1.                      Tender No SG 9878P14 Page 9    Method of Testing        1  Visual Inspection   Each module shall be carefully inspected under an illumination of  not less thanl000 lux   for the following conditions    a  Cracked  bent  misaligned or torn external surfaces    b  broken   cracked cells   c  faulty interconnections or joints   d   e                cells touching one another or the frame                failure of adhesive bonds  bubbles or de laminations forming a  continuous path  f  between a cell  amp  edge of the module    g  faulty terminations  exposed live electrical parts   h  Junction box should have common terminals with suitable bypass  diode for preventing hot spot problem                       2  Performance at STC   As per IEC 61215 2005  amp  IEC61646    The current voltage characteristics of the module shall be  determined in accordance with IEC 60904 1 at a specific set of  irradiance  amp  temp conditions   Performance of  PV Module shall be generally evaluated at  Standard Test Conditions  STC  as defined in IEC 60904 standards     cell temp of 25   C      incident solar irradiance of 1000W m2      spectral distribution of light spectrum with an air mass AM 1 5                   3  Dry Heat test  As per IEC      at 85     2   C for 16 hours     4  Cold Test  As per IEC    40     3   C for 16 hours        5  Rapid change of temperature  As per IEC     Module shall be exposed alternately for 30 minutes to hot chamber  at 80  C   2  C  amp  t
2.             25 0 Handing over   25 1 On completion of the work  all rubbish  kilns  vats  tanks   materials and temporary structure of any sort or kind used for the  purpose or connected with the construction erection work shall be  removed by the Contractor and all pits and excavations filled up  and the site handed over in a tidy and workmanlike condition and no  final payment in settlement of the account for the said work shall  be held to be due or shall be made to the Contractor until such  Site clearance and restoration shall have been effected by him and  such clearance and restoration may be made by OIL at the expenses  of the Contractor in the event of his failure to comply with this  provision within seven  7  days after receiving notice in writing  from OIL to that effect  If it becomes necessary for OIL to have  the site cleared as indicated above at the expense of the  Contractor  OIL shall under no circumstances be held liable for any  losses or damages to such of Contractor s property as may be on  such site due to such removal there from  which removal may be  effected by means of public sale of such materials and property or  in such a way as seems fit and most convenient to the OIL    25 2 For the purpose of removing surplus materials in its original  form  the Contractor shall submit the documents records evidencing  the entry of materials inside the Plant by producing the Gate Entry  Permits and consumption statements based on approved drawings to  establi
3.          Parameters Required Offered  e Over under frequency  protection  e Anti islanding protection  Alarm Signals Via system fault relay  voltage  free contact   Front Panel Display 40x4 LCD panel with membrane                                                                               e Solar radiation  e Inverter import  amp  export kWh  summation  e Solar kWh  e System set points and event  logs   Front Panel Controls  To be mentioned    via keypad    Front Panel   To be mentioned   Indicators   Circuit Breakers Solar Input   REI Designed to minimize both  conducted and radiated RFI  emissions   Earthing Provisions AC bypassing to earth on  inverter and DC inputs   ENVIRONMENTAL   Operating 4 50 degrees Celsius   Temperature   Range   Humidity 0 903  non condensing   Enclosure Rated FOK IP30  indoor  application    ENCLOSURE   Dimensions To be mentioned   Weight To be mentioned  Typical voltage toleranc   15  and  90  for any two of the  3 phases   15  and  20  for the remaining  phase   Tender No SG 9878P14  Page 14          Parameters    Required    Offered       Typical frequency tolerance      3Hz       DATA LOGGING             Communication RS232 RS485   Interface Modbus Profibus Telephone Modem  System Features je Adjustable logging       repetition from 1 sec to 900   seconds   e Storage capacity of up to 3  year with 10 min   logs       e Time and date stamped log   entries   e Time and date annotated fault  log  holding the   fault description and operating  
4.      Further  the bidders shall be allowed a notice period of 10 days to  rectify the discrepancy  failing which a penalty of Rs  5000 per  day shall be levied till rectification  is done           LZ Power Conditioning Unit  PCU   PCU shall have a minimum  warrantee period of 5 vears from the date of commissioning  The       SGI9878P 14 Page 6    Bidder   s detailed Warranty  Guarantee clause shall be furnished   Efficiency of the PCU shall not be less than 97   EU   In case of  any deviation observed during operations from the warranty cited   the Contractor shall be informed in writing by the OIL  The  Contractor shall be responsible to rectify the same within 10 days  of notification without any extra cost to OIL                     Successful Bidder shall provide a bank guarantee for the first 5  years for settlement of claims as mentioned in clause 4 1 2 1  b   against the Performance Guarantee Parameters stipulated above  The  guarantees shall be irrevocable and unconditional as per the  prescribed formats  in order to safeguard the interests of OIL and  to ensure continued delivery of performance parameters as  stipulated above           Tea The mechanical structures  electrical works and overall  workmanship of the grid solar power plants must be warranted for a  minimum of 5 years        8  Insurance   8 1 The Contractor shall take Comprehensive Marine cum Erection  Insurance policy for the complete Project and for the insurance to  be arranged by the Contractor  th
5.     Price with Conditions   Go to this Tab    Notes and s  Attachments    for Uploading and Statist  Terms of Payment   9010   90  against despatch 10  after receipt    Priced Bid    files  Created C  Created E  Last Processed C    Last Processed E       Details Send EMail Call Gear         Function   Number   Name   Valid fr  E  The table dees not contain any data          On    EDIT    Mode  The following screen will appear  Bidders are advised to Upload       Techno Commercial Unpriced Bid    and    Priced Bid    in the places as indicated above              RFx Response Number 60006452 RFx Number TEST2 Status  Submission Deadline 13 04 2013 11 00 00 INDIA  RFx Owner  VWIPRO_TEST1 Total Value 0 00 INR    dia ji  _ RFX Information tems              Commercial Unpriced Bid           Area for uploading Priced  Bid         Sign Attachment Add Attachment Bdil Description Wersioning Delete Create Qualification Profil      Assigned To Category Description Fie Hame   Version  GJ The table does not contain any data       Processor          Note       The    Techno Commercial Unpriced Bid    shall contain all techno commercial details except  the prices     Page 3 of 5       The    Price bid    must contain the price schedule and the bidder   s commercial terms and  conditions  For uploading Price Bid  first click on Sign Attachment  a browser window will  open  select the file from the PC and click on Sign to sign the Sign  On Signing a new file with  extension  SSIG will be create
6.    Degree of protection should not be less than IP 21     It shall have protection features such as over voltage   hort circuit  over temperature etc    4 8 The inverter shall be efficient based on MPPT with IGBT  reliable power based design   4 9 The system should be capable of providing all the data  including that of meter and PCU to the Master Control at Pipeline  Headquarters OIL  Guwahati through existing OFC Infrastructure  and wireless link on relevant BIS IEC protocol  All the  equipments  hardware  software for complying to the same will be  in the bidder   s scope  The PCU shall be capable of complete  automatic operation  including wake up  synchronization  amp  shut  down  It must be capable of initiating DG set START command in  existing sequence when SPV system unable to meet the load demand  and initiate DG Set STOP command when SPV system ready able to  take the load  Suitable manual control both from local control  desk and Remote Master Control desk shall be incorporated in  the system              YAN OB    4  4   4  s                                     4 10 PCU shall have facility to display basic parameters of the  system    4  Built in with data logging to remotely monitor plant  performance through external PC shall be provided   4 12 PCU shall be DSP control and shall operate in Sleeping mode  when there will no power connected    4 13 PCU shall operate seamlessly without being effected on any  power cut to the load    4 14 PCU shall off  grid in nat
7.    OIL INDIA LIMITED   A Government of India Enterprises   E PO   Udayan Vihar   Guwahati     781171    Assam  India   TELEPHONE NO   91 361  2594287    FAX NO   91 361 2643686   Email  aparajita   oilindia in   erp_mm  oilindia in    INVITATION TO e BID UNDER SINGLE STAGE TWO BID SYSTEM    Tender No  amp  Date   SGI9878P14 of 18 05 2013   Tender Fee   Rs 1 000 00   Bid Security Amount   Rs 85 000 00   Bidding Type   SINGLE STAGE TWO BID SYSTEM  Bid Closing on   As mentioned in the Basic Data of e portal  Bid Opening on    do    Performance Guarantee   Applicable   Integrity Pact   Applicable    OIL invites Bids for Solar Photovoltaic Power Plant through its e Procurement site under  SINGLE STAGE TWO BID SYSTEM  The bidding documents and other terms and  conditions are available at Booklet No  MM LOCAL E 01 2005 for E Procurement LCB  Tenders  The prescribed Bid Forms for submission of bids are available in the Technical RFx   gt   External Area    gt  Tender Documents    The general details of tender can be viewed by opening the RFx   Tender  under RFx and  Auctions   The details of items tendered can be    The tender will be governed by     a     General Terms  amp  Conditions    for e Procurement as per Booklet No  MM LOCAL E   01 2005 for E Procurement LCB Tenders and Amendment No  1 to General Terms and  Conditions for Indigenous E Tender     b  Technical specifications and Quantity as per Annexure     1A     c  The prescribed Bid Forms for submission of bids are availab
8.   20 4 Within 15 days after the ffectiv date of Contract  the  Contractor shall submit a detailed Quality Assurance Plan  QAP    covering all activities under scope of supply of the Contractor and  all stages of inspection  for OIL to comment   approve the same   and indicate OIL s hold points   20 5 The Contractor shall give OIL a minimum of ten days  10  days  clear notice of any work being ready for inspection and tests  specifying the period likely to be required for such inspection and  tests  Thereafter  OIL or his inspector shall attend at the OEM s  premises  such inspection and tests within seven  7  days of the  date on which the equipment is notified as being ready for  inspection and test    20 6 The Contractor shall furnish to the OIL  2  two  copies of  unpriced purchase orders including detailed technical specification  and drawings placed on his sub contractors sub suppliers as soon as  such orders are placed by the Contractor  but in any case not later                                                                         SGI9878P 14 Page 12       than one  1  month befor the xpected date of the equipment  getting ready for inspection    20 7 In cases where OIL have to conduct the inspection  whether at  the premises or works of the Contractor  the Contractor shall   provide free of charge to OIL such labour  materials  electricity   fuel  water  stores  apparatus and instrument and or facilities as  may reasonably b deemed required to carry out efficiently 
9.   and     10                       4 15 Typical failure analysis report of PCUs and recommended  list of critical components shall be provided by the bidder  while submitting their offer           4 16 Provision shall be available in the PCU for remote  monitoring through suitable wireless mode of following  parameters   DC power input   DC input voltage   DC current   AC power output   AC voltage  all the 3 phases and line     AC current   all the 3 phases and line    Power factor    Tender No SG9878P14 Page6             Se HEHE HEHEHE SHE          In addition to the above  energy values to be displayed     The number of PCUs is indicative only  The bidder may design  the system to extract maximum   efficiency with inbuilt redundancy           5  Batteries    The batteries shall be capable of providing minimum Two  2  days  autonomy  The batteries should qualify IEC 61427  IS 1651  IS  13369 or IS 15549 whichever is applicable              6  DC distribution board  DCDB    DC distribution board shall be provided in between solar array  and PCU  It shall have MCCB of suitable rating for connection and  disconnection of array section  It shall have meters for  measuring the array voltage and array current  DCDB can also be    integrated into PCU for space saving                 7  AC Distribution    Power conditioning unit installed in a control room converts DC  energy produced by the solar array to AC energy  The AC power  output of the inverter shall be fed to the AC Distri
10.   as given in the Bidding Document in toto  failing which offer will  be rejected          Performance Bank Guarantee clause  Force Majeure clause   Tax liabilities clause  Arbitration clause   Applicable Law   Liquidated Damage clause            AQQ CC v          xvii   Integritv Pact           OIL shall be entering into an Integrity Pact with the bidders as  per format enclosed vide Annexure DDD of the tender document  This  Integrity Pact proforma has been duly signed digitally by OILfs  competent signatory  The proforma has to be returned by the bidder   along with the technical bid  duly signed  digitally  by the same  Signatory who signed the bid  i e   who is duly authorized to sign  the bid  Any bid not accompanied by Integrity Pact Proforma duly  signed  digitally  by the bidder shall be rejected straightway   Uploading the Integrity Pact with digital signature will be  construed that all pages of the Integrity Pact has been signed by  the bidder   s authorized signatory who sign the Bid                              C  GENERAL     i  Annexure    3  amp  4  The Compliance statement must be filled up by  bidders and to be submitted uploaded along with their bids  In case  bidder takes exception to any clause of the bidding document not  covered under BEC BRC  then the Company has the discretion to load  or reject the offer on account of such exception if the bidder does  not withdraw modify the deviation when as advised by Company  The  loading so done by the company w
11.  NON REMARKS  COMPLIANCE   PAGE NO   SUB CLAUSE NO   Signature   Seal   Full Name    Address      NOTE OIL INDIA LIMITED expects the bidders to fully accept the terms and conditions of the  bid document  However  should the bidders still envisage some exceptions  deviations  to the terms and conditions of the bid document  the same should be indicated as per  above format and submit along with their technical bids  If the proforma is left blank    Page 3 of 5    or not submitted  then it would be construed that the bidder has not taken any  exception deviation to the terms and conditions of the bid document     Annexure 4  Compliance Statement for Technical Specifications    Write  YES  If agreed and accepted otherwise write  NO  and enclose deviations with Clause No                                                  SECTION NO  CLAUSE NO  COMPLIANCE  NON REMARKS  COMPLIANCE   PAGE NO   SUB CLAUSE NO   Signature   Seal   Full Name    Address      NOTE OIL INDIA LIMITED expects the bidders to fully accept the terms and conditions of the  bid document  However  should the bidders still envisage some exceptions  deviations  to the terms and conditions of the bid document  the same should be indicated as per  above format and submit along with their technical bids  If the proforma is left blank  or not submitted  then it would be construed that the bidder has not taken any  exception deviation to the terms and conditions of the bid document     Page 4 of 5       Annexure 5  PRICE B
