1. Nm Thread Tightening torque Nm M4 1 1 M 14 49 M5 2 1 M 16 75 M6 3 7 M20 150 M8 8 9 M 24 260 M10 18 M 30 520 M 12 30 M 36 920 H R 259 en 12 04 Maintenance 5 Maintenance 5 1 H R 259 en 12 04 The person responsible for the facility must ensure that the specified maintenance work is carried out properly Bearings and greasing The bearings of the motors are equipped with regreasing devices and automatic grease quan tity control The regreasing of the bearings is done by means of a grease gun through the nipples provided on the end shields Overfilling of the bearing chambers is not possible since in case of an extended regreasing the used grease will be thrown off by a rotating disk in the outer grease chamber through an aper ture in the bearing cap or into a grease collecting chamber Regreasing during operation only Danger of accident Pay attention to rotating parts Regreasing intervals grease quantity and grease quality are indicated on the instruction plates on the motor Regreasing however is to be one at least once a year Clean the lubricating nipples If the motor is equipped with grease removal rams the used grease must be removed after re greasing by pulling the ram at the bearing several times up to the limit stop while the motor is in operation If the motor is equipped with grease collecting chambers these chambers are to be dismounted at motor standstill acc to the intervals on the instru
2. Type AHWA 355 to AHWA 560 Stator frame and end shields are made of grey cast iron or steel The stator jacket is designed as double casing through which the cooling water is led The housing is provided with inlet and outlet for the cooling water Stator winding The stator winding is made in an insulation class see rating plate acc to EN 60034 1 High quality enamelled wires suitable surface insulating materials and the type of insulation provide a high level of mechanical and electrical stability with a high utilization factor and a long service life Rotor The rotor has a hard soldered cage The rotor is dynamically balanced The balance is indicated on the shaft end or the rating plate see Paragraph 4 1 Installation The motors in standard design meet the requirements of vibration level N acc to DIN EN 60034 14 IEC 60034 14 in special cases level R reduced or S special Terminal boxes Additional connector boxes for monitoring equipment are available in addition to the motor connection boxes A neutral point box is only attached if ordered extra see dimensional drawing The number of available terminals can be seen in the wiring diagrams Monitoring devices Monitoring devices are only available on special request See wiring diagram H R 259 en 12 04 Transport 3 Transport For handling during transport the stator construction of the motor is equipped with lifting eyebolts DM where the lift
3. and outlet openings must be protected from obstructions and coarse dust Motors with water jacket cooling Type AHWA 355 to AHWA 560 Before commissioning water cooled motors the troublefree working of the cooling water circuit must be guaranteed It must be ensured that the motor is only switched on when the cooling water circuit is in operation It must be kept functioning until the motor comes to standstill after switching off Inlet and outlet openings are located on the motor housing The cooling water circuit is to be monitored Normally the motor is equipped with PTC thermistor sensors which switch off the motor if the cooling water circuit fails If the housing is provided with vent plugs for the water chamber venting should be done for the first filling and thereafter at regular intervals Only clean non aggressive cooling water is to be used Permissible content of suspended solids is max 10mg l The inlet temperature of the cooling water should be at least 20 C 68 F Temperatures below 20 C 68 F result in higher formation of condensation water Permissible inlet and outlet temperature maximum pressure and the required amount of cooling water are indicated on the motor plates If the motors are run at a coolant temperature below 0 C 32 F then because of the reduced cooling action owing to the addition of antifreeze consultation with the motor manufacturer is necessary H R 259 en 12 0
4. if any Regrease antifriction bearing with relubricating device while high voltage machine is running Follow instructions on lubricating plate Refer to manufacturer s documentation for sound power level and information about the use of ap propriate sound reducing measures Maintenance and servicing Follow manufacturer s operating instructions H R 259 en 12 04 Description 2 Description 2 1 Overall construction and design Mounting arrangement acc to EN 60034 7 see dimension drawing or rating plate Horizontal arrangement IM B3 Vertical arrangement IM V1 or IM V10 Connection designations acc to DIN VDE 530 part 8 IEC 60034 8 see wiring diagram Degree of protection acc to EN 60034 5 see rating plate Cooling acc to EN 60034 6 IC 411 surface cooling or hollow fin cooling IC 511 tube cooling IC 01 internal cooling IC 611 internal cooling with mounted on air to air heat exchanger IC 81 W internal cooling with air water heat exchanger IC 71 W water jacket cooling Details of the motor design are indicated in the relevant technical catalogues 2 2 Bearings The motors are equipped with grease lubricated antifriction bearings The bearings are equipped with regreasing devices and automatic grease quantity control 2 3 Cooling 2 3 1 Surface cooling TEFC for the Type A SA AHRA Design for fin hollow fin or tube cooling where an external fan takes in the cooling air throug
