1. RETURN ee 3 T aime CAR LE Sensor Female compression nuts Stop ends dependent on AAV connection Fig 5 Panel plan and elevation diagram showing mountings The mounting rails can be adjusted 1f required by loosening the fixings and sliding the clamps to suit the preferred pitch Ensure that the clamps are tightened well once moved The mounting rails are provided with several 8mm wide slots to allow for diversity of fixing centers L WE WEE ee er a e i 5 E I cu E JMI STRLUT 2505 09 aT h i L M LIP x T D A D i t Das x SECTION TO HANIF ETE amp D a 1 E LEN ad ep ee NEP TURNER Ee a DE E EE EEN TN x 3 ie Re e_N Gi n pn EENEG a a U M zi Lk E TTI DI aule E E RESTI e WR 1 l zCDTUEE Zeep Bee c D oh HU SS MS M G WEE SS S i dai T rm e di x j INLET gaca DUTLET coem e eI x Li rali alii Em SOLAR PANEL SECDTLBE3 GENERAL ASSERELY F d _APPLICATIOH SO TARE ALT UC D LITE E i EE M03 6410 fa FORDER The third step is to fix the mountings for the panel 3a On a Sloping Roof If the roof 1s sloping 1 Access the roof to locate rafters for fixings Remove roof tiles where fixings are to go 2 If possible use the straps provided as they offer more flexibility only use the speci
2. otube DF 120 6 SOLAR THERMAL COLLECTOR Installation Guide ecotube Issue date 05 05 10 Issue version 0 3 Web www stokvisboilers com Email info stokvisboilers com Installation Support Helpline 020 878 33050 Using this Installation Guide Safety reminders and symbols Transportation and handling Installation Preparation Solar system overview Before starting the installation Panel location s panel size and roof space required Practical considerations Sizing replacing or converting the cylinder Power supply Safety considerations Twelve Step Installation Guide I Check the kit contents 2 Prepare the panel 2a Panel preparation without fin angle adjustment 2b Panel preparation with fin angle adjustment Connection Possibilities 3 Fix the panel mounting 3a Ona sloping roof 3b Ona flat roof 3c Ona wall 4 Mount the Panel 4a Ona sloping roof 4b Ona flat roof 4c Ona wall 5 Run the pipework amp sensor cable 6 Join pipework to Panel 6a Connection through a sloping roof 6b Connection through a wall 7 Install Internal Components 7a Pump station expansion vessel amp display unit 7b Air separator isolation valve AAV drain cock amp sensors 8 Fill flush amp test system 9 Install electrical protection 10 Setthe solar controller 11 Configure for the customer 12 Commission and handover Troubleshooting Installation support Appendix Commissioning checklist amp sign off App
3. Auxiliary if appropriate Yes No N A All joint s checked for leaks 2 AAV Open DI Manual air vents cleared 4 Drain cocks closed and tightened Un Radiators cleared of air ON Header tank ball valve operating N Header tank insulat ion replaced 8 Boiler operation checked 9 Radiators checked 10 Hot water checked Secondary Yes No N A 1 All joint s checked 2 Cold tank filled 3 Cold tank ball valve operating 4 Gate valves open 5 Cold tank lid and insulation replaced 6 Water at all taps 7 3 way diverter valve correct ly fitted if applicable 8 Thermal mixing valve fitted If applicable Commissioning Checklist cont Electrics Yes No N A 1 CH HW controller reset 2 Immersion heater connected and tested 3 13A socket to solar controller test ed for correct polarity 4 Tank and reference sensors tested securely positioned 5 Electric wires clipped and tidy 6 Sensors test ed on controller 7 Controller temperature settings correct 8 Pump setting on AUT Mains Water Supply Yes No N A 1 House stop cock open 2 Primary header tank stop cock open 3 Cold tank stop cock open Insulation Yes No N A 1 All pipe work insulated 2 All insulation securely taped Tidy Up Yes No N A 1 All dust sheet s removed 2 All packaging in vehicle 3 Indoor work areas cleaned 4 Outdoor work areas swept cotube Com
4. Where appropriate use barriers to protect against drop hazard Use personal harnesses and or protective scaffold as appropriate Care should be taken to avoid skin burns from contact with hot manifold piping when installing panels in bright sunlight Never fill the system with water or perform a pressure test on it if there is a risk of frost even with air temperatures of 5 C frost damage could occur gt gm D eco Transportation and handling Please note the following Transport the Ecotube panel horizontally to provide maximum protection of the tubes The panel should be carried by the mounting channels or boxed ends and not subjected to twisting Use a suitable material to cover the panel if installing during sunny weather Panel weight empty is 60 kg When handling the panel suitable protective gloves should be worn to protect against sharp edges Solar System Overview The Ecotube panel is made up of 6 evacuated glass tubes each containing a fin covered with a special coating of Titanium Nitrite Oxide A copper tube filled with system solution passes up the middle of a larger copper tube attached to the middle of each fin see fig 1 Solar ra diation direct and diffused 1s absorbed by the fin coating and converted into heat This heat is carried by the system solution and pumped to the hot water cylinder during operation of the circulation pump The vacuum in the glass tubes eliminates con
