would take lots of testing to find a good initial solution For this project the initial 42 move operator 2 opt Or opt Exchange Cross MakeActive MakelInactive SwapActive Extended SwapActive CO Nan BRIN B Table 1 The local search operators of Google OR tools that are used by the model solution for all local search operators is the first solution found by the systematic search using a non random selection for route allocation 43 6 Results 6 1 Experiment Setup For evaluating the implemented model the problem instance is the same setup as the FRIDA cell case study as described in Section 5 All node to node travel time data is simulated in Robot Studio 1 by running each movement and performing all opera tions with both hands To be able to compare the generated solutions with the reference solution found manually by the operator in the case study the latter sequence is eval uated with the same set of simulated travel and operation time Also the sequence issued is used as a test instance to verify that it does not conflict with any of th
6. a cost is defined as cij This cost can differ in different contexts but is interpreted as the travel cost between 14 nodes i and j We also define a set of m vehicles with routes Ry R1 R2 Rm that together cover all visits 16 A solution to the VRP is to assign all nodes v V to a route Ry such that e Each node V except the depot is visited exactly once e All vehicles start and end at a fixed depot that is visited once by each vehicle e Side constraints are satisfied The objective of the VRP is to minimise the travelling cost over all vehicle routes Finding an optimal route is NP hard 22 18 15 4 Sometimes additional objectives are added to the problem a common objective is to minimise the number of vehicles used to perform all visits 3 4 Variations of the VRP Except for the pure VRP there is a large amount of variations where specific side con straints are enforced These side constraints range from time based constraints to route based constraints and even constraints on certain visits Apart from these well studied academic variations in industrial applications the VRP is composed of combinations of all variations and affected by real life side constraints such as working hours for chauffeurs and compatibility between customers These combined VRPs are called Rich VRPs since they express several constraints and pa rameters from several VRP variations that further increase the difficulty of the problem
7. 1 2 Project Purpose and Goal The purpose of this project is to evaluate the suitability of using constraint program ming on robotic assembly sequencing The problem is modelled as a vehicle routing problem 16 with a set of constraints adding the restrictions to the robot which are not in the standard vehicle routing problem The aim of this project is to implement a constraint programming model for solving the problem as a vehicle routing problem and benchmark it against real life installations An actual installation of the FRIDA robot cell has been used to generate a test case In this installation a skilled engineer has achieved a good cycle time this time is used as case benchmark This reference installation was made within a timespan of a couple of weeks The constraint programming approach will be applied on the same setup to achieve comparable results 13 Scope In the thesis project the focus is to demonstrate a constraint programming solution to find good sequences for one FRIDA robot solutions are not required to be optimal but good enough The solution will use a fixed tray layout in the production cell meaning that no changes in the geographical layout are done These trays are the same as in the reference installation To automatically find good solutions the product components will have the possibility to be moved between these fixed trays instead of moving the actual trays The model will take into account collision avoid
8. 2 Objective Function The objective function of the case study is the makespan so that the total cycle time can be found for the product assembly However the model has been evaluated with two objective functions that the user can alternate between in order to experiment with different approaches Both objective functions are to be minimised Since the goal is to find the best makespan the alternation of which cost function the solver uses is only to evaluate the impact on makespan that is caused by minimising travel time during search makespan max arrival Q1 JEE route 0 As seen in 21 the makespan of the product assembly is equal to the maximum value of the arrival time at any of the end nodes which are not connected to route 0 travel time y T inex 22 JENS route 0 The standard VRP objective function to minimise the total travel time is presented in 22 The objective is to minimise the sum of travel times for all visited arcs T that is the cost to travel from each node i to its successor next j for all nodes that are not assigned to route 0 5 3 FRIDA Robot Sequencing Side Constraints The following sub sections will cover the constraints which come from the sequencing problem of the FRIDA robot assembly cell They are deduced from the case installa tion but can be generalised such that they are applicable on different installations that are similar to the case study Section 5 3 1 describes in detail how
9. Restart lee 1 3 Local S6arch soe sr a A a eh 7 4 ObjeciveFunctions sa ses o e e e T Conclusion eun a a RPSL Discussion 8 1 Improving the Model es 8 2 Customising the Search Strategy o so va 8 3 Improving Local Search Performance 8 4 Multiple Objective Functions sme sees res ss sr rs sea 8 5 Cell Layout Optimisation so ooo se ses een 8 6 Extending the scope 8 7 The Job Shop Approach References 1 Introduction 11 Setting In a lean production environment assembly sequences might persist for years If the market demands change the environment may be subject to rapid changes to meet up with these demands During the product s life time an assembly sequence might be improved several times and it requires experience to reach fast assembly cycle times ABB is one of the leading manufacturers of industrial robots in the world 2 Since the first electrical robot introduced about 40 years ago the company has made huge progress and ABB technology is installed and operating all over the world Typical tasks performed by robots are painting welding polishing and grinding and they are used on all kinds of production lines from computer manufacturing to cars The latest concept from ABB is the Flexible Robot Industrial Dual Arm FRIDA 19 which is a concept aimed at flexible and agile production environments The robot is small compact and suitable for i
10. Search The MIT Press 2009 28 Willem Jan van Hoeve and Irit Katriel Global Constraints pages 205 244 In van Beek et al 26 2006 58 29 Nikolaj van Omme Laurent Perron and Vincent Furnon OR tools user s manual Technical report Google 2013 https or tools googlecode com svn trunk documentation user_manual index html 30 Jianyang Zhou A constraint program for solving the job shop problem In Freuder G editor Principles and Practice of Constraint Programming CP96 volume 1118 of Lecture Notes in Computer Science pages 510 524 Springer Verlag 1996 59
11. agation In OR Tools there exists only one branching heuristic for sequence variables which will find the first possible interval variable in the sequence and assign it When this search over sequence variables is finished all next variables are set and the routes are constructed however the time domain variables are not set Because of the time domain variable not being set the last branching is to search over the objective value There exists only one variable to branch over and thus no variable selection strategy is needed Values are selected by splitting the variable domain in half and choosing the lower half until a feasible value is found It is possible to use a randomised restart strategy during search The user can decide whether to use randomisation or the naive search presented above The randomised restart strategy use a Luby restart sequence over the number of failures and randomises the route value selection The user needs to provide a number of failures F from which to restart are multiplied by the Luby sequence for each restart 5 4 2 Local Search Local search is used as an alternative search method in the model It can be used with one of 8 local search move operators that can be seen in Table 1 These operators are implemented in Google OR Tools These operators are the same as Section 3 5 3 and are all pre implemented in Google OR Tools to use with local search The operators are numbered for reference while testing
12. contrast universal strategies are used to work with any problem The first proposed universal strategy is the Luby sequence 17 to solve problems with randomised algorithms The Luby sequence is given by S 1 1 2 1 1 2 4 1 1 2 4 8 where the number of 26 steps is multiplied by the ith element in the sequence given by 1 a ifi 2 1 f 1 Loss MPA 5 epe 1 4 6 Reification Sometimes there is reason to post a disjunction between constraints for example given variables A B and C the following disjunction is required A B CVC 0 To solve this each constraint is accompanied by a Boolean variable that indicates if the constraint is satisfied or not With reification the following relations can be posted in a simple way A B C amp b C 0 amp b bi Vb2 The Booleans b and b are decision variables that represent the status of the constraints they represent If the constraint holds the Boolean value is equal to 1 respectively a value of 0 represents that the constraint fails Vice versa if the Boolean variable is set to I the constraint holds respectively it fails if the value is 0 Some constraints in solvers can implement an implicit reification where the variables b and b are not given by the programmer but as a part of the constraint 4 7 Global Constraints A global constraint is a constraint that can be decomposed into a conjunction of several other constraints The global constraint encapsulates these
13. each solution found using setting a Cycle time s Change Upper bound solution 105 91 3 39 Lower bound solution 95 35 6 92 Average solution 97 54 4 78 Table 6 The upper and lower objective value and average value for randomised restart together with the change from using the standard backtracking search 6 5 Objective Function Variation In order to test the result of the two objective functions described in Section 5 2 2 tests are run with all settings presented in Table 3 and the best cycle time after 20 minutes of search is used for comparison Route variables are assigned by selecting the first unbound variable and assigning its smallest value Table 7 shows that using makespan managed to get good solutions while travel time did not find better solutions than the initial As can be seen in Table 8 both objective functions performed similar with respect to the number of found solutions when using tree search with travel time finding two more solutions for every setting In Figure 11 it can be seen that both objective functions actually improved the cycle time with every new solution travel time accepted a less good solution after the initial solution then improved that solution 6 6 Local Search Local search was tested with the best performing setting from the systematic search tests Table 9 shows each local search move operator op and the best cycle time found using both travel time an
14. for each unique installation give the possibility for other usages The number of solutions found can be analysed so as to find common bottlenecks or changes that have larger impact on the solution 8 7 The Job Shop Approach The job shop scheduling JSP approach could be explored as an alternative track Be cause the two problem types overlap and similar techniques can be applied further research in this area could prove useful when improving the model The assembly sequence contains attributes which are more common to the JSP such as the prece dences and some solution methods for solving the JSP have been introduced to the implemented model It is possible that reformulating the problem into a JSP will pro vide additional insight into the problem This insight can be used to understand further the problem domain and improve the current model 56 9 References 1 ABB ABB robot studio http www abb com product seitp327 2 10 11 12 bas 30450ba8a4430bcf c125727d004987be aspx Accessed 2014 05 02 ABB ABB robotics http www abb com cawp seitp202 251 20b1ede2a3238c12575cb00290940 aspx Accessed 2013 10 30 Krzysztof Apt Principles of Constraint Programming Cambridge University Press New York NY USA 2003 J Christopher Beck Patrick Prosser and Evgeny Selensky On the reformulation of vehicle routing problems and scheduling problems In Proceedings of the Fifth Symposium on Ab
15. manual testing the model produced an improved version already within seconds of runtime continuing to produce solutions until the 20 minutes time limit was met 53 8 Discussion This project has shown the implementation and evaluation of a constraint model to solve a FRIDA robot assembly sequencing problem Results from the tests made show that using constraint programming can indeed be a powerful tool when trying to au tomate and drastically decrease the time when doing a FRIDA robot installation The following sub sections are dedicated to further discussion about the performance of the implemented model and will present some interesting future work that could further aid the installation procedure 8 1 Improving the Model Certain improvements to the model could be done Instead of using simulated times from robot studio the solver can make calls to dedicated software which will calculate the travel time using dynamic models Additionally the solver could also take into account collision avoidance algorithms so to ensure accurate solutions To improve the speed of the model a reasonable approach is to look into more global constraints that can be utilised for increased propagation Such a constraint is the PATH constraint 10 which will create a path from the start nodes to the end nodes going through all the visits in the problem The PATH constraint propagates accumulated distance along each route and ensures that the flow of each rou