12.  in the Contract   17 5 Brand names mentioned in the Contract documents are for the  purpose of establishing the type and quality of products to be  used  The Contractor shall not change the brand name and qualities  of the bought out items without the prior written approval of the  OIL  All such products and equipment shall be used or installed in  strict accordance with original manufacturer s recommendations   unless otherwise directed by the OIL                                                                 18 0 Validity   The validity of the Contract shall not be affected  should one or  more of its stipulations be or become legally invalid and such  stipulation is severable from and   not fundamental to the  obligations of either party to this Contract  In such a case  the  parties shall negotiate in good faith to replace the invalid clause  by an agreed stipulation which is in accordance with the applicable  law and which shall be as close as possible to the Contract   s  original intent                    19  PARTICIPATION OF OIL   S ENGINEERS                            19 1 For basic design and detail engineering of Plant and Equipment  carried out by Contractor  Subcontractors  OIL reserves th right                SGI9878P 14 Page 11       to depute his   Consultants  engineers hereafter called OIL s  Engineers  to participate in this work    19 2 The participation assignment  number of OIL S engineers  their  technical disciplines and the period of participation s
13.  key personnel shall not be removed  from this Project without the permission of OIL  unless the reason  is resignation    14 5 In the interest of the timely completion of the Project  OIL  may request that the Contractor alter or modify the area of  monitoring  The Contractor shall furnish adequate information in  the monthly progress reports in the format to be mutually agreed                                                          SGI9878P 14 Page 8       upon between OIL and Contractor  The Contractor shall submit the  requisite number of progress reports   14 6 OIL may call for weekly fortnightly or more frequent meetings  at OIL   s premises to review the progress of each activity  In case  the PM is not able to attend the meeting  the Contractor shall  depute some other authorized representative    14 7 The Contractor shall submit program of execution both in the  form of activities in  Network  as well as quantitative program in  terms of month wise physical targets for various disciplines of  work  These shall be periodically updated considering the progress  of the Project    14 8 On the first day of each calendar month following  effectiveness of the Contract  two copies of a monthly progress  report with exception report showing current status of various  activities including status of ordered yet to be ordered items  shall be submitted by the Contractor to the OIL    14 9 The monthly progress report to be submitted by the Contractor  shall indicate progress of a
14.  operations to be done by the contractor and how it is to be  managed    4  The contractor shall provide a copy of the SOP to the person  designated by the mine owner who shall be supervising the  contractor s work              Da Keep an up to date SOP and provide a copv of changes to a  person designated by the Mine Owner Agent  Manager   6  Contractor has to ensure that all work is carried out in       accordance with the Statute and SOP and for the purpose he may  deploy adequate qualified and competent personnel for the purpose  of carrying out the job in a safe manner  For work of a specified             Tender No SG9878P14 Page 16       scope nature  he should develop and provide to the mine owner a  site specific code of practice in line              7  All persons deployed by the contractor for working in a mine  must undergo Mines Vocational Training  initial medical  examination  PME  They should be issued cards stating the name    of the contractor and the work and its validity period   indicating status of MVT  IME  amp  PME    8  The contractor shall submit to DGMS returns indicating    Name of his firm  Registration number  Name and address of person  heading the firm  Nature of work  type of deployment of work  persons  Number of work persons deployed  how many work persons  hold VT Certificate  how many work persons undergone IME and type  of medical coverage given to the work persons    9  The return shall be submitted quarterly  by 10th of April   July  Oct
15.  shall be responsible for proper fencing   lighting  guarding and watching of all works at site until handing  over and further arrange proper provisions for like period of  temporary drainage  roadways  foot wavs  guards and fences as far  as may be rendered necessary by reason of works for accommodation  and protection of the OIL s adjacent property and that of  the  public and others    24 3 3 The Contractor must take sufficient care in moving his  construction plants and equipment from one place to another so that  they may not cause any damage to the property of the OIL   particularly to the existing structures and overhead and  underground services and in the event of Contractor s failure to do  so  the cost of such damages shall be borne by the Contractor   24 3 4 The Contractor shall take all precautions during execution   especially while excavating to avoid interference with or damage to  underground works  such as cables  pipe lines  drains etc  and  provide all possible protection to these works and in case they are  damaged  rebuild divert them at his own cost    24 3 5 All operations necessary for the execution of the works and  for the construction of any temporary works shall so far as  compliance with the requirements of the Contract permits be carried  on so as not to interfere unnecessarily or improperly with the  public convenience or the access to use and occupation of public or  private roads and footpaths or of properties whether in the  possession of O
16.  statistics   e View and change system setpoint  configurations   remotely   e Bulk log download for data  importation into a   spreadsheet where applicable             Logging Attributes       A summary of the data logging  abilities to be   supplied with the control system  for instantaneous   viewing and periodic logging are  listed below    SYSTEM SUMMATIONS    e Inverter import and export kWh  e Solar kWh   e Hours run   SYSTEM PARAMETERS   e Inverter volts  amps  kW  kVA           frequency  System volts and frequency                   e Solar panel temperature  Ambient temperature   e PV panel voltage   Solar charge current    Heat sink  amp  cabinet  temperatures    e Solar radiation  with external          pyranometer           REMOTE MONITORING  amp  CONTROL             Tender No SG9878P14    Page 15        Details of Remote Network  amp  Monitoring Control Devices  Software  etc      Details of Desktop  amp  Laptop PCs    ANNEXURE X  SAFETY GUIDELINES    GENERAL HSE POINTS TO BE INCORPORATED IN THE CONTRACT  Le It will be solely the Contractor   s responsibility to fulfill  all the legal formalities with respect to the Health  Safety and  Environmental aspects of the entire job  namely  the person  employed by him  the equipment  the environment  etc   under the  jurisdiction of the district of that state where it is operating   All sub contractors hired by him must comply with the same  requirement as the contractor himself and shall be liable for  ensuring compli
17.  to meet the power requirements on 24 hours  x 365 days basis  On failure of duty set  other set starts  automatically  amp  sequentially and takes the load  The load consist  of lighting  communication  telemetering  amp  other laser equipments             SGI9878P 14 Page 1     CP Transformer Rectifier Unit  battery charger and 2X 1 5 ton  split  5 star  Air conditioners  Average normal load 3 5 KW  depending on climatic condition  The System Voltage  400 V A C    All the local operating  amp  process parameters are integrated with  Mainline SCADA of the pipelines through OIL   s optical fibre  infrastructure              2  Scope of Work           2 1 The scope of work includes prepar Detailed Project Report   DPR   Verification of site and DNI data  Design  Manufacture                       Supply  Installation  erection  Testing and Commissioning and  maintenance of Off grid Solar Photovoltaic Power Plant of 20 KWp  with remote monitoring and Controls facilities AS WELL AS       AUTOMATIC STARTING STOPPING OF STANDBY DG SETS AS AND WHEN REQUIRED  DEPENDING UPON POWER LOAD CONDITIONS SEQUENTIALLY    The scope also includes preparation of documents and co ordinate to  get MNRE subsidy                                                              2 2 The system comprising of equipments  modules  interfacing  devices  battery banks  and related items for Off  grid Solar  Photovoltaic Power Plant of 20 KWp with at least average    generation of 27000 kwh annually at system out
18. Authorities operating under the Root Certifying Authority of India  RCAI   Controller of  Certifying Authorities  CCA  of India  The bid signed using other than    Class 3 with  Organisation   s Name    digital certificate  will be rejected     7 0 Bidders must ensure that their bid is uploaded in the system before the tender closing date  and time  Also  they must ensure that above documents which are to be submitted in a sealed  envelope are also submitted at the above mentioned address before the bid closing date and  time failing which the offer shall be rejected     8 0Bid must be submitted electronically only through OIL   s e procurement portal  Bid  submitted in any other form will be rejected     9 0 SINGLE STAGE TWO BID SYSTEM shall be followed for this tender and only the  PRICED BIDS of the bidders whose offers are commercially and technically acceptable shall  be opened for further evaluation     10 0 a  The Integrity Pact is applicable against this tender  OIL shall be entering into an  Integrity Pact with the bidders as per format enclosed vide Annexure DDD of the  tender document  This Integrity Pact proforma has been duly signed digitally by OIL   s  competent signatory  The proforma has to be returned by the bidder  along with the  technical bid  duly signed  digitally  by the same signatory who signed the bid  i e   who  is duly authorized to sign the bid  Any bid not accompanied by Integrity Pact Proforma  duly signed  digitally  by the bidder shall be rej
19. ID FORMAT       BIDDING FORMAT       DESIGN  MANUFACTURE  SUPPLY  ERECTION  TESTING AND COMMISSIONING OF GRID CONNECTED    20 KWp OFF GRID SOLAR PV POWER PLANT AT REPEATER STATI    JAG                      TROAD  MARIGAON  ASSAM        ON No 5       THE BIDDER SHALL READ THESE PRICE SCHEDULE   SCHEDULE OF RATES  SOR   S  IN CONJUNCTION  WITH THE SCOPE OF WORK       ITEM   NO    DESCRIPTION    UOM    QTY    UNIT  PRICE    TOTAL  PRICE       IN INR    IN INR       1    DETAILED PROJECT REPORT  DPR   DESIGN   MANUFACTURE  SUPPLY  PACKING  amp  FORWARDING   TRANSPORTATION TO SITE OF GRID CONNECTED SOLAR  PHOTOVOLTAIC POWER PLANT    LUM PSUM       UNLOADING AT SITE  ERECTION  TESTING AND  COM MISSIONING OF 100KWP SPV POWER PLANT    LUM PSUM             COM PREHENSIVE ANNUAL M AINTENANCE CONTRACT  FOR A PERIOD OF FIVE YEARS       LUM PSUM                Page 5 of 5          Annexure  DDD  INTEGRITY PACT  Between  Oil India Limited  OIL  hereinafter referred to as  The Principal   And     Name of the bidder  L hereinafter referred to as  The  Bidder Contractor     Preamble      The Principal intends to award  under laid down organizational procedures  contract s for  Tender No  SGI9878P 14  The Principal values full compliance with all relevant laws and  regulations  and the principles of economic use of resources  and of fairness and  transparency in its relations with its Bidder s and Contractor s     In order to achieve these goals  the Principal cooperates with the renowned inte
20. IL or any other person and the Contractor shall save  harmless and indemnify OIL in respect of all claims demands   proceedings  damages  costs  charges and expenses  whatsoever  arising out of or in relation to any such matters    24 3 6 Due to any emergency  any protective or remedial work is  necessary within the Contractor   s battery limit  the Contractor  shall immediately carry out such work  If the Contractor is unable  to or unwilling to do the work  OIL shall carry out such work and  all costs incurred due to this shall be deducted from Contractor   s  payments                                            24 4 Boarding  lodging  amp  transport   The Contractor shall take care of the boarding  lodging  all travel  between Contractor   s office and site etc  of his direct and  indirect employees        24 5 Construction Water and Power   The Contractor needs to make suitable arrangement for Construction  Water and Power based on site conditions  To the extent possible   OIL shall facilitate the same  Non availability of Power from OIL  should not be an excuse for delay in completion of the project                         SGI9878P 14 Page 17    24 6 Site grading   Excavation   All fossils  coins  articles of value of antiquity and structures  and other remains or things of geological or archaeological  interest discovered on the site of the works shall be deemed to be  the absolute property of OIL and the Contractor shall take  reasonable precaution to prevent his workme
21. ITH AMC OF 20 KWp OFF GRID SOLAR PV  POWER PLANT FOR REPEATER STATION No 5 AT JAGIROAD  MARIGAON  ASSAM  OF OIL   S NAHARKATIA BARAUNI TRUNK PIPELINE WITH REMOTE MONITORINGS  AND CONTROLS AS WELL AS AUTOMATIC STARTING STOPPING OF STANDBY DG  SET AS AND WHEN REQUIRED DEPENDING UPON POWER LOAD CONDITIONS                                                                                                                                                                                              Location and other related data        The site is located at Jagiroad Town in Marigaon District of  Assam  adjacent to the National Highway No  37 at a distance of  about 60 KM from Guwahati  Jagiroad is connected by railway and NH   37 with Guwahati and other major cities in north east  Hotels            restaurants and other facilities available at Jagiroad  The  proposed project site is protected area and manned by security  personnel  For details of existing layouts of OIL installation          Drawing No OI PL 0741 may be referred to     Latitude  26degree 07 55 N   Longitude  92degree 12 23 E   Humidity  Max  100  and Min  70   Average  75    Ambient Temperature  4 degree  Min   40 degree  Max   amp  Reference  Temp  25 degree Celsius    Elevation  54 1 MASL   Maximum Total Rainfall 353 6 mm  July    Earthquake Zone  5 IS 1893                     Existing Power amp    related Set Up at Site           The station is unmanned and there are thr 20 KW DG sets and one  of the thr set is run
22. Performance Guarantees and achiev the results as agreed in the  Contract  the Contractor undertakes to rectify the Plant and  Equipment and continue to demonstrate and prove the Performance  Guarantees till the rated output and other parameters are achieved   In case the rated output and other parameters are not achieved even                            SGI9878P 14 Page 14       after repeated Performance Guarantee Tests within 15 days of first  test  the Contractor shall be liable for Liquidated Damages due to  non performance as per Special terms  amp  Conditions    23 1 6 In case either the performance parameters achieved during  the performance guarantee tests are not within the acceptable  limits as per Technical Specifications or the total liquidated  damages due to shortfall in performance has exceeded the ceiling   OIL shall have the right to reject the plant as per  Rejection of  Defective Plant  clause mentioned elsewhere in the Contract                       23 2 Availability   235221 The Equipments under this Contract shall be designed for  maximum reliabilitv  availabilitv  and maintainabilitv and as  specified herein    23 2 2 The Contractor shall design the plant to maximize the  availability and the value shall be as per Technical  Specifications  Any shortfall in the guaranteed availability factor  of any of the Unit will be subject to Liquidated Damages  The  Liquidated Damages for shortfall in guaranteed availability factor  shall be as per Special Terms  am
23. Principal as part of the  business relationship  regarding plans  technical proposals and business  details  including information contained or transmitted electronically     4  The Bidder Contractor will  when presenting his bid  disclose any and all  payments he has made  is committed to or intends to make to agents   brokers or any other intermediaries in connection with the award of the  contract     The Bidder Contractor will not instigate third persons to commit offences  outlined above or be an accessory to such offences     Section 3   Disqualification from tender process and exclusion from future    Contracts    If the Bidder  before contract award has committed a transgression through a violation  of Section 2 or in any other form such as to put his reliability or risibility as Bidder into  question  the Principal is entitled to disqualify the Bidder from the tender process or to  terminate the contract  if already signed  for such reason     1     If the Bidder Contractor has committed a transgression through a violation of  Section 2 such as to put his reliability or credibility into question  the Principal is  entitled also to exclude the Bidder Contractor from future contract award  processes  The imposition and duration of the exclusion will be determined by  the severity of the transgression  The severity will be determined by the  circumstances of the case  in particular the number of transgressions  the  position of the transgressions within the company hier
