ISTAR Evaluation - Software Engineering Institute

image

Contents

1. 0 Product Release Control cccccccsseeees K E lt lt lt Z2Z2Z No horiz commun Minimal open closed No trace Problem reporting Isolated But do have checklists CMU SEI 88 TR 3 159 Figure C 3 Design and Coding Functionality Checklist PRIMARY ACTIVITIES Detailed Design Create system skeleton ceseeeeeees Code Development and Translation Create program library ccceeeseeeees Create prog lib interdep c eee Develop package specs create package SPEC eeeeeeeeeeeeeeeeeees modify package SPEC eee eee eee eee delete package Spec s src Develop package bodies create package bodies modify package bodies delete package bodies Query and manip prog lib list unit names list unit type we list prog lib interdep list subprog interdep determine completeness a determine recomp c ceeeeeeeeeeneeeees list package interdep eee eee FEMOVE UN ith unian ian R clear prog lib cescvessecscecseoceesteceessstscndeseeeves Translate code trans into a prog lib eee create cross reference Map sesse display error messages s list subprog interdep ai pretty print source code Create executable image n se Execute code halt resume terminate execution trace execution path oh clock CPU time by subprog n SECONDARY
2. Generic Experiment Description Experiment 1 steps 3 4 5 and 6 Create initial baseline Mapping Issues Problems What is a baseline in ISTAR An Ada workbench work area The source code must be in an Ada workbench work area in order to be operated compiled edited upon As many work areas as needed can be constructed e g one for each baseline The Ada workbench provides no facility for marking code as immutable Code cannot be sent to other users from the Ada workbench except through the contract database facility A configuration item in the contract database of the experimenter performing the next steps ISTAR version and configuration management can be used to freeze and identify the baseline CMU SEI 88 TR 3 109 ISTAR inter contractual transfer operations can be used to allow others ac cess to the code ISTAR inter contractual transfer operations are inconvenient when used on a private contract A configuration item within an ISTAR library The advantages listed in the prior alternative ISTAR inter contractual transfer operations are convenient when used on a library The installation of configuration items in libraries is a multi step task Mapping Rationale The ISTAR library option was chosen Keystroke Details Each Ada module is exported from the Ada workbench to the experimenter s private contract within a configuration item B0O1 1 The experimenter then performs a raise noti
3. 0 set up accounting reports as set up statistical reports ee Reflecting modifications to plan reassignment of people cee changes in task structure schedule changes in project or product structure changes in computing resources 158 Supported Y N lt Zz lt lt Z2 lt Z22Z2Z22 lt lt lt lt lt lt lt lt ZzZ lt lt lt lt lt lt lt lt z lt NZZZ Observations No formal basel COCOMO Print reports used Many Enter in database Within scheduler Performed manually in experiment Change in task def Not tried Many Individuals only No accounting Same as completion reports Performed manually in experiment Not tried CMU SEI 88 TR 3 Project Execution Communication and coordination communication between team members work area coordination task completion and notification Information access and control project database access ACCESS CONTO Gnt conte Product Management Traceability of project documentation access trace information cseeeeee creation of trace information 0 Control of change requests Approve FEQUESTS eeceeseeeeeeeeteeeeeeteeees log and track requests eee eee eee display change history eee Quality control check adherence to standards 24 V amp V and acceptance testing support test plan development
4. F4a What means exist for finding out the status of teams tasks and products e g on line queries interim or periodic reports What type of queries are supported How easy is it to add custom queries The framework contains a general status query mechanism for contract status whether it has been accepted by the contractor transactions updates and cancellations general information on a given Cl XI or work area The monitoring facility is more user friendly and gives status compiled from timesheets Example information includes running over under on time and resources F4b If task lists are supported are they strictly private to each user or is their information shared among team members e g passed down a hierarchy Are tasks assigned to physical persons or to logical roles Different people can assume the same role such as maintainer of a library Check off style and supervised task lists are not supported Textual tasks taken out of scheduled WBS s are assigned to individual users who cannot share them with other team members Each user is able to manually create sub tasks and assign them to other team members CMU SEI 88 TR 3 177 F4c What does the environment support for logical groups and accounts Can access rights be mapped to a task or only to a person Does the environment have the notion of a task description which automatically links a task with the users assigned to it ISTAR does not support logic
5. No CMU SEI 88 TR 3 F9 F10 F11 F12 F13 F14 CMU SEI 88 TR 3 How well are merge inconsistencies identified When XIs are merged from one Cl into another naming inconsistencies may arise The user is asked to rename the XI as the process proceeds The text of XIs cannot be merged How well are merge inconsistencies handled See above What type of product release information is maintained a What was built when and by whom The build tool records that infor mation for its products b Number of distributed versions no c Differences among versions no d Locations of each version no e Required hardware for each version no Correlation between versions and error reports no Problem reports are attached to Cls or Xls The user is free to attach them as he sees fit There is no automatic means for having them referenced by system releases g Correlation between versions and components yes The build tool records the identity of the components variant and version numbers used in the build h Errors reported fixed by version no How is product release information queried and displayed The build tool s query menu allows the display of such information as it keeps see above Describe the mechanics of reverting back to an earlier release of a product using old binaries sources and dependent modules Not directly supported Are unused intermediate files automatically
6. T1 3 changed T11 reviews bug report in 4 and begins design change T11 sends timesheet to T1L T12 begins change to code in report 3 T12 sends timesheet to TiL Mapping Issues Problems Mapping Rationale Timesheet transport mechanism must be up and running As mpm create admin 1 Cls and assign self contracts named adminCon and ac cepted as ADMIN which will be used for timekeeping mpm timesheet monitoring is initialized T11 accepts and views assignments from T1L T11 creates admin 1 Cls and as signs self contracts named adminCon and accepted as ADMIN which will be used for timekeeping T12 accepts and views assignments from T1L T12 creates admin 1 Cls and as signs self contracts named adminCon and accepted as ADMIN which will be used for timekeeping T1L sends down the problem reports to T11 and T12 T1L creates admin 1 Cis and assigns self contracts named adminCon and accepted as ADMIN which will be used for timekeeping Timesheet monitoring is initialized T11 attaches PR to assigned CI T11 sends timesheet to T1L T12 attaches PR to assigned CI T12 sends timesheet to T1L Keystroke Details Timesheet transport mechanism must be up and running As frmadmin sys admin workbench general shutdown If that does not work cd FRMDATA tmp create BB DIE and GPO DIE to kill off bigbro and GPO If they do not die in a few minutes remove these files and the LCK files and then kill 15 Log in to ISTAR sys admin