5. special lubricating grease used is indicated on an instruction plate attached to the motor For motors with a regreasing device it is advisable to regrease both bearings shortly after commis sioning with the motor running The grease type grease quantity and regreasing intervals are marked on an additional plate fixed on the motor The values for grease service life with regreasing intervals can surely be expected for motors with degree of protection IP 55 The bearing is protected against the ingress of fine dust and of water in all directions e g for outdoor installation without additional protection For motors with degree of protection IP 44 and IP 54 these data apply with the restriction that the environmental load by dust and water is not exceeding the limits of DIN EN 60034 5 with tests according to DIN EN 60034 5 For motors which are transported and stored in assembled condition with the machine to be driven the following must be observed Storage a The free shaft ends must be greased before installation of the motors also all of the other exposed metal parts e g foot and flange surfaces or supporting faces of terminal boxes and covers As protection against dust and humidity grease seals with antifriction bearing grease are to be in stalled at the shaft opening b A hygroscopic substance e g Branogel is to be filled into the terminal boxes of the motors c The machines are to be stored dry dustfree and in a temperatur
6. special order only Page 16 of 23 H R 259 en 12 04 Spare parts 7 Spare parts and components When ordering spare parts please state Spare part designation Motor type Serial number Example End shield DE AHSA 400LM 04A 5 036 228 Type and serial number of the motor can be taken from the rating plate H R 259 en 12 04 Page 17 of 23 Storage instructions 8 Storage specifications 8 1 For motors which have to be stored for a period of up to 2 years the fol lowing is to be observed 8 1 1 Storage 8 1 1 1 The motors must be stored dry dustfree and at room temperature In this case no special packing is required Otherwise the motors must be packed in plastic foil with hygroscopic substances e g Branogel or in an air sealed foil Protective cover must be provided against sun and rain 8 1 1 2 In order to avoid secondary failures at the bearings caused by vibrations at standstill for example N by adjacent running machines the motors are only allowed to be stored in vibrationless rooms 8 1 1 3 Motors with roller bearings are equipped with a bearing lock at the driving end It is to remain locked until commissioning or to be reinstalled after an inspection or a trial operation A locking device is N not necessary and not present ifthe bearing is axially preloaded 8 1 1 4 On motors with sealed condensation water drain holes it might be necessary to have the condensa N tion water flow out Afterwards the borehole
7. the bearings In case of 2 and 4 pole motors it might happen that by the use of unsuitable grease the grease quantity regulation fails and when pressing new grease into the bearings they get abnormally hot due to overfilling In such cases the bearings have to be cleaned thoroughly by using cold degreasing agent and refilled with suitable grease Avoiding of mechanical damage bearing damage All machines have to be checked at regular intervals for mechanical damages Special attention must be paid to ensure that the intervals for bearing replacement and regreasing intervals or grease change intervals as well as oil change intervals to be specified by the user are observed When the rated service life is reached the bearings should either be replaced or it must be proven in an inspection that there is no mechanical damage For bearings which are not regreasable it is ensured that the rated service life will only be reached clearly after the grease service life of the bearings is reached The calculated rated service life of the bearings can be seen in the data sheet of the ma chine ifit was specified particularly or for structural reasons specified for an individual case For machines which are exposed to forces applied externally e g belt force or axial load from the driven machine the bearing service life is a minimum of 20 000 hours for the full load indicated in the technical list All of the other machi
8. 4 Installation and commissioning A 4 1 H R 259 en 12 04 The motors with mounted on air water heat exchanger for the Type JHWA Before commissioning of the motors the troublefree functioning of the cooling water circuit must be guaranteed It must be ensured that the motor will only be switched on when the cooling water circuit is in operation It must continue to work until the motor comes to standstill after switching off Permissible inlet and outlet temperature maximum pressure and the required amount of cooling water are indicated on the motor plates Mounting Fitting of pulleys or couplings First the shaft end should be cleaned not with emery cloth and then greased The pulley or coupling should be lifted only with the aid of a lifting device The threaded centering hole in the shaft end can be used for this purpose Insert a threaded bolt into the threaded hole Then place the steel washer the diameter of which is large enough to cover the hub borehole of the pulley or coupling The pulley and coupling is to be fitted onto the shaft end by means of a nut or coupling or a suitable hydraulic device The fitting of the drive elements by means of hammer blows is not permitted because of the risk of damage to the bearings When replacing the bearings the bearings must only be removed and reinstalled by means of suitable devices using the shaft centering Only original spare parts must be used The rotor of the motor is