16. nodes in a complete graph 8 Formally the problem can be defined as given a set of N nodes and a distance C which represents the distance of the edge from node i to node j if the edge does not exist this value is either infinity or the shortest distance between i and j depending on the problem A solution is a path of N edges forming a circuit 3 2 Generalising the TSP The Vehicle Routing Problem VRP is a generalisation of the TSP Consider adding several salespeople to the TSP such that the problem is to visit all nodes exactly once by one salesperson This is called the Multiple TSP MTSP and is equal to the VRP when there exist no vehicle capacity constraints The problem now consists of distributing several visits over a set of vehicles such that the total travelling distance is minimised Figure 4 gives an illustration of a VRP with three routes Customers EN Depot Wehicle route Figure 4 A vehicle routing problem with three vehicles The VRP is interesting in several ways for industrial applications and specifically in logistics applications Also the TSP is a well studied problem with industrial applica tion such as finding the shortest path between all nodes on a circuit board 3 3 Defining the Vehicle Routing Problem The VRP is defined using a graph G V A where V is a set of n vertices the visits and A is a set of arcs combining all vertices in V With every arc aj
17. problem has been enlarged with several nodes to allow optimisation of how com ponents are distributed on the trays in the cell this does not mean that the trays them selves are moved The following constraints take care of how to decide which nodes are to be added to the virtual route once some other nodes are assigned to a route 40 There must be exactly one tray node for each component and there must be exactly one node representing the physical tray placement In the cell description each of the tray nodes are ordered by tray index first then by component index giving a matrix of size NbComponents x NbComponents This matrix will have rows indexed by the tray index the actual physical location in the cell and columns representing the possible component in each tray The matrix trayRoute is a matrix containing the route variable of all nodes where Tray gt 0 and is indexed by the tray parameter and component parameter c for each node The route allocation is modelled by posting a COUNT constraint for all collection of tray nodes with the same tray index The same constraint is posted for all nodes with the same component index CouNT trayRoute 0 NbComponents 1 31 COUNT trayRoute 0 NbComponents 1 32 The constraints for camera nodes are similar The matrix CameraRoute y is an C x M matrix where C NbComponents and M is the number of components picked up with the suction tool The constraints posted ar
18. this thesis project is formulated as a vehicle routing problem with pick ups and deliveries together with several side constraints The goal is to find a sequence of visits that satisfies all these constraints to assembles the product correctly In the thesis VRP each task to be performed is a visit node this can be pick up of a component or photographing to compensate for errors in the pick up Vehicles in the thesis VRP are the robot s hands The routes are the ordering in which the robot assembles a product Each component will have exactly one pick up node and one drop off node with at least one additional process operation such as cleaning a component before the drop off or removal of adhesive tapes after drop off Because of the assembly graph and the ordering of the product assembly there exist numerous precedence constraints These constraints present themselves both on each component s individual nodes as well as between the drop off of all components to gether Time windows represent work time of each node and these are used to separate work that cannot be performed at the same time Depending on the input assembly graph and number of components the size of the thesis VRP lies in the range of a medium sized problem as described by Caseau and Laburthe 8 meaning that the size ranges from 30 to 90 nodes and therefore motivates the using of constraint programming Being rich further increases the difficulty of the problem Som
19. 2 aspx Accessed 2013 10 25 20 Paul Shaw Using constraint programming and local search methods to solve vehicle routing problems In Principles and Practice of Constraint Programming CP98 volume 1520 of Lecture Notes in Computer Science pages 417 431 Springer Verlag 1998 21 Ning Tao Guo Chen and Ning Tao Solving VRP using ant colony optimiza tion algorithm In Fifth International Conference on Information and Computing Science ICIC pages 15 18 IEEE Computer Society 2012 22 A S Tasan and M Gen A genetic algorithm based approach to vehicle routing problem with simultaneous pick up and deliveries In 40th International Con ference on Computers and Industrial Engineering CIE pages 1 5 Pergamon Press Inc 2010 23 Sam R Thangiah Ibrahim H Osman and Tong Sun Hybrid genetic algo rithm simulated annealing and tabu search methods for vehicle routing problems with time windows Working paper 1993 http citeseerx ist psu edu viewdoc summary doi 10 1 1 186 7231 24 P Toth and D Vigo editors The Vehicle Routing Problem Monographs on Dis crete Mathematics and Applications Society for Industrial and Applied Mathe matics 2002 25 Edward Tsang Foundations of Constraint Satisfaction Academic Press 1993 26 P van Beek F Rossi and T Walsh editors Handbook of Constraint Program ming Elsevier 2006 27 Pascal Van Hentenryck and Laurent Michel Constraint Based Local
20. 24 All precedence constraints are posted with the constraint 24 This constraint keep intervals separated in time given the relation e lt sj Because of the active variables and the performed expression of the interval variables only nodes which are active in the current solution store are affected by the constraint Vc CA 0 ixj Vi Tray Vj Camera i lt j Wie Tray Vj Operation i lt j Vi Tray Vj Fixtures i lt j Vi Camerac Vj Fixtures Q5 i lt j Vi Operation Vj Fixtures For each component in the assembly there are constraints posted such that the correct order of pick up and drop off is ensured As seen in 25 components which have to be photographed or have any operation that needs to be performed before the drop off these nodes are also covered by precedence constraints The expressions above cover all these relations between node types such as trays or cameras i lt j Vij Fixtures FixtureOrder lt FixtureOrder 26 37 Vi jEV Fixture Fixture gt 0 A FixtureOrder 0 i lt j 4 SubAssembly SubAssembly A Component Component 4 1 Q7 Component 0 On all fixture nodes there are constraints which are deduced from the assembly graph These constraints are posted on nodes which all have the same component index as well as between nodes with different component indices such that the final assembly order is preserved The constraint 26 en
21. 4 7 4 The Transition Constraint IN RELATION 4 7 5 The Disjunctive Constraint DISJUNCTIVE 4 7 6 The NoCycle Constraint CIRCUIT 48 Large Neighbourhood Search oo 49 Interval Decision Variables llle oo oo AA 10 10 11 12 14 14 14 14 15 15 15 16 16 16 17 18 18 19 20 4 10 Google OR Tools Implementation of the Constraint Model 5 1 The FRIDA Cell Case Study e 3 2 Model ved EHE S e al id ex 2 2 Core Constraints in ue A S Rr eee amp E 5 2 2 Objective Function o 5 3 FRIDA Robot Sequencing Side Constraints 3 3 4 Pre edences eo OR RUE Re 5 3 2 Avoiding Arm Collisions os se se ses se ss oso res oa 2 33 Capacity 46 c m g n ble RR PUERO SED S Es 5 3 4 Route Allocation eese 5 4 Search Strategy and Branching Heuristics 5 4 1 Systematic Tree Search ee 29412 Local Search sasa 68 a ser s Results 6 1 Experiment Setup 26 se seb Sg 99A 6 2 ModelSet ngs ng el Ex REG O RSS UR 6 3 Systematic Tree Search 6 4 Random Restart Search 6 5 Objective Function Variation 6 6 LocalSearch uu cete RU dde P Ue d 6 7 Impact of Using Different Tools for Pick up 6 8 Compared to the Reference Solution Conclusions T Y Systematic Tree Search sss cg e p 7 2 Randomised
22. Constraint satisfaction problems are defined as CSP V D C where D v represents the domain for each variable v V i e D v contains all possible values that can be assigned to vj A constraint c C on a subset V ofV is a relation that restricts the values of the variables V If V 1 then the constraint is a unary constraint Examples of constraints are x y or x Z 1 A CSP is considered solved when all variables v V have been assigned values such that all constraints c C are satisfied This is the process of propagation and search that assigns and removes values from variable domains If all constraints are satisfied and some variables have multiple values in their domains this is called a general so lution The solutions are a subset of the Cartesian product D x x x D y where V x y This gives a set of allowed combinations of value assignments for all v V such that all constraints are satisfied The store of the CSP solver is all the variables together with their current domains This is needed for the solver to keep track of the global state of the problem when solving it 4 2 Constrained Optimisation Problems A constrained optimisation problem COP is defined as a CSP with an objective func tion f from D x x x D y to a number where V x y The goal of a con strained optimisation problem is to find a solution such that all constraints are satisfied and such that the value of f is
23. Each node s attributes give it special demands depending on whether a node is a pick up a drop off or an operations node The pick ups require that the capacity for the given tool on the robot s hand is zero Drop offs require that the given tool is not empty when that node is visited i e the capacity for that tool is not zero All fixture node operations except for drop off nodes are performed with the gripper tool These operations require that the capacity of the gripper is zero so that it is not blocked by a component For these nodes the grip capacity must be equal to 0 both before and after the visit All camera nodes require that there is a component picked up with the suction tool thus the capacity of the suction tool must be greater than 0 before or after visiting a camera node For all nodes which represent an operation that must be performed before the drop off for that component the capacity for the given tool must be greater than 0 both before and after visiting that specific node TRANSITION route ACC jx ACC prey transitions I T 30 All of these constraints are posted as a TRANSITION constraint 30 with the input being an array containing route accjz and accprey for each node i and tool k I is the initial state while T is the set of accepting states The transitions tuple set is built for each node given the combination of its attributes so that the accumulated quantity for each resource is correctly co
24. For nodes not representing a fixture this value will be 0 Tray is an integer value referencing the tray the node represents For nodes not representing a tray this value will be 0 32 Camera is an integer value referencing the camera the node represents For nodes not representing a camera this value will be 0 Durations is an integer array of length NbRoutes with the time it take to service the node on each route A value of 1 means that the node is out of reach on that route FixtureOrder is an integer value defining the order in which the node is per formed if the node is representing a fixture Drop off nodes have order 0 while operations after drop off have higher values For nodes which are not drop off nodes this value is always 0 SubAssembly is an integer value describing what sub assembly the node repre sents This parameter is derived from the assembly graph Apart from the integer values above each node contains a number of Boolean values to designate categories of nodes These Boolean values are useful for selecting what nodes are covered by a constraint Start a Boolean value that designates if a node is one of the start nodes End a Boolean value that designates if a node is one of the end nodes Output a Boolean value that designates if a node is the output of the assembly This is false for all nodes except the last node in the array Operation a Boolean value that designates if a node is an operation
25. RP 18 with the only difference being that the PDP considers transportation of goods while DARP considers transportation of persons 3 5 Common Approaches to Solve the VRP Because of the many areas of application and the complexity of the VRP the impact of a good solution is huge and can help companies make large savings or increase their profit Because of this the VRP is a well studied problem 16 24 14 3 5 1 Genetic Programming Genetic programming is a way of solving optimisation problems based on the idea of evolution and natural selection Such an algorithm starts by constructing a set of naive solutions Then the process is to mutate this solution into a possible set of other solutions and evaluate their fitness keeping only solutions that are strong enough In this sense the fitness function is the cost function of the problem e g the total travel time in the VRP A genetic algorithm solution is presented in 22 3 5 2 Ant Colony Optimisation This method is inspired by ant colonies and ants preference to follow other ants rather than finding new paths In practice a program that simulates this behaviour is imple 16 mented It is utilised by finding a set of routes with ant agents representations of ants to generate a set of initial solutions After the first set of solutions are found the to tal distance is calculated over all routes and the one with the lowest cost is saved as a pheromone trail When the ant agents s
26. The next and prev variables should form permutations of N and all nodes have only one predecessor and successor the ALLDIFFERENTEXCEPT constraints 6 and 7 ensure this The values of the prev variable at the start nodes are assigned the value of N because they do not have a successor The values of the next variable at the end notdes are assigned the value of N because they do not have a predecessor The ALLDIFFERENTEXCEPT constraint allows assigning a value at these nodes which is not an index in the variable array ALLDIFFERENT next N Vj N5 8 ALLDIFFERENT prev N Vj NF 9 34 The ALLDIFFERENT constraints are redundant with 6 and 7 they improve prop agation and reduce the time it takes to find a feasible solution The consistency level of these two constraints can be modified to find good solutions and is evaluated in Section 6 3 the available levels are bound consistency and domain consistency NOCYCLE next active 10 The NOCYCLE constraint 10 is used to eliminate the possibilities of sub tours ap pearing in the solutions A sub tour is any circuit that does not start or end at the start and end nodes of the overall tour These circuits would be separated from the depot and thus create new routes which are not visited by an arm For nodes where active is zero the value of next will be that node s index i e it will point back to itself NeXtprey i ViEN 11 prev i WIEN 12 To en
