Home

AN001_Maximise your renewable energy

image

Contents

1. The Smart Boost is allowed Xtender settings Basic settings 1100 Press SET and search with Press SET and search with Battery priority voltage 1297 lee SET adjust the desired value with and press SET Your battery voltage is at the right value i The voltage values are XTH 3000 12 12 6 Vdc XTH 5000 24 25 2 Vdc XTH 6000 48 50 4 Vdc XTH 8000 48 50 4 Vdc Nar NS 5 Maximum source AC current power sharing Xtender settings Press SET and search with Basic settings 1100 Press SET and search with Max source AC current Power Sharing 1107 Press SET adjust the desired value i with and press SET Your input current is adjusted i The current value Aac must be set according to the size of the circuit breaker or the grid capacity Page 5 6 Moroen Notes Worldwide sales and service Switzerland Studer Innotec Rue des Casernes 57 1950 SION Switzerland Tel 027 205 60 80 Fax 027 205 60 88 Email info studer innotec com Web http www studer innotec com Limitation of responsibility The use of STUDER INNOTEC devices is the responsibility of the customer in all cases STUDER INNOTEC reserves the right to make any modifications to the product without prior notification Page 6 6 UDER
2. Kereon Application Note Renewable energy system connected to a grid without grid feeding General description Minimal configuration This application note describes how in a e Range of inverters backup system to use renewable energy even when the system is connected to a o All Xtender Series grid and the grid feeding is not possible e RCCO02 03 Features amp advantages o Software vers 1 3 7 and higher e deal for backup system with o RCC User level EXPERT renewables where there is no feed in tariff or where grid feeding is not possible e Use the maximum of renewable energy available e Direct use of renewables without cycling energy in the battery ies to avoid their premature aging Application Schematic Grid or Generator Xtender series Consumers Solar regulator a A WIND regulator a Renewables Battery ies Figure 1 Backup system using renewable energy without grid feeding Page 1 6 vare p DALONNI YIANLS 80 E L L A Z00 NY Detailed description Operation description In a backup system the power to the end consumer is taken from the input grid generator or in a blackout situation from the DC side battery ies renewables Generally in the case where grid feeding is not possible the renewable energy is lost when the system is powered from input This application note shows the possibility to use the renewable energy of the system even when the system is c
3. ible to store this production in the battery ies s buffer zone for later use see figure 4 mower Compensation of grid energy by renewable energy stored in the buffer Renewable profile Load profile Time Grid energy Renewables directly used Renewables buffered and used later Figure 4 Load profile with renewable energy buffered An example to determine the value of the battery ies priority voltage considering a battery ies of 24Vdc Full battery ies 25 5Vdc empty battery ies 24Vdc and a backup zone of 80 of the total capacity of the battery ies Full battery ies Fullpat 25 5Vdc Empty battery ies Emptypar 24 0Vdc Battery ies priority voltage is Emptypat 80 Fullbat Empty pat 24 0 8 25 5 24 25 2Vdc Saving the renewable energy or the battery ies life In such a system there is the choice between storing or not the renewables in excess If renewable energy is stored energy in the battery ies will therefore be cycled implying a decrease of the battery ies lifetime lf renewable energy is not stored it will be lost but the energy in the battery ies will be stable implying an extension of the battery ies lifetime The question is whether to store the excess renewable energy not Where the price of battery ies storage is cheaper than the cost of grid generator energy it is advisable to store the renewables in excess Otherwise if grid gene
4. iority voltage solar power is used to recharge the battery ies Charging from the grid is now allowed because the objective is to keep the battery ies charged Page 3 6 for backup time generator is off blackout no more sun For proper functioning of the system the voltage target of the solar wind regulator should therefore be above the battery ies priority voltage Solar priority function s algorithm The solar priority function s algorithm maintains the battery ies at a proper level for long lifetime and always keeps a reserve of energy for backup The input limit is reduced linearly over a working range as shown in the graphic below Input current A Battery priority voltage 1297 Battery priority voltage Interval Max source AC current 1107 TETTE Battery voltage Vdc Interval Vdc XT H M 12 0 2 XT H M 24 0 5 XT H M 48 1 0 UI Power of Inverter charger Figure 4 Graph of Solar priority function Current taken on the AC source depending on the battery ies Parameters Four parameters allow controlling the energy management with different sources 1 Battery ies priority as energy source 1296 2 Smart Boost allowed 1126 3 Battery ies priority voltage 1297 4 Maximum source AC current power sharing 1107 Associated application notes ANOO1 AC source assistance Smart Boost f