9. MS Operating Instructions H R 259 en 12 04 Three phase motors with squirrel cage for high voltage with antifriction bearings AJSA 315 AHSA 355 to 560 AHRA 630 to 800 AHWA 355 to 560 JHSA 315 to 800 JHRA 500 to 800 JHWA 353 to 800 LOHER GmbH P O Box 1164 e 94095 RUHSTORF Hans Loher Str 32 e 94099 RUHSTORF GERMANY Phone 49 8531 39 0 e Fax 49 8531 32895 E Mail info loher de http www loher de ee LOHER Table of contents Page 1 Safety and commissioning instructions sasaaa eee 2 2 DESC I a hrs ed eed ER 5 3 UMANS DOE 4c et Ae Ge Se oe Oe a a Oe aa a e et te ee e a 7 4 Installation and commissioning 000 eee eee eee eee 8 5 Maintenance ss E A ee eS 13 6 Additional COUIDMECIN 43 A AS Ae ee Reed 16 T Spare Paris nt a da a A A an esa 17 8 Storage INSIFUCHONS aaa 22 2 18 9 Faults and remedies 222 cta Load Laa Ll ll a e 22 Appendix 1 Alignment check circa a 23 Subject to modifications Loher GmbH 2004 All rights reserved H R 259 en 12 04 Page 1 of 23 Safety and commissioning instructions A 1 Safety symbols in these instructions 1 1 Safety symbols in these instructions The symbols are used in this user manual in order to draw attention to special dangers DM This symbol indicates a dangerous situation Fatal or serious injuries or larger material damage can result Danger This symbo
10. ablish and maintain safe equipotential bonding The clearances between uninsulated live parts and between such parts and earth must not be below the following values 36 mm at Un lt 3 3 kV 60 mm at Un lt 6 6 kV 100 mm at Un lt 11 kV No presence of foreign bodies dirt or moisture is allowed in the terminal box Close unused cable entrance holes and the box itself in a dust and watertight manner For trial run without output elements lock fitting key For high voltage machines with accessories check satisfactory functioning of these before put ting into service he proper installation e g segregation of signal and power lines screened cables etc lies within the installer s responsibility If no further information is given the torque for the contact screws and nuts should be used accord ing to section 4 6 2 Page 3 of 23 Safety and commissioning instructions A 1 7 A Danger 1 8 Page 4 of 23 Operation Vibration severities in the satisfactory range Vrms lt 4 5 mm s according to ISO 3945 are accept able in coupled mode operation In case of deviations from normal operation e g elevated temperature noises vibrations disconnect machine if in doubt Establish cause consult manufacturer if necessary Do not defeat protective devices not even in trial run In case of heavy dirt deposits clean cooling system at regular intervals From time to time open closed condensate drain holes
11. ction plate and the used bearing grease is to be removed If this is not done the grease piles up and the bearings get overheated Extending the regreasing intervals endangers the bearing and might risk a deterioration of the sealing provided by the grease and thus the ingress of dust into the bearing If the motors have not been operated for a prolonged period we recommend even for new motors regreasing the bearings before putting into operation especially if due to congealing of grease in the bearing there are noises which are caused by vibrations of the bearing cage During the running in increased bearing noises might occur for a short period The bearing noise is not critical as long as the operating temperature of the bearing is not yet reached and if the noise is caused by the viscosity and the dynamic viscosity of the bearing grease The temperature of the bearings is continuously to be checked Up to an ambient temperature of 40 C 104 F a heating up of 80 K is acceptable if the recommended grease quality is used Page 13 of 23 Maintenance A 5 1 2 Page 14 of 23 We would like to point out that the grease quantity regulation can only work properly if the grease types specified by us are used The plate fixed on the motor is decisive here Relubrication with grease of a different saponification basis e g sodium saponified grease might cause a deterioration and elimination of the grease effect and thus a total damage of