27. ance by disallowing certain trays fix tures and cameras to be visited by both arms simultaneously To avoid this waiting is allowed at trays fixtures and cameras The constraint programming model does not utilise the kinematics or dynamics of the robot but instead uses travel times and operation times generated off line obtained by simulation in Robot Studio 14 Structure of the Report The rest of this report is structured in seven sections Section 2 deals with the details of the problem and the background of ABB It presents the FRIDA robot in more detail as well as the robot s working environment An introduction to the vehicle routing problem and an outline of the research that have been conducted on this specific problem type are given in section 3 It introduces some variants of the vehicle routing problem and popular approaches to solving them The job shop problem is also introduced since it is closely related to the vehicle routing problem Section 4 introduces the constraint programming paradigm and Google OR Tools the constraint programming library used to implement the model used in the thesis work This section contains the theoretical background to understand the proposed model described in the thesis A description of the implemented constraint programming model is given in section 5 The model is presented in detail together with core constraints for the vehicle routing problem and the implemented constraints to solve
28. arch as search procedure it can be said that it was a setback The initial assumption that local search would greatly improve the performance of the solving process did not hold true However the speed of each local search test shows promises that should not be neglected This is further discussed in Section 8 3 7 4 Objective Functions It was no surprise that travel time would be the best performing cost function in order to find good solutions although the tests show that using travel time as guidance for the search procedure also has impact on the total cycle time Both when using the systematic tree search and when using local search the travel time objective yielded better solutions over time This indicates that the relation between the total distance travelled and the final cycle time is well connected 7 5 Conclusion When comparing to the reference solution the systematic tree search with randomised restarts did manage to generate a better solution while local search didn t manage to produce a better solution than the reference The tree search solution shows an im provement of 18 when compared to the reference solution The results show that using constraint programming to automatically find good robotic assembly sequences is feasible The implemented model can be used in several ways primarily to find a good enough solution within a reasonable time limit Comparing to the reference where the best sequence was found within weeks of
29. at subset of the Carte sian product of the variable domains is allowed In contrast usual constraints calculate the possible subset of the Cartesian product through a dedicated algorithm 13 Al ternatively the table can be replaced by a deterministic finite automaton DFA The regular expression that the DFA accepts is the set of variable assignments that satisfy the constraint 4 7 5 The Disjunctive Constraint DISJUNCTIVE V si ei spej eT i AG ei ESj V ejSsi 5 28 The DISJUNCTIVE T constraint is a common constraint in scheduling It ensures that a given set of tasks T s e is non overlapping By non overlapping each task s start and end times are constrained so that no task starts during another task as seen in 5 This is illustrated in Figure 7 EN EF ds 1 2 3 4 5 6 7 8 9 10 time Figure 7 The tasks 1 3 and 4 are disjunctive i e non overlapping In Google OR Tools the disjunctive constraint also contains a sequence variable which holds a representation of the ordering in which the tasks covered in the constraint are to occur This sequence variable is a decision variable used to preserve the order of tasks scheduled by propagation and is useful when combining the disjunctive constraint with ordering constraints 4 7 6 The NoCycle Constraint CIRCUIT The NOCYCLE N constraint ensures that for a set N of nodes there exists only one circuit visiting all nodes In routing problem this constrain
30. b As with the VRP the JSP is not always as pure as the description above In real world applications several side constraints must be considered and it is not as strict There is examples where there are additional transition times representing the minimum time that must pass between any two executions on the same resource It is not uncommon for activities to be associated with a set of resources on which it can be scheduled The similarities between the VRP and JSP have been studied in the literature and tech niques for reformulating the two problems into each other have been studied and pre sented with good results 4 This shows that there is great similarity between the two problems and most of the real applications have elements of scheduling and routing such as travelling time total ordering of visits or activities and duration When reformulating the VRP as a scheduling problem the vehicles become resources and the visits become activities that are to be performed on these resources Each activity can be performed on each resource and when the VRP contains time windows the execution is constrained within these Travelling times are remodeled as transition times To model capacities on vehicles a consumable second resource is associated with each primary resource When to use the JSP or the VRP Since there are several problems that fall between the pure JSP and the pure VRP there have to be some criteria to determine what so lution m
31. ch tests show that for this model using the pre implemented local search operators is inefficient The speed in which they find neighbours and test solutions however suggests that local search could be a great improvement to the model Local search is also used in scheduling sometimes with swap or shuffle opera tors which bear close resemblance to the or opt operator in Section 5 4 2 for routing problems Testing showed that the local search efficiently optimised the travel time of the problem but did not take into account the cost of waiting at each node This means that if a move generated a shorter travel time while introducing a longer waiting time it was allowed anyway This is because of the travel time cost function and a possible solution is discussed in Section 8 4 Further research into good local search operators combining makespan and travel time would improve the model greatly when it comes to finding a near optimal solution fast 8 4 Multiple Objective Functions Since the results from using both makespan and travel time as objective function in the model are similar it would be most interesting to look into multiple objective optimi sation By combining the two cost functions and searching for solutions where both are guiding the search even better solutions are assumed to be found Or if no better solution is found the best solutions can be obtained within a much shorter time This in itself is a whole area of exploration that wi
32. constraints and uses special propagation algorithms Global constraints are well documented in the literature and often proved to solve complex problem which cannot be solved by binary constraints Global constraints can be described as constraints that capture relations between a non fixed number of variables 28 Using global constraints adds readability and provides better propagation that will cover all covered variables while a binary constraint only covers two variables at a time 28 Such constraints can be found in the Global Constraint Catalogue which contains de scriptions of 347 global constraints and their names in a number of constraint solvers 6 For each global constraint described below the first name is the name in Google OR Tools the name of the constraint in 28 is given within parentheses 4 7 1 The AllDifferent Constraint ALLDIFFERENT Vx xjeX iz jo KAL 2 One of the best known global constraints is the ALLDIFFERENT X constraint which has practical usage in many constraint models The ALLDIFFERENT constraint states 27 that in a given set of variables all variables have pairwise distinct values This is a straightforward constraint that can be expressed by declaring the binary constraint x Z xj between all distinct variables x and x of X A special case of the ALLDIFFERENT constraint is the ALLDIFFERENTEXCEPT X c constraint which works like the standard ALLDIFFERENT with the addition of a con sta
33. d makespan as the objective function When using makespan to guide the search no local search operator managed to improve the initial solution found with systematic search Operators 4 5 and 6 were unable to improve the initial solution within the time limit 47 Objective Value s Makespan s Travel Time s a 102 44 113 29 b 110 90 113 29 c 110 90 113 29 d 102 44 113 29 d 110 90 113 29 f 110 90 113 29 g 102 44 113 29 h 102 44 113 29 Table 7 Best objective value for each setting s and objective function Solutions s Makespan Travel Time a 14 16 b 4 6 c 4 6 d 14 16 e 4 6 f 4 6 g 14 16 h 14 16 Table 8 The total number of solutions found using each cost function Figure 12 shows a graph over the solutions found when using local search with operator 2 and travel time to guide the search The first solution in the graph shows the initial solution value Using travel time as the objective function will in some cases result in a better cycle time however in order to find these solutions the search sometimes finds solutions with a higher cycle time 6 7 Impact of Using Different Tools for Pick up An alternative test was done where the ratio of components picked up with the suction cup tool was changed These tests takes a parameter t which takes on values 0 to 5 indicating how many components are picked up using the suction cup to
34. d the later solutions This is a trade off that has to be made between finding the first solution fast or finding the best solution faster 7 2 Randomised Restart The tests using randomised restart strategies show an improvement over both the initial tree search test and the local search test The running time of the solver to find solutions is equivalent to the performance of the systematic tree search but the quality of the solutions and the number of solutions were greatly improved While using the randomised restart solving strategy the model gave the best results of all evaluations This is partially because of the objective where the makespan of the last found solution before restarting the search will guide the search to ignore the same sub tree of the search after restarting This leads to more efficient searches after each restart given that the previous search found an improved solution 52 7 3 Local Search Local search did not perform well under the circumstances as it was outperformed in every case by the systematic tree search Several of the move operators failed to improve the solution at all while the others made minor improvements by improving the travel time The fact that local search only managed to improve the initial solution 1f it used travel time to guide the search shows that these operators do not work well with makespan as cost function but rather the distance only From the results gained when testing local se
35. des between two different routes e Cross exchange parts of two routes This could be the starting or ending part of the routes The following move operators are implemented in Google OR Tools see Section 4 10 and require the use of Boolean variables to designate if a node is active in the current solution This is to model disjunctions where only one visit in a set of customers is performed e MakeActive make one inactive visit active e Makelnactive make one active visit inactive The direct opposite to the Make Active move operator e SwapActive make one active visit inactive while inserting one inactive visit in the exact same place in the route such that the travel time is reduced e Extended SwapActive equal to SwapActive but test all possible insertions of all inactive visits when inserting the inactive visit Apart from the mentioned local search moves there also exist several others that can be implemented depending on what problem is to be solved 17 Certain algorithms exist that can help the search not to get stuck in local optima rather they guide the search out of the local neighbourhood in different ways These algo rithms are called meta heuristics Two interesting meta heuristics are tabu search 7 and simulated annealing 9 which have both been used on VRPs with good results Constraint based local search 27 is a concept of combining the speed and power of local search with the ease of modelling in const
36. ds combining techniques to find better solutions In this way all the strengths of the techniques can be utilised to find a near optimal solution fast and with reasonable certainty that it will be feasible Similar to the local search approach Large Neighbourhood Search LNS is a tech nique that uses meta heuristics to improve a current solution Instead of using smaller moves like those in local search the LNS approach is aimed at gradually improving a solution by alternately destroying removing variable assignments parts of the cur rent solution and repairing it assigning new values using the systematic search of constraint programming The heuristics used in LNS are such that they guide the algo rithm in these two steps by telling how the current solution is to be destroyed and how to rebuild the next solution 20 The principle behind LNS is that searching a larger neighbourhood around any cur rent solution will result in local optima that are of high quality however the searching of a larger neighbourhood is often more time consuming than the smaller neighbour hoods defined by the local search operators since increasing the neighbourhood size also increases the possible ways a new solution can be constructed 20 Several other hybrid approaches have been introduced and show promising results when solving the pure vehicle routing problem types such an example is to combine different meta heuristic methods such as genetic programmin