7. Keystroke Details As t12 CONTRACT code WORKBENCH CONFIGURATION COMPONENT FUNCTIONS CREATE t12deliv 1 EXIT Framework ops deliver t12deliv 1 against workAssign code 1 EXIT Keystroke Problems Generic Experiment Description 11 6 Finish off T12 and start up T12suc Mapping Issues Problems Mapping Rationale Accept T12 delivery cancel T12 assignment assign t12suc tasks Keystroke Details As til Accept T12 delivery CONTRACT titeam OPS REGISTER focus on delivery creates t12deliv 1 in titeam EXIT Cancel T12 assignment WORKBENCH PROJECT MANAGEMENT TASK DEFINITION housekeeping IMPORT SCHEDULE planning t1 1 sched 1 OK Task id 1301 CANCEL XI workCancel code 1 td 1 Assign t12suc tasks CMT FUNCTIONS CREATE NEW Cls workAssign codeSuc 1 Move to each of these Change MERGE INTO from planning t1 1 planning t1 1 wbs 3 planning t1 1 sched 3 Do merge EXIT PROJECT MANAGE MENT TASK Housekeeping IMPORT schedule planning t1 1 sched 3 OK Task id CMU SEI 88 TR 3 143 2301 jobcode 7301 activity code suc ISSUE subcontract name pmexp t12suc WcodeS LF XI workAssign codeSuc 1 td 1 OK Keystroke Problems Generic Experiment Description 11 11 T12suc accepts first assignment and plans for work Mapping Issues Problems Mapping Rationale T12suc accepts and views assignments from T1L T12suc creates admin 1 Cl and assign self contracts named adminCon Accepts a
8. Not applicable C 2 5 General Questions G1 G2a 172 Ada filename syntax Do Ada source code files have to have a specific extension If so what extension No Ada source files are kept in the Ada workbench Each element of an Ada workbench work area is an Ada compilation unit The name of the element in the work area is the name of the compilation unit as known to the compiler The type specification body subunit is also known to the workbench Does all source code have to be in the same directory or is a hierar chical project structure supported Not applicable Source code is kept in workbench work areas not UNIX direc tories See next question and answer CMU SEI 88 TR 3 G2b What mechanism is used for sharing program libraries Each ISTAR Ada workbench work area is associated with exactly one Ada program library The workbench implements an ACQUIRE command which calls the compilers Alsys ACQUIRE command which allows one program library to reference compilation units in another library The workbench dis plays a menu of compilation units in the target library which must be owned by the current user AS many units as desired may be acquired in this way G2c Can a package specification and body be separated in different program libraries Yes G3 Intermediate compilation files None C 3 Project Management C 3 1 Functionality Questions Fla Fill out the functionality checklist for each of the four
9. PERFORMANCE MEASUREMENT Note responsiveness of communication QUESTIONS F3g F4e F5f P3b Generate distribution list based on filed error reports that have been handled by this release Distribute release notice to customers ACTIVITIES PDM 2 b PDM 2 c PDM 4 Invite all project members to a release completion party ACTIVITIES PX 1a Distribute customer delivery Release 1 1 to responding customers ACTIVITIES PDM 4 A 2 4 The System Analyst The system analyst receives the collection of error reports analyzes them and the source code of the corresponding release and provides recommended actions to the manager for each problem report 1 o Oo For error report 1 prepare and send a response to customer indicating that the reported item is not an error in the Ul system ACTIVITIES PDM 2 a PDM 2 b For error report 2 indicate a recommended change to VT with an indication of the complexity of the change For error report 3 indicate a recommended change to CLI package str_utilities with an indication of the complexity of the change For error report 4 examine the user manual trace to the source code of CLI ex amine its related design document and recommend a change to the design source code and user manual The affected package is command_interpreter PERFORMANCE MEASUREMENT Record elapsed time to use the traceability relations ACTIVITIES PDM 1 a QUESTIONS F4j F5a Pid For error r
10. Pascal CMU SEI 88 TR 3 4 3 APCR 4 4 SX1 4 5 SDL 4 6 VDM 4 7 RGL RGT 5 Overall Quality and User Experience 6 Conclusions Bibliography Appendix A Generic Experiment Steps A 1 Configuration Management A 1 1 Configuration Management Experiment 1 A 1 2 Configuration Management Experiment 2 A 1 3 Configuration Management Experiment 3 A 2 Project Management A 2 1 The Experiment Setup A 2 2 The Customers A 2 3 The Manager for Product Maintenance A 2 4 The System Analyst A 2 5 Team 1 A 2 6 Team 2 A 2 7 Team 3 A 2 8 Documentation Group A 2 9 QA Group A 3 Design and Coding A 4 System Administration A 4 1 System Management Experiment 1 A 4 2 System Management Experiment 2 A 4 3 System Management Experiment 3 A 4 4 System Management Experiment 4 Appendix B Phase 4 Develop Environment Specific Experiments B 1 Introduction B 2 Configuration Management B 3 Project Management B 4 Design and Coding B 5 System Administration Appendix C Phase 5 Execute Environment Specific Experiments C 1 Checklists C 2 Configuration Management C 2 1 Functionality Questions C 2 2 Performance Questions 56 57 57 58 58 65 69 71 73 73 73 76 78 80 81 86 87 89 90 91 92 92 92 93 100 100 102 103 105 107 107 109 116 149 153 155 156 163 163 168 CMU SEI 88 TR 3 C 2 3 User Interface Questions C 2 4 System Interface Questions C 2 5 General Questions
11. The UNIX C technical workbench supports ISTAR users access to the host UNIX environ ment It provides an escape to the shell and provides for import and database infor mation The escape to the UNIX shell is via a workbench menu item and results in the users being placed in the SHELL of choice The SHELL environment variable is inherited from the shell used to initially invoke ISTAR The forked shell s current directory is set to the users HOME The environment of the user s initial shell is NOT fully replicated Exiting the shell returns the user to the UNIX C workbench Files created from a shell can be imported to the ISTAR database via a menu selected command lf a directory is specified a subtree is imported The import export operations duplicate storage and do not merely point to the data within the UNIX file system There is also an interface with the system generation BUILD facility and BUILD_C and BUILD_STR typed database objects We did not use these mechanisms It is not possible to move objects from the UNIX file system to other workbenches The database types are different For example UNIX text files cannot be read into the text workbench Ada programs cannot be moved from the UNIX file system to the Ada workbench The E editor recognizes bang escapes to the shell Regrettably the identity of the shell is not taken from the SHELL variable but is always bin sh 4 2 Pascal The Pascal workbench