12. d property The person responsible for the plant has to make sure that N safety and operating instructions are available and observed operating conditions and technical data acc to the order are observed protective equipment is used and specified maintenance work is carried out H R 259 en 12 04 Page 7 of 23 Installation and commissioning 4 Installation and commissioning Page 8 of 23 A most careful mounting and alignment of the motors on an absolutely even surface is impera tive to avoid distortions when the screws are being tightened For machines which are to be coupled attention must be paid to careful alignment See Appendix 1 for alignment checking Couplings that ara as elastic as possible should be used When using pulleys toothed wheels etc ensure that the permitted radial and axial shaft loads are not exceeded The motors with surface cooling TEFC hollow fin cooling or tube cooling or internal cooling with air to air heat exchanger for all specified types except Type AHWA and JHWA Maximum permissible coolant temperature ambient temperature on site acc to EN 60034 1 IEC 60034 1 is 40 C 104 F and a permissible altitude up to 1000 m above mean sea level for other va lues see rating plate Care must be taken that the cooling air can flow without hindrance into the air inlet openings and freely pass through the air outlet openings and cannot be directly sucked in again Suction
13. dynamically balanced The state of balance is indicated on the shaft end face or the rating plate H half key F full key Take care of the balance for installation of the driving element The balancing of the transmission elements to be fitted must be adapted to the rotor balancing In case of half key balancing any protruding and visible part of the key must be removed or a mechanical balance ensured The motor must only be mounted and operated according to the specified mounting arrangement see rating plate Page 9 of 23 Installation and commissioning 4 2 gt gt gt Page 10 of 23 Connection insulation resistance Connection must only be made by an expert and in accordance with the valid safety regulations The relevant installation and operating instructions as well as national and international rules have to be observed Observe the data on the rating plate Compare type of current mains voltage and frequency refer to item 4 3 1 Check the wiring diagram Observe the rated current for setting of the protective switch Connect motor in accordance with the wiring diagram provided in the terminal box The motor must be protected against excessive heating For earthing the motor is provided with an earthing terminal which depending on the mounting ar rangement is either located on the frame or on the flange end shield as the case may be In addition all motors have a protective conductor terminal inside th
14. e controlled room d For further measures the specifications according to the items 8 1 1 2 8 1 1 4 are applicable H R 259 en 12 04 Page 19 of 23 Storage instructions 8 1 3 2 8 1 3 3 8 2 8 2 1 8 2 1 1 8 2 1 2 8 2 1 3 8 2 2 8 2 2 1 8 2 2 2 Page 20 of 23 Commissioning Before commissioning the hygroscopic substance e g Branogel must be removed from the terminal boxes and the measures according to 8 1 2 carried out For outdoor storage the following needs to be done in addition Protective cover against the influence of sun and rain must be provided exchange of air must be possible to avoid condensation water After 2 months it must always be checked if the protective measures acc to 8 1 3 1a are still given and functioning For motors which are stored for more than 2 up to 4 years before com missioning the following additionally applies Storage The manufacturer must be informed about the storage duration in the purchase order The shaft opening and terminal box cover must be provided with grease seals of antifriction bearing grease The motor shafts are not allowed to be rotated before commisioning as otherwise the pro tective grease coating is destroyed If movement of rotating parts is unavoidable the protective grease coating has to be applied afresh A hygroscopic substance e g Branogel must be put in the terminal boxes Commissioning Before commissioning the hygroscopic subs
15. e Werte an der Kupplung Measured values at the coupling Winkelversatz Angular offset Bemerkungen Comments Falls keine Werte vom Kupplungshersteller vorgeschrieben sind If no values were specified by the coupling manufacturer H R 259 en 12 04 Page 23 of 23 LOHER LOHER GmbH P O Box 1164 e 94095 RUHSTORF Hans Loher Str 32 e 94099 RUHSTORF GERMANY Phone 49 8531 39 0 e Fax 49 8531 32895 E Mail info loher de http www loher de Satz Loher Druck Loher 12 04 Printed in Germany
16. e properly sealed In case of water cooled motors check whether the cooling water circuit is in operation For forced ventilated motors it is to be checked whether the forced ventilation is functioning and in operation when the main motor is in operation Page 11 of 23 Installation and commissioning 4 6 4 6 1 4 6 2 4 6 3 4 6 4 Page 12 of 23 Tightening torques for screwed joints General If no other data are indicated the following torque limits screw and nut are applicable Note Screwed joints for electrical connections Screws which become unusable have to be replaced by new ones of the same strength class and type Thread Tightening torque Nm Thread Tightening torque Nm M4 1 2 M 12 15 5 M5 2 M 16 30 M6 3 M 20 52 M8 6 M 24 80 M10 10 M 30 150 Screwed joints strength class 8 8 and A4 70 Tightening torques for screws of the strength class 8 8 and A4 70 A4 80 only in components with higher strength e g grey cast iron steel Thread Tightening torque Nm Thread Tightening torque Nm M4 2 3 M 14 105 M5 4 6 M 16 160 M6 79 M20 330 M8 19 M 24 560 M10 38 M 30 1100 M 12 66 M 36 1900 Screwed joints strength class 5 6 Tightening torques for screws of the strength class 5 6 4 6 A2 or for screws in components with lower strength e g aluminium Thread Tightening torque
