        REQUEST FOR PROPOSAL - State Load Dispatch Centre
         Contents
1.       12     Whether the SI  Lead member of the consortium  has  submitted bank   s certificate of solvency        13     Whether the SI  Lead member of the consortium  must  have company registration certificate  registration under  Labour Laws Contract Act  valid sales tax registration  certificate and valid service tax registration certificate           14        Whether the contact details of SI  amp  Members in Performa                 155    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional       Energy Meters  Sr  Description Status Cross   Yes No    Reference  NA        VI has been submitted        15     Whether the Profile of the SI  All members of consortium   in detail has been submitted       16     Whether the Copies of original documents defining the  constitution or legal status  place of registration and  principal place of business  All members of consortium   submitted        17     In case of Consortium  Whether Power of attorney from all  members of consortium authorizing the signatory  SI  of  the Bid to commit to PSTCL for implementation  amp  7 years  of Comprehensive O amp M of the project submitted       18     In case of Consortium  Whether every member is willing to  extend the Comprehensive O amp M of the Project for more  years as may be mutually agreed  if required by the  Purchaser        19     Whether the document mentioning monetary value of each  project  work performed by the SI during the
2.       The SI  any member of the consortium  must have the experience of having successfully  commissioned at least one on line ABT monitoring system in a power generation  transmission  or distribution utility and same should have been in successful operation        Sr    SI  Name of Project  Certificate of Successful   P O  No  Cross   No    Member   User  Type commissioning from end    amp  Reference   Discom  Transco    user  to be attached  Date So as  Gencom   With Para No    Contact Details                                The SI  any member of the consortium  must have the experience of having successfully  commissioned the remote meter reading project by using either of the following communication  technologies i e  GPRS  GSM  3G  CDMA  V SAT  OF  OPGW  Microwave  PLCC  RF  LPR   Radio  Leased Lines  MLPS VPN  M2M etc  and  or any combination of these as specified         Sr    SI  Name of Communic    Certificate of P O  No  Cross  No    Member   Project  User   ation Successful  amp  Reference   With Contact   Technology   commissioning Date nn  Details  Used from end user  to Para No    be attached                                   The SI or any member of the consortium must have the experience in Software Development   Software Customization  Display Building  Report Customization  etc  suitable for the intended  purpose        Sr    SI Name of Project    Certificate of Successful P O  No  Cross  No   Member   User  Type  With   commissioning from end  amp  Reference
3.      ABT  amp  Conventional meters supplied by the SI shall be got tested  amp  sealed from the  Meter Testing Lab as may be specified     Onsite Installation  amp  Commissioning of the meters shall be got approved  amp   terminals  ports etc  sealed from the agency as may be specified     Further the meters after installation  amp  commissioning shall be further subject to  testing to check its integrity  amp  proper working as per the prevailing system of the  Purchaser     In case any deficiency is found after installation  amp  commissioning of the meter it  shall be rectified by the SI if possible  otherwise SI will have to replace the meter at  its own cost     Type Test  In addition to as already specified above in common for all the  equipments  amp  in detailed specifications of the meters  the type tests certificates as  per the applicable standards  CBIP technical report  88 for meters issued by an  authorised test house are required to be furnished by the SI  Meter Manufacturer   Only type tested meters are acceptable in first instance  However Purchaser reserves  the right to get these meters Type tested again  in its presence  Any fees on this  account shall be borne by the SI  Meter Manufacturer and shall be reimbursed by  Purchaser only if type tests are successful  SI need to indicate the cost of Type  Testing charges in the price bids     It is again reiterated that the SI shall be responsible for the complete installation and  commissioning of the meters  a
4.      Whether all the BOQ schedules as per Performa XVI have  been duly filled  signed and enclosed        74     Whether all the offered equipment  sub assemblies are type  tested as per the requirement of the Specifications   No non  type tested equipment  sub assembly nor plea of the bidder  that it will get the item type tested if it is successful shall  be acceptable         75     Whether SI have enclosed the Type test reports  certificates  of all the equipment  items offered in the bid       76     Whether SI has quoted the Type test charges of various  equipment  i e  ABT Meters  Conventional meters etc   in  Performa  XV        TT     Whether the SI has provided the Quality Assurance Plan  along with the bid  Tender       78     Whether the SI has provided the Training plan along with  the bid  Tender       79     Whether the SI has taken care that the supplied  communication and other equipment  which have been  sourced from outside India are not under restriction and  or  in any list banning its installation in India as per Govt of  India instruction if any and whether the Certificate in this  respect enclosed        80     Whether the SI has quoted Firm Prices in Indian Rupees              81   Whether the Web Server  site shall have the suitable   capability  software to allow at least 500 multiple users  with response time of few  5 s  seconds    82   Has the SI proposed database storage for at least 2 years       for all the data which shall be available from t
5.     D  QO  Intrastate Boundary Metering Project  CRD  Temporarily separate from main Integrated SCADA  EMS scheme and  NS later on integrated with it                                 D  5 BAN ti  Communication         oA AI Ik    _           Cleud    4  SCADA  EMS CC  Under ULDC Phase ll    SCADA   EN     SLD  NRLDC                                                                                   Time Synchronized ABT Type Boundary  Meters with GSM  GPRS Modems  Spare  ports with suitable protocol for connectivity    to RTU as and when required  Sealed Energy Meters proposed for Analog data acquisition under Integrated      ntrastate Boundary Metering SCADA  EMS Scheme for making available Revenue Grade Data to SLDC   Being Implemented Separately     on Fast track  Operators for monitoring    RTUs    l  Interconnect                         84    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Annexure III    Intrastate Boundary Metering Project    Proposed Centralized Control Center  Sheet 1 of 2    Main Server Hardware  amp  Communication             For Connectivity to  CADA Servers     Meter Connectivity Front End   Communication Gateway Server           Boundary  Meters            Database  amp   Storage  Servers         S  Development    Main Data Server  amp  Console    Processing Server          SS  Network Mgmt  Server  amp   Console       Scheduling Server       Storage  amp   BackUp    Number of
6.     Energy Meters    The SI shall be responsible to maintain the scheme during installation and field testing  commissioning and O amp M  Period as per RFP  phase till its taking over  The SI shall repair or replace all defective parts and shall have prime  responsibility for maintaining as per defined maintenance schedules and keeping the system operational to the  satisfaction of Purchaser     12 3 22 Completeness of Equipment    All fittings  accessories and apparatus not specifically mentioned in the specification but are actually necessary for  completeness of the equipment shall be deemed to be included in the offer  All equipment shall therefore be  complete in all respects whether such details are mentioned in the tender document or not     12 3 23 Cancellation    The Purchaser reserves the right to cancel the Purchase order as a whole or in part at any time or in the event of  default on the part of the Supplier prior to the receipt of intimation regarding taking in hand of the manufacture of  material against the Purchase Order despatch of material to the consignee     12 3 24 Raw Material    The raw material to be used in the manufacture of the goods equipment to be supplied against Purchase  Order Contract shall be of the best quality of its kind obtainable in the market  The Supplier shall be solely  responsible for the procurement of raw material required for the purpose     12 3 25 Material  amp  Workmanship    All the materials used in the manufacture of equip
7.     Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    8     10     11     12     13     14     15     16     Energy Meters    SI shall also be responsible to provide at his cost all the consumables during comprehensive  O amp M period which shall include Stationary  Printer Cartridges  replacement of equipment due  to their wear  amp  tear  Toners  etc  as may be required for O amp M     Extension on Comprehensive O amp M on mutually accepted terms  amp  conditions for further  period beyond 7 years as specified     Continued support  on technical aspects  etc   free of cost for at least five years even after  expiry of Comprehensive O amp M  Service support if required could be on payable basis  during such period  Life span of the supplied system  equipment under the Project shall be  as specified     SI shall certify  amp  commit to make available the spares to repair the faulty equipment  amp  for  its expansion for life span as specified after declared commissioning of the system  SI shall  also suggest  maintain stock  amp  supply the critical  mandatory spares of the equipment which  it may visualize to become extinct in due course  before such eventuality may arise     Detailed complete documentation  as built drawings  source code  with examples   manuals   compilers  tools  debuggers  component level details etc  which shall be required to do  further development of software capability at CEC shall be supplied by
8.     Rated secondary current of CTs p   1Amp 5 Amp  Voltage variation   V reference   20  to  30   Frequency   SOHZ     5   Power Factor   Zero to unity  lagging or leading   in all the four quadrants    System   3 phase 4 wire  Test Output     Each meter shall have a test output device  visual  for checking the accuracy of active  energy  Wh  measurement as per the relevant standards  Test output device may be in  the form of a pulse indicator accessible from the front and capable of being monitored  by suitable testing equipment as per the relevant standards     92    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    12 0    13 0    14 0    15 0    Energy Meters    Self Diagnostic Feature    The meter shall be capable of performing complete self diagnostic check to monitor the  circuits for any malfunctioning to ensure integrity of data memory location all the time   The meter shall have indications for unsatisfactory  nonfunctioning  amp  malfunctioning of  the following at least    a  Internal Clock  Date and Time with respect to the DCD  CMRI  GPS etc    b AII display segments as per the requirement under G 19 of IS 14697     The details of any type of malfunctioning should be logged with time and date in the  meter  The details of self diagnostic capability feature should be furnished by the meter  manufacturer     Meter Power Supply Arrangement    The meter must be capable to operate with the power drawn from the PT 
9.     SI has to involve at least 4 persons as may be nominated by the Purchaser with it  from the  very beginning  so that they may become proficient in implemented system  be able to  handle the system independently in all aspects of routine development  display building   report configuration  etc  and O amp M     6 2 6 Resource Requirement    SI shall provide     The proposed number of resources at each locations      Level of skills and experience of the resources    49    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    7 BID EVALUATION CRITERIA    1  Pursuant to the SI meeting the qualification criterion  SIs will be short listed for the  evaluation of the technical  commercial bid  In case of disqualification  the SI shall be dully  informed at appropriate time as may be decided by PSTCL  However  it is not binding on  PSTCL to inform the SI or give any reason     2  An important component for evaluating the proposed solution would be the satisfactory  completion and running of similar network including components proposed as part of the  proposed solution  Proposed technical components should have a track record of successful  implementation of network s  preferably of similar scope may be smaller in size     3  PSTCL shall evaluate the technical bids of the qualified SIs to determine whether the  technical bids are complete and substantially responsive  Bids that are not meeting the  instructions g
10.     The software maintenance services would include availability of software  fixes  and  upgraded versions at no extra cost to the Purchaser for a period of 7 years from the date of  network acceptance as has been specified  At all times  Purchaser should be kept informed  of the upgrades and    no longer supported    versions  Continued upgrade of the supplied  system as and when it is developed  available with the SI  including sub vendor  is in the  scope of supply during the pendency of comprehensive O amp M     The Purchaser has option to award the O amp M contract to the SI after successful initial period  of 7 years or give it to any third party as already specified  SI should provide sufficient  documentation so that Purchaser can take up maintenance by a third party  if necessary     The SI should clearly specify the arrangement for maintenance of the systems including all  software supplied  Successful SI shall depute sufficient number of competent personnel as  may be required from time to time depending upon the work exigency  amp  quantum of work   However at all times during the currency of the contract at least two  2  competent O amp M  personals  Engineers shall be deputed at the Purchaser   s premises for maintenance at CEC   amp  development activities  reports etc and an out door team s at a selected centralized place  for maintenance at remote locations  to be indicated by the SI in the Bid itself   The SI must  ensure that the Service Engineer  team vis
11.    Energy Meters       power off of  feeder        of  off  the    4 Duration  Power  hours   feeder     of       5   Apparent  Energy Import       6   Apparent  Energy Export       7   Day   s  Cumulative  Apparent  Energy   KVAh                             Perpetual Type Power    Quantities        Sr    Parameter    Scrolling  Cyclic    Display       Curren  t Block    Previou  s Block    Remote Reading   Instantaneous     Storage       1 Cumulative  Active Energy  perpetual  counter in Wh    X    Y       2   Cumulative  Apparent  Energy  perpetual  counter in Vah       3 Cumulative  Reactive  Energy  perpetual  counter in Varh                            All the MDI registers should be with date  amp  time  MD resets count shall be  available through push button as well as through remote     Note  Signs may be used to represent Export  Import  Lag  Lead in concurrence  with the general scheme as specified in Active Energy  amp  Reactive Energy  section  Besides the above specified lists  complete list of available parameters  for online monitoring  amp  available parameters which are stored in the meter  amp  are  retrievable through ports or otherwise  available in the meter may also be    supplied with the Bid   5 0 to 6 0 same as in case of ABT meters specifications   7 0 This clause of ABT meter specifications is not required     8 0 to 31 0  Same as in case of ABT Meter specifications     105    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme us
12.    Whether SI has filled all the deviations taken for any  clause  requirement as per the specification in the  Performa 1       Section 3       Whether MoU  agreement clearly specifying the stake of  each member and outlining the roles and responsibilities of  each member has been submitted as specified in RFP       In case SI is a 100  subsidiary  JV  parent company s  whether the requisite authorization from the each partner   parent has been submitted       Whether SI has attached filled all the documents performa  required for fulfilling technical experience requirements   Minimum pass fail        Whether Reports on the financial standing of the SI and its  consortium members  such as profit and loss statements  and auditor   s reports for the past five financial years has  been submitted in Performa V and cross referenced to the  attached financial reports  statements like balance sheets   profit  amp  loss statements        Whether the SI has submitted the undertaking as per  Performa III       Whether SI  lead member of the consortium  has Quality  certifications from an accredited and internationally  reputed   renowned firms  viz  ISO 9000 etc         10     Whether SI  lead member of the Consortium  has office in  Punjab        11     If SI does not have the office in Punjab  Whether SI has  furnished the requisite undertaking that an office shall be  opened in Punjab  with sufficient personnel and inventory  of spares within a month on selection as successful SI  
13.   220kV  amp   132kV transmission lines  amp  transformers for energy auditing purpose at around 150 locations  out of 220 Locations     Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    5  Thorough knowledge of Availability Based Tariff scheme and capacity  capability  amp  honest  willingness to understand  amp  implement the user requirements relating to ABT Type Scheduling  Unscheduled Interchange  UI   Grid Loss Calculations  Transmission level energy audit etc  and  also otherwise as may be required by an SLDC      6  Whole of the Turnkey project shall be executed in stages as specified in  Proposed  Implementation Plan  Schedule  section  keeping in view the immediate outputs  end results  required from this project  future requirements and to further synchronize the integration  requirements of online data available from this project with upcoming Integrated SCADA  EMS  Scheme     7  Visualized Schematic of Intrastate Boundary Metering Scheme and its future connectivity to  SCADA  EMS as and when Integrated SCADA  EMS shall come up in future is as shown in  Annexure II     8  Detailed schematics of the Intrastate Boundary Metering Project are available at Annexure III   a  to Annexure III  b   Schematics are just for visualization purpose only  Numbers of Servers   Machines shown are only indicative  single  less number of servers may accommodate multiple  functions or more machines may be required
14.   3 3       Data Storage  HIS  Server  Functionality  including Data  Storage  Dual                                                    138       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       Redundant as  specified        Hardware  Give  details        Software  Give  details        Network  Management  Server  Functionality   Dual Redundant  as specified        3 4 1    Hardware  Give  details        3 4 2    Software  Give  details        3 5    Network  Management  Console Workstati  on  amp  Laser  Printer       Hardware  Give  details        Software  Give  details        3 6    Billing Server  Functionality       3 6 1    Hardware       3 6 2    Software       3 7    Billing Generation  Console Workstati  on  amp  Laser  Printer       Hardware  Give  details              Software  Give  details                                                  139       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       3 8    Scheduling Server  Functionality   Dual Redundant  as specified        Hardware  Give  details        Software  Give  details        Scheduling  Console Workstati  on suitable for  SLDC s  responsibilities  amp   Laser Printer       Hardware  Give  details        Software  Give  details        Development  Server  Functionality       3 10 1    Hardware  Give  details        3 10 2    Software  Give  details        Developm
15.   Both software after installation as specified shall be  subjected to the following acceptance test     99    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    26 0    27 0    28 0    29 0    Energy Meters    a  Method of installation on DCD  CMRI as specified   b  Functional checks as specified   c  Downloading Meter Data from the Meter through optical port  d  Downloading data  file to PC as specified   e  Tamper proof nature of the data  file downloaded to the PC     f  Conversion of the data file to MS Excel  Txt format as specified and verification  of such converted files against original data files from meter   g  Functioning of auto time synchronization  setting of the real time clock of the    meter while downloading of the data or otherwise as specified   h  The DCD  CMRI software should have features to set  synchronize the time in    itself before hand   i  Proper functioning of advance and retard time commands   j  Per meter downloading time verification  k  Capacity of DCD  CMRI software for data storage  Manuals     The meter must have detailed user friendly manual having operational details   configuration change procedures and maintenance procedures of meter  DCD  CMRI  software  PC software and also shall provide the Memory mapping detail of the Meter  for online  amp  offline monitoring  A user friendly manual covering remedial measures to  be taken by the users in day to day operation of Meter  DCD  CM
16.   Contact Details  user  to be attached  Date Seeds NO  age No   Para No                                110       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    ii  Profile of Key Personnel Handling the Job       No     Sr    Name of Engineer   Designation    Details of Remarks  Cross Ref  Experience                               iii  Details of Orders in Hand or in Pipe Line       Sr    Description of Work  No     Name  amp  address Value of Remarks  Cross Ref     of the ordering  authority    the contract                               DATE     SIGNATURE    NAME   DESIGNATION   SEAL OF COMPANY    111    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional                                        Energy Meters  Performa V  Financial Statement  Name of the SI  Address  To be filled in for SI  each Member of Consortium   Fiscal year Turnover Cross Net Profit  loss after Cross  Reference tax  In INR  Reference   immediate  In INR   Section No    Section No    Page No  Page No   last five  Para no  Para no   2006 07  2007 08  2008 09  2009 10  2010 11  SIGNATURE   NAME   DESIGNATION   DATE  SEAL OF COMPANY    112       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa VI    Contact Details of SI  amp  Members   if any  Concerned Persons     To be contacted for any details  clarificat
17.   Conventional    10    Energy Meters    TRAINING REQUIREMENTS    SIs shall arrange to provide training to Purchaser s personals and  or nominees and  associate them from the very beginning with the Project execution till the end so as to  build the capacity of the Purchaser to take over  amp  handle the project independently  For  this purpose necessary training modules will be defined by the SI and trainings will be  arranged for each module  amp  further development of the system and on all the aspects of  O amp M  Also SI may suggest basic qualifications requirements of the personnel who will  be suitable for specific jobs  trainings associated with this project  Purchaser will try its  best to arrange for the persons with specific qualifications  But in case of non   availability of such persons  SIs shall train the available  nominated persons of the  Purchaser completely  SI shall access the calibre of the nominated persons who are  assigned to undergo the respective training module and prepare the respective module  curriculum accordingly to train them completely  amp  comprehensively  Training  amp   Capacity Building of PSTCL personnel during the entire project period shall be the  responsibility of SI  Details of training methodology in this regard should be submitted  by the SI  The detailed contents for each course may be finalized during detailed  engineering     SI shall also give training to requisite number of PSTCL s personals at its works   Duration of the 
18.   Indian  Rupees 7 5 Crores or above for the best three year out of last 5  five  financial  year  and    2  No members of the consortium should be in loss  Net Profit  Loss after Tax  for the last  three financial years     3  Respective Financial data should be certified by company   s Chartered Accountant and   or statutory auditors and detailed Balance sheets and profit  amp  loss account must also be  submitted     4  In case of meter manufacturer is not a SI  consortium member then same financial QRs  as above shall be applicable to it also     15    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    3 3    3 4    Energy Meters  5  The details in this regard are be submitted in the format as per Performa V  General Requirements    a  The SI  lead member of the consortium  shall have Quality certifications from an  accredited and internationally reputed   renowned firms  viz  ISO 9000 etc      b  The SI  lead member of the Consortium  should have office in Punjab  In case SI has no  presence in Punjab  SI shall furnish an undertaking that an office shall be opened in  Punjab  with sufficient personnel and inventory of spares within a month on selection as  successful SI     c  The SI  Lead member of the consortium  shall have bank   s certificate of solvency     d  The SI  Lead member of the consortium  must have company registration certificate   registration under Labour Laws Contract Act  valid sales tax registratio
19.   M S               aaa  having Registered Office  Gls dooms N GAY IMTS cakra n A saits having Registered Office at  VEEE EEA  iii  M S                                                  having Registered Office at    PERAS aa   Requisite power of attorney from all the members of the consortium  as well as the MOU between the Consortium members are being made part of this  contract agreement     for complete implementation  amp  comprehensive O amp M of the Project Called  Selection of  a System Integrator for Complete Implementation on Turnkey Basis  amp  Comprehensive  O amp M Services  in respect of Intrastate Boundary Metering Scheme suitable for SLDC  Operations based upon ABT Type Energy Meters as per the specification  in accordance  with Purchase enquiry No SLDC 116 2011 dated                         and SI   s Proposal  Nega nn dated                      This is in confirmation of the advance acceptance notified in the Purchaser s  letter No                   dated                  wherein the Purchaser has accepted the proposal  of SI as per Purchase Order  Work order No                In view of the foregoing the Purchaser and SI have agreed to the scope of work  and Terms and Conditions of the order including Comprehensive O amp M  amp  Service  Levels settled between them     The RFP  Tender specification  the SI   s Proposal and related correspondence   clarifications and Purchase Order acknowledged  accepted by the SI from part of this  agreement     This agreeme
20.   Offered Meter    Offered scheme    specified if so desired  by Purchaser     Technical  Specifications of the  offered meter     Technical  Specifications of the  offered scheme  All   amp  Complete Details  of offered protocols  of meters and non   royalty undertaking    Self certified claim of  SI  References to  already implemented  projects   Demonstration  visit  to already  implemented project  may be required as  specified if so desired  by Purchaser     D  General Organization and Solution Components    Number of  Partners  Manageability of a  consortium would become  difficult in case there are  more than 2 3 members   Detailed acceptance test plan  and procedures   Training Plan and Schedule  including proposed training    Consortium   All members of   Memorandum    the consortium    of  Understanding   Agreement    Proposed Solution    stoppage of  online data or  refresh rate  increase to  gt  5  minutes  0     No 0     7  Open  Standard  Protocol as  specified  7   Propriety But  Details  available  amp   Royalty free   5  Else 0    5  Yes  5   Slight  Deviation  4 to  1  Major  Deviations  0     2  SI alone 2   2 3 members  including SI 1    gt 3  0     Proposed Solution    Any time savings proposed in Proposed Solution    modules       53    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    es the implementation schedule  Properly Qualified persons    proposed by the SI  CVs  attached   E 
21.   References of Similar Projects along with Contact Details of Concerned Persons    submitted proposal      To be contacted for any details  confirmations etc  in respect of claims made in the                                                                                                       Name of the SI  Address  Sr    Execution Customer   Contact   Contact   Mobile   Office   Fax Email etc   Agency Name  Persons   Address No No  Project  A   Executed by any other agency  firm  B   Executed by SI or any member  SIGNATURE   NAME   DESIGNATION   DATE  SEAL OF COMPANY    108       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa III  Undertaking Certificate     On SI s Letterhead   That the SI and  or Consortium Members  i  Is  Are not in litigation with PSTCL  PSPCL or erstwhile PSEB    ii  Is  Are not a defaulter for 25  or more quantity for more than 9 months or any  quantity more than 15 months in making supplies against earlier purchase orders  placed on them at the time of scheduled date of opening of this bid    iii  Has  Have not made misleading or false representations in the performas   statements and attachments submitted in proof of the qualification requirements    iv  Does  Do not have Record of poor performance such as abandoning the works   not properly completing the contract  inordinate delays in completions  litigation  history  or financial failures etc  in earlier works exe
22.   The above utility must also be available free of cost as an  ActiveX  COM  DCOM etc component  with complete documentation with  examples source code snippets in VBA  VB  C etc  so as to be useable as an  embedded software component with third party Billing  Base station software     96    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    c     d     e     g     h     1     D  k   D    m     n     Energy Meters    Name of the data file should be such that meter should be identifiable preferably  data period shall also be identifiable  For example the Name of the data file for  Meter with Sr No xxxxxxxx and with data for the period 01 02 2009 to  28 02 2009 could be xxxxxxxx_20090201_20090228 dat etc    Data collected above through DCD  CMRI must show all the values of stored  quantities as specified as well as the set values of all the programmable  parameters  Meter Name Plate Details as well as logs of Parameter Changes   Clock Correction  Abnormal Conditions   Tamper  Fraud Conditions etc    The software for PCs  amp  DCD  CMRIs shall be supplied in suitable and  compatible form  media to enable its easy loading into the IBM Compatible as  well as existing DCD  CMRIs in erstwhile PSEB along with backup copies on  CD    Data tapping operation shall not erase the data from the meter   s memory  or  effect the meter operation in any way    The software in DCD  CMRI shall be simple to operate  amp  foolproof  For  example
23.   all or any one of the  following    d  Meters of 0 2 s  class accuracy  e  In  development of  CEC  Base    manufacturer   Software    Financial  turnover shall be  certified by  Chartered  Accountant    Certified Proof   5  If Meter   to be submitted    manufacturer  5  If  in software  development  4  if  Communication  provider  2  None   0        124    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    4    Computer  Station   Communication  Service provider  of offered  system   Employee base   100  with the  number of qualified  employees on roll  over the last  financial year  Number of Quality  certifications from  an accredited and  internationally  reputed   renowned  firm  viz  ISO 9000  etc    Local Presence  Office s  in Punjab  with sufficient  personnel and  inventory of spares    Energy Meters    SI    Valid Proof of  Certifications    Details to be  provided  regarding the  office s   addresses and  their  infrastructure  and employees    C  a Renee wee Integrated Automated Remote  ee Renee wee Solution    Detailed Write up  along with proposed  Solution Design in  lucid and plane  language  with  abbreviation    standard industry  terms expanded and  any technology  jargon used   explained properly   so that even lay  person can  understand the  offered solution in  single reading  with  respect to the  offered design   approach and  methodology of the  project along with    At discretion of  the Purcha
24.   amp  recurring charges as far as possible    Price Bids must be submitted in the prescribed sample format  Performa XV  clearly  indicating the applicable taxes  ED  CST  Service Tax   which are payable by Purchaser   In case any tax component is not payable or less payable  due to any concession  available  than it must be indicated in the price bid  by purchaser  clear remarks against  the same must be given in the remarks column  Otherwise in case of any ambiguity full  cost loading of taxes shall be made and Purchaser shall not consider any plea later on   In case of any double bid or a bid which can be interpreted with two final prices  the  same shall be evaluated to the disadvantage of the bidder  and even if with that  disadvantage the bidder has least cost and finally selected  it shall have to execute the  order at lesser of two costs  As such special attention must be given while filling in the  Price bid performs so that it may not lead to ambiguous price evaluation    All the component cost shall be included to arrive at final cost and bidder has no right to  ask  suggest for excluding any component from the final cost    Purchaser reserves the right to interpret the clauses to clear any doubt  contradiction   ambiguity  conflict in the stipulations of this RFP at any time of and its decision in the  matter shall be final and without any liability to the Purchaser  The response to this  tender should be full and complete in all respects  Incomplete  partial or 
25.   around 45 seconds  and must not  exceed 1 minute  for all the ABT meters  SEMs  simultaneously and refresh rate  must not exceed 15 minutes all the CEMs simultaneously  in respect of time stamped  instantaneous  Current Block  Current Day Instantaneous parameters as specified   due to communication system constraints  amp  to keep the whole implementation  economical   may be by transmitting only those parameters which changes by a  particular threshold value  should be user programmable for individual parameters   and by routinely undertaking a demand scan automatically for received data integrity  every few minutes  so as to optimize the data volume to available channel bandwidth  along with routine  amp  secure downloading of offline  stored data from the meters     Communication between Meters  amp  CEC   Introduction  The complete implementation of Communication sub system for connectivity between  Meters  amp  CEC shall be in the scope of the SI  The implemented system should at least    meet all the requirements suitable for the purpose as specified     General Requirements      For the purpose the Project  the SI shall design  procure and ETC  Erecting Testing    Commissioning  a suitable communications sub system  May be based upon GPRS   GSM  3G  CDMA  V SAT  OF  OPGW  Microwave  PLCC  RF  LPR  Radio  Leased  Lines  MLPS VPN  M2M etc  and  or combination of any  all these with and  or without  data hubs  concentrators antennas  interfacing devices  protocol conver
26.   associated communication   amp  CEC as specified       59     Whether the SI has specified the time requirements for  developing various changes  services  amendments   display building reports  installation  amp  commissioning of  new meters including communication  other such like  activities etc which may be sought by the Purchaser from  time to time as the system will evolve        60     CEC software should be capable to handle data  remotely  and  or imported through CMRI  from all meters  may be  by use of converters  APIs etc  and CEC shall be meter  manufacturer independent  Whether any details required  from third party meters have been specified in the  proposal        Section 6       61     Whether the SI agrees with the proposed implementation  schedule and if not  whether has submitted the revised  schedule taking care of the deadline as specified in the RFP       62     Whether the SI has submitted the relevant documents   Charts  Solution Design  expected time lines etc as per in  compliance to the RFP Clauses 6 2 1  6 2 2  6 2 3  6 2 4   6 2 5  6 2 6       63     Whether the SI has filled all the performas required to be  submitted        64     Whether translated copy of any document in any other  language except in English  Punjabi has been translated  and  duly attested by the authorized signatory of the SI   Bidder       Section 7       65     Whether the SI has filled the self scoring sheet  Performa   X  for bid evaluation purposes and has highlighted
27.   if any  subsequent  to the  commissioning of  meters till  Comprehensive  O amp M starts as  specified    400       2 3    Integration of  existing  Conventional  Energy Meter  including any H w   S w  APIs  amp   Converters etc     200       2 2 1    One time charges  till Comprehensive  O amp M starts as  specified  e g  SIM  activation  any  license  IP  BW  allocation fees  etc      200       Recurring Charges   if any  subsequent  to the  commissioning of  meters till  Comprehensive  O amp M starts as  specified    200       2 4    Any Other item   service  Please  Specify   Please  Specify item   service wise by  inserting  additional rows                    Centralized Energy Center    Subsystem                                           137       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       3 1    Communication  Front End  CFE   Functionality   Dual Redundant  as specified   Initial  CFE functionality    required for 2000  meters        Hardware  Give  details        Software  Give  details        Equipment for  Connectivity of  CEC to Meter  Communication  Hub  if any  e g   Leased Line  etc        Recurring Charges   if any  subsequent  to the  commissioning of  Lease Line till  Comprehensive  O amp M starts as  specified       3 2    Data Processing  Server  Functionality   Dual Redundant  as specified        3 2 1    Hardware  Give  details        3 2 2    Software  Give  details         
28.  1  40  Patran 2  41  Patti 2  42  Rajla 1  43  Rajpura 2  44  Reshiana 1  45  Sahnewal 2  46  Sarna 1  47  Sultanpur 2 1  48  Sunam 2  49  Thatha Sahib  Botianwala  1  50  Tibber 1  51  Verpal 2  B  132 kV Substations  Punjab   1 Abohar 2 2  2 Alawalpur 1 1  3  Anandpur Sahib 1 2  4  Asron 1  5 Badal 2 1  6 Badni Kalan 1 2  7 Baluana 1  8 Banga 2 1  9 Batala 1 1  10  Beas  11  Bhikhiwind 2 1  12  Bhogpur 2 2          79    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional                                                                                                                                                    Energy Meters   13  Bilaspur 1  14  Chamkaur Sahib 1  15  Children Park 1  16  Chohal 2   17  Dhariwal 1 1  18  Dharamkot 2 2  19  Dhilwan 2  20  Doraha 2 2  21  Ekalgadda 1  27  Faridkot 1  23  Ferozshah 2 2  24  Gholian 1  25  Ghulal 2 2  26  Gidderbaha 1  27  Hakima Gate 2  28  Hardochinna Road  Gurdaspur 2 2  29  Hoshiarpur 2 2  30  I G C   BTI 2 1  31  Jadla 1   32  Jallalabad 2 2  33  Jandiala Guru 2  34  Jayantipur 1  35  Kahanpur 1  36  Kangra 1  37  Kapurthala 2 2  38  Kathu Nangal 1 2  39  Kharar 2 2  40  Khera Mandir 2   41  Kotkapura I 2 2  42  Kotkapura II 1  43  Mall Mandi ASR MC 2  44  Mall Mandi GT RD  1 2  45  Malout 2 2  46  Mamoon  Pathankot 1  47  Mana Singh Wala 1  48  Maur 2 2  49  Moga I 2 2  50  Moga II 1  51  Muktsar 2 2  52  Nakodar 1 2  53  Naraingarh 2 2  54  Nawanshahar 1 2  55  Nurme
29.  5  locations  out of 220 locations  where main communication  connectivity shall not be feasible due to technical  any reasons    Validity of Tender    Proposals  Tenders must be valid for 180  One hundred eighty  days from the date of  opening of Techno  Commercial bid  Any SI revising the offer  bid within the validity  period is likely to be ignored and blacklisted    Order preference will be given to Punjab based manufacturers as per erstwhile Board   s  and PSTCL s prevailing Purchase Regulations    SI s may have to demonstrate  give presentations  arrange visits to the already  implemented similar Projects as part of Techno Commercial Evaluation    Other Terms  amp  Conditions    No conditional offers shall be acceptable    Various Performa has been given in the RFP to be filled in by the SI  SI may amend   modify the Performa as per its requirement exigency  However any such amendment   modification shall be listed in the Deviation Schedule  Performa I  with justification   reason and how it affects the SI and the Purchaser    Request for extending the due date of Proposals  Tenders may not be considered    No printed general conditions of Sale attached with the tender shall be accepted    The bidders are required to fill and submit all the Bidding Schedules    The evaluation of the bids will be done on the basis of information provided by the SI in  the Performa  schedules  undertakings  certificates  specified write up submitted as has  been asked for in the RFP  Th
30.  Communication equipment  Hubs  etc  The SI must quote for 20k VA x 2 UPS with 2 hrs backup  with auto change over switch along with cost  amp  sizing requirements for CEC  However  Purchaser will have the Option to order it or not  because Purchaser have UPS  DG Sets  DC  Batteries already available for SCADA EMS systems at SLDC  which can be shared  provided  load  power requirement of offered equipment  sub system is possible to be catered through  these  The cost of the UPS shall be considered for the Price bid evaluation     Implementation of additional SEMs  CEMs  related communication sub system  amp  data  integration as per the specifications for the additional Points during the O amp M period and in case  of need to provide new equipment  third party software  hardware  communication connectivity  etc for the scheme as may be required due to the any exigency arising necessitating changes in  specifications during Comprehensive O amp M and evolution period  the same shall be arranged by  the SI in mutual discussion  agreement with Purchaser  Further the selected SI shall be fully  responsible to undertake  implement the new features  functions which shall arise or as may  evolve or be required specifically by the users  purchaser as a result of working with the  system  in mutual consultation with the Purchaser  Such evolution period of the system shall  start as soon as contract is awarded till the end of the O amp M period as specified in this RFP   SI is responsib
31.  Deviations Taken  Degree of Deviation from the   All members of   100  RFP terms and conditions the consortium compliance is   Deviations or  expected from SI and   Deviations  any major deviation   leading to  from specified   better  requirements  shall   solution  5   lead to   Others   disqualification  restricting   Some deviation may   conditions etc   be allowed which   4 to 0   does not have major  impact on the overall  functioning of RMR  system and are not  disqualifying the SI  proposal otherwise   marks shall be  deducted based on  degree of deviation as  mentioned in the  Deviation Statement   part of the Bid  from  requirements  specification and total  number of deviations   Further Deviations  which leads to better  solution may be  given full score     Total Evaluation Marks    6  The SI has to give self scoring for the Bid Evaluation as per Performa X       7  SIs scoring at least 70  in the techno commercial evaluation shall be considered for  further opening of Price   Financial Bid  In case of excessive number or very less number of  SIs  Bidder qualifies  Purchaser reserves the right to increase  decrease the cut off so as to  select at least 3 bidders  if available  and preferable not more than 5 bidders for Price  Evaluation  However no SI with less than 50  score shall be considered qualified and as  such shall not be considered    8  The price  financial bids for the techno commercial qualified SIs will then be opened and  evaluated to determine wh
32.  For this purpose  supply and deployment of necessary man power at the CEC of the Purchaser and necessary  development engineers  Service Engineers  support personals shall be the responsibility of  the SI     5 4 12 Software Licenses   All supplied software such as Operating Systems  Applications for servers  clients  database   antivirus etc  shall be suitably licensed  authorized in the name of the Purchaser  All software  including CEC sub system shall be handed over to PSTCL at the end of Comprehensive O amp M  period or as and when may be decided by Purchaser and no licensing fee should be payable  expect for recurring charges and  or subscription charges  etc  that too in respect of anti viruses   etc  only and not in case of main system  software  thereafter  Any deviation must be  specifically brought out in the deviation sheet     44    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    6 PROPOSED IMPLEMENTATION PLAN  SCHEDULE  The work shall be completed within nine months from the date of entering of the Contract  Agreement by the System Integrator as per the following schedule in stages   Within one week of contract award  i e  issue of letter of intent   LOI   the Vendor shall submit  a detailed PERT  project schedule for Purchaser   s review and approval  The project schedule  shall include all tasks to monitor overall duration  direction and integration of the project from  inception to comp
33.  IS 9000 Basic Environmental Testing Procedures for Electronic and Electrical Items   PSGC  Punjab State Grid Code     The meter shall preferably be ISI marked and shall fully comply with all stipulations in  applicable standards with latest amendments  the relevant provisions of Punjab State  Grid Code  except those specifically modified by this specification     ABT Specific Requirements    a  Net Active Energy  The Active Energy  Wh  measurement shall be carried out  on 3 phase 4 wire principle with accuracy as per Class 0 2s  The energy shall be  computed directly in CT and VT secondary quantities  The meter shall compute  the Net Active Energy  Wh  sent out from the substation bus bars during each  successive 15 minutes block  and store it in its memory along with plus  minus  sign i e  the positive sign if there is a net energy export  and a minus sign if there  is a net energy import  Net Active Energy sent out up till that moment in the    86    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    4 0    b     c     Energy Meters    current block as well as net active energy sent out for the immediate previous  block shall be displayed while scrolling    Reactive Energy  The meter shall also compute the Reactive Power  Var  on 3   phase 4 wire principle  with an accuracy as specified and integrate the Reactive  Energy  Varh  algebraically into two separate registers  one for the period for  which the average of RMS vo
34.  Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    6 0    7 0    8 0    Energy Meters    parameters as specified   These parameters shall be auto displayed through scrolling   cyclic display etc  with scroll lock facility  Auto scrolling  cyclic display etc  shall be  visible when any one of the specified power supplies is available     Besides the quantities specified in the section    Other Power Quantity Measurements  Requirements     the following measured  calculated values  quantities shall also scroll   cycle continuously   1  Meter s identification code and model as specified as well as unique  meter serial number   il  Date  DD MM Y YYY   Time  HH24 MM   amp  Current Block No  iii  Last recorded anomaly  fraud  incident log etc  as specified in this  specification     The display shall automatically come back to scrolling mode if push button is not  pressed for say 3 minutes  The display shall meet with the condition of minimum roll  over period stipulated in clause 6 10 of IS  14697 1999  The display shall have a good  readability  amp  visibility  with back lighting if required     The size  height of Displayed digits should be around 10mm  Display size should be  such  so as to display complete  multiple values as per the type of the contents  While  displaying the values  the identification of each value shall be possible preferably  through full quantity name or through easily understandable mnemonics  abbrev