12. They are also available as escape sequences even on terminals without function keys 14 CMU SEI 88 TR 3 been selected the local menu contains a command to create a successor of the selected Cl e HELP This key invokes the context sensitive help system e VALIDSET This key is used for filling in form fields It causes the display of a menu containing items which can validly be entered into the field For example during the specification of an import operation the VALIDSET key will display a list of all XIs which can be imported from the contract into the work area The user may use menu selec tion techniques to select an item from this list e CONTEXT The project management tools use this key to switch between different views of their database For example the structure of a product within an activity can be displayed by focusing on the product that is moving the cursor to it and pressing the CONTEXT key 2 3 Analysis An analysis of ISTAR s contract model and user interface follows 2 3 1 Contract Model The contract model is designed so that each user operates within an environment that cannot be changed without his knowledge and acquiescence Furthermore this environ ment which is to say the information available to the user and the names by which that information is known is organized in part according to the tasks the user performs The organization which implements this strategy leads to a degree of fragmenta
13. in it plans code designs etc and how is it searched accessed There is no support for reuse as a central theme of the environment ISTAR s main strength is in project management although there is workbench support for CORE requirements SDL system descriptions Ada and other lower level programming tasks Common elements from the programming level workbenches can be placed in shared libraries which are contributed to by any user and are moderated by a librarian who may accept or reject submis sions Copies of library elements must be formally requested F2a What cost estimation models are used Are they sufficiently flexible to be tailored to reflect the characteristics of the organization or project The COCOMO model is supported within the project management workbench The model has a small database of parameters which originally reflect a global experience with managing projects The parameters can be edited once deviations from the standard values are found necessary for the current organization The tool is stand alone from the rest of the environment 174 CMU SEI 88 TR 3 F2b Are the information structures for project plan management sufficiently rich and extensible to accommodate the information needs e g are there enough placeholders for relevant information including comments annotations to be included in the plan information Are the structures integrated or does the user need to duplicate information ISTAR pr
14. list delete Field Name Field Size Field Expr Figure 4 5 The Fields on the First Line CI_LIST _name BO1 CI_LIST HAS _LATEST_CI CONFIG_ITEM CONFIG_ITEM HAS_SIGNATURE CI_SIGNATURE CONFIG_ITEM CONTAINS_XI USER_XI USER_XI HAS REAL _XI_NAME XFER_ITEM XF US R_ITEM EXPORTED_BY WORK_AREA 1 R_XI IMPORTED_BY WORK_AREA 2 Ae el Figure 4 6 The Constraints Used in Producing Figure 4 4 CMU SEI 88 TR 3 63 64 CMU SEI 88 TR 3 5 Overall Quality and User Experience ISTAR is a relatively new product and has as yet only a handful of users With the help of IST we contacted three of those users and asked them to respond to a questionnaire A copy of that questionnaire appears at the end of this section Two of the users we contacted returned the questionnaire In one case we received two responses from separate organizations within the responding corporation In order to protect their iden tities we will not publish their answers but rather summarize them Our comments are also based on our conversations with IST personnel Use of ISTAR by its customers tends to be experimental It is generally used by tech nology transition and assessment groups within the customer s organization One of our respondents has begun use of ISTAR on a line project employing twenty developers over two years and generating an estimated 100 000 lines
15. pected of him or her To accomplish this the relationships among the individuals of the organization are modeled as contracts Each contract has a specification of the work to be performed under it a person to whom it has been assigned and a person for whom the work is being done In Chapter 2 we describe the contract model both as a project management structure and as a data storage structure We find that the emphasis on project hygiene leads to a strict separation of user data spaces which causes excess data storage requirements and data movement operations This in turn may make data sharing and cooperative work more difficult ISTAR s user interface is also described in Chapter 2 That interface has a high degree of consistency because all user interaction is mediated through Im perial Software s proprietary editor E which is window and menu oriented Chapter 3 which forms the bulk of the report deals with the functional areas that is those tool sets supplied with ISTAR which were of most interest to us The remaining tool sets are described in Chapter 4 ISTAR s project management tool set ISTAR uses the term workbench rather than tool set contains tools for project estimation description scheduling resource alloca tion and tracking These tools are well integrated at the data level that is with the exception of the estimation tool the output of one tool feeds naturally into the next tool in the plannin
16. symbolic links to directories containing the source code of the respective subsystems Using these logical names copy all the files in each of the indicated source direc tories VT CLI SM and MAIN into the integration program library structure Record initial source file sizes 4 Define a new integrated system model from existing subsystems This system model specifies the compilation dependencies in effect when integrating all of the individual subsystems 5 Build an executable load module named AIM_BO1_EXE from all the Ada source code files use the system model defined in Step 4 where appropriate Measure time taken to perform the build 6 Construct a configuration baseline named BO 1 of the current system Measure time taken to create the CM files Record initial sizes of CM files Measure time taken to perform baseline operation 7 Parallel test integrated system using 3 variants of main program MAIN A MAIN B MAIN C Measure time for single file fetch reserve and replace operations MAIN A test VT interfaces MAIN B test CLI interfaces MAIN C test SM interfaces a Test VT interfaces i Build executable load module named VT_MAIN using MAIN A as the main program Measure time taken to perform the build ii Fix bugs in VT body using variant line of descent Measure time taken for creating a variant line of descent Measure CM file size increase caused by variant iii Construct a configuration baseline na