5. 3 or 6 bar pressure relief valves flowmeter filling and flushing unit wall mounting kit insulated casing Resol Delta Sol BS plus Controller easy to read multi display screen with backlighting that allows the user to view the operating status of the system cotube Q Paes A3 3 10m Other lengths available DN16 21N2 preinsulated flexible Solar Hose Flexible hose with integral insulation enables protected pipework to be run with minimum joints reducing risk of leaks as well as enhancing finish and improving installation time Technical Data Insulation 150 C resistant closed cell EPDM thickness 14mm thermal conductivity 0 038W mK Sensor Cable 2 core 0 75mm2 silicone rubber 175 C End fitting BSP t hread 3 4 Max working pressure 20 C 16 bar Dimensions W x H 90 x 50 mm Set of 4 Solar Hose fixing brackets set of 8 for East West system pack of fittings for stainless flexihose 2 of for E W system A3 4 Expansion Vessel c w mounting bracket with quick release coupling Protects the system under stagnation conditions Quick release coupling means EV can be serviced without system draindown A3 5 Tyfocor LS System Solution Ready mixed antifreeze affording protection to 28 C with a continuous t emperature ca pacity of 170 C A3 6 Automatic Air Vent DZR Brass casing with stainless steel float Can withstand continuous temperature of 150 deg C Isolation Valve Air Separator A3
6. 7 Smart display SD3 SD3 smart display with 3 7 segment displays for indication of the system temperatures and heat quantity of the solar system A3 8 Panel Mounting Kit Pitched Roof LS2 Solar Roof Flashings set of 2 set of 4 for E W system HT Insulation Roof straps and fixings 2 panel Flat Roof Rubber padstone 1 pc 500mm x 500mm x 30mm thick to be cut into 4 equal squares Wall Mounted Wall hanging brackets and fixings Not supplied A3 9 Documentation Installation Guide Users Manual Important User Notes for fixing by Solar Controller Warranty Registration Card cotube
7. Controller to the SD3 display unit with supplied 10 metre length of 2 core bell wire Connect one end to the V bus output in the solar controller run bell wire to the V Bus connection at the back of the SD3 display Unit 5 amp 1 7 Setting the BS3 Controller Use the backwards and forwards buttons to scroll through the menu Using the forward button go straight to current time setting and set the time by holding down the centre set button until the set sign flashes and then using the forward and backward buttons set the correct time Once correct hold down the set button until the set sign stops flashing in order to save the time selected Next hold down the forward button until AAR 1 shows then follow the Procedure in paragraph 2 Definitions backwards COL collector temp erature TST lower tank temp S3 upper tank temp S4 return temp HP total operating hours of solar pump os set forwards cotube Paragraph 2 Set your controller as below ARRI standard solar system use this setting DTO switch on temp difference set of 6 DTF switch off temp difference set of 3 SMX maximum store temp set to 70 EM panel max t emp shut down set to 140 OCX collector cooling set to off OCN minimum limitation collector set to off OCF antifreeze collector set to off OREC option re cooling set to off OTC option tube collector set to off OHQM heat quan
8. and Automatic Air Vent Installed on return pipework off the solar store Drain cock Solar System Optional Solar display unit SD3 smart display additional sensor The Pump Station includes isolation valves an inline flowsetter up to 13 litres min a check valve a pressure gauge a fill amp flush valve and a 6 bar pressure relief valve Solar flexi is available in lengths of up to 25 metres Size range DN16 3 4 DN20 1 amp DN25 1 Rubber Padstone 500 x 500 x 30 For flat roof panel mounting Cut into 4 sections A Alternative x S Pitched tiled roof Fixing Screws Tyfocor LS System Solution Antifreeze Inhibitors Roof flashings for tiled slated roof If applicable STEP 1 cont Optional Pitched Roof mounting parts Single Panel Additional Installation Items ROOF MOUNTING STRAPS 1 2 Optional Extras Depending on the project you may also have purchased some of the following Blending or TemperingValve sized appropriately for the cylinder a requirement to prevent scalding TIPS If the panels are stored before the start of an installation they must be kept in a dry location out of direct sunlight use the packaging or a tarpaulin amp SAFETY REMINDER Exercise care when lifting heavy objects eo Page 0000 2a Panel preparation without Fin Angle Adjustment 1 Unscrew the 3 self tapping screws