35.  Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    4 16    4 17    4 18    Energy Meters    advised to deposit bid document price and view the FAQ page on www punjabsldc org  in this respect from time to time  The clarification should be asked only as per the  format given below  Queries not adhering to this format may not be responded to     Page No  Section No  of the   Query Details  RFP Document       For any one to one or collective meeting s or discussions can be arranged by prior  appointment  PSTCL reserves the right not to respond to any  all queries raised  which  in its opinion  and at its sole discretion  considers that it would be inappropriate to do so  or does not find any merit in it    The sections and detailed table of contents are given at the beginning of this document   The SI is expected to examine all instructions  terms  forms  and specifications in this  document  Failure to furnish all information required by the tender document or  submission of a bid not substantially responsive to requirements of the tender document  in every respect will be at the SI   s risk and may result in the rejection of the bid    SI shall quote the prices of all the goods  amp  services as required  mentioned in the RFP   valid for 180 days in the Performa  XV  amp  BOQ in Performa XVI  i e  Price Bid  Performa XV as such without Prices  amounts filled in     Work Appraisal  If required works appraisal of SI and  or all members of the  Co
36.  O amp M Cost of CEC  including  consumables as  specified       4 7 2 3    O amp M Cost of  Remote End  Equipment i e ABT  Meter  CEM  DCU   Modem  etc        4 7 2 4    O amp M Cost of  Remote End  interfacing  Equipment in case  of interfaced  existing CEMs       Any other item    Give details        Tools  amp   Accessories  e g   compilers   debuggers  test  tools  etc  As may  be Required   proposed  Give  Details        Type Test  Charges  as  specified        6 1    For ABT meter       6 2    For CEM             UPS 20kVA x 2   With 2 Hours                                                    150       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       backup and auto  changeover type        8 Training  as  specified           9 Any other  Mandatory   Miscellaneous  Items  Services   Give Details by  increasing the  rows if required                                                    Total Lump Sum Cost  in Rs    P  Sum of all cost in column  L               Total Lump Sum Cost  in Words           Important Notes    1  As already stated  the above format is a guideline  It is the responsibility of the SI to propose a complete solution  and to include all such items in the  Price Bid   to meet with the requirements  expectations of the Purchaser as has been detailed  specified in the RFP or as may be required for the  proposed solution offered by the SI  or any other item which the SI know from its expe
37.  Programmable parameters   e  Dimensions   f  Weight       56     Whether DCD  CMRI  amp  PC  software Provided       57     Whether Sealing arrangements  provided on   a  Meter body   b  Meter Terminal Block   c  Optical Port   d  Communication ports       58     Details of Meter Construction  Features  As per CBIP 88 report  with latest amendments    a  Type  amp  Quality of material of  meter body and Case    b  Whether immune to vibration    shocks during transportation  handling    c  Whether immune to external  magnetic field    d  Whether immune to external  electric field   e  Other Protection features       59     Mounting Details  Rack  Panel   Metal Box  etc         60     Metering Cubicle Details in case  of rack type meter       61     Whether Connection Diagram  amp   Terminal Marking as per relevant  standards shown on the meter  body       62     Whether the meters are type tested  as per the relevant standards          63        Whether Type Testing done for   a  HV Test  IS 14697  Clause  12 7 6 3    b  Insulation Resistance Test  IS   14697  Clause 12 7 6 4    c  Influence of external magnet   A C  test  CBIP 88 report    d  Degree of Protection IP 51 for  dust and moisture   e  Regarding composition and  properties of plastic             121       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters        Polycarbonate  material if  used for making body of the  meters   f  and other type tes
38.  Rest of the functionality  features    will have to be developed by the selected SI before the supplied system shall be declared  successfully commissioned     5 4 2 General Requirements    1     The SI shall implement the proposed Centralized Energy Centre  CEC  to be tentatively  located at SLDC  Ablowal  Patiala   The CEC shall collect the data from ABT  amp   Conventional Meters and display  store  process the same as per the requirements of the  Purchaser specified in this RFP  which may come up during the interaction with end users  and  or requirements which may evolve subsequently throughout the implementation and  or  the O amp M periods     The CEC shall acquire the online and stored data from ABT  amp  Conventional Meters and  collect Scheduling information from System operators and display  store  process the same  as per the requirements of the Purchaser as specified in this RFP  The stored meter data e g   load survey  parameters  tampers etc should be downloadable as and when possible  automatically or as desired without affecting the online data communication  All the data  being received from the meters should be stored in a database for further analysis  amp  record  to monitor power supply status of individual feeders  power supply conditions  hours of  supply  violations besides Value Added Analysis as may be required  Further Settlement  System based upon ABT regime and grid wise and feeder  transformer wise loss  calculations shall be an integral part o
39.  Servers  Machines shown are only indicative  single   less number of servers can accommodate multiple functions    Billing Server    Intrastate Boundary Metering Project    Proposed Centralized Control Center  Sheet 2 of 2     SLDC  Operator Consoles  Remote Consoles  Web Server etc   Scheduling  Consoles                Secure website   amp  for web based  S Scheduling   Monitoring       Server    Modem  Firewall P              Number of Servers  Machines shown are only indicative  single   less number of servers can accommodate multiple functions    Remote Operator  Consoles for  Scheduling     Monitorin  Browser g    85    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    1 0    2 0    3 0    Energy Meters    Annexure IV    A  Technical Specification of Availability Based Tariff  ABT  Type Meter   Accuracy Class 0 2S     Scope    The specification covers the design  engineering  manufacture  assembly  and testing of  Static  Electronic ABT  Availability Based Tariff  compliant Trivector Type  Four  Quadrant  Bi Directional Energy Meter  suitable for 3  phase 4 wire connections  solidly  earthed system with balanced and un balanced loads for a power factor range from zero  to unity  lagging and leading   with initial and sustained accuracy of class 0 2S  The  meter shall be installed for EHV  HV circuit  as a self contained device for measurement  of active energy transmittals in each successive 15 minutes block etc  mee
40.  The meter will do calculations  display  amp  store the various values in CT  PT  secondary power quantities   b  Meter data in secondary quantities for display and storage shall have minimum 8    digits including one decimal digit for cumulative values and 2 decimal digits for other  power quantities     91    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    9 0    10 0    a    b    c    d    e      11 0    Energy Meters    c  No rounding off to the next higher last decimal shall be done for voltage and  frequency  All 15 minutes Wh figures shall however be rounded off to the nearest last  decimal   d  The meter shall safely withstand the usual fluctuations arising during faults etc   The various limits shall be as per the relevant standards with latest amendments  These  fluctuations shall not cause any damage to or mal operation of the meter and shall retain  the data under any adverse system conditions    The meter should start registering energy at 0 1  of basic current  Ip  at UPF or  lower  Rated maximum current shall be 1 2 times of Ip  e  The meter shall continue to function for the remaining healthy phase s   in case  one or two phases of VT supply fails  In case of a complete VT supply failure  the  computation of average frequency shall be done only for the period during which the VT  supply was available in the 15 minutes block     f  Any time block contraction or elongation for clock correction shall also b
41.  Unit Total Taxes  amp  Duties Unit Service Total E T C    Servic    includin  ence with  Ex Works nd forwarding FOR FOR   ED  custom duty  E T C  charges and or other   e Tax g Taxes   to price freig charges not Destin   Destin CST VAT  any charges  for non  service or any  units inclusive of ht  amp    forming part ation ation Cess etc  on Ex   for supply charges other  detail packing  amp  insu of Price Price works prices supply portion  Tax  sof forwarding ranc production  exclu  exclu portion  wherever  charges e cost  ding ding ED  CST   whereve   applicable    the forming part   char handling taxes taxes Custom   r  Unit Rate   item of ges freight  amp   amp   amp  Duty applicabl   Lumpsum     production transit duties    duties      e  in the cost  insurance    submi  tted A B C D E B    F Ax G B x    I   L Jdt  x A   K Jx   L F G   C D E Rate B G Or J    x A Rate H J K  propo  x  h  sal Rate  As  applicable  if  I   unit  rates or   Lumpsum  respectively                                                           Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       Remote End Metering Subsystem       ABT Meters 700       1 2    Conventional 400  Meters       1 3    CMRI or Data 25 for    Collection Device ABT  Meters        DCD  for ABT 25 for  meters  CEMs CEMs       1 4    Mounting For 220  arrangement e g  Locatio  panels  cubicles  ns   Racks etc        1 5    CT PT cables   communication   signal 
42.  and also indicating differences in Main  amp  Check meter if these are higher than the  thresholds defined collectively and  or individually  Provision should be there to substitute  Main Meter readings with Check Meter readings or some other readings manually if desired  by authorized representative of the Purchaser clearly indicating the same on the reports  bills  thus prepared  Such activity shall also be logged in the database     5 4 6 Reporting Requirements   1  The system shall be able to generate various exceptional reports on tamper events and  energy data    2  Acquire real time instantaneous data like voltage  current  frequency  power factor  active  power  reactive power  etc  at the specified regular intervals as defined by the Purchaser  from time to time    3  On line data shall be presented in Single Line Diagrams  SLDs   Tabular format  Graphical  formats  Continuous Trends and other the user defined formats from time to time  Necessary  Display  amp  report Builder system shall be provided by the SI    4  It should be possible to compare  amp  view historical  amp  current data for defined periods  simultaneously on single screen for forecasting purpose    5  Viewing  comparing the historical  recorded parameters in graphic format    6  This software shall provide facility to define threshold on the electrical parameters and store  them in a database and whenever it finds the limits are exceeding while polling alarms may  be generated at the Operator Cons
43.  as per the solution proposed by the SI to meet the  performance requirements  amp  desired end results     9  At present there are no ABT Meters installed in PSTCL  However there are around 300  embedded Open Access  OA  Customers of PSPCL  Punjab State Power Corp  Ltd   having  different makes of ABT Meters  M s Secure  M s L amp T  M s Wallaby  etc    with remote  metering  communication facilities  but are still being manually downloaded through CMRI   Common Meter Reading Instrument  and accordingly energy  UI bills are being calculated   generated for them manually  These ABT meters are procured by Open Access Customers   PSPCL and are installed at their respective premises  The offered system shall have provision  for integration of these energy meters with the CEC as and when it is decided in due course  as  per the requirement of SLDC  PSTCL     10  There are also around 200 existing Conventional Energy meters  CEMs  installed at 400 kV   220 kV  132 kV substations of PSTCL  These meters are to be integrated with proposed CEC  system as per the requirement of SLDC PSTCL  Verification of the specifications of these  CEMs in respect of whether these meters can be modified  adapted to interface with the  proposed system  any liaison with supplier of these meters for getting changes incorporated  if  technically as well as financially viable shall be in the scope of SI  In case some or if all the  meters are not compatible with the proposed system or charges  expenditure
44.  associated with this scheme  system up gradations  suggesting new better   amp  cheaper equipment due to development in technologies leading to less recurring cost     meeting with functional  performance requirements even after commissioning     18  As stated the Comprehensive O amp M contract shall be extendable by a further period as per  mutual agreed terms  amp  conditions at the time of such extension  Process for such extension  shall start 1 year in advance from the expiry date of existing O amp M contract to be initiated  by the SI  In case of no initiative is taken by existing SI  it shall be assumed that existing SI  is no more interested in providing the services after the expire of present contract and  Purchaser shall have the right to search for new O amp M service provider  Rates of the  equipment  amp  services shall be determined  taking in account the inflation from the original  date of starting of previous O amp M contract period  general decrease in electronics   technology prices  implementation price for a similar new system and such other genuine  considerations which shall be put forth by the SI at that time and evaluated  amp  accepted by  the Purchaser     19  Purchaser reserves the right to review the performance of the bidder during Comprehensive  O amp M period and if found not up to the mark it may not be continued at the option of the    Purchaser     59    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp
45.  class Meter Manufacturer  if it is neither the  SI nor a member of consortium  from whom these will be sourced     Who meets the same Financial Capability Requirements as are required for SI and  Member of the Consortium  that is minimum average turnover and not in loss  conditions   Same documentary proofs as stipulated for SI  Members shall have to be  supplied     Who is a manufacturer of 0 2s class accuracy  Static Tri vector Type  Four  Quadrant  Bi Directional  revenue  tariff grade Energy Meters  suitable for EHV   HV circuits and has previously supplied the same to Indian Utilities   Certified Proof  to be Attached     The meter supplier shall not be defaulter for 25  or more supply for more than 9  months or any quantity for more than 15 months in making supplies against earlier  POs placed on them    Business dealings have not been suspended and the firm has not been blacklisted  amp   debarred     27    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    5 2 2    Energy Meters  Scope of the Specification    This specification covers supply and ETC of CT PT operated 0 2s Class ABT Meters  amp   Conventional Energy Meters  Detailed description of the technical specifications of the  required ABT  amp  Conventional Meter is given in Annexure IV  SI has to fill up the  Check list cum Technical Particular Sheet in respect of ABT  amp  Conventional Meters to  be supplied as per Performa  IX  A   amp  Performa    IX  B 
46.  cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    enclosures  panels etc  along with cabling etc  from existing C amp R panels with suitable  amp   complete sealing arrangements  Size of Panel  dimensions will depend upon the number  of meters  SEMs CEMs  at the respective location and dimension of the meter being  supplied by the SI  Requirement of mounting arrangement will depend upon the actual  field conditions and as per the scheme to be provided by the bidder  but it will be used  for price bid evaluation purposes  Actual requirement of Panels cubicles for each site  will be accessed based on the field survey by the SI during detailed engineering phase     Type tests  All the relevant equipment shall be subject to Type Tests as per IEC IS  standards prescribed for the equipment if any  including EMI EMC  The tests shall be  carried out through any approved Central Govt  Approved Laboratory  Purchaser  reserves the right to witness  conduct Type test as specified at Vendor s cost and the  charges against Type Testing shall be payable only against successful type testing  Cost  of undertaking Type tests of the equipment shall be given separately by the SI     Routine Test  All the relevant equipment shall be subject to routine test procedures as  per the standards prescribed for the equipment and witnessed by the representative of the  PSTCL  For Routine Tests conducted  the calibration certificates for all the lab  instruments u
47.  each party will retain one copy     12 3 7 Intimation to the AO SLDC and Consignee    The Supplier will give advance intimation regarding despatch of the material to AO SLDC  PSTCL   Ablowal Patiala  to enable him to arrange payment  A copy of such intimation should be sent to the consignee and  the Purchaser office as well  Demurrage  wharfage charges in connection with despatch of the material if any shall  be charged to Supplier s account    12 3 8 Invoicing Procedures  All invoices should be prepared in six triplicate  6 copies   The original and two copies showing the amount due     description of material  number of packages together with delivery note Receipted challan as issued by the  Consignee should be sent to AO  SLDC  PSTCL  Ablowal  Patiala   Fourth copy with a copy of invoice and    65    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    delivery note  receipted challan should be sent to the consignee and the remaining copies to the Chief Engineers   SO amp C  SLDC Projects  220 kV Grid Sub Station  Ablowal  PSTCL  Patiala 147001  simultaneously All payments  are to be made by AO  SLDC  PSTCL  Ablowal  Patiala and no goods will be accepted by the consignees unless  accompanied by priced challans or invoices     12 3 9 Order Preference    The PSTCL would allow an order preference to such SIs whose works are situated within the State of Punjab as per  the procedure laid down as under      1  
48.  establishing Automatic Remote Meter Reading systems in any power sector utility   and   3 1 2 The SI or any Member of the consortium must have the experience of having  successfully commissioned at least one on line in real time ABT monitoring system in a power  generation  transmission or distribution utility and same should have been in successful  operation  and   3 1 3 The SI or any Member of the consortium must have the experience of having  successfully commissioned the remote meter reading project by using either of the following  communication technologies i e  GPRS  GSM  3G  CDMA  V SAT  OF  OPGW  Microwave   PLCC  RF  LPR  Radio  Leased Lines  MLPS VPN  M2M etc  and  or any combination of  these as specified   and   3 1 4 The SI or any member of the consortium must have the experience in Software  Development  Software Customization  Display Building  Report Customization  etc  suitable  for the intended purpose     3 1 5 The details in this regard are to be submitted strictly as per Performa IV     3 1 6 Success of the Testing  Demonstration  Presentation as specified in respect of ABT  amp   Conventional meters shall be treated as part of the minimum pass  fail criteria     3 1 7 Not able to score minimum marks in Bid Evaluation Criteria as given in Chapter 7 shall  be treated minimum pass  fail criteria     3 2 Financial Capability Requirement  minimum pass  fail criteria     1  The SI  lead member of the Consortium  should have average annual sales turnover of 
49.  expand  The communication shall be performed as per the communication  protocol specified in the Meter Specifications for remote communication  CFE Servers  should also have the capability to query the other meters which are already provided by  OA Customers available at existing substations of PSTCL or may also be installed in the  future by the Purchaser through suitable interface devices  converters  software APIs     CFE should have necessary capability to feed Network Management Servers  NMS  for  logging  alerting the operators in respect communication faults  malfunctions so as to  generate alarms and to calculate the availability of respective channels     CFE should not be dependent upon communication media selected  May be only  interface devices at CFE end and  or at remote end be required only to be reconfigured  or changed     It shall be able to accept  authenticate and resolve communication request received from  multiple communication equipments at the same time  It can also be used to control and  monitor multiplexer  concentrators  modems etc  if any available at the remote location     Being critical to the CEC it should be in dual redundant  hot standby configuration     Data Processing Server  DPS   All the data being received from CFE and ICCP  as  and when implemented  shall come to DPS and stored in databases  Gross data  acquisition is the responsibility of CFE  But DPS should have the intelligence to locate  the gaps in data  especially in Meter Sto
50.  for each of its 220  amp  132 kV  grid sub stations and transmission lines based on Conventional Energy meters  CEM     The data from the meters is also proposed to be integrated with SCADA  RTUs at  substation  amp  CEC levels and necessary stipulations  specifications  protocols are  accordingly being specified for this Scheme     Besides the express need for calculation of Grid losses of PSTCL  SLDC under PSTCL also  needs real time monitoring  amp  control of Unscheduled interchanges  UI  to restrict state   s  drawl and further record and process the data in respect to the power  online data   amp  energy  interchanges  offline  stored data  taking place in real time at its electrical boundary points   interfaces with CTU  BBMB  neighbouring state utilities  state Discoms  Generation  amp   Energy Sent Out  ESO  of state Generators  CPPs  IPPs  etc  As such all such interface  points need to be covered in this scheme  An interface out put for the UI energy monitoring  data at boundary metering points on real time basis  as acquired at the CEC  shall also be  provided for the upcoming control centre of Discoms Gencoms     In addition to Intrastate Boundary Metering there is a requirement of around 400  Conventional Energy Meters of 0 2s accuracy class for Transmission level Energy Audit of  400kV  220kV  amp  132kV Transmission lines  amp  Transformers and the data from these meters  shall also be acquired remotely by the Centralized Energy Centre in the similar way for 
51.  generating reports  amp  data storage for analysis purpose and these meters also interfaced with  SCADA RTUs     Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    2 GENERAL REQUIREMENTS  amp  SCOPE OF WORK    1     This is single point responsibility turnkey contract to be executed through a suitable  amp  capable  System Integrator  for complete implementation of Intrastate Boundary Metering project cum  Transmission level Energy Audit  as being visualized in PSTCL  SLDC which includes Survey   design  engineering  supply  testing  packaging  transportation  erecting  successful  commissioning  putting into operation and establishing the successful performance during the  performance guarantee tests and comprehensive O amp M  including warranty etc  thereafter  initially for 7 years and further extendable as may be mutually agreed  Complete  Implementation means full responsibility to implement ABT Meters  associated communication  sub system  amp  Centralized Energy Center sub system as specified  Further Comprehensive  O amp M means full responsibility to undertake effective  amp  efficient Operation  amp  Maintenance  activities as specified  This includes all incidentals  services  materials  manpower  permissions   liaison  licences  spares  consumables etc   whether explicitly listed or implicitly required for the  satisfactory completion and performance of the System as per the specifications  mee
52.  given in the  Performa II  A      26  Sample Meters with tenders  SI shall submit the sample meters on returnable basis  two of  each type i e  one ABT Meter each of 1 amp  amp  5 amp and one Conventional Energy Meter   each of lamp  amp  5 amp  along with the tender bid proposals  During demonstration SI shall use  these sample meters along with additional number of meters as specified in the demonstration  clause of the RFP  Sample meters shall be suitably marked in non erasable ink  stamping on its  Body with Make  Model  Serial Number  etc  The firm will deposit samples along with the  tenders having suitable packing arrangement for damage proof storage at no risk cost to PSTCL   Samples of finally selected firm shall be retained by the PSTCL for record  however in case of  unsuccessful firms the samples may be collected from this office within one month of the PO     In short the SI will have absolute responsibility for the Project from Start to Finish  for End to End  complete Solution for Implementation and O amp M services initially for 7 years from the date of  successful commissioning of the whole project  This includes but not limited to Sites surveys   planning  design  detailed engineering  procurement  manufacture  assembly  fabrication  factory  testing  packing  supply  amp  delivery at site  handling  insurance of all types  events  purposes  amp   storage at sites along with all the accessories  interfacing requirements i e  wires  cables  connectors   Term
53.  information provided by the SI in the Performa  schedules  undertakings  certificates   specified write up  etc   submitted as has been asked for in the RFP    Quantity  number of minimum items required by Purchaser are indicated in the Sample BOQ and must be quoted at least for that quantity  number       Price Bids must be submitted in the prescribed sample format  Performa XV  clearly indicating the applicable taxes  ED  CST  Service Tax  which    are payable by Purchaser  In case any tax component is not payable or less payable  due to any concession available  than it must be indicated in the  price bid  by purchaser  clear remarks against the same must be given in the remarks column  Otherwise in case of any ambiguity full cost loading of  taxes shall be made and Purchaser shall not consider any plea later on  In case of any double bid or a bid which can be interpreted with two final  prices  the same shall be evaluated to the disadvantage of the bidder  and even if with that disadvantage the bidder has least cost and finally selected   it shall have to execute the order at lesser of two costs  As such special attention must be given while filling in the Price bid performs so that it may  not lead to ambiguous price evaluation    Efforts must be made to segregate the costs for recurring  amp  non recurring cost  charges  As far as possible total prices may be arrived at starting from  unit ex works item prices and unit service charges and then building up these prices 
54.  last three  financial years has been submitted  All members of  consortium         20     Whether the Performa II regarding Experience in projects   works of a similar nature and list of major clients who may  be contacted for further information  All members of  consortium  has been submitted        21     Whether copy of Permanent Account Number  PAN  from  Income Tax Authorities of area of operation of the SI has  been submitted        22     Whether copies of Income Tax Return for the last three  financial years of SI has been submitted       23     Whether the financial data provided as per Performa V has  been certified by Chartered Accountant       24     Whether Information regarding any litigation  current or  during the last three years  in which the SI or any member  of the consortium is involved along with the parties  concerned  and disputed amount has been provided  All  members of consortium        25     Whether SI  any member has given an undertaking   Performa III  for having thorough understanding of ABT  scheme and that it is further willing to understand the user  specific requirements from time to time  amp  adaptation of  ABT as implemented in Punjab and accordingly implement  the same for the Purchaser        26     Whether SI and its consortium members has submitted all  the documents mandatory for the qualifying requirements   minimum pass fail criteria           27        Whether the SI has submitted the proposed methodology of  execution of works 
55.  local RTU level GPS time systems shall be made available     38    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters  5 4 4 Software Requirements    The format of the Reports  Displays  User Requirement Specification  URS  and Detailed  Functional Specification  DFS  shall be decided after the award of contract in consultation  with the end users  For this purpose  SI shall discuss and propose various features  amp   functions available in the system and discuss and understand the end users requirements   However as visualized at present the system shall have following or equivalent functions  amp   features     Entity Management   The system shall be able to define different entities  units  Discoms  Gencoms  Transcos   OA Customers  substations  CPPs  IPPs etc with multiple interface points behaving as one   An entity can have interface with any other entity and  or with other states  CTU  BBMB  etc  The definition shall be hierarchical and logically inter related in database also  The  definition of such entities shall include various data attributes i e  station name  address   installed capacity  type of generator  agreed capacity  standard auxiliary consumption  heat  rate etc  which ever is required     Metering Location   Each actual metering location shall be identified by a unique name  There may be main  meter  check and back up meter for same meter node  location and the proposed system  must be 
56.  of each of these  parameters shall be based on accepted methods  At any instant a snap shot of all  any  selected out of the instantaneous  current averages  cumulative values shall be readable  by the host  Further during online response  the meter may indicate to the master about  its emergent status  such as log overflow  storage capacity overflow etc  anomaly   attempted fraud etc  if any  so that master may take appropriate action in advance   Offline data communication  The purpose of Offline data communication is to get  stored values  logs  Name plate details  current configuration details etc as well as  remote programming of defined programmable parameters  time synchronization  commands etc from master to the meter  Offline data will normally be downloaded once  a day  after midnight  but it must be possible to download it any time for any period  out  of available data in meter storage  as the master  host system may desire    Offline data be downloadable in suitable chunks  parts so that Host  master may  prioritize online  amp  offline communication simultaneously  so that offline data  communication once started may not hang  clog data communication path keeping in  view its bulk    Online  Offline Data communication operation shall not erase the data from the meter   s  memory  or effect the meter operation in any way  No hardware and software changes  except configuration changes may be required for online  offline communication  through comm  port when ever
57.  of the  document       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    as downloading of  load survey   tampers  etc stored  in the meter   Any AMR Project s  executed with  Availability Based  Tariff Meters   Any AMR projects  already executed   may be by SI or  any other vendor   with communication  technology offered  by the SI for this  Project for data  transfer   Number of  Automated Remote  Metering projects  executed on turnkey  basis involving  comprehensive  O amp M for more than  3 years   Any Similar CEC   BCS as specified  implemented  suitable for  Regime   Audit    ABT  Energy    Energy Meters    Any member  of the  consortium    Any member  of the  consortium    Any member  of the  consortium    Any member  of the  consortium    Work Order   Purchase Order   Completion  Certificate  Work Order   Purchase Order   Completion  Certificate along  with certificate  from the end  user    6  Yes  6  under  implementation  3   No  0     6  Yes  6  No  0     Work Order   Purchase Order   Completion  Certificate    6   gt 2  6   lt 2 or  under  implementation  3   None  0     Work Order   Purchase Order   Completion  Certificate    5  Yes  5  under  implementation  3   No  0     B  System Integrator or SI s Organizational   10  Capability    annual  more    Average  turnover is  that INR 50 Crore in  the best three  financial years out  of last 5 years     2   Manufacturing  capability and  or  Service Provider of
58.  on making them  compatible are more than the supplied meters for this Project then informing the PSTCL of the  facts and seeking approval for replacement of these meters and  or addition with the new  compliant meters with proper justification  amp  proof of efforts done to make these meters  communicable with the proposed CEC system shall be the responsibility of the SI  However   PSTCL s decision in this regard shall be final  Further data being downloaded through CMRI at  present should be possible to be integrated with CEC     11  As already stated Scope of Intrastate Boundary Metering Project broadly includes SCADA  compatible remote metering for revenue grade power  energy flow data for Monitoring   Scheduling  Billing and Reporting  suitable for Availability Based Tariff  amp  Transmission Level  Energy Audit  To understand the Scope of the project  it can be broadly divided into three parts    i  Remote End Metering subsystem   ii  Communication  Connectivity subsystem  amp   iii   Centralized Energy Center subsystem  Detailed Technical Specifications and  or proposed  Technical Specifications of these sub systems are as per  Technical Specifications and  Requirement  section of the RFP    12  Details of Comprehensive O amp M  are as per Comprehensive O amp M Section of the RFP    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    13     14     15     16     17     18     19     Energy Meters    Details of Service 
59.  or for handling of materials  All such materials used shall be of waterproof and flame resistant  type  All the other materials such as working drawings  plans etc  which are combustible but are essential for the  works to be executed shall be protected against combustion resulting from welding sparks  cutting flames and other  similar fire sources  Cables  wires etc  shall be fire proof  retardant     13 1 10 Security  amp  safety    The SI shall have total responsibility for all equipment and materials in his custody stores  looses  semi assembled  and  or erected by him at site  The SI shall make suitable security arrangements including employment of security  personnel to ensure the protection of all materials  equipment and works from theft  fire  pilferage and any other  damages and loss  All materials of the SI shall enter and leave the project site only with the written permission of  the purchaser in the prescribed manner  The SI shall be fully responsible for ensuring safety of his men and  material deployed at site The SI shall provide adequate safe working conditions at the site and shall take necessary  precautions to enforce safety rules when working under hazardous conditions     13 1 11 Materials handling and storage    All the equipment furnished under the contract and arriving at site shall be promptly received unloaded transported  and stored in the allocated storage space by the SI  The SI shall be responsible for examining all the shipment and  notify th
60.  software must have the facility to correct the meter data being  collected from alternative location by a suitable factor  Such corrections must be indicated  in reports etc     Original Meter data collected in the database should not be modifiable  alterable  delete able  and should be always available  However if any need for correction is required same shall    34    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    26     27     28     29     30     31     Energy Meters    be possible with logging of such changes done  Even then original data should be always  available  Further processing should take place on changed  corrected data with suitable  indication in end results  reports  but still original data from meters should always be  available  This is required to maintain data integrity because high value monetary  transactions shall take place based upon this data and necessary safeguards need to be  implemented     The CEC shall be capable to configure data collection time  type of data to be collected   number of days of load survey data and tamper events as per user requirement     Database should be able to store data from meters and processed data shall be kept for say 5  years with suitable automatic backup at some suitable remote location for disaster recovery   Further it should be possible to do data backup  amp  restoration to  from DVD  Tape  External  HDD based storage devices  It shall be the respons
61.  stamped receipt for the amount  of the cheque or to his authorized representative who has  a power of attorney  conferring   authority of the SI to receive such payment from the PSTCL except where the SI is  described in the Bid as a firm  in which case the receipt must be signed in the name of the  firm by one of the partners or by some other persons holding a power of attorney  authorizing him to do so by other partners     56    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    9    Energy Meters    COMPREHENSIVE O amp M    The SI shall include in the price schedule  the annual operation  amp  maintenance charges for  providing the comprehensive Operation  amp  maintenance support including payments of all  sort of recurring charges  fees  etc  for all the equipment supplied at all locations as per the  terms and conditions specified  These charges shall be valid for a minimum period of seven   7  years from the date of commissioning worked out on basis of supposedly 2 years  warranty period   5 years of extended warranty period     Until final acceptance of the network by PSTCL after Comprehensive O amp M Period   elimination of defects in design  manufacture  material quality  workmanship  erection   replacement of defective parts  to the satisfaction of the Purchaser  Cost of dismantling   transport  re erection  if any  during the elimination of defects  replacement of the defective  items shall be borne by the SI 
62.  the  cross reference in respect of documents attached       Section 8       66     Whether SI has completely read and understood the  payment terms and desired service levels and penalties  clauses        Section 9          67        Whether the SI has mentioned the recurring  non recurring   license  permissions  liaison  fees  etc  if any for all  hardware  software  installation  field implementation                 159    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional       Energy Meters  Sr  Description Status Cross   Yes No    Reference  NA        Communication  frequency allocations etc  for initial  commissioning in the proposal        68     Whether the SI has mentioned the recurring  non recurring   license  permissions  liaison  fees  etc  if any for all  hardware  software  installation  field implementation   Communication  frequency allocations etc  for the O amp M  period  in the proposal        69     Whether SI has agreed to provide Comprehensive O amp M  for 7 years as specified       70     Whether the SI has taken care about the consumables  required during comprehensive O amp M period       71     Whether the SI has given the complete details of  recurring non recurring charges to be incurred during  Comprehensive O amp M period so that per unit charges may  be calculated        Others       72     Whether all the Price schedules as per Performa XV have  been duly filled  signed and enclosed        73
63.  the Consortium      Information regarding any litigation  current or during the last three years  in which the SI or  any member of the consortium is involved  the parties concerned  and disputed amount   All  members of consortium      The proposed methodology of execution of works backed with their planning and  deployment  duly supported with broad calculations and quality assurance procedures  proposed to be adopted  justifying their capability of achieving the completion of work as  per milestones specified in  Proposed Implementation Plan  Schedule  section within the  stipulated period of completion     Participating SI  if doesn   t have facility to manufacture materials required for the work   must submit their vendor list from where they will procure the material  services with their  credential and annual turn over  While choosing vendors the SI must ensure that vendor  must have supplied the equivalent quantity of material in any one year during last three  financial years     SI along with tender shall submit the complete address  description details  list of tools   instruments etc available at the works related to the material equipments  especially the  energy meters  offered in the bid     Not withstanding anything stated above  the PSTCL reserves the right to access SIs     capability and capacity to perform the contract  should the circumstances warrant such  assessment in an overall interest of the PSTCL  to successfully execute the scope of work  covered
64.  the SI     Comprehensive O amp M support shall include reports configuration  display building  database  management  and web management etc  for all the sub systems in all aspects shall be the  responsibility of the SI     Complete implementation of additional ABT  amp  Conventional meters  related  communication sub system  amp  data integration as per the specifications  for the additional  items  which may be required by Purchaser and any new points as a part of network  expansion  at existing or new locations  sub stations from time to time  This shall include  commissioning of meters  communication  any accessories  incidentals  permissions  required for their successful commissioning  The cost of such additional work shall be at  per unit rate already quoted by the SI in the Bid in a time bound manner to be indicated by  the SI  It shall be PSTCL   s prerogative to procure such additional equipments from the  successful SI or on its own and get only additional communication work implemented  through the successful SI  Any necessary changes in database  reports  energy accounting  model  bills etc  at any  all the equipment  locations to make the additional metering point  fully functional similar to initial stage metering points covered in the scheme should be  included in the Comprehensive O amp M prices  These segregated works shall be implemented  by SI on mutually agreed terms and conditions as and when required  However cost at unit  rates for working out such su
65.  the contract     12 3 16 Insurance    1  The rates are required to be quoted on F O R  Destination basis and it is the responsibility of the Supplier to  deliver the goods in sound condition F O R  destination and for that purpose the Supplier may at his option  insure the material against all risks at his own cost during transit for full delivered value of the material up to  destination  All works in connection with making and settling of claims  if any  with Road Rail transport  Authorities and or Insurance Company shall be carried out by the SI for which the PSTCL shall make no extra  payment  However  necessary assistance required in connection with making and settling of such claims  if  any  shall be provided by the consignees     2  All damages and or shortages during transit as covered by the Insurance shall be made good to the purchaser  immediately on their own  and  or on receipt of such information from the consignee  without waiting for  settlement of claims  However  in case of apparent damages and or shortages the consignees shall obtain the  loss damage certificate from the concerned Transport Authorities and send the same to the SI within a period  of thirty days from the date of receipt of material  A certificate shall be submitted by the Suppliers  SIs with  each bill to the effect that the material has been duly insured     3  The consignees shall report losses and damages to the firm within 30 days of the arrival of the equipment at  the store site  It 
66.  the data tapping from the coupled meter   s memory shall start on  pressing of a key  another key to start data transfer to the PC  and an indication   which would indicate completion of data collection  keep indicating while the  data is held in the device and would stop indicating when all data has been  transferred to the PC etc    DCD  CMRI software shall also have the necessary feature for time  synchronization  setting of the real time clock of the SEMs while downloading  of the data as specified  The DCD  CMRI software should have features to  manually set  auto synchronizes with BCS  the time in itself before hand  Further  if the meter clock has drifted so much that it is not possible to correct the meter  clock as specified then it must also be indicated in the log file being transferred  to the DCD  CMRI from the meter  Also attempts to synchronize  actual  synchronizing of the meter clock through DCD  CMRI be also indicated in the  log files    In case of any discrepancy in tapping of meter data by DCD  CMRI  i e  DCD   CMRI already available within erstwhile PSEB procured from M s Signals  amp   Systems  India  Pvt  Ltd   Chennai bearing model No  CMRI     1010   ABT  meter supplier shall install the required software in DCD CMRI for making it  compatible with the ABT meter software  However  if due to some reasons the  existing DCD  CMRI are not suitable  then the meter manufacturer must also  supply the DCD  CMRI    Collected data shall be stored on the base c
67.  the first electrical port of the meter with the  specified inter operability profile to be specified later on by the purchaser  so that meter  could talk with RTUs  Necessary documents  settings  source code  tools  compiles etc    what so ever is required for this purpose shall be supplied by the bidder so that  purchaser may on its own or by engaging any third party to undertake this activity in  case of default by the bidder  Also the present configured inter operability profile of the  Meter  protocol for this port should be supplied with the tender  Overall intention of first  electrical communication port is to provide a refresh rate of 10 seconds or better for  online monitoring purpose via SCADA  RTU    Second Electrical Communication Port  Second electrical communication port  specified shall be used for immediate  amp  independent remote communication with  proposed energy center to be located at SLDC  Ablowal either through GPRS  GSM   3G  CDMA  PLCC  Microwave  Radio  VSAT  Leased Line  PSTN  VPN or any other  media  mode to be implemented by the bidder  SI  For this purpose preferably open  standard protocol such as IEC60870 5 104  IEC60870 5 101  DLMS COSEM  BIS  specified   etc  or any proprietary protocol  alongwith complete details  source code   libraries  usage examples  documents  APIs  tools  compilers  step by step procedure   etc shall be required to be made available by supplier  so that if needed third party could  be engaged to develop interface cap
68.  the invoice of  concerned equipment  In case Central Excise staff refuses to issue a separate gate pass indicating  the excise duty claimed from you  the original invoices raised for the supply of the equipment  will bear a certificate from the Central Excise staff to the fact that Excise Duty has been charged  from you and the amount so charged will be indicated     The firms indicating nil or concessional rate of E D  in their tenders will have to absorb E D  up to the final rate  applicable at the time of tendering  The firms  which do not agree to this stipulation or indicate E D  as extra  without indicating the applicable rate  be loaded with maximum rate of excise duty     12 3 5 Octroi Charges    Octroi charges at destination shall be paid extra on actual basis as applicable     12 3 6 Contract    The detailed order issued in accordance with agreed terms and conditions and accepted acknowledged by the firm  shall itself form valid contract along with subsequent amendment  if any  and shall be construed and operated as  such in terms of Indian Contract Act 1872 as amended up to date     It will be obligatory on the part of the successful Tenderer to execute within 30 days of the receipt of detailed  order  a legal contract agreement on non judicial stamp paper of the appropriate value as per format specified by  PSTCL  Performa XI   The detailed Purchase Order so issued shall be termed Purchase Order Cum Contract  Agreement  The contract shall be made in duplicate and