17. e terminal box As protection against dust and humidity unused cable entries in the terminal box must have a tor sionproof seal All terminal screws and nuts have to be securely tightened to avoid excessive transition resistances see paragraph 4 6 2 Protective measures are to be taken In case of terminal boxes which have ground surfaces between cover and base a thin grease film is to be applied for sealing and against corrosion High voltage terminal boxes have a pressure relief valve with a predetermined rupture point in the bottom part of the terminal box Valve and sealing must not be damaged during assembly and connection The degree of protection must be guaranteed In case of damage the sealing has to be renewed only with original sealing material In operation the terminal box must always be tightly closed Cable and lead entries and connecting cables must be suitable for the ambient temperatures that occur Terminal boxes with current transformer For the use of current transformers it must be ensured that the secondary circuit of the current transformer is protected from unintentional opening during operation After storage for a prolonged period or a shutdown see 8 1 2 the insulation resistance of the winding must be measured phase to phase and phase to earth Damp windings can result in leakage currents arc overs and blow outs The insulation resistance for the windings must reach the following values Stator w
18. g the instructions for air water heat exchangers must be con sidered The permissible inlet and outlet temperature maximum pressure and the required amount of cooling water are indicated on the motor plates Check before commissioning Check whether the bearing lock has been removed See Paragraph 3 2 Bearing lock Observe data on the rating plate Check whether the voltage and frequency of the motor comply with the mains data Check whether the rotational direction is correct Check whether the motor is protected as specified in the regulations Check whether the electrical connections are securely tightened and whether the monitoring devices are correctly connected and adjusted Visual check whether the pressure relief valve and the sealing in the HV terminal box are undamaged Check whether protective measures have been taken earthing Check coolant temperature Check whether the additional equipment if any is functioning Check whether the cooling air inlet openings and cooling surfaces are clean If a condensation water drain hole exists open the hole for a short time that the accumulated condensation water can be drained off Check insulation resistance of the stator winding Check whether the motor is securely fixed Incase of a belt drive check the belt tension Check whether the cover of the terminal box is closed and whether the cable entries ar
19. h the openings in the fan cover and presses the air over the surface or through the cooling tubes of the stator housing In case of hollow fin or tube cooling the heat dissipation is supported by a closed cooling air circuit inside the motor 2 3 2 Internal cooling for the Type JHSA In case of motors with degree of protection IP 23 the cooling air ambient air is taken in by internal fans through air inlet openings led over the heat generating elements in the motor and is blown out through air outlets 2 3 3 Internal cooling with mounted on air water heat exchanger for the Type JHWA The motors are equipped with air water circuit coolers The cooling air led through the heat ex changer and motor is recooled in the heat exchanger and the heat loss is dissipated through the cooling water The heat exchangers are provided with special ribbed tubes 2 3 4 Internal cooling with mounted on air to air heat exchanger for the Type JHRA The motors are equipped with air to air heat exchanger The cooling air led through the heat exchanger and motor is recooled in the heat exchanger and the heat loss is dissipated through the cooling medium air 2 3 5 Water jacket cooling for the Type AHWA 355 to AHWA 560 The stator housing has a double casing It is sub divided for water channelling and the cooling water passes through This results in a good heat dissipation Additionally this reduces the danger of suspended matter carried along i
20. inding 4 Ustator kV 1 MQ measured at a winding temperature of 20 C Any overvoltage surpressors present that are connected to the motor may falsify the insulation resistance If there is any doubt disconnect the overvoltage surpressors If the insulation resistance is lower dry the windings also refer to item 8 1 2 H R 259 en 12 04 32 Installation and commissioning 4 3 4 3 1 4 3 2 4 3 3 4 4 4 5 H R 259 en 12 04 Rotational direction and designation of the terminals acc to DIN VDE 0530 8 IEC 60034 8 In case of motors with only direction of rotation the direction of rotation is marked on the motor with an arrow Terminals U1 V1 W1 to phases L1 L2 L3 in alphabetical or natural order always results in right handed rotation This applies to all motors even if they are not suited for right handed rotation Changing the direction of rotation The rotational direction can be switched by interchanging two supply lines on the motor terminal board For a machine with only one shaft end or two shaft ends with different thicknesses the direction of rotation is that seen an observer when he views the outer face of the only shaft end or the thicker shaft end In cas of forced ventilation the direction of rotation is separately marked by an arrow on the forced ventilation system itself Air water heat exchanger motors with air water heat exchanger of the type JHWA For connection and commissionin