37. e a COUNT constraint over each column in the matrix In this case the same camera can be used several times so there are no COUNT constraints posted on the rows to constrain the usage of each individual camera COUNT CameraRoutesm 0 NbComponents 1 33 To handle the multiplicity of fixture nodes a TRANSITION constraint is posted giving a specific pattern of how the route variable is assigned to each node i The pattern assumes that the two sub assemblies in the case study are mounted on different fixtures The pattern constrains each sub assembly to be fully assembled on one and the same fixture i e all nodes with the same fixture parameter value of this sub assembly are active The pattern also constrains the two different sub assemblies to be assembled on different fixtures 1 e active nodes of the second sub assembly must have instance data parameters that are different from those of the first sub assembly The pattern contains both cases where the two sub assemblies are fully assembled on both fixtures such that there exist two possible assignments of active fixture nodes FixtureRoute routei route route Win i Fixture gt 0 34 TRANSITION FixtureRoute Transitions I T 35 An argument of the constraint is an array of route variables described in 34 Each of the variables route in FixtureRoute is ordered in ascending order on the SubAssembly parameter first and then on the FixtureOrder parameter T
38. e constraints were posted and the variable domains were preprocessed This setting did the fastest search however the first solution was found first when the A IDif ferent constraint strong propagation parameter was set When evaluating the model by using different cost functions to guide the search travel time and makespan the results show that travel time indeed has an impact on the cycle time even though makespan is identical to cycle time This shows that makespan and travel time are tightly coupled and have similar impact on the solution cycle time The systematic tree search shows to be most effective when solving the sequencing problem All possible combinations of the problem tested when varying the pickup tools used and thus increasing the problems size were solvable and yielded good results within the given time limit With the need of aiding the install process of the FRIDA robot finding only one solution to start from within a short period of time is valuable and finding a good solution within minutes is a very valuable result Testing different parameters shows that the biggest impact of parameter settings is given by the pre processing step By initially removing values from the domains of variables which are not allowed showed to decrease the size of the search space dras tically The consistency level of the ALLDIFFERENT constraint shows that the search process benefits from a weaker level reducing the time for the solver to fin
39. e model constraints The model is tested with different search configurations to find the best solution within a given time frame All experiments are run under Windows 7 on an Intel Core i7 of 2 13 GHZ and 8 GB of RAM To be noted as successful the configuration needs to find a solution within 20 minutes that is better than the reference solution which was found within weeks For testing different local search operators the timelimit for the solver was set to 5 minutes to find optimal solutions When doing tests which include randomisation such as in Section 6 4 each test was run a total of 20 times and the average value of that data was calculated When eval uating the best solution found during the multiple tests if any solution was found the highest and lowest makespan value of the solutions were collected as well as the average solution value of the 20 runs In order to test the model fully three test types have been done The first test type has tests of the model settings comparing the possible parameter settings and finding a best performing setting three binary parameters are tested resulting in eight settings done with systematic search local search and different cost functions for each The second test case is to use the found best performing setting from the previous test and to compare with the reference solution in order to evaluate the quality of the solutions found by the model The third test type is done by using differen
40. e of the attributes of this problem lie in the domain of a JSP such as the precedence constraints The choice of modelling as a VRP comes from the remaining attributes 20 being dominant in that the travel time between the trays fixtures and cameras is greater than the duration to perform the pick up or drop off operations 21 4 Constraint Programming Constraint programming CP is a way to solve problems through modelling the prob lem as a Constraint Satisfaction Problem CSP with variables and constraints describ ing relations between variables The CP paradigm is declarative meaning that as a pro grammer the task is to describe the problem s structure and the logic without control flow The problem model contains all information necessary to solve the problem with a general algorithm parametrised by inference algorithms that are specific to the con straints used in the model This allows the flexibility of reusing the general algorithm for many different problems The software implementing the constraint programming algorithms and constraints is here referred to as the solver This section introduces the necessary theory and definitions needed to understand the implemented model and the discussions sections of the report This section is based on 3 25 the interested reader is encouraged to read them for further information on constraint programming and examples of other problem types 4 1 Constraint Satisfaction Problems
41. e resulting search tree is finite with suitable conditions on the branching since the store after each propagation is stronger than the previous It is non overlapping such that no solution to the problem is duplicated And the solver does not lose solutions during search rendering a complete search over all assignments It is also systematic only considering one variable at each decision until all variables are assigned 24 4 5 2 Heuristics How to branch during search is defined by the branching heuristics These are based on the programmer s knowledge of the search space and the problem at hand These heuristics define in what order the variables are selected for branching and what deci sions e g value assignments should be done in each branch Branching heuristics are vital in order to find good solutions fast 4 5 3 Exploration Depth First Search One way to solve constraint satisfaction problems is to use a depth first search DFS approach The search will explore each branch as deep as possible before backtracking If a propagator fails at any node the search will backtrack and try the right branch before continuing on the left branch until a solution is found An example of DFS is given by Figure 5 that shows that the left most nodes of the tree are visited first then the search systematically visits the closest branch to the right This approach is common in constraint programming since in many cases it will lead to finding a
42. earch the graph and select which node to travel to next they use a probabilistic rule and prefer to move to a node based on short edges or high pheromone value Ant colony optimisation has been successfully used in solving the TSP 12 and is applicable to the VRP 21 3 5 3 Local Search Local search is a meta heuristic technique that is often used for optimisation problems This technique defines a transition function that given one solution will explore the neighbouring solutions that can be reached from the initial solution via the transition function The objective value of the problem is evaluated for each neighbour and only the can didates that improve the current solution the most are kept for further iteration The process is then repeated with the optimal solution as the new current solution Local search is an iterative improvement method that only finds solutions that are neighbours of the current solution and can therefore not be sure to find an optimal solution to the problem it might only find local optima Local search is a popular approach to solve routing problems because of the simplicity to define the neighbourhoods of a route For solving routing problems with local search there exist several move operators 15 e 2 Opt change the location of two arcs in the route The two arcs are removed and the nodes affected are connected by new arcs e Relocate move a visit from one route to another route e Exchange swap two no
43. ed constraints and variables are those which are intended to use when modelling scheduling problems However the experiments in Section 6 suggest that they provide a more efficient model when used together with the routing constraints and enabled synchronisation between the two routes 5 2 Model I now describe the core routing model in terms of instance data decision variables constraints and objective function All instance data parameters are referenced with 31 the first letter in upper case while decision variables will be referenced with lower case letters Instance Data The model takes a description of the production cell as an input in order to post the constraints This cell description contains information about the total number of nodes fixtures arms and components in the problem that are all derived from the input assembly graph The following parameters are important for the model NbNodes is the number of nodes in the model i e nodes corresponding to a tray fixture camera etc NbRoutes is the number of routes to be scheduled one for each robot arm and one to assign nodes that are not part of the solution i e nodes that are not active NbComponents is the number of components in the product assembly O x is the capacity for a given resource j on route k In the case study these resources are the gripper and suction cup capacities on each of the robot s arms These parameters are used to preserve the general
44. em These cameras are also used when a component is picked up using the suction tools the robot knows the placement of the component with a minor error To compensate for this error it needs to take a photograph of the component and calculate at what angle to place it at the fixture In some applications there might be other tools in the cell that are required for a certain process step examples of this are air guns for cleaning components before assembling them on the fixture Figure 3 gives an overview of the layout of the cell in the case study as simulated in the programming software Robot Studio The trays are positioned so that the robot can easily reach each component and there are two fixtures in front of the robot on which to assemble the components The cell also contains 5 cameras distributed over each tray and an air gun in the upper left corner of the cell 2 4 Optimising the Task Sequence The many combinations of the cell setup together with the complexity of finding good ways to move the robot s arms through the cell requires experienced programmers Since each assembly is to be done several times during a product s life time each assembly is referred to as a cycle with the assembly line containing several cycles Finding the robot assembly sequence under these conditions proves to be a difficult task and requires experienced programmers who know what can be done to improve the total cycle time of the product assembly Even wit
45. emoved before launching the solver process 6 3 Systematic Tree Search The data in Table 4 shows the results from tests run using systematic tree search Each of the combinations of settings was run and the time for the solver to find a first solution was recorded together with the number of branches and failures to find that solution The first solution was fastest to obtain when using setting g That is using the weaker 45 s Time s Branches Failures Cycle time s a 5 644 714 312 113 29 b 27 394 721 314 113 29 c 27 173 721 314 113 29 d 4 689 714 312 113 29 e 26 336 721 314 113 29 f 26 944 721 314 113 29 g 4 289 714 312 113 29 h 4 370 714 312 113 29 Table 4 Time number of branches and number of failures taken to find the first solu tion together with the objective value s Time s Branches Failures Cycle time s a 1081 493 667 953 334 035 102 44 b 74 878 22 643 11 329 110 90 c 75 985 22 643 11 329 110 90 d 1111 742 667 857 333 987 102 44 e 71 822 22 643 11 329 110 90 f 774 409 22 643 11 329 110 90 g 1114 213 667 857 333 987 102 44 h 1128 902 667 857 333 987 102 44 Table 5 Time number of branches and number of failures at the last found solution propagation for the ALLDIFFERENT constraint together with a high number of prece dence constraints and when pre processing the variable domai
46. ethod to use to solve these grey zone problems Beck et al 4 present some properties that differentiate the two problems from each other 19 In the VRP the duration of operations at each node is small compared to the transit time however in the JSP the operations are dominant In the JSP the objective is to minimise the ending time for the last task also called makespan In the VRP the studied criterion is the travel time over all routes In the JSP there are usually few resources that can perform an activity in the VRP on the other hand most vehicles can perform most visits The JSP has time window dependencies that are fixed for all activities The task is to allocate a resource to each activity The VRP contains fewer dependencies between visits especially on different routes In another study by Beck et al 5 the similarities and differences of the VRP and JSP are examined The experiments in the study are done by solving a test instance generated from attributes which range from VRP properties to JSP properties These instances are solved using JSP solvers using systematic search and VRP solvers using local search The result presented shows that both solvers are able to solve all instances to optimality However when several precedence constraints are present the VRP solver must begin with a solution from the JSP solver in order to find an optimal solution 3 7 The VRP of the Thesis Project The FRIDA sequencing problem in
47. f which tool to use for pick up search found a better solution after two solutions while local search did not manage to find a solution that outperformed the reference within the time limit 50 t Upper Bound s Lower Bound s Average s 0 0 872 0 557 0 669 1 3 400 0 624 1 212 2 30 083 0 850 3 061 3 20 882 0 884 3 349 4 40 647 1 199 12 432 5 26 079 1 167 4 759 Table 11 The upper lower and average search time to find the first solution when changing which tool to use for pick up Solution Objective Value Reference 85 12 Tree Search 70 49 Local Search 89 95 Table 12 Cycle time value of the reference solution and the best found solving ap proaches under the assumption that operations on fixtures are performed concurrently Cycke time s A AA AK ra aL ARA AA 4 Local search N Tree search is Reference E m m 12 13 14 15 Solution number Figure 13 The solutions found by the solver as compared to the reference 51 7 Conclusions In the followin sub sections I will discuss the results found when running the experi ments presented in Section 6 7 Systematic Tree Search The best performing setting for the FRIDA sequencing problem when looking at total cycle time and the total running time of the solving process was when domain consis tency for AllDif ferent was turned off an increased number of precedenc