69.  the port may be used with suitable communication as and  when desired or decided    Further the meter manufacturer must supply the details  settings  amp  requirements of the  any protocol which will be necessary for interfacing the meter with the personal  computer  data collection centre  Base Computer systems  AMR systems etc for online  and offline data communications    DCD  CMRI  amp  PC Software  Basic Utilities    The meter supplier  manufacturer shall provide the necessary licensed software which  would enable an IBM Compatible PC to     a  Accept the data from the DCD  CMRI  especially from DCD  CMRI already  available with erstwhile PSEB procured from M s Signals  amp  Systems  India   Pvt  Ltd   Chennai bearing model No  CMRI     1010  and  or from an interface  device connected to the Optical Port and store it in a tamper proof file in binary   encrypted  password protected etc read only format for tapping all data stored in  a meter   s memory and faithfully transferring it to the IBM Compatible PC  The  intention is to ensure absolutely no tampering  except total erasure  of the  colleted data file while handling that file with PC    b  For reading that binary  encrypted  password protected etc  read only data file   the meter supplier must give a utility program  software to convert that data to  MS Excel format  text file etc  Use of the utility must be user friendly   understandable by a computer savvy person  easy to use with requisite help   documentation
70.  to be filled     Copies of original documents defining the constitution or legal status  place of registration  and principal place of business  All members of consortium      Power of attorney from all members of consortium authorizing the signatory  SI  of the Bid  to commit to PSTCL for implementation  amp  7 years of Comprehensive O amp M of the project  as given in this RFP  Further that each of member shall be willing to extend the  Comprehensive O amp M of the Project for more years as may be mutually agreed  if required  by the Purchaser     Monetary value of each project  work performed by the SI during the last three financial  years  All members of consortium      Experience in projects  works of a similar nature and list of major clients who may be  contacted for further information on those contracts  All members of consortium    Performa II  B     16    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    6     10     11     12     13     14     15     Energy Meters    Permanent Account Number  PAN  from Income Tax Authorities of area of operation of the  SI  Lead Member      Income Tax Return for the last three financial years  Lead Member      Qualifications and experience of key site managers and technical personnel proposed for the  Contract  Lead Member     Reports on the financial standing of the SI  such as profit and loss statements and auditor s  reports for the past five financial years  All Member of
71.  to the above  for the execution of the above Contract  we the undersigned offer to  survey  design  procure  complete  commission  implement and operate and maintain the whole  of the said Work  as per the Terms  amp  Conditions of the RFP except for those which have been  specifically been brought out in the Statement of Deviation     In the capacity of the SI  Lead Member of Consortium for the Project  we declare that we have  requisite technical competence and experience as specified and are interested in successfully  implementing and Comprehensive O amp M of the Project as specified  should PSTCL select us for  this purpose     We are submitting this Bid on our own and are dealing in all the three components of the whole  proposed project  1  ABT Meters   ii  Communication Service Provider for the offered medium   amp   iii  Centralized Energy Centre based upon Computer H W  amp  S W     OR     We are submitting this Bid as the Lead Partner of a consortium consisting of the following  companies  firms     114    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Company Firm Name Area of Responsibility Address with Contact Details      ABT  Conventional  Meters  Communication  Service Provider of the  offered medium     Centralized Energy  Centre        We are enclosing Power s  of Attorney from the other consortium Members authorizing us to  act as    Lead Partner    for this Project and confirming t
72.  under the package within stipulated completion period  This assessment shall inter   alia include  a  document verification   b  bidders work  manufacturing facilities visit   c   manufacturing capacity  details of works executed  works in hand  anticipated in future  amp   the balance capacity available for the present scope of work   d  details of plant and  machinery  manufacturing and testing facilities  manpower and financial resources   e   details of quality systems in place  past experience and performance   f  customer feedback    g  banker   s feedback etc     In case of necessitated tripartite agreement the SI shall submit the details draft of the  agreement to be executed between the parties  SI  PSTCL and communication service  provider s  along with the clear responsibilities of each party  Undertakings from the  intended communication service provider s showing willingness to execute the above  agreement shall also be supplied with the bid  PSTCL shall only agree to make the  recurring  non recurring payments directly to the Communication service provider and other  liaison responsibilities for getting the communication services for providing the requisite  Service Levels shall be of the SI and any penalty  in case of any default by communication  service provider SI will also be imposed on SI only as far as PSTCL is concerned  Further   any recurring   non recurring charges payable by PSTCL to the communication service  provider shall be indicated clearly in 
73.  work    C  WATER  Free supply of water will be made available for the construction purpose wherever water is  available and the same shall be given at agreed point at the site   Note  PSTCL   s Guest House accommodation facility may be provided to the SI subject to its   availability as per applicable PSTCL rules  In case of power supply  amp  water requirements at  locations where Purchaser doesn t have a power connection  water connection etc  then SI will  make its own arrangements at its own cost        13 1 8 Facilities to be provided by the SI    A  Tools  tackles and scaffoldings   The SI shall provide all construction equipment  tools  tackles and scaffoldings required for  pre assembly  erection  testing and commissioning of the equipment covered under the  contract   B  COMMUNICATION  The purchaser will extend the telephone  amp  telex  if available at site  for purpose of contract   The SI shall be charged at actual for such facilities   C  FIRST AID  The SI shall provide necessary first aid facilities for all his employees  representatives and  workmen working at the site           13 1 9 Fire protection    The work procedures that are to be used during the erection shall be those  which minimize fire hazards to the  extent practicable  Combustible materials  combustible waste and rubbish shall be collected and removed from the  site at least once each day  Corrugated paper fabricated cartons etc  will not be permitted in the construction area  either for storage
74. 1    CEC End Personals  for system  administration   report  configuration   support and further  development as  may be required  including for field  work       4 2 2 2    O amp M Cost of CEC  including  consumables as  specified       4 2 2 3    O amp M Cost of  Remote End  Equipment i e ABT  Meter  CEM  DCU   Modem  etc           4 2 2 4       O amp M Cost of  Remote End  interfacing  Equipment in case                                                 145       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       of interfaced  existing CEMs       4 2 3    Any other item        4 3    3  Year O amp M       4 3 1    Recurring Charges       4 3 1 1    Primary  Connectivity       4 3 1 2    Alternative  Connectivity for  5  locations as  specified        4 3 2    Fixed Charges       4 3 2 1    CEC End Personals  for system  administration   report  configuration   support and further  development as  may be required  including for field  work       4 3 2 2    O amp M Cost of CEC  including  consumables as  specified       4 3 2 3    O amp M Cost of  Remote End  Equipment i e ABT  Meter  CEM  DCU   Modem  etc        4 3 2 4    O amp M Cost of  Remote End  interfacing  Equipment in case  of interfaced  existing CEMs       4 3 3    Any other item           44       4  Year O amp M                                                    146       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme u
75. 132 kV  Sub Stations 79 74 114    4   Consumers connected directly with PSTCL at  132 kV  amp  220kV level  11 15  5  inerstateLines Ts   a  o   6  AN wey cers    7 400 kV Substations and upcoming Thermal  Generating Stations 79    220   s3s  16    Grand Total 220 700       Detailed List of Interface  Metering Points  amp  Locations                                                                                                    Sr  No Name of Substation 1 Amp 5 Amp   A  220kV Substations  Punjab    1  Ablowal 2   2  Ajitwal 1   BE Amloh 1   4  Bagapurana 2  X Bahadurgarh 2   6  Bajakhana 1   7  Barnala 3   8  Batala  Wadala Granthian  1 1  9  Butari 1   10  Civil Lines  Loharka ASR 2 2  11  Dera Bassi  Saidpura  2   12  Dhandari Kalan I 2   13  Dhandari Kalan II 2   14  Dhuri 2   15  Fatehgarh Churian 2   16  Ferozepur 2 2  17  Ghubaya 2   18  Gobindgarh I 3   19  Gobindgarh II 3   20  Gobindgarh III 2   21  Goraya 2 2       78    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional                                                                                                                                                    Energy Meters  22  Himmatpura 1  23  Humbran 2  24  Jagraon 2  25  Jamsher 2  26  Jamsher 4  27  Khassa 1  28  Kohara 1  29  Kotla Jangan 1  30  Kotli Suratmali 1  31  Lalton Kalan 2  32  Mahilpur 2 1  33  Majitha 1  34  Malerkotla 2  35  Mansa 2  36  Moga 2  37  Mohali I 3  38  Mohali II 1  39  Mukatsar
76. 5 3    Connectivity to  Internet       3 15 3 1    One time charges  till Comprehensive  O amp M starts as  specified  e g  SIM  activation  any  license  IP  BW  allocation fees  etc         3 15 3 1    Recurring Charges  of lease line if any  subsequent to the  commissioning of  Website till  Comprehensive  O amp M starts as  specified       CEC Level  Peripherals  amp   other equipment  as specified or as  required for the  whole network        3 16 1    Laser printer of A3  size       3 16 2    High resolution  colour printer        3 16 3    Duplex Laser  printer          3 16 4       Any other item s                                                    142       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters        Pls give details        GPS Clock   Connectivity to  CEC  amp  Time   Date Display for  Control Center       Networking  LAN  equipment e g   Router  Switches   Firewall etc   Dual  Redundant        3 18 1    Hardware Give  details        3 18 2    Software Give  details        Any Other item   service  e g   Mounting  arrangement   panels  cubicles   Racks  LAN  cabling  Power  supply cabling   Conduiting   Laying etc    Give  details and  segregate by  inserting additional  rows as required         3 20    Furniture for CEC       3 20 1    Furniture  One  Table  amp  revolving  chair of reputed  make for each  Local  Remote   console   workstation     10          3 20 2       Furniture for CE
77. Accreditation Board for Testing and Calibration Laboratories  NVM Non Volatile Memory   PC Personal Computer   PCB Printed Circuit Board   PF Power Factor   PSEB Punjab State Electricity Board  erstwhile   PSGC Punjab State Grid Code   PT Potential Transformer   QA Quality Assurance   RTC Real Time Clock   TTB Test Terminal Block   UPF Unit Power Factor   VB Visual Basic   VBA Visual Basic for Applications  Vref  Reference Voltage   Vin  Vyns Von Respective Phase Voltage  VSAT Very Small Aperture Terminal  VT Voltage Transformer          3G       d        3  Generation Communication          1    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    INTRODUCTION    Punjab State Transmission Corporation Ltd   PSTCL   is in the process to provide ABT  Compliant electronic energy meters at the interface points of PSTCL s grid system at  Interstate and Intra State level as well as to measure the Energy Sent Out  ESO  of the  Intrastate Generators  CPPs  IPPs etc  as per the Regulations  Orders  Codes  Policies   Requirements of PSTCL  SLDC or as may be decided from time to time  in stages     With the unbundling of erstwhile PSEB  there is need for undertaking Intrastate Boundary  Metering Scheme and as per the stipulations of Punjab State Grid Code such interface points  need to be covered  metered by installing 0 2s class accuracy ABT Type Energy Meters     Further  PSTCL also intend to cover Energy Audit scheme
78. Basic Infrastructure for CEC  i e  Meter Data  Acquisition process  Storage  Basic Reports        Balance 50  of ABT Meter Supply  Installation   Commissioning alongwith that of necessary  communication Hardware  Software  services   communication commissioning of respective  meters etc  for data transfer as specified      Balance 50  of CEM Supply  Installation   Commissioning alongwith that of necessary  communication Hardware  Software  services   communication commissioning of respective  meters etc  for data transfer as specified   100  of each     Establishment of CEC  essentially in respect of   Grid losses calculations etc      Supply of CMRI  amp  handling over of CMRI to  the concerned     Continued Interaction with the Users  URSs   User Requirement Specifications   DFRs   Detailed Function Requirements   amp  Design and  Finalization of Displays  Reports  Billing  Specifications etc  and its approval      Trial integration of already installed  Conventional Energy meters      Trial Run of partially completed system     It should be possible to calculate PSTCL   s Grid Losses using ABT meters  being installed at the interface  tie line points between PSTCL and utilities  being served by it preferably by 31 Mar 2012  The first priority should be of  Mile Stone   ABT meters so as to meet the deadlines  amp  conventional energy meters may be  installed subsequently and or in parallel to ABT meter installation at the  convenience of the bidder        46    Intrastate B
79. C  e g  for servers           As  require                                              143       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       maintenance  personals and for  keeping the records   Give Details        Comprehensive  O amp M  SI shall  quote year wise    for 700 ABT  meters  amp  400  CEMs   for 200  existing CEMs     7 Years       4 1    1  Year O amp M       4 1 1    Recurring Charges       4 1 1 1    Primary  Connectivity       4 1 1 2    Alternative  Connectivity for  5  locations as  specified        4 1 2    Fixed Charges       4 1 2 1    CEC End Personals  for system  administration   report  configuration   support and further  development as  may be required  including for field  work       4 1 2 2    O amp M Cost of CEC  including  consumables as  specified          4 1 2 3       O amp M Cost of  Remote End  Equipment i e ABT  Meter  CEM  DCU   Modem  etc                                                  144       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       4 1 2 4    O amp M Cost of  Remote End  interfacing  Equipment in case  of interfaced  existing CEMs       4 1 3    Any other item        4 2    2    Year O amp M       4 2 1    Recurring Charges       4 2 1 1    Primary  Connectivity       4 2 1 2    Alternative  Connectivity for  5  locations as  specified        4 2 2    Fixed Charges       4 2 2 
80. CP server shall be able to interact with multiple clients in parallel  Through it meter  data which shall be available now through this Project shall be sent to SCADA  EMS  and vice versa  when meter data shall also be available through SCADA  RTUs   Purchaser   s visualization of such interconnectivity between CEC  amp  SCADA  EMS  system and Meter  amp  SCADA  RTUs is shown in Annexure II  It should also be in dual  redundant hot standby configuration     Development Server  Consoles  The Development server shall provide the software  utilities  tools  compilers  display builder application  debuggers  report configurations  etc  to be used to develop and maintain the system software  displays  databases  etc     Network Management Server  Consoles  The Supplier shall provide Network   Configuration Management subsystems to monitor all LAN  servers  consoles and meter  communication  amp  remote equipment activities  All status changes associated with  communication devices  remote end equipment  servers or workstations  LANs  user  interface equipment  time equipment  and support peripherals shall be initiated   monitored  logged and controlled via suitable displays and  or tables  It should be  possible to calculate availability of various systems  sub systems  components etc  achieved routinely  Appropriate events shall be issued for configuration changes     Scheduling Server  Consoles  This server  console shall be dedicated to managing the  Scheduling activities suita
81. CVT  secondary circuits  The total burden imposed on CTs  amp  PTs by the meter for  measurement and operation shall be as per the relevant standards  While operating with  supply from PT CVT  the meter shall not require any separate auxiliary supply for their  normal operation    It shall be preferable that Meter has provision for connecting external auxiliary supply   AC and  or DC normally available at grid substations  so that meter may not  unnecessarily load the bus bar  line PT  CVT during its normal operation  Priority of  meter operational supply should be first external and if external is not available or  switched off then from PT CVT  Such changeover shall preferably be also logged   Further  the meter shall be capable to display  amp  data downloading of the stored  quantities through either an internal in built or external power pack battery  The  batteries provided for Display  Optical Port downloading etc shall have life of not less  than 10 years  The batteries shall not get damaged or damage the meter even during idle  storage of the meter for two years  Adequate protection must be in built to safeguard  against damage to meter on account of application of high or wrong type of voltage at  external battery terminals etc     Clock Battery    The clock operation in the meter shall not be disturbed in any event  In case of failure of  power supply  the meter shall be capable of continued operation of the meter   s calendar   clock with the help of internal cloc
82. Communication  It should be possible to change the communication media may be with  minimum changes  if ever such need may arise with the availability of better  amp  economical  communication media   Such changes required should clearly bring out in the proposal   Further CEC software shall be capable to handle data from all meters and shall be meter  manufacturer independent     32    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    10     11     12     13     14     15     16     17     Energy Meters    The solution offered by the SI shall be scalable and capable of integration with other  applications  systems of PSTCL  The SI shall also provide an Interface to integrate the CEC  database with the third party billing applications also  in addition to the Billing application  that is required to be supplied by the SI as per this RFP  as and when required  Further it  shall be possible to exchange the data with already commissioned EMS  SCADA system  through ICCP Protocol  or as may be required later on   However the present bid must  include the cost of implementing such exchange of data functionality with SCADA  EMS  through ICCP server  Interoperability  database details  charts  all requisite documents   tools  converters  etc  shall be supplied by the Purchaser     The proposed solution must ensure adequate data security  data storage and system  redundancy     The SI must specify the time requirements for developi
83. Communication  media    Within 15 minutes  through implemented  Communication  media    Within 48 hours   including non   working days     Rs  1 000   for  each day delayed  beyond the  allowed period     Rs 10 000   for  every test failure   once every week     Rs 10 000   for  every test failure   once every week     Rs  1 000   for  each day delayed  alongwith the full  communication  charges  recurring  charges payable       61    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    CEC  during  O amp M     Work  Completion  Time  pre   commissionin  g     Energy Meters    shall be responsible to  collect data through  CMRI or any other  appropriate mechanism    If there is any error in Within 24 hours  the software or MIS   reports generated are not   as per PSTCL   s   requirement  the SI shall   be responsible to   provide correct and   error free software and    or MIS reports    Slippage in Reporting  frequency of MIS  generation as defined by  PSTCL    The SI shall be  responsible to complete  the work as per Work  Plan Schedule    As per work  schedule for the  milestones    for that channel     Rs  1 000   for  each day delayed      of O amp M  charges payable  will be deducted  on proportionate  basis    0 5  of the  payable amount  as per the  payment schedule  for every week  delayed subject to  maximum of 5   of total contract  value of  undelivered  un  commissioned  equipment so  delayed        Note 1  Penal
84. D  Identification code  string  at least 20  Characters  through DCD  CMRI  Other markings on the meter shall be as per the  relevant standards       Property of PSTCL    and meter manufacturer name shall be written on the meter name  plate along with other Name Plate details as given below should also be available to be  downloadable with DCD  CMRI operation as well as through remote via comm  port     Name Plate Details    Sr    Information   1 Meter Serial Number   Meter Constant  impulse Wh    Accuracy   Make   Model  Type   Month  Year of Manufacture  Configuration  Settings   Firmware version   9   Rated secondary current of CT  1A or 5 A    10   Reference Voltage  Frequency   11   Principal unit s  of measurement   12   Warranty  Guarantee Period etc   13   Any other which may be specified by the purchaser before  commencement of supply                                CO  AD  Ny BY  Go  bo                               Disclosure requirements    Besides as stated in the relevant sections of the Specification  the meter manufacturer  must also give the principle of operation of the meter  outlining the method and stages of  computation of various parameters starting from input voltage and current signals  including the sampling rate if applicable should be furnished by the supplier  The  manufacturer should indicate the method adopted to transform the voltage and current to  the desired low values with explanation on devices used such as CT  PT or Potential  divider as t
85. Data Base Servers  Data storage server shall be used to perform  Information Storage  archival and Retrieval functions  It shall operate in a primary   standby redundancy mode i e  if primary server crashes the standby automatically takes  over it  Data storage server shall also perform the task of taking backup on the external  storage devices  such as disk arrays  tape libraries and optical jukeboxes etc   connected  in the network in such a way that the devices appear as locally attached to the operating  system  Preferably Storage Area Network may be used for different servers running  distinct applications to increase the storage capacity utilisation and for easy and fast  accessibility  availability of the data over the network  It shall also be possible to recover  the data from external storage in case of failure of server  It shall also be capable to  receive  amp  process simultaneous request from multiple users for generating and  managing different types of specified reports e g  historical trending etc  The database  should be relational data base which should be queried through SQL etc and should be  suitably sized for complete data storage    ICCP Server  The ICCP servers shall be used to handle the inter control centre  communications functions between CEC and proposed Integrated SCADA  EMS  Scheme control centre as and when it come up  The ICCP link shall be designed to allow  data exchange over communication network between different control centres  The  IC
86. Electro Magnetic Compatibility Electro Magnetic Interference  EMS Energy Management System   ETC Erection  Testing  amp  Commissioning   FAT Factory Acceptance Test   GIS Geographical Information System   GTP Guaranteed Technical Particulars   ICCP Inter Control Centre Communication Protocol  IEEMA Indian Electrical and Electronics Manufacturers Association  IPP Independent Power Producer   ISO International Organization for Standardization  LPR Low Cost Pocket Radio  Low Power Radio  M2M Machine 2 Machine   MIS Management Information System   MOP Ministry of Power   MPLS Multi Protocol Label Switching   NOCC Network Operations Control Center   O amp M Operation  amp  Maintenance   ODBC Open Database Connectivity   OF Optical Fibre   OPC Object Linking and Embedding for Process Control  OPGW Optical fibre composite overhead Ground Wire  PERT Project Evaluation and Review Technique   PLCC Power Line Carrier Communication   PSPCL Punjab State Power Corporation Limited   PSTCL Punjab State Transmission Corporation Limited  RF Radio Frequency   RSCC Regional System Coordination  amp  Control   RTD Real Time Data   RTU Remote Terminal Unit   SAT Site Acceptance Test   SCADA Supervisory Control and Data Acquisition  SCAFA Standing Advisory Committee on Radio Frequency Allocation  SLDC State Load Dispatch Centre   TCP IP Transmission Control Protocol  Internet Protocol  TSV Tab Separated Values   VPN Virtual Private Network   WPC Wireless Planning  amp  Coordination   SEM Special En
87. Level Agreement are as per Service Levels and Penalty Terms section of the  RFP     Suitable number of compatible CMRI  say 25 Number or as may be required by the SI  suitable  for manually downloading of meter data  for ABT meters  CEMs  both new  amp  existing  to cater  for the eventuality of any meter to CEC communication failure  for extended period of time   Responsibility to manually download meter data in such eventuality shall be of SI  If more than  25 Nos CMRI are required then the same may mentioned in BOQ  Price Bids  In case later on  more CMRI may be required by the SI to meet with Service Level Requirements during or after  commissioning and during Comprehensive O amp M period then the same shall have to be provided  by the SI and Purchaser will not pay for the same  CMRI shall at least have memory Capacity of  8 MB SRAM  BIOS OS on FLASH EEPROM Memory to accommodate software of around 5  vendors  meters and for data downloading purposes     Communication front end  CFE  functionality at CEC end subsystem being implemented should  have capacity to accommodate minimum of 2000 number of meters  both SEMs  amp  CEMs   initially as proposed  specified in the RFP  However the rest of the CEC system except  Communication front end  CFE  functionality should have the capability to handle   accommodate data for at least 10000 metering points  located at more than 1500 locations  without degradation of performance  The expandability of Communication front end  function
88. N  with elapsed  time  KW   12   Rising Demand   Y N Y N  with elapsed  time  KVA              103    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    15 Minute Block Level Power Quantities  For 45 days                                                      Sr    Parameter Scrolling  Cyclic   Remote Storage at  Display Reading the end of   Current the block  Curren   Immedi   Block  t Block   ate Instantaneous  Previous    8 Well as  Block Immediate  Previous  Block   1   Active Energy   Y x Y Y  Import  2   Active Energy   Y Y Y Y  Export  3   Reactive Y Y Y Y  Energy Lag  Import  4   Reactive Y Y Y Y  Energy Lead  Import  5   Reactive Y Y Y Y  Energy Lag  Export  6   Reactive Y Y Y Y  Energy Lead  Export  7   Apparent Y Y Y Y  Energy Import  8   Apparent Y Y Y Y  Energy Export  9   Total Energy   Y Y Y Yr   Fundamental    Harmonics                Optional depending upon availability of Storage     Day Level Power Quantities  For 45 days                                    Sr    Parameter Scrolling  Cyclic   Remote Storage at  Display Reading the end of  Curren   Previous  Current Day   the day  t Day Day Instantaneous  as well as  Immediate  Previous Day    1  Day   s Active   Y Y Y Y  Energy Import  2  Day   s Active   Y Y Y Y  Energy Export  3 Count and   Y N Y Y  Max  Min  Duration of             104    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional 
89. Project  as such it is not possible to give the details of the quantity of each  and every item nor it is possible to specify a format  Purchaser s need to have an answer to its requirements and Selected SI has to provide the end to end  solution     As such it is desirable that Price Bid Format be kept rigid  standardized for ease in comparison  amp  evaluation  as well as flexible  to cater to the various  solutions which shall be offered by the SI  As such SIs are requested to follow the below format as a guide and try to adjust the prices of the supplied  system in following format  However they are free to add as many sub headings as may be required below those mentioned in the format  If anything is  not adjustable below the indicated headings then new can be added to give complete and comprehensive Price Bid     It is important that this Price Bid Schedule should be enclosed in Part II of the Bid  However the same format which the SI will be putting up with  prices filled in the Part II  should be given against the BOQ Schedule without prices filled in as specified therein as far as possible     Important  All the quoted figures should be firm in Indian Rupees  Also refer to notes below the Price Bid performa before filling in the prices any  clarification required may please be taken from the PSTCL before quoting for this tender                 ae Supply Portion ETC and  Sr  Description Cross Qty Other Services Total Remarks  Refer  Along Unit Price Inla Packing  amp 
90. Public Sector Undertakings fully owned by the Punjab Govt Central Government Other state  Governments supplying material directly through units owned by them provided that a  certificate of Govt  ownership issued by the concerned Govt  Department shall be submitted in  the envelope for Earnest Money  Exemption shall not be applicable if the tender is submitted for  supply of material through private unit manufacturer     b  Suppliers having Permanent Earnest Money of deposit Rs 10 00 Lac with the SO amp C organisation  of the PSTCL  a certificate to this effect issued by the concerned Accounts Officer of the PSTCL  during three months immediately preceding the due date of tender opening and showing the  Serial Number Account Number allotted in the Permanent Earnest Money Deposit Register shall  be submitted by the SIs in the envelope for Earnest Money     3  Earnest money may be accepted in the form of Bank Guarantee valid up to 3 months after the validity date of  tenders as per NIT Tender specification in the case of Public Sector Undertakings partly owned by Punjab  Government Central Govt  other State Governments  The proof of the firm being a joint venture of the  Central State Govt  shall be attached with the bank guaranteed     4  Incase of successful SIs  earnest money shall be converted as security deposit and shortfall  if any  shall be got  deposited for faithful execution of purchase order contract     5  Earnest Money shall be forfeited in case of withdrawal  mod
91. RI is required to be  provided by the manufacturer   Warranty  The meter should carry a warranty for a period of Comprehensive O amp M  If any  equipment  meter  software fail during this period  the firm shall carry out free  replacement within 30 days of notification   Packing   The meter shall be properly packed in suitable packing to avoid damage or disturbance  during transit or handling  to ensure their safe arrival at destination and long term  storage  Each meter may be suitably packed in the first instance to prevent ingress of  moisture and dust and placed in a cushioned carton of a suitable material to prevent  damage due to shakes in transit  The lid of the carton may be suitable sealed  A suitable  number of sealed cartons may be packed in a case of adequate strength with extra  cushioning  if considered necessary  The cases may be than properly sealed against  accidental opening in transit  The packing cases may be marked to indicate the fragile  nature of the contents    Tamper  Fraud  Anomaly Detection  Logging of Incidents    The meter shall have the following special features to prevent  detect common ways of   tamper and fraud and record  log the same with date  amp  time of occurrence  duration    count etc  However detection mechanism should ignore momentary  transient  occurrences of these  which are below appropriate thresholds and specify the same  clearly in the meter manual  literature    a  Phase sequence Reversal  The meter shall keep working accur
92. T Billing  Related             Active Energy  Import             Y             88          Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional                                                                            Energy Meters  2   Active Energy   Y Y Y Y N  Export  3  Frequency  Hz    Y Y Y Y Y      Average  4   Reactive Y Y Y Y N  Energy Lag  Import  5   Reactive Y Y Y Y N  Energy Lead  Import  6   Reactive Y Y Y Y N  Energy Lag  Export  7   Reactive Y Y Y Y N  Energy Lead  Export  8   Net Active   Y Y Y Y Y  Energy  9   Frequency Y Y Y Y  Y   Coded 00 99  for 49 00   51 00 Hz   10   Apparent Y Y Y Y  N  Energy Import  11   Apparent Y Y Y ys N  Energy Export  12   Total Energy   Y Y Y XY  N   Fundamental 4  Harmonics     Optional depending upon availability of Storage   Day Level Power Quantities  For 45 days    Sr    Parameter Scrolling  Cyclic   Remote   Stora   ABT Billing  Display Readin   ge at   Related  Curren   Previous      the  t Day Day  Curre   end of  nt Day   the  Instant   day  aneous  as well  as  Immedi  ate  Previou  s Day    1   Day   s Active   Y Y Y Y N  Energy Import  2  Day   s Active   Y Y  Y Y N  Energy Export  3   Net Cumulative   Y Y Y Y N                            89          Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    5 0    Energy Meters       Active Energy       4  Day s Reactive   Y N Y we Y  Energy High   V gt  103         5   D
93. The rate of Punjab firms would be de escalated by 15  for all the Units  Their position in the comparative  statement shall be shown accordingly for the purpose of comparative statement     2  The zone of consideration for placing of purchase order contract would thereafter be demarcated taking into  account the quantity of material required as per NIT and the quantities offered by the different SIs  subject to  the condition that for Punjab based firms upto 20  of the total quantity will be reserved provided they fall in  consideration zone after application of price differential  However  where the Punjab firm qualify amongst the  lowest SIs on their own quoted rates  they shall form part of the original quoted list for purpose of placing  orders     3  The purchase on the Punjab firm claiming order preference and falling within this zone would be placed on the  lowest rate of a firm not claiming order preference within the zone of consideration or on the concerned  Punjab firm   s own quoted rate which ever may be lower     4  In the event of zone of consideration ending at the de escalated rate tendered by a firm claiming order  preference  the rate to be allowed to such firms shall be the next quoted rate by the firm not claiming order  preference or the concerned firm   s own quoted rate  which ever may be lower     5  The Punjab based firms claiming order preference shall be required to furnish an undertaking in prescribed  Performa XII on a Non judicial stamp papers o
94. V  1  37  KRBL Ltd  Dhuri  38  Chandigarh Distiller  amp  Bottlers 1  39  Dee Development Engineers Pvt Ltd 1  F  Tentative number of ABT meters for 400k V  interface points with upcoming 400k V 3  substations in Punjab  G  Tentative number of ABT meters for New  Thermal Generating stations coming up in 78  Punjab  H  Substations having Independent Feeders  220Kv Sahnewal  1     220kV Rajpura  2  k  3  132kV Ropar 1  4  132kV Anandpur Sahib 1  5  132kV Asron 2  6  132kV Mamoon 1  7  220kV Civil Lines Amritsar 1  8  220kV Butari 1  9  220 V Jamsher 1  10    132kV Kapurthala 1  11  132kV Khera Mandir 1                      Quantity of Conventional Energy Meter Required for Transmission Energy Audit    At present around 400 Number Conventional Energy Meters are proposed to be installed at  substations of PSTCL as per the field requirements on 400 kV  220kV  amp  132kV transmission  lines     Note  The above specified list of meters  amp  substations is only for indication purposes and the  actual quantity may vary as per the field survey  Apart from this  meters shall also be installed at  future new  upgraded substations as specified in the RFP from time to time     83    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters  Annexure II    Schematic of Intrastate Boundary Metering Scheme cum Intra  Transmission Energy  Audit and its future connectivity to SCADA  EMS as and when Integrated SCADA  EMS  shall come up
95. ability at Control center end in case of any default  by the supplier and to protect purchaser   s interest  amp  investments  Overall intention in  selection of the protocol for this port is to provide a refresh rate of 10 seconds or better  for the specified parameters for online monitoring purpose along with making available  the offline  stored  load survey data from the same port to the energy center    The Host  Base station at energy center  RTU and the meter shall preferably follow  Master Slave relationship with meter as slave    Further Second Electrical Port and Optical Port can be an independent or an internally  shared port but must have separate optical interface and electrical interface available  outside for user connections  Further in case of internal share of these ports it should be  possible that any changes made in the meter configuration must be logged identifying  the external interface from which such changes are made     95    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    18 0    Energy Meters    Online data communication  For the purpose of Online data communication   Instantaneous  present averages  cumulative values means the actual values at the latest  instance of time  These values will be continuously updated by the meter hardware as  per internal sampling and computation time  The value read is always the last updated  and shall be date and time stamped  The measurement and computation
96. able to resolve these ambiguities by assigning suitable priorities  Each of these  meters shall also be uniquely identified in the software  It shall be possible to change the  name of the location without affecting the energy measurement and calculation  On any  given location assigned meter can be changed and for the software the location will remain  the same  Further reports for the location shall be generated with the changed meter data   The location   meter relationship shall have to be maintained for secure and reliable  measurements  Bills  UI  Grid Calculation     Load Monitoring   The load monitoring module of the software shall provide graphical as well as tabular  display of various parameters of the feeders  meters interconnected in this system  Entity  wise Feeder analysis screens shall be available in Single Line Diagrams  tabular  Graphical  forms simultaneously  Collection of readings from each entity  feeder on continuous basis  shall be plotted against the background    It should be possible to have multiple online real time trends  It should be possible to have  comparative trends with available history data    The readings should be available with elapsed time during the current demand integration  period of 15 minutes along with scheduled energy entitlement during the same 15 minutes   SIs will have to consult the end users to solicit  understand the exact requirements of display  formats    Active  Reactive and Apparent parameters shall be available fo
97. ality should be scalable to at least 10000 meter points from 1500 locations in  increments by addition of modules as and when required on addition of new meters at new  locations  No database or CEC software or additional hardware should be required to be added  till 10000 points except additional modules in respect of Communication front end functionality  and must be indicated clearly in the bid  The bidders must indicate clearly the initial CFE  functionality being offered supported by its technical literature  brochure     Training Requirements of the Purchaser   s personal shall be as per the  Training Requirements   section of the RFP     Includes recurring  non recurring  license  permissions  liaison etc along with the fees  charges   etc  if any for all hardware  software  installation  field implementation  Communication   frequency allocations etc  for initial commissioning  commissioning period and for the O amp M  period  The SI shall also be responsible for incidentals related  unrelated which may crop up to  complete the project within the agreed timelines  Any permission  licence  tripartite agreement  to be executed  etc  if required to be obtained for the Project from any competent authorities  as  may be prescribed  required for its use  for performance enhancement  achieving Service  Levels  should be in the name of Purchaser  However any reasonable assistance  documents   tripartite agreement  etc  required by SI from the Purchaser so that any licences  p
98. alizations  restoration for less than 5 minutes thereafter be taken as single  continuous tamper     m  The meter shall have an appropriate display system by which any attempt of    n     o     tampering the meter is promptly displayed with date and time tagging    In case of any anomaly  fraud  tamper  battery failure  preferably in advance   clock  failure  configuration change etc the meter should have a provision for alarm   indication  However details of that particular exception should be stored  amp  available  through display  Latest one exception  with date  time  should also scroll in the  display along with the instantaneous values as specified  At least 200 Nos   tampering  exception events  count  occurrence  restoration and duration  shall be  logged with date and time    Other possible tampers  anomalies which can be detected  logged shall be brought  out by the vendor  Tamper information and readings should not be possible to  change through CMRI or PC ports     Meter Identification  Name Plate Details  Marking of Meter    Each Meter shall bear the information as per the relevant standards  Each meter shall  have a unique serial number given by manufacturer  which shall be marked permanently  on its front  as well as in its memory  Besides unique meter serial number the meter shall    101    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    31 0    Energy Meters    have the provision for programming Meter I
99. all the rules and regulations of local authorities during the performance of his field  activities  He shall also comply with the Minimum Wages Act  1948 and the Payment of Wages Act  both of the  Government of India  and the rules made there under in respect of any employee or workman employed or engaged  by him or his Sub Contractor    All registration and statutory inspection fees  if any  in respect of his work pursuant to this Contract shall be to the  account of the SI  However  any registration  statutory inspection fees lawfully payable under any statutory laws  and its amendments from time to time during erection in respect of the equipment ultimately to be owned by the  Purchaser  shall be to the account of the Purchaser  Should any such inspection or registration need to be re   arranged due to the fault of the SI or his Sub SI  the additional fees to such inspection and or registration shall be  borne by the SI     13 1 3 Purchaser   s lien on equipment    The Purchaser shall have lien on all equipment including those of the SI brought to the site for the purpose of  erection  testing and commissioning of the equipment to be supplied  amp  erected under the Contract  The Purchaser  shall continue to hold the lien on all such equipment throughout the period of contract  No material brought to the  site shall be removed from the site by the SI and or his Sub SI without the prior written approval of the purchaser     13 1 4 Inspection  testing and inspection certific
100. amp  Conventional    Energy Meters    simultaneously and the result of the demonstration  testing shall be treated as a part of the  minimum pass  fail technical qualification criteria     Demonstration  testing shall include capabilities of the offered solution at least in respect of  offered meters  their ports  protocols  interfacing capabilities  communication media proposed   achievement of desired refresh rate for all the specified parameters from all the meters  simultaneously  data acquisition software details  instantaneous as well as stored meter data  retrieval etc  For this purpose  minimum 4 meters  2 ABT type  amp  2 conventional  each may be  installed locally  remotely at three substations located in Punjab along with the communication  through the proposed communication media with data acquisition software system  The meters  shall also be tested for simultaneous communication with the RTU and its Data downloading  capability via DCD CMRI etc     Necessary equipment systems  SIMs etc  required for this purpose shall be brought  arranged by  the bidder at his own cost and risk  For demonstrating RTU connectivity  RTU  RTU simulator   laptop  may be made available by PSTCL  however  bidder needs to carry requisite RTU  simulation system for their proposed protocols for this purpose     Name and address of such customers where similar project has been implemented if available  and which the participating SI are referring to along with full contact details may be
101. amp  as per catalogue attached    will not be entertained  Deviations   Variations Comments  if any should be clearly detailed out  mentioning the clause in the  same chronological order as given in this specification  otherwise it will be presumed  that all clauses stipulated therein are acceptable to the SI  Bidder  No post tender  development will be allowed regarding any change in terms of prices or technical  specification    Proposal  Tender must bear signatures of a person authorized by SI  Authenticating  documents to prove authority of signatory  Legal power of attorney in favor of  signatory  must be attached with the tender    The firms having permanent security deposit of Rs 10 0  ten   lac with the CE  SO amp C  Organization   irrespective of the fact whether they have Permanent EMD  PEMD   already deposited with other purchase organization s of the PSTCL   a certificate to this  effect issued by the Accounts Officer SLDC  PSTCL  Patiala during three months  immediately preceding the due date for tender opening and showing the Serial Number   Account Number allotted in the permanent Earnest Money Deposit Register shall be  submitted by the SI  Bidder in the envelope for Earnest Money  for seeking exemption  thereof  Similarly Public Sector Undertakings fully owned by the Punjab Govt  Central  Government  Other state Governments supplying material directly through units owned  by them shall submit a certificate of Govt  ownership issued by the concerned Govt   Dep
102. and the rules there under  Any statutory amendment   modification or re enactment thereof for the time being in force shall be deemed to apply to and be  incorporated in the Contract Purchase Order  It will not be objectionable if the Sole Arbitrator is an officer of  the PSTCL and he has expressed his views on all or any of the matters in question of dispute or difference     2  Upon every or any such reference  the cost of and incidental to the reference and award respectively shall be in  the discretion of the Sole Arbitrator so appointed who may determine the amount thereof or direct the same to  be taxed as between Solicitor and Client or as between party and party and shall direct by whom and to whom  and in what manner the same is to be borne and paid     3  The work under the Contract shall  if reasonably possible  continue during the arbitration proceedings and no    payment due or payable by the Purchaser PSTCL shall be withheld on account of such proceedings     12 3 34 Samples  Demonstrations  Visits    Whenever asked for  samples  demonstrations  visit to already implemented projects must be supplied  given   arranged by the SI supplier free of cost at the purchaser   s office  location  Ordinary samples will not be returned to  the Tenderer  supplier  However  expensive samples  the return of which is desired by the supplier SI will be  returned to him at his own risk and cost     70    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme usin