21. ing hooks can be fixed Check whether the screwed lifting eyebolts are securely tightened Lift the motors only by using these lifting eyebolts Several lifting eyebolts must always be used together considerable damage The lifting eyebolts are only suitable for the motor weight Additional loads attached to the motor must never be lifted using these eyebolts Slinging the motors on other parts e g shaft ends is not permitted since this might result in 3 1 Check before installation Check whether the motor has been damaged during transport Ifthe packing is damaged to such an extent that motor damage is to be assumed the packing should be removed in the presence of a representative of the carrier 3 2 Bearing lock for motors with cylindrical roller bearings only The rotor of the motor is locked in order to avoid damage to bearings caused by vibrations N at standstill by red marked locking screws in the bearing cap or by a transport locking mechanism fixed to the shaft end Before the motor is mounted the locking screws must be loosened by 10 mm and secured and the transport locking device must be removed see instruction plate on the motor After this it must be possible to turn the shaft by hand We recommend loosening of the bearing lock only after the drive element has been fitted The transport locking mechanism should be reused for further transports Prevent failures and thus avoid damages to persons an
22. l shows a situation that may be dangerous If not avoided injuries or material damage may result High voltage machines rated at more than 1 kV have dangerous live and rotating parts and may have hot surfaces All operations serving transport connection putting into service and mainten ance shall be carried out by responsible skilled persons in conformity with EN 50 110 1 DIN Danger VDE 0105 IEC 60364 Improper handling may cause serious personal injury and damage to property Danger 1 2 General 1 3 Intended use These high voltage machines are intended for industrial installations They comply with the har monized standards of the series EN 60034 DIN VDE 0530 Their use in hazardous areas is pro hibited unless they are expressly designed for such use follow supplementary instructions On no account use degrees of protection lt IP 23 outdoors Air cooled models are designed for ambient temperatures of 20 C up to 40 C and altitudes of lt 1000 m above sea level Ambient temperature for air water cooled models should be not less than 5 C for sleeve bearing machines see manufacturer s documentation By all means take note of deviating information on rating plate Field conditions must conform to all rating plate par ticulars High voltage machines are components for installation in machinery within the meaning of the Machinery Directive 98 37 EC Putting into service is prohibited until conformity of the end product
23. late when put into operation If motors with direct water jacket cooling or with air water cooler Type AHWA or JHWA are stored at temperatures up to 20 C 4 F the following must be ob served in addition to the instructions of point 8 1 and 8 2 The water has to be drained completely from the air water coolers In any case the coolers must be dried completely with hot air of max 60 C 140 F and then sealed Motors with coolers have to be stored in a dry and dustfree room At the time of commissioning motors with regreasing device have to be relubricated with double the grease quantity specified on the lubrication plate Further to these storage instructions all data of these operating instruc tions must be taken into account The manufacturer s warranty is only applicable if all of the above men tioned items are strictly observed Page 21 of 23 Faults and remedies 9 Faults and remedies Fault Bearing is too hot If remedies described are insufficient we recommend replacing the bearings Motor does not start Page 22 of 23 Bearing noise Fault Motor is too hot High decrease in speed Motor runs unevenly Protective device triggers Possible causes Too much grease in bearing Bearing dirty Belt tension too high Coupling forces are pulling or pushing Coolant temperature above 40 C 104 F Not enough grease in the bearing Motor incorrec
24. n the water getting deposited H R 259 en 12 04 Page 5 of 23 Description 2 4 2 4 1 2 4 2 2 4 3 2 4 4 2 4 5 2 5 2 6 2 7 2 8 Page 6 of 23 Motor frame Construction for surface cooling TEFC hollow fin cooling or tube cooling Depending on the frame size the stator frame and end shields are made of grey cast iron or steel The fan cover is made of sheet steel The stator frame surface is provided with cooling fins hollow fins or tubes and an attached terminal box Construction for internal cooling ODP for the Type JHSA Depending on the frame size the stator frame and end shields are made of cast iron or steel The stator frame has an even surface with attached terminal box There are distance fins between stator jacket and stator pack to facilitate the internal cooling Construction for internal cooling with air water heat exchanger for the Type JHWA The stator frame and end shields are of steel The stator frame surface is plain with a mounted on terminal box Between the stator jacket and the stator core there are spacing ribs to facilitate the internal cooling An air water circuit cooler is mounted onto the ventilation openings Construction for internal cooling with air to air heat exchanger for the Type JHRA Like for the internal cooling with air water heat exchanger however an air to air heat ex changer is mounted onto the ventilation openings Construction for water jacket cooling