9. in the roof space loft with a suitably extended run of pipe work from the pump station to the expansion vessel The Display Unit should be mounted where it 1s easily visible Consult with the client as to t he exact location It will be connected to the solar controller with the bell wire supplied so con sider where this can be run unobtrusively Fix the Pump Station and precharge the Expansion Vessel 1 Securely fix the pumpstation to the wall 2 Runa pipe from the pressure relief valve to a suitable drain or container the empty Tyfocor container for a small system 3 The pump station will require a 13A socket If not already available this will need to be installed by a suitably qualified engineer 4 Before being secured the expansion vessel precharge pressure must be set 1 barg pressure 1s required at the furthest panel from the riser Precharge pressure needs to be set 0 2 bar lower than the resultant working pressure taking into consideration the geodetic pressure height of the panels in relation to the expansion vessel location cotube Installing Connect the Panel Pump Station amp Cylinder Up to 8 panels basic small system 7 Run the flexible ready insulated stainless steel flow pipes flexi pipe supplied directly from the panel through the roof and down to the solar coil flow connection on the cylin der 6 Join the flexi pipe to copper pipework between the cylinder solar coil lower re
10. pump station Automatic Air Vent Isolation Valve Air Separator Fit sensors 5 The SI sensor should already have been installed inside the manifold box on the flow pipe where the top tube joins the manifold Use a suitable connection block to join the SI sensor lead to the lead in the centre of the twin core solar pipe Install the S2 sensor on the cylinder this 1s normally positioned in the pocket provided on most cylinders located in the middle of the solar coil If a pocket 1s not provided use a knife or chisel and carefully remove a section of the foam insulation insert the sensor against the cylinder ensuring good contact and re cover with the insulation that you re moved 7 Install the S3 sensor on the top of the cylinder If no pocket exists it can be st rapped to the hot draw off pipework as close to the cylinder as possible This sensor 1s normally used to give an indication of the temperature at the top of the cylinder 1e Temperature potentially going to the taps via the blending valve 8 Install sensor for display unit p n FRP6 to return pipe work beneath pump station us ing a cable tie or jubilee clip STEP 7 TIPS If the pressure vessel 1s set up incorrectly the system will over pressurise and vent off Only insulate the connection between the pump station amp the expansion vessel if there 1s a risk of burns to the customer The lower sensor S2 needs to be installed on the cyl
11. a suitable size to prevent overheating of the system during normal usage The cylinder should either be a twin coil cylinder or a single coil cylinder if used as a preheat store As a guide 50 litres of dedicated solar storage is required per metre square of collector area Dedicated storage is nominally 33 of the total store volume this applies for both a twincoil cylinder and a pre heat cylinder ie the solar coil takes up the lower 1 3 of the cylinder The above will depend on DHW consumption and system efficiency when sizing systems and as a general rule a minimum cylinder of 200 litres capacity is required for 1 pc DF 120 panel to prevent system overheat during periods of high solar gain eco Power Supply A suitably rated power supply will be required dependent on the size of the circulation pump If not already available this will need to be installed by a suitably qualified engineer The Resol Pump Station amp Solar Controller requires a 230 V 1ph 50 Hz supply and is suitable for most systems of up to 8 collectors Safety considerations A IMPORTANT DO A FULL HEALTH AND SAFETY ASSESSMENT BEFORE COMMENCING INSTALLATION Each installation is different and the installer is responsible for ensuring that the installation is carried out in a manner fully compliant with all Health and Safety Regulations and best prac tices The points listed below are watchpoints to be taken in to consideration but may not cov
12. alist roof fixing bolts when you cannot move the slates or tiles 3 Fix the straps to the rafters with an assistant in the loft using suitable wood screws Ensure the fixing centres are the same distance apart as the fixing centres of the panel mounting channels Choose suitable fixing slots according to site conditions An 86 cm length can be used acroos the panel mounting channels if the panel is to be installed vertically TIPS Although it 1s sometimes impossible to avoid standing on tiles slates keep this to a minimum and try not to put on your full body weight Apart from the danger of slip ping a cracked tile or slate means unnecessary repair work At least four tiles should be left clear from top connection to ridge for ease of work ing on pipe connections inside the roof space 3b On a Flat Roof If you are putting the panel on a flat roof 1 Saw the rubber padstone supplied into 4 2 Place the 4 resultant smaller padstones on the roof spaced so that the mounting channels see Fig 5 will rest centrally on them 3 There 1s no need to secure the panel to the roof 3c On a Wall If the panels are to be wall mounted 1 Measure the centres of the panel mounting channel slots see Fig 5 2 Drill two holes into the wall at this distance apart 3 Install suitable shield anchors STEP 3C TIPS If the wall substrate needs reinforcement we suggest the use of 41mm x 21mm unistrut not supplied fixed to the wall