103. artment in the envelope for Earnest Money for exemption from Earnest Money   Exemption shall not be applicable if the tender is submitted for supply of material  through private unit  manufacturer     19    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    4 2 Opening of Proposals  Tenders    4 2 1    4 2 2    4 2 3    4 2 4    4 2 5    4 3    4 4    4 5    Offers  Proposals  Tenders will be opened on the date and time prescribed in the RFP in  the presence of SI or their authorized representatives  who may like to be present  In  case the date of opening of tender falls on a holiday or holiday is subsequently declared  on that date  the Proposals  Tenders will be opened on the next working day following  the holiday at the same time and venue as notified in the NIT  The following procedure  will be adopted for the opening of Proposals  Tenders    Firstly the main envelope containing the bids will be opened in the presence of the  bidders  representatives who choose to be present at the time  amp  date as notified in the  RFP  After opening the main envelope  the envelope marked Part  I  Earnest Money   shall be opened first and if these deposits are found to be as per the requirement of the  specifications  only then the envelope marked Part II shall be opened  The bids without  earnest money deposits shall be out rightly rejected    After opening Part II of the bids  Qualification technical commercial   
104. at UPF   iii  100      at UPF   iv  120      at UPF  The offered meter shall also be capable to withstand and shall not get damaged if  phase to phase voltage is applied between phase and neutral   The meter should register energy correctly even when the load is not terminated  back to the meter and instead the current is drawn through a local earth  if possible   Tamper information and readings  stored data should not be modifiable through  CMRI or P C    Ports   In case more than one tampers exist simultaneously  then meter shall record all the  tempers with date and time of occurrence  duration   Power Supply failure  The meter shall log the cases of failure of Self Power i e   PT CVT and its restoration with date and time   Tampering data  events should be recorded  logged with date and time  firstly as per  the recommendations of CBIP 88 Report  Latest Amendments   secondly as per the  Relevant Standards or lastly as specified in the Specification in the relevant sections   in that order  And if not covered  specified in any of the above then the recording  should be to log the first occurrence and of last restoration along with total number  and total duration of all such occurrences during the above period  It shall also  record instantaneous data  for each phase  i e  voltage  current  P F  etc  Tampers  shall be recorded if it persists for some  say 1 to 5 minutes  minutes continuously  and once a tamper is detected by crossing the threshold time  any momentary  norm
105. at the same terms and conditions   for a further period upto 6 months after expiry of currency of rate contract  The bidder  has to pass the benefits  if any  arising due to price variation of items during the validity  of rate contract to the purchaser    Supply Order may be placed upto the last date of the currency of the rate contract   Delivery date in the Supply Order need not necessarily fall within the currency of the  rate contract but it can go beyond it depending upon the terms of delivery stipulated in  the rate contract or in specifically agreed condition of delivery in respect of particular  supply order  No extension of validity period of the rate contract itself is required when  deliveries against outstanding supply orders continue even after expiry of the validity  period  The rate contract will remain alive for purpose of delivery for all the stores  ordered during the currency of the rate contract until deliveries have been completed     In case of 7 years of Comprehensive O amp M the SI  Bidder has to quote year wise basis  clearly indicating the details of fixed cost and recurring cost    Equipment Testing   Type Testing    The ABT Meters and other equipment  sub assemblies shall conform to the relevant type  tests  Type test reports for all these items shall be submitted to the purchaser for  approval  acceptance  Purchaser reserves right to witness  conduct type tests as  specified at vendor s cost and the charges against type testing  which has to be i
106. ately irrespective of  the phase sequence of supply    b  Missing Potential  The meter shall record  log occurrence of missing of one  two  potential as per the relevant standards    c  Meter shall work accurately during the tamper conditions of neutral disturbance i e   when DC voltage  High Frequency is fed to neutral    d  The meter should be provided with magnetic shielding so that any external magnetic  field  AC DC Electro magnetic or Standalone Magnet  as per the value specified in  CBIP reports no  88 with latest amendments  should not affect the proper  functioning of the meter     100    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    30 0    e     g   h   1   D  k     D    Energy Meters    Accuracy of the meter should not be affected with the application of the abnormal  radiations  voltages  frequencies generating devices as per latest CBIP report if any   any where on the phase  neutral circuits etc The accuracy of the meter should be  checked before   amp  after these applications  and the accuracy of the meter during  tamper shall be as per latest CBIP reports if any  Meter shall record the energy accurately under the effect of radiation emitted by  mobile phone or such other devices  The test shall be carried out by bringing a  mobile phone in the close proximity of the meter for 10 minutes when there is an  incoming call and shall be checked under the following conditions    i  10  I  at UPF   ii  50  h 
107. ates    The provision of the clause entitled Inspection  Testing and Inspection Certificates under Technical Specification  shall also be applicable to be erection portion of the Works  The purchaser shall have the right to re inspect any  equipment though previously inspected and approved by him at the SI   s works  before and after the same are  erected at site  If by the above inspection  the purchaser rejects any equipment  the SI shall make good for such  rejections at his own risk and cost either by replacement or modification repairs as may be necessary to the  satisfaction of the purchaser  Such replacements will also include the replacements or re execution of such of those  works of other SIs and or agencies  which might have got damaged or affected by the replacements or re work  done to the SI   s work     13 1 5 Access to site and works on site    Suitable access to and possession of the site shall be afforded to the SI by the purchaser in reasonable time  The SI  shall carry out necessary field adaptation jobs for interfacing equipment  amp  hub at sub stations  at designated places   The SIs shall have the complete responsibilities for the conditions of the work site including the safety of all  persons employed by him or his sub SI and all the properties under his custody during the performance of the work   In the execution of the works  no person other than the SI or his duly appointed representative  Sub SI and  workmen shall be allowed to do work on the si
108. ation of uptime can be done with the  following formula      Quarterly Uptime      Total number of hours in the quarter     Total downtime in hours x 100  Total number of hours in the quarter   If successful SI is not able to maintain the system as per above defined expected service levels    then 10   of the O amp M cost shall be deducted per 1  or its part  degradation after 97  desired   availability  subject to the maximum of 50  of the O amp M cost  by Purchaser from the amount    due per quarter to the Successful SI  Bidder for the O amp M service     11 2 Service Levels and Penalty Terms    eaves Service Condition Acceptable Limit Penalty    Hardware  procurement  amp   installation   during O amp M     Data transfer  through  communicatio  n connectivity   during O amp M     Data transfer    through   communicatio  n connectivity   during O amp M     Communicatio  n Failure   during O amp M     Replacement of  defective   faulty  equipments already  supplied by the SI    Instantaneous parameter  data from all the ABT  meters installed shall be  transferred from the  remote metering point to  the CEC     Instantaneous parameter  data from all the  conventional meters  installed shall be  transferred from the  remote metering point to  the CEC     If there is a failure in  transmitting data  through the  communication  connectivity and or  meter is faulty  the SI    Replacement within  5 days  including  non working days     Within 1  one   minute through  implemented  
109. ay   s Reactive   Y N Y Y Y  Energy Low   V lt  97         6 Count and   Y N Y Y N  Max  Min  Duration of  power off of  feeder        7 Duration of   Y N Y Y N  Power off  hours of the  feeder        8   Apparent Y Y Y Y N  Energy Import       9   Apparent x Y Y Y N  Energy Export                               Perpetual Type Power Quantities        Sr    Parameter Scrolling  Remote   Storage   ABT   Cyclic Reading Billing  Display  Instant Related  Cur   Prev   aneous   rent   ious  Bloc   Bloc  k k          1   Cumulative Active   Y Y Y Y N  Energy perpetual  counter in  Wh Separate for  import  amp  export as in  conventional  bidirectional energy  meter                                Note  Signs may be used to represent Export  Import  Lag  Lead in concurrence  with the general scheme as specified in    ABT Specific Requirements    section   Besides the above specified lists  complete list of available parameters for online  monitoring  amp  available parameters which are stored in the meter  amp  are  retrievable through ports or otherwise  available in the meter may also be  supplied with the Bid     Meter Display    Each of the rack panel metal box shall have alphanumeric common  individual  both  type of legible  easily readable and visible  even during the night  display for indication  of the meter parameters one by one of all the Instantaneous Parameters  the current as  well as immediate previous 15 minutes block  Day Level parameters  amp  Perpetual type    90   
110. backed with their planning and  deployment  duly supported with broad calculations and                156    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional       Energy Meters  Sr  Description Status Cross   Yes No    Reference  NA        quality assurance procedures proposed to be adopted   justifying their capability of achieving the completion of  work as per milestones specified in  Proposed  Implementation Plan  Schedule  and  or as has been  proposed by the SI itself  section within the stipulated  period of completion         28     Whether the SI has submitted the filled the performa  VI   for filling the details of its manufacturing works       29     Has the SI  who doesn   t have own facility to manufacture  materials required for the work  has submitted its vendor  list from where it will procure the material  services with  their credential and annual turn over etc  as specified       30     Whether the SI has submitted the draft TPA agreement as  specified       31     Whether SI  bidder have attached a Certificate from banker   issued not earlier than three months prior to the date of bid  opening  indicating various fund based  non fund based  limits sanctioned to bidder and extent of its utilization as  on date        Section 4       32     Whether the entire bid documents have been signed by  authorized signatory and whether Legal power of attorney  in favour of signatory has been enclosed        33     W
111. based meters for    28    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    5 3    Energy Meters    Remote Communication as specified  However till companion standards are  published by BIS and  or such meters are available  meter with other open standard  protocols or proprietary protocols which may be available and suitable for the  intended purpose could be installed  As such CEC should have facility to accept data  from such meters through APIs  Protocol Converters etc   may be based upon  IEEMA specified interoperability MIOS based system  Full details of any protocols  whether open  standard or proprietary  must be made available to the Purchaser as  specified  Further any royalty etc  shall not be payable by the purchaser if it takes the  services of any third party to develop suitable devices  software using any of these  proprietary  standard  open protocols at least for the present Project  Further CEC  should also be able to integrate and be compatible with already existing  installed  ABT meters at OA Customers end and with existing conventional energy meters  installed in 400kV  220 kV  132kV substations of PSTCL     Any protocol selected above for the meters should be such that it should be possible  to acquire time stamped instantaneous  Current Block  Current Day Instantaneous  parameters as specified for achieving a refresh rate of 10 seconds or better  even  though for present RFP it has been specified as
112. bicle shall also be provided to mount the  meter and associated TTBs  Metering cubicle  i e  Rack Panel Metal Box  shall be  designed to accommodate one two racks  rows each with 2 3 4 meter  Metering cubicle  shall be pre wired and shall have door switch and space heater controlled by thermostat  and switch  The cubicle shall be made of 2 mm CRCA for load bearing members and  1 6 mm CRCA for doors and covers  The cubicle shall be confirming to IP 54 of  ISI2063and properly treated and painted with light grey shade no 631 as per IS5   Optionally in case of Metering Cubical a common Display  common Optical Port  amp   common communication port may be provided     Connection Diagram  amp  Terminal Marking    The general scheme of Connection Diagram  amp  Terminal Marking shall be as per the  relevant standards  The connection diagram of the metering module shall be clearly  shown appropriately on the meter  The meter terminals shall also be marked and this  marking should appear in the above diagram  In case any special precautions need to be  taken at the time of testing  installation of the meter the same may be indicated along  with the circuit diagram  Phase sequence shall be marked on the diagram of connections     Quality Assurance    The meter manufacturer must have a quality control  assurance  QA  procedure  plan for  manufacturing of the specified equipment generally based on the established and proven  practices of the manufacturer     Type  Routine Tests   Meter mus
113. bids at any time prior  to award of contract  without thereby incurring any liability to the affected SI or SIs or any obligation to inform the  affected SI or SIs of the grounds for PSTCL   s action     12 4 3 Notification of Award    Prior to the expiration of the period of bid validity  the PSTCL will notify the successful SI s  in writing by  registered letter or by cable or telex or fax  that his bid has been accepted  The receipt of acceptance should be sent  by the SI in writing through registered post as well as by fax     The notification of award will constitute the formation of the contract     71    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Upon the furnishing of performance security by the successful SI s   the PSTCL will promptly notify each  unsuccessful SI and will discharge the bid security     12 4 4 Signing of Contract    At the same time as the PSTCL notifies the successful SI that his bid has been accepted  the PSTCL will send the  SI the contract form  Performa XI   incorporating all agreements between the parties     On receipt of the contract form  the successful SI shall sign and date the contract form  and return it to the PSTCL  as per mutually decided date     12 4 5 Security Deposit    The successful SIs shall be required to submit security deposit for faithful execution of the Purchase Order   Contract at the rate of two percent  2   of order value rounded off to a mul
114. ble for  SLDC Operations as per the specification     Around 700 ABT Meters and 400  Conventional Meters associated  communication  amp  Setting up of Centralized  Energy Centre     24 10 2011    14 11 2011    21 11 2011 up to 11 00 AM  21 11 2011 at 11 30 AM    Rs 2500   in the form of demand draft in  favour of AO SLDC  PSTCL payable at  Patiala  to be submitted in a separate  envelope along with the tender or before the  due date      RFP  Tender specification can only be downloaded from PSTCL website www pstcl org   www punjabsldc org  No hard copy of the same will be issued by this office     Address for Bid Submission  Correspondence  amp   Contact Person        Dy Chief Engineer  SLDC Project    SLDC Building  220kV Grid Sub  Station   PSTCL  Ablowal  Patiala  147001   Phone No  91 175 2365901   Fax No  91 175 2367490  2365340  Mobile No  096461 18007   Email  se sldcprojects   punjabsldc org       SAVE ELECTRICITY TO REDUCE POWER CUTS    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    10     11     12     Energy Meters    TERMS  amp  CONDITIONS  A set of RFP  tender documents containing technical specification  qualifying  requirement  general instructions  terms  amp  conditions  specified Performa etc  against  above tender enquiry can only be downloaded from PSTCL websites www pstcl org  and www punjabsldc org and no hard copy of the same will be issued by this office   However the cost of specification i e  R
115. ble to Availability Based Tariff Regime as may be adapted in  Punjab from time to time as per the policies  regulations etc  fulfilling the  responsibilities of an SLDC  Scheduling server  console shall maintain  preserve  control  the databases relating to day ahead  current day  implemented schedules  scheduling  transactions  interactions  schedule revisions etc between various utilities being served  by PSTCL  SLDC  Interface to the Operators shall be through Operator Consoles   website  fax  manually etc  Scheduling Consoles shall be used by Scheduling Operator at  SLDC to authenticate the final schedules  other settings etc  It shall help Load Dispatch    37    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional     viii      ix      x      xi     Energy Meters    Operator of intra state utilities to define the schedules for various entities after proper  authentication and shall also generate the real time  historical trends of schedules with  parameters like current load  current drawl etc  Operator shall also have screens for  selection of different parameters to generate trends  graphs and tabular data relating to  scheduling etc  Being Critical it should be in dual redundant hot standby configuration   Further  ABT Billing software running on the servers shall generate ABT related energy  accounting and settlement reports on periodic basis     Billing Server  Console  Billing server shall maintain data regarding bill
116. bsequent works may also be quoted     In case of need to provide new equipment  third party software for the scheme as may be  required due to change in specifications during O amp M and evolution period  the same shall  be arranged by the SI in discussion  agreement with Purchaser  at a reasonable price keeping  reasonable margins for its efforts  Purchaser shall have the right to determine the exact  difference in cost through the means which may be available  possible and contest the SI   s  claim if it is found to be unreasonable  In case of dispute on this account the Purchaser shall  have right to get the supply of ABT meters or any other equipment  third party software   partial or complete on its own and SI shall have to provide other services i e  the  communication connectivity  accessories  other equipment  amp  changes in databases  reports   settings  integration etc     SI will have to submit details regarding the time periods required by it for fulfilling the new  requirements  additions  amendments in respect of software changes  display building     58    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    reports  installation of new meters  providing communication infrastructure etc  for each  item for providing time bound effective service to the Purchaser during O amp M periods     17  The Comprehensive O amp M service shall include Warranty support  replacements of any  faulty equipment
117. by applying Freight  amp  Insurance  Packaging  amp  forwarding   various Taxes on these prices to arrive at total price for that item  It is required that Quantity column in the price bid must be filled if quoted prices  are required to be increased  decreased on prorate basis with change in quantity  In case no quantity is mentioned or lumpsum is mentioned in the  price bid or stated to be included in the quoted prices without mentioning in which specific item price it is included  against an item  it shall be  assumed to be fixed and shall not be payable on increasing  decreasing in the ordered quantity even during O amp M period and shall have no effect on  that quoted price    All the component cost shall be included to arrive at final cost and bidder has no right to ask  suggest for excluding any component from the final  cost  Any such plea shall be out rightly rejected    Note  Requirement of mounting arrangement will depend upon the actual field conditions and as per the scheme provided by the bidder  but it will be  used for price bid evaluation purposes     SIGNATURE    NAME    DESIGNATION   DATE  SEAL OF COMPANY    152    Performa X VI  BOQ  BID Schedule    No format is being specified here  SI has to device a format for the Price Bid Schedule to be  enclosed in Part III of the Bid as mentioned in Performa XV  The same  similar  Atleast in  same logical sequence  format which the SI will be putting up with prices filled in the Part III   should be given against th
118. by the SI and must be built in the cost of implementation  and the O amp M Charges respectively     7  The proposed communication network shall  a  have emphasis on high reliability and  availability   b  have efficient dynamic bandwidth management   c  have modular  architecture for growth and expandability  d  shall support flexible network  configuration changes  It is desired that SI must execute a SLA with Communication  sub system provider to achieve desired availability as specified     8  The data communications from meter to modem DCU converters and further to CEC  end should be secure  amp  tamper proof and it should not be possible to tamper with the  data in between ABT Meters  amp  CEC using any means  Data may be encrypted between  Meters  amp  CEC and secret encryption keys  if any  shall be kept in safe custody of the  Purchaser and also fed in by authorized personals of the Purchaser only and shall not be  disclosed to operation  amp  maintenance personal of the SI  In case of compromise of the  keys due to any reason there should be provision to generate  define new keys and same  treatment be done  For the purpose of testing the communications lines there should be  separate provision  For clarity purpose it is asserted that  where modem DCU converters  are separate from the meter  the same shall be enclosed in a proper sealable panel box  along with meters so that no one can tamper even with the connecting cables of these  devices  Additional cost in this 
119. cables   arrangement for  making the system  secured for each  location etc   each  item may be  separated out in  individual rows        1 6    Any other item   service  Please  Specify item   service wise by  inserting  additional rows        Communication Subsystem             Equipment for 700  interfacing 700  Meters at 220  locations to  proposed  communication  media e g  DCU   Modem  Power                                                    135       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       Supply   Converters etc    give details of  equipment  required in  separate rows        One time charges  till Comprehensive  O amp M starts as  specified  e g  SIM  activation  any  license  IP  BW  allocation fees  etc      700       Recurring Charges  if any  subsequent  to the  commissioning of  meters till  Comprehensive  O amp M starts as  specified    700       2 2    Equipment for  interfacing 400  Conventional  Meters at 220  locations to  proposed  communication  media e g  Modem   Converters  their  Power Supplies  etc     400          2 2 1       One time charges  till Comprehensive  O amp M starts as  specified  e g  SIM  activation  any  license  IP  BW  allocation fees  etc            400                                              136       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       2 2 1    Recurring Charges 
120. cal PC  Time required for downloading the complete stored data  logs etc must be  reasonable  amp  practicable and to be mentioned by the supplier    Electrical Communication port  2 Nos   The overall intention of the 2 Nos electrical  communication port is for online data communication of all the instantaneous   current averages  cumulative values and offline data retrieval  tapping of stored values  preferably through open standard protocols through suitable communication device   media from personal computer  data collection center  Base Computer systems  AMR  systems  SCADA RTUs  Remote terminal Units  etc    First Electrical Communication Port  Out of two electrical communication ports  specified  one port will be used for interfacing the meter  in the near future  with  SCADA  RTU which shall be located at the substation itself  where the meter s are  proposed be installed  SCADA  RTU shall act as data concentrator and shall make  available the time stamped data to SLDC Operators  amp  Local Substation Operator on  LDMS  Local Display  amp  Management System  from the meters as well as other  substation equipment  For this purpose first electrical communication port can have  either or all of these open standard protocols  EC60870 5 101  IEC60870 5 104   TEC61850  Modbus  DNP3 protocols may be by using converters etc  To be compatible  with RTUs  it should be possible to configure  amp  it shall be the responsibility of the  supplier to configure on site the protocol of
121. ccompany the proposal  Details of specifications of the offered  equipment shall also accompany the proposal     The CEC system proposed by the SI should comprise of all the necessary hardware  amp   software which may be required  suitable for all the functions  features as has been  described  amp  visualized in the RFP  along with any additional system  component etc  as per  SI s own experience in implementing such systems  Intention is that further development  required if any  which may come up during interaction with the Users after award of Order  and during finalization of URSs  User Requirement Specifications  and DFRs  Detailed  Function Requirements  etc  before commissioning  it should be possible to be fulfilled by  customization only or SI should have capability  amp  capacity to write custom programs   queries to implement these UFRs  DFRs without the need for additional hardware  software  systems  If any additional need for extra Hardware and  or third party software arises before  commissioning of the respective systems than it shall be the responsibility of SI to provide  the same at its own cost  At the minimum CEC system must have suitable servers  amp   consoles as described herein along with capacity and capability of Hardware  amp  Software i e   detailed technical specifications in terms of RFP requirements     All the critical components  server functionalities at CEC should be in dual redundant hot  standby configuration as may be required to achie
122. cheme then it should have suitable  backup power supply i e  UPS  Inverter  etc as specified with sufficient long backup for  continuous operation of such critical elements as the case may be  Critical element shall  be defined as Communication Hubs if visualized in the solution  CEC  Remote Operator  Consoles etc  The equipment shall be capable of withstanding surges  amp  voltage spikes  of 6KV as per IEC 61000 4 5 standards     Climate  The equipment shall be suitable for climate  amp  weather conditions as specified  in the Annexure V    Wiring  Connectors  Terminal Blocks etc  All the wiring  connectors  terminal blocks  shall be as per the standards  Suitable Test Terminal block  for CT auto shorting   shorting link type and for PT  fuse type   TBs  Connecting wires for CT  PTs and Power  supply etc  shall be required for all the Meters as may be required for successful  commissioning     Indicators  All the equipment shall have suitable indicators to show healthiness of its  operations and  or fault condition     Cabinets  Enclosures  Mounting  SI shall install meters on respective C amp R panels   Generally Space  approx  350mm H   200 mm W   125mm D  is available on the  existing C amp R panels for installation of the SIs supplied metering system  However in  case such space is not available or is not suitable for the supplied metering system due to  any reason then SIs will have to provide its own mounting arrangement  cabinets     25    Intrastate Boundary Metering
123. conditional bids  shall be rejected  The SI must quote for all the items asked for in this tender    Purchaser reserves the right to modify  amend  add  delete the stipulations of the  specifications before final date of submission of the proposals  However due notice  amp   time will be given to all the concerned to make necessary changes in their tendered  offers    Rate Contract  Bidder has to quote for the complete solution along with unit rates of  the offered equipment  so that in case of addition  deletion of item  equipments  proportional payments may be made  deducted  Also the same rates now quoted will be  freezed as rates for rate contract in case of any similar work is required to be executed  e g  extra meters at new locations  additional operator consoles  additional remote  operator consoles  additional billing  scheduling consoles  etc at the discretion of the  Purchaser  All the Optional items  features as mentioned in the offered proposal of the  SI must be quoted compulsorily and shall be evaluated for final cost comparison   However final decision to procure the same is reserved by the Purchaser at its discretion  without any liability  claim    The Purchaser reserves the right at the time of Contract award to increase or decrease  the quantity of items  The actual quantity against the supply may vary upward and  downward with the approximate quantity for ABT meters and CEMs given in  Annexure 1  Subsequent purchase order s may be placed as  amp  when the
124. course shall be two or more weeks and each day shall have 8 teaching  hours     For Training at PSTCL s premises  PSTCL may depute persons in one batch  or as may  be mutually agreed   so as to fully acquaint them with the system as will be proposed by  the SI  Duration of the course shall be one or more weeks and each day shall have 8  teaching hours  PSTCL shall provide a training room on free of cost basis     All the expenses of training  amp  trainees at onsite and offsite shall be borne by the bidder   However TA  DA  hotel charges  etc  of the trainees shall be paid by PSTCL     60    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    11 SERVICE LEVELS AND PENALTY TERMS    11 1 Desired Service Levels    The selected vendor shall automatically be bound with a Service Level Agreement with PSTCL  on minimum service levels desired herein or as agreed to be mentioned in the final Order as  shall be proposed by the SI  Bidders  Desired availability is of the order of 99 9  in respect of  individual meters  communication channels  individual equipments which substantially affect  over all operations  reports  scheduling etc  99   in respect of all the three sub systems  individually and 97  over all for the Project as a whole  Availability shall be calculated  quarterly as the payments shall be made quarterly to the SI during O amp M period  The unit of  calculation shall be hour for penalty purpose  Calcul
125. ction and approval of  test certificates     Random testing of material on its receipt in the Stores irrespective of the fact whether or not it was inspected  before despatch shall be carried out by PSTCL and in case of any failure  the entire lot shall be rejected at the risk  and cost of the supplier     12 3 19 Fake Inspection Call  s     All such firms  who often after giving inspection call do not put up material to inspecting officer s  for inspection  due to one reason or the other  shall be required to remit the expenditure on T A   amp  D A  of the Inspecting  Officer s  for each such visit which shall be Rs 3000    Outside Punjab   Rs 1000    Within Punjab  per visit of  each officer     Besides this recovery against each such fake call  a letter of warning shall be issued and it shall be counted towards  firm   s performance for all intents and purposes  These charges shall be Rs 5000   and Rs 2000   per visit of each  officer respectively in case the material fails during inspection    12 3 20 Guaranteed Site Availability Test  GSAT  of the System    The SI shall demonstrate final acceptance test on commissioning of complete scheme with continuous availability  as specified in  Service Levels  amp  Penalty Terms  Section for the each equipment for a minimum period of 30 days   The availability achieved shall be calculated jointly by the SI s representative and the purchaser as per the  modalities to be finalised by the Purchaser beforehand  In case the actual achi
126. cuments  stipulation  details  write ups  Performa  etc  of  RFP must accompany with the bid  whether mentioned in the check list or not  in appropriate  parts of the three part bidding process     SIGNATURE   NAME   DESIGNATION     DATE  SEAL OF COMPANY    161    
127. cuted with PSTCL PSPCL    v    Was  were never been black listed by any company  Transco  organization or  government body    vi  Has  Have thorough understanding of ABT scheme  amp  Energy auditing at  transmission level  agrees with and has capability to fulfill the scope of this RFP  and are further willing to understand the user specific requirements from time to  time  amp  adaptation of ABT as implemented in Punjab and accordingly implement   amp  suitably modify the same as it may change during the pendency of the  Contract including during Compressive O amp M period    vii    Would not pay any commission etc  or engage any commission agent or liaison  agent for dealing with PSTCL in any matter including purchase of equipment   No officer official of the PSTCL will deal with any person who claims to be a  commission agent or liaison agent of any company and that the officers  officials  of the PSTCL must deal only with persons directly employed by the Suppliers    viii  Has  Have office in Punjab with sufficient personnel and inventory of spares and  Address of the same is as under    OR Does not  don   t have any office  presence in Punjab and commit to open the  same with sufficient personnel and inventory of spares within a month on selection  as successful SI    ix  Is  Are providing the solution complying with all the Technical Specification  Requirements as has been mentioned in the RFP    x  Has  Have willingness for extension in Comprehensive O amp M on mutuall
128. d  amount to take care of all liabilities either direct or indirect  in pursuance of the contract     13 1 14 CODE REQUIREMENTS    The erection requirements and procedures to be followed during the installation of the equipment shall be  in accordance with the relevant codes and accepted engineering practices  approved Drawings and other  applicable Indian recognized codes and laws and regulations of the Govt  of India     13 1 15 COMMISSIONING SPARES    It will be responsibility of the SI to provide  maintain all commissioning spares required for initial  operation till the end of successful completion of performance and guarantee test  GSAT and beyond till  the end O amp M period  All commissioning spares shall be deemed to be included in the scope of the  contract at no extra cost to the Purchaser  These spares shall be received and stored by the SI at least  1 one  month prior to the schedule date of commencement of commissioning of the respective equipment  and utilized as and when required     76    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    14  Annexure  amp  Performa    Energy Meters    Annexure I    Intrastate Boundary Metering Project  Proposed Location of ABT Meters                      Neighboring States     LV side of T Fs  220 66kV  132 66kV   132 33kV  132 11kV    Discom2  Zone 2  DN       TU  BBMB etc        VSAT   GPRS GSM CDMA   3G   Microwave  Optical Fiber   LPR  etc   Single or Mixed Technologie
129. d  requirements   shall lead to  disqualification   Some deviation  may be allowed  which does not  have major  impact on the  overall  functioning of  RMR system  and are not  disqualifying  the SI proposal  otherwise   marks shall be  deducted based  on degree of  deviation as  mentioned in the    5  No Deviations  or Deviations  leading to better  solution  5  Others   restricting   conditions etc  4 to  0        128    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Deviation  Statement  part  of the Bid  from  requirements  specification  and total  number of  deviations   Further  Deviations  which leads to  better solution  may be given  full score     Total Evaluation Marks 10         SIGNATURE    NAME    DESIGNATION   DATE  SEAL OF COMPANY    129    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa XI  Contract Agreement Form     To be entered on a non judicial Stamped Paper     This contract agreement made this                    Day 0f Senada in the  L EE between the Punjab State Transmission Corporation Limited  hereinafter called Purchaser   and M S as iade having their Registered office at  A thane A IA Aa hereinafter called    System Integrator       OR   and MS aonana enon eneas having their Registered office at  DANA T A hereinafter called    System Integrator  Lead Member  of the  Consortium consisting Of  1
130. d down in the  RFP documents  The quotation should also indicate the make  name of the  manufacturer  brand of the equipment offered accompanied with other descriptions   literature and sample  if any  at Tenderer s own cost  Fully dimensioned drawing of the  equipment  technical particulars and detailed literature shall also accompany the tender   For bought out assembly  units  detailed drawings  part number and name of the vendors  will be provided in the bid  In respect of need for supplying the documentation Special  attention of the SI  bidder is drawn towards Documentation  amp  Life Span Clauses of the  Technical Specifications  amp  Requirement section of the RFP    Detailed Write up on the Proposal  Participating SIs are required to submit a detailed  write up  in Performa VIII  along with Solution Design  As annexure to write up  of the  proposed solution along with detailed schematics showing the various components   modules  etc  whether hardware or softwares along with their respective functions  uses  etc  Features  specifications of the offered solution and sub components  modules may  also be listed and described  Pro  amp  cons of the offered solution s should also be  discussed in the write up  Proposal  Products   services offered should meet the  requirements visualized  subsequently evolved as mentioned in the RFP document  SI is  required to give a suitable explanation on how the offered item in the Bid will be used     20    Intrastate Boundary Meterin
131. d into by the joint venture partners or unconditional authorization from  parent company for participation in the bid shall be submitted with the bid     14    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    The SI  all Members should fulfil the following Qualification requirements for this Bid and  shall provide the relevant documents as required  The qualifying requirements shall form part of  technical specification which shall be considered for the purpose of technical evaluation and to  decide eligibility for opening of price bids  In case the SI  Members are not fulfilling the  Minimum Pass  Fail Requirements but submit the bid  it will be out rightly rejected  No claim  whatsoever shall lie against PSTCL for such submissions  SI  Members are required to check  the qualifying requirements before submitting the bids  However  the Purchaser reserves the  right to waive the minor deviations  which do not materially affect the capability of the bidder  to perform the contract     Qualification of bidder will be based on meeting minimum pass  fail criteria as specified  The  bidders shall also be required to furnish the information as specified in their bid to assess the  general capability  capacity of the firm to execute the job     3 1 Technical Experience Requirements  minimum pass  fail criteria     3 1 1 The SI or any Member of the consortium shall have prior experience or is presently  engaged in
132. d tables  amp  Performa must have a cross  reference i e  Page No  amp  Highlighted Marking  e g  Page No 5 Mark A  Page No 5 Mark  B  Page No 25 Mark E  corresponding to the submitted  claimed facts by the bidder in  its offered bid  where proof of the same could be checked  referred to  In case of non  compliance to these instructions the Bid may be rejected without liability to the  Purchaser  As such submitted bids should be complete in all respect    The tender shall be prepared in formal manner neatly typed or printed with all prices  stated both in words and figures  There shall be no erasing  Any corrections made should  be neatly done and signed  A systematic form of totaling should be adopted to avoid any  ambiguity with detailed description of the equipment offered  Being a RFP minimum  requirement in respect of which are confirmed to be supplied are mentioned  have being  specified in the BOQ  amp  Price Bid Performa  However other details of the equipment  amp   services which are being proposed for the Project implementation  amp  Comprehensive  O amp M  sub system wise  along with unit rate s  for increasing  decreasing the quantities  as per survey  for first implementation  during O amp M as well as when ever required by  Purchaser     Telegraphic fax e mail tender bids will not be accepted    The cost of specification i e  Rs 2500   in the form of demand draft payable at Patiala in  favour of AO  SLDC  PSTCL  Ablowal  Patiala   if not already submitted  shal
133. d the specification carefully so that their  offer may not be rejected on account of amendments  revisions  if any  with respect to  any earlier specification   Complete Implementation means full responsibility to implement ABT  non ABT  Meters  associated communication sub system  amp  Centralized Energy Center sub system  as specified in the specifications  Further Comprehensive O amp M means full  responsibility to undertake effective  amp  efficient Operation  amp  Maintenance activities as  specified  System Integrators are advised to study  amp  understand the scope of the tender  document carefully  Submission of bid shall be deemed to have been done after careful  study and examination of the tender document with full understanding of the implication  of the scope explicit  amp  implicit and other terms  amp  conditions   The SI shall bear all costs associated with the preparation and submission of the bid   including cost of presentation and verification of claims made by the applicant for the  purposes of clarification of the bid  if so desired by PSTCL  PSTCL will in no case be  responsible or liable for those costs  regardless of the conduct or outcome of the bidding  process   Interested System Integrators meeting the Qualification Requirement are hereby invited  to submit the  Technical  Commercial and Financial Bid Proposals as per the provisions  detailed in this RFP  The last date for submitting the bids shall be as stated in this RFP        Dy  CE  SLDC Proj
134. data collected  from meter seamlessly with server data    Billing  UI  Grid Loss Calculation Software   The CEC shall have the provision to provide required inputs to the Billing  UI  Grid Loss  Calculation software for generating bills of ABT consumers as per the User requirement     Third party interface  The ABT software shall have provision for interfacing with third party software  For the  above purpose  software shall support XML  OPC  ODBC interfaces     Other  General functions  amp  features   CEC shall have the capability to synchronize date and time of all meters with available GPS  system at CEC    The CEC shall have the capability of alarm system for any tamper event  excess demand  registered by the meter and other required alarm parameters    The system shall generate alarm as Communication fail in case of failure of communication  system    Comprehensive Tamper report with option for Tampers  Tamper Durations  Filter Tamper  and type of tamper for quick snapshot of errors in the system    The CEC shall be able to schedule the meter reading remotely  Flexible scheduling of meter  reading shall be provided by CEC automatically on a pre selected daily  weekly or monthly  basis    The Software must allow for designing Menus  Keyboard shortcuts  Schedulers  Event  objects    CEC shall have the capability to produce the data in the user required data formats    CEC shall be scalable in Hardware and Software terms to cater to the increase in  requirement    41    In
135. e BOQ Schedule without prices filled in Part I of the Bid     SIGNATURE    NAME    DESIGNATION   DATE  SEAL OF COMPANY    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa X VII  Maximum  amp  Minimums  amp  Scalability  without degradation of overall performance   In respect of all the Proposed Items of the Solution    No format is being specified here  SI has to device a format for the Price Bid Schedule to be  enclosed in Part III of the Bid as mentioned in Performa XV  The same  similar  Atleast in  same logical sequence  format which the SI will be putting up with prices filled in the Part III   should be given here with Maximum  Minimums  amp  Scalability  i e  Scalability possible  without degradation of overall performance  columns of the same items or as may be required  in Part II of the Bid     SIGNATURE    NAME    DESIGNATION   DATE  SEAL OF COMPANY    154    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional             Energy Meters  Performa X VIII  CHECK LIST   This must accompany with the Techno Commercial Bid   Sr  Description Status Cross   Yes No    Reference  NA   Section 2  1    Whether the SI has taken care about the complete scope of    the specification including ABT meters  conventional  meters and existing conventional meters etc        Whether the SI has submitted the requisite number of  Sample meter with the tender    
136. e duly  accounted for and logged   g  Errors in the energy measurement for all power factor angles from 0   to 360      shall be as per the standards specified in this specification    h  The harmonics shall be filtered out while measuring Wh  Var and Varh and only  fundamental frequency quantities shall be measured  computed  displayed  amp  stored   Meter shall also measure  compute  amp  display the Total Energy in Wh consisting of  fundamental  amp  harmonic energy for each 15 minute block separately    i  The Electrical Requirements  Power Consumption  Influence of Supply Voltage   Influence of Self Heating  Influence of Heating  Insulation  Immunity to Earth  Phase  faults etc    Electromagnetic Compatibility  Accuracy Requirements  Meter  Constructional Requirements  Marking of Meter  Test  amp  Test Conditions etc  shall be as  per the relevant standards unless specifically modified in these specifications    j  The meter shall have the provision of recording display Maximum Demand  MD  resetting and MD Count also    Climatic Conditions  The meter shall be suitable to work satisfactorily under the  climatic conditions of temperature  amp  humidity as defined in the relevant standards   Further climate conditions of Punjab should also be kept in view as listed in the  specifications    A C  Supply System    The supply shall be through CT  amp  PT connection of the respective EHV  HV feeder as  follows     Rated secondary voltage Vref    110V Phase to Phase  110 V3V P N
137. e information in these documents should be specific and  self contained without giving any references to the technical literature  Any condition   clarification necessitated  Deviation taken must be clearly mentioned  brought out in  Deviation Schedule Performa  otherwise it will be taken that SI  Bidder agrees to all the  conditions  stipulations of the RFP  Any dispute  variation later on shall deem to be a  default on the part of SI  Any shortcomings if found later during the scrutiny   evaluations of the tenders  the proposal shall be suitably cost loaded even if the  submitted bid is claimed to have nil deviations    21    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    4 9 7    4 9 8    4 9 9    4 9 10    4 9 11    4 9 12    4 9 13    4 9 14    a     b     c     Energy Meters    During design  execution of this work  in case there is any change in the specified  location  number of meters  etc  then the contract value will be adjusted in accordance  with the unit prices for the corresponding items to be added  deleted    Quantity  number of minimum items required by Purchaser are indicated in the Sample  BOQ and must be quoted at least for that quantity  number of consoles  workstations   meters  other items  etc    While quoting for any item efforts must be made to segregate the cost of different  functions if shared servers are proposed for various functionalities  Efforts must be made  to segregate cost of fixed