17. verify bigbro gpo status as shutdown network services and contract services to start up GPO and bigbro again Verify with general status As mpm create admin 1 Cls and assign self contracts named adminCon and ac cepted as ADMIN which will be used for timekeeping mpm timesheet monitoring is initialized As mpm CONTRACT errors WORKBENCH CONFIGURATION COMPONENT 136 CMU SEI 88 TR 3 FUNCTIONS CREATE NEW Cl admin 1 EXIT OPS ASSIGN adminCon admin 1 mpm OK EXIT Pop back to current contracts CONTRACT focus on new contract accept as ADMIN Timesheet monitoring Framework CONTRACT errors WORKBENCH PROJECT MANAGEMENT MONITORING switchdown to schedule planning 1 sched 1 return EXIT LOGOUT T11 accepts and views assignments from T1L T11 creates admin 1 Cls and as signs self contracts named adminCon and accepted as ADMIN which will be used for timekeeping As t11 CONTRACT accept as desCh WORKBENCH PROJECT MANAGEMENT TASK VIEW workAssign desCh 1 td 1 OK EXIT CONFIGURATION COM PONENT FUNCTIONS CREATE NEW Cl admin 1 EXIT ops assign adminCon admin 1 t11 OK EXIT Pop back to current contracts CONTRACT focus on new contract accept as ADMIN LOGOUT T12 accepts and views assignments from T1L T12 creates admin 1 Cls and as signs self contracts named adminCon and accepted as ADMIN which will be used for timekeeping As t12 CONTRACT accept as code WORKBENCH PROJECT MANAGEMENT TASK VI
18. 00 15 00 16 00 15 00 I 120 001 100 UNDELI VERED Figure 3 11 A Timesheet Progress comments for particular tasks are entered in a pop up window Estimated date CMU SEI 88 TR 3 29 of completion status of the activity as complete or incomplete and textual comments can be entered Resource usage is logged on a pop up form that is keyed on resource names within resource management centers Utilization is again allocated on a per day basis Timesheets are submitted against cost control centers Cost control centers at the clients store timesheet submission from multiple subordinates and consolidate entries see below When a timesheet is submitted it is verified for correct activity names correct activity job code pairs and the existence of a filled in progress report for each activity Submission changes the status of a timesheet from unsubmitted to awaiting ap proval Approval of the timesheet by the client is described below 3 1 3 2 Monitoring and Cost Control Centers The monitoring tool is ISTAR s method of consolidating numerous timesheets from a client s contractors into unified reports that track actuals against projected schedules The monitoring process is dependent on being able to store timesheet submissions in a local database The monitoring tool creates a cost control center when it is first given a new schedule The new schedule provides the tool with the activity names and job codes
19. 04 09 87 Lipa iiin 3 t_ __ _ J3 issued 04 09 87 r 4 7 superseded jobcode 5301 end date 26 02 87 cancelled d oe 4 signed of F gan 4 subcontracted YES activity H1_team SS 4 L Figure 3 10 Task Definition Task assignment is performed after the information in the above described fields has been entered The LOCAL function issue task assignment prompts for the fully qualified name of an transfer item into which the information from Figure 3 10 will be placed The configuration item within which that transfer item appears will have already been con structed and contain whatever documents and information the contractor will need to complete the assignment These might be code test cases checklists requirements specification or design documents etc or references to such things The issue task assignment local function also prompts for the name of the ISTAR user to whom the contract will be assigned The configuration item mentioned above is sent to that user as the specification of a contract The task definition tool user is the client of the newly assigned contract The client names the contract and the contractor is free to choose a different name when accepting the contract The task definition tool allows a client to assign a contract to himself This provides a mechanism for partitioning work A sub contracted or self assigned contract s status is ma
20. 1 workAssign desCh 1 Move to each of these Change MERGE INTO the WBS and schedule all from planning t1 1 Accept PRs from mpm FUNCS INSTALL REPORTS place 1 3 on workAssign t1 1 FUNCS INSTALL REPORTS place 1 4 on workAssign t1 1 Issue tasks Back to framework PROJECT MANAGEMENT TASK DEFINITION IMPORT SCHEDULE planning t1 1 sched 1 Task id 1301 jobcode 6301 activity VALIDSET code reporting weekly timesheets standards qa team objectives correctness verification qa team ISSUE TASK DEFINITION sub contract sub contract name pmexp t12 Wcode TD XI workAssign code 1 td 1 OK Task id 1101 jobcode 6101 activity VALIDSET des_change reporting weekly timesh CMU SEI 88 TR 3 135 eets standards qa team objectives correctness verification qa team ISSUE TASK DEFINITION sub contract sub contract name pmexp ti1 WdesCh TD XI workAssign desCh 1 td 1 EXIT Keystroke Problems The RMC announces itself as being empty in response to the scheduler s request for availability Cured by the controller re entering the RMC1 and oking out This has been a persistent no pun intended problem and there seems to be no model of when an RMC must be Oked or UPDATEd The attachment of mpm s PRs to tils assignment Cl did not carry the PRs down to til Have to go back to mpm and SEND PR to T1L This will also have to be per formed when T1L is the superior and T11 and T12 are the subordinates Generic Experiment Description
21. 6 Contract CMEXP Resource View gt amount po r STO TO 1 man hours a ce a a pe a a a a a a J 7 Analyst Instantiator Figure 3 4 Work Breakdown Structure Resource View Effort is the number of man hours necessary for the resource to complete the activity Effort differs from calendar time because a resource can be utilized part time Note the util field in Figure 3 4 Specification of effort instead of actual time permits the scheduler to determine the actual time the activity will take An initial estimate of an activity s actual time is effort times 1 utilization Estimation of the effort required to complete activities is provided by a tool based on the COCOMO model Currently there is no automated connection from that tool to either the database or to the WBS Figure 3 5 shows an activity in an embedded system that has been assigned a given number of delivered source instructions The body of the input consists of the levels of the different cost drivers Boehm s book Boehm 81 describes the meaning of each of the drivers The derived person months in Figure 3 6 can be entered by hand into the work breakdown structure effort specification The resource name given in the resource requirement field of Figure 3 4 is unique to the activity No two activities in the structure may require the same resource However a resource requirement may be given a tag and a name A resource tag is used to collect a
22. ACTIVITIES Detailed Design Def redef objects and operations Def redef data structures Def redef prog units Def redef prog unit interfaces a Design redesign control flows 0 0 Code Development and Translation Browse code 160 Supported Activity Y N lt lt lt lt lt lt lt z lt lt lt lt lt lt lt lt lt lt lt lt Z2Z22 22222 Observations Each workbench work area has an attached program library Augments the compiler s ACQUIRE command Syntax directed editing Syntax directed editing The menu for each work area and library lists under user control all units their types compilation status and parent unit if sub unit Units acquired from other libraries are flagged Units depending on a given unit may be listed The inverse listing is not supported The library is deleted with the work area Compiler is not ST supplied HELP key toggles source error listing Editor has rigid layout rules CMU SEI 88 TR 3 Zz find a specified Object eee Only within edited file with a typical pattern directed search browse a body from the spec browse a dependent witHed package browse a called subprog eeeeee browse the parent subprog c eee browse a specified compilation unit 22222 CMU SEI 88 TR 3 161 Figure C 4 System Administration Experiment 1 Functiona