13. c Roof Flashing Plates with Silicone Gaiters Top of roof Flow pipework and sensor cable NOTE Tiles removed to show detail Return pipework STEP 6b Connection through a wall 1 Fora flat roof installation 1f possible run the pipework over the edge of the roof and penetrate the wall as for a wall installation 2 If the pipework must penetrate a flat roof consult a roofing contractor to ensure a waterproof finish 3 To penetrate an exterior wall drill suitable size holes for sleeves to accept the flow and return pipework and another smaller hole and sleeve for the sensor cable 4 All pipes should be sleeved through the full thickness of the wall 5 Waterproof the installation using a suitable silicone sealant WARNING Do not penetrate a flat roof If it 1s not possible to run the pipework over the edge and through a wall consult with a roofing contractor t o ensure a water tight finish 7a Pump Station Expansion Vessel and Display Unit The pump station should ideally be installed adjacent to the hot water cylinder so informa tion on syst em status can be observed in relation to system pressure system temperature and system flow The pump station should be located where he customer can clearly see and access both the solar controller and the system pressure gauge The expansion vessel is normally installed directly off the pump station If necessary the ex pansion vessel can be mounted
14. ed out before the panel 1s fixed on the roof or wall Situations where the fin angle will need adjustment are as follows A Vertically mounted panel on a 40 pitch sloping roof that does not face exactly due south rotate fins to face due south B Horizontally mount ed panel on a very steep sloping roof alter fin angle to face 40 off the horizontal allow for the pitch of the roof C Horizontally mounted panel on a vertical wall alter fin angle to face 40 off the Horizontal If you have a query about whether or not the fin angle needs adjustment please phone our helpline on 020 87833050 eco ruba Fig 2 Connection Possibilities The panels can either be installed vertically or horizontally in both cases the connection can be one sided or can alternate see figs 1 amp 2 Fig 2a Vertical Installation SENSOR SENSOR RETURN TO PANEL FLOW FROM PANEL RETURN TO FLOW FROM PANEL PANEL ALTERNATING CONNECTION ONE SIDED CONNECTION Fig 2b Horizontal Installation SENSOR RETURN TO TT PANEL ONE SIDED CONNECTION RE TURIN TO PANEL ALTERNATING CONNECTION Important When carrying out horizontal installation with alternating connection it must always be ensured that the direction of flow is from the bottom of the panel to the top to ensure venting Important When carrying out one sided horizontal installation the connecting pipes E must be installed from above to g
15. endix 2 Installers Notes Appendix 3 Kit contents specification cotube A NN Ch Ch Oh Q0 tA 10 10 10 11 14 14 14 14 16 16 16 16 16 17 18 19 19 20 21 22 23 23 25 25 26 26 27 3l 32 sing this Installation Guide This guide describes the Ecotube system and recommended methods for its installation and maintenance It should be read and used in conjunction with the manuals supplied with and relevant to the individual components Stokvis suppliers of the Ecotube recommends that all their products are installed by properly trained and qualified personnel These assembly instructions are written for special ists who are authorized to carry out solar thermal installations The installer should have the necessary basic skills and have the relevant accident prevention measures in place Installations have to be adapted to particular sites and responsibilit y for ensuring that the installation 1s safe and fit for purpose rests with the installer Safety reminders amp symbols Key to Safety symbols used in this manual DANGER Immediate danger to life amp limb DANGER Electrical Hazard DANGER Risk of burns or scalding DANGER Potentially dangerous situation for the product and environment gt gt I The installer must follow their own Health amp Safety procedures in particular The accident prevention regulations for work on roofs should be observed at all times
16. ensor wires for connection 3 Check the line 1 Check wiring at mains pump 2 See pump manufacturers instructions 3 Cover solar panels and allow to cool 4 No action required 1 Open valves 2 Twist cap at pressure relief valve and vent air if accessible 3 Check all pipe work rises on return side and falls on flow side Clear manual air vents 4 See above 1 Check all joints 2 Close fully 3 Clean and replace if necessary eco Commissioning Checklist amp Sign Off Client Name amp Address Site Address if different Commissioning Checklist cont Panel and Roof Yes No N A 1 Panels secured 2 Roof tiles replaced and secure 3 Sensor securely fixed 4 Water proofing checked 5 Insulation OK Solar Yes No N A 1 All joint s checked for leaks 2 Anti freeze added frost protection on controller switched to off 3 All pipe work securely supported 4 AAV valve closed 5 Manual air vents cleared and closed 6 Drain cocks closed and tightened 7 Check valve bleed screw closed 8 Pump correctly fitted 9 Pump isolating valves fully open 10 Pump setting correct flow meter set 1 5 litres min per panel 11 System pressurised to design pressure 12 Filling loop closed 13 Filling loop disconnected 14 Pressure relief valve cleared 15 No isolating valve between panels and safety valve cotube Commissioning Checklist cont Primary