24. RATORIES  CENTERS    1 The PV modules must be tested and approved by one of the IEC  authorized test centers  Test certificates can be from any of the  National Accreditation Board for Testing and Calibration  Laboratories  NABL   BIS Accredited Testing   Calibration  Laboratories    11 2 The inverters must be tested and approved by one of the IEC  authorized test centers  Test certificates can be from any of the  authorized laboratories viz  Electronics Regional Test Laboratory   ERTL  East    CPRI  Bangalore   ERTL  West  and ERTL  North    11 3 The batteries must be tested and approved by one of the IEC  authorized test centers  Test certificates can be from any of the  authorized laboratory viz  ERTL  East   Semi Lab Kolkata  CECRI  Chennai  CPRI  Bangalore  ERTL  North   and SEC    11 4 Test certificates for the BoS items  components can be from  any of the NABL  BIS Accredited  Testing Calibration  Laboratories  MNRE approved test centers                                                              2  Civil Work Specification   12 1 Concreting   f Concrete mix shall be of M 20 M 25 grade for pedestal and earth  pit chambers    f Pedestal base shall be provided with tapered gola using water  proofing compound of IS 2649    f CC work shall be done over th ntire Arrav area    f Curing of all concrete work shall be carried out continuously    E    for minimum of 7days                 12 2 Array layout   Contractor shall design the array layout by incorporating  following di
25. The array structure shall be so designed that it will occupy  minimum space without sacrificing the output from SPV panels    aad Design drawings with material selected shall be submitted  for prior approval of OIL    2 3 The structure shall be designed to allow easy replacement of  any module  amp  shall be in line with the site requirements    2 4 The array structure shall be made of hot dipped galvanized  MS angles of suitable size    2 5 The support structure design  amp  foundation shall be designed  to withstand wind speed upto 200 kmph using relevant Indian wind  load codes    2 6 The module alignment  amp  tilt angle shall be calculated to  provide the maximum annual energy output  This shall be decided  based on the location of array installation   2 7 All fasteners shall be of stainless steel of grade SS 304   2 8 The array structure shall be grounded properly using  maintenance fr arthing kit    2 9 Galvanized Steel Structural must be considered for all type  of structural steel proposed for the power plant     10 The mounting of solar modules shall be done on rooftop and  ntire Fabrication of elevated structure and the structure atop  loping roofs shall be done by the Bidder                                                                       a DN       3  JUNCTION BOXES    3 1 The array junction boxes shall be dust  vermin  amp  waterproof   amp  made of FRP ABS plastic    oer The Array Junction Box will also have suitable surge  protection  The Junction Boxes s
26. Yours Faithfully    Sd   MS A GOGOI  SENIOR MANAGER MATERIALS  FOR   GENERAL MANAGER  PLS        Page 5 of 5    ANNEXURE 1A    TECHNICAL SPECIFICATIONS           L A  Solar Photo Voltaic Module  Crvstalline    zali The Solar PV module will be minimum of 200 Wp nominal  rating    ne Solar modules offered shall be certified as per latest    edition of IEC 61215  The modules shall also qualify for IEC  61730 for safety qualification testing  For modules to be used in  a highly corrosive environment throughout their lifetime they  must qualify for IEC 6170  153 SPV module shall contain mono polv crvstalline high power  Silicon solar cells  The solar cell shall have surface anti   reflective coating to help to absorb more light in all weather  conditions   1 4 The module frame shall be made of aluminium or corrosion  resistant material  which shall   be electrolvtic allv compatible with the structural material  used for mounting the modules   a0 Photo electrical conversion efficiency of SPV module shall  not be less than 14     6 Fill factor of the module shall not be less than 0 70  ad Each module shall have low iron tempered glass front for  strength  amp  superior light   transmission  It shall also have tough multi layered polymer  back sheet for environmental  protection against moisture  amp  provide high voltage electrical  insulation    8 Solar PV module shall be highly reliable  light weight and  shall have a service life of more  than 25 years     9 The rated output of a
27. aanssecocsandoes  Date  18 05 2013 WINESS  lik jist wk    Page 5 of 5    
28. actor shall be responsible for all tools  tackles and test  equipment required for commissioning and carrying out tests    p  Contractor shall be arranging boarding  amp  lodging for his  engineers and transportation of men and materials to site at his  own expense    q  Location of site is at Jagiroad Town in Marigaon District of  Assam  adjacent to the National Highway No  37 at a distance of  about 60 KM from Guwahati    r  The Comprehensive AMC of the plant for 5 years after warranty  period shall be the part of the contract                                            s  Supply and installation of 6 Numbers energy efficient LED  lights  Reputed Make  of suitable wattage in place of existing  Security Light Fittings for equivalent illumination shall also  be in contractor   s scope        3  Design of system       SGI9878P 14 Page 3    The bidder to ensure proper system designing that would include his  own independent studies on peak sunshine data  resulting in the  correct sizing of equipment for the solar energy system and Battery  Bank with optimum Capacity for full back up for at least two  rainy cloudy days  It is therefore very important to form proper  design procedures and component sizing before any actual  implementation  The design procedures and all the equipment shall  comply MNRE specifications              4  Terms of Payment  4 1 Payment Schedule           4 1 1 Payment Schedule for Design  Manufacture  Supply  Packing  amp   Forwarding  Transportation to s
29. alify from the tender process all bidders who do not sign  this Pact or violate its provisions     Page 3 of 5    Section 7   Criminal charges against violating Bidders Contractors  Subcontractors    If the Principal obtains knowledge of conduct of a Bidder  Contractor or Subcontractor  or  of an employee or a representative or an associate of a Bidder  Contractor or  Subcontractor  which constitutes corruption  or if the Principal has substantive suspicion  in this regard  the Principal will inform the Vigilance Office     Section 8   External Independent Monitor Monitors   three in number depending on the size of the contract    to be decided by the Chairperson of the Principal     1  The Principal appoints competent and credible external independent Monitor for  this Pact  The task of the Monitor is to review independently and objectively   whether and to what extent the parties comply with the obligations under this  agreement     2  The Monitor is not subject to instructions by the representatives of the parties  and performs his functions neutrally and independently  He reports to the  Chairperson of the Board of the Principal     3  The Contractor accepts that the Monitor has the right to access without restriction  to all Project documentation of the Principal including that provided by the  Contractor  The Contractor will also grant the Monitor  upon his request and  demonstration of a valid interest  unrestricted and unconditional access to his  project documentatio
30. ance all HSE laws by the sub or sub sub  contractors   Za Every person deployed by the contractor in a mine must wear  safety gadgets to be provided by the contractor  The Contractor  shall provide proper Personnel Protective Equipment as per the  hazard identified and risk assessed for the job and conforming to  statutory requirement and company PPE schedule  Safety appliances  like protective footwear  Safety Helmet and Full Body harness has  to be DGMS approved  Necessary supportive document shall have to  be submitted as proof  If the Contractor fails to provide the  safety items as mentioned above to the working personnel  the  Contractor may apply to the Company  OIL  for providing the same   OIL will provide the safety items  if available  But in turn  OIL  will recover the actual cost of the items by deducting from  Contractor s Bill    However  it will be the Contractor s sole  responsibility to ensure that the persons engaged by him in the  mines use the proper PPE while at work                                                                          All the safety gears mentioned above are to be provided to the  working personnel before commencement of the work    Sa The Contractor shall prepare written Safe Operating  Procedure  SOP  for the work to be carried out  including an  assessment of risk  wherever possible and safe methods to deal  with it them  The SOP should clearly state the risk arising to  men  machineries  amp  material from the mining operation   
31. ara 4 2 below    b  Submission of a Bank Guarantee equivalent to 10  of the total  Contract Price valid for a period of first 5 years after  commissioning for settlement of claims against the Performance  Guarantee Parameters stipulated at clause no  7 0              SGI9878P14 Page 4    4 1 2 2 90  of the total price for Erection  Testing and  Commissioning of equipment and materials upon completion of  Erection at site and completion of acceptance tests at site    4 1 2 3 10  of the total price for Erection  Testing and  Commissioning of equipment and materials upon successful handing  over of the Plant to OIL        4 1 3 Payment Schedule for 5 years Comprehensive AMC   4 1 3 1 90  on pro rata towards the Annual Maintenance Contract  shall be paid against submission of duly certified invoice on  quarterly basis    4 1 3 2 The last 10   payment upon completion of successful  completion of Annual Maintenance Contract           Bidder   s to furnish the Annual Maintenance Schedule as part of the  Offer   4 2 Security Deposit   Before the Contractor is entitled for any payment under this  Contract  he shall submit a Bank Guarantee towards Security Deposit  for 10  of the total Contract Price valid in full valid up to end  of 2 months after warranty period  All BGs towards Advance and  Performance Guarantees  in the format as per our tender  shall be  from the Nationalized   Public Sector banks or other banks as  approved by the OIL                       5  Completion Time    T
32. archy of the Bidder and the  amount of the damage  The exclusion will be imposed for a minimum of 6 months  and maximum of 3 years     The Bidder accepts and undertakes to respect and uphold the Principal s    Absolute right to resort to and impose such exclusion and further accepts and  undertakes not to challenge or question such exclusion on any ground  including    Page 2 of 5    the lack of any hearing before the decision to resort to such exclusion is taken   This undertaking is given freely and after obtaining independent legal advice     If the Bidder Contractor can prove that he has restored recouped the Damage  caused by him and has installed a suitable corruption prevention system  the  Principal may revoke the exclusion prematurely     A transgression is considered to have occurred if in light of available evidence no  reasonable doubt is possible     Section 4   Compensation for Damages    If the Principal has disqualified the Bidder from the tender process prior to the  award according to Section 3  the Principal is entitled to demand and recover  from the Bidder liquidated damages equivalent to 3   of the value of the offer or  the amount equivalent to Earnest Money Deposit Bid Security  whichever is  higher     If the Principal has terminated the contract according to Section 3  or if the  Principal is entitled to terminate the contract according to section 3  the Principal  shall be entitled to demand and recover from the Contractor liquidated damages  equiva
33. bution Board   metering panel  amp  isolation panel  which also houses energy  meter                    8  Cables and Hardwares   Cables of appropriate size to be used in the system shall have  the following characteristics      Will meet IS 694 1554 standards     Temp  Range  100C to  800C      Voltage rating 660 1000V     excellent resistance to Heat  Fire  oil  cold  water  abrasion   UV radiation     Flexible   Cabling on DC side of the system shall be as short as possible to  minimize the voltage drop in the wiring  Components and hardware                                  shal be vandal and theft resistant  All parts shall be  corrosion resistant  The system description  general technical  requirements etc  are given for general guidance only  The    supplier manufacturer shall submit the detail design of the  complete solar generating system by using their software to  optimize the combination of modules considering the specific  location  isolation  nature of load etc              9  ENERGY METER   9 1 A smart Energy Meter shall be provided as approved by the OIL  to measure the delivered quantum of energy    9 2 Meter must be provided with the necessary data cables    9 3 Energy Meter should be import export type ABT compliant  0 5  Class of accuracy                 Tender No SG 9878P14 Page 7    10 0 The Balance of System   BoS  items   components of the SPV  power plants must conform to MNRE specification for off grid  solar project         0 AUTHORIZED TESTING LABO
34. city and quantity must always be available at site                               SGI9878P 14 Page 15    and kept ready for immediate use  Sufficient number of workmen must  be fully trained in the use of such equipment and must be available  for immediate intervention at all times   24 2 3 For storage of materials and equipment for the construction  and erection work  storage must be subdivided into storage units  and the distance between such storage units shall be as acceptable  to the insurance company which issued the policy  All inflammable  materials and especially all inflammable liquids and gases must be  stored at a sufficient large distance from the property under  construction or erection and from any hot work    24 2 4 Welding  soldering or the use of an open flame in the  vicinity of combustible material is only permitted if at least one  workman suitably equipped with extinguishers and well trained in  fire fighting is present    24 2 5 At the beginning of work  all fire fighting facilities must  be checked thoroughly    24 2 6 Explosives shall not be used at the site by the Contractor  without the permission in writing of OIL and only in the manner and  to the extent to which he has prescribed  Where explosives are used  by the Contractor  the same shall be transported to the site in  explosive proof van and stored in a special magazine to be provided  by and at the cost of the Contractor  who shall be liable for all  damages loss or injury to any person or pro
35. ct To be mentioned  Annexure 10C  Power Conditioning Unit  PCU    Parameters Required Offered  Make Reputed Manufacturers like  SMA  ABB etc    Nominal Output   230 415 volts  1  three phase  4   Voltage Wire output  Nominal voltage  shall be adjusted by  10  via  system set points   Output Frequency 50Hz   0 5   Inverter to follow grid  frequency up to  3Hz of the       nominal output frequency during  normal operation       Continuous Rating    Lal    To be mentioned       Max DC Link Voltage  Range       mm    To be mentioned       MPPT Range    mm    To be mentioned                                                          Control Type Voltage source  microprocessor  assisted output regulation  Waveform DSP Microcontroller generated  PWM for low THD  sinewave output  Parallel Operation   Phase Controlled Pulse Width  Power Control Modulation  PWM   THD Less than 3   Efficiency  94   Internal Protection   Inverter continuous overload  System protection   using electronic Inverter peak current  short  detection  circuit  protection  e Heatsink over temperature  protection  e Over under voltage AC voltage  protection  Tender No SG9878P14 Page 13                             LCD     keypad displaying the following        e Inverter per phase voltage   current  kW  kVA and frequency   e System voltage and frequency   e Inverter on line status   e PV panel voltage   e Solar charge current and  ambient temperature   e Individual power stage heat    sink and cabinet temperature    