138. e possible to be stored in data bases  compressed files  backup devices  may be in  offline devices  Necessary utilities to retrieve the same as and when required should be  available and provided     5 4 10 Data Versioning and Data Integrity   1  The system shall provide fully versioned data system that tracks and maintains both     corrections    and    changes       2  True changes that naturally occur over time  such as meter changes  multiplexer changes   location changes etc   shall be tracked over time with effective dates  and the appropriate  values shall be used for each effective time range in all reports  exports  and calculations   including seamless handling of request time frames that cross change boundaries    3  All corrections of data shall be maintained in the system  including the maintenance of  multiple versions when multiple corrections have been made to the same data     5 4 11 Operation  amp  Maintenance Support   1  In the early stages of the project the SI shall provide a brief training to Purchaser   s  nominees and associate them with execution works  Prior to the commissioning of the  system  the supplier shall provide comprehensive training to the purchaser personnel on all  aspects of the system including design  programming  operation  report generation and  troubleshooting    2  Comprehensive O amp M contract including various services to be provided as per this RFP   shall be for a period of 7 years from the date of successful commissioning 
139. e purchaser immediately of any damage  shortage  discrepancy etc  for the purpose of information only   The SI shall be solely responsible for any shortages or damage in transit  handling and or in storage and erection of    75    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    the equipment at Site  All equipment shall be handled very carefully to prevent any damage or loss  The equipment  stored shall be properly protected to prevent damage either to the equipment or the floor where they are stored  The  equipment from the store shall be moved to the actual location at the appropriate time so as to avoid damage of  such equipment at site    All the materials stored in the open or dusty location must be covered with suitable weatherproof and flame proof  covering material wherever applicable     13 1 12 Site office records    The SI shall maintain up to date copies of all drawings  specifications and other Contract Documents and any other  supplementary data complete with all the latest revisions thereto  The SI shall also maintain in addition the  continuous record of all changes to the above Contract Documents  drawings specifications  supplementary data   etc  effected at the field and on completion of his total assignment under the Contract shall incorporate all such  changes on the drawings and other engineering data to indicate as installed conditions of the equipment furnished  and erected under 
140. eature  functions  programmable  parameters permanently       46     Communication Ports Supplied   a  Optical port for Local   b  First communication port for  interfacing meter with  SCADA RTU   c  Second communication port for  independent remote  communication   d  Whether Load survey data of  selective period can be  downloaded remotely from the  meter  Yes No    e  Does the meter support 10  Second or better refresh rate  from both the electrical ports as  specified        47     Number of Communication Ports       48     Optical port for Local  Downloading as per Specifications       49     Whether protocol details of  Optical port along with memory  map  API as specified has been  submitted        50     First communication port  protocols       51     Whether protocol details of First  communication port along with  memory map  API as specified has  been submitted        52     Second Communication port  protocols       53     Whether protocol details of  Second Communication port along  with memory map  API as  specified has been submitted        54     Whether Optical Port Compatible  with the DCD  CMRI as already  existing with erstwhile PSEB   PSPCL          55        Provide following details for             120       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters       DCD CMRI   a  Parameters read out   b  Clock synchronization   c  Per Meter downloading time  and uploading time for PC   d 
141. ect   PSTCL  Patiala     Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Table of Contents                                                    Sr  Description Page No   List of Abbreviations 5  1  Introduction 7  2  General Requirement  amp  Scope Of Work 8  3  Qualifying Requirements 14  4  General Instructions And Other Terms  amp  18  Conditions  D  Technical Specifications And Requirements 25  6  Proposed Implementation Plan  Schedule 45  7  Bid Evaluation Criteria 50  8  Payment Terms 55  9  Comprehensive O amp M 57  10  Training Requirements 60  11  Service Levels And Penalty Terms 61  12  General Terms  amp  Conditions 63  13  Other General Terms  amp  Conditions 74  14  Annexure  amp  Performa TT                   Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    List of Abbreviations                                                                                                                                                                            Abbreviation Meaning   AMR  RMR Automatic Meter Reading   Remote Meter Reading  BBMB Bhakra Beas Management Board   BOQ Bill of Quantity   CDMA Code Division Multiple Access   CEC Centralized Energy Centre   CEM Conventional Energy Meter   CPP Captive Power Plant   CSV Comma Separated Values   CTU Central Transmission Unit   DDE NetDDE Dynamic Data Exchange  Network DDE  EMI EMC 
142. ect is as per Annexure III  b   The detail of the some of the devices  in the visualization is as follows     Communication Front End shall acquire data from the meters and send the same to the  Main Data Processing server and as such concentrate no  of communication lines into a  single interface to reduce loading on data servers  It shall be supporting the number of  channels for concurrent automatic communication with all specified number of meters  for acquiring instantaneous parameters in real time meeting the specified refresh rate  from specified number of locations  It should be possible to achieve the specified data  refresh rate from all the meters simultaneously in respect of time stamped instantaneous   Current Block  Current Day Instantaneous parameters as specified  may be by  transmitting  receiving only those parameters which changes by a particular threshold  value  should be programmable for individual parameters  and by routinely undertaking  a demand scan automatically to check data integrity every few minutes  so as to optimize  the data volume to available channel bandwidth along with routine  amp  secure  downloading of offline  stored data from the meters for Analysis  energy accounting   billing  UI  Grid Losses Calculation etc  as may be desired  automatically as per  schedule or on specific requests from the control centre  More than one communication  gateway servers can be installed at CEC to handle the growth of metering points as the  system may
143. ed to enforce the logical progression of  work such that certain tasks cannot start until others have finished     6 1 Proposed Stages  Milestones  Schedule of Implementation    Stages   Mileston Duet   of Work Description  ae Months      Resource Mobilization    System Study    Basic initial introductory training to Purchaser   s  nominees   st   Field Survey   l Pon 100    Complete aa of metering points  required  finalization of Number of ABT CEMs  Meters to be installed  required under 2A 2B  amp   3A 3B Milestone s  for calculation of Energy  Input  Energy Output  amp  Grid Losses     45       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters       Interaction with the Users  URSs  User  Requirement Specifications   DFRs  Detailed  Function Requirements   amp  Design and  Finalization of Displays  Reports  Billing  Specifications etc  and its approval     Defining exact H w  amp  S w Requirements for the  project    Deciding about the location of CMRI       First 50  of ABT meter Supply  Installation   Commissioning alongwith that of required  communication Hardware  software  services   communication commissioning of respective  meters etc  for data transfer as specified    100  ofeach     First 50  of CEM Supply  Installation   Commissioning alongwith that of required  communication Hardware  software  services   communication commissioning of respective  meters etc  for data transfer as specified     
144. eeting the best standards  of workman ship  The offered system shall be complete with all components and  software necessary for their intended purpose  The solution design  supply  installation   testing  commissioning and Comprehensive O amp M of total system shall be within the  scope of vendor s supply irrespective of whether those are specifically brought out in  this specification and or the commercial order     The bare minimum  common specifications for all the proposed equipment to be  supplied by the SI  shall be as follows     Standards  All the equipment shall be as per relevant Indian standards for such  equipment installations  If Indian standards are not prescribed for any equipment than  International  IEC Standards shall be met with  In case there is no standards prescribed  any where than the equipment shall at least be non hazardous  non polluting  non  interfering with the working of other related  unrelated equipment  tamper proof   securely installed and suitable for the intended purpose     Power Supply  All the equipment shall operate from available electric supply where  ever the equipment is installed  It could be 220VAC  50Hz     30   48 VDC  220VDC   12VDC as the case may be  Any additional converter  inverter  rectifier etc shall be  either built in or provided with the equipment with proper sealable  tamperproof  arrangement  In case the equipment is critical element of the scheme and on which  depends the working of the significant part of the s
145. el Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    6  Implementation  Plans to implement the proposed design   Implementation methodologies to be used   Possible risks involved during implementation   Plans to eliminate or mitigate those risks   7  Operation and Maintenance  Methodology that would be used to operate  Plans to sub contract or Existing Staff  resources will be used     6 2 3 Implementation Plan with Timelines      Project Organisation  The SI shall provide The project organization chart outlining the roles  and responsibility at each level     The number of resources that will be deployed at each of the levels     Project risks     The expectation from Purchaser   s staff at various locations     The assumptions while making implementation plan     SI shall propose senior level officer as Single Point of Contact for any communication with  the Purchaser      SI shall propose the Project Review Mechanism     6 2 4 Operations  amp  Maintenance    SI shall explain the Operation  amp  Maintenance methodology in detail explaining how operations   amp  maintenance will be carried out     6 2 5 Training Methodology    SI shall provide      Training methodology     Level of skill and experience of the trainers      Expected Level of skills and experience of the trainees      Incase of non availability of desired level of skills of trainees available with Purchaser then  methodology to make the existing manpower suitable by trainings  courses etc   
146. ent  Console Workstati  on  amp  Laser  Printer       3 11 1    Hardware  Give  details        3 112    Software  Give  details        ICCP Server  Functionality       3 12 1    Hardware  Give  details           3 12 2       Software  Give  details                                                     140       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       Local  SLDC  Operator Consoles  with Laser Printer       3 13 1    Hardware  Give  details        3 13 2    Software  Give  details        Remote Operator  Console with  Laser Printer       3 14 1    Hardware  Give  details        3 14 2    Software  Give  details        3 14 3    Communication  Connectivity for  remote consoles       3 14 3 1    Hardware Give  details        3 14 3 2    One time charges  till Comprehensive  O amp M starts as  specified  e g  SIM  activation  any  license  IP  BW  allocation fees  etc         3 14 3 3    Recurring Charges   if any   subsequent  to the  commissioning of  consoles till  Comprehensive  O amp M starts as  specified             Hosting of  Integrated  Website locally as  specified  no page                                                    141       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       wise charges will  be acceptable    Dual Redundant        3 15 1    Hardware Give  details        3 15 2    Software Give  details        3 1
147. ergy Meter  ABT type    SLA Service Level Agreement   ABT Availability Based Tariff   AC Alternating Current   API Application Programming Interface   BIS Bureau of Indian Standards   BCS Base Computer System             Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional                                                                Energy Meters   CBIP Central Board of Irrigation  amp  Power  CD Compact Disc  CEA Central Electricity Authority  CMRI Common Meter Reading Instrument  COM Component Object Model  Software Components Terms   CRCA Cold Rolled Close Annealed  CVT Capacitive Voltage Transformer  CT Current Transformer  DC Direct Current  DCD Data Collection Device  DCOM Distributed COM  Software Components Terms   DLMS COSEM Device Language Message Specification    COmpanion Specification for Energy Metering  EHV Extra High Voltage  ESD Electrostatic Discharge  GPS Global Positioning System  GSM GPRS Global System for Mobile Communication  General Packet Radio Service  HV High Voltage  Ip Basic Current  IEC International Electro technical Commission  IP International Protection Rating  Ingress Protection Rating       I phs Iypn  Ib pn     Respective Phase Current       IS    Indian Standard                                                                         ISI Indian Standard Institute   LCD Liquid Crystal Display   LED Light Emitting Diode   MD Maximum Demand   MIOS Meter Inter Operable Solutions  NABL National 
148. ermissions   etc  as may be required  shall be provided  if viable and practically possible  but any expenditure  on this account will have to be borne by the SI  All such support required from the Purchaser  must be brought out clearly in the proposed solution  However such activity should be  undertaken in time bound manner so as not to delay the Project commissioning from the  proposed schedule to achieve respective milestone     For Comprehensive O amp M no spares shall be provided by the Purchaser and if required by the SI  then these must be build up in the Comprehensive O amp M prices  It is the responsibility of the SI  to operate  amp  maintain the system  At the end of the Comprehensive O amp M  all the faulty  equipment shall be got rectified by the SI before handing over the same to Purchaser  Purchaser  may order additional equipment spares before finally taking over the system after  Comprehensive O amp M  which the SI shall have to supply at its finally agreed rates to the  Purchaser so that PSTCL may be able to operate  amp  maintain the system thereafter on its own  after end of Comprehensive O amp M period     Making available of adequately sized Uninterrupted Power Supply for running the system  without any break  At least for 2 hours  due to power failures at critical locations i e  CEC     10    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    20     21     22     23     24     25     Energy Meters   
149. es  prices     Part III Price Bids  The third part will consist of the rates quoted as well as other related  terms like Freight  Insurance  ED  CST etc  and other incidental charges relevant to the  price as per the specified price schedule along with unit price of each item to cater for  increase  decrease of the Count etc as per actual field survey  or ordered during  comprehensive O amp M period and or for other items    All these three envelopes will be further enclosed in a larger sealed envelope  double  covers  both covers  inner  amp  outer  super scribed with as follows alongwith Covering  letter  Performa VII     i  Bidder s Name   Gi  Tender Specification No  etc    iii  Date  amp  Time of Opening     iv    Addressed to the CE  SO amp C  SLDC  Projects   PSTCL  Ablowal  Patiala   Proposals  Tenders shall be received in the office of Dy  CE  SLDC  Projects   SLDC  Building  220KV Grid Sub Station  PSTCL  Ablowal  Patiala up to specified time on the  due date given in the tender notice  In case the due date of receipt  opening of Proposals   Tenders happen to be a holiday  Proposals  Tenders shall be received and opened at the  same time on the next working day    Proposals  Tenders received late will not be considered  opened regardless of the date of  posting of the tender    The proposal  tender should be submitted strictly as per RFP  tender specification  complete in all respects  Mere writing that deviations variations comments are    As per  previous supply  
150. esponsibility for completion of  the works within the specified time schedules and thereafter for Comprehensive O amp M as  specified     The SI or any Member of consortium must also have thorough knowledge of Availability Based  Tariff Metering Regime  its Scheduling  Revisions  UI  Billing  settlement procedures etc  SI   any member has to give an undertaking  Performa IID  for having through understanding of  ABT scheme and that it is further willing to understand the user specific requirements from time  to time  amp  adaptation of ABT as implemented in Punjab and accordingly implement the same for  the Purchaser as it may change  evolve during the pendency of the Contract including during  Compressive O amp M period     In the case of a consortium  applicant consortia shall have a valid Memorandum of  Understanding  MoU   agreement among all the members signed by the Chief Executives   Authorised Signatories of the companies dated prior to the submission of the bid  The MoU   agreement shall clearly specify the stake of each member and outline the roles and  responsibilities of each member  The MoU shall also clearly mention the lead member who will  be acting as SI for the Project  The MoU  agreement shall be exclusively for this project and all  members shall be responsible in case of failure by any member  However it will be the SI who  shall be fully accountable for all the defined roles  amp  responsibilities of each member to meet  with desired end results  amp  st
151. essful SI regarding the roll out of the scheme shall commence ONLY after receipt  the Performance Security     The PSTCL shall have the right to execute the Performance Bank Guarantee in the event of any contractual  violation by the successful SI during the entire contract period     72    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters  12 4 7 Period of Agreement  The period of agreement shall be considered till the end of O amp M period as per this RFP i e  for installation  testing     commissioning  operation and maintenance of this scheme  The PSTCL reserves the right to extend the period of  this agreement beyond five years subject to mutually accepted terms and conditions as stated in this RFP     73    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    13 OTHER GENERAL TERMS  amp  CONDITIONS    13 1 1 General    The following shall supplement the conditions already contained in the other parts of these specifications and  documents and shall govern the portion of the work of this Contract to be performed at Site     The SI upon singing of the Contract shall  in addition to a Project Coordinator  nominate a responsible  representative for field activities who shall have overall responsibility and co ordination of the works to be  performed at Site     13 1 2 Regulation of local authorities and statutes    The SI shall comply with 
152. estone stages as per Section 6  Implementation  Plan Schedule  is as given below     i     il     ii     iv     Supply Portion     85  of the total supply  amp  ETC value on pro rata for meters  ABT CEMs   amp  associated  communication commissioned  amp  other complete material equipment supplied  amp   commissioned as specified etc  along with 100   Sales Tax  VAT  Excise Duty and  other statutory levies as per contract shall be paid within 30 days of the end of respective  stages  against respective commissioning reports duly verified by Purchaser     Service Portion     85  of the service value provided after successful completion of the service along with  100   Service tax etc and other statutory levies as per contract shall be paid within 30  days of the end of respective services  against respective commissioning reports duly  verified by Purchaser     Balance 15   of the  i   amp   ii  above shall be payable within 30 days after successful  completion of GSAT  amp  Performance Guarantee test for complete System against  submission of a Performance Bank Guarantee equivalent to 5   of work completed   excluding the cost of Comprehensive O amp M   valid for period of 12 months from the  completion of contract period including O amp M contract     Comprehensive O amp M Services    7 years of Comprehensive O amp M services shall commence from the successful  completion of GSAT Acceptance  Payment during O amp M shall be paid 100   on  quarterly basis  along with 100  appl
153. etering points  minimum Certificate n  1  None 0   300 metering points   Any AMR project executed   Any member of   Work Order    6  Yes  6   for both online data refresh   the consortium Purchase Order    under  rate of 1 minute or better Completion implementatio  simultaneously from 100 or Certificate along with   n  3  No  0   above metering points located certificate from the  at more than 50 locations as end user clearly  amp   well as downloading of load unambiguously  survey  tampers  etc stored in stating the facts        50       themeter ____      Any AMR Project s executed   Any member of   Work    with Availability Based Tariff  Meters    Any AMR projects already  executed  may be by SI or any  other vendor  with  communication technology  offered by the SI for this  Project for data transfer   Number of   Automated  Remote Metering projects  executed on turnkey basis  involving comprehensive  O amp M for more than 3 years  Any Similar CEC  BCS as  specified implemented  suitable for ABT Regime   Energy Audit     Energy Meters    the consortium  Any member of    the consortium    Any member of  the consortium    Any member of  the consortium    Order   Purchase Order   Completion  Certificate  Work  Purchase  Completion  Certificate along with  certificate from the  end user  Work  Purchase  Completion  Certificate    Order   Order     Order   Order     Work  Purchase  Completion  Certificate    B  System Integrator or SI s Organizational Capability    Average ann
154. ether the price  financial bids are substantially responsive  Bids  that are not substantially responsive are liable to be disqualified at PSTCL   s discretion    9  The SI may be asked to arrange for the field testing demo of equipment s   visit to previous  implementations during the techno commercial evaluation if required    10  Scoring of cut off percentage  as specified  score in the techno commercial evaluation shall  be treated as minimum pass  fail qualifying criteria     54    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    8  8 1    Energy Meters    PAYMENT TERMS    Currency and Rates of Exchange    All payments shall be made in Indian Rupees only     8 2 Payment Schedule    1     The total project cost has been divided into two components for the purpose of payment     The Roll Out cost  That includes supply of material  Installation of meters  services   commissioning of respective items  equipments  one time fees  spares  permissions etc  for implementation of the scheme as specified and recurring charges of communication  system  the O amp M etc  till it is declared commissioned       The Operations and Maintenance  Comprehensive O amp M Cost for a period of 7 years     for the commissioned system from the date of commissioning of Project as above  and  of other systems  items  which were deferred by Purchaser  from their respective date of  commissioning     The payment schedule for the Project w r t  mil
155. eved availability falls short of the  guaranteed availability under the contract  it would be considered as SI   s default  The equipment shall not be  considered as successfully commissioned without successful demonstration of Guaranteed Site Availability Test   GSAT      12 3 21 Warranty and SI   s Responsibilities    The Supplier  SI shall be responsible to replace free of cost with no transportation and insurance expenses to the  Purchaser up to the destination of material  equipment  the whole or any part of the material  which under normal  and proper use and maintenance proves defective in material or workmanship within the O amp M Period as per RFP  from the date of successful commissioning and carrying out of GSAT of the equipment by the SI     The above provision shall equally apply to the material so replaced  repaired by the Supplier  SI during the  warranty period in case the same is again found to be defective within the period equal to the period of O amp M  Period as per RFP  of its replacement  repair     In case the replacement repair of defective material is not carried out within two months of its noticing or  intimation  the Supplier SI shall have to pay interest  12  per annum on the value of each complete operational  unit of equipment beginning from the date of its becoming defective up to date of its re commissioning after  replacement repair     68    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional
156. f Government controlled raw  material under Orders Instructions of Central State Government regulations  strikes  lockouts  embargo  acts of  Civil Military authorities or any other causes beyond their reasonable control  neither of the two parties shall be  made liable for loss or damages due to delay or failure to perform the contract during the currency of Force  Majeure conditions  provided that the happening is notified in writing  with documentary proof  within 30 days  from the date of the occurrence     The supplies shall be resumed under the contract as soon as practicable after the happening  event  ceases to exist     12 3 15 Extension in delivery   Commissioning period    Any genuine delay in approval of technical details  drawings  samples  issuance of amendment of Purchase order   conducting inspection and approval of Inspection Test Report Test Certificates for allowing despatches etc  will  count towards extension of the delivery period by corresponding period other than admissible under Force Majeure  conditions  if any  substantiated by the supplier and duly accepted by the Purchaser  No extension in delivery shall  be granted in case of delay in payment  However  for delayed payments beyond stipulated period as per terms of  payment clause  compensation shall be credited  0 5  of the payment so delayed per month or part thereof to be  adjusted against penalties levied or to be levied subject to a maximum of penalty leviable due to delay in deliveries  under
157. f appropriate value to the effect that they shall execute the  order if placed on them under    Order Preference    as per the tender specification  Such undertaking should be  submitted by the Punjab based tendering firms latest by the close of day of opening of tenders  In case  no such  undertaking is furnished by the Punjab based firms who are otherwise eligible for claiming    Order Preference     as per the tender specification  their tender shall not be considered for placement of any order under Order  Preference  In the event of refusal by the Punjab based firms to execute the purchase order contract at their  quoted rates or offers made under Order Preference as per    c    and    d    above as the case may be  After having  furnished the above under taking  their earnest money shall be forfeited apart from initiating further  administrative action  such as suspending business dealings  blacklisting etc     12 3 10 Despatch Instructions    The material is required to be despatched to designated PSTCL Consignee   stores as per dispatch instructions  issued by PSTCL     12 3 11 Delivery   Commissioning Schedule    The delivery of whole material equipment and erection  testing  and commissioning of the same at the respective  location shall be completed as per the Milestones mentioned in Proposed Implementation Plan     12 3 12 Date of Delivery  Commissioning    The date of delivery shall be reckoned as the date of receipt of material by the Consignee as per the Receip
158. f the Project     The SI shall define offered system   s hardware configuration  its specifications and other  requirements of the above hardware to meet the overall objectives of the proposed system   The Purchaser   s visualization of system is as shown in the Annexure III  The CEC shall  have server grade machines  workstations  consoles  peripherals and laser printers  at least  one printer of A3 size  one high resolution colour printer  one duplex printer  besides other  printers for bill printing etc   Ethernet switches  routers  web server  etc  with latest versions   For various activities  functions  features etc  a number of Servers  amp  Consoles have been  indicated in the schematic  These number shown are only indicative  Single  less number     31    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    more number of servers may accommodate number of features  functions etc  and as such  number of these required may be more or less  as per the solution offered by the SI   However number of workstations  consoles etc required initially is indicated in the BOQ as  far as GUI  MMIs are concerned  Normally it is expected that operators will work on  independent Consoles  Workstations and servers shall not require direct human intervention  except during maintenance activities     What so ever solution is offered by the SI  the complete schematic and detailed literature of  the offered system shall a
159. f the Supplier   SI fails to comply with the notice within time considered to be reasonable by the Purchaser  he will suspend   terminate business dealings with the defaulting firms for a specific period apart from claiming reasonable  compensation  damages  forfeiture of security etc  The action taken under this clause will be notified to all the  purchasing agencies and other Transco  Utilities by the concerned Purchasing Authority of PSTCL     Further in case of such default by the Supplier Contractor  the purchaser may also suspend business dealing with  the supplier Contractor apart from claiming reasonable compensation  damages  forfeiture of security etc     12 3 18 Inspection of Equipment  amp  Test    The PSTCL shall inspect  examine and test the equipment  material through its official s  and  or through an  outside agency nominated by PSTCL at the manufacturer s  Supplier s works  during or after the manufacture of  goods prior to despatch  on receipt of a clear notice of minimum two weeks in advance  to be reckoned from the  date of receipt by the Purchaser  The Supplier  SI shall provide all facilities as may be required to carry out the  tests in accordance with approved standards  free of cost  If the purchaser or nominee representative desires to have  one or all tests got through independent laboratory  test house  the testing charges of such a laboratory  test house  shall be borne by the supplier  The Purchaser shall dispatch no material without prior inspe
160. fied in this specification then it must also be indicated  logged in the log  files  All attempts to synchronize  actual synchronizing of the meter clock through DCD   CMRI may also be indicated  logged in the log files     Programmable Parameters   The meter may have following Programmable  P   Non Programmable  NP  parameters                       Sr    Information Type   Pass From  word   Meter  DCD  Remote   CMRI BCS   Master  1 Real Time Clock P Y N Y Y   Limited  as  specified   2   Demand Integration P Y N Y Y  Period  3 Meter ID  Identification   P Y N Y Y  4   Relevant settings in P Y N Y Y   respect of ports for  communication                               The change in programmable parameters must be logged  The supplier shall furnish  complete details of all the programmable parameters  facilities under following  categories  1  Factory Programmable  ii  User Programmable     Certain programmable parameters  features may be available in the meters  e g  CT PT  error compensation curves etc  by default  but may not be desirable for protecting the  interest of purchaser  It should be possible to permanently disable such programmable  parameters  features etc  as may be specified by the Purchaser as and when desired     Communication Capabilities    Each of the meter  meter rack shall be provided with an accessible  amp  sealable  galvanically isolated Optical port  i e  IEC 1107 etc    amp  two electrical communication  ports  e g  RS 485  RJ 45  RS 232 port etc   p
161. g ABT  amp  Conventional    Energy Meters  12 3 35 Approval of Drawings   Certificates    1  Two complete sets of Technical details specification of the equipment  Type  amp  Routine Certificates  if already  carried out on similar equipment   detailed equipment drawings and any other special requirement for  shipping  transportation of equipment up to destination will be submitted by supplier with in 2 to 3 weeks from  the date of receipt of purchase order  Approval on drawing wherever required  will be conveyed by the  Purchaser normally within 15 days from its receipt     2  In case any further details or modifications be required by the PSTCL the same shall be conveyed to the  supplier within the said 15 days period for conveying approval where after it will be the responsibility of the  supplier to submit further details of modified drawings within 2 weeks of receipt of intimation and get these  approved from the PSTCL which will be done within the usual 15 days period from their receipt     12 3 36 Discounts    The SIs are informed that discount  if any  should be merged with the quoted prices  Discounts of any type   indicated separately  will not be taken into consideration for evaluation purposes     12 3 37 Firm Price    Prices quoted by the SI must be all inclusive  firm and final  and shall not be subject to any escalation whatsoever  during the period of the contract  Prices should indicate the price at site and should include all state and central  taxes  Viz  e
162. g cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    4 6    4 7    4 8    4 9  4 9 1  4 9 2    4 9 3  4 9 4  4 9 5  4 9 6    Energy Meters    Purchaser reserves the right to ask for details  presentations  demonstrations  visits etc as  specified in this regard from the bidding SI as part of the Techno Commercial  Evaluation  The write up must have specific chapters on following    G  Main write up must consist of detailed and separate write ups on  a  Remote  Meter End   b  Communication Sub system  amp   c  Centralized Energy Centre  end  Detailed specifications of equipments being supplied and of computer  hardware  software must also be mentioned in the respective write ups with  reference to detailed brochures  manuals etc accompanying the bid     ii  Remote Meter End write up must include the meter details  capabilities   number of ports  independent and  or shared  and protocols available for  each  modem  DCU  RTU arrangement  etc along with any external power  supply arrangement  requirement clearly showing the same on a detailed  diagrams  schematic    iii  Details on how the meter and communication devices including connecting  cables and external power supply cables  if any  shall be made secure  amp   tamper proof     iv  What alternative arrangement s it is proposing in case where principal  communication connectivity is found not available during actual  implementation  For the purpose of evaluation it may be assumed that there  shall be
163. g out changes it will  introduce in the commissioned system  However  if Purchaser is not willing to accept the  new  latest system and SI still feels that it will be helpful  economize its own O amp M  operations than SI may be given go ahead subject to no cost to the Purchaser and minimal  shutdowns of the CEC system  sub systems     The CEC system  software should be capable to acquire data from existing ordinary   Conventional  non ABT  Energy meters  any IED  etc in the similar fashion and it should be  possible to send commands  text to such devices for execution  display  as and when  required for producing more detailed  comprehensive functions such as line wise losses   Transformer wise losses  energy audit  Rotational Load Shedding schemes  displaying some  messages remotely etc  as and when desired  required by Purchaser  As such CEC system   software should have functional capability similar to an SCADA system and it must be  possible to run different applications may be in real time and  or in offline mode  to  integrate some new applications as and when required     5 4 3 Proposed Architecture     It is the responsibility of the SI to propose the suitable Architecture  However as being  visualized by the Purchaser the proposed Architecture of CEC Sub system for Intrastate    35    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional     i      a      b      c      d    ii     Energy Meters    Boundary Metering Proj
164. gineer   SO amp C  organization and  hence exempted from depositing Earnest Money with Tenders  shall also be required to submit Security Deposit of  2  of order value in the form of Bank Guarantee within 30 days from the award of Order Contract     On faithful execution of Purchase Order Contract in all respects  including warranty period  if any  the security  deposit of the SI shall be released by the Contracting Purchasing Agency     In the event of default on the part of the SI in the faithful execution of Purchase Order Contract his security deposit  shall be forfeited by an order of the contracting purchasing Agency under intimation to all other Superintending  Engineers  Chief Engineers     The forfeiture of Security Deposit shall be without prejudice to any other rights arising or accruing to the PSTCL  under relevant provisions of the Purchase Order Contract  like penalty damages for delay in delivery including  suspension of business dealings with PSTCL for specific period     12 4 6 Performance Security    In addition to the Security Deposit as defined in the Section above  the successful SI shall provide a performance  security   five  5  percent of the total contract value excluding Comprehensive O amp M Value in the form of Bank  Guarantee valid upto 12 months after the contract period including the O amp M Period  The successful SI shall  provide the Performance Security as per the Performa XIII defined in this bid document     The balance payments to the succ
165. give the following undertakings on their letterhead with the tender documents   Performa III     i  That they would not pay any commission etc  or engage any commission agent or liaison  agent for dealing with PSTCL in any matter including purchase of equipment  ii  That no officer official of the PSTCL will deal with any person who claims to be a    commission agent or liaison agent of any company and that the officers officials of the  PSTCL must deal only with persons directly employed by the Suppliers     12 3 32 Places s  of Manufacture    The equipment shall be brand new  The Tenderer shall state the make  place s  of manufacture as well as the places  of testing and inspection of the equipment offered in his tender  It shall also be stated whether the equipment  offered carries ISI  certification mark or not  The material carrying ISI mark will be preferred     12 3 33 Arbitration    1  If at any time any question  dispute or difference  what so ever  shall arise between the Purchaser PSTCL and  the SI Supplier  upon or in relation to  or in connection with the Purchase Order Contract  either party may  forthwith give to the other  notice in writing of the existence of such question  dispute or difference and the  same shall be referred for sole arbitration by a nominee of the Purchaser PSTCL  who shall give a  reasoned speaking awards  The award of the Sole Arbitrator shall be final and binding on the parties under the  provision of the latest Indian Arbitration Act  
166. h 2  PSTCL  2   10  Jalandhar  BBMB  7   11  Jalandhar  PGCIL  2   12  Jamalpur  BBMB  8   13  Jamsher  PGCIL  4   14  Lehra Mohabbat  PSTCL  1   15  Mahilpur  PGCIL  2   16  Mohali  PSTCL  6   17  Pong  BBMB  1   18  Ranjitsagar  PSTCL  3   19  Sangrur  BBMB  3   20  Sarna PSTCL  6   c  132kV   21  Chohal  PGCIL  1   22  Kangra  PGCIL  1   23  Ropar  PSTCL  5   24  Sarna  amp  Pathankot  PSTCL  2   25  Shanan  PSTCL  4   E  Independent Power Plants  IPPs   amp  Captive Power Plants  CPPs    1  Rana Sugars Ltd  Batala 1   2  AB Grain amp  Spirits 1   3  Jalkheri Power Plant 1   4  Luxmi Foods amp  Energy  Kohara 1   5  Indian Acrylics Pvt  Ltd  Sangrur 1   6  Narangwal MHP 1  i Dalla MHP 1  8  Tugal MHP 1  9  Chupki MHP 1  10  Khatra MHP 1  11  Kanganwal MHP 1  12  Bowani MHP 1  13  Jagera MHP 1  14  Bajak SPV 1  15  Khatkar Kalan SPV 1  16  Hebowal Biometh  LDH 1  17  Dolowal MHP 1  18  Salar MHP 1  19  Bhanubura MHP 1  20  Babanpur MHP 1  21  Killa 1  22  Sahoke 1  23  Cnakbhai MHP 1             82    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional                                                                                                 Energy Meters  24  Lohgarh 1  25  Sadana 1  26  Ghollian MHP 1  27  Channuwal MHP 1  28  Akhara MHP 1  29  Khanpur 1  30  Sudhar 1  31  Gill Power Ltd Babheli 1  32  Malwa Power Pvt  Ltd 1  33  Universal Biomass 1  34  Atlantic Power 1  35  Punjab Biomass 1  36  Azure Solar Plant  SP
167. h are required to measure  energy input and Energy output to  from PSTCL s Grid so as to calculate grid losses by  31   Mar 2012 and the conventional energy meters may be installed subsequent or in  parallel to installation of ABT meters as per the convenience of the bidder with priority  to ABT meters  If necessitated rest of the works  functionality may be delayed  accordingly if so required by SI while proposing stages  milestones     5  The metering points shall be selected as per the requirements of Purchaser which shall  be finalized as per the survey by SI by the end of 1    milestone period  Additional  metering points which may crop up thereafter before the system is declared  commissioned shall also have to be commissioned prior to final commissioning   However if the metering points are increased substantially  i e  more than 50  increase  or more than 500 number additional  during period  from those decided by the end of 3   milestone due to any exigency such as policy changes etc  then system can be declared  commissioned after necessary performance  amp  guaranteed availability tests  And rest of  the meters will have to be commissioned and integrated as per the revised schedule  within 4 months from the date of initial intimation for enhanced meter quantity at the  rate of 25  every month  SI needs to have a capacity to install 300 meters per month if  the need arises for such eventuality even after commissioning of the system  Otherwise  under normal circumsta
168. hal 2 2          80    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional                                                                                                                                                                   Energy Meters   56  P Colony  ASR 1  57  Pakharpur 1  58  Panjgraian 1  59  Pathankot 2 2  60  Phagwara 1 2  61  Phillaur 1 1  62  Ropar 2 2  63  Sadiq 2 2  64  Samadh Bhai 1 1  65  Sarainaga 2  66  Sc  City  Jalandhar 1  67  Sehh 1  68  Shamashpur  Samrala  1  69  Sihora 1  70  Skatri Bagh 1  71  Sosan 1  72  Sri Hargobindpur 2 2  73  Swadi Kalan 1  74  Talwandi Bhai  Kot Karore  2 1  75  Tanda 2  76  Tangra 2  71  Tarn Taran 2 2  78  Urban Estate Ph II  Jalandhar 2  79  Verka 1 2  C  Generating Stations including Switch yard  1 GNDTP  Bathinda 30  2 GHTP  Lehra Mohabat 36  3 UBDC HEP 14  4  Ranjit Sagar HEP 22  D Shanan HEP 17 10  6 GGSSTP Ropar 36  7 Anandpur Sahib HEP 14  8 Mukerian HEP 28  D  Interstate Substations   a  400 kV  1  Amritsar  PGCIL  2  2  Ludhiana  PGCIL  2  3  Malerkotla  PGCIL  2  4  Moga  PGCIL  4  5  Patiala  PGCIL  2   b  220kV  6  Barnala  BBMB  1  7  Bhakra  BBMB  1          81    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional                                                                                                                                              Energy Meters   8  Ganguwal  BBMB  1   9  Gobindgar
169. hall be 50 Hz  The energy meter shall be rack  panel  metal box  mounted with individual  common  both types of displays   Same as in case of ABT type Meters    Conventions for Active Energy  amp  Reactive Energy     The Active Energy  Wh  and reactive energy  Varh  measurement shall be carried out  with accuracy as per the standards for Class 0 2s  These quantities shall be computed  directly in CT and VT secondary quantities  The Active Energy  Wh  shall have the  positive sign if there is a energy export  and a minus sign if there is a energy import  from the substation bus bars  In case of lagging reactive power is being sent out from  substations busbars  Var display shall have a positive sign and if reactive power flow is  in the reverse direction  Var display shall have a negative sign     Power Quantity Measurements Requirements     Instantaneous Power Quantities      Y Yes Required  N  Not Required                                                              Sr   Parameter Scrolling  Cyclic   Remote Storage at  Display Reading the end of  Curren   Immedia the block  t Block   te  Previous  Block  1 Current     I  ly    Y N Y N  I   2   Voltage  Vm    Y N Y N  Vyn  Von  3   Power Factor   Y N Y N   Lag Lead   4    Frequency   Y N Y N   Hz   5   Apparent Y N Y N  Power  6   Active Power Y N Y N  7   Reactive Power   Y N Y N  8   Real Time Y N Y N  Clock  Date  amp   Time   9   Maximum Y N Y N  Demand  KW   10   Maximum Y N Y N  Demand  KVA   11   Rising Demand   Y N Y 
170. hat all participating members are jointly  and severally liable for participating in the proposal and performance of the contract  if  awarded  We are also enclosing Power of Attorney for the person who is signing the bid     If selected  we understand that it would be on the basis of the organizational  technical  financial  capabilities and experience of the consortium members as specified in the Request for Proposal  document  We understand that the basis for our qualification will be our meeting the  qualification requirements  amp  terms  amp  conditions as specified  and that any circumstance  affecting our continued eligibility under the RFP  or any circumstance which would lead or  have lead to our disqualification under the RFP  shall result in our disqualification under this  process     We agree to abide by this bid for 180 days from the last day of submission of bid and the same  shall remain binding upon us and may be accepted to be increased for suitable periods as may  be required by Purchaser  at any time before the expiration of that period  If requested to extend  the period of validity for a specified additional period  we understand that no change in the bid  will be allowed for such extension and in case  we extend the validity of our bid  we will extend  validity of Bid Security also     We declare that we have disclosed all material information  facts and circumstances to PSTCL   which would be relevant to and have a bearing on the evaluation of our Qua
171. he meters   calculated  corrected  scheduling etc as specified                 160    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional          Energy Meters  Sr  Description Status Cross   Yes No    Reference  NA   83   Weather the SI has mentioned the power supply    requirements and load of the proposed CEC  Meter End  Equipment and Communication subsystem at each location  which are required to be provided by Purchaser        84     Whether the SI has given the detailed Maximum and  Minimums in respect of capacity  amp  capability of all the  supplied equipment in the Performa XVII       85     Whether the offered CEC system  software should be  capable to acquire data from any IED  etc and also send  commands  text to such devices for execution  display as  specified        86     Whether SI has filled the Check List cum technical  particulars sheet for ABT and conventional meters   Performa IX A  amp  IX B        87     Whether SI has submitted the list of testing facilities  available  Performa XIV        88     Whether the SI has quoted for the Mounting arrangement   Panel requirement charges as specified in the bid          89        Whether the SI has given details of the dimensions of the  meter as well as dimensions of the space required for  mounting the meter                Note  This check list is for providing assistance to the SI in submitting the Bids  However It is  the responsibility of the SI that all do