25. nes have a rated bearing service life of at least 40 000 hours For bearings with a separate oil supply the user must suitably monitor the lubrication to ensure that it maintained H R 259 en 12 04 Maintenance 5 2 A 5 3 5 4 H R 259 en 12 04 Terminal locations terminals ventilating passages Depending on the operating conditions the following should be done at certain intervals checking the cleanliness of terminal locations and terminals checking of the electrical connections with regard to tightness see Paragraph 4 6 2 for tightening torques cleaning of the ventilating passages Both the cooling air inlets and the cooling surfaces must be protected against obstruction and contamination If required the water chambers are to be flushed and cleaned of deposits Never use sharp edged tools for cleaning Air water heat exchanger Motors with air water heat exchanger of the Type JHWA For maintenance please comply with the specifications for the air water heat exchangers Condensation water drain hole If the motor has a condensation water drain hole it has to be opened at regular intervals to allow the accumulated condensation water to drain Attention must be paid to always seal the condensation water drain hole by a screw with lock washer so that the degree of protection is assured Page 15 of 23 4 2 Additional equipment 6 Additional equipment On special order only 6 1 Tempe
26. or remove couplings or other drive elements only with appropriate means heat and cover them with touch guard Avoid excessive radial and axial bearing loads note manufacturer s docu mentation The balance of the high voltage machine is indicated H Half F Full key With half key models the coupling too must be half key balanced In case of protruding visible part of key establish mechanical balance Make necessary ventilating pipe connections Models with shaft ends pointing upward to be pro vided with cover by customer The ventilation must not be obstructed and the exhaust air also of neighbouring sets not taken in directly Electrical connection All operations must be carried out only by skilled persons on the high voltage machine at rest Before starting work the following five safety rules must be strictly applied De energize Provide safeguard against reclosing Verify safe isolation from supply Connect to earth and short Cover or provide barriers against neighbouring live parts De energize auxiliary circuits e g anti condensation heating Exceeding of limit values of zone A in EN 60034 1 DIN VDE 0530 1 voltage 5 frequency 2 form and symmetry leads to higher temperature rise Note rating plate particu lars and connection diagram in terminal box The connection must be so made that permanently safe electrical continuity is maintained Use appropriate cable terminations Est
27. rature monitoring The temperature sensors for monitoring e g the stator winding temperature the bearings the coolant must be connected by one or several additional terminal boxes The temperature sensors have to be connected according to the relevant connection diagram The specifications and instructions acc to Paragraph 4 2 Connection are applicable to the connections 6 2 Space heater Heating capacity and connection voltage See special plate on the motor The space heater has to be connected by an additional terminal box acc to the relevant connection diagram The specifications and instructions acc to Paragraph 4 2 Connection are applicable to the connections Operation of the space heater is only allowed when the motor is switched off The space heater must never be switched on during motor operation 6 3 Forced ventilation Observe direction of rotation see arrow for directional rotation Forced ventilation is to be connected acc to the wiring diagram inside the terminal box During operation of the main motor the forced ventilation motor must be switched on The forced ventilation is dissipating the heat loss during operation of the main motor When switching off the main motor a temperature dependant continuation of the forced ventilation is required 6 3 1 To be checked when commissioning the main motor Check whether the forced ventilation works and is in operation when the main motor is switched on On