36. ctivities against targeted dates and  targeted quantities in Performa as per the requirement of the  Contract for maintaining consistency of reporting and for  maintaining database by  the OIL  Reasons for shortfalls  if any   shall be clearly brought out and proposed remedial measures to  arrest the delays shall be indicated by the Contractor in the  progress report  wherever applicable    14 10 The progress report shall also highlight inspection status   The Contractor shall submit one copy of the inspection certificate  duly signed by representatives  authorized agencies after  inspection along with each progress report    14 11 In case of site work  manpower schedules area wise   skill  wise for subsequent month and status of the same for the previous  month shall be submitted                                                        15 0 Performance of Contract   15 1 The Contractor shall be responsible for the due and faithful  performance of the Contract in all respects according to the  drawings  specifications  particulars and all other documents  referred to in this Contract  Any approval which OIL may have given  in respect of the stores  materials  supplies or other particulars  and the work or the workmanship involved in the Contract  whether  with or without test carried out by the Contractor or the OIL   shall not relieve the Contractor from his obligations and  notwithstanding any approval or acceptance given by the OIL  it  shall be lawful for OIL to reject the 
37. d  Close that window  Next click on Add Atachment  a browser  window will open  select the  SSIG signed file from the PC and name the file under Description   Assigned to General Data and clock on OK to save the File     4 0 Please note that all tender forms and supporting documents are to be submitted through  OIL   s e Procurement site only except following documents which are to be submitted  manually in sealed envelope super scribed with Tender no  and Due date to Chief Material    Manager   Oil India Limited  Pipeline Headquarter    P O  Udayan Vihar  Guwahati    781171 on or before the Bid Closing Date and Time mentioned in the Tender     a  Original Bid Security   b  Detailed Catalogue  if any    c  Any other document required to be submitted in original as per tender  requirement    All documents submitted in physical form should be signed on all pages by the authorised  signatory of the bidder and to be submitted in triplicate     5 0 Bidders are requested to examine all instructions  forms  terms and specifications in the bid   Failure to furnish all information required as per the NIT or submission of offers not  substantially responsive to the bid in every respect will be at the bidders risk and may result  in rejection of its offer without seeking any clarifications     6 0 All the Bids must be Digitally Signed using    Class 3    digital certificate with Organisation    s  name  e commerce application  as per Indian IT Act obtained from the licensed Certifying  
38. e  monitoring and controls  facilities    g  Transportation of equipment from works to site  h  Unloading  loading in of all supplied equipments on foundations       at the selected place    i  Pre Commissioning  amp  commissioning of all supplied equipments   j  Test running of the Solar Plant as well as load trials at site   k        l however facilitate to  ensure that the same is obtained successfully    1  The system should be capable of providing all the data including  that of meters and PCU to the Remote Monitoring Control Facilities  to be installed at Pipeline Headquarters  OIL  Guwahati with  relevant IEC protocol  All the equipment  hardware  software  along with a latest version of branded laptop and necessary  software for mobile monitoring for complying with the same will  be in the bidder   s scope    m  UPS  Battery  Battery charger system to be considered as part of  the scope so as to keep the system live throughout year  The  battery should be of sufficient capacity to provide continuous back  up for two days with normal average power only even during  rainy low sunshine days without any interruption depending the  daily solar radiation and climatic parameters    n  Contractor shall be responsible for all civil jobs such as  construction  erection  installation  etc  as required depending  upon designed system and the site conditions including all material  supply  labour etc  related to construction  erection  installation   amp  commissioning    o  Contr
39. e Contractor shall be responsible  for settlement of claims with the underwriters  The Contractor  shall be the loss payee under the policy and the Contractor will  arrange replacements   rectification expeditiously without waiting  for settlement by insurance claim at Contractor s own cost                 9  Spares       9 1 Bidders to provide Commissioning Spares required for smooth  commissioning of the plant  Bidder shall submit a list of such  commissioning spares along with the bid  All such spares shall be  supplied along with the main equipment  This will be considered  during evaluation of the Bid  The Contractor shall return to OIL  all unused and left over commissioning spares  after successful  commissioning of the plant                    9 2 Bidder shall  in addition  provide a list of recommended spares  along with prices  quantity and sources  The prices of these  recommended spares will not be considered while evaluating the main  Bid  However  the prices shall remain firm for a period of three  years after successful commissioning and handing over of the entire  plant        9 3 Bidder has to provide all spares required for the plant during  the AMC period        SGI9878P 14 Page 7          10  Drawings   Documents   The Contractor shall submit all initial documents in 6 copies   final documents in 6 copies along with one soft copy  and  as  built  documents in 6 copies along with 1 soft copy  amp  1  reproducible        11  Price   The bidder shall quote pr
40. e the tender  documents before the last date of sale of tender document mentioned in the tender     3 0 The tender is invited under SINGLE STAGE TWO BID SYSTEM  The bidders are  required to submit both the  TECHNO COMMERCIAL UNPRICED BID    and    PRICED  BID    through electronic format in the OIL   s e Tender portal within the Bid Closing Date and  Time stipulated in the e Tender     3 1 Please ensure that Technical Bid   all technical related documents related to the  tender are uploaded in the Technical RFx Response  gt  User    gt  Technical Bid only  The     TECHNO COMMERCIAL UNPRICED BID    shall contain all techno commercial details  except the prices  Please note that no price details should be uploaded in Technical RFx  Response     Page 2 of 5    3 2 The    PRICE BID    must contain the price schedule and the bidder   s commercial terms  and conditions        3 3 A screen shot in this regard is given below  Offer not complying with above  submission procedure will be rejected as per Bid Rejection Criteria mentioned in  Annexure CCC                   Go to this Tab    Technical RFx  Response    for Uploading    Techno   commercial Unpriced Bid        Zest   mmmn      y   Testnsanes Response  Cosel macy Vi    RFx Response Number 60006452 RFx Number TEST2 Status Submit  RFx Owner WIPRO_TEST1 Total Value 0 00 INR RFx Response Vi                   Event Parameters         Service and Delive                  Currency  Indian Rupee   f Incoter   Detailed Price Information
41. ecord meeting Technical Criteria as stated vide Para 2 1   3 1  amp  3 2  The certification by the bidder for his   her own Solar  PV power plant will not be acceptable    a  The bidder shall enclose documentary evidence along with the  offer in support of 2 1       b  Copy of Work Order  Contract agreement and completion  certificate that the bidder has experience as per 3 1   c  Performance Certificate from th user regarding successful  operation of the Solar PV power plant Project for at least one  01   year as per Para 3 2 above        4 0 Average Annual Financial Turnover as per Audited Annual  Reports for the last three accounting years as on the bid closing  date should be at least Rs  85 00 lakhs  Rupees Eighty five Lakhs   only        For proof of Annual turnover  attested copies of the following  documents should be submitted along with the bid     i  A certificate issued bv a practicing Chartered  Cost  Accountants  Firm  certifving the Annual Turnover and nature of  business  and   ii  Audited Balance Sheet and Profit and Loss account    4 1 Bidder must quote for the AMC  The bidder shall submit an  undertaking in support of their concurrence of doing the AMC for  five years     B  COMMERCIAL        1  Bids are invited under Single Stage Two Bid System  Bidders have  to submit both the Unpriced Bids and Priced Bids through electronic  form in the OIL s e Tender portal within the Bid closing date and          SGI9878P 14 Page 2    time stipulated in the e Tender  T
42. ected straightway  Uploading the  Integrity Pact with digital signature will be construed that all pages of the Integrity  Pact has been signed by the bidder   s authorized signatory who sign the Bid     b  The name of the OIL   s Independent External Monitors at present are as under   Page 4 of 5    i  SHRI N  GOPLASWAMI  I A S   Retd     Former Chief Election Commissioner of India  E mail Id   gopalaswamin   gmail com    ii  SHRI RAMESH CHANDRA AGARWAL  IPS  Retd    Former Director General of Police  E mail Id   rcagarwal  rediffmail com    11 0The tender shall be governed by the Bid Rejection  amp  Bid Rejection Criteria given in  enclosed Annexure CCC  However  if any of the Clauses of the Bid Rejection Criteria    Bid Evaluation Criteria  as per Annexure CCC  contradict the Clauses of the tender and    or    General Terms  amp  Conditions    as per Booklet No  MM LOCAL E 01 2005 for E   procurement  LCB Tenders  elsewhere  those in the BEC   BRC shall prevail     12 0 To ascertain the substantial responsiveness of the bid OIL reserves the right to ask the  bidder for clarification in respect of clauses covered under BRC also and such clarifications  fulfilling the BRC clauses in toto must be received on or before the deadline given by the  company  failing which the offer will be summarily rejected       OOO    NOTE     Bidders should submit their bids  preferably in tabular form  explicitly mentioning  compliance   non compliance to all the NIT terms and conditions     
43. ed Annual Maintenance schedule  to OIL within 15 days of the placement of the purchase  order contract for AMC and on or before 15th January every year  thereafter           The contractor shall also submit a detailed report every quarter to  OIL about the maintenance carried out in the concerned period           For ongoing cleaning and maintenance the contractor shall provide  man power to carry out routine maintenance in line with OEM s  recommendation           29 2 Unscheduled  Break Down maintenance  The contractor shall have to rectify any functional failure in the  system  The contractor shall be allowed a notice period of 10 days  from the date Break Down to rectify the same  failing which a  penalty as per clause 21 shall be levied                 29 3 Spares required during AMC   The contractor shall supply all spares required during the AMC  period  This includes spares for scheduled as well as unscheduled  maintenance        30  Warranty   The Contractor shall be liable to replace any parts that may fail  or show signs of defects in the works done by the Contractor under  this Contract  or from any act or omission of the contractors for a  period of 12 months from the date of Commissioning of the complete  Power Plant or 24 months from the date of last major dispatch   whichever is earlier     31  General Conditions of Contract   All other terms and conditions shall be as per General Conditions  of Contract enclosed  However  in case of any discrepancy between  t
44. elated to BRC must be  submitted along with the Techno Commercial Bid           A  TECHNICAL        1 0 General   1 1 The offered Solar PV plant shall be rated for a minimum of 20  KWP   1 2 The 20 KWp Solar PV Plant shall be a complete svstem and meet  the specifications as per Technical Specifications of the NIT and  conforming to MNRE specifications    1 3 Any offer which does not include all the jobs services  mentioned in the Scope of Work will be considered as incomplete and             rejected   2 0 Bidder s Qualification   2 1 Bidder shall be an Original Equipment Manufacturer  OEM  of          Solar PV module or Bidders shall be Channel partner with valid  accreditation of MNRE under JNNSM   3 0 Experience        SGI9878P 14 Page 1       3 1 A bidder should have experience of setting up of minimum two  numbers of not less than 10 KWP Solar PV power plant  each  from  concept to commissioning including operation and maintenance  O amp M   in India  one of which should be in a Central   State Govt     public sector undertaking  PSU  Public limited company  during the  last seven  07  years    3 2 The SPV Power Generation Projects as quoted in 3 1 above   which the party has commissioned should be working successfully for  at least six months from the date of commissioning           Supporting documentary evidences to be provided    The Bidder shall furnish documentary evidences as mentioned below  along with the bid to establish his qualification experience    track r
45. ever  such  rejection replacement by OIL shall not absolve the Contractor of  any of his responsibilities under this Contract    16 2 In the event of such rejection  OIL shall be entitled to the  use of the plant in a reasonable and proper manner for a time  reasonably sufficient to enable him to obtain other replacement  plant                                   17 0 Type  Quality of Materials and Workmanship   17 1 The Contractor shall be deemed to have carefully examined and  to have knowledge of the equipment  the general and other  conditions  specifications  schedules  drawings  etc  forming part  of the Contract and also to have satisfied himself as to the nature  and character of the work to be executed and the type of the  equipment and duties required including wherever necessarv of the  site conditions and relevant matters and details  Anv information  thus procured or otherwise obtained from OIL shall not in any way  relieve th Contractor from his responsibility and executing the  works in accordance with the terms of contract    17 2 The items   works under the scope of the Contractor shall be  of the best quality and workmanship according to the latest  engineering practice and shall be manufactured from materials of  best quality considering strength and durability for their best  performance and  in any case  in accordance with the specifications  set forth in this Contract  All material shall be new  Substitution  of specified material or variation from the met
46. ffence or reported it to the Vigilance Office  the Monitor may also  transmit this information directly to the Central Vigilance Commissioner   Government of India    8  The word  Monitor  would include both singular and plural     Page 4of5    Section 9   Pact Duration    This Pact begins when both parties have legally signed it  It expires for the Contractor 12  months after the last payment under the respective contract  and for all other Bidders 6  months after the contract has been awarded     If any claim is made  lodged during this time  the same shall be binding and continue to  be valid despite the lapse of this pact as specified above  unless it is  discharged determined by Chairperson of the Principal     Section 10   Other provisions    1  This agreement is subject to Indian Law  Place of performance and jurisdiction is  the Registered Office of the Principal  i e  New Delhi     2  Changes and supplements as well as termination notices need to be made in  writing  Side agreements have not been made     3  If the Contractor is a partnership or a consortium  this agreement must be  signed  by all partners or consortium members     4  Should one or several provisions of this agreement turn out to be invalid  the  remainder of this agreement remains valid  In this case  the parties will strive to  come to an agreement to their original intensions     Ms A Gogoi  Sr  Manger Materials  For the Principal For the Bidder Contractor  Place  Guwahati Witness  1 cectceeriapsr