48. for the task e g one arm can pick up one component while the other arm can perform a process step 2 3 The Lean Production Environment Cell The production environment in which the robot is placed when working with product assembly is called a cell Within this cell the FRIDA robot is operating autonomously without any interference from the outside world The input is trays with new parts or sub assemblies to assemble The output are those parts assembled to a new sub assembly The input trays are filled outside the cell by a different part of the production line be it manually or automated The given output assembly is handled either by another robot in the production line or manually by a human worker The components that the robot will assemble are initially laid out on trays in the cell from which the robot will pick up components and place them on one or several fix tures A fixture is a mounting for a sub assembly which gives the robot a stable refer ence where the components always are positioned in the same way The layout of these trays and the fixtures is flexible and can be moved anywhere inside the cell Also each tray is of the same size which allows for several combinations of the cell layout Airgun Figure 3 A simplified overview of the lean production environment cell For each component tray in the cell there is one camera To find components on the tray the robot system uses cameras as its vision syst
49. g with simulated anneal ing and tabu search 23 3 6 The Job Shop Problem A problem similar to the VRP is the Job Shop Problem JSP The JSP is an NP hard combinatorial optimisation problem described by a set J of jobs that are to be scheduled over a set M of resources 30 Each job consists of a sequence of activities A a1j a2j aij where aj represents the i activity of job j J Each activity a corresponds to a pair m pij where pi is the duration for the activity and mj M is the designated resource on which the activity is performed Each activity requires an allocated resource for the entire duration meaning that no other task may be using the same resource during that time Also all tasks have to be finished once they are started meaning that no pre emption is allowed The ordering of the activities for each job posts precedence constraints such that no activity may be started before the previous activity has finished executing on a resource The problem is modeled by posting disjunctive constraints on all activities that use the same resource and conjunctive constraints on activities in each job such that the complete ordering is preserved The objective of the JSP is to minimise the makespan of the schedule that is the time passed between the start of the first activity on all resources and the completion of the last activity on all resources This is equivalent to minimising the time of the last finished jo
50. h or backtrack if no other branch exists The function f can be any function that for the given problem calculates a good boundary value This function could be strictly discrete or it can be a relaxed to a real value function For vehicle routing problems a good boundary function to use is a shortest path heuristic function that can compute the best bound for each route in the VRP Restarts During Search Assume that the branching uses randomisation The cost of backtracking can be too high and to save time during the search a restart strategy can be implemented This restart is set to start the search from the root node once a criterion has been met This criterion can be a time limit no solution found within x seconds or a limit on the number of failures A restart strategy is a sequence t1 f2 f3 where t is the number of branches and backtracking steps the randomised search is allowed to perform After f steps the search is restarted from the root node and is allowed to run for t steps The sequence can either be the number of steps or a sequence of scalars multiplied by a fixed number of steps Restart strategies are commonly used for minimising the cost of randomised search heuristics As with all heuristics the restart strategy selected is based on knowledge of the problem at hand In the case of randomised search it is based on the run time dis tribution of the specific problem these strategies are called non universal In
51. h experience installing and getting a robot to run can take several weeks to get a good enough performance from the robot In the studied reference case where an installation of the FRIDA robot was carried 12 out the time it took for the entire installation to reach good enough results was a couple of weeks This project was made by an ABB engineer who manually crafted the sequences in which the robot would carry out certain tasks and optimisations were done in small iterations In order to save time and to get the most out of the FRIDA robots when automating a product assembly this process of installing and configuring the robot could be done by using operations research tools to automatically construct robust assembly sequences and search for an optimal task sequence As an addition to the finding of an optimal task sequence the tools can also be used to identify bottlenecks in the design of the production cell and in that way aid an iterative process of continuously optimising the installation 13 3 The Vehicle Routing Problem 3 1 The Travelling Salesperson Problem The Travelling Salesperson Problem TSP is a specialisation of the vehicle routing problem and is one of the oldest optimisation problems known The problem is formu lated as Find the shortest path a salesperson can take to visit all of his customers in one route and return to his home town The goal can be reformulated as finding a Hamil tonian tour given a set of
52. he constraint solver and values of the remaining as signments In addition to the implemented constraints and propagators Google OR Tools offers full support for implementing custom constraints and branching heuristics 30 5 Implementation of the Constraint Model 5 1 The FRIDA Cell Case Study The following section will describe the unique input instance used to test the thesis constraint programming model The parameters presented are those specific to the case study however they are presented in a way to preserve generality This gener ality allows reuse of the model without extensive alteration in order to utilise similar assemblies Most of the nodes of the VRP model are related to a pick up or delivery task for example picking a component from a tray and mounting it on a fixture This creates a relation on such node pairs which present themselves as precedence constraints where a component has to be picked up before being placed on a fixture Aside from the precedences among the component nodes there also exist precedence constraints on the ordering of the assembly more precisely which component is placed first on the fixture This 1s dictated by the assembly graph and is necessary in order to get a correct final assembly In the definition of the VRP one node cannot be visited several times since this would contradict the Hamilton circuit of each route in the problem In the project the VRP has some nodes which are geographical
53. here both arms work to drop components and perform other tasks For all interval variables of nodes where the Fixture index is non zero the DISJUNCTIVE constraint 28 is posted The constraint covers all interval variables for all nodes as mentioned in Section 4 7 5 we can ignore all interval variables for each node where the value of active is false vi e C 0 29 DISJUNCTIVE interval j V Tray iv Camera i Also in order for the arms not to block the view of the other arm camera nodes cannot be visited while the same tray note is visited In order to separate these visits the 38 DISJUNCTIVE constraint 29 is posted for each tray camera node pair The pair is defined by the tray and camera parameters for these nodes When these parameters are equal the camera node is directly above the tray node The DISJUNCTIVE constraints in the model can be regulated by the user In some cases where it is possible to separate the fixtures in the assembly cell it is not necessary to post the disjunction on both fixtures If this is the case the disjunctions may be posted on each fixture separately 5 3 3 Capacity To model capacity along each path Kilby et al 15 suggest an approach to use the same constraint as for the accumulated arrival time at each node However this solution proved to be ineffective when the problem contained pick up and delivery aspects with low capacity and is thus not suitable for this case
54. his results in the pattern Transitions where drop off node for each pair of component and fixture parameter are constrained such that only one drop off is present in the final solution while the other nodes route route variable is set to zero The route allocation is then solved by the TRANSITION constraint 35 41 5 4 Search Strategy and Branching Heuristics The model has three different searches implemented systematic tree search ran domised restart tree search and local search In Section 5 4 1 the branching heuristics for the systematic search is presented this is based on the theory in Section 4 5 Local search is described in Section 5 4 2 5 4 1 Systematic Tree Search In the systematic search the first set of variables to branch over are the route variables These are chosen first since the assignment of nodes to an active route i e route 1 or 2 will propagate many other nodes to be inactive The nodes with the most impact are the tray and fixture nodes since all nodes with the same component are required to be on the same route Assigning routes early will decrease the size of the search tree When the route variables have been assigned the search branches over the sequence variables First over the disjunctiveSequence variables followed by the routeSequence variables This is a feasible strategy since when the route is assigned many of the interval variables will be set to unperformed and will not be considered during prop
55. inom en 20 minuters tidsgr ns vilket r ett god k nt resultat Samtidigt ppnar resultaten upp f r vidare unders kning av problemet f r att f rb ttra l sningarna Acknowledgements The work with this thesis project has been educational and interesting I ve gotten insight into how a large industrial company like ABB operates and the interesting world of robotics I would like to thank my supervisor Johan Wess n at ABB Corporate Research for all the help and support and for many a good discussion about the problem and optimisa tion technologies I would also like to thank my reviewer Pierre Flener for his invaluable feedback during the writing of the thesis A special thank you goes out to Ivan Lundberg Mikael Hedelind and Peter Fransson at ABB for their time to answer any question about the FRIDA project and help to provide simulated data to perform the evaluations and benchmarks Last I would like to thank all the persons at ABB who during my time at the office all made it a good working environment Contents 1 Introduction lj Set ngoz Lu css Rev Bee Pee Sehr ee 1 2 Project Purpose and Goal ser ss 1 3 SCOPe gt e ierg ra von Ob iR CUR Sum es 1 4 Structure of the Report lens 2 Background 2 1 ABB Robotics and the FRIDA Robot 2 2 Assembly Graphs 4 a ye de a ar RIP AS 2 3 The Lean Production Environment Cell 2 4 Optimising the Task Sequence
56. int c and all its variables xj for each value in the domain D x there exist values in the domain of all other variables in c such that all the values form a solution to c This is the most popular and strongest consistency level and is often referred to as Generalised Arc Consistency GAC To achieve GAC is expensive and sometimes the cost of reaching GAC is not motivated and thus a weaker consistency is chosen instead 23 In order to tune the solving process different levels of consistency are usually exper imented with so as to find a solution fast In the VRP there has been evidence where using bound consistency for some constraints will increase the speed of the search pro cess and aid in finding better solutions within some given time limit This time limit is usually present in situations where a good enough solution has to be found fast however it is not necessarily optimal 4 5 Search Only propagation in itself is not enough to find a solution instead the solver needs to search for solutions Together with propagation the search is the main concept for constraint programming The search made by the constraint solver is a complete search meaning that it will cover all possible assignments of values to variables Propagation occurs in each search step to prune values leading to an infeasible solution under the current store resulting in a stronger store This ensures that the size of the search space is strictly decreasing With
57. is a significant decrease in solving time between the tests where t 4 and where t 5 while the resulting cycle time is similar for both 6 8 Compared to the Reference Solution After all the initial tests were run the model solutions were benchmarked against the reference solution with the best performing settings The setting with the best perfor mance was the systematic tree search using setting a in Table 3 and using random value selection for searching route allocation The objective function yielding the best results was makespan The results in Table 12 show the reference solution with simulated time data the best performing model as well as the best result found using local search to guide the search The local search operator used was the best performing as shown in Table 9 Figure 13 shows each solution found in comparison to the reference solution the hor izontal line being the reference solution As can be seen in the graph systematic tree 49 Cycletime s 7 8 9 10 11 12 13 14 15 16 17 Solution number 18 Figure 12 The cycle time value using travel time as cost function and the or opt local search operator t Upper Bound s Lower Bound s Average s 0 56 15 49 40 52 11 1 70 75 66 26 68 72 2 101 51 95 41 98 27 3 101 83 94 48 97 23 4 104 94 96 92 100 81 5 105 70 98 96 101 74 Table 10 The upper lower and average objective value for different settings o