17. er all eventualities Wear appropriate safety gear high visibility jackets hard hats safety boots and gloves for handling the panel and for use when cutting the flexible pipe Safe working practices must be adopted when on roofs following all guidelines set out by the Health and Safety Executive Care must be taken when erecting ladders on PVC guttering to avoid damage Scaffolding or tower scaffold should always be used when called for by exist ing Regulations Arrange for the scaffolding to be erected only erect scaffolding yourself if you are qualified to do so Do not install on the roof during adverse weather conditions when the roof is wet or icy and slippery or when it is excessively windy Assess if there may be any danger to passers by use cones and or warning notices as neces sary If the install impinges on public areas e g pavements notify the appropriate authority and arrange for the area to be cordoned off Consider how the panels can be hoisted safely Make sure you have the correct equipment and enough assistance Flowcon Pump station c w BS 3 Solar controller If applicable for up to 8 panels If applicable Solar flexi hose 2 in 2 Insulated flow amp return stainless steel corrugated flexible pipes c w integral silicone two core sensor cable Fixing clips for 2 in 2 Connections St Steel flexi to copper Expansion Vessel Expansion vessel mounting kit If applicable Air Separator
18. inder at the mid point of the Solar coil Depending on the type of cylinder or heat exchanger it is critical to place this sensor in the correct position to ensure efficient operation of the system WARNING A Once cut the flexi pipe is razor sharp Wear gloves when handling cotube Use a fill and flush pump to fill the system with water via the fill flush points on the pump station Pressurise the system to minimum 3 bar for 20 minutes to test for leaks Large systems on tall buildings will require tested to suit design pressure 3 Check all joints for leaks drain and repair if necessary and retest 4 When draining disconnect the electrical supply to the pump station to isolate it Use the drain points on the pump station or the drain cock on the return pipework adja cent to the cylinder to drain the system 3 Drain the system and flush through with mains water to remove any loose scale or con taminants 6 Refill the system with the Tyfocor provided Open the Automatic Air Vent AAV Recon nect electrical supply T Pressurise the system to the operational design pressure 8 Run the pump on manual operation Check all the joints again 9 Top up as necessary to maintain design pressure as air is expelled through the AAV 10 Setthe flowrate at 1 5 litre minute per panel using the manual flowsetter on the pump station or panel banks if installed on large systems ll When satisfied that all air ha
19. ipework and sensor cable 4 Make sure the pipework 1s neatly fixed to the property where necessary 5 When considering connection possibilities for a panel on a sloping roof consult Fig 2 Table A No of collectors Max flow rate Req d pipe Size 1 10 11 17 18 27 28 40 41 70 71 110 TYPICAL PIPE SIZES FOR VARIOUS FLOWRATES 111 160 320 l min 161 280 560 l min 0108 The pipework now needs to be connected to the panel through the roof or wall depending on the location of the panel STEP 6a Connection Through a Sloping Roof 1 The penetration through a sloping tiled roof should be made using the lead flashing plates Note the flashings will accept 22mm to 54mm pipework by cutting the silicone nipple accordingly 2 Locate where to drill your holes from inside the roof so as to miss the roof joists 3 Drill the holes through the tiles we advise drilling pilot holes first to minimise the chances of breaking tiles 4 Lay the lead flashing over the tile with the hole 5 Cut a suitable hole smaller than the pipework in the top of the red part of the flashing plate 6 Push the pipe through into the loft 7 Ensure the roof is water proof and the flashing is flush around the edges of the tile 8 Repeat this process for the other pipe 9 Don t forget the small hole for t he sensor cable Fig 9 Sloping roof solar panel mounting schematic with pipe work penetration de tail Plan View 2p
20. lla risk I Complete and sign the commissioning checklist 2 Make sure the customer understands the system 2 Explain the readings on the display or solar controller if no display is inst alled with particular emphasis on S3 the cylinder temperature 3 Make sure the warranty registration card 1s filled in and the customer has the user manual Problem Cause Action No power to the controller Sensor fault indicated by 1 bol 2 888 8 disp layed for sensor 3 88 8 Pump will not run No circulation in system Pressure drops in system 1 Faulty blown fuse in mains supply 2 Faulty blown fuse in control unit 3 Circuit breakers fuses tripped in house 4 Power cut 1 Faulty sensor 2 Loose connection on sensor lead s 3 Short circuit 1 Mains pump wiring faulty 2 Pump rotor jammed 3 System parameters EM exceeded 4 CMN and DTO not satisfied 1 Pump isolating valves closed 2 Air lock at pressure relief valve 3 Air lock in the system 4 Pump is not running 1 Leak in system 2 Drain down valve not closed 3 Pressure relief valve not fully closed Call the Installation helpline 020 87833050 1 Check wiring and replace fuse if required with 3amp in p lug 2 Check and replace fuse if required with 4amp circular fuse in controller fixings kit 3 Check wiring and reset 4 Wait until power is restored 1 Check Change sensor 2 Check s