47. h as cement  aggregates   concrete cubes  soil and other consumables    24 10 5 Any special measures or techniques which may be necessary  for construction of structures such as dewatering  sheet piling   diaphragm walls  well sinking  well point system and continuous  pouring of concrete shall be deemed to have been taken into account  by the Contractor and no extra claim  whatsoever  shall be  entertained    24 10 6 The Contractor shall carry out structural load test on each  part of the building structure at his own cost if such structural  load test is warranted due to unsatisfactory test results of  concrete cubes and if so directed by the OIL                                                                    SGI9878P 14 Page 19       24 10 7 OIL may during the progress of Work  order the removal an  re erection of part or whole of the work executed  that is foun  not in accordance with the approved drawings  specification  written instructions  OIL shall not be responsible for any cost  incurred in connection with any such removal and re erection  th  Contractor shall indemnify OIL for any costs and expenses that OI  may have incurred in connection with such removal and re erection   Re inspection retest shall be carried out only after necessary  rectification work replacement by the Contractor    24 10 8 The inspection  examination or testing carried out by OIL  shall not relieve the Contractor from any of his obligations under  this Contract        FoununaaA          
48. hall be  mutually agreed    19 3 The Contractor shall provide all opportunities and information  to OIL s engineers to get acquainted with the technical know how  and the methods and practices adopted by the Contractor in basic  and detail engineering  The Contractor shall provide documents   drawings  calculations etc  as may be required by OIL s Engineers   19 4 OIL shall bear all costs relating to airfares  local travel   residential accommodation and subsistence in respect of OIL s  engineers                          20  NSPECTION AND TESTING   20 1 OIL shall have the right of inspection and testing the  contract work or any part thereof at any stage during the  manufacture at the Original Equipment Manufacturer   s premises   Should the Contractor himself not be in a position to carry out the  tests  he shall  within five  5  days of receipt of the OIL s  demand prepare specimen and samples and send them at his own cost  to such testing stations as OIL may specify and the cost of the  test so effected shall be to the Contractor s account  However   cost pertaining to the OIL s inspection personnel shall be borne by  the OIL    20 2 The Contractor shall bear all costs of any and all  inspections and tests    20 3 Should a part of the plant be manufactured not on Contractor s  own premises but on other premises  the Contractor shall likewise  obtain permission for OIL to inspect and test the work as if the  said plant were being manufactured on the Contractor   s premises 
49. hall have suitable arrangement  for the followings    a  Combine groups of modules into independent charging sub   arrays    b  Provide arrangement for disconnection for each of the groups   c  Provide a test point for each sub group for quick fault  location    d  To provide group array isolation    e  The current carrying rating of the Junction Boxes shall be  suitable with adequate safety factor to inter connect the Solar  PV array                             Tender No SGI9878P14 Page 4    3 3 The junction boxes shall have suitable cable entry points  fitted with cable glands of appropriate sizes for both incoming   amp  outgoing cables   3 4 Suitable markings shall be provided on the bus bar for easy  identification  amp  cable ferrules shall be fitted at the cable  termination points for identification                    4  POWER CONDITIONING UNIT  PCU    PCU shall supply the DC energy produced by array to DC bus for  inverting to AC voltage using its MPPT  Maximum Power Point  Control  control to extract maximum energy from solar array and  produce 400 V AC  3 phase  50 Hz to feed the LT panels        4 1 MPPT controller  inverter and associated control and  protection devices etc  all shall be integrated into PCU    4 2 The rating of PCU shall be suitable to the capacity offered  4 3 PCU shall provide 3 phase  400   5  V  50    1 5 Hz supply  on AC side with THD lt 3     DC voltage ripple content shall not be more than 3    Efficiency of PCU shall not be less than 97  
50. he Completion and handing over of the Off  Grid SPV projects  shall be done within 3 months from date of issue of LOI PO  However  we request to quote your best possible Commissioning  Schedule but not later than the above mentioned requirement  The  Bidder shall submit Ll   12 schedule along with the offer           6  Liquidated Damages  6 1 OIL shall levy Liquidated Damages at the rate of 0 5  of the  Contract Price per week of delav in completion time  subject to a    o    ceiling of 7 5   of the total contract value  For this  purpose a                      delav of one dav also shall be considered as a delav of one week   6 2 The Liquidated damages for Performance Guarantee parameters  shall be as Specified in Clause 7 below    6 3 The liquidated damages on account of delay as well as       performance parameters during warranty shall be limited to a  maximum of 7 5  of the Contract price  There shall be no cap on  liquidated damages on account of performance parameters related to  guaranteed generation mentioned in clause 7 0 below    6 4 Further  the Contractor will have to satisfy the requirement  of Technical Specifications  If the required parameters are not  achieved  then the Contractor will have to rectify the same within                   SGI9878P 14 Page 5    a period of one month  failing which the equipment will be rejected  and all damages shall be recovered from the Contractor    6 5 After erection   commissioning  the System supplied under this  Contract 
51. he Special Terms and Conditions and General Conditions of  Contract  Special Terms and Conditions shall prevail           SGI9878P 14 Page 22    ANNEXURE     CCC    BID REJECTION CRITERIA  BRC    BID EVALUATION CRITERIA  BEC     The following BRC BEC will govern the evaluation of the bids  received against this tender  Bids that do not comply with  stipulated BRC BEC in full will be treated as non responsive and  such bids shall prima facie b rejected  Bid evaluation will be  done only for those bids that passed through the    BID REJECTION  CRITERIA  BRC     as stipulated in this documents                                      Other terms and conditions of the enquiry shall be as per general  terms and conditions vide MM LOCAL E 01 2005 for E procurement LCB  tenders  However  if any of the clauses of the BRC BEC contradict  the clauses of the tender or MM LOCAL E 01 2005 elsewhere  those in  the BRC BEC shall prevail                             BID REJECTION CRITERIA  BRC               The bid shall conform generally to the specifications and terms and  conditions given in the Tender Document  Bids will be rejected in  case services offered do not conform to the required parameters  stipulated in the Scope of Work  Not withstanding the general  conformity of the bid to the stipulated specifications  the  following mandatory requirements will have to be particularly met  by the Bidders without which the same will be considered as non   responsive and rejected  All documents r
52. he unpriced bid is to be  submitted as per scope of work and technical specification of the  tender and the price bid as per the online commercial bid format   For details of submission procedure  please refer relevant para of  general terms and conditions vide MM LOCAL E 01 2005 for E   procurement LCB tenders  Any offer not complying with the above  shall be rejected straightway           ii  Bid security     Bid security of Rs 85 000 00 shall be submitted manually in sealed  envelope superscribed with Tender no  and Bid Closing date to Chief                Manager PL   Pipeline Headquarters  Oil India Limited  Guwahati   781171  Assam on or before the Bid Closing Date and Time mentioned  in the Tender  If bid security in ORIGINAL of above mentioned                      amount is not received within bid closing date and time   the bid  submitted through electronic form will be rejected without any  further consideration  For exemption for submission of Bid  Security  please refer Clause No  8 8 of General Terms and  Conditions vide MM LOCAL E 01 2005 for E Procurement LCB Tenders   The Bid Security shall be valid for 10 months from the date of bid  opening  i e  upto 24 05 2014        In case of extension of Bid Closing date against the tender where a  bidder has already submitted his bid with requisite bid security  validity within the original B C  Date such bidders will extend  validity of bid security covering the extended period of the bid  closing date     iii  Perfor
53. hod of fabrication                         SGI9878P 14 Page 10    may be permitted but only with the prior written approval of the  OIL   17 3 The Contractor shall procure and or fabricate all materials  and equipment in accordance with all requirements of Central and  State enactment  rules and regulations governing such work in India  and at site  This shall not be construed as relieving the  Contractor from complying with any requirement of OIL as enumerated  in the Contract which may be more rigid than and not contrary to  the above mentioned rules  nor providing such construction as may  be required by the above mentioned rules and regulations  In case  of variance of the Technical Specification from the laws   ordinance  rules and regulations governing the work  the Contractor  shall immediately notify the same to the OIL  t is the sole  responsibility of the Contractor  however  to determine that such  variance exists  Wherever required by rules and regulations  the  Contractor shall also obtain the statutory authorities  approval  for the plant  machinery and equipment to be supplied by the  Contractor    17 4 The Contractor shall follow all codes and standards referred  in the Contract and the documents related thereto  Codes and  standards of other countries may be followed by the Contractor with  the prior written approval of OIL  provided materials  supplies and  equipment according to the standard are equal to or better than the  corresponding standards specified
54. ices FOR Narangi Guwahati   Site  which  shall remain firm till the contract execution and inclusive of all  taxes  duties etc as well as site supervision for successful  commissioning  performance           12  Approval of System Design   12 1 The design of each subsystem and bill of material intended to  be used shall be submitted to respective authority for approval   12 2 Quality Assurance Plan should include design control  process  control  quality control  testing of sub system              13  Arbitration  The venue of arbitration shall be Guwahati     14  Progress Monitoring   14 1 The Contractor shall appoint a Project Manager  PM  on or  before the effective date of Contract for overall co ordination   The Bio data of the PM shall be furnished to the OIL  OIL shall  inform the Contractor within 7 days of receipt of Bio data   objections  if any and shall demand for a change in PM assigning  valid reasons    14 2 In case of site activities  a Site Manager  SM  shall be  appointed  All provisions as per 14 1 are applicable for this  clause also    14 3 Within 3 days of the ffectiv date of Contract  the  Contractor shall submit to OIL a detailed organization chart  showing the proposed organization structure for the project  along  with details of key personnel  both at office and at site  OIL  shall inform the Contractor within 7 days of receipt these details   objections  if any and shall demand for alteration assigning valid  reasons    14 4 These PM   SM and other
55. ifications  fulfilling the BRC clauses in toto must be received on or before  the dead line given by the company  failing which the offer will be  summarily rejected              iii  Price bids of only those bidders will be opened whose offers  are found technically acceptable  The technically acceptable  bidders will be informed before opening of the  price bid         AOKK KK K K       SGI9878P14 Page 6    Annexure 1  Project Experience    Kindly provide relevant Project Experience of the bidders relevant past experience       SI  No   Project   Year   Year Location of   Size of   Client  project project          Award   Completion                                                 Please provide proof of completed assignments    Signature  Seal     Full Name     Address     Page 1 of 5    Annexure 2  Company Information    Kindly provide the following details for the Firm    1  Name of the Firm     2  Turnover in the last three audited financial years  in INR         FY 2010 2011   FY 2011 2012   FY 2012 2013                       Please provide Published Annual Account for Balance Sheet and Profit and Loss statements  as Proof     Signature   Seal     Full Name      Address      Page 2 of 5       Annexure 3  Compliance Statement for General Terms and Conditions    and Special Terms and Conditions    Write  YES  If agreed and accepted otherwise write  NO  and enclose deviations with Clause No                                                  SECTION NO  CLAUSE NO  COMPLIANCE 
56. ill be final and binding on the  bidders  No deviation will  however  be accepted in the clauses  covered under BRC              ii  If any of the clauses in the BRC contradicts with other clauses  of bidding document elsewhere  then the clauses in the BRC shall  prevail           2 0 BID EVALUATION CRITERIA  BEC                        A  TECHNICAL           SGI9878P 14 Page 5    The bids conforming to the technical specifications  terms and  conditions stipulated in the bidding document and considered to be  responsive after subjecting to Bid Rejection Criteria  BRC  will be  considered for further evaluation as per the Bid Evaluation  Criteria given below           i  In the event of computational error between unit rate and total  price  the unit rate as quoted by the bidder shall prevail    ii  Similarly in the event of discrepancy between words and quoted  figure  words will prevail    iii  Evaluation will be done on    total contract cost    basis to  ascertain the lowest bid   Annexure     5           B  COMMERCIAL           1  To evaluate the inter se ranking of the offers  Assam entry tax  on purchase value will be loaded as per prevailing Govt  of Assam  guidelines as applicable on bid closing date    Bidders may check this with the appropriate authority while  submitting their offer        ii  To ascertain the substantial responsiveness of the bid OIL  reserves the right to ask the bidder for clarification in respect  of clauses covered under BRC also and such clar
57. ing the contractor  to take action to comply with the requirements  and for further  non compliance  the contractor will be penalized prevailing  relevant Acts Rules Regulations    24  When there is a significant risk to health  environment or  safety of a person or place arising because of a non compliance  of HSE Measures Company will have the right to direct the  contractor to cease work until the non compliance is corrected   25  The contractor should prevent the frequent change of his  contractual employees as far as practicable    26  The contractor should frame a mutually agreed bridging  document between OIL  amp  the contractor with roles and  responsibilities clearly defined    27  For any HSE matters not specified in the contract document   the contractor will abide the relevant and prevailing  Acts rules regulations  pertaining to Health  Safety and  Environment                                   KaKKKK KK KK          Tender No SG9878P14 Page 18    ANNEXURE   BBB  SPECIAL TERMS AND CONDITIONS    The following clauses shall be read in conjunction with General  Conditions of Contract as well as Technical Specifications to the  extent applicable  In case of any discrepancies between the  stipulations in these documents  the General Conditions of Contract  shall stand superseded                 1  Objective   The main objective of this project is to prepare DETAILED PROJECT  REPORT  DPR   DESIGN  MANUFACTURE  SUPPLY  INSTALLATION  ERECTION   TESTING AND COMMISSIONING W