58. ity of the model and allow solving the problem with different resource configurations on the robot arms Tj jx is the travel time from node i to node j on route k This data is necessary to find what arm will have the lowest cost when containing the arc connecting nodes i and j For future reference the following notation is used for some important set of nodes in the model They are used for expressing some of the constraints S 1 NbRoutes is the set of indices for the start nodes for all routes V NbRoutes 1 NbRoutes NbNodes is the set of visits in the cell E NbNodes NbRoutes 1 NbNodes 2 x NbRoutes is the set of end nodes for all routes N VUSUE is the set of all node indices in the model NS V US is the set of nodes that have a successor NE V UE is the set of nodes that have a predecessor For each node the instance data is generated from information about the components and the actual location that node represents in the cell For each node the following integer parameters are known Id is a unique integer used to references the node in the input array Component is an integer value that references the component handled at this node by either a component pick up drop off photograph or operation For nodes not representing a component this value will be 0 these nodes are the output and start and end nodes Fixture is an integer value referencing the fixture the node represents
59. ll need careful research to find a good way to combine the two cost functions 8 5 Cell Layout Optimisation It would be interesting to look at optimising the layout of the production environment to find an optimal or near optimal setup for the FRIDA robot The complexity of this optimisation problem is huge since the problem will deal with continuous variables with high precision and also take into account several parameters coupled with the design of the robot as well This problem is highly interesting and lies beyond the scope of this thesis 8 6 Extending the scope The generated routes from this solution form just one assembly The final assembly needs to be more thoroughly tested with the given route simulated over several cycles in order to make sure they hold over several iterations This will have to be done outside the model with more accurate simulations Getting the exact time is difficult and will need long time in order to be evaluated properly Since the model has only been tested on one reference installation and setup of com ponents it should be subject to more testing and experiments in order to improve the 55 performance Looking at possible other installations and testing the solver against sev eral handcrafted solutions would give more valuable insights into the problem domain and help to improve the model further Alternatively the different tests and the fact that the solver can output several interesting solutions
60. ly the same location one such example is the fixture nodes Because of this the tasks performed on the fixtures are multiplied such that there exists one node per task and fixture combination This also introduces another aspect of the problem as none of these nodes can be visited at the same time as any other node i e there is a temporal disjunction between visits An extra level of freedom is introduced to find more solutions By allowing the com ponent tray layout of the cell to be rearranged the total number of tray nodes is derived from the possible permutations of component tray layout The number of fixture nodes is also multiplied by the number of actual fixtures in the cell so that the best placement of the components can be found Since the VRP states that each node in the problem can only be visited once the number of cameras needs to be multiplied by the number of components that needs to be photographed Because of the introduced freedom in the problem there needs to be an efficient way to handle nodes that are not active in the final solution Otherwise finding a good solution or getting a solution that is near optimal will be extremely hard The objective function of this problem is the total cycle time of the assembly which corresponds to the total makespan of the assembly However since the travelling times are greater than most task durations of the problem it is still modeled as a vehicle rout ing problem Some of the us
61. ns In Table 5 data regarding the last found solution meaning the last solution found before reaching the time limit is presented with the search time number of branches and number of failures The result differs from what we have for finding the first solution The last solution is best found when using setting a that is using domain consistency the ALLDIFFERENT constraint using an increased number of precedence constraints and performing pre processing of variable domains The difference between finding the first and last solution is only the consistency level for ALLDIFFERENT 6 4 Random Restart Search The graph in Figure 10 shows when the 14 solutions using setting a and makespan were found during the test run in Section 6 3 This is used to select a restart strategy for randomisation and restart test The search restart limit used is 1000 failures which is within the first leap between solution 2 and solution 3 where the search time differs from 6 37s to 45 57s and number of failures differs from 300 to 2500 In Table 6 the results from randomised testing are presented Given the best solution found from the previous test the randomised restart approach shows an improvement by an average of 4 73 The solution with the lowest resulting cycle time had an increase of the total cycle time of 3 39 over the previous best found solution 46 Searchtime s e e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Solution number Figure 10 Time for
62. nstallations in workspaces intended for human work ers The size and targeted applications of this robot make it suitable for smaller assem bly tasks normally performed by human operators Finding an optimal assembly sequence for the FRIDA robot is hard because of the nu merous constraints and parameters that have to be accounted for to find a sequence There exist scenarios that will cause the arms of the robot to collide which is prohib ited Also there might be solutions that are seemingly bad but will prove to be better than naive solutions when implemented All of these parameters combined has proven to be a complex task and finding a good enough solution can take weeks Because of the continuous changes in the assembly line which is common in a lean environment it is interesting to automatically obtain good assembly sequences Over an entire assembly line a single product assembly is called a cycle In some scenarios the cycle time is measured in seconds and major savings can be provided through small improvements in the sequence Enhancements to provide an improvement on a prod uct assembly will result in higher throughput and better savings throughout the entire assembly line A constraint programming model 3 is proposed as a method to automatically find a good solution for aiding the programmer installing and configuring the FRIDA robot in an assembly environment and thus decreasing setup times and cycle times simulta neously
63. nstrained Each node has a requirement for at least one resource k in acc and thus the other possible resource load must be preserved over that node i Depending on the kind of node and the tool used to pick up the component of that node the DFA of the TRANSITION constraint described in Section 4 7 4 will differ slightly For all pick up nodes the DFA in Figure 8 will ensure that the accumulated value at the node is increased by one by only allowing values larger than the minimum value of acc g For all drop off nodes the DFA in Figure 9 will ensure that the accumulated value is decreased by one by only allowing values smaller than the maximum value of acc z 39 Start w 1 2 0 max 1 Figure 8 The increasing automaton for the acc variable where max is the lowest SU value of acc z start w Figure 9 The decreasing automaton for the accj variable where max is the lowest value of accjx This is done in relation to accy 4 which must be smaller than acc for pick ups and larger for drop offs The benefit of using the TRANSISTION constraint is the ability to constrain route 0 to be assigned certain values as in Figure 9 and Figure 8 In the case of resource load all acc values on nodes that are unassigned are set to 0 This removes the usage of reified constraints for the load of route 0 All route 0 values are set to the minimum value possible in the accumulated variable domain 5 3 4 Route Allocation The
64. nstraint Directed Scheduling pages 1 15 1997 http citeseerx ist psu edu viewdoc download doi 10 1 1 55 7513 amp rep repi amp type pdf M Dorigo and L M Gambardella Ant colony system a cooperative learning approach to the traveling salesman problem IEEE Transactions on evolutionary computation 1 1 53 66 1997 Ian P Gent Chris Jefferson Ian Miguel and Peter Nightingale Data structures for generalised arc consistency for extensional constraints In Proceedings of the Twenty Second AAAI Conference on Artificial Intelligence AAAI 2007 57 14 B L Golden S Raghavan and E A Wasil editors The Vehicle Routing Problem Latest Advances and New Challenges Operations research computer science in terfaces series Springer 2008 15 Philip Kilby and Paul Shaw Vehicle Routing pages 799 834 In van Beek et al 26 2006 16 Gilbert Laporte The vehicle routing problem An overview of exact and ap proximate algorithms European Journal of Operational Research 59 345 358 1992 17 Michael Luby Alistair Sinclair and David Zuckerman Optimal speedup of las vegas algorithms Information Processing Letters 47 173 180 1993 18 Sophie N Parragh Karl F Doerner and Richard F Hartl A survey on pickup and delivery problems Journal f r Betriebswirtschaft 58 2 81 117 2008 19 ABB Corporate Research Dual arm concept robot http www abb com cawp abbzh254 8657f 5e05ede6ac5c1257861002c8ed
65. nt c and the condition that two variables x and x can be assigned to c without violation 4 7 2 The Element Constraint ELEMENT z X 3 The Element X y z constraint is a global constraint that given an array of n variables X x1 xn a variable y where D y C 1 n and a variable z the constraint enforces that z X y In other words the value of the variable in X indexed by the value of y is equal to the value of z Alternatively this constraint could be used with a constant c instead of the variable z The variable in X indexed by y would then be constrained to be equal to the value of c 4 7 3 The Count Constraint COUNT x EX x v 2c 4 The COUNT X c constraint as represented in 4 states that the value v is present in variable array X exactly c times This is useful for modelling problems where there exist resource constraints The COUNT constraint is a specialisation of the Distribute constraint GLOBAL_CARDINALITY which is defined as an aggregated version of COUNT that takes a set VC of pairs v c and an array of variables X Then for each pair v c in VC value v is constrained to occur c times for all variables in X 4 7 4 The Transition Constraint IN RELATION The Transition constraint is commonly also known as the table constraint or the ex tensional constraint An extensional constraint expresses the relation of that constraint through a table The table will explicitly tell the propagator wh
66. o as to express prece dences An example of such a constraint is the StartAfterEnd I I5 constraint which will ensure that Start gt Endr Other variants of this binary constraint also exist which allows synchronising the starts or ends of the intervals 4 10 Google OR Tools The constraint programming library used in this thesis work is Google OR Tools 29 a C library made by Google and available under the MIT license an open source license The library also contains interfaces to some linear programming and mixed integer programming solvers as well as a set of implemented algorithms such as graph e g shortest path min flow max flow and knapsack algorithms The library contains a superset of the global constraints described in Section 4 7 and implements local search as an alternative to systematic tree search This allows one to use constraint based local search with relative ease by implementing the local search operators needed to solve the problem The library also allows concatenating a list of local search operators in such a way that the search procedure of each local search operator is launched in the order they are concatenated the initial solution for each operator will then be the last solution from the previous operator Further OR tools has support for Large Neighbourhood Search as well which is im plemented as a local search heuristic that clears a subset of the variable assignments and builds a new solution using t
67. ol The first test where f is zero is when all components are picked up using the gripper tool and the last test is when all components are picked up using the suction cup tool For these tests the search used was a systematic search The objective value resulting from these tests as shown in Table 10 indicates that using the gripper more often tends to decreases the cycle time compared to using the suc tion cup tool This is apparently not always true since using the suction cup for three components give a lower cycle time than the previous test where two components are picked up with the suction cup When looking at solving times for each of the tests as shown in Table 11 it shows once again that it is easier to find solutions using only the gripper tool This pattern 48 125 T A kh h e A 115 u 110 as o La TT E m m Cycletime s a MS 1 2 3 4 567 8 9 10 11 12 13 14 15 16 Solution number Figure 11 Cycle time value comparing travel time TT with makespan MS op Travel Time s makespan s 1 106 70 n a 2 101 98 n a 3 106 70 n a 4 n a n a 5 n a n a 6 n a n a 7 107 11 n a 8 103 55 n a Table 9 Best objective value for each local search move operator and objective func tion is not definitive since it shows that using the suction cup to pick up all components shows an improvement over using the gripper tool for one of the components There