172. he said contract purchase order              Our liability under this Guarantee is restricted to Rs  in words  Rs    Our Guarantee shall remain in force  until       We hereby agree that any claim or dispute arising under this Deed shall fall within  the jurisdiction of competent courts at Patiala    We hereby further declare that this Deed has been executed by our lawfully  constituted attorney legally competent to sign and execute such deeds     Signed       Witness for  Witness Bank          132    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Performa  XIV    Name of the Test    1  TEST OF RAW MATERIALS     i   il     ili  etc     2  ROUTINE TEST   i   il     iii  etc     3  ACCEPTANCE TEST     i   il     lii etc     4  TYPE TEST   1   il     iii   etc     5  Site  GSAT TEST   1   il     iii   etc     Energy Meters    TESTING FACILITIES  Available at Works    Details of Testing facilities available  Remarks     NOTE  In case  testing facilities are not available for certain tests  indicate in the remarks  column from which testing house s  Institution s  these will be got carried out     DATE     SIGNATURE    NAME    DESIGNATION    SEAL OF COMPANY    133    Performa XV  Price Bid Schedule    As the SI has to give the detailed proposal to meet with the requirements as has been specified in the RFP along with quantity of the various items   equipments  services  etc  to be provided for complete implementation of the 
173. he third party billing applications also  in addition to the Billing application that  is required to be supplied by the SI as per this RFP  as and when required  Further it shall be  possible to exchange the data with already commissioned EMS  SCADA system through ICCP  Protocol  or as may be required  specified later on   However the present bid must include the  cost of implementing such exchange of data with SCADA  EMS through ICCP server   Interoperability  database details  charts  all requisite documents  tools  converters  etc  shall be  supplied by the SI and it should be possible to change  configure the interoperability of supplied  equipments  sub systems as may be required later on     It is the responsibility of the SI and in its own interest that it should clearly  amp  plainly bring out  the deviations it shall take  contradictions in the specifications  SI   s conditions etc along with its  ramifications for the Purchaser and suggested solutions to overcome these in the Bid proposal   Performa I      Testing  Demonstration  Presentation  Before opening of Price Bids  all the participating SIs  shall be called upon to give demonstration along with presentation on their proposed solution   system in PSTCL  for accessing first hand capabilities of the proposed meters  communication  interface devices  communication media and refresh rate achieved from the multiple meters    11    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  
174. he user requirement  All the reports   shall also be provided in soft copy on CD     5 4 7 Security Requirements   1  The system shall provide an integrated security system that allows administrators to create  users and grant those users permission to see   operate the system   data  tamper conditions    2  The system shall allow administrators to create groups of users with the same permission  set  All users assigned to a given group shall have the same permissions at the system level    3  Multi level configurable password control with complete event logging  Audit Trial     4  Access to the system must be authorized by and authenticated ID and Password security    5  The system shall be capable of conducting Audit trail of users and system activities and  ensure integrity and complete confidentiality of the data    6  Safety methods must allow for Electronic Signature and Audit Trail management for every  event in the system and must support lockable desktop access  All Access rights are based  on hierarchical levels and access areas    7  Electronic Signature  tampering  sniffing attempts guarded against  password expiry control   automatic log off  Audit Trail management  encrypted data recording should be supported  by the Software Security system     5 4 8 Sizing  amp  Scalability of CEC    Communication front end  CFE  functionality at CEC end sub system being implemented  should have capacity to accommodate minimum 2000 number of meters  both SEMs  amp  CEMs   init
175. her rights accruing to the Punjab  State Transmission Corporation Limited under the Purchase order contract if  placed awarded on to us     Signature of constituted attorney    131    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    i     ii     iii     iv     v     Energy Meters    Performa  XIII  Bank Guarantee for Contract   Performance Security                    To be entered on a non Judicial stamped Paper of Rs   only    Bank Guarantee No  Dated The Bank of  hereby agrees unequivocally and unconditionally to pay  within  48 hours  on demand in writing from the  Purchaser   or any  officer authorized by him on his behalf  of any amount upto and not  exceeding  in words Rs   to the Punjab State Transmission  Corp  Ltd  on behalf of M S who have entered into a  contract or who unconditionally accepted the Purchaser Order cum Contract  Agreement no  dated for rendering consultancy  for order value of Rs against specification   No        This Guarantee shall be valid and binding on this Bank upto and including  and shall not be terminable by notice or on account of any change in  the constitution of the Bank or the firm of consortiums suppliers System Integrator  or by any other reason whatsoever and our liability hereunder shall not be impaired  or discharged by any extension of time or variations or alterations made  given     conceded or agreed with or without our knowledge or consent  by or between the  parties to t
176. hether offer is valid for atleast for 180  One hundred  eighty  days from the date of opening of techno   commercial bid        34     Whether the SI has submitted the Detailed write up of the  proposal along with the proper indexing and cross  reference       35     Whether the SI has completely understood the Rate  contract clause of the this section and has quoted  accordingly       36     Whether a demand draft amounting to Rs  2500   in favour  of AO SLDC  PSTCL  Ablowal Patiala  payable at Patiala  in respect of cost of specification is attached       37     Whether the bids submitted are in Quadruplicate  4 sets   and tagged as per specifications             38    Whether the softcopy on CD has been submitted  39    Whether tender bid is unconditional   40    Whether the Proposal  Tender has been submitted in three    parts i e  Part I  Part II  amp  Part I  Each part will be  enclosed in a separate sealed envelope duly super scribed  on the each envelope as specified          41        Whether all above three envelopes have been further  enclosed in a larger sealed envelope  double covers  both  covers  inner  amp  outer  super scribed as specified along  with Covering letter  Performa VII                 157    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional             Energy Meters  Sr  Description Status Cross   Yes No    Reference  NA   Section 5  42   Whether the proposed system is designed for continuous    o
177. ially as proposed  specified in the RFP  However the CEC system except Communication  front end  CFE  functionality should have the capability to handle  accommodate data for at  least 10000 metering points  located at more than 1500 locations without degradation of  performance  The expandability of Communication front end functionality should be scalable to  at least 10000 meter points from 1500 locations in increments by addition of modules as and  when required on addition of new meters at new locations  No database or CEC software or  additional hardware should be required to be added except additional modules in respect of  Communication front end functionality and must be indicated clearly in the bid  The bidders  must also indicate the minimum CEC end system required in respect of CFE functionality     43    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    5 4 9 Relational Database Management System   The system must store the data in a relational database that also has the capacity to manage the  objects and data  It is required that all the instantaneous data coming from meters should also be  stored and retrievable for future reference  Online data storage for at least two years is required  and offline data storage for indefinite period is required  All the real time data coming from all  the field devices and  or being generated  calculated in CEC  i e  scheduling interactions etc    should b
178. iations  etc  Display must be electronic  LCD  LED display must have a life at least equal to the  life of the meter  The minimum guaranteed life in years of LCD  LED should be clearly  brought out by the manufacturer     Data Storage Requirements  Meter Storage Capacity    Each meter shall have a Non Volatile Memory  NVM  in which various parameters as  specified shall be stored  Meter shall have storage capacity  Non volatile  for the  specified meter data in its memory for at least a period of 45 days  All the data shall be  stored in the form of arrays  The older data shall not get erased unless replaced by fresh  data  NVM  which does not require any battery backup shall have minimum retention  period of 10 years  Battery backed up memory will not be considered Non Volatile     Monitoring of Voltages    The three line to neutral voltages shall be continuously monitored and in case any or all  of these falls below about 70  the condition shall be suitably indicated and recorded in  the logs  The indication details shall be given on the front of the meter  The time blocks  in which such a voltage failure occurs  persists shall also be marked  for example with  star      while storing in the meter   s memory  The indication shall automatically become  normal when VT secondary voltages are healthy again  The two specified Varh registers  shall remain stay put while VT supply is unhealthy     Special Power Quantity Measurement  Display  Storage  Protection requirements     a 
179. ibility of SI to do disaster recover   backup  restoration procedures as and when required     The CEC shall have the capability to modify the various parameters  configuration of the  communication equipment remotely  CEC shall have suitable NMS system to identify the  faults  problems  bottlenecks etc  in the smooth working of the whole system     In the event of meter data not reaching the CEC due to the failure of RMR  the SI shall be  responsible for providing meter data through  Common Meter Reading Instrument  CMRI  to the Base Computer Station and the BCS shall have the provision to accept  update and  process the data from CMRI  The SI shall be responsible for providing the required number  of CMRIs and placed at suitable locations so that in case of need for manual downloading a  CMRI is available in the substations or at a nearby substation  Locations of such CMRI may  be freezed by SI in consultation with Purchaser  However manual data downloading  responsibility and integration of such downloaded data in CEC shall rest with SI  Suitable  assistance may be provided by Purchaser which may be discussed and freezed     The SI shall provide the latest version of the CEC software  Any up gradation   modification  of the software in the latest versions shall be delivered  amp  implemented  either free of cost or  if cost is involved in such up gradation than on cost to cost basis in discussion  agreement  with the Purchaser  While offering to do so SI shall clearly brin
180. icable taxes  if any at the end of each completed  quarter  within 30 days after successful completion of services during the said quarter   Since the O amp M services are spread over a period of 7 years  total O amp M cost quoted by  the SI for each year shall be divided into four  4  equal instalments to be paid quarterly  in respective year  This O amp M charges shall be subject to deduction of any penalties  recoverable from the successful SI under this contract as per service levels     55    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    8 3 Other Conditions    1  The payment against the roll out cost shall only be made against the receipt of performance  bank guarantee as specified in this bid     2  Bank Guarantees shall be valid for 12 months from the completion of contract period  including O amp M contract     3  For financial  price bids the SI shall have to take the minimums quantities as specified in the  Performa for Price Bids  Performa XV  and Quantities which are not specified are to be  indicated by the SI     4  PSTCL will award the contract to the successful SI whose bid has been determined to be  substantially responsive  has fulfilled the Qualifying requirements during techno   commercial evaluation and has been determined as the lowest evaluated price  financial bid   based upon the total Cost of the Project as quoted by the SI  The total Cost of the Project  shall comprise of tw
181. ies   entities at local  at SLDC itself   amp  remote  Control centres of Discoms  Gencoms  etc as and  when or as may be required  locations along with routing of online instantaneous parameters  etc  available through CEC system to SCADA  EMS system for integrating the same with that  scheme for EMS applications and to provide a consolidated view for monitoring in real time by  SLDC Operators from revenue  tariff grade data  as and when proposed Integrated SCADA   EMS scheme comes up  Till the main Integrated SCADA  EMS Scheme come up  SLDC  operators shall be provided with local operator consoles connected with this Project     System design should be such that it should be further extendable  modifiable to include  monitoring of the inter exchanges with upcoming Generators and others schemes for generation   transmission  amp  distribution of electric energy which may be implemented in energy sector of  the state as and when desired     At present there is a tentative requirement of 700 ABT Type Meters to be installed at some 220  locations within the state and at few places even outside the state  Details are in Annexure     along with implementation of associated  amp  appropriate communication sub system and  Centralized Energy Centre at SLDC  Ablowal  Patiala meeting the specified end results  Besides  ABT meters 400 Nos  Conventional energy meters  CEMs  with similar capability but without  ABT functionality are also required to be installed throughout PSTCL at 400kV
182. ification of an offer within the validity period as  required in the NIT Tender Specification after opening of Tenders     6  In case of tenders not accepted  the earnest money shall be refunded within 30 days of the award of Order   Contract to the successful SIs     12 2 Price Schedule    The price  s  shall be indicated in the bidding price schedule as per the format attached in this bid which  shall form the part of the PRICE BID  The quoted prices shall be further governed by the following  terms  amp  conditions      1  Any price payment discount figure offered by the SI  shall be indicated in the price bid it self i e  Part III of  tender  Offering of discount on quoted prices subsequent to the opening of tenders  will be out rightly rejected     2  No taxes and duties shall be paid on the element of cost quoted  packing charges not forming part of  production cost  of the price format given in the price schedule    The quoted Unit prices shall be applicable for addition deletion of BoM quantities during contractual period  The SIs are required to quote price per unit    Tenders without break up of prices are liable to be rejected     OO R    Whether the firm indicates NIL or concessional rate of E D  in their tenders they will have to absorb the ED up  to full rate applicable at the time of tendering  In case the firm which do not agree to this condition or indicate  the ED as extra  without indicating the applicable rate or remain silent  then the tender of the firm 
183. inal blocks  enclosures  cabinets  lock  amp  key arrangement  site preparations  earthing  erection   installation  integration  networking  testing at site  end to end testing  guaranteed availability tests   performance testing  commissioning  training  purchaser s capacity building to independently  handle  maintain  amp  further develop the system  finally handing over  however custody of the  implemented equipment  sub systems  system shall be of Purchaser from the day it is paid for   declared commissioned  the Project after the expire of O amp M period  willingness to extend the O amp M  contract for further period as per mutual agreement  supporting  amp  providing the necessary  information  i e  Source code  block diagrams  compilers  chip level details  schematics etc which  may be required to get the system working  amp  continued technical support  to the Purchaser  third  party in case O amp M agreement is not extended by any party due to any reason  Implementation and  O amp M also includes further development of the system  the need for which may evolve during the  working with the system  due to new requirements or due to change in policies     The overall aim shall be to meet with the requirements which at present exist and further shall  evolve in future as per the requirements of the stakeholders of the energy sector in the state of  Punjab and in process make implemented system world class showcase of the technologies  developed  amp  used  As such the i
184. ing   collections  reconciliations etc  suitable to ABT Regime as adapted in Punjab from time  to time between intrastate utilities being served by PSTCL SLDC  Billing server shall  also maintain the accounting of UI energy charges  Reactive energy charges etc  on the  pattern being followed by NRPC NRLDC  New Delhi  www nrpc gov in  amp   www nridc in         Local  amp  Remote Consoles  It should be possible to selectively  area wise disseminate  the online data  in real time  amp  offline data from CEC and also to  amp  gather information   e g  ABT Schedules  etc   from operators by providing Operator Consoles  local  amp   remote   in the control centres of various entities  utilities situated locally at CEC and  or  at remote locations through some sort of VPN may be through Internet  shared media or  dedicated  Number of such operator consoles can be increased to 50 number or more as  and when required in steps  However  initially minimum 4 local and 2 remote consoles  shall be provided and quoted for along with communication media  with suitable  bandwidth etc  All Consoles  workstations should be large monitors  19    or more      Web Server  The CEC should have suitable web server to host integrated website  suitable to selectively disseminate real time data available in the CEC  publish  schedules  revisions  UI  meter data  etc and collect schedule requests and other  information from utilities and other information from within  outside the PSTCL  The  Web Server 
185. ing ABT  amp  Conventional                                                                   Energy Meters  Annexure V  CLIMATIC CONDITIONS  Sr  No  Particulars Conditions  1 Maximum temperature of air in shade 50  C  2 Minimum temperature of air in shade     5  C  3 Maximum temperature of air in contact with metallic 60  C  portion in sun  4 Maximum daily average ambient temperature  40  C  5 Maximum yearly average ambient temp  35  C  6 Maximum relative humidity  95   7 Average number of thunder  storm days per annum  60  8 Average number of dust storm days per annum  40  9 Average number of days of fog per annum  70  10 Average number of hailstorm days per annum  5  11 Average number of rainy days per annum  60  12 Average annual rain fall More than 76cms  13 Number of months during which tropical monsoon 3  conditions prevail   14 Maximum wind pressure  150kg sq M  15 Altitude above M S L  Not exceeding 1000 mtrs  16 Sites are susceptible to earthquakes  The earthquake  forces for which equipment to be designed    a  Horizontal direction 0 3g  b Vertical direction 0 15g  17 Atmospheric pollution  Heavy          106    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional  Energy Meters  Performa  I  Statement of Deviations     From Complete RFP Requirements as specified        Sr    Statement of Remarks  Type of deviation Cross Reference  deviations Explanation    and variations Commercial  Terms No     amp  Conditions   Perf
186. interfaced  existing CEMs       4 5 3    Any other item        4 6    6  Year O amp M       4 6 1    Recurring Charges       4 6 1 1    Primary  Connectivity          4 6 1 2       Alternative  Connectivity for  5  locations as  specified                                                  148       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       4 6 2    Fixed Charges       4 6 2 1    CEC End Personals  for system  administration   report  configuration   support and further  development as  may be required  including for field  work       4 6 2 2    O amp M Cost of CEC  including  consumables as  specified       4 6 2 3    O amp M Cost of  Remote End  Equipment i e ABT  Meter  CEM  DCU   Modem  etc        4 6 2 4    O amp M Cost of  Remote End  interfacing  Equipment in case  of interfaced  existing CEMs       4 6 3    Any other item        4 7    7    Year O amp M       4 7 1    Recurring Charges       4 7 1 1    Primary  Connectivity       4 7 1 2    Alternative  Connectivity for  5  locations as  specified        4 7 2    Fixed Charges           4 7 2 1       CEC End Personals  for system  administration                                                     149       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       report  configuration   support and further  development as  may be required  including for field  work       4 7 2 2   
187. ional meters with the CEC for Transmission Level  Energy auditing purposes and has attached the technical  Write up for the same       52     Whether details of equipment  software  settings etc  required by SI to Integrate the already installed Meters at  OA Customers with proposed CEC system as specified  have been mentioned in the proposal       53     Whether the proposed Initial CEC end sub system being  implemented has the capacity to accommodate minimum  2000 metering points  Both SEMs  CEMs        54     Whether the CEC system except Communication front end   CFE  functionality has the capability to handle   accommodate data for at least 10000 metering points   located at more than 1500 locations without degradation of  performance           55        Whether the Communication front end functionality is  scalable to at least 10000 meter points from 1500 locations                158    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional       Energy Meters  Sr  Description Status Cross   Yes No    Reference  NA        in increments by addition of modules as and when required  on addition of new meters at new locations        56     Whether the SI has quoted for minimum number of each  item specified in BOQ Performa  XV        57     Whether the number of Operator Consoles  Local  Remote  etc   are possible to be increased       58     Whether SI shall be able to implement all the three Sub   systems i e  Remote Meter End
188. ions etc  in respect of the submitted proposal     Name of the SI                                                                         Address  Sr    SI  Member   Contact Contact Mobile Office Fax No    Email  No  Persons Address No  etc   Manufacturing Works Details  Sr    SI  Member   Work Description   Work Address   Office Fax No  No  along with Tools No    amp  Tackles  available  SIGNATURE   NAME   DESIGNATION   DATE  SEAL OF COMPANY    113       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa    VII    Covering Letter    On Applicant   s letterhead Date  dd mm yyyy    To   Chief Engineer  SO amp C   SLDC Projects    SLDC Building  220kV Grid Sub Station   PSTCL  Ablowal  Patiala   147001    Reference  RFP Tender No                          005 Dated  scan na Kean AA    Subject  Submission of Bid Proposal for RFP    Selection of System Integrator for complete  implementation on turnkey basis  amp  comprehensive O amp M services in respect of  Intrastate Boundary Metering Scheme suitable for SLDC operations based upon  ABT type energy meters       Sir     In response to the advertisement dated issued by Punjab State Transmission Corp  Ltd    we offer our bid proposal to participate in the bidding process for selection of the    System  Integrator or SI    for the above referred Project        We have examined the RFP Documents  Service Level Agreement  etc  including Addenda   Amendments
189. ipulations of the RFP  SI will have the responsibility for selecting   replacing any existing Member of the Consortium if its performance is not up to the mark or  otherwise too  as may be required due to any Govt   Regulators  Policy changes or as may be  desired by Purchaser etc    to achieve the defined Service Levels  specified end results  in  consultation with Purchaser  without undue interruption in the availability of data to the  Purchaser  Further the Purchaser will make all the interactions with the SI only for all intent and  purposes  Ordinarily payments shall be also released to the SI only unless there is a statutory  requirement  law  regulation to the contrary     Further the SI  any Member of consortium can be a company or a Joint Venture  JV  or a 100   subsidiary  In case SI or Members of the Consortium are JV or a 100  subsidiary then the  credentials of the partners of JV or parent company of 100  subsidiary can collectively meet all  Qualifying Requirements of the SI  Member of the Consortium  In case of a 100  subsidiary   JV  parent company s must submit requisite authorization from the each partner  parent  company in support of participation in the bid along with following      1  Parent company s of the Joint Venture or of the 100  subsidiary shall be liable jointly  and severally for the execution of the Contract in accordance with the contract terms   and a statement to this effect shall be included in the authorization     Gi    Agreement entere
190. it all the remote installations at regular interval  at  least once every year  apart from on call basis during breakdown     Recurring charges  permissions  licence fees  frequency allocations  liaison  recurring  charges  O amp M Charges etc for the O amp M Period if any for all the supplied hardware   software  installation  field implementation  Communication  CEC software  hardware   including etc  which are of non  recurring nature shall be included in the charges for this  activity and detailed bill may be raised to claim these charges  Any genuine variation must  be passed on the Purchaser with justification  however acceptance  non acceptance of the  same shall done after through verification s and documents for which SI shall provide the  necessary inputs  support     For Comprehensive O amp M  no spares shall be provided by the Purchaser and if required by the  SI  then it must be build up in the Comprehensive O amp M prices  It is the responsibility of the SI  to operate  amp  maintain the system  At the end of the Comprehensive O amp M  all the faulty  equipment shall be got rectified by the SI before handing over the same to Purchaser  Purchaser  may order additional equipment  spares before finally taking over the system after  Comprehensive O amp M  which the SI shall have to supply at its finally agreed rates to the  Purchaser so that PSTCL may be able to operate  amp  maintain the system thereafter on its own  after end of Comprehensive O amp M period     57
191. itional equipment such as Additional Meters  Consoles  etc  as  required from time to time as per the requirement of Purchaser  Installation of ICCP  Server and other such item shall be staggered and are to be completed in the time bound  manner and must be indicated in the bid suitably  Time required for implementing such  items  systems may be indicated by SI  Bidder so that purchaser can take informed  decision in respect of when to give go ahead in respect of these items to meet desired  deadlines and or synchronize these implementations with other schemes     2  It is a proposed implementation plan  SI may submit its own implementation plan  but  Grid loss calculations are required by 31    Mar 2012 and whole project shall have to be  completed within 9 months of award    3  The work on next stage to achieve next milestone shall not be started before the  permission of Purchaser  It shall be responsibility of the SI to ask for such permission in  timely manner to complete the whole project in stipulated time  If possible SI may club    47    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    two or more stages to expedite the whole implementation by putting up with facts   figures  methodology etc   after taking consent of the Purchaser in this regard     4  SI may suggest better  revised implementation time line  The basic strategy to be  adopted is to have in place all the ABT Meters on priority whic
192. iven  not complete or not substantially responsive are liable to be disqualified  at PSTCL   s discretion     4  The evaluation will also take into consideration if the equipments to be used for RMR  implementation by the SI as per the scope of work defined by this RFP are from the leading  industry players     5  The technical bid shall be evaluated based on the criteria as detailed in the Table below  The  SI shall submit all the relevant documents required for the Technical Evaluation as per the  Table below with appropriate references in the table itself  SI shall give the cross reference  of the document being attached for compliance of PSTCL requirement and shall also  highlight the relevant clause of the document     7 1 Technical Evaluation Table    Evaluation Criteria Applicability Document for   Marks  Compliance  Verification  Number of years of   Any member of   Completion 3   gt 3Y 3  3Y   experience in providing   the consortium Certificate of relevant   1Y 1   lt 1Y 1   Automated Remote Metering assignments None  0   Solutions in any utility  Number of Automated   Any member of   Work Order    4   gt 2 4  2 1 2   Remote Metering Projects     the consortium Purchase Order    under  All types of metering points Completion implementatio  Certificate n  1  None 0   Number of Automated   Any member of   Work Order    4   gt 2 4  2 1 2   Remote Metering Projects     the consortium Purchase Order     lt 1  i e  under  11 kV and above feeder Completion implementatio  m
193. k battery  The batteries provided for RTC shall have  life of not less than 10 years  The battery shall not get damaged or damage the meter  even during idle storage of the meter for two years     Real Time Clock   Each meter shall have a built in calendar and clock  having an accuracy of  2 minutes  per year or better  The calendar and clock shall be correctly set at the manufacturer   s  works to the Indian standard time  The date  dd mm yyyy  and time  HH24  MM  shall  be displayed on the meter front while data scrolling  Feature for keeping the time of  clocks synchronized with GPS device time should be available via communication port   Meter Software shall have provision for recording reading on 29th Feb  of leap year  without manually intervention  setting etc    Limited clock adjustment shall also be possible at site  in case of GPS device  system is  not provided  by using the DCD  CMRI  When an advance or retard command is given  through DCD  CMRI  six subsequent time blocks shall be contracted or elongated by ten  seconds each  The meter shall not accept another clock correction command for seven    93    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    16 0    17 0    Energy Meters    days  All clock corrections shall be logged in the meter   s memory and suitably shown on  print out of collected data    Further if the meter clock has drifted so much that it is not possible to correct the meter  clock as speci
194. l be 5  locations where  main communication connectivity shall not be feasible due to technical  any reasons   Further alternative communication connectivity subsystem could consist of more than  one communication media  mode  provider     2  Suitable Multiplexing equipment  Data Concentrators  Interfacing devices  Modems  any  M2M system  antennas  etc along with connecting cables  power cables  lugs  TBs  etc   as may be required     Negotiations required with communication provider for connections  service  SLA etc     4  All the licences subscription etc  shall be procured in the name of the PSTCL for which  the Communication Service provider shall have to sign a tri party agreement between  the SI and the PSTCL as other parties     5  Any hardware  software  settings  configurations  site preparations  interconnecting  cables  accessories etc at various locations etc     6  The SI shall also be responsible for co ordination  liaison with regulatory bodies  DoT   WPC  BSNL  TRAI  NOCC  and SCAFA etc  for obtaining necessary approvals    clearances on the behalf of Purchaser for commissioning   establishing and subsequent  operation of the network  Time required for these clearances shall be within the  timelines defined in this RFP  Purchaser will provide reasonable assistance   documentation to the SIs in approaching these bodies  However one time charges   recurring charges for the contract period  Implementation phase and Comprehensive  O amp M Phase  shall be payable 
195. l have to  be submitted at the time of submitting the tender failing which tender of the firm shall  not be received  accepted  entertained at all  Further any clarification required by the  intended bidder in respect of the RFP specifications shall be entertained only after  deposit of cost of specifications  which can be sent along with the queries  and no  queries on RFP shall be entertained after specified due date    The Proposals  Tenders shall be submitted in three parts i e  Part I  Part II  amp  Part III   Each part will be enclosed in a separate sealed envelope duly super scribed on the each  envelope as under     i  SI  Bidder s Name   Gi  Tender Specification No etc    iii  Part No  I  I or III    Part I Earnest Money Deposits  The first part will  consist of Earnest Money Deposit   EMD  in the form of demand draft in favor of  AO SLDC  PSTCL  Patiala  payable  at Patiala     18    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    4 1 10    4 1 11    4 1 12    Energy Meters    Part II Qualification Technical Commercial bids  The second part will consist of  Comprehensive Index  Checklist  qualifying requirements  detailed write up on proposal  along with technologies offered  technical specifications of equipment offered  BOQ   exactly in same format as the Price bid but without the rates  prices filled in   schedule  of deliveries  schedule of deviations  etc  and all other terms and conditions except the  rat
196. l on submission of proof of remittance    iii  Prices offered are firm in Indian Rupees and payments shall be acceptable in Indian  Rupees     We enclose herewith the complete Techno Commercial Bid as required by you  This includes  Part I  Part II  amp  Part III of the three part bid as required              We have also enclosed a demand draft  No    for Rs  2500   in favor of  AO SLDC  PSTCL  Ablowal  Patiala  in respect of cost of specification and a demand draft   No    for Rs     against Earnest Money Deposit issued by    bank   valid till  J  dd mm yyyy   in favor of AO SLDC           PSTCL  Ablowal  Patiala  in the cover containing qualifying requirements  Our offer contains  all the Performa and Annexure as specified     We do hereby undertake  that  until a formal contract is prepared and executed  this bid   together with your written acceptance thereof and notification of award of contract  shall  constitute a binding contract between us     Yours faithfully     Authorized Signatory  Name and Title of the Signatory    Date  amp  Seal of the Company    116    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa  VIII  Detailed Write up on the Proposed Solution to meet with the Technical Requirements as  described in the RFP    Name of the SI  Address    Number of Pages       No    Description Page No                             Note  A detailed write up along with Solution Design  As annex
197. lar  existing setup  implemented by the  SI  Members may be  required as specified  if so desired by the  Purchaser    Self certified claim of  SI  References to  already implemented  projects   Demonstration  visit  to already  implemented project  may be required as  specified if so desired  by Purchaser     Self certified claim of  SI  References to  already implemented  projects    Demonstration  visit  to already  implemented project  may be required as    el    10    5   lt  1  Minutes  5  1   2 Minutes  3   2 5 Minutes   1   gt 5 Minutes   0     5  No effect  5   Slight  deterioration   i e  degrade  by one step as  described  above    Complete    2        52    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    3    If offered Meter has provision  for connecting external  auxiliary supply  AC and  or  DC normally available at grid  substations  so that meter may  not unnecessarily load the bus  bar  line PT  CVT during its  normal operation  However  The meter must also be  capable to operate with the  power drawn from the PT   CVT secondary circuits in  absence of Aux  Power  supply    Whether the offered solution  of remote reading of online  amp   offline meter data being  offered on Open Standard  Protocol or Manufacture shall  allow full details  tools etc   for any third party to develop  the communication capability  without any royalty    Whether agrees to provide  specified Service levels    Energy Meters  
198. le to depute Persons with requisite qualifications  source code level  knowledge  amp  necessary licence to modify the offered software during the execution   commission phases and even after wards  For this purpose any tools  i e  compilers   debuggers  test tools etc  as may be required shall be the responsibility of the SI and must be  supplied as part of the original order  proposal  SI will have to submit details regarding the  time periods required by it for fulfilling the new requirements  additions  amendments in  respect of software changes  display building  reports  installation of new meters  providing  communication infrastructure etc  for each item for providing time bound effective service  to the Purchaser during O amp M periods     The proposed solution must ensure adequate data security  starting from meters to CEC   data  storage and system redundancy     The solution shall at least address all functional and performance requirements within this  specification and shall include sufficient information and supporting documentation required to  determine compliance with this specification  The solution for the proposed Project should have  viable approach which may lead to overall achievement of the minimum goals in time bound  manner as specified in this RFP     The CEC solution offered by the SI shall be scalable and capable of integration with other  applications  systems of PSTCL  The SI shall also provide an Interface to integrate the CEC  database with t
199. lemented  projects   Demonstration   visit to already  implemented  project may be  required as  specified if so  desired by    5   lt  1 Minutes  5   1 2 Minutes  3  2 5  Minutes  1   gt 5  Minutes  0     5  No effect  5   Slight deterioration   i e  degrade by  one step as  described above    Zs Complete  stoppage of online  data or refresh rate  increase to  gt  5  minutes  0     Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional       126    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    nm    If offered Meter has  provision for  connecting external  auxiliary supply   AC and  or DC  normally available  at grid substations   so that meter may  not unnecessarily  load the bus bar   line PT  CVT during  its normal operation   However The meter  must also be capable  to operate with the  power drawn from  the PT  CVT  secondary circuits in  absence of Aux   Power supply   Whether the offered  solution of remote  reading of online  amp   offline meter data  being offered on  Open Standard  Protocol or  Manufacture shall  allow full details   tools etc  for any  third party to  develop the  communication  capability without  any royalty   Whether agrees to  provide specified  Service levels    o Purchaser     Offered  Meter    Offered  scheme    Energy Meters    Technical  Specifications  of the offered  meter     Technical  Specifications  of the offered  scheme  All  am
200. letion  The actual progress made to date and the schedule delivery date for the  completed systems shall be closely monitored by Purchaser   The implementation schedule shall summarize all activities  and shall include but not limited to  the following    e Collection of basic field data for the whole scheme i e  for around 1100 meters  700  ABT meters  amp  400 Conventional meters at around 220 locations    Submission of final Meter list  Design drawings etc for Purchaser approval  Hardware purchases  production  development  integration  etc   Hardware production schedules  Factory testing and  or Inspections  Documentation preparation and release  Documentation revision and release following Purchaser comments   Training schedule   Shipment  Receipt  forwarding and staging  Site preparations  field adaptation jobs  Installation  Field testing  commissioning and system integration  Site availability tests  Guaranteed Availability Tests  Performance Availability tests as  may be applicable    e Completion  commissioning of sub systems  amp  project as a whole    e Submission of manuals and final  as built drawings    e Integration of existing Conventional Energy Meters   e Comprehensive O amp M and completing the remaining works which were deferred  i e    ICCP Server  OA Customer meter integration as may be required by PSTCL  etc     Each scheduled task shall have an estimated duration for completion and predefined   relationships with other tasks  Relationships shall be us
201. lifications for the  Bid and selection     We again acknowledge and understand the essence of the stipulations of the RFP and will abide  by these and shall have complete  amp  absolute responsibility of implementation of the system and  its O amp M as stated in the RFP     We further acknowledge and understand that in the event that PSTCL discovers anything  contrary to our above declarations  it is empowered to forthwith disqualify us and our Bid from  further participation in the process     115    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    We  the undersigned SIs  having read and examined in detail the specifications and all bidding  documents in respect of above RFP do hereby abide to supply the equipment and provide the  services at the prices and rates mentioned in this bid     We do hereby undertake that  in the event of acceptance of our bid  the supply of equipment and  commencement of services shall be made as stipulated in the schedule of delivery forming a  part of the attached technical bid     In the event of acceptance of our bid  we do hereby undertake that   i  To supply the equipment and commence services as stipulated in the schedule of   delivery forming a part of the attached technical bid   li  We affirm that the prices quoted are inclusive of delivery  installation  and  commissioning charges and all sales  service taxes   Octroi and any local levies will be  charged on actua
202. long with test blocks  if separately provided  as  specified and further as per Purchaser s advise  including unpacking and site  inspection on receipt at site  mounting the meters on existing control  relay panels at  an appropriate viewing height  connection of CT and VT circuits including any  required field cables  re wiring  functional testing  commissioning and hand over   The contractor s personnel shall procure  carry the necessary tools  equipments   materials and consumables  including insulated tapes  wires  lugs  ferrules  hardware  etc      Suitable number of compatible CMRI for manually downloading of meter data to  cater for the eventuality of any meter to CEC end communication failures  for  extended period of time are to be provided by SI  As a part of commissioning of  CMRI the SI shall load the software specified into the PCs as desired  directed by  the Purchaser and fully commission the same  The SI shall also impart the necessary  instructions to engineers  A user friendly manual covering resetting   remedial  measures to be taken by the users in day to day operation of CMRI as a corrective  measure at site has to be provided by the SI  However rresponsibility to manually  download meter data in such eventuality shall be of SI as specified     CEA on the initiative of MOP has recommended the DLMS  COSEM  IEC 62056   as an open standard protocol for energy meters in India  CEC should have necessary  software and interfaces to accept data from DLMS  COSEM 
203. ltages of all 3 Phases is103 0  or higher  and the  other for the period for which the average of RMS voltages of all 3 Phases is  below 97 0   The Current Reactive Power  VAr   with a plus or minus sign   and Cumulative Reactive Energy  Varh  readings of the two registers shall be  displayed while scrolling  The readings of the two registers at each midnight  shall also be stored in the meter   s memory  The Reactive Power and Reactive  Energy transmittals shall be computed in Var Varh  amp  directly calculated in CT  and VT secondary quantities  When lagging reactive power is being sent out  from substations busbars  Var display shall have a positive sign and Varh register  shall move forward  When reactive power flow is in the reverse direction  Var  display shall have a negative sign and Varh registers shall move backwards   Average Frequency  For the purpose of Average Frequency of 15 minutes  block for ABT purpose the meter shall count the number of cycles in VT output  during each successive 15 minutes block  and divide the same by 900 to arrive at  the average frequency  This shall be stored in the meter   s memory as a 2 digit  code which shall be arrived at by subtracting 49 from the average frequency   multiplying by 50 and neglecting all decimals  For example  49 89 Hz shall be  recorded as 44  In case the average frequency is less than 49 0 Hz  it shall be  recorded as 00  In case it is 51 0 Hz or higher  it shall be recorded as 99  As  Average Frequency paramete
204. ment shall be of the best quality obtainable of their respective  kinds and whole of the work shall be of the highest class  well finished and of approved design and make  Casting  shall be free from blow holes  flaws  cracks or other defects and shall be smooth  close grained and of true forms  and dimensions     12 3 26 Changes    No variation or modification or waiver of any of the terms and provisions shall be deemed valid unless mutually  agreed upon in writing by both the Purchaser and the Supplier     12 3 27 Packing    All material should be suitably packed for transportation direct to the consignee and the Supplier shall be  responsible for all damages losses due to improper packing  All boxes shall be marked with the signs indicating up  and down sides of the boxes and also unpacking instructions considered necessary by the Supplier  The contents of  boxes shall have place marks corresponding to the number in the packing lists to enable easy identification  The  destination station  location name of the material shall also be marked on all boxes  The prices quoted by the SIs  shall be deemed to include the cost of packing     12 3 28 Instruction Plates  amp  Markings    All the name plates  instruction plates  warning signs and any markings whatsoever on the equipment and its parts  and accessories shall be in English language with idioms in current use  Purchaser s Name  Purchase Order number  and date be given on the name plates     12 3 29 Test Certificates and D
205. n certificate and  valid service tax registration certificate     e  Conversion Rates from foreign currency to INR of the RBI as on last day of that  financial year shall be given by SI for conversion purpose of the submitted financial  data     f  Even though the SI and Members of consortium  as specified  meet the above qualifying  criteria  they are subject to be disqualified if     e The SI or any member shall not be in litigation with PSTCL  PSPCL or erstwhile  PSEB  Any such litigation shall out rightly disqualify the SI   e The SI or any member shall not be a defaulter for 25  or more quantity for more  than 9 months or any quantity more than 15 months in making supplies against earlier  purchase orders placed on them at the time of scheduled date of opening of this bid    e SI or any member Made misleading or false representations in the forms  statements  and attachments submitted in proof of the qualification requirements   e SI or any member has Record of poor performance such as abandoning the works  not  properly completing the contract  inordinate delays in completions  litigation history   or financial failures etc  in earlier works executed with PSTCL    e Slor any member has been black listed by any government organization or body     Documents to be submitted for accessing the qualifications of the SI  Members    The Profile of the SI and  or all members of consortium in details to be submitted  In this  case Lead Member Shall acts as SI  Also Performa VI is