5. onnected to a grid This operation requires an inverter charger from Xtender series with two special functions e The Smart Boost function which adds power to the AC source according to the input limit current e The solar priority function which adjusts the instantaneous power consumed from the source according to the battery ies voltage The operation of the solar priority function is done with an automatic modification of the input limit current The input limit current is decreased from the initial value given by the user if there is enough energy available at the DC side The lower the input current the more the load is provided with DC power by the Smart Boost function In this way the power from the DC side is integrated in the system and the input consumption is limited Input current decreased Generator or Grid MART BOOST Figure 2 Smart Boost function Battery priority voltage description and dimensioning The point where the input limit starts to decrease is the priority voltage of the battery ies parameter 1297 1297 Energy for backup CPOO z Figure 3 Battery priority voltage This parameter sets two zones in a battery ies ooz e A zone below this point which ensure an energy reserve for a_ blackout situation e A zone above this point where the renewable energy in excess can be stored When there is higher production of renewables than power consumed it is poss
6. rator energy is cheap it is advisable not to store the renewables in excess Page 2 6 birepen If the renewable energy production in excess is not buffered Figure 5 the battery ies priority voltage should be set for example to 0 5Vdc below the floating voltage of the solar wind regulator Power No storage of excess renewable energy the energy is lost Renewable profile Li We L Iw Grid energy Load profile Time N N Sa Renewables directly used Lz Renewables lost Figure 5 Load profile without renewable energy buffered Another case concerns the situation where there is no excess renewable energy Figure 6 Power Load profile Renewable profile Time N Grid energy N Renewables directly used Figure 6 Load profile without excess of renewables The battery ies priority voltage should also be set to 0 5Vdc below the floating voltage of the solar wind regulator to keep it loaded to a maximum Operating example For example if battery ies are higher than the priority voltage and if a solar panel is connected to the battery ies at the DC side its regulator MPPT or other provides solar power to the DC bus At the same time the Xtender will take away the solar power to maintain the DC Bus at the priority voltage This represents a direct use of the solar power in the final user load without cycling energy in the battery ies If battery ies are lower than the pr
7. unction More information about the Smart Boost is available on the ANOO1 AC source assistance Smart Boost function The voltage values for the battery ies priority voltage 1297 are available at the next page item Battery ies priority voltage ii More information about the source max AC current and the battery ies priority voltage are available at the next page hs TUDER RCC 02 03 programming guide 1 User level to EXPERT Remote controller setting SET E Press SET and search with AL ESC User level 5012 Pros SET and insert the code i 42 64 68 Press SET Your level is EXPERT i The code is available in the user manual RCC 02 03 i 2 Battery priority as energy source Xtender settings 4 ESC SET gt Press SET and search with Y Basic settings 1100 Press SET and search with a Battery priority as energy source 1296 Press SET selection Yes with and press SET Your battery ies are the priority energy source 4 Battery priority voltage Page 4 6 3 Smart Boost allowed y Basic settings 1100 Press SET and search with A Press SET and search with Lockings 1123 Press SET and search with Smart Boost allowed 1126 Press SET selection Yes with and press SET

Download Pdf Manuals

image

Related Search

Related Contents

ACON / PCON    Houdan, ma ville - Communauté des Communes du Pays Houdanais  ASUS P45VJ User's Manual  20G215-00 E2 User Manual  幼児・小児用エネルギー減衰型除細動電極  OHA Gaz  Samsung ES90 Uživatelská přiručka  l`intro et la table des matières du livre  MODEL 351 352 362 363 372 373  

Copyright © All rights reserved.
Failed to retrieve file