58. ite  The Contractor shall ensure  that proper documentation is followed at entry gate of OIL s  premises for such items  which shall be carried back by Contractor  after completion of work                    24 9 Erection   installation and construction   24 9 1 For completing the work within the time schedule  the  Contractor shall carry out the work round the clock by providing  adequate manpower  however  without violating any labour laws and  safety guidelines    24 9 2 The Contractor shall unpack and do visual checking against  physical damages to the equipment  cases  clean equipment befor   start of erection  Damage  if any  will be reported to the OIL   Consultant and shall be rectified   replaced expeditiously  in case  of materials not supplied by the Contractor   so as not to upset  the erection and commissioning schedule  Delay on account of                               SGI9878P 14 Page 18    settlement of insurance claims shall not be considered an excuse  for delay in Completion    24 9 3 The Plant and equipment will be installed on the civil  foundation structures  including power control room and battery  room  to be constructed by the Contractor  However  if any minor  deficiency is noticed in the dimensions  centerlines  levels   locations etc  of the foundation or anchor bolts or other  embedment   s  the Contractor shall make arrangement for  rectification of the same at his own cost  Chipping dressing of the  foundation with air or air and water jet prio
59. ite of Off Grid Solar Photovoltaic  Power Plant with REMOTE MONITORINGS AND CONTROLS                      4 1 1 1 Before the contractor becomes eligible for any payment  under the contract he shall fulfill the following    a  Submission of Bank Guarantee towards security deposit as per  para 4 2 below    D  Submission of a Bank Guarantee equivalent to 10  of the total  Contract Price valid for a period of first 5 years after  commissioning for settlement of claims against the Performance  Guarantee Parameters stipulated at clause no  7 0       4 1 1 2 10  of the total price for Design  supply of equipment   materials  maintenance tools and tackles  amp  spares shall be paid  against preparation of DPR  Verification of site  amp  DNI data and  Design of the plant    4 1 1 3 60  of the total price for Design  supply of equipment   materials  maintenance tools and tackles  amp  spares shall be paid  against supplies on receipt of total supplies under the Contract at  site    4 1 1 4 30  of the total price for Design  supply of equipment   materials  maintenance tools and tackles  amp  spares shall be paid  on successful completion of installation and commissioning                    4 1 2 Payment Schedule for Unloading at Site  Erection  Testing  and commissioning of 20KWp SPV power plant   4 1 2 1 Before the contractor becomes eligible for any payment  under the contract he shall fulfill the following    a  Submission of another Bank Guarantee towards security deposit as  per p
60. l be deducted per day    21 2 More than 10 days to 20 days  1  of the annual maintenance  contract amount will be deducted per day    21 3 More than 20 days  3  of the annual maintenance contract       amount will be deducted per day           21 4 After 20 days  OIL may take up the maintenance works on its  own  and deduct all expenses from the contractor        22  TRAINING  22 61  Contractor shall arrange for training OIL   s personnel for  working procedures and systems covering working norms and quality                   SGI9878P 14 Page 13    standards  Such training will include training in Contractor s  design and engineering department and or in the manufacturers shop  and for operation and maintenance in working plants at no cost to  OIL    22 2 The Contractor shall furnish detailed training program for  OIL s personnel not later than 2 months from the effective date of  the Contract  The training program shall be imparted to ensure the  readiness of OIL sS personnel before the commencement of operation  of the plant  The travelling and living expenses of the OIL s  trainees shall be borne by the OIL  OIL shall also arrange  necessary travel documents for his trainees  The Contractor shall   however  assist in arranging visa and medical insurance of  trainees  wherever necessary                                23 0 Performance Guarantee  Availability  amp  Reliability Requirement  and Tests       23 1 Performance Guarantees  amp  Tests  23 1 1 The guarantee for perfo
61. lar power project must use a RF  identification tag  The following information must be mentioned  in the RFID used on each module  This can be inside or outside  the laminate  but must be able to withstand harsh environmental  conditions   and also in clear and indelible markings       Name  monogram or symbol of manufacturer of PV module       Name  monogram or symbol of manufacturer of Solar cells       Type or model number       Unique Serial number and model number of the module       Polarity of terminals or leads  colour coding is permissible       Maximum system voltage for which the module is suitable       Date  amp  place  country of origin  of manufacture  separately for  PV module and solar cell       I V Curve for the module       Wattage  Im  Vm  amp FF for the module       Name of the test lab issuing IEC certificate     Other relevant information on traceability of solar cells and  module as per ISO 9000                                                                             Tender No SG9878P14 Page3    The 20 KWP solar PV power plants shall have necessary equipment  to continuously measure solar radiation  ambient temperature   wind speed and other weather parameters and simultaneously  measure the generation of DC power as well as AC power generated                      from the plant   Module shall have type approval certificate as per Annexure 9   Bidder shall provide the data sheet as per Annexure 10 B              2  Module Mounting Structure    2 1 
62. le in the Technical RFx   gt   External Area    gt  Tender Documents     d  In the event of receipt of only a single offer against the tender within B C  date  OIL  reserves the right to extend the B C  date as deemed fit by the Company  During the  extended period  the bidders who have already submitted the bids on or before the original    B C  date  shall not be permitted to revise their quotation   Page 1 of 5    e  Any sum of money due and payable to the contractor  including Security Deposit  refundable to them  under this or any other contract may be appropriated by Oil India  Limited and set off against any claim of Oil India Limited  or such other person or persons  contracting through Oil India Limited  for payment of sum of money arising out of this  contract or under any other contract made by the contractor with Oil India Limited  or such  other person or persons contracting through Oil India Limited      f  Bidder are advised to fill up the Technical bid check list  Annexure EEE  and Response  sheet  Annexure FFF  given in MS excel format in Technical RFx   gt  External Area    gt   Tender Documents  The above filled up document to be uploaded in the  Response     Special Note     1 0 General Qualification Criteria     In addition to the general BRC BEC  following criteria on Bidders  Experience and their  financial capabilities shall be considered  documentary evidence to be provided along with  the bid in Technical RFx   gt  External Area    gt  Tender Documen
63. lent to 5  of the contract value or the amount equivalent to Security  Deposit Performance Bank Guarantee  whichever is higher     The bidder agrees and undertakes to pay the said amounts without protest or  demur subject only to condition that if the Bidder Contractor can prove and  establish that the exclusion of the Bidder from the tender process or the  termination of the contract after the contract award has caused no damage or  less damage than the amount or the liquidated damages  the Bidder Contractor  shall compensate the Principal only to the extent of the damage in the amount  proved     Section 5   Previous transgression    The Bidder declares that no previous transgression occurred in the last 3 years  with any other Company in any country conforming to the TI approach or with  any other Public Sector Enterprise in India that could justify his exclusion from  the tender process     If the Bidder makes incorrect statement on this subject  he can be disqualified  from the tender process or the contract  if already awarded  can be  terminated for such reason    Section 6   Equal treatment of all Bidders Contractor Subcontractors   The Bidder Contractor undertakes to demand form all subcontractors a  commitment in conformity with this Integrity Pact  and to submit it to the Principal  before contract signing     The Principal will enter into agreements with identical conditions as this one  with all Bidders  Contractors and Subcontractors     The Principal will disqu
64. line   Copper Indium Gallium  Diselenide  CIGS     No  of PV cells per Module   matrix   Solar module frame material   Frameless   Module dimensions To be mentioned   Module weight To be mentioned   Output cables Polarized weatherproof DC  rated multicontact  Connectors   Junction Box Weather resistant HDPE   IP65    Construction Front  High transmission  tempered glass   Back  Polvester Encapsulant  EVA   ax  Temperature rise of  To be mentioned   solar cells under  severe   working conditions over   ax  Ambient Temp    Nominal voltage To be mentioned   Nominal Wattage To be mentioned   Power Tolerance  3    Peak power voltage  Vmp  To be mentioned   Peak Power current  Imp  To be mentioned   Open circuit voltage  Voc  To be mentioned   Short circuit current  Isc    To be mentioned   Weight of each module To be mentioned   Fill Factor Atleast 0 6  higher shall  be preferred     Temperature coefficient of    0 09      C   Isc   Temperature coefficient of    0 33  mV    C             Tender No SG9878P14    Page 12                                                                                        Temperature coefficient of    0 2      C  power   Maximum system voltage 600 1000V  Maximum series fuse rating 15  A   NOCT  Air 20 oC  Sun   4742   C  0 8kW m2  Wind 1m s    Standards   Approvals from  IEC 61646  IEC 61730  TUV   International Agencies UL   Temperature cvcling range  40   C to 485   C  Humidity 85  RH   Static load  front and   2400 pascals  back    Hailstone impa
65. mance Bank Guarantee     Successful bidder will be required to furnish a Performance Bank  Guarantee  10  of the order value     For exemption for submission of Performance Bank Guarantee  please  refer Clause No  9 12 of General Terms and Conditions vide  MM LOCAL E 01 2005 for E Procurement LCB Tenders  The Performance  Bank Guarantee for capital nature items like plant and machinery  etc  shall be valid for 12 months from the date of commissioning or  18 months from the date of despatch whichever concludes earlier   However  for consumables like chemicals  cement  tubular etc  the  Performance Bank Guarantee shall be valid for 12 months from the  date of despatch                     iv  The Bank Guarantee should be allowed to be encashed at all  branches within India           SGI9878P 14 Page 3    v  Validity of the bid shall be minimum 120 days from the Bid  Closing Date        vi  The prices offered will have to be firm through delivery and  not subject to variation on any account  A bid submitted with an  adjustable price will be treated as non responsive and rejected        vii  Bids received after the bid closing date and time will be  rejected  Similarly  modifications to bids received after the bid  closing date  amp  time will not be considered     viii  All the Bids must be Digitally Signed using  Class 3  digital  certificate  e commerce application  as per Indian IT Act obtained  from the licensed Certifying Authorities operating under the Root  Certifying Auth
66. material  if it is found that  the materials supplied and or erection and or construction work  carried out by the Contractor are not in conformity with the terms  and conditions of the Contract                                               SGI9878P 14 Page 9    LBs  2 The Contractor shall cooperate with the OIL s other  contractors  if any  for any associated plant and freely exchange  all relevant technical information with them to obtain the most  efficient and economical design and to avoid unnecessary  duplication of equipment  The Contractor shall also co ordinate  with other contractors for any interface activity at his battery  limits  No remuneration shall be claimed from OIL for  such  technical co operation           16 Rejection of Defective Plant                   16 1 If the completed Plant  or anv portion thereof  before Final  Take Over  is found to b defective or fails to fulfill the  requirements of the Contract  OIL shall give the Contractor notice          setting forth particular of such defects or failure and the  Contractor shall forthwith make the defective plant good  or alter  the same to make it complv with the requirements of the Contract   Should he fail to do so within a period of time as deemed  reasonable by OIL and stated in the said notice  OIL may reject and  replace at the risk and cost of the Contractor  the whole or any  portion of the plant  as the case may be  which is defective or  fails to fulfill the requirements of the Contract  How
67. mensions     Minimum 750mm space around the periphery wall of rooftop     Minimum 900mm space near the rain water exhaust pipe  water  tank and rooftop entrance   12 3 Stair case   Contractor shall provide a GI stair case for grid rooftop of  following specifications   Base channel  110X50mm   Hand rail pipe  50mm dia   Distance between Steps    300mm     Steps angle     110X110mm   A Structural design   TS 800 2007 shall be followed for structural design  Contractor  shall submit the DBR and STADD calculations along with the  structural design   12 5 Control Room                                      aaow                      Tender No SG9878P14 Page8          The contractor shall design the control room as per the relevant  IS  CEA  amp  manufacturer   s recommendations standards  Accommodation  of following equipments facilities shall be considered while  designing the control room     Electrical Panel     Battery Bank     Sitting area for operators if required    13 0 Plant Protections   3 1 Lightning  amp  Over Voltage Protection     SPV Power Plants will be provided with Lightning and over  voltage Protection connected to proper earth mats      The Lightning conductors shall be provided as per Indian  Standards  IS  in order to protect the entire Solar Array yard  from Lightning strikes      Necessary concrete foundation for holding the lighting  conductor in position will be made after giving due consideration  to maximum wind speed    f Lighting conductors shall be ear
68. n  The same is applicable to Subcontractors  The Monitor is  under contractual obligation to treat the information and documents of the  Bidder Contractor Subcontractor with confidentiality     4  The Principal will provide to the Monitor sufficient information about all meetings  among the parties related to the Project provided such meetings could have an  impact on the contractual relations between the Principal and the Contractor  The  parties offer to the Monitor the option to participate in such meetings     Di As soon as the Monitor notices  or believes to notice  a violation of this  agreement  he will so inform the Management of the Principal and request the  Management to discontinue or heal the violation  or to take other relevant action   The monitor can in this regard submit non binding recommendations  Bevond  this  the Monitor has no right to demand from the parties that thev act in a  specific manner  refrain from action or tolerate action     6  The Monitor will submit a written report to the Chairperson of the Board of the  Principal within 8 to 10 weeks from the date of reference or intimation to him bv  the  Principal  and  should the occasion arise  submit proposals for correcting  problematic situations     7  If the Monitor has reported to the Chairperson of the Board a substantiated  suspicion of an offence under relevant Anti Corruption Laws of India  and the  Chairperson has not  within reasonable time  taken visible action to proceed  against such o