23. Login to underlying operating environment as the system administrator b Create subdirectory in which experimental results will be stored c Establish environment variables to be used in the experiment d Develop command named record to collect data file size measurements e Develop command named timeit to collect execution time measurements for any environment command 2 Perform pre installation operations Measure time taken to perform each pre installation step a Create special accounts first installation only b Back up appropriate disks c Copy environment configuration files to aid in a re installation re installation only d Shutdown currently executing Ada environment software re installation only 3 Load environment software from the release media Measure time to load the Ada environment software Record the amount of disk space consumed by the Ada en vironment software 4 Integrate with existing underlying operating environment Measure time taken to successfully integrate the Ada environment software into the existing operating en vironment by recording the time taken for each of the following activities a Reconfigure tune underlying operating environment for Ada environment opera tion 100 CMU SEI 88 TR 3 e Modify system generation parameters e Install sharable pages of environment software e Establish appropriate page and swap space e Reboot machine b Install online help files
24. MEASUREMENT For each sub step above record the responsiveness of the tool or facility used in plan development Record the storage cost of each object in the global plan WBS schedule PERT chart cost estimate etc Note how long a critical path analysis takes as an indication of interactiveness ACTIVITIES PPM 1 b PPM 1 c PPM 1 d PPM 1 e PPM 1 g PPM 1 i QUESTIONS F2a F2b P2a P8a P3f S4 Issue tasks to the documentation group the QA group and the three maintenance teams for plan refinement and feedback Teams 2 and 3 and Documentation are requested to confirm their aspect of the plan Team 1 and QA are requested to refine their part of the plan ACTIVITIES PI 1 c CMU SEI 88 TR 3 87 7 Merge refined plans from teams into a global plan Perform consistency checks on 10 11 12 88 the new version of the plan budget overrun schedule overrun overassignment of people etc ACTIVITIES PPM 1 h QUESTIONS F2c F2f F2g Save the new version of the plan as project history Generate a document containing the plan If possible generate a report highlighting changes in the two versions of the plan ACTIVITIES PPM 1 i QUESTIONS F2d Approve the plan Inform customers of release schedule for error reports being handled by UI Release 1 1 Inform teams to proceed according to approved plan e g by issuing tasks Set up access control so that only the team responsible for a system part has modify
25. System Configuration For the sake of credibility the Ada system model upon which the configuration manage ment experimentation will be based was designed to fulfill the following requirements e The system must be large enough to address configuration management and version control issues yet small enough to be implemented within the context of the evalua tion project approximately 20 Ada compilation units e The current state of the system must coincide with a particular phase of the software life cycle e g system integration e Minimally three levels of Ada compilation unit dependencies should be represented e g Package Specification Package Body Subprogram Body e The Ada system must be designed in a manner that warrants the use of Ada s separate compilation feature e The Ada system must be designed in a manner that is amenable to variant branch development e The Ada system must be comprised of at least two logical subsystems in order to support development by more than one software engineer Given these system requirements an Ada system model see Figure A 1 which is simple yet supports separate development and testing has a hierarchical structure con tains various compilation dependencies and lends itself nicely to system integration ac tivities was chosen in order to evaluate an environment s support of key configuration management activities It should be noted that the system integration phase of th
26. The product flow from activity to activity is used by the scheduler to find an executable sequence of ac tivities The resource view defines the properties of the resource necessary to accomplish the activity see Figure 3 4 These properties are attribute effort utilization and tag infor mation This detailed information will be matched by the scheduler against similar descriptive information of available resources in the resource management centers WBS Version 2 6 CContract CMEXP Activity View gt activity description P ITransform the Analysis into an experiment Instantiated for ISTAR Child activities r ProgramCreate StepInstantiate Figure 3 2 Work Breakdown Structure Activity View A resource attribute defines the capability and level of experience that are needed to accomplish the activity Attributes have the form skill rating where for example skill is knowledge of UNIX and rating is a level from 1 novice to 10 expert of how well the person knows UNIX The attribute panel includes unix 5 if a person with moderate knowledge of UNIX is needed on the activity 8ISTAR allows any text string to be entered as a rating We felt that a number scale as reflected here was more appropriate CMU SEI 88 TR 3 21 WBS Version 2 6 CContract CMEXP Product View gt r KeyStroke AdaCode Figure 3 3 Work Breakdown Structure Product View WBS Version 2
27. UNIX files Eliminates need to extensively learn E the ISTAR editor Allows use of more powerful editors and formatters available within UNIX Because the source code and other programming activities will execute within the UNIX workbench and temporarily within other specialized ones e g Ada all the data associated with a system is available within one framework Someday this should be the database itself but configuration management and traceability are not sufficient yet in ISTAR Must switch contexts to gain access to the information Requires the extra effort to make up an XI explanation file to point to the real data Where should the documents be placed relative to the sources Documents describing one subsystem should be placed in a subdirectory of that subsystem Documents describing different subsystems are distinct from each other and thus permission can be granted on a limited basis to manipulate one subsys tem while preserving the integrity of the rest of the subsystems Project teams need to see only the sources to a subsystem thus placing the documents in a separate directory isolates them from the documents that need to be handled by the documentation group If the programmers need to read the documents they need not go far in the tree The documentation group has to manipulate files in multiple locations 118 CMU SEI 88 TR 3 Documents are placed in the same directory as the sources they describe All i