21. ments Installing Engineer Site Specific Additional Details Electrical Supply Isolation Specialist Information Collector Manufacturer amp Model Controller Manufacturer amp Model Cylinder Manufacturer amp Model Wcotube Resol A3 1 Ecotube M Panel s DF 120 Dimensions 2923 x 842 x 155 Weight Empty 60kg Full 62kg Net aperture area 1 799m Net absorber area 1 715m Performance Swiss testing station 1597 kWh panel year 888 kWh m year Performance UK 1365 kWh panel year 767 kWh m year Gas displacement CO2 year 264 8kg Electricity displacement CO2 year 576 kg Number of tubes 6 Diameter of tube 120mm Solar Keymark registration no 011 7S684 R Conformance DIN EN12975 Microgeneration Certification Scheme MCS1255 A3 2 Pump station amp Solar controller Suitable for up to 6 panels Single amp Double panel systems Flowcon A Pumpstation c w BS 3 Solar controller single line pump station dial pressure gauge 6 bar pressure relief valve flowmeter fitted with manual air vent filling and flushing unit wall mounting kit insulated casing Resol Delta Sol BS 3 Controller easy to read multi display screen with backlighting that allows the user to view the operating status of the system East West System Flowcon D2F Pumpstation BS plus Solar Controller Three line pump station flow and return thermometers dial pressure gauge
22. nd fixing or chimney stack This allows fine adjustment and marking of fixing point s with no danger of the panel slipping The Ecotube panels can be hoisted by the manifold end using suitable slings rope with care NOTE Do not allow panel to twist during hoisting as this can damage the connections within the manifold Avoid exposing the vacuum tubes of the panel to strong sunlight during installation keep covered with a suitable cover until the system is filled with water Prolonged ex posure without water may damage the panel SAFETY WARNING A Mounting the panel on the panel mountings is a job requiring at least two able persons Carry out a risk assessment prior to hoisting up the panel cotube The fifth step 1s torun the pipework amp cable through the property 1 The tubing of the flow and return lines must be carried out using copper tubes as per DIN 1786 or approved systems 2 Stainless Steel DN16 2 in 2 can be installed directly to the panel with the appropriate fittings for up to a 6 panel installation The heat insulation materials must be able to withstand temperatures of up to 160 C The use of this hose is recommended in order to reduce the number of joints and therefore the risk of leaks and also to enhance the fin ished appearance of the installation 3 You will already have decided on the shortest and least disruptive route from the panel to the cylinder through the property for the p
23. on the panel header box 2 Open the header box and carefully remove the top layer of heat insulation to reveal the header pipe work and tube connections 3 Using a drill or knife make a hole in t he rubber around or between the pipes and push the sensor inside the manifold 4 Locate the panel sensor S1 on the flow pipe pipe closest t o the glass tubes inside the manifold just before the exterior flow pipe connection It should be secured in direct contact with the copper pipe using a jubilee clip See Fig 4 5 Replace the heat insulation and header box lid and secure using the 3 self tapping screws 6 Note the unique panel number and write it down on the warranty registration card 7 Decide which of the four pipes exiting from the manifold will be used for flow and return and fix 22 mm compression joints to these blank off the other 2 pipes with 22mm stop end compressions Please note the flow pipe is the copper pipe closest to the glass tubes the return pipe is the one furthest away from the tubes To understand the connection options please consult Fig 2 2b Panel Preparation with Fin Angle Adjustment NOTE The fin angle may only be set when the system is un pressurized As far as 1s possible panels should be positioned to face South The fin angle of the vacuum tubes is pre set to 30 which should be suitable for most installations They can be rotated to the required angle It 1s recommended that this procedure be carri
24. ow pipe pipe closest to the glass tubes inside the manifold just before the exterior flow pipe connection It should be secured in direct contact with the copper pipe using a jubilee clip See Fig 4 9 Replace the heat insulation int o the header box and replace the header box lid 10 Screw the 3 self tapping screws back into the panel header box 11 Air pressure test the panel to 1 bar to check for leaks An adapted garden pressure sprayer or small compressor can be used 12 Decide which of the four pipes exiting from the manifold will be used for flow and return and fix 22 mm compression joints to these blank off the other 2 pipes with 22mm stop end compressions Please note the flow pipe from the panel is the copper pipe closest to the glass tubes 13 Note the unique panel number and write it down on the warranty registration card TIPS REMEMBER The panel flow connection 1s the copper pipe closest to the glass tubes the return pipe is the one furthest away Ei WARNING Only change the fin angle if it is really necessary to do so If you do be extremely careful not to crack the compression nuts when loosening and tightening them cotube o Solar Installation Kit TYPICAL 12 pc DF120 6 SOLAR THERMAL COLLECTOR LAYOUT Note 2 panels removed to show typical padstone layout PANELS JOINED USING 22mm to 22mm compression unions with BRASS olives Fig 4 Panel manifold end to show sensor position