206. nces SI is expected to commission new metering points along  with associated works  amp  documents etc  within 4 days if only new meters are to be  provided and within 10 days if new communications channels are also to be provided  along with new meters     6 2 Implementation Approach and Methodology    The SI shall submit the detailed approach and methodology as part of the technical bid   Necessary PERT charts shall also accompany the proposals  Any deviations in implementation  plans and or periods than the suggested due to logistical or other reasons  if any must be brought  out in the deviation chart and discussed with purchaser     6 2 1 Understanding of Scope    SI shall provide their understanding of the scope of the project elaborating the various lifecycle  aspects  viz  Design  Procure  Implement  Operate  and Monitor  amp  Review during their entire  contract tenure  The SI shall mention their understanding of various services to be provided  including Communication Network for the Meter Data   Performa III     6 2 2 Solution Design    Along with write up as specified  the SI shall also provide the details of the architecture  covering overall framework to be adopted for the execution of the project    Network Architecture proposed   Scalability Issues   Technical Security measures proposed   Hardware Software proposed   Design   Design Consideration   Assumptions made while designing the solution    aie a    48    Intrastate Boundary Metering cum Transmission Lev
207. ndard time scales such as Today   Yesterday  Week To present Date  Month to present Date  Year to present date  Last Seven  Days  Last thirty days  Last Week  Last Month  Last Quarter  Last Year   The format of the reports shall be provided at the time of defining User Requirement  Specification  URS  and Detailed Functional Specification  DFS      Historical Data   This module shall provide archive historical data i e  load survey data  for each 15 minute  interval  for various parameters  as configured for meter  as stored by the server    The data as acquired online shall get shifted to historical database on a continuous basis and  shall be made available in graphical formats for various energy   demand and frequency  parameters    This module shall also make available schedule values for each 15 minute interval for  virtual meter as defined by user    The data shall be made available in graphical format  daily   weekly   monthly views  as per  user selection     Auto Read Utility   This module will provide for acquiring missed load survey data from meters in case of  failure of communication channel for on line data  It shall also be possible to download the  data to laptop or Meter Reading Instruments  It should be possible to integrate such  downloaded meter data with the normal system  historical data    The SI shall provide software  amp  hardware necessary for receiving data from MRI and  downloading the same to Central Server  It shall be possible to integrate the 
208. ndicated  in Price schedule  shall be payable only against successful type testing  A complete  integrated unit shall be tested to assure full compliance with the functional and technical  requirements of the Specification  The testing sample shall include one of each type of  meters  cards  modules  devices  sub assemblies  cables etc  The list of Type tests to be  performed on the meters and other items is mentioned in specifications    If any document  literature  manual  Certificate  etc  is in a language other than Punjabi  or English  the same alongwith translated copy in English  Punjabi shall also be  supplied  duly attested by the authorized signatory of the SI  Bidder    Necessitated Corrigendum  Amendment s to the RFP Specifications  if any  will be put  on the web site s without any further notice in press    Number of items may be increased or decreased and  or altogether deleted from the  requirements  scope as may be desired without any liability  amp  claim    All the communication including this RFP and the bid documents should be signed by  the authorized representative of the SI    Any questions  clarifications  if required  may be asked by sending an email to se   sldcprojects   punjabsldc org   PSTCL will respond to any request for clarification of the  tender document by responding directly and  or in the FAQ  only if the firm has already  submitted the cost of the Bid document as specified  As such all the interested SIs are    23    Intrastate Boundary
209. ng various changes  services sought  by the Purchaser from time to time as the system will evolve     The CEC end system should be sufficiently capable to accept better refresh rates than  specified  even less than 10 second     CEC software should be capable to handle data  remotely and  or imported through CMRI   from all meters  may be by use of converters  APIs etc  and CEC shall be meter  manufacturer independent  Details required from third party meters must be specified in the  proposal     The SI shall ensure that the software solution provided for the System shall have the  provision to maintain a    Unique Network Identification Code     UNIC  for each metering  point using suitable indexing methodology preferably easily understandable  amp  logical  nomenclature  which may be got approved from purchaser before implementing   The SI  shall also be responsible for regularly updating the UNIC as and when there is a network  expansion     The RMR System and web based Application software should be capable generate   meaningful reports  as defined by the PSTCL from time to time on   a  All the requirements of Availability Based Tariff scheme as prevalent in PSTCL suitable  for SLDC Operations  amp  responsibilities   b  All the requirements of Intrastate Transmission Energy Audit for calculating the line  losses  Grid wise losses etc  of all the substations of PSTCL    c  Schedules  Bills  UI Calculations for individual consumers  Discoms  Gencoms and  provision for rec
210. njab Sales Tax is not applicable under clause 5  2  a  iv  of the Act     12 3 2 Value Added Tax    The VAT as applicable if inclusive in prices shall be paid against documentary proof on submission of  following certificates      i  Certified that the transaction on which tax has been claimed has been will be included in the return  submitted to be submitted to the Sales tax authorities for the assessment of the tax and the amount claimed  from the PSTCL has been shall be paid for the Sales Tax Authorities     ii  Certified that the goods on which tax has been charged have not been exempted under the rules made there   under and charges on account of the Sales tax on these goods are correct under the provisions of the relevant  act or rules made there under     iii  Certified that we shall indemnify the PSTCL in case it is found ata later stage  that wrong or incorrect  payment had been made on account of tax paid by us     iv  Certified that we are registered dealer  amp  our Regn  no  is of VAT as applicable if inclusive The material on  order is required for use in generation  transmission and distribution of electrical energy to the Public  As such   the Punjab Sales Tax is not applicable under clause 5  2  a  iv  of the Act     12 3 3 Central Sales Tax    The PSTCL has been registered as a dealer under the Central Sales Tax Act     When the Central Sales Tax is to be paid by the PSTCL  a declaration Certificate in Form  C  will be issued by the  concerned AO on receipt 
211. non rusting construction and finish  The cases shall be designed for   mounting on a plane  vertical surface such as a control  amp  relay panel front  inside a   metal box etc  All terminals for CT and PT connections shall be arranged in a row and   shall have easy accessibility when terminal cover is open and no accessibility when   terminal cover is closed  Terminals shall have a suitable construction with barriers and   cover  to provide a secure and safe connection of CT and PT leads through stranded   copper conductors of 4 sq mm sizes  Minimum Clearance  amp  Creepage Distance shall be   as per the relevant standards    The meter shall also withstand without any damage or mal operation reasonable   mechanical shocks  earthquake forces  ambient temperature variations  relative humidity   etc as per relevant standards  They shall have an IP 51 of ISI2063 category dust tight   construction  and shall be capable of satisfactory operation in an indoor  non air   conditioned installation  It shall be immune to vibration and shocks during   transportation and handling  It should also be immune to external magnetic  amp  electric   fields as per CBIP 88 June 2000 edition    All the materials and electronic power components used in the manufacture of the meter   shall be of highest quality and reputed make to ensure higher reliability  longer life and   sustained accuracy    The meter shall be designed with application of specific integrated circuits  The   electronic component
212. nsortium shall be done by authorized representative s of the Purchaser as part of  Techno Commercial evaluation  as may be desired by Purchaser  For the works  appraisal  if required firms shall have to deposit following charges with PSTCL      1  Rs  50 000   per firm if firm s are located outside Punjab some where in  India     Gi  Rs  25 000   per firm if firm s located within Punjab    Note  Work Appraisal is normally required if some new firm s submit tender which has  never supplied the tendered item to PSTCL  erstwhile PSEB earlier  its work appraisal shall  be carried out before opening of the Part II  Price Bid   However if a firm has been  manufacturing similar items and has proven experience  it may not be considered as a new  firm     24    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    TECHNICAL SPECIFICATIONS AND REQUIREMENTS  General    As the SI has to provide the complete solution  proposal and it has to further provide  Comprehensive O amp M services and develop the system further as per the requirements  of the Purchaser and  or as it may evolve  So it is not the intent to specify completely  herein all the details of the hardware  software  communication and design of the  system  However the system shall conform in all respects to high standards of  engineering  design and workmanship and shall be performing in continuous  commercial operation in manner acceptable to the purchaser m
213. nt contains                aaa  pages     In witness whereof the parties here have to have affixed their signatures on the  day  month and year written as above     SYSTEM INTEGRATOR PURCHASER    130    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters  Performa XII  UNDERTAKING FORM   To be entered on a Non Judicial Stamped paper of Rs                    only    Wen ana de tetera rt Ailes Man tati states that our works are situated  in the State of Punjab and we claim    order Preference     as stipulated in the P S T C L   tender specification No                       GUE a a against which we  have submitted our tender No                aaa  date Syst ni nan SA KAN    We undertake to execute the order contract if place awarded on to us even by counter  offer at the rates worked out by Punjab State Transmission Corporation Limited in  accordance with its Purchase Regulations  It is further understood that in the event of  refusal by us or failure on our part to execute the order contract  full or part   placed awarded on us under    Order Preference    on any account what so ever  the Punjab  State Transmission Corporation Limited shall have the right to forfeit the earnest money  deposited by us and we shall have no claim for the refund thereof  The Punjab State  Transmission Corporation Limited shall also have the right to suspend business dealing  with us and to back list our firm  without prejudice to ot
214. nvolvement of the SI shall not cease with the commissioning of the  system as per this RFP or will not be limited to Comprehensive O amp M of the commissioned system    12    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    only  but SI will have to remain committed and evolve the functions  functionalities of the system  during pre or post commissioning in partnership with PSTCL     13    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    3 QUALIFYING REQUIREMENTS    As there are three distinct  discernable subsystems of the whole project  i  ABT Meters   ii   Communication Connectivity amp   iii  Centralized Energy Centre based upon Computer H W  amp   S W  its is imperative that eligible SI should be 0 2s class meter manufacturer  communication  service provider and in software development  either all three in one or bid be submitted by lead  member of a consortium formed specifically for this turnkey project  and or by executing a  tripartite agreement  if necessitated due to any regulations  with the communication service  provider s to effectively take care of all the three subsystems  Lead Member of the consortium  will be referred as SI for all intent and purpose     This Invitation for Bids is open to all such eligible SI who is in a position to assume  on a  turnkey  single point responsibility basis  the full obligation and r
215. o be signed and  sealed by the respective authorities which may have issued the same along with clear contact  details  Phone  Mobile  Email etc     Sr  Evaluation    Criteria    A  Experience  Reading System  Number of years of  experience in  providing  Automated Remote    Metering Solutions  in any utility    of  Automated Remote  Metering Projects    types of  metering points  of  Automated Remote  Metering Projects    11 kV and above  feeder metering  points  minimum  300 metering  points   Any AMR project  executed for both  online data refresh  rate of 1 minute or  better  simultaneously from  100 or above  metering points  located at more than  50 locations as well    Applicability    in Automated Remote    Any member  of the  consortium    Any member  of the  consortium    Any member  of the  consortium    Any member  of the  consortium    Document for  Compliance  amp   Verification    Completion  Certificate  relevant  assignments    Work Order   Purchase Order   Completion  Certificate    Work Order   Purchase Order   Completion  Certificate    Work Order   Purchase Order   Completion   Certificate along  with certificate  from the end  user clearly  amp   unambiguously  stating the facts     of   1Y 1     Marks    3Y    lt 1Y 1     3   gt 3Y 3     None  0     4  2 4   under  implementation  1   None 0     2 1 2     4   gt 2 4    lt I ie   implementation   1   None 0     2 1 2     6  Yes  6  under  implementation  3   No  0     Self  Scoring  and cross  reference 
216. o components  i  The Roll out Cost And  ii  The O amp M Cost     5  Respective items  consignments shall be supplied only after receiving a written go ahead  from the Purchaser     6  Work Completion Certificate shall be given by the Chief Engineer  SO amp C  PSTCL after the  successful user acceptance of the milestones as specified  However  Work Completion  Certificate for field related activities shall be issued by the respective Sr  XEN  P amp M and or  as may be designated by the Purchaser later on     7  Payment to the SI shall be made within 30 days on submission of the Work Completion  Certificate and invoice by the SI for the respective works as specified     8  All invoices should be prepared in 4 copies containing the amount due  description of the  equipment installed and details of the work completed or as may be specified  The Original  and two copies of the invoice and the Work Completion Certificate given by the concerned  officer shall be sent to the concerned payment authority as may be decided by the Purchaser  and one copy shall be given to the concerned officer in charge of the work     9  All Payments shall be made by AO  SLDC  PSTCL  Ablowal  Patiala  or as may be  specified later on     10  The payment shall be done after considering any penalty charges to be paid by the SI as  defined in this bid     11  Payment due to the SI shall be made by crossed cheque  Such cheques shall be issued direct  to the SI upon whom the order was placed  on furnishing a
217. o how they can be considered superior in maintaining ratio and phase angle  for variation of influence quantities and during its service period  Details of memory  used in the meter should be furnished by the manufacturer  This is in confirmation with  the CBIP 88 reports     B  Technical Specification of Conventional Energy Meters  Accuracy Class 0 2S    1 0    Scope    The specification covers the design  engineering  manufacture  assembly  and testing of  Static  Electronic Conventional Trivector Type  Four Quadrant  Bi Directional Energy  Meter  suitable for 3 phase 4 wire or 3 phase 3 wire connections  solidly earthed system  with balanced and un balanced loads for a power factor range from zero to unity   lagging and leading   with initial and sustained accuracy of class 0 2S  The meter shall  be suitable for being connected to voltage transformers  VTs  having a rated secondary  line to line voltage of 110 V  and to current transformers  CTs  having a rated  secondary current of 1A 5A  Any further transformers  transducers required for their  functioning shall be inbuilt in the meter  Necessary isolation and  or suppression shall  also be built in for protecting the meter from surges  voltage spikes  fault currents  EMI  etc  that occur in the VT and CT circuits of extra high voltage switchyards  The    102    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    2 0  3 0    4 0    Energy Meters    reference frequency s
218. ocuments  The Supplier SI shall be required to furnish to the Purchaser s office consignees  wherever necessary  the following  documents along with the consignment     i  Printed pamphlets  amp  catalogues   3 Copies   ii  Computerized Control Centre  CEC  station folder containing all hardware  layout   wiring   GA    drawings key diagram  I O points   5 Copies     69    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters  iii  As built Bill of Material  erection  Installation drawings  wiring  details sizes   interconnecting termination details   etc for each station  separately   5 Copies   iv  User  Operation and Maintenance   Manual  5 Copies   v  Approved Drawings  as built drawings  5 Copies   vi  Any other relevant information document   as to be decided by purchaser   3 Sets   vii  Any other manual  schematics  source code etc as mentioned else where in the RFP  In addition    to the above the SI shall furnish minimum 3  three  set of the following test certificates along  with consignment for facility of the consignees       a  Type Test Certificates  b  Routine Test Certificates  c  Acceptance  Inspection Test Report    12 3 30 Civil Suit   Juridiction    All legal  amp  arbitration proceedings in connection with the Purchase Order Contract shall be subject to the territorial  jurisdiction of the local Civil Courts at Patiala  Punjab only     12 3 31 Undertaking    All the Tenderers are required to 
219. of material     When the tax is to be paid by the Supplier a declaration certificate in Form  C  will be issued by the concerned AO  subject to submission of the following certificates       a  Certified that the transaction on which tax has been claimed has been will be included in the  return submitted to be submitted to the Sales Tax Authorities for the assessment of the Sales Tax  and the amount claimed from the PSTCL has been shall be paid to the Sales Tax Authorities     b  Certified that the goods  on which Sales Tax has been charged have not been exempted under  Central Sales Tax Act or the Rules made there under and the charges on account of the Sales Tax  on these goods are correct under the provisions of the relevant Act or rules made there under     c  Certified that we shall indemnify the PSTCL in case it is found at a later stage  that wrong or  incorrect payment had been made on account of the Sales Tax paid by us     d  Certified that we are registered dealers under the Central State Sales Tax act and our Registration  No  is    64    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    e  Certified that payment has been made under protest  The bills for the Sales Tax and insurance  charges  if any  should be submitted separately  A declaration certificate in Form    C    will be  issued by concerned AOfor all supplies received during a particular accounting year     The firms indicating nil o
220. oles  Facility to acknowledge one or multiple alarms at a  time and also facility to save the alarm shall be provided    7  It shall show and transfer data in case of change in meters  An indication of meter changed  shall be available in the reports  bills and separate record shall be maintained to avoid any  confusion     42    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    8  The CEC system must have drivers specially defined for Electrical applications like Modbus  RTU  TCP and IEC protocols  The networking between server and client should be highly  efficient  It should also have the capability to export data to other applications in standard  formats like XML  CSV    9  The software shall have provision to generate hierarchical reports  i  Customer wise  ii   utility wise  iii  interstate  iv  intrastate groups  up to individual meter wise etc as desired by  the purchaser from time to time    10  Apart from the above mentioned reporting requirements  the software shall have capability  to generate following type of reports  a  Meter Data Report  b  Meter Replacement Report  c  Consumption Data Report  d  Voltage Data Report  e  Interruption Data Report  f  Demand Data Report  g  Feeder wise Line Losses  amp  Grid wise Losses Report  h  Etc    However SI shall be required to define any specific report format as per the requirement of the   Purchaser  The detailed formats shall be finalized as per t
221. omputer in original tamper proof  binary  encrypted format file as well as MS Excel  Text file    It should be possible to display  amp  print the collected data on PC s screen in MS   Excel   Text format    It should be possible to store the original collected data in binary format  on a  floppy disc  CD  DVD  Pen drive    The DCD  CMRI software should be suitable for reading  down loading of  multiple meter data  Time Setting in DCD  CMRI  Time correction for Meter as  specified  and other relevant configurations programmable parameters in the  meter  All such changes  configurations should be password protected and  logged in the meter with date  amp  time    The necessary training if required as well as detailed  amp  easily understandable  manuals  documentation for this purpose shall also be provided     97    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    19 0    20 0    Energy Meters    Sealing of Meter    Proper sealing arrangements shall be provided on the meter to make it tamper proof   Provision of at least two seals on the meter body  one seal on the terminals block and  one separate seal on optical port should be available  Sealing arrangement of  communication ports must also be provided     Meter Construction    The meter shall be made of high quality materials  components to ensure high reliability   and long life  The meter shall be supplied housed in compact and sturdy  metallic or   moulded cases of 
222. onciliations with payments made  received    d  Tie line break downs and interruptions  Supply status monitoring of these Transmission  line    e  Load survey data from these lines    f  Actual energy wheeled by PSTCL    g  Total Grid losses of PSTCL    h  Actual machine wise generation from all state generating plants    i  Actual Energy sent out  ESO  of all the state generating plants    j  Gross generation from IPPs  CPPs and other smaller generating plants shall also be  available    k  Meter tamper reports  Exception reports   1  Etc     The system shall have the capability of converting the load survey data into text  ASCII   CSV  TSV formats as desired for hassle free integration with other applications  The system  shall provide interactive graphics package  which allow getting graphical presentation of    33    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    18     19     20     21     22     23     24     25     Energy Meters    load profiles  peak demand  load factor etc for a specified period  Interactive display  characteristics like line graphs  bar chart  pie chart etc shall be user selectable     There should be software utilities etc  such as Dynamic Data Exchange  DDE  and  or Real  Time Data Function  Microsoft Excel  available in the CEC Subsystem to link real time  data coming from meters to Microsoft Excel and other third part applications  It should be  possible to connect Purchaser s PCs  etc  in
223. orma   Undertakings   Certificates  etc                                                It is certified that the above mentioned deviations are the only deviations taken to fulfill the  specified requirements in the RFP and there is no other deviations  conditions  non compliance  mentioned any where and if mentioned has no effect on the tendered proposal     Further it is certified that the Proposal  tender is complete in all respects  Every clause had been  carefully studied before submission of a complete and comprehensive proposal  tender  All the  necessary certificates  undertakings  Deviations  Non Compliance   Price Schedules etc as  specified has been given in the Price Bid Performa  Any deviation  non compliance  and  or any  difference necessitated from the specified performa are mentioned in the Statement of  Deviations  even any deviation from the language of the certificates  undertakings has been  mentioned along with explanation  It is understood that failure to comply with any of these  instructions or to offer unsatisfactory explanation for non compliance is likely to render  effective comparison of our proposal  tender as a whole impossible and may lead to rejection of  our otherwise competitively lowest offer     SIGNATURE    NAME    DESIGNATION   DATE  SEAL OF COMPANY    107     Technical   Section No   Page No   Para       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa  I  
224. oundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters      Establishment of Complete CEC   Communication servers  Data servers   database servers  local operator consoles   basic reports  essentially in respect of Grid  losses etc       Establishment of integrated website for  scheduling  amp  information  data  dissemination etc      Establishment of remote operator consoles   4 6     amp  7  100   alongwith communication etc   and other  Month    consoles as specified  ordered     Detailed Training     MIS report generation     ABT Scheduling  Billing etc  as may be  specified      Any additional metering points as per the  requirements of the Purchaser     Integration of existing Conventional Energy  Meters      Completion of Remaining works    GSAT  amp  Successful Performance Guarantee for the   th whole system  of all the above milestones     2 en Moni Oe Commercial Operation begins  Project Declared  Commissioned     Note  7 years of Comprehensive O amp M services shall commence from the successful   completion of GSAT Acceptance   Deliverables      As built Drawings     Literature  Training Manuals  licences   ownership documents  any other document   agreement etc      Balance works as specified    9 Month 100     Note     1  Subsequent to the GSAT completion period of 9 months  the contractor SI shall not be  relieved of its responsibilities such as  Integration of existing ABT meters of Open  Access consumers  add
225. p   Complete  Details of  offered  protocols of  meters and non   royalty  undertaking    Self certified  clam of SI   References to  already  implemented  projects   Demonstration   visit to already  implemented  project may be  required as  specified if so  desired by  Purchaser     3  Yes  3  No 0     7  Open Standard  Protocol as  specified  7   Propriety But  Details available  amp   Royalty free  5   Else 0     5  Yes  5  Slight  Deviation  4 to 1   Major Deviations   0        127    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    D  General Organization and Solution Components   10          All members   Memorandum    1   Number of  Consortium Partners   Manageability of a  consortium would  become difficult in  case there are more  than 2 3 members   2   Detailed acceptance  test plan and  procedures  3   Training Plan and  Schedule including  proposed  modules  4   Any time savings  proposed in the  implementation  schedule  5   Properly Qualified  persons proposed by  the SI  CVs  attached     training    of    consortium    SI Proposed  Solution    Understanding   Agreement    Proposed  Solution    Proposed  Solution    Proposed  Solution    2  SI alone 2  2 3  members including    E  Deviations Taken 5    of    consortium    1   Degree of Deviation   All members   100  from the RFP terms  and conditions    percent  the   compliance is  expected from  SI and any  major deviation  from specifie
226. p  revise the schedule for various entities so as to be  given to the SLDC meeting the ABT system  Schedules shall be possible to be entered by  respective entities through proposed web site  remote consoles or it should be possible to be  entered manually  The module when initiated shall allow user to enter the schedule data   scheduled generation and import   export  for each 15 minute integration period using a  graphical user interface window  The schedule shall be represented in tabular as well as  graphical format  The schedules shall be stored for any further reference by the user    It shall be possible to collate individual schedules of generation and interface points to a  single schedule and it should be possible to be emailed  fax the same to specified recipients  automatically once go ahead is given by scheduling operator    The user shall be able to configure the collation and grouping of meters for preparing  various schedules     Report Generation   The software shall have module to customize and generate various type of reports based on  data collection  data validation  estimation  UI Charge  Scheduled and Actual  events   communications and logs  The different type of reports required to be generated for  preparation of intrastate energy account  shall also be as per the pattern being followed by  NRLDC  New Delhi  www nrldc in     Unscheduled Interchange  UI  report shall be generated based on the data for the agreed  schedule and the actual generation  da
227. peration  24 hours day  365 days year  without any need  for shutdowns for any activity  Further all Shutdown  requirements are mentioned in the proposal       43     If the ABT Meters are to be sourced by SI from any source  which is neither the SI nor a member of consortium  then  whether the Qualifying details  amp  proofs submitted       44     Whether the SI has submitted the full details  tools as  specified in case of proposed Protocol for Meter to CEC       45     Whether the SI has submitted the full details  tools as  specified in case of proposed Protocol from Meter to  SCADA  RTU       46     Whether the offered system fulfil the requirement of  desired refresh rate in case of ABT meters and  Conventional Energy meters as specified        47     Whether the SI has submitted the full details  tools as  specified in case of proposed Protocol for Meter Optical  Port       48     Whether the proposed CEC system supplied is being  designed to Integrate with Integrated SCADA  EMS  Scheme coming up separately as specified        49     Whether details of equipment  software  settings etc  required by SI to Integrate the proposed CEC with  Integrated SCADA  EMS Scheme coming up separately as  specified have been mentioned in the proposal       50     Whether the SI proposed system has the provision to  Integrate the already installed ABT Meters at OA  Customers with proposed CEC system being supplied       51     Whether the SI will integrate the already existing  convent
228. pstcl    PUNJAB STATE TRANSMISSION  CORPORATION LIMITED       REQUEST FOR PROPOSAL  SELECTION OF SYSTEM INTEGRATOR    FOR  COMPLETE IMPLEMENTATION ON TURNKEY BASIS   amp   COMPREHENSIVE O amp M SERVICES  IN RESPECT OF    INTRASTATE BOUNDARY METERING  CUM    TRANSMISSION LEVEL ENERGY AUDIT SCHEME  USING ABT TYPE   amp   CONVENTIONAL ENERGY METERS    TENDER NO  SLDC 116   2011    PUNJAB STATE TRANSMISSION CORPORATION LTD      REGD  OFFICE  PSEB HEAD OFFICE  THE MALL  PATIALA     O O CHIEF ENGINEER  SO amp C  SLDC BUILDING  220KV GRID SUBSTATION  PATIALA   147001     Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Note    Energy Meters    REQUEST FOR PROPOSAL    Address details of issuing authority    Tender Enquiry No    Scope   Brief Description    Quantity    Downloading of Specification  Start Date  RFP  Tender documents from  PSTCL website    Last date for receipt of any  clarifications on the RFP etc     Date  amp  time up to which tenders shall be received  Date  amp  time of opening of tenders    Cost of Specification    Chief Engineer  SO amp C   SLDC Building   220 KV Grid Sub Station  PSTCL  Ablowal    Patiala 147001     SLDC  116  2011    Selection of a System Integrator for  Complete Implementation on Turnkey Basis   amp  Comprehensive O amp M Services  in respect  of Intrastate Boundary Metering cum  Transmission Level Energy Audit Scheme  based on ABT Type Energy Meters  amp   Conventional Energy Meters suita
229. r concessional rate of CST  ST in their tenders will have to absorb CST ST up to the final  rate applicable at the time of tendering  The firms  which do not agree to this stipulation or indicate CST as extra  without indicating the applicable rate  be loaded with maximum rate of CST    12 3 4 Excise Duty    Excise Duty if applicable will be paid at full rates prevailing during the scheduled delivery on the basis of actual  period subject to the production of the following certificates by the Manager Senior Administrative Officer of the  firm along with documentary proof     a  Certified that the transaction on which the Central Excise Duty has been claimed has been shall  be included in the return submitted to be submitted to the Central Excise Authorities and amount  claimed from the PSTCL has been shall be paid to the Central Excise Authorities     b  Certified that the goods on which Excise Duty has been charged have not been exempted under  Central Excise Duty rules and that the Central Excise charged on these goods is not more than  what is payable under the provision of relevant Act or rules made there under     c  Certified that we shall indemnify the PSTCL in case it is found at a later stage that wrong or  incorrect payment has been received on account of Excise Duty  amount paid will be refunded   The benefit credit of the CED under MODVAT Scheme duly authenticated by the authorities   representatives of the Central Excise Dept  shall be allowed to the Purchaser in
230. r is also specified to be measured and stored in  absolute terms with 2 decimal places  coded Avg Frequency storage on 15 min  basis be treated as optional depending upon meter memory space     Other Power Quantity Measurements Requirements     a     b     c     d     Average Frequency  Hz   The Average Frequency of 15 minutes block shall be  displayed directly in Hz with two decimal places and shall also be stored in its  memory as such  The average frequency shall be recorded with a resolution of  0 01 Hz for the minimum frequency range from 47 50 to 52 50 Hz  The average  frequency of current block upto that instant as well as immediate previous 15  minutes block shall be displayed while scrolling in Hz    Active Energy Import  amp  Export  The meter shall also compute Active Energy  Import  amp  Export separately during each successive 15 minutes block  store in its  memory and display while scrolling  for current block as well as immediate  previous 15 minutes block     Net Cumulative Active Energy  Further  the meter shall continuously integrate  and display while scrolling the Net Cumulative Active Energy sent out from the  substation busbars upto that time  The cumulative Wh reading at each midnight  shall be stored in the meter   s memory  The register shall move backwards when  active power flows back to substation busbars    Average Voltages  The meter shall continuously compute the instantaneous  average of the RMS values of the three line to neutral VT secondary 
231. r monitoring in the form of  energy as well as demand based  In addition to the above parameters  on line monitoring for   Active demand  scheduled  current  predicted and suggested values should be made  available    The SI shall provide display generator  which enables user to create or reconfigure various  screens  amp  graphs  The user shall be to able to configure various parameters  energy    demand  to be displayed on the online monitoring screen    The System Operator  Power Controller should continuously be able to monitor ex bus  generation and inter utility power transfer for every current  amp  historical 15 min block  online     39    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Apart from individual feeder monitoring  the software shall provide for monitoring the  summated generation  load for a group of meters  The user shall be able to define the  configuration of meters for this summated data    Alarm conditions of the feeders shall be made available on online screen     these alarms are  basically the anomaly conditions as logged by the meter like PT miss  under voltage  tamper  conditions etc    Besides general alarm conditions shall also be displayable in case of failure of any  equipment  communication    Apart from meter alarms  user defined alarms shall be made available based on limits  defined for various parameters     Load Scheduling   The module shall be used to prepare  am
232. r that item   Total item prices  L  shall include sum of supply  amp  ETC price including applicable taxes i e   F   G   H   J   K    Even if any item is mentioned included in the prices it must give a breakup of the same and must be enumerated at least  e g  any tools  compilers   debuggers  test tools  various types of cables  convertors  mounting arrangements  furniture  any other item  etc  these must be  with brief  specifications including its make  model dimensions etc   in the BOQ     cca Oy es OS    151    10     11     12    13     14     15     Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters    The above quoted Unit prices shall be applicable for price adjustment on account of variation in quantity during the pendency of the Contract that is  during Roll out and during Comprehensive O amp M Phase  Also during design  execution of this work  in case there is any change in the specified  location  number of meters  etc  then the contract value will be adjusted in accordance with the unit prices for the corresponding items to be added   deleted  Bidders are advised to give break up of prices as far as possible so that it is possible to calculate unit rates for Ex Works  FOR destination  prices even for execution  amp  other services  Otherwise any dispute later on  due to not meeting this requirement shall be settled in favour of Purchaser   The price evaluation of the bids will be done on the basis of
233. re is a  requirement and upto the last date of validity of rate contract    The purchaser reserves the right to place any or no number of orders for supply during  the rate contract period    The purchaser reserves the right to place the purchase orders on any other supplier s   during the rate contract period  Purchaser reserves the right to suspend terminate the  Rate Contract at any time during the tenure of the Rate Contract without assigning any    22    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    d     e     g     4 9 15    4 10    4 11    4 12  4 13  4 14    4 15    Energy Meters    reasons  whatsoever  No compensation shall be payable to the selected bidder in this  regard    The Purchaser reserves the right to award the rate contract simultaneously or at any time  during its currency with one or more supplier s     The Purchaser reserves the right to place separate rate contract s during the rate contract  period  Purchaser may obtain any items referred to in the offer from other sources to  meet emergency  if the purchaser  whose decision shall be final  is satisfied that the  selected bidder is not in a position to supply specific quantities within the period in  which supply is required    The Rate Contract would be finalised for the period of Contract including  Comprehensive O amp M period  The purchaser reserves the right to renew extend the rate  contract with the bidder at expiration of the contract 
234. red  Survey data  to issues selective data  acquisition to CFE  which may further acquire the data from the selective meters  DPS  shall also do calculations  aggregations  corrections  processing  generating alarms  real   time UI  Grid Losses calculations  etc  in real time  DPS shall also validate the data  provided by the communication gateway server  generate alarms  route the data to the  data storage server  Data calculations  data combinations and special processing for  different data types shall also be performed  Different types of Alarms and events from  energy meters shall be processed and necessary acknowledgements to the intermediate  devices shall also be sent  Data for different processes  applications running in the  network shall be segregated and saved in respective database  It shall also provide of  screens  displays  Single Line Displays  etc for pictorial representation of substation  data  viewing of complete real time meter parameters both power and energy on user    36    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional     ili      iv      v      vi      vii     Energy Meters    screens  real time trending  alarm displays  etc  It should also be able to identify the data  being received from ABT type meters  amp  Conventional Energy meters and shall send it to  the corresponding repository  tables  Being critical it shall also be in dual redundant hot  standby configuration     Data Storage  amp  
235. referably with open standard protocols for  remote communication  All three ports shall be of universal type conforming to relevant  standard so that these can be easily connected to a DCD  CMRI  MODEM  Cable  e g   GSM  GPRS  CDMA  PLCC  Microwave  Radio  VSAT  Leased Line  PSTN  VPN   Ethernet etc    Laptop  PC  GPS Time device for data communication  time  synchronization etc  The ports shall be integral part of body and sealable  There shall be  provision of passwords for online  offline data retrieval  changing the configuration   Collected data in meter shall not be reprogrammable  modifiable through any of the  externally provided or internally provided  if any  ports for maintaining data integrity   Accuracy of the meter should not deteriorate when communication with any of the ports  is going on individually or simultaneously    Optical Port  The overall intention of the optical port for each meter  or a common  optical port for a meter rack  on its front is to tap the data stored in the non volatile  memory  time correction  limited configuration changes thorough Portable or hand held  data collection device  DCD  CMRI   The DCD  CMRI shall serve as the interface    94    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    between the meter specified above and the personal computer  PC   It shall also be  possible to obtain a print out  hard copy  of all data collected from the meter  using the  lo
236. regard may be build up in the price bid     30    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    5 4    5 4     Energy Meters    9  Which ever solution is offered by the SI  the complete schematic  topology with all  equipment and detailed literature of H w  amp  S w of the offered system should accompany  the proposal  Details and specifications of the offered equipment should also accompany  the proposal     10  Communication connectivity charges to be indicated in the bid are ceiling prices for the  purpose of payment of connectivity charges to the service provider  Connectivity  charges shall be paid to the communication service provider as per the TPA on actual  basis which shall be reviewed on yearly basis or as per tariff revision whichever is  earlier  In case the actual connectivity charges are more  the difference shall be borne by  the SI     11  Vendor shall be responsible to update the bandwidth needed for CEC in case the same is  found to be inadequate subject to acceptability  approval of the purchaser     Computerized Energy Centre  CEC     1 Introduction    The complete implementation of Computerized Energy Center shall be in the scope of the SI  as  specified  While supplying the CEC sub system it must have the at least data acquisition system    and  for    data storage system with basic reporting  MIS  online displays  graphs  basic frame work  ABT Scheduling  UI Billing  Grid Losses calculation etc 
237. rience that it will be required in future by the Purchaser for  fulfilling the intended purpose  All the above items  equipment  services etc if indicated as lot  Lumpsum must be elaborated in the bid  BOQ  schedule as well as technical bid for meeting with the functional RFP requirements  For this purpose cross reference to that description  elaboration  must be given in the price bid    2  SI shall provide break up of quantities as far as practical  supply cost  Services  i e  Survey  Design  amp  Engineering  Erection  amp  Testing   commissioning  etc    packing  freight  amp  Insurance  FOR Destination prices  taxes  amp  levies  give complete details   total price for the Roll out phase  and same year wise for the Comprehensive O amp M Period too  Only the prices  amp  taxes etc  which are quoted or taxes as per actual in the price bid shall  be payable by the Purchaser  Regarding Taxes applicable full taxes at the time of quoting may be mentioned  Any concession etc  if applicable e g   against Form  C  may also be mentioned    The lump sum amount arrived at as mentioned in  P  shall be used for Price bid evaluation    The SI shall indicate the details of applicable rate of taxes and duties considered in column  G H  amp K  above    The SI shall indicate the unit ex works prices in column  B  and unit FOR site destination prices in  E  by adding F amp I and P amp F charges   The SI shall indicate unit Erection  testing  amp  Commissioning  ETC  charges in column  I  fo
238. s 2500   in the form of demand draft payable at  Patiala in favor of AO  SLDC  PSTCL  Ablowal  Patiala  is to be submitted at the time  of submitting the tender failing which tender of the firm shall not be received  accepted   Tender quoted by any other party which has not purchased the tender documents on the  basis of letter of authority  power of attorney shall not be accepted  Interested SIs are  advised to check the Purchaser specified websites regularly to see the amendment   corrigendum against this RFP  as no further Press Note may be published   If the day fixed for opening of tenders happens to be a holiday  the same will be opened  on next working day at the same time and at the same place   All tenders must be accompanied by Earnest Money Deposit  EMD  at the rates  prescribed in the tender documents  specifications  It shall be a Three Part Bid   Telegraphic  fax  e mail tenders will not be accepted   Conditional tenders are liable to be rejected out rightly   The offers must be valid for 180  One hundred eighty  days from the date of opening of  techno commercial bid   PSTCL reserves the right to reject any or all the tenders so received without giving any  reason and shall not be responsible to pay for expenses or losses that may be incurred by  the Bidder in preparation of tender bids   Order preference will be given to Punjab based manufacturers as per erstwhile Board s   PSTCL s prevailing Purchase Regulations   System Integrators  SIs  are requested to rea
239. s as may be viable           O  we  C M  l Legends  i  i  i    i    Tie Line    Discom 2  Zone 3   i    Q ABT Meter    i  l M Main Meter    M    f i  Wht i    Check Meter  Interstate Tie  B Backup Meter   Line   i  i    Calculations for ABT Meter Quantity for Boundary Metering    The assessment of tentative number of interface points is made in accordance with stipulations of SGC     a  Generators  PSPCL   PSTCL interfaces  For Energy Injection to PSTCL  Main  amp  Check meters  on all outgoing feeders above 66kV at Generator Switchyard  for the purpose of Energy Sent Out   ESO  Main and check meters on all outgoing feeders at any voltage level and back up meter on    each generator and auxiliary transformer     b  PSTCL     DISCOM  PSPCL   Metering at the following points on the LV side of EHV    Power Transformers      e 66 kV side of 220 66 kV or 132 66 kV transformers   e 33 11 kV side of 132 33kV or 132 11 kV transformers     c  Consumers Feeders  Main meters for all IPPs  CPPs at any voltage level and independent  consumers of PSPCL above 66kV   d  Interstate Points  Check meters on each interstate points where ABT meters are already    installed    77    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Sr Description No  of   1 Amp 5 Amp  Locations    Generating Stations   eg   197    10   2   Transco Discoms interface points at 220 kV  Sub Stations 51 85 14   3 Transco Discoms interface points at 