28. a schedule derived from Imperial Software Tech nology 87 Activity Network Formation The activity network is formed automatically when the work CMU SEI 88 TR 3 25 details of cmexp marc CMEXP 88 03 10_16 14 5 allocation requests A arc Graham Analysis 87 01 02 Marc Graham ProgramCreate 87 02 20 Marc Graham WriteUp 87 04 08 Dan Miller Execution 87 02 25 Marc Graham StepInstantiate 87 01 30 87701708 87 02 24 87 06 10 87 04 07 87 02 19 SAES A ENEE breakdown structure is read into the scheduler s work area from either the WBS work area or the contractual database The network records the dependencies among the leaf activities of the work breakdown structure which are derived from the product flows among those activities The leaf activities of the work breakdown structure are those which do not have children The non leaf activities are discarded by the scheduler and do not appear in the activity network or in any subsequent outputs of the project manage ment tools Time Analysis The user supplies the earliest start and latest finish dates for the project and optionally for each of the activities in the network The time analysis tool then schedules the project in conformance with those dates if possible This is resource unlimited scheduling in that it assumes all resources will be available when needed The output of this step is available in a variety of forms including a Gantt chart critical path a
29. admin 1 for each user and then framework OPS ASSIGN contracts lt USER NAME gt admin lt USER NAME gt admin 1 user Later this policy of sending the initial contract im mediately will be stopped since a more lazy form of assignment is preferred Keystroke Problems Using the syntax directed editing capabilities of E is not as easy as using the normal ISTAR editing facilities There is documentation but the process is difficult to explain in text Initially when the experimenter lost the syntax directed editing and could not find a way to get it back he relied on documentation from the demo system Generic Experiment Description SET7 Enter users as available resources for the project specifying each individual s qualifications analysis documentation management etc Enter a planned vacation for the documentation person during the second week after the detailed plan has been approved Mapping Issues Problems Who should administer the resource management center Use mpm head of the project Use experimenter the person running the experiment What attributes should be assigned Broad categories of capabilities Specific abilities How many types of attributes should be assigned Few Many How many Resource Management Centers RMCs should there be One RMC One RMC managed by a single individual provides a focal point for the management of corporate resources Follows IST documentation s model of how RMC
30. be performed by the boss s boss Localization of management is achieved Mapping Rationale As mpm use WBS tool to layout dependencies between activities and products Use the resource requirement view to indicate which activities must have the same person on multiple activities Resources requested in the WBS tool are abstract objects that will obtain actual assignments when scheduled with the resource RMC The level of indirection in WBS s resource can be worked around by naming conventions In scheduler import WBS and assign total time limitations in activity data constraint view Review time analysis in schedule summary view Request availability of people in RMC Batch schedule can be attempted where tag satisfaction will be attempted Tags can be overridden in interactive scheduling View schedule under schedule summary to verify resource restrictions on raw time analysis More visual views such as GANTT charts can be obtained as reports Save schedule with con tractual operations before bookings are sent to RMCs At RMC a request for new transactions will show the requested allocations which can be accepted provisionally booked and booked Keystroke Details 128 CMU SEI 88 TR 3 See subsidiary steps for details Keystroke Problems Milestone durations cannot be set as 0 they take a day Non leaf tasks cannot readily be assigned to abstract team entities Assignments of the categories of work should be given to team leader
31. c Establish aliases or symbols for execution access to the Ada environment software e g the symbol ADA when used will invoke the environment s Ada compiler d Establish access control privileges for the Ada environment software i e grant read and execute rights to users of the environment e Modify system wide startup command procedures to initialize the Ada environ ment software automatically upon system reboot Invoke Ada environment software and verify that it is executing e Copy configuration files to avoid the need for re creating them from scratch re installation only e Boot the software e Logoff 5 Perform acceptance test s for the installed Ada environment i e invoke Ada en vironment software and verify that it is installed correctly Measure time taken to perform the acceptance test s by recording the time taken for each of the following activities a Log in to underlying operating environment as an Ada environment user Also if required log in to the Ada environment b Create a subdirectory named ACC_TEST for acceptance testing purposes c Create an Ada program library named ADA_LIB in the ACC_TEST directory to be used during the acceptance tests d Verify the online Ada environment help facility works by asking for assistance on using the help utility e Query the online Ada environment help facility regarding the process of creating editing compiling linking and execut
32. date time created other identities of the XI e Description Same as for Cl e Logged Users Not applicable e Reports Same as for Cl ISTAR offers a Report Generator Language RGL and Report Generator Tool RGT for end user report definition and generation These facilities were used to display historical information See the writeup of Configuration Manage ment Experiment 2 step 2 F3a Describe the mechanics of composite CM operations Merge variant ver sions of CM file element Two Cls may be merged using the CMT CHANGE DELETE Menu This operation will copy entire XIs from one Cl to another The user is given a menu from which to select the XIs to be merged The text of XIs cannot be merged F3b Describe the mechanics of composite CM operations Compare different versions of CM file element Not supported CMU SEI 88 TR 3 165 F3c F3d F3e F4 F5 F6 F7 F8 166 Describe the mechanics of composite CM operations Baseline a sys tem A baseline of a system is a FROZEN Cl whose XIs are the source modules of the system Any of the operations which freeze a Cl therefore create a new baseline Assuming that a baseline is kept in an ISTAR library or in any remote contract not owned by the programmer then the operation of disallow ing access to the Cl makes modification of the elements of the Cl impossible either indirectly by being moved to another location and modified or directly if the Cl i