25. s been expelled close the AAV 12 Setthe controller to AUTO operation The System should now be operational the green light should be ON STEP 8 TIPS Use the drain points on the pump station or the drain cock on the return pipework adjacent to the cylinder to drain the system WARNING yx When draining disconnect the electrical supply to the pump station to isolate it cotube For general electric shock protection 1 Link the panels together so that they are electrically equal 2 Connect the solar tubing flow and return within the buildings earthed equipotential bonding zone using a short line this would normally be done via the equipotential bonding in customers cylinder cupboard 3 If there is lightning protection in place in the building large metal parts e g the collec tor housing must be connected to it 4 Please also observe the assembly instructions issued by the control system manufac turer 5 Work must always be carried out by an authorised specialist Step 10 Connect and Set Solar Controller 1 Connect the Solar Controller to the various sensors by fi faeces I plugging in wires from the sensors to the correspondingly n d se C numbered points on the controller di e E ff 51152 53 3 i D ki i e SI from the panel sensor of VBus si F i n S2 lower cylinder sensor S3 top of cylinder sensor S4 return flow sensor before pump station 2 Connect the Solar
26. tity measurement this is used for the remote display set to on If not using the display switch to off FMAX flow rate set tol 5 Itr min MEDT heat medium set to 3 Tyfocor LS HND1 manual operation set to auto HND2 set to Auto LANG language EN English BS3 version number The SD3 display will now show panel temperature bottom store temperature and total kW hr output for the solar thermal system ontigure the system to meet the Customer s needs 1 To customize the system for the client you need to understand when the customer normally uses hot water and how much is typically used Consider baths showers washing up washing machine if hot fill etc 2 Suggest a time programme for the boiler that meet s the hot water needs of the customer This will typically involve the solar gain through the day topped up by the boiler to ensure evening and morning hot water needs are fulfilled e g depending on the time of year set the timer to run the boiler until the cylinder is at the required temperature during the night to top up the solar gain in advance of showers the following morning 3 Set the thermostat on the cylinder to 65 C 4 To be sure the system 1s fully operational go through and fill in the commissioning checklist in Appendix 1 WARNING A risk assessment should be carried out to ensure that the cylinder temperature 1s taken above 60 C at regular intervals to guard against Legione
27. turn connection and the pump station with the connectors supplied as follows A Wearing a pair of safety gloves cut the flexi to the required length B Slide on the nut and fix the circlip round the last groove on the pipe C Tighten the flexi copper flat edge up to the nut D Release the nut to reveal the flanged end on the flexi pipe E Insert the washer and tighten back up WARNING once cut the pipe is razor sharp Install the OPTIONAL SD3 Display Unit 7 Mount the SD3 display unit following the mounting instructions in the SD3 box 8 Take the supplied 10 metre length of 2 core bell wire and connect one end to the V bus output in the solar controller g Run the bell wire to the SD3 display 10 Connect the remaining end of the bell wire to the V Bus connection in the back of the SD3 display unit 7b Install Air Separator Isolation Valve Automatic Air Vent Drain Cock and Sensors 1 Attach the return solar connection on the cylinder with 22mm compression connections to the air separator this should be fitted in a horizontal position fitted with the Isolation valve and Automatic Air Vent See 6 Above 2 The drain off cock should also be located on t his return pipe at the lowest point of the system usually next to the return solar cylinder connection 3 This return connection from the cylinder is connected to the bottom of the pump station 4 The return pipe to the panel should run from the top of the