240. s in each current circuit  at basic current       10     Power loss in each voltage circuit    at reference voltage and frequency        11     VA Burden on CT PT circuit  As  per IS 14697        12     Whether meter carries ISI mark       13     a  Over load capacity       14     b  Variation of voltages and  frequency at which the meter  functions satisfactory       15     Details of Rating  a  Voltage       b  Current       16     Expected Life of the meter       17     Dimensions       18     Weight  approx         19     Memory storage capacity  MB        20     Various Standards to which meter  conforms       21     Complete list of Power Quantities  parameters available in meter for  Display  Remote Communication   through Optical Port  Load survey  i e  Stored etc           22        Whether all the parameters  indicated in specifications are  available i e     1  Instantaneous parameters             118       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters        ii  15 minutes block level  parameters    iii  Perpetual type parameters    iv  Day level parameters   Please indicate which of the   specified parameters are not   available        23     Sign of power  energy import  amp   export as indicated by the meter       24     Meter display type  LCD  LED   Etc         25     No  of digits  character displayed       26     Size of digits  character displayed       2T     Non volatile memory reten
241. s shall be mounted on the printed circuit board  All insulating   materials used in the construction of meter shall be non hygroscopic  non aging and of   tested quality    All parts that are likely to develop corrosion shall be effectively protected against   corrosion by providing suitable protective coating  Any protective coating shall not be   liable to damage by ordinary handling nor damage due to exposure to air under normal   working conditions   The meter shall have operation indication device such as a blinking LEDs and  or LCD   indications  alphanumeric display  sealing arrangements  mounting arrangements etc as   specified in this specifications  The terminal cover design shall be pilfer proof    Meter shall be designed and constructed in such a way so as to avoid causing any danger   during normal use  However the following should be ensured     1  Personnel safety against electric shock    11  Personnel safety against effects of excessive temperature    iii  Protection against spread of fire    iv  Protection against penetration of solid objects  dust and water in normal working  condition     v  Protection against fraud  prevention against pilferage     The meter construction should conform to CBIP reports with latest amendments     98    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    21 0    22 0    23 0    24 0    25 0    Energy Meters    Metering Cubicle    In case of rack type meter  a MS metering cu
242. sed should be submitted with the reports     Packing  All the equipment to be supplied shall be suitable packed so as that there is no  damage to the equipment of any kind and it shall be possible to store the equipment at  outdoor locations for extended periods     Nameplate  All the equipment supplied shall carry the suitable Name plates identifying  it completely  Further all the equipment must be marked    Property of the PSTCL    along  with Purchase Order No etc     GIS  It should be possible to keep an account of equipment  Complete details  amp  quantity  of the equipment at particular location     ETC  Complete erections  testing  amp  commissioning of the equipment including site  preparation  earthing  power supply etc shall be ensured  amp  provided by the SI as  specified  Any incidentals  permissions  licences  etc  required at site or otherwise in  respect of the installation  commissioning  amp  continuous working of this equipment at  various sites as may be required to fulfil the scope of the Project whether stated  explicitly  implicitly or implied  Appropriate help  permit to works  documents  etc  if  available  possible easily with Purchaser shall be provided     Security  safety  Safe custody of the equipment  Security  safety  amp  safe custody of  Equipment shall be the responsibility of the SI at all stages of the project execution  Any  equipment shouldn   t be left unattended  Equipment shall be properly handed over to  authorized person by the SI 
243. ser   shall be given  depending upon  the readability   responsiveness  and suitability  of solution  offered    claim  liability  shall  entertained on  this account  As  such   document may  be prepared with  full  understanding  of the scope of  requirements  and solution be       125    references  to the  point  to the  supplied documents   catalogues in the  submitted bid     With the solution  provided by SI   shall the online data  will be available  simultaneously as  specified from all  the specified  number of meters  installed at specified  number locations be  available in CEC for  monitoring purpose  along with remote  downloading of  stored data  load  survey  tampers etc  for reporting   billing  UI  etc   purpose through  same  communication  media  channel   With above online  data communication  going on  will the  occasional  downloading of  stored data  load  survey  tampers  etc   as may be required  be possible without  unduly effecting the  routine online date  acquisitions     Energy Meters    offered  accordingly   Technical  presentation  and  or  demonstration  and  or visit to  similar existing  setup  implemented by  the SI  Members  may be required  as specified if so  desired by the  Purchaser    Self certified  clam of SI   References to  already  implemented  projects   Demonstration   visit to already  implemented  project may be  required as  specified if so  desired by  Purchaser     Self certified  clam of SI   References to  already  imp
244. shall have the suitable  capability  software to allow at least 500 multiple  users with response time of few  5 s  seconds  Purchaser already have two number  website hosted at SLDC  Ablowal  It should be possible to use the same domain name so  that SLDC have  appear to have consolidated web site  Web site shall also have  provision to unload ABT Meter data collected manually using a CMRI from any web  enabled PC with suitable interface to CMRI  The website shall provide online  amp  offline  data through password protected pages  which shall further be displayable  browse able  on mobile phones  handsets  Personal Computers  Laptops etc which may be connected  to Internet  Website shall also be used for interaction with the general public and  Purchaser   s customers for ABT Scheduling and Energy  meter Data dissemination   payment  bill collection  disbursal etc     GPS Time Synchronization system  A Satellite based True Time GPS  Global  Positioning System  clock along with its accessories shall be implemented at CEC  It  shall be used to synchronize CEC s time with standard reference time via satellite so that  synchronization of servers  clients in CEC is possible on continuous basis  The Data  Server  CFE shall in turn synchronize the time of all the meters while acquiring online  data from them  As such it should be possible to time synchronize the ABT Meters  remotely through CEC where GPS time facility shall be available and later on through  SCADA  RTUs also where
245. sibility  ports but are still  being manually downloaded through CMRI  Common Meter Reading Instrument  and  accordingly energy  UI bills are being generated for them manually  These ABT meters  were  are being procured by Open Access Customers themselves and were  are being  installed at their respective premises  Proposed system shall have necessary provision for  integrating Open Access customers    provided ABT meters with the CEC as and when  desired by PSTCL if found viable may be by putting up additional protocol converters   APIs  etc     Existing CEMs at 400kV  220 kV and 132 kV substations of PSTCL are to be integrated  with proposed CEC system if found viable  feasible by putting up protocol converters  APIs   etc     There should be provision of entering multiplying factors to scale the raw data received  from meters to engineering values as may be required  Further there should be provision to  enter correction factors to cater for meter data available from some alternative location   interface point instead of from the desired location  For example instead of requirement of  meter placement on LV side of a Power transformer  it is placed on HV side due to non  availability of metering CT on LV side  or instead of placing the meter at far end as may be  required the meter is placed at near end of the transmission line  tie line due to non viability  of placing it at far end  data available from Check Meters etc  There could be many such  contingencies as such CEC
246. sing ABT  amp  Conventional Energy Meters       4 4 1    Recurring Charges       4 4 1 1    Primary  Connectivity       4 4 1 2    Alternative  Connectivity for  5  locations as  specified        4 4 2    Fixed Charges       4 4 2 1    CEC End Personals  for system  administration   report  configuration   support and further  development as  may be required  including for field  work       4 4 2 2    O amp M Cost of CEC  including  consumables as  specified       4 4 2 3    O amp M Cost of  Remote End  Equipment i e ABT  Meter  CEM  DCU   Modem  etc        44 2 4    O amp M Cost of  Remote End  interfacing  Equipment in case  of interfaced  existing CEMs       4 4 3    Any other item        4 5    5  Year O amp M       4 5 1    Recurring Charges          4 5 1 1       Primary  Connectivity                                                 147       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional Energy Meters       4 5 1 2    Alternative  Connectivity for  5  locations as  specified        4 5 2    Fixed Charges       4 5 2 1    CEC End Personals  for system  administration   report  configuration   support and further  development as  may be required  including for field  work       4 5 2 2    O amp M Cost of CEC  including  consumables as  specified       4 5 2 3    O amp M Cost of  Remote End  Equipment i e ABT  Meter  CEM  DCU   Modem  etc        4 5 2 4    O amp M Cost of  Remote End  interfacing  Equipment in case  of 
247. t be Type tested and Type test certificates issued by any national laboratory  accredited from NABL for the offered model shall be made available  The Type tests as  well as Routine tests shall be carried out strictly as described in the relevant sections of  IS 14697  CBIP technical report  88 publications and with latest amendments thereafter     Acceptance Testing   A  Meter    Meter shall be duly tested  amp  certified that it is suitable for the purpose as per the   relevant standards  amp  CBIP 88 report  Latest Amendments   In addition  each and every   meter shall be subjected to the following acceptance tests    a  Functional checks for display and memory    b  Accuracy of the calendar and clock   Method should be given by the manufacturer    c  Accuracy of Wh  Varh  voltage  frequency measurement etc  shall be checked at the  steps of 0 5 Hz over the full frequency range in case of ABT meters only   d  Testing of internal  external power pack battery arrangement as well as meter  Burden  Wattage   e  Testing for all tampers  frauds and anomaly may be carried out for compliance as  specified    f  Working  suitability  functions etc of Optical Port as well as communication port as  specified     B  Acceptance Testing of DCD  CMRI software and PC software   DCD  CMRIs software and PC software  utilities  supplied by the meter supplier must    be installable on the specified DCD  CMRIs  amp  PCs to verify that they are suitable  user  friendly for the specified purpose
248. t certificates  as per standards             64  Whether Detailed User Manual  provided   65  Whether carries Warranty Period  equal to Comprehensive O amp M  Period    66  Whether details of Tamper  Fraud     Anomaly detection  Logging of  incidents are provided        67  Whether details of Anomaly   Fraud  Tamper  Battery failure   Clock failure  Configuration  change indication are provided          68  Total number of tamper events  logged  69  Whether agrees with Disclosure    Requirements As per CBIP 88  report with latest amendments                      70  Provide the Disclosure Details as  above   71  Additional feature   information if  any       Performa    IX  B     Check list cum Technical Particular Sheet for Conventional Energy Meters    Please repeat the above table as in case of ABT meters  However ABT specific clause may be  left blank     SIGNATURE   NAME   DESIGNATION   DATE  SEAL OF COMPANY    122       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa X    Self Scoring Sheet for Bid Evaluation  Name of the SI  Address    Note  Bidder must ensure that following table is exactly same as given in the    Bid Evaluation  Criteria    Section  While filling the self score sheet the cross reference of the document  submitted to claim the marks may be submitted  SI shall also highlight the relevant clause of the  document submitted to claim the marks  The submitted documents must als
249. ta as acquired from meters     User will be provided with the facility of entering UI rates as and when required  Previous  UI rates shall be also accessible    Summary as well as detail  each 15 minute  report shall be made available for UI  Incentive   Penalty statement shall also be made available based on rules entered by the user  Further   total export import report and plant load factor report shall be generated by this module  The  system shall be able to generate report as per the requirement of transmission level energy  audit e g  Energy Sent Report  Energy Loss Report  Line Loss report  Grid Wise Loss report  etc    The system shall also integrate with a commercially available reporting package  such as  Crystal Reports  to allow generation of custom reports for unique operational requirements   It should be possible to query data into Microsoft Excel for any special reports  Standard  system reports shall include reports for use in the analysis of data  and the operation of the  system    Reporting tools shall offer users the option of exporting reports to disk using a variety of  standard Windows formats including  at least  CSV  PDF  Word  Excel and rich text format     Date selection    40    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    When running a report by date span  the system shall provide users with the option to enter  specific start and stop dates  or to run reports using sta
250. taking due receipts  SI shall strive to locate the Equipment  within the premises of the Purchaser     Documentation  The Successful Bidder shall submit hardware and software  documentation in three sets for the whole scheme to Purchaser for review and approval   After approval four set of all the documents shall be submitted as final documentation   Any changes observed during field implementation shall be incorporated in the as build  drawing and four sets of same shall be submitted to Purchaser  All manuals   configuration utilities and software tools shall be in English language   The following minimum documents are envisaged for submission    Detailed engineering drawing of Remote End Subsystem  Communication Sub    system and Centralized Energy Centre   Details of Meter locations  feeders    26    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    5 2    5 2 1    Energy Meters    Details of Communication  amp  CEC end hardware to be supplied   Details of software to be supplied   Functional Design  amp  Specification   Hardware  software  maintenance and operation manuals    FAT SAT  GSAT documents   Testing Facilities Available in house  Performa XIV   Further Successful Bidder shall provide complete set of documents in soft copy as well   CD media  in two sets  2 sets of CD  Floppy for system back up shall also be provided  to restore the complete system in case of system crash due to unforeseen reasons     Continuo
251. te  except by the special permission  in writing of the purchaser or  his representative     13 1 6 Protection of work    The SI shall have total responsibility for protecting  safety  security of his works till it is finally taken over by the  purchaser as per contract  No claim will be entertained by the purchaser for any damages or loss to the SI   s works  and the SI shall be responsible for complete restoration of the damaged works to original conditions to comply with  the specification and drawings  should any such damage to the SI   s works occur because of any party not being  under his supervision or control     74    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters  13 1 7 Site facilities to be provided by the purchaser    A  SPACE    The purchaser shall at his discretion and for the duration of execution of the Contract make  available at site  land  space as required for execution of the contract  On completion of work the  SI shall hand over the land duly cleaned to the purchaser    B  ELECTRICITY  POWER SUPPLY  The power supply as may be decided by purchaser will be provided free of charge for  consumption in works which may be located at premises of the Purchaser  SI shall provide and  install all necessary wiring fixtures  bulbs and other temporary equipment as necessary for further  distribution and utilization of energy for power and lighting and shall remove the same on  completion of the
252. ted  Challan and date of commissioning shall be reckoned as certified by the designated Construction supervision  Engineer of the purchaser     12 3 13 Penalty   Damages for delay in delivery   commissioning    If the Supplier fails to deliver   commission the material equipment within the stipulated delivery  commissioning  period of the Purchase Order Contract  the same is liable to be rejected and if accepted  the Supplier shall be liable  to pay as penalty charges a sum of Rs 0 5   half of one percent  of the total contract value per month of delay or  part thereof  not exceeding maximum limit of 5  of the total contract value of undelivered  un commissioned  equipment so delayed     66    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    There will be a slack of one month that will not entail any penalty and will not involve any additional financial  implication to the PSTCL  Delay beyond the slack period will attract penalty for the period of delay including slack  period  however there will be no penalty  liquidity damages in respect of purchase of propriety items     12 3 14 Force Majeure    During the pendency of the Contract Purchase Order  if the performance in whole part by either party or any  obligation there under  is prevented delayed by causes arising out of any war  hostilities  civil commotion  acts of  the public enemy  sabotage  fire  floods  explosions  epidemics or non availability o
253. ters placed at  appropriate location throughout if technical solution need for the same or without these  if there is no need  along with any leased line etc from communication provider   s   Internet Service Provider   s hub  system to CEC to achieve a data refresh rate as  specified in Clause 5 2 2 9 of the RFP in respect of time stamped instantaneous  Current  Block  Current Day Instantaneous parameters as specified  may be by transmitting only  those parameters which changes by a particular threshold value  should be  programmable for individual parameters  and by routinely undertaking a demand scan  automatically to check data integrity every few minutes to optimize the data volume to    29    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    available channel bandwidth along with routine  amp  secure downloading of offline  stored  data from the meters for Analysis  energy accounting  billing  UI  Grid Losses  Calculation etc  as may be required  automatically as per schedule or on specific  requests from the control centre  For Boundary metering  the actual requirement of data  refresh rate is of 10 Seconds or better for the meters to be interfaced with SCADA   RTUs     SI shall also propose an alternative communication sub system s wherever principal  communication connectivity is found not available during field survey  For the purpose  of evaluation it may be assumed by the bidder that there shal
254. the Contract  Such drawings and engineering data shall be submitted to the purchaser in required  number of copies     13 1 13 Insurance    The following statutory provisions shall also apply in addition to the Insurance of Material      A  WORKMEN   S COMPENSATION INSURANCE  This insurance shall protect the SI against all claims applicable under the Workmen   s Compensation Act   1948  Government of India   This policy shall also cover the SI against claims for injury  disability   diseases or death of his or his Sub SI   s employee  which for any reason are not covered under the  Workmen   s Compensation Act  1948  The liabilities shall not be less than Workmen   s Compensation As  per statutory Provisions Employees liability As per statutory provisions    B  COMPREHENSIVE GENERAL LIABILITY INSURANCE  This insurance shall protect the SI against all claims arising from injuries  disabilities  disease or death of  members of public or damage to property of others  due to any act or omission on the part of the SI  his  agents his employees  his representatives and Sub SIs from riots  strike and civil commotion  The  hazards to be covered will pertain to all the works and areas where the SI his sub SIs  his agents and his  employees have to perform work pursuant to the Contract   NOTE  The above are only illustrative list of insurance covers normally required and it will be the  responsibility of the SIs to maintain all necessary insurance coverage to the extent both in time an
255. the bids will be  taken up for SI   s qualification  Proposal   s technical  amp  commercial evaluation  For this  the very first step shall be to see whether the SI  Bid has properly  completely filled  Check List  Performa X VIII  and comprehensive Index  Paging  as specified  without  going into details of the proposal at the discretion of the Purchaser  Non Compliant bids  on this account shall be out rightly rejected which otherwise may be responsive and  or  most economical    The third part of the bids  Price bid  shall be opened in case of only those firms whose  Part II of the bids after evaluation is found to be conforming to the specifications  The  date and time for opening Part II of the bids will be intimated to the qualifying bidders   The price bids  Part II  will be opened in the presence of the representative of the  qualifying bidders who choose to attend    The officer inviting Proposals  Tenders  contracting purchasing agency  PSTCL   referred to as Purchaser  reserve the right to modify the schedule of requirement   technical particulars and the specifications at any time and to place the order as a whole  or in parts and to reject any or all the Proposals  Tenders received without assigning  reasons or liability  The purchaser will not be responsible for and will not pay for  expenses or losses that may be incurred by the tenderer in the preparation of the  Proposals  Tenders    The material offered should be strictly according to the specifications lai
256. the price bid and shall be considered in the price  evaluation     17    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    4 1 5  4 1 6    Energy Meters    GENERAL INSTRUCTIONS AND OTHER TERMS  amp  CONDITIONS  Submission of Tenders   The SI  bidders must carefully observe the following instructions  The offer  bid   proposal not strictly in accordance with these instructions are liable to be rejected   Proposal  Tenders not fulfilling the minimum pass  fail qualifying requirements shall be  out rightly rejected and decision of purchaser shall be final    Proposal  Tender should be submitted in Quadruplicate  4 sets  alongwith one soft copy   CD  of each bid in MS Word format in separate sealed envelopes  without price bids    Each copy should be separately tagged and clearly marked as  Original      Duplicate         Triplicate     and    Quadruplicate       Pages of each copy of the Proposal  tender bid should be paged consecutively along with  its enclosures  manuals  certificates  performa etc   flagged properly wherever required  in the file  folder along with comprehensive index at the very beginning  In case of  necessity of multiple files  folders each file  folder should have comprehensive same  index with same running page number across all such multiple folders mentioning all the  documents even in other files  folders  Paging of the submitted tender is very important  for proper Bid Evaluation  As such Submitte
257. ting  international codes and standards  Intrastate Boundary Metering shall be suitable for ABT  Regime     Through this turnkey project  it is proposed to implement a system capable for real time online  monitoring of instantaneous energy inter exchanges  power quantity parameters  etc   and  remotely downloading Meter stored data  do ABT type scheduling  between intrastate players  and preparing consolidated state schedule for submitting to RSCC  as may be required  Energy  Auditing  Accounting  Billing  UI  Grid Loss calculations  etc  using energy inter exchanges  data from ABT type meters  to be installed under this project or already installed for OA  Customers  between various entities connected  served by PSTCL  i e  between intrastate  distribution companies  State   s Thermal Power Plants  State   s Hydro Power Plants   Transmission System  etc    with Open Access Customers  CPPs  IPPs etc  and at interstate  boundary with neighbouring states  BBMB  amp  CTU within Punjab  and also at few places  outside Punjab   Also the project envisages to have a comprehensive Reporting System suitable  for Availability Based Tariff  ABT  as adapted in Punjab and to generate required  MIS reports  at Centralized Energy Centre  CEC   to be located at SLDC  Ablowal  Patiala and to further  disseminate the real time online data  amp  offline  stored data from the meter available  amp  collected  at CEC  processed  corrected or otherwise  as may be required to concerned users  utilit
258. ting the ABT  requirements and certain other functions  as described in the following paragraphs   sections of this document  The meter shall be suitable for being connected to voltage  transformers  VTs  having a rated secondary line to line voltage of 110 V  and to  current transformers  CTs  having a rated secondary current of 1A SA  Any further  transformers  transducers required for their functioning shall be inbuilt in the meter   Necessary isolation and  or suppression shall also be built in for protecting the meter  from surges  voltage spikes  fault currents  EMI etc  that occur in the VT and CT circuits  of extra high voltage switchyards  The reference frequency shall be 50 Hz  The energy  meter shall be rack  panel  metal box mounted with individual  common  both types of  displays     Standards    While drafting this specification  reference has been made to Punjab State Grid Code   National and International standard specifications with latest amendments  In case  if  certain details are not covered in this specification  the relevant State Grid Code  Indian   International standard shall be applicable     IS 14697  AC static Watt Hour Meter for Active energy  Class 0 2S  with latest  amendments   IEC 60687  Static Watt hour meter for class 0 2s with the latest amendments   CBIP Tech  Report No 88  Revised with Latest amendment   with latest amendments  CBIP Tech  Report 111 for common Meter Recording instrument and optical Ports in  use  with latest amendments  
259. tion  period in absence of power   Minimum 10 years        28     Storage Capacity in days for  specified Parameters  Minimum  45 days        29     Display roll over period       30     VT supply failure indication       31     Requirement for special power  quantity measurement  display    storage  protection       32     Whether fulfill the Climatic  conditions  under which meter  work satisfactorily  As per  Annexure V       33     Maximum error  Accuracy  due to  variation in Voltage    20     30          34     Maximum error  Accuracy  due to  variation in Frequency   50        5  HZ        35     Maximum error  Accuracy  due to  variation in Power Factor  Zero to  unity  lagging or leading  in all the  four quadrants        36     Test output device       37     List of Self Diagnostic feature       38     Meter Power Supply Arrangement   VT Operated only or Provision  for External Power Supply is also  available        39     Built in Calendar  amp  Clock  Accuracy  Minimum  2 minutes  per year           40        Details of Built Real Time Clock s  synchronization  adjustments  Procedure                Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters       41   42     Built in Calendar  amp  Clock s  Guaranteed life  Minimum 10  years        43     Factory Programmable Parameters   Detail List         44     User Programmable Parameters   Detail List        45     Whether possible to disable some  f
260. tiple of Rs 10   on the higher side     Ordinarily the EMD received with tenders shall be converted into Security Deposit  If the amount of EMD received  with tender is more than the amount of security deposit required for the Purchase Order  Contract  the balance shall  be refunded and in case of shortfall the SI  Supplier shall be required to deposit the additional amount     In the case of SIs from whom Earnest Money is accepted in the form of Bank Guarantee  the Security Deposit shall  also be acceptable in the form of Bank Guarantee  valid up to 3 months after the completion of contract period   including warranty period if any  To start with  the Bank Guarantee submitted against Earnest Money shall be  treated as Bank Guarantee against Security Deposit  If its amount is adequate  its validity may be extended by the  SI to cover the total period required for security Deposit  otherwise  the SI shall be required to submit fresh Bank  Guarantee for the correct amount and period for security  then the Bank Guarantee for Earnest Money shall be  released     Public Sector Undertakings owned by Punjab Government Central Government other State Governments   supplying material directly through units owned by them shall be exempted from depositing security against  Orders Contracts given to them  However  exemption shall not be applicable for the supply of material through a  private unit   manufacturer     The Tenderers having permanent deposit of Rs  10 00 lac with the Chief En
261. to the LAN  Switch of CEC system to access  database and Real Time data through DDE  NETDDE  RTD  SQL Queries etc     Site preparation  conditioning  cabling  UPS  furniture  racks  panels  fixtures etc  as may be  required  However Site  Room with false flooring  amp  Air Conditioning pre installed will be  made available by purchaser  The SI shall provide a layout plan of the CEC  amp  other  equipment locations indicating the space requirement  Purchaser shall provide the required  site  room for the same  However  the SI shall be responsible for the site preparation  including providing reputed make furniture   furnishing  electrical  earthing and minor civil  work  if required  for CEC     Any Licences  Subscription shall be procured in the name of PSTCL by SI  However  to  operate  amp  maintain such items full responsibility shall be of SI during Implementation  amp   Comprehensive O amp M Phase     It should be possible to integrate such manually collected data from now supplied CMRI  amp   data collected by existing CMRI in PSPCL  with the CEC applications i e  billing  UI   analysis etc  amp  database with suitable indication in the consolidated reports that data of such  and such meter was downloaded with CMRI and  or was manually entered     As already stated there are many Open Access  OA  Customers of PSPCL  Punjab State  Power Corp  Ltd   having different makes of ABT Meters  M s Secure  M s L amp T  M s  Wallaby   which though may have remote communication pos
262. trastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    The software shall convert the data received from meters into a database which will cover  the following aspects    a  Details of the meter and metering equipment   b  Calendar Clock  duly stamped     c  Instant parameters   d  Load survey   e  Billing data   f  Tamper information   g  Transaction log   The MIS Report generation at CEC shall be as per the user requirement from time to time   SI shall provide user manuals for the CEC software and software shall also have the feature  of HELP for user convenience     5 4 5 Data Management  amp  Validation   1  Whenever data is collected  the system will automatically validate the data collected by  defined data validation rules    2  During communication with the meter  the system shall  Verify that the device ID of the  meter matches the device ID stored in the system and that the clock of the meter is within a  maximum tolerance compared to the standard time of the collection system    3  SI shall describe in detail the proposed Database Management system   s design and  architecture for effective management and analysis of data received from all the meters  through provided communication or through CMRI    4  CEC shall perform all the validation checks as per user requirement to ensure the data  correctness    5  CEC shall due the initial billing calculations with Main Meters and present the overall  results
263. ty clauses are applicable for the entire project duration including the roll out phase  and the comprehensive O amp M phase of 7 years as applicable     Note 2  Penalty shall be deducted from the next payable amount due to the SI     Note 3  For Serial no  2  amp  3 in the Table above   Data shall also be pulled out of meters as  per the schedule defined by the PSTCL from time to time  However this penalty is to ensure  network capability to transfer data and this can be tested by PSTCL any time  This penalty shall  be imposed at the time of testing done by the PSTCL   Note 4  The finally Order will be taken as a contract agreement  Performa XI  between SI  amp   Purchaser as far as  SLA is concerned     62    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters  12 GENERAL TERMS  amp  CONDITIONS    12 1 Earnest Money    1  Incase of open and Limited tenders  the bidders shall be required to submit Earnest Money at the following  rate in the form of PSTCL s Cash Receipt  Bank Demand Draft in favour of  AO  SLDC  Punjab State  Transmission Corporation Limited  Patiala   payable at Patiala along with the tenders      a  Tender valuing up to Rs  50 000   Nil    b  Tenders valuing above Rs 50 000     2  of tendered value rounded off to multiple of Rs 10    on the higher side  subject to minimum Rs  5000   and  maximum of Rs 10 00  ten  lac     2  The following shall be exempted from depositing Earnest Money      a  
264. uage   with abbreviation  standard  industry terms expanded and  any technology jargon used   explained properly  so that  even lay person can  understand the offered  solution in single reading   with respect to the offered  design  approach and  methodology of the project  along with references  to the  point  to the supplied  documents  catalogues in the  submitted bid     With the solution provided by  SI  shall the online data will  be available simultaneously as  specified from all the  specified number of meters  installed at specified number  locations be available in CEC  for monitoring purpose along  with remote downloading of  stored data  load survey   tampers etc for reporting   billing  UI  etc  purpose  through same communication  media  channel    With above online data  communication going on  will  the occasional downloading  of stored data  load survey   tampers  etc  as may be  required be possible without  unduly effecting the routine  online date acquisitions     Energy Meters        feemployeers O  C  Proposed Integrated Automated Remote Metering Solution    At discretion of the  Purchaser  shall be  given depending  upon the readability   responsiveness and  suitability of solution  offered  No claim   liability shall be  entertained on this  account  As such this  document may be  prepared with full  understanding of the  scope of requirements  and solution be  offered accordingly   Technical  presentation and  or  demonstration and  or  visit to simi
265. ual turnover is  more that INR 50 Crore in the  best three financial years out  of last 5 years    Manufacturing capability and   or Service Provider of all or  any one of the following    a  Meters of 0 2 s class  accuracy manufacturer    In Software development  of CEC  Base Computer  Station   Communication  provider of  system   Employee base   gt 100  with  the number of qualified  employees on roll over the  last financial year   Number of Quality  certifications from an  accredited and internationally  reputed   renowned firm  viz   ISO 9000 etc     Local Presence Office s  in  Punjab with sufficient  personnel and inventory of  spares    b     Service  offered    c     Financial turnover  shall be certified by  Chartered Accountant    Certified Proof to be  submitted     Certificate from SI    Valid Proof  Certifications    to be  regarding  the office s   addresses and their  infrastructure and    Details  provided    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    6  Yes  6   under  implementatio  n  3  No  0    6  Yes  6  No   0     6   gt 2  6   lt 2 or  under  implementatio  n  3  None  0   5  Yes  5   under  implementatio    5  If Meter  manufacturer   5  If in  software  development   4  if  Communicatio  n provider  2        Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Detailed Write up along with  proposed Solution Design in  lucid and plane lang
266. ure  of the proposed solution  along with detailed schematics showing the various components  modules  etc  whether  hardware or software along with their respective functions  uses etc  should be given here   Features  specifications of the offered solution and sub components  modules should also be  listed and described along with detailed Pros  amp  cons of the offered solution s should also be  discussed in here  As many pages as may be required may be attached  But all the write up here  should be readable in a single reading to understand the offered solution so as such pamphlets   brochures of the offered components should not be attached here  but a write up specific to this    proposal may be attached  This will carry weightage in techno commercial bid evaluation as    specified   SIGNATURE   NAME   DESIGNATION   DATE  SEAL OF COMPANY    117       Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa  IX A     Check list cum Technical Particular Sheet for ABT Meters       Sr    Description    Actual Values to be  filled in by SI instead  of writing complied   Ok etc  where ever  applicable    Cross Reference       Manufacturer s Name  amp  Country       Meter Make  Series  Model       Type       Accuracy class  0 2s        Basic Current  Amp        Maximum Continuous current  A        Standard reference voltage  V        Standard reference frequency  Hz         2  90  YN  Hy Be a    Power los
267. us Operations  The system shall be designed for continuous operation  24  hours day  365 days year  without any need for shutdowns for any activity  Requirement  of regular  specific shutdown if any may be brought out in the proposal itself     Life Span  The design life of the equipment shall be a minimum of 15 years from the  date of final acceptance  The life shall be achievable through normal and regular  maintenance and without major dismantling or overhauling  All type of spares and  spare modules shall be made available during life time of the equipment for  maintenance  repair and upkeep of the equipment     The Bidder shall make available at no cost to Purchaser the manufacturing drawings and  rights to manufacture those subassemblies which the manufacturer will not support or  discontinue to support for during this life span including subassemblies not included in  the original procurement  For each subassembly  the specific parts supplied shall be  identified and referenced in supplied documentation     The Successful Bidder shall provide 7 years of Comprehensive O amp M service including  warranty for the supplied equipment from the date of commissioning after successful  GSAT and shall be responsible for its maintenance during this period including supply  of spares  if required  included in the O amp M cost  for ensuring the successful operation of  the system     Technical Specification for ABT  amp  Conventional Meters    Qualification Requirements of the 0 2s
268. ve specified Service Levels  Some of  critical components  server functionalities are Communication Front End Server s  Data  Processing Servers  Database servers along with databases  ABT scheduling servers  ICCP  servers  web server  LAN etc as the failure of any of these shall severely effect the overall  functioning of CEC  Any failure of these critical items  functions should automatically be  taken care by dual redundant system     Any requirement of additional hardware or third party software which may be required for  fulfilling the different requirement after commissioning of the respective components at  CEC shall be provided by the Purchaser  SI at mutually agreed cost  terms  amp  conditions   Such suggested third party hardware  amp  software should be easily available and the SI or any  other party shall not be carrying exclusive rights on the same or debar it in future     The basic features  functions  reports etc to be made available at CEC as visualized at this  instance of time are given in this RFP  For detailed functions  features  reports etc the SI  shall interact with the end users of the system to understand their requirements  UFRs   DFRs   and also freeze the same in consultation with the Purchaser and thereafter  implement the same as part of commissioning process and or before commissioning   Purchaser shall facilitate such interaction as and when desired by any side     CEC solution offered should not be dependent on the selected mode  media of  
269. voltages as  a percentage of 63 51 V and display while scrolling  The accuracy of the voltage  measurement  computation shall be atleast 0 5   a better accuracy such as 0 2   in the 95 105  range being desirable     87    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    e     Energy Meters    Various Other Power Quantities  Various other power quantity measurements  in addition to those specified in other sections  else where in this specifications   shall be as listed below                                      Instantaneous Power Quantities   Y Yes Required  N  Not  Required   Sr   Parameter Scrolling  Cyclic   Remote   Stora   ABT Billing  Display Readin   ge at   Related  Curren   Immedia   5 the  t Block   te end  Previous of the  Block block  1 Current     l  Iy    Y N Y N N  I   2   Voltage  Vm    Y N Y N N  Vyn  Von  3   Average of   Y N Y N N  RMS Voltage  as Percentage  of 63 51 V  4   Power Factor Y N Y N N  5   Frequency   Y N Y N N   Hz   6   Apparent Y N Y N N  Power  7   Active Power Y N Y N N  8   Reactive Power   Y N Y N N  9   Real Time Y N Y N N  Clock  Date  amp   Time                             15 Minute Block Level Power Quantities  For 45 days         Sr     Parameter    Scrolling  Cyclic    Display       Curren  t Block    Immedi  ate  Previous  Block    Remote  Readin  g   Curre  nt  Block  Instant  aneous  as well  as  Immedi  ate  Previou  s  Block     Stora  ge at  the  end of  the  block    AB
270. will  however  be Supplier s responsibility to prefer timely claims on the insurance under   writers and to arrange replacement thereof to the consignees     4  The Suppliers shall be wholly responsible for the loss  shortages  damages etc  during transit  Such shortages  and damages etc  will have to be replaced repaired by the Supplier SI free of cost immediately without waiting  for maturing of the Supplier s SI s claims with the concerned transport Authorities     5  Incase replacement repair of defective material is not carried out within six months of intimation of damages   Supplier shall have to pay interest at the rate of 12  per annum on the advance payments made by the Punjab  State Transmission Corporation Limited  PSTCL  from the date of its payment up to the date of its re   commissioning of the equipment after replacement repair or to the date the default is made good     12 3 17 Negligence and Default    In case of negligence on the part of Supplier  SI to execute the order contract with due diligence and expedition and  to comply with any reasonable orders given in writing by the Purchaser in connection with the Purchase    67    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Order Contract or any contravention in the provisions of the Purchase Order Contract  the Purchaser may give 21  days notice in writing to the Supplier  SI to make good the failure or neglect or contravention and i
271. will be  loaded with maximum rate of duty for evaluation purpose     63    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    7  Whether the firm indicate NIL or concessional rate of CST VAT in their tenders they will have to absorb the  CST VAT up to 4  applicable at the time of opening of tender  The firms which don   t agree to this condition  or indicate CST as extra without indicating the applicable rate or remain silent then the tenders of the firm will  be loaded with 4  CST VAT for evaluation purpose     8  Modvat Benefit  The firms should quote their rates after taking into account the Modvat Benefit available to  them  If the firms do not mention clearly about Modvat Benefit  then it will be assumed that they have quoted  the rates after taking into account the Modvat benefit available to them     9  In case of imported equipment  the SI shall indicate Custom Duty and any other duty cess component as  applicable separately along with rates  Freight  port handling  forwarding   custom clearances and inland  freight  amp  insurance shall be part of FOR quoted prices  The SI shall be entirely responsible for import of  equipment  However  essentiality certificates  if any shall be provided by the purchaser     12 3 Sales Tax    12 3 1 Punjab General Sales Tax     The material on order is required for use in generation  transmission and distribution of electrical energy to the  Public  As such  the Pu
272. xcise  custom duties on the final finished supplies tendered for     12 3 38 Revelation of Prices    Prices in any form or by any reasons should not be revealed in techno commercial bid or before opening the price  bid  failing which the offer shall be liable to be rejected     12 4 Terms and conditions of Tendering Firms    In case terms and conditions of the contract applicable to this invitation of tender are not acceptable to any SI   clearly specify the deviation as per the Performa I     Similarly in case the equipment and services being offered has deviations from the schedule of requirements laid  down in the RFP  the SI shall describe in what respects and to what extent the equipment and services being  offered differ  deviate from the specification  even though the deviations may not be very material  SI must state  categorically whether or not his offer conforms to requirement specifications and schedule of requirements and  indicate deviations  if any     12 4 1 The PSTCL   s right to vary quantities at the time of award    The PSTCL reserves the right at the time of award of contract to increase or decrease the number of metering  points  associated communication and  or other equipment as specified in the Schedule of Requirements without  any change in unit prices or other terms and conditions     12 4 2 The PSTCL   s Right to accept any bid  reject any or all bids    The PSTCL reserves the right to accept any bid  and to annul the tender process and reject all 
273. y  accepted terms  amp  conditions for further period beyond 7 years as specified    xi   Agree s that Life span of the supplied system is 15 years   xii  Certify that will make available the spares after comprehensive O amp M period on  payment basis to substitute the faulty equipment and  or shall supply the spares  for the system s expansion for life span as specified    xiii  Shall provide continued support  on technical aspects  etc   free of cost for at  least five years even after expiry of Comprehensive O amp M  Service support if  required shall be on payable basis during such period    xiv  Has done the complete initial survey feasibility study in respect of  communication connectivity at all the locations and has proposed the  communication media along with the offered system accordingly    SIGNATURE    NAME    DESIGNATION   DATE  SEAL OF COMPANY    109    Intrastate Boundary Metering cum Transmission Level Energy Audit Scheme using ABT  amp  Conventional    Energy Meters    Performa IV  TECHNICAL EXPERIENCE  amp  GENERAL CAPABILITY       Name of the SI  Address  i  The SI  any member of the consortium  must have prior experience or presently engaged  in establishing Automatic Remote Meter Reading systems in any power sector utility   Sr    Name of Name of Project  Whether P O  No   amp    Cross  No Power Sector   User  With Commissioned  under   Date Reference     Utility Contact Details  implementation   Section No    Page No    Para No                           
    