68. ome implementations of this approach allow using a constraint solver to do the last assign ments of variables in a solution found by local search 29 4 9 Interval Decision Variables The variables used in a model are decision variables which are assigned values The most common variable is the integer variable Such a variable is the standard finite domain variable which can be assigned integer values Some solvers contain specialised variables that can be used specifically to solve cer tain problems One such variable is the interval variable An interval variable is a variable which encapsulates several boundaries these are useful for modelling tasks in a scheduling problem An interval variable can be decomposed into several integer variables which are constrained with binary constraints An interval variable contains the following integer variables e Start is a variable for the starting time of the interval e End is a variable for the end time of the interval e Duration is a variable for the duration of the interval This is the difference between End and Start It can either be a variable duration that is to be set during the solving process or it can be a fixed duration determined by the input data e Performed is a variable to determine if an interval is performed or not An interval is unperformed if End Start meaning it has a negative duration Special binary constraints can be posted on interval variables s
69. optimised Solving a COP by branch and bound introduces the objective as a constraint that for each feasible solution n the value must be lower than the current best value b for a minimisation problem and higher for a maximisation problem 22 4 3 Propagation One of the central concepts in CP is propagation Propagation is the process of re moving values from the domains of variables given that the assignment of the value will lead to an infeasible solution The disallowed values are pruned from the domain For some constraints it is straight forward to find what values will be pruned from the domain such as for the constraint x gt 5 for any variable x all values that are less than or equal to 5 will be removed from the domain of x A propagator is the implementation of a constraint and is responsible for monitoring the values of variables covered by the constraint and removing values which break the constraint The purpose of the propagator is to strengthen the current store into a stronger store A store s is stronger than another store s2 iff s x C s2 x for at least one variable x This denotes an ordering amongst stores and is written as s lt s2 we say that s is stronger than s2 When changes occur to the domain of any variable in the store of a constraint the propagator may prune further values which break the constraint it implements In other words the propagator will remove values that cannot be a part of the solution
70. out propagation during search it would be reduced to a brute force search Constraint propagation together with the complete search is what makes constraint programming a powerful tool 4 5 1 Branching In constraint programming the search space is defined as a search tree This tree is defined by the branching of the model and guides the search for solutions to the current application The branching is what defines the search tree by selecting variables which are not yet assigned values after propagation and dividing their domain into at least two non empty and non overlapping partitions Each partition is a decision on what values the variable can be assigned in a possible solution The decision creates a branch in the search tree and defines the store for each of the resulting sub trees Note that the root of the tree is the store after initial propagation and each leaf node is either a failure or a solution After each decision the affected propagators will check that the current store is consis tent with each propagator and prune values if possible If all propagators are subsumed at this point all combinations of assignments in the store are solutions If any propaga tor signals a failure the current store and that subtree of the search will not contain any feasible solution and the solver will backtrack When a backtrack occurs the solver will undo the latest decision and try with the next partition of the variable domain instead Th
71. pecial safety conditions to be met to ensure a safe environment The Flexible Robot Industrial Dual Arm FRIDA shown in Figure 1 is a concept robot designed by ABB to meet the demands of agile production environments that are usu ally found in manufacturing of consumer electronics 19 Although the robot is made for cooperating with humans or other robots this thesis will only handle the situation where a single robot is working alone in an isolated environment with a dedicated input and output area for components and assemblies Figure 1 Two FRIDA robots working on an assembly line The robot prototype is composed of a portable two armed robot that is the same size as an average adult human The robot s arms contain 7 rotating joints which allows the robot to work within spaces that are designed for human working conditions or even more confined spaces Another part of the concept is that it is completely safe to share workspace with the robot as it does not require specific safety regulations This is useful when an assembly can utilise the parallelisation that the robot is capable of and the precision of a human coworker To perform duties similar to those of a human worker the robot is fitted with hands In the case study the hands consist of two suction tools for picking up flat components and a gripping tool for pick ups and performing other tasks such as lifting trays 2 2 Assembly Graphs The description of how to assemble a
72. precedence con straints are handled Section 5 3 2 describes the constraints used to separate the arms such that collisions are avoided Section 5 3 3 describes how capacity is constrained Section 5 3 4 describes how nodes are assigned to route zero 36 5 3 1 Precedences The sets of indices in 23 are used to express the precedence constraints in the case study Each set is for selecting between nodes to post the binary START AFTER END constraint on the interval variables of each node Vc CA 0 Pickup i i EV ATray gt 0 Component c Camera i i V ACameraj gt 0 Component c 23 Operation i i V A Operation Component c Fixtures i i V Fixture gt 0 Component c There are two types of precedence constraints The first one is precedences regarding nodes prior to and including the drop off for each component they form the ordering of how the component is picked up and placed on the fixture The second one is for all nodes representing the fixtures they form the different operations that are performed on a component once placed on the fixture All precedence constraints are deduced from the assembly input graph and are binary relations on the interval variables The notation i lt j is used to describe the binary interval constraint posted for each prece dence relation where a node i precedes node j in a route i lt j START AFTER END interval interval jx
73. problem med variabler och deras relationer F rdelen med att anv nda villkorsprogrammering f r att automatisera installationen av FRIDA roboten r den relativa enkelheten i att uttrycka krav och begr nsningar i problemet i modellen F r att demonstrera anv ndandet av villkorsprogrammering vid automatiserade instal lationer har en referensinstallation anv nds Utifr n denna installation och med ett Vehicle Routing Problem VRP som utg ngspunkt har en modell skapats och en s k strategi tagits fram f r att kunna hitta bra sekvenser Experiment med ett antal parametrar som f r att kunna styra l sningsprocessen har genomf rts Detta f r att kunna hitta en upps ttning med parametrar som effektivt kan hitta m jliga sekvenser f r roboten i en 20 minuters tidsram F r att kunna j mf ra de resultaten som villkorsl saren gav och den l sningen som till mpades i referensinstal lationen simulerades k rtider f r roboten i programvaran Robot Studio Referensin stallationens tid tillhandah lls genom att l sa problemet med den givna sekvensen och p s s tt erh lla en k rtid som kunde j mf ras med modellens l sningar Utifr n de resultat som experimenten visade p kan slutsatsen dras att villkorsprogram mering r ett l mpligt verktyg f r att automatiskt hitta bra l sningar p problemet med att installera FRIDA roboten Samtliga l sningar som villkorsl saren hittade visade p en b ttre k rtid n referensen och fanns
74. product is called an assembly graph giving the break down of the assembled product and the order in which the components are as Product Assembly Sub assembly Process Operation Process Operation Component 2 Component 3 Component 1 Figure 2 An example of how an assembly graph is represented sembled This graph will also contain process steps that must be performed before the next step in the assembly can take place An assembly graph gives the programmer installing the FRIDA robot a relation be tween the components and the ordering of each part of the assembly When program ming the robot it is the basic algorithm for how to perform an assembly of a product Figure 2 shows an example of an assembly graph containing three components on two sub assemblies In order to achieve a correct assembly component 1 and component 2 need to be assembled before component 3 can be added and finishing the product assembly Also component 1 and 3 are subject to some process operation which needs to be performed before they can be added to the assembly The assembly graph is represented as a tree with the assembled product as the root and possible sub assemblies as sub trees the leaf nodes are made up by the components in the assembly Since each branch of the tree can be made in parallel there is not a total ordering between operations as long as the robot has capacity
75. raint programming see Section 3 5 4 below Constraint based local search has been applied to the vehicle routing problem with good outcome 11 20 3 5 4 Constraint Programming Constraint programming is a paradigm that is further described in Section 4 Con straint programming has proven to be a helpful tool in solving VRPs because of the number of real world side constraints that appear when working with real problems The strength of constraint programming in this case is the ability to with relative ease incorporate side constraints into a model and the checking of these constraints ensures that a solution is feasible 15 Constraint programming performs a systematic search and is normally required to ex plore each possible solution in a predefined order The search process and checking of constraints sometimes make constraint programming a slower approach than non systematic approaches unless it is hybridised with other methods as in Section 3 5 5 below This is a matter of trade off that has to be made when selecting constraint programming as a tool to solve the vehicle routing problem However when dealing with rich VRPs constraint programming has been shown to be efficient in reducing the number of candidate solutions to evaluate since it guarantees that the solutions returned all satisfy the constraints of the problem 20 3 5 5 Large Neighbourhood Search and Other Hybrid Methods A common way to solve the VRP is by hybrid metho
76. s e disjunctiveSequence is a sequence variable that contains the possible orderings of interval variables on the nodes which are covered by the Disjunctive constraints in Section 5 3 2 This is used to synchronise the visits of each arm Redundant with the arrival and start variables All nodes are stored in an array in the model and all decision variables are accessible by the node id Pre Processing of Variable Domains For some variables it is possible to perform some pre processing before propagation takes place The nodes affected by this pre processing are derived from their attributes such as tray index component index and durations The following pre processing can be done in the model given the input node attributes e For any node i where the duration for one route is equal to 1 remove this route from the domain of route e For any node i where the tray index is not zero remove the minimum value of accumulated quantity for the component s designated resource e For any node i where the fixture index is not zero and fixture order is equal to Zero i e the drop off nodes remove the maximum value of accumulated quan tity for the component s designated resource 5 2 1 Core Constraints The following constraints are the basic constraints needed to solve the VRP These core constraints express the route and the information associated with it ALLDIFFERENTEXCEPT next N 6 ALLDIFFERENTEXCEPT prev N 7
77. solution fast given that the constraints propagate well such that backtracking is minimised When solving CSPs each leaf node of the search tree is a possible solution therefore DFS is a good choice for exploring the search tree Figure 5 The numbering of the nodes designates the order in which the nodes of the search tree are explored during depth first search Breadth First Search Another exploration strategy that can be utilised is breadth first search BFS In contrast to DFS the search will explore each level in the search tree in the order shown in Figure 6 Each level will be completely explored from left to right before progressing to the next level BFS is a good choice if the search tree is such that there might exist solutions at any level of the tree Branch and Bound When working with constrained optimisation problems branch and bound is a common choice for exploration It works in the same way as DFS or BFS with the addition of a boundary function f computing the upper and lower bound 25 Figure 6 The order in which nodes of the search tree is explored during breadth first search of the objective function in the COP For every decision made during the search the best value of that branch for f is evaluated If the new bound is lower than the previ ous best the branch is further explored Otherwise the entire subtree under the branch is pruned from the search space and the solver will continue on the next branc
78. straction Reformulation and Approximation volume 2371 of Lecture Notes in Computer Science pages 282 289 Springer Verlag 2002 J Christopher Beck Patrick Prosser and Evgeny Selensky Vehicle routing and job shop scheduling What s the difference In Proceedings of the 13th In ternational Conference on Automated Planning and Scheduling pages 267 276 AAAI Press 2003 Nicolas Beldiceanu Global constraint catalog http www emn fr z into sdemasse aux doc catalog pdf Accessed January 2014 Olli Br ysy and Michel Gendreau Vehicle routing problem with time windows part ii Metaheuristics Transportation Science 39 1 119 139 2005 Yves Caseau and Frangois Laburthe Solving small TSPs with constraints In Proceedings of the 14th International Conference on Logic Programming pages 316 330 MIT Press 1997 Wen Chyuan Chiang and RobertA Russell Simulated annealing metaheuristics for the vehicle routing problem with time windows Annals of Operations Re search 63 1 3 27 1996 Bruno De Backer and Vincent Furnon Meta heuristics in constraint program ming Experiments with tabu search on the vehicle routing problem In Pro ceedings 2nd International Conference on Metaheuristics pages 1 14 INRIA amp PRiSM Versailles 1997 Bruno De Backer Vincent Furnon P Prosser P Kilby and Paul Shaw Local search in constraint programming Application to the vehicle routing problem In Proc CP 97 Workshop Industrial Co