28. s are to be sealed again 8 1 2 Commissioning 8 1 2 1 Before commissioning the insulation resistance of the winding must be measured by qualified personnel phase to phase and phase to ground Damp windings may cause leakage currents ar cing and ruptures In case of values lt 4 Un kV 1 MQ measured at a winding temperature of 20 C 68 F the winding must be dried Drying is possible by passing a single phase AC current through the winding The voltage has to be adjusted in such a way that the recommended values of the heating current in accordance with Illustrations a and b are not exceeded The temperature should reach approx 80 C 176 F and be in effect for several hours Drying is also possible in a drying kiln Page 18 of 23 H R 259 en 12 04 Storage instructions 8 1 2 2 8 1 2 3 8 1 2 4 Recommended heating circuits and maximum heating currents b Y Imax 65 Ir Imax 75 p In the case of motors with bearing lock the bearing lock this one has to be removed before commis sioning Antifriction bearings lubrication If adequately stored for a prolonged time it can be assumed that for 2 years the lubricating grease in the bearings is not affected For motors with insulation class F a lithium saponified antifriction bearing grease with a dripping point of at least 180 C 356 F is used for normal ambient temperatures For the motors with insulation class H and for certain special motors the
29. tance e g Branogel must be removed from the terminal boxes and the measures according to 8 1 2 are to be carried out Antifriction bearings lubrication Motors with a regreasing device must be relubricated immediately after commissioning with about the double grease quantity until the used grease has been thrown out Further greasing can then be done with the bearing grease indicated on the lubrication plate During the running in period increased bearing noises may occur which are not dangerous when the operating temperature of the bearing has not been reached and is caused due to the dynamic viscosity of the bearing grease H R 259 en 12 04 Storage instructions 8 3 8 3 1 8 3 2 8 4 8 5 H R 259 en 12 04 If motors not Type AHWA and JHWA are stored at temperatures up to 50 C 58 F the following must be observed in addition to the instructions according to point 8 1 and 8 2 The standard antifriction bearing grease for the motors as per the catalogue is suitable for operating temperatures between 30 C 22 F and 130 C 266 F Temperatures up to 50 C 58 F are harmless for the antifriction bearing grease when the motors are at standstill or stored For operation at 50 C 58 F a special grease e g Kl ber Isoflex All time SL2 is available for the bearings Motors with a regreasing device are to be relubricated with the double the grease quantity specified on the lubrication p
30. tly mounted Bearing grease dark coloured Scoring at bearing inner race e g caused by motor start with locked bearing Imbalance caused by coupling Motor fastening unstable Possible causes Countertorque too high Mains voltage too low Phase interruption Wrong winding connection Overload Too many starts per hour Insufficient ventilation Insufficient cooling Ventilation passages or water chambers dirty Short eircuit of winding or terminal board Starting time exceeded Remove excess grease Replace bearing Reduce belt tension Realign motor correct coupling Adjust temperature of cooling air Grease according to specifications Check mounting type of motor Check bearing current flows Replace bearing avoid vibrations at standstill Exact balancing Check fastening Check motor and load torque Check mains conditions Check mains supply Observe wiring diagram and rating plate Compare data on rating plate Comply with rated duty type Check ventilation passages check direction of rotation Check cooling water inlet and outlet temperature Clean Measure insulation resistance Check starting conditions H R 259 en 12 04 Appendix 1 Servicebericht Service report Seite Page berpr fung der Ausrichtung Alignment check Servicenr Service No Bestellnr Order No Typ Type Seriennr Serial No 1 100 mm 1 100 mm pro 1 100 mm each 1500 6 5 3 2 5 Gemessen
31. with this directive has been established follow particular local safety and installation rules as e g EN 60204 1 4 Transport Storage Immediately report damage established after delivery to transport company If appropriate pre vent putting into service of machine Eyebolts are dimensioned for the weight of the high voltage machine do not apply additional loads If necessary use suitable adequately dimensioned means of transport e g rope guides Remove shipping brace e g antifriction or sleeve bearing locks vibration dampers before putting machine into service Reuse it for further transports When storing high voltage machines make sure of dry dust free and low vibration Vims lt 0 2 mm s location danger of bearing damage at rest Measure insulation resistance be fore putting machine into service With values of lt 4 Un kV 1 MQ at 20 C winding tempera ture dry the winding Refer to the section Storage regulations Page 2 of 23 H R 259 en 12 04 Safety and commissioning instructions A 1 5 A Danger 1 6 A Danger H R 259 en 12 04 Installation Make sure of even support solid foot or flange mounting and exact alignment in case of direct coupling Avoid resonances with rotational frequency and double mains frequency as a result of assembly Turn rotor listen for abnormal slip noises Check direction of rotation in uncoupled state refer to the section Electrical connection Mount

Download Pdf Manuals

image

Related Search

Related Contents

Betriebsanleitung  LOREX Technology LW1012 Series User's Manual  Monoclonal Mouse  Mode d`emploi  10 langs.fh9  Optibox Gekko HD  Starvert iV5 - Componente Industriale  

Copyright © All rights reserved.
Failed to retrieve file