69. n or any other person  from removing  or damaging any such article or thing and shall  immediately upon discovery thereof and before removal acquaint OIL  of such discovery and carry out at the expense of the OIL   as to the disposal  removal or otherwise of the same              24 7 Unloading   The RR Challans duly endorsed will be handed over to the Contractor  for taking delivery of materials from railway   trucks   ships  unloading the same from wagons  trucks   ships and subsequent  handling  transportation and storage at the Site after submission  of custody cum indemnity bond in OIL s approved Performa  The  demurrage charges  if any  will be payable by the Contractor for  the reasons attributable to the Contractor              24 8 Supply of erection   construction materials and consumables   The Contractor shall provide all necessary erection equipment and  tools and tackles including material handling equipment   crane  service will be provided by OIL    compressors and other equipment  and instruments and consumables  all commissioning equipment and  instruments  welding equipment  winches  alignment tools  precision  levels etc   which may be required for carrying out the erection  and commissioning work  as applicable  efficiently  Unless  otherwise specified  the above erection equipment   materials shall  be the property of the Contractor  However  OIL S prior written  permission shall be required for removal of these erection  equipment   materials from the S
70. ncipal will inform its  Vigilance Office and in addition can initiate disciplinary actions     Page lof5     1      2     Section 2   Commitments of the Bidder Contractor    The Bidder Contractor commits itself to take all measures necessary to prevent  corruption  He commits himself to observe the following principles during his  participation in the tender process and during the contract execution     1  The Bidder Contractor will not  directly or through any other person or firm   offer  promise or give to any of the Principal s employees involved in the  tender process or the execution of the contract or to any third person any  material or immaterial benefit which he she is not legally entitled to  in order  to obtain in exchange any advantage of any kind whatsoever during the  tender process or during the execution of the contract     2  The Bidder Contractor will not enter with other Bidders into any undisclosed  agreement or understanding  whether formal or informal  This applies in  particular to prices  specifications  certifications  Subsidiary contracts   submission or non submission of bids or any other actions to restrict  competitiveness or to introduce cartelisation in the bidding process     3  The Bidder Contractor will not commit any offence under the relevant  Anticorruption Laws of India  further the Bidder Contractor will not use  improperly  for purposes of competition or personal gain  or pass on to  others  any information or document provided by the 
71. ng    16  The health check up of contractor s personnel is to be done  by the contractor in authorized Health Centres as per OIL s  requirement  amp  proof of such test s  is to be submitted to OIL   The frequency of periodic medical examinations should be every  five years for the employees below 45 years of age and every  three years for employees of 45 years of age and above    17  To arrange dailv tool box meeting and regular site safetv  meetings and maintain records                                               Tender No 5G19878P14 Page 17    18  Records of daily attendance  accident report etc  are to be  maintained in Form B  E  J  as per Mines Rules 1955  by the  contractor    19  A contractor employee must  while at work  take reasonable  care for the health and safety of people who are at the  emplovee s place of work and who may be affected by the  employee   s act or omissions at work    20  A contractor employee must  while at work  cooperate with  his or her employer or other persons so far as is necessary to  enable compliance with any requirement under the act or the  regulations that is imposed in the interest of health  safety and                                                 welfare of the emplovee or anv other person    22  Contractor s arrangements for health and safetv management  shall be consistent with those for the mine owner    23  In case Contractor is found non compliant of HSE laws as             required company will have the right for direct
72. ny supplied module shall not vary by  more than 3  from the average power rating of all ratings  Each  module  therefore  has to be tested and rating displayed    10 It shall perform satisfactorily in relative humidity up to  95  and temperature between   4 0  C and 85  C It shall be able to  withstand wind gusts up to 150 Km hr      The solar modules should have suitable encapsulation  amp   sealing arrangements to protect the silicon cells from the                                                                                                                                           environment  The encapsulation arrangement shall ensure complete  moisture proofing for th ntire life of solar modules   2 Bidder must consider Shading Losses as per the relevant       Industry Standard  amp  Practice while designing the proposed power  plant Guarantee on power output of solar module will be as  follows                    Tender No 5G19878P14 Pagel    Guarantee on power output of solar module will be as follows                                      End of Year Guaranteed Output  1 98 5    2 97 5    3 97    6 95  9 6   8 94 5    10 93 5    15 91    20 88 5    25 86                    1 14 Marking  Each module shall carry the following clear and  indelible markings        name  monogram or symbol of manufacturer        type or model number        serial number        polarity of terminals or leads  colour coding is permissible        maximum system voltage for which the module is 
73. o cold chamber at  40  C  Ten such cycles shall  be carried out        6  Composite temp humidity test  As per IEC    Test shall be carried out as mentioned in IEC specification     7  Acceptance Criteria        The Module is deemed to have passed the tests if the sample meets  the following criteria    a  There is no evidence of a major visual defect such as a  cracked or broken window  bubbles or de lamination in the  encapsulant etc    b  There are no cell breakages  amp  no water infiltration into  terminal boxes   c  No sample exhibits any open circuit or ground fault    d  No visible evidence of major defects that may affect the  performance of the module                                Tender No SG9878P14 Page 10    e  Insulation Resistance not less than 50M ohm at 500 V DC   f  Degradation of performance may not exceed 5  after each single       test or 8  after the whole s       quenc    Annexure 10 A  Solar Module Data Sheet  Crystalline PV        Parameters    Required    Offered       PV Module Manufacturer    To be mentioned                                                                                                                                                                                  name  amp  Country  PV Module type Multi Mono crystalline  No  of PV cells per Module  Solar module frame   Anodized Aluminum  material  Module dimensions To be mentioned  Module weight To be mentioned  Output cables Polarized weatherproof DC  rated multicontact  Connec
74. ober  amp  January  for contracts of more than one year   However  for contracts of less than one year  returns shall be  submitted monthly   10  It will be entirely the responsibility of the Contractor his  Supervisor representative to ensure strict adherence to all HSE  measures and statutory rules during operation in OIL s  installations and safety of workers engaged by him  The crew  members will not refuse to follow any instruction given by  company s Installation Manager   Safety Officer   Engineer    Official   Supervisor Junior Engineer for safe operation    Any compensation arising out of the job carried out by the  Contractor whether related to pollution  Safety or Health will be  paid by the contractor only                                                           12  Any compensation arising due to accident of the Contractor s  personnel while carrying out the job  will be payable by the  contractor    13  The contractor shall have to report all incidents including                near miss to Installation Manager   departmental representative  of the concerned department of OIL    14  The contractor has to keep a register of the persons  employed by him her  The contractor s supervisor shall take and  maintain attendance of his men every day for the work   punctually    15  If the company arranges any safety class   training for the  working personnel at site  company employee  contractor worker   etc  the contractor will not have any objection to any such  traini
75. ority of India  RCAI   Controller of Certifying  Authorities  CCA  of India  The bid signed using other than  Class  3  digital certificate  will be rejected                                   ix  C folder is meant for Technical bid only  Therefore  No price  should be given in C folder  otherwise the offer will be rejected           x  Price should be maintained in the    online price schedule    only   The price submitted other than the    online price schedule    shall  not be considered        xi  The User ID  amp  Password are not transferable  Bids  submitted by parties to whom the User ID  amp  Password was not issued  by the Company will be rejected              xii  Conditional offers will be rejected     xiii  Bids received in any form or media other than through  OIL   s e Procurement portal will not be accepted        xiv  Bid documents uploaded in the e Procurement Portal shall  be tvped written and scanned clearly and contain no inter  lineation  erasures or overwriting except as necessary to correct  errors made by bidder  Any bid not meeting this requirement shall  be rejected        XV  Bidders must quote clearly and strictly in accordance  with the price schedule outlined in  Price Schedule Format    Annexure    5  of bidding documents  otherwis th bid will be    summarilv rejected  The Bids in which the rates for anv part of the  work are not quoted shall be rejected           SGI9878P14 Page 4    xvi  Bidder must accept and complv with the following clauses
76. p  Conditions                                         24  ERECTION  INSTALLATION  amp  CIVIL WORKS  The Contractor shall strictly adhere to the following as applicable  as per scope of work                               24 1 Mobilization and access to site   24 1 1 Communication facilities  if required shall be arranged by  the Contractor    24 1 2 While execution of work  no person other than the       Contractor  Sub Contractor and his or their employees shall be  allowed on the Site during working hours except with the written  permission of the OIL  Facilities to inspect the works at all times  shall be afforded by the Contractor to OIL and his representatives  and other authorized officials  The labour camps shall not be  established by the Contractor inside the site premises  Nothing  extra shall be payable by OIL on this account    24 1 3 The access to the Site shall be exclusive to the Contractor  but only to enable him to execute the works  The Contractor shall  afford to OIL and to other Contractors whose names shall have been  previously communicated in writing to the Contractor by the OIL   reasonable facilities for the execution of the work concurrently  with his own    24 2 Safety   24 2 1 Upon arrival of Plant and Equipment Material at the Site   the Contractor shall assume custody thereof and remain responsible  thereafter for safe custody until the whole plant is handed over   24 2 2 Adequate firefighting equipment and extinguishing agents of  sufficient capa
77. perty and shall be  responsible for complying with all statutory obligations in these  respects  The contractor shall employ only licensed blasters    24 2 7 The contractor shall for the duration of the contract   maintain in good order and condition all such protective apparel  and equipment  such as safety helmets  safety belts  gloves etc    for all their workmen and staff engaged for contract work as may be  required to be used by Law and by the OIL  The contractor shall  ensure that such protective apparel  equipment are worn and used by  their workmen and staff without fail  In case OIL notices any non   compliance thereto  OIL will not only be entitled to make  alternative arrangements for the same but recover cost and damages  plus OIL s own charges   20  or as deemed fit by the company  on  his account    24 2 8 The contractor shall follow the safety instructions as  mentioned in Annexure X                                                                 24 3 Care of works and security   24 3 1 From the commencement to the completion of work  the  Contractor shall take full responsibility for the care of Works and  for all temporary Works from damages  loss or theft  by making  suitable security arrangement  In case any damage or loss shall  happen to the Works or to any part thereof or to any temporary  Works from any cause whatsoever  the Contractor shall at his own  cost replace or repair and make good the same           SGI9878P 14 Page 16    24 3 2 The Contractor
78. put voltage of 400    volts a c  shall include the following but not limited to the  supply  erection  testing  commissioning and integration into the  OIL   s Mainline SCADA to facilitate control amp  monitoring from          Master control Room at Pipeline Headquarters  Noonmati  Guwahati   Assam suitably   a  Solar PV modules of composite capacity as mentioned above  including mounting frames  structure  array foundation and module  inter connection  Array Junction boxes    b  Power Conditioning Units that are communicable on with remote  sensing  DSP and sleeping mode operation  System shall initiate DG  set START command in existing sequence when SPV system unable to  meet the load demand and initiate DG Set STOP command when SPV  system ready able to take the load  Suitable manual control both  from local control desk and Remote Master Control desk shall be  incorporated in the system   c  AC power evacuation panel with bus bars and circuit breakers  with proper interfacing with the existing distribution panels    d  Metering and protection  Isolation systems  Meters to be  communicable on remote sensing    e  LV Power and Control Cables including end terminations and other  required accessories for both AC  amp  DC power    f  Earthling system for PV Array  DC power system  lightning  protection system  AC power system for LT  equipment etc for                                        SGI9878P 14 Page 2       control room building  PCU  Data acquisition system with remot
79. r to placing the  equipment on foundation will also be carried out by the Contractor   However  the procedure for rectification will be finalized by the  Contractor with the written approval of OIL   24 9 4 CC mattress shall be done on the Solar Panel array area                 24 10 Inspection  amp  Testing during erection  amp  commissioning   24 10 1 OIL or his authorized agent shall have the right of  inspection and testing the materials brought to site by the  Contractor and erection   installation   construction work at any  stage and the Contractor on demand from OIL shall carry out such  tests in an appropriate manner in the presence and free of charge  to QTIL    24 10 2 Within 15 days after th ffective date of Contract  the  Contractor shall submit a detailed Quality Assurance Plan  QAP    covering all activities under scope of supply of the Contractor and  all stages of inspection  for OIL to comment   approve the same   and indicate OILfs    24 10 3 No work shall be covered up or put out of view without the  approval of the OIL  n the event of failure to do so  the  Contractor shall uncover any part of the work or make openings in  or through the works as OIL may direct and they shall be made good  with materials approved by OIL and should match with workmanship of  the surrounding work    24 10 4 The Contractor shall at his cost  arrange for construction  laboratory equipment  testing materials  consumables etc   at site  for testing of construction materials suc
80. ransmission  It shall also have back  glass sheet for environmental protection against moisture  amp   provide high voltage electrical insulation     Tender No SG 9878P14 Page 2                                                                                                                                           1 23 Solar PV module shall be highly reliable  light weight and  shall have a service life of more than 25 years   24 The rated output of anv supplied module shall not varv bv  more than 3  from the average power rating of all ratings  Each  module  therefore  has to be tested and rating displaved    125 It shall perform satisfactorily in relative humidity upto  95  and temperature between  4  C and 85  C It shall be able to  withstand wind gusts of upto 150 Km hr    L26 The solar modules should have suitable encapsulation  amp   sealing arrangements to protect the it from the environment  The  encapsulation arrangement shall ensure complete moisture proofing                                                             for th ntire life of solar modules   L 23 Bidder must consider Shading Losses as per the relevant  Industry Standard  amp  Practice while designing the proposed power       plant     Guarantee on power output of solar module will be as follows        of Year Guaranteed Output       98 5        97 5        97        95 5        94 5        93 5        91        88 5                 Hs nB VO 4N eR    86        1 29 Marking   Each PV module used in any so