33. definition Since each distinct plan is also stored in the database they do not overlap Implementing a changed plan is very difficult 176 CMU SEI 88 TR 3 F3d How adequate is the support for frequent changes in a project during its lifetime Changes in task structure are limited to canceling and superseding with up dated task descriptions There is no other support for altering tasks after changes to plans are made F3e How automated are the facilities for reporting project monitoring infor mation to the planning and monitoring facility Timesheet monitoring consolidation and inter contractual delivery are automatic Timesheets are filled out by hand Multiple timesheets with references to the same time period are consolidated in monitoring upon receipt in the supervisor s contract F3f Is there a conflict of interest between setting up accounting structures and access control structures With the UNIX operating system for example disk usage accounting as well as access control is based on ownership This complicates a desire to account for disk usage per subsystem but access control per team There is no conflict of interest since there is no accounting F3g What statistics can be collected by the environment e g bugs per sub system User accounting statistics show when each user logged in and out of the system Each Cl and XI is annotated with modification times and comments Generally limited statistics gathering
34. deleted Pmak will delete binaries when asked The system does not notice what files are used unused nor does it do any deletion on its own 167 F15 How easily do the generic experiments map onto environment opera tions Not easily The problems are as follows e There is no notion of baseline e There is no notion of product release e There is no notion of check in check out e The build tool is divorced from the component management system and does not support Ada C 2 2 Performance Questions Timing figures are given in seconds Each entry represents a distinct trial Space figures are given in the form xxk yy where xx represents space in the UNIX file system and yy represents ISTAR database records Pia 168 Elapsed time of fundamental CM operations Create CM element Create Configuration Item Cl This is normally done within the Component Management Tool Enter CMT 8 8 12 12 Create Cl 6 Empty Cl i e with no transfer items Commit CMT changes 7 7 12 11 8 Exit CMT 10 12 Commit and Exit in one operation 15 Create Transfer Item XI This can only be done by exporting from a workbench The following timings are from the Ada workbench Export 2 12 9 13 13 11 15 10 16 15 15 17 15 15 16 CMU SEI 88 TR 3 Pib Pic Pid Pie P2f Elapsed time of fundamental CM operations Fetch CM element Transfer Items into a workbench Again the Ada workbench was timed Import 28 43 29 Intercon
35. deleted and a new XI having the same name can be exported Fetching and reserving an element presented difficulties Given the decision to store baselines in libraries as frozen Cls a user wishing to fetch an element of the baseline must retrieve the entire baseline It would have been possible to circumvent that problem by placing each element of the baseline each XI within the Cl into a Cl by itself The problems such a solution raises outweigh the benefits Consider the situation confronting the programmer once he has completed his changes to an ele ment He will want to create a new baseline incorporating the element He cannot do that himself if he has retrieved only the element from the library He will need to instruct the librarian to construct the new baseline This is an error prone procedure The operation of reserving an element is not implementable in ISTAR At most ISTAR will record the fact that a copy of the baseline was taken by the programmer at a certain date and time It will not associate the reinstallation of a successor baseline into the library by the programmer with the act of taking a copy In short ISTAR does not support a check in checkout paradigm If a programmer taking a baseline from a library wishes to prevent other users from accessing it until he or she is done the programmer must request the librarian to prevent such access But this will prevent all access to the baseline It is certainly desirable to h
36. description Defining a method requires specification of the e method s language e steps operations in the method possibly recursive e algorithms for method definition and reporting e activities within steps information gathering checking reporting e database queries to support the previous two steps e help files e method driver and language definition files The APCR workbench works both as a method definition facility and as a platform for running user defined methods The workbench s user interface is divided into generic activities and method specific activities APCR workareas contain method definitions Workareas can be created selected deleted imported and exported Within a workarea files containing the various types of definitions can be viewed printed edited deleted and copied Database queries of the target method can be constructed syntax checked and executed Language operations permit the definition and analysis of the language used in the method Step definition permits the definition and analysis of the steps in the method being defined Steps are distinct groups of operations performed in producing a specification used in the method Algorithm definition permits the definition and analysis of retrieval and update operations to be performed on the specification database produced by the users of the method The operations are coded in the generalized query language GQL Fact gathering permits the defin
37. description There is a specialized process for entering Cls into a library Any ISTAR user may initiate the process by sending a notification to the owner of the library Recall that an ISTAR library is a contract database and thus has an owner as does every such database The owner of a library effectively serves as a librarian The librarian reads the text of the notification which is a predefined form containing descriptions of the item and may con tain information concerning the standards quality assurance procedures and tests which have been applied to the item and decides whether to accept or reject the item for inclusion in the library Therefore the contents of a library are necessarily subject to some degree of human quality control This is consistent with ISTAR s liberal enforce ment policy A summary of the movement of data within ISTAR among contracts work areas and libraries is given in Figure 2 2 There is yet another mechanism whereby ISTAR users may share information The owner of a contract may elect to allow other users to share the contract The users sharing a contract may each access and modify its contents as though they owned it ISTAR ensures that no two sharers of a contract access it simultaneously It is worthwhile to note at this point that an ISTAR user can access an ISTAR tool only while signed on to or working on acontract Therefore no two sharers of a shared contract may be working on the contract in an
38. example mpm needs not be concerned with T12 s leaving the project except that he is also manager of the RMCs and thus will have to allocate a new RMC Creates firewalls of control and need to know in both vertical and horizontal directions Informing a superior is only necessary when the current activity violates some constraint e g time above that needs to be reissued by the superior Changes to a plan may have to move up and down the hierarchy of assign ments and necessitate the cancellation of many contracts What is the interaction between planning and task allocation Planning and task allocation should be separate Enables the lower level person to do whatever he needs to accomplish the goal set by the higher level plan There is no need to inform superiors as long as dates deliverables or resources do not change If changes occur at a lower level after planning has been performed at a higher level and a task has been assigned to manage that aspect then can cellation must occur from the superior s level to the current level and replan ning and reassigning must be done at the higher level Planning and task allocation should not be performed by separate people levels Changes in a subordinate s realm can be fully corrected if this necessitates replanning at the current level The amount of control is increased No problems occur with having to jump a level in a management hierarchy to correct a plan that can only