79. sure that the route is consistent the ELEMENT constraints represented by 11 and 12 are used to create a channelling between the next and prev variables These are redundant with each other although the presence of both strengthens propagation route prey route Vi EN 13 route next route Vi EN 14 For each node i on each route route must be the equal to the route of the successor node next This is maintained by the ELEMENT constraints 13 and 14 next j arrival departure Tij route Vi N 15 To accumulate time along the route the constraint 15 is posted with an ELEMENT constraint next RouteSequence route Vi EN 16 start Startinterval route Vi EN 17 departure E NA Interval route Vi EN 18 DISJUNCTIVE Interval Vr NbRoutes Vi N 19 35 Because of the multiple interval variables associated with each node the constraints 16 17 and 18 represent a set of ELEMENT constraints that channel information from the in terval variables to the next start and departure variables given the assigned route The DISJUNCTIVE constraint 19 is used to constrain the Interval variables for each route to be disjunctive this is used for the relation between the ordering of the nodes and the start and departure variables for each node The three time domain variables arrival start and departure allow waiting time at each node arrival lt start Vic N 20 5 2
80. sure the ordering within each set of component fixture nodes Fixtures is maintained while 27 ensure that the ordering of the final assembly is preserved For the purpose of evaluating the model in Section 6 the number of precedence con straints posted can be regulated through an input parameter given to the solver The difference is such that either the component drop off only precedes the direct succes sor of that component or such that the first component drop off must be before all other drop offs The resulting model would accept the same solutions but this approach al lows testing the model with different amounts of constraints and different levels of propagation 5 3 2 Avoiding Arm Collisions In order to avoid collisions on certain nodes in the assembly a temporal disjunction as described in Section 4 7 5 is necessary Such collections of nodes are the fixture nodes which represent the same location in the cell and the camera and tray nodes with the same index since they are in close proximity to each other The other locations of the cell are only visited once in each assembly The interval variables of each node allows using the DISJUNCTIVE constraint and will ensure that the affected nodes are not overlapping DISJUNCTIVE interval j V Fixture gt 0 28 When several nodes are close together the robot arms risk to collide if operating too close to each other This is specifically the case on the fixture nodes w
81. t input data so as to describe what tool is used to pick up a specific component There are two different setups tested for this model for mirroring the manual installa tion process the only difference being how the robot can operate on the fixtures When running the model it was assumed that the fixtures are located close together and thus cannot be operated in parallel The reference solution on the other hand is applied to a setup where the fixtures are separated such that they can be operated concurrently by both arms These setups produces two differently constrained versions one with DISJUNCTIVE constraints over both fixtures and one with DISJUNCTIVE constraints that only covers one fixture respectively For this reason the model is tested in two ways It is first tested with the more constrained version so as to evaluate if the con straint programming approach manages to find solutions to the problem The model is then run with the less constrained version to evaluate solution quality when compared to the reference solution The last test type described in Section 6 7 is applying a variation of the input instance which tests for different configurations of how to pick up components by changing the designated tool from gripper to suction cup the purpose is to evaluate how the model 44 Parameter Domain consistency for ALLDIFFERENT Increased number of precedence constraints Pre processing of variable domains WI NS
82. t is used to ensure that a route can only start at the depot start node and end at the depot start node effectively eliminating possible sub tours This constraint has been shown to be useful in solv ing routing problems in order to make sure that there exists only one cycle for each route 15 8 The NOCYCLE constraint is very similar to the ALLDIFFERENT constraint in that all nodes in the graph require a unique successor and predecessor The different solutions satisfying this constraint are all the permutations of circuits over the nodes in N Even though the constraint name says that no cycles the outcome of the semantics described above suggest that it is actually one cycle Therefore the name CIRCUIT is more precise since the semantics says exactly one cycle However the name of the constraint as used by Google OR Tools is NOCYCLE 4 8 Large Neighbourhood Search A common hybrid approach is to use constraint programming only to control the fea sibility of neighbouring solutions found by a local search algorithm 11 also see Sec tion 3 5 5 In this case the search is controlled by the local search and the constraint model is only used as a checker It can be done to certain degrees since the cost of propagating constraints can be high to the point where it is unacceptable When using the constraint model as checker the local search will be used to find a candidate solution to a sub problem which is checked by the constraint solver S
83. te is preserved 8 2 Customising the Search Strategy The branching strategy used in this model is a naive implementation by simply assign ing the lowest value to the first unbound variable in most cases There are several other approaches that should be examined in order to improve the search speed and find so lutions faster To begin with the search strategy is naive and the value selection is done without detail knowledge of the problem solution space With more knowledge a customised branching strategy could be implemented in order to find solutions faster The most constrained variable will propagate the most when assigned and should be assigned first This is not an option implemented in Google OR Tools but it is possible to implement In order to assign the route of each variable it is possible to select the given route in such a way that the lowest possible duration time is achieved for each node This would be a depth first solution process which will propagate several unassigned nodes to route O fast while allowing a low total cycle time Ways to find good sequences can be improved in such a way that both travel time and waiting time are minimised The evaluation of both these times is helpful when evaluating the total cost of each new assignment and could help the search to find solutions which satisfy both the tested objective functions simultaneously 54 8 3 Improving Local Search Performance The results from the local sear
84. the specific demands of the schedul ing problem with the FRIDA robot Results of the constraint programming model are presented in section 6 of the report It compares running times and solution quality of some combinations of constraints and search strategies as well as the reference solution s cycle time A comprehensive description of the setting for testing is given in this section Section 7 contains the analysis of the results and conclusions drawn from these results These results are further discussed in section 8 where future work containing improve ments and alternative modelling techniques that might be interesting are proposed 2 Background 2 ABB Robotics and the FRIDA Robot ABB is one of the leaders in robotics technology for industrial applications Since the first electrical robot was introduced the number of ABB robots used in industry has risen to around 160 000 all over the world 2 The areas of application for such robots range from painting of components to welding polishing and grinding One major improvement for industry is the possibility to use robots for heavy and monotonous duties such as lifting heavy components Robotics is used all over the world and in many industries from computer manufac turing to buildings cars and the most beneficial part of integrating robots in the work flow is to improve the working conditions for humans However most robots are big and working in the same area as a robot requires s
85. to be per formed on a component before its drop off In the case study this node is the air gun Decision Variables All variables are encapsulated in an array and referenced by a node e Hence the index i denotes a node in the model where i N next N is the index of the immediate successor of i route S is the index of the arm which visits i or O for the unassigned route arrival 0 265 1 is the time of arrival at i departure 0 2 1 is the time of departure at i start 0 29 1 is the time node i is serviced this allows modelling waiting upon arrival at each node acci 0 max Q is the accumulated quantity of resource k after visit i For this case k can either be load on gripper or suction cup tools interval is the interval during which the node i can be serviced on route m This is an interval variable active 0 1 Boolean variable designating if i is active This is used by some constraints to ignore nodes which are not active in the current store Assigning a node to route 0 is equal to setting it inactive prev is the index of the immediate predecessor of i This variable is redundant with next however it is known to improve the model when solving the VRP 15 33 e routeSequence is a sequence variable that contains information about possible orderings of interval variables of each route Contains the same information as the next variable
86. tudy the implemented prototype solutions showed an improvement of 1776 all within a time limit of 20 minutes instead of weeks This shows that constraint programming can be a good tool for automating robot installations Handledare Johan Wess n Amnesgranskare Pierre Flener Examinator Lars Ake Nord n ISSN 1401 5749 UPTEC IT 14 011 Tryckt av Reprocentralen ITC Popular Scientific Summary in Swedish I ett steg att m ta snabbt f r nderliga produktionsmilj er som r vanligt f rekommande inom konsumentelektroniktillverkning d r arbetsuppgiften f r arbetarna kan ndras inom loppet av n gra m nader har ABB tagit fram konceptroboten FRIDA FRIDA roboten r en tv armad robot i samma storlek som en vuxen m nniska och har som m l att vara l tt att installera i ett arbetsutrymme som r gjort f r en m nniska Ett problem vid installationen av FRIDA roboten som har visat sig r den komplexitet i att vers tta en m nniskas arbete till instruktioner f r roboten p ett effektivt s tt Instal lationstider har visat sig kunna ta flera veckor vilket inte r h llbart i sammanhanget av en produktionsmilj som kan ndras inom loppet av n gra m nader M let med arbetet har varit att unders ka och demonstrera m jligheten att automatisera installationsprocessen av en FRIDA robot med hj lp av villkorsprogrammering Vil Ikorsprogrammering r en programmeringsparadigm f r att l sa kombinatoriska prob lem genom att modellera
87. under the current store A propagator is said to be at fixpoint when it cannot remove any more values from the current store If at any point the propagator finds that any value to the variables in the store is not violating the constraint and can appear in the final solution we say that it is subsumed A subsumed propagator does not have to check the store for any change to the store later in the solving process However if the propagator prunes a domain to an empty set it will fail In this case the constraint is violated under the current store and no feasible solution exists 4 4 Consistency Once the propagation algorithm has finished it is said to have reached consistency This consistency is the termination criterion for the algorithm and specifies that under the current store there exist values in the domains of the covered variables such that the constraint is satisfied If the propagator signals a failure the store is said to be inconsistent This notion of consistency is vital in constraint programming and is well researched in the literature There are several levels of consistency but two of the most common are domain and bound consistency Bound consistency is reached whenever for a constraint c and all its variables x the bounds of x participate in a solution to the constraint c This level of consistency is efficient when dealing with linear inequalities such as x y Domain consistency is defined such that for a constra
88. uring certain hours of the day The time window constraint is formulated as follows given an earliest start time E and a latest start time the arrival time a for any node i is constrained to the interval E aj Lj A vehicle is allowed to wait if it arrives earlier than the earliest start time of the given node 3 4 3 Pick up and Delivery Problem The Pick up delivery problem PDP or the Vehicle Routing Problem with Pick up and Deliveries VRPPD is an extension of the VRP where goods are transported along the route of any vehicle such that some visits are associated with pick ups and some with deliveries alternatively both at the same time The VRPPD can be divided into two subclasses 18 The first subclass involves the situation where the pick ups and deliveries are a one to many relation meaning that the goods are supplied by a subset of customers and delivered to another subset of customers This class considers problems where the goods demanded at one customer can be delivered from any of the supplying customers The second subclass handles the case where the pick ups and deliveries are constructed as pairs of nodes forming a one to one relation Goods picked up at one node can only be delivered to one specified destination This can be described as a transportation request where a packet is transported via a route to a delivery This is the classical definition of the PDP and is identical to the Dial A Ride problem DA
Download Pdf Manuals
Related Search
Related Contents
Owner`s Manual FujiFilm S100FS Digital Camera User Manual off!® active chase-moustiques en vaporisateur Devoir n°2010_11 Correction Samsung BT62TDBFST Instrukcja obsługi Hamlet XPW2UTRAVEL mobile device charger Aero Troll - Hegedus Aerodynamics 取扱説明書 Guide Utilisateur Fortidata – Sauvegarde en Ligne Copyright © All rights reserved.