81. rmance includes ratings output for  the individual items  systems and electrics as well as Technical       Specifications for the integrated operation of the Plant  The  Contractor s responsibility under this guarantee shall not in any  way be reduced  diminished or absolved for any reason whatsoever in  respect of supplies  materials and equipment not manufactured by  the Contractor  Details of Performance Guarantee tests and method  of computation of performance values shall be as per Technical  specifications and Special Conditions of Contract   23 1 2 The Contractor undertakes to demonstrate to the satisfaction  of OIL the Performance Guarantee  PG  Tests and achieve all the  parameters as specified in Technical Specifications of the Contract  within 15 days from the date of notice to Contractor regarding  readiness of plant   equipment for PG tests   23 1 3 The Contractor shall provide and install all measuring  instruments required for checking the guaranteed performance which  e  e             are not included among the permanent measuring instruments of th  unit sub unit  Such instruments shall be furnished by th  Contractor on a temporary basis for the duration of the Performance  Guarantee Tests    23 1 4 During performance tests  OIL shall make available necessary  Operating and Maintenance personnel  However  the charges for  consumable etc  and other such items shall be borne by the  Contractor    23 1 5 In case the Contractor fails to demonstrate and prove the  
82. rms and  conditions of the Contract shall be deemed waived or amended by  either party unless such waiver or amendment is executed in writing  by the duly authorized agents or representatives of such party   The failure of either party to execute any right of termination  shall not act as a waiver or amendment of any right of such party  provided hereunder                    28  After Sales Service   The details of service centers in India shall be provided along  with the offer  All essential materials  amp  manpower shall be placed  at the servic centers to ensure quick  amp  efficient after sales  service              29  Comprehensive Annual Maintenance Contract  This shall cover two parts  a  Scheduled  Preventive maintenance   b  Unscheduled  Break Down maintenance                29 1 Scheduled  Preventive maintenance   The contractor shall have to quote the rates for Annual Maintenance  Contract for 5 years after the warranty period  which includes bi  monthly visits mutually agreed interval and supply of essential  spares  During the visit  cleaning of the panels  amp  tightening of  the connections shall be carried out        The AMC shall include overall supervision of maintenance activities  that are required to ensure optimum performance of the Solar system  as per the performance guarantee parameters indicated above and  Guaranteed Generation figures for 25 years submitted by the  contractor        SGI9878P 14 Page 21          The contractor shall submit a Detail
83. rnational  Non Governmental Organisation  Transparency International   Tl   Following TI s  national and international experience  the Principal will appoint an external independent  Monitor who will monitor the tender process and the execution of the contract for  compliance with the principles mentioned above     Section 1   Commitments of the Principal     1  The Principal commits itself to take all measures necessary to prevent  corruption and to observe the following principles      1  No employee of the Principal  personally or through family members  will in  connection with the tender for  or the execution of a contract  demand  take a  promise for or accept  for him herself or third person  any material or  immaterial benefit which he she is not legally entitled to     2  The Principal will  during the tender process treat all Bidders with equity and  reason  The Principal will in particular  before and during the tender process   provide to all Bidders the same information and will not provide to any Bidder  confidential additional information through which the Bidder could obtain an  advantage in relation to the tender process or the contract execution     3  The Principal will exclude from the process all known prejudiced persons    2  If the Principal obtains information on the conduct of any of its employees which is  a criminal offence under the relevant Anti Corruption Laws of India  or if there be    a Page 2 of 6 substantive suspicion in this regard  the Pri
84. sh the surplus quantity of the materials belonging to the  Contractor  OIL shall allow the Contractor to remove such materials  if it is satisfied  in its sole and absolute discretion  only after  completion of the entire Work    25 3 No imported Material shall be allowed to be taken out other  than imported tools and tackles and instruments brought by the  Contractor on draw back basis and provided  he has carried out  necessary documentation at the time of taking such items inside the  Plant   25 4 The Contractor shall return to OIL all unused and left over  commissioning spares  after successful commissioning of the plant                                                                 SGI9878P 14 Page 20       25 5 OIL shall have the right to take possession or use any  completed or partially completed Work  Such possession or use shall  not be deemed to be an acceptance of any work done not in  accordance with the Contract  However  any damage to such work  solely due to such provision or use shall be to the OILs account        26 0 USE OF COMPANY S EQUIPMENT    26 1 Contractor shall assume the risk of and shall be solely  responsible for damage to and loss or destruction of materials and  equipment or supplies furnished by Company  In case there is a loss  or damage to the company s equipment for causes attributable to  contractor  the contractor shall compensate the company              27 0 WAIVERS AND AMENDMENTS    It is fully understood and agreed that none of the te
85. shall have to pass the site tests as stipulated in the  Technical Specification without any deviations thereof  otherwise  OIL shall have the right to reject the entire equipment  amp  recover  the amounts paid together with compensation in relation thereto or  levy liquidated damages as deemed fit by OIL at his sole  discretion                    Teg Performance Guarantee Parameter  TeL Solar PV Module  Module shall be having a minimum guarantee  for a period of 25 years  In case of any deviation observed during    operations from the performance guarantee parameters cited  the  Contractor shall be informed in writing by OIL  The Contractor  shall be responsible to rectify the same within 10 days of  notification without any extra cost to OIL  Performance guarantee  parameters on output of solar module shall be as follows              End of Year  Guaranteed Output  98 5   97 5    97    95 5   94 5    10 93 5    15 91    20 88 5    25 86     OA G N        The above shall be guaranteed at the consumer end and that shall be  treated as the measuring point  The bidders should provide a  quarterly guaranteed generation in MUs  Million Unit  along with  the offers over the next 25 years considering the degradation in  output based on clause above  Penalty shall be levied on an annual  basis in terms of revenue lost to the utility for the deviation in  output         Penalty  2   Tariff     MUs guaranteed   MUs supplied     Tariff shall be as per prevailing ASEB rates for Guwahati
86. such  tests of the plant in accordance with the contract and shall give  all such facilities to OIL or his authorised representative to  accomplish such tests    20 8 When the inspection tests have been satisfactorily completed  at the contractor   s or his sub contractor s premises  OIL shall  issue a certificate to that effect  to the extent such certificate  is required to be delivered by OIL pursuant to this Contract     20 9 In case any Equipment fails in inspection tests or the test  reports are not satisfactory  OIL shall reject or demand  rectification   re inspection  Re inspection retest shall   e  carried out only after necessary rectification work replacement by  the Contractor    20 10 No Plant  Equipment and Material shall be shipped before th   inspection certificate  waiver certificate and dispatch clearance  have been issued by the OIL    20w11 In the case of commissioning spares  operating and  maintenance spares and insurance spares  the same shall be offered  for inspection along with the main equipment    20 12 The inspection  examination or testing carried out by OIL  shall not relieve the Contractor from any of his obligations under  this Contract                                                        21 0 Penalty    For any delay in attending breakdown report  delay in completing                         breakdown report of the plant  penalty will be imposed as under   21 1 More than 5 days to 10 days  0 5  of the annual maintenance  contract amount wil
87. suitable       Date  amp  place of manufacture        I V Curve for the module        Wattage  Im  Vm  amp FF for the module   Module shall have type approval certificate as per Annexure 9   Bidder shall provide the data sheet as per Annexure     10 A                                1B  Solar Photo Voltaic Module  Thin Film    5 The Solar PV module will be minimum 30Wp nominal rating    16 Thin Film Solar modules offered shall be certified as per  latest edition of IEC 61646   7 The modules shall also qualify for IEC 61730 for safety  qualification testing  For modules to be used in a highly  corrosive environment throughout their lifetime they must qualify  for IEC 61701  The safety class shall be UL 1703   8 SPV module shall contain amorphous silicon microcrystalline  solar thin film or shall be of Copper Indium Gallium Diselenide   CIGS   The thin film modules shall have surface coating to help  to absorb more light in all weather conditions  The modules shall  be able to perform well under weak light conditions  diffuse  amp   reflective light    9 The module frame shall be made of aluminium or corrosion  resistant material  which shall be electrolytic ally compatible  with the structural material used for mounting the modules  1 20 Photo electrical conversion efficiency of Thin Film module  shall not be less than 6 5     of Fill factor of the module shall not be less than 0 6    L 22 Each module shall have low iron tempered glass front for  strength  amp  superior light t
88. thed through flats and  connected to earth mats as per applicable IS with earth pits      The pits are provided with Masonry enclosure with cast iron  cover plate having locking arrangement  watering pipe using  Charcoal and salt as per IS                                                        13 2 Grounding     The complete Solar PV power Plant with all its accessories will  be grounded  so that in the event of a lightning strike or  utility over voltage  current will find a safe path to earth   Note that a separate grounding would be provided for this  purpose  separate from the one used for lightning conductor      Each Solar PV array structure shall be grounded properly as per  IS standard      The earth conduction shall run through appropriate pipes partly  buried and partly on the surface of the control room building   The complete earthing system shall be mechanically  amp  electrically  connected to provide independent return path to earth                    Annexure 9  Quality Testing of PV Module    Quality Testing of PV Module    Modules used in crystalline PV solar panels shall have IEC 61215  compliance certificate  The qualification testing procedure is  defined in IEC 61215 to examine the impact of mechanical  thermal   amp  electrical stress on power output  The bidder shall submit  appropriate type approval certificate for the offered solar  modules from IEC approved laboratory  Similarly Thin Film Solar  panels shall be IEC 61646 compliant                   
89. tors  Junction Box Weather resistant HDPE   IP65   Construction Front  High transmission  tempered glass   Back  Polyester Encapsulant  EVA  ax  Temperature rise of To be mentioned  solar cells under severe  working conditions over  Max  Ambient Temp   Nominal voltage To be mentioned  Nominal Wattage To be mentioned  Power Tolerance  3   Peak power voltage  Vmp  To be mentioned  Peak Power current  Imp  To be mentioned  Open circuit voltage  Voc  To be mentioned  Short Cl roure current   To be mentioned   Isc   Weight of each module To be mentioned  Fill Factor 0 7  Temperatur coefficient of    0 065  0 015      C  Isc  Temperatur coefficient of     160 420 mv    C  Voc  Temperature coefficient of    0 5  0 05      C  power  Maximum system voltage 600 1000V  Maximum series fuse rating  NOCT  Air 20 OC  Sun   4742   C  0 8kW m2  Wind 1m s   Standards   Approvals from  IEC 61215  IEC 61730  TUV   International Agencies UL  Tender No SG9878P14 Page 11                   Temperature cycling range  40   C to  85   C  Humidity 85  RH   Static load  front and 2400 pascals  back           Hailstone impact       25mm at 23m s          Annexure 10 B  Solar Module Data Sheet  Thin Film PV                                                                                                                                            Voc             Parameters Required Offered   PV Module Manufacturer To be mentioned   name  amp  Country   PV Module type Thin Film Amorphous  Silicon micro crystal
90. ts  as on the Bid Closing Date     i   Successful execution of a single order of value not less than 42 50 Lakhs for supply of  similar items during last three years     ii   Annual turnover of the firm in any of the last three financial years or current financial  year should be more than 85 00 Lakhs     2 0 Application showing full address email address with Tender Fee  Non refundable  of Rs   1 000 00 in favour of M s Oil India Limited and payable at Guwahati is to be sent to Chief  Material Manager   Oil India Limited  Pipeline Headquarter    P O  Udayan Vihar  Guwahati         781171  Application shall be accepted only upto one week prior to Bid Closing date  The  envelope containing the application for participation should clearly indicate    REQUEST FOR  ISSUE OF USER ID AND PASSWORD FOR E TENDER NO        for easy identification and  timely issue of user ID and password  On receipt of requisite tender fee  USER_ID and initial  PASSWORD will be communicated to the bidder  through e mail  and will be allowed to  participate in the tender through OIL   s e  Procurement portal  No physical tender documents  will be provided  Details of NIT can be viewed using    Guest Login    provided in the e   Procurement portal  The link to e Procurement portal has been also provided through OIL   s  web site www oil india com     NOTE  PSUs and SSI units are provided tender documents Free of Cost  as per govt  guidelines   however they have to apply to OIL s designated office to issu
91. ure but capable of initiating  DG set START command in existing sequence when SPV system unable  to meet the load demand and initiate DG Set STOP command when SPV  system ready able to take the load  Suitable manual control both                                              Tender No SG9878P14 Page5         from local control desk and Remote Master Control desk shall be  incorporated in the svstem    4 15 PCU to be communicable on remote sensing    Indications  through LEDs  amp  LCD display      Inverter ON     LOAD ON       Inverter under voltage over voltage    Inverter over load     Inverter over temperature   Protections      Over voltage both at input  amp  output      j   i   i   i       B                   Over current both at input  amp  output   Over under frequency   Over temperature   Short circuit   Protection against lightening   Surge voltage induced at output due to external source   idder shall provide the data sheet as per Annexure   10C             Typical Technical Features shall be as follows                             Parameters Value   Continuous Output Power To suit the Capacity of the  Rating proposed Plant   AC voltage 3phase 400V     5    Frequency 50Hz   Waveform Sine wave   PV entries 2   Minimum Efficiency 97         Ambient temperature range   0 45  C          Total Harmonic Distortion  lt  3                       Degree of protection IP21   Nominal Voltage and  400 V  3 Phase  50 Hz  Frequency   Frequency Tolerance    3    Voltage Tolerance  15
    