28. uarantee venting cotube oe To alter the absorber fin angle please see following procedure amp fig 2 1 Unscrew the 3 self tapping screws on the panel header box 2 Open the header box and carefully remove the top layer of heat insulation to reveal the header pipe work and tube connections 3 Carefully loosen the lower tube Fig 3 Evacuated Tube Connections compression nut female nut A fig 3 from the upper manifold connection male connection B fig 3 until the tube rotates Ki ee ME Ze ECH s Eech E WE er e a m i NU ys KW Z K TS he Li 3 ri FML San e P depre Pm auem di EY T 7 ru rms EI Ba mi dela A A i D a 5 er A wx r 7 tig aa p pe y JT im rh dE s er D adi AT d oye Ae tros A EMO PR der LIE RT ER ad ii KkA 3 d i Ei mw rz uds Pw 2 RAT e OnT hA Thai a s Liu wo 8 AL rond psa gr Tit fun e CR sa O sx E DR a cr vi AC 8 ry AA ETA le gare ia E oe d NV oW i i i 3 VR Tas f hi d NAc la eni Ars d wA utm v a e Ar e d Sr d L 4 Rotate the tube until required fin angle is reached 5 Carefully tighten the lower tube compression nut to the upper manifold connection until tube 1s unable to rotate DO NOT over tighten 6 Repeat steps 3 to 7 for each tube 7 Using a drill or knife make a hole in the rubber around or between the pipes and push the sensor inside the manifold 8 The panel sensor should be located on the fl
29. vection and conduction heat losses as well as protecting the collector from adverse weathering influences The water in the hot water cylinder is then heated by the system solution circulating from the solar system and through a heat exchange coil near the bottom of the hot water cylinder Having dissipated its energy the heat transfer liquid 1s pumped back to the solar panel for reheating This process continues provided there is a temperature difference higher or equal to the pre set value usually 6 C and the minimum panel temperature is reached usually set at 20 C NOTE If these conditions are not maintained the pump will switch off and the con trol unit will wait for the temperature of the panel to increase before restarting the heat transfer process eco Solar System Overview Fig1 System schematic Auto H r Werit OPTIONAL Hot water tank Heat exchanger PAIN COCK We AIR SEPARATOR C W AIR VENT Sensor A From mains supply Existing boiler Before Starting the Installation Before starting an installation there 1s Important preparation to do Check the site and decide on the number of panels required This will depend on the size of the hot water cylinder and the orientation of the roof and type of building Panel Location s Panel Size amp Roof Space required A key advantage of the Ecotube solar panel is that it can be installed at an angle on a pitched roof hori
30. with appropriate fixings and then the panel can be fixed to the unistrut A slight rise should be allowed for at the manifold end to assist in venting cotube Fig 6 Pitched Roof solar panel mounting schematic Side View 2 pc Straps TWISTED END SECURED TO RAFTER Fig 7 Pitched Roof solar panel mounting atic Plan view Top of roof Builders Panel Mounting Channels NOTE Tiles removed to Rafters to suit solar panel show detail fixing centres 2100 mm eo The fourth step 1s to attach the panel to the mountings Step 4a On a Sloping Roof If the roof is sloping 1 Hoist panel to roof level and slide the panel up the roof to the fixings 2 Ensure the fins are facing the correct way 3 Lift the panel into position on the mounting straps bolts 4 Fix the panel in position Step 4b Ona Flat Roof If you are putting the panel on a flat roof 1 Hoist the panel up to the roof and place on the rubber padstones 2 Ensure the fins are facing the correct way 3 No securing to the padstones 1s necessary Step 4c Wall Mounted If the panel is to be wall mounted 1 Hoist the panel up and position on the wall mountings or shield anchors 2 Ensure the fins are facing the correct way 3 Secure the panel in place by fixing to the shield anchors TIPS W hen hoisting the panel it 1s quite useful to take the weight by a rope slung over the ridge tiles and finally tied to a grou
31. zontally on a flat roof or vertically on a wall to gain maximum exposure to the sun s rays They can also be placed flat on a specially constructed pergola in the garden Ideally it should be as close to south facing as possible but if that 1s not possible a two panel Fast West system 1s also effective Shading from buildings or trees should be avoided Take into consideration roof orientation dormer positions if any and internal and external pipe runs Consult with the client as appropriate The dimensions of the Ecotube panel DF120 is 2905 x 860 x 150mm Practical considerations Decide on how the roof can be safely accessed and the height of scaffold required The installa tion can be carried out using scaffolding to roof height and roof ladders or by working from an extended scaffolding platform Examine ground conditions amp hazards 1 e ponds brick walls slopes in the area the scaffold is to be erected in Arrange for the scaffolding to be erected The roof should be checked before installation to ensure that it is in a sound condition and is capable of taking the weight of the panel s Check as applicable for loose tiles or slates and soundness of roof supports Plan the optimum route of the pipe runs If the panel is to be wall mounted decide if it can be fixed directly to the wall or if it 1s neces sary to use additional battens Sizing Replacing the Cylinder The Ecotube system requires a hot water cylinder of

Download Pdf Manuals

image

Related Search

Related Contents

DS 9DVF3 • DS 12DVF3 DS 14DVF3 • DS 18DVF3  NEC MultiSync LCD225WXM - Flat panel display - TFT - 22" - widescreen - 1680 x 1050 / 60 Hz  Here  0120 343 550 www.componentsource.co.jp  Mode d`emploi  Hama Traveller 146 Premium Duo  pri bipap avaps  Sahira color.book    PDF版 239KB  

Copyright © All rights reserved.
Failed to retrieve file