39. experiment QA2 There is no plan refinement step since ISTAR does not support the sending back of comments that are to be integrated into higher level plans with environment assistance QA3 There is no Team 2 in the ISTAR PM experiment QA4 There is no Team 3 in the ISTAR PM experiment Keystroke Details Keystroke Problems Generic Experiment Description T1 13 Complete UI CLI Prepare for QA review Send to whoever handles delivery to qa may be self or manager Notify manager Mapping Issues Problems How are un planned child to child interactions handled The first child can DELIVER on the assignment just to notify the superior and then ask the peer externally to RETRIEVE the Cl Keeps the superior informed while avoiding the possibility of passing much technical information needlessly 146 CMU SEI 88 TR 3 Difficult for peers to communicate without assigning contract How to tell peer to RETRIEVE a local Cl The second child does not have a contractual relationship with the superior so there is no way for him to DELIVER on his work The first child can DELIVER the contents to the superior who then creates a con tract by ASSIGN to the second child Follows strict hierarchy contractual ISTAR approach The common superior retains control Enables both children to DELIVER their own items to the parent May involve expensive sending of information up and down the contractual tree Difficult for child
40. files Measure time taken to perform baseline operation Merge bug fixes and enhancements back into main line of descent for a Main program b VT package body c VM package specification and body Measure time to perform merge operations Record CM file size increases caused by merge operations Add prologues to package specifications and bodies Measure time for single file reserve and replace operations Construct a configuration baseline named V1 0 of the current system Record current sizes of CM files Measure time taken to perform baseline operation Build executable load module named Product using all current source code A 1 2 Configuration Management Experiment 2 The purpose of this generic experiment is to investigate a programming support environment s support of pure configuration management activities such as system con struction re construction of previously generated baselined systems and construction of hybrid a mixture of new and old systems Successful completion of Configuration Management Experiment 1 is assumed for the context of this experiment 1 Experiment setup a Establish environment variables to be used in the experiment b Change working directory to the system_integration directory created in Experi ment 1 c Create a new program library named build_lib underneath the sys_integration directory d Confirm that no files are currently reserved e Remove any pre exis
41. interfere with the process of sorting out priorities to resources which are supposed to be under more strict controls Mapping Rationale Each person involved in the development or enhancement of the software should be defined as an ISTAR user who is then able to receive contracts and thus deliveries Using contracts for communications also permits customers to reply along the links to send problem reports Establish users as UNIX users ISTAR developers users need to be developers so that they can push to UNIX As the UNIX super user create accounts for all experiment users As ISTAR administrator create all the experiment users within the system administra tion workbench Establish an RMC1 contract belonging to mpm to hold all resources people com puters etc The RMC needs to be a separate contract so that competing activities can submit requests to a controlled pool The RMC control tool will highlight conflicts for resources in the center Keystroke Details UNIX accounts As root create etc passwd entries with names that are the same as they will be in ISTAR environment ISTAR users As frmadmin within the experiment data tree pmexpistardt create each user as a developer with the same name as in UNIX account Resource control center Establish contract RMC1 at mpm by sending assignment as frmadmin within tech using contract rmc1 and Cl rmc1 1 and then have mpm accept as RMC1 In resource definition tool define th
42. is given in Figure 4 3 As can be seen in Figure 4 3 such forms are available to describe the body headers and footers of the report The report body in Figure 4 3 describes the report given in Figure 4 4 A report description such as that in Figure 4 3 consists of a sequence of lines Each line of the description will produce some number possibly zero of lines of the report The numeral to the left of the vertical line in the report description is the level of the line The lines are collected into text blocks A text block consists of all lines which have the same level number and are separated if at all by lines whose level numbers are all greater All the lines of a given text block appear and if necessary repeat together The square brackets in the lines of Figure 4 3 are place holders for data The data appearing in these positions are described in a template form available through a LOCAL functions command An example appears in Figure 4 5 There is an entry in that form for each field on the line The relationship between place holders in the line and entries on the form is positional the first entry in the form describes the data to appear in the first place holder on the line etc The lines of a text block appear on the report for all possible ways in which the data they contain can be instantiated from the database If there are no such ways the lines do not appear Notice in Figure 4 4 that only two of the transfer items l
43. item came if imported There is no way to print this listing The Component Management Tool Query Menu item output Displays 1 Version history which lists the items that are the successors and predecessors of the selected item identifies the latest and preferred ver sions and gives the status FROZEN or FREE For configuration items dis plays whether access is allowed for transfer items displays type and date time of creation 2 Status which indicates FROZEN or FREE lists transfer items with types and date time of creation and access for configura tion items gives that information plus other references to the transfer item by other configuration items for transfer items 3 Description which gives the user defined description for configuration and transfer items 4 Logged users which lists users who have copied the configuration item The lists above can be printed The lists above are produced by seven different commands Write a new report using ISTAR s Report Generating Tool RGT The report can be printed All the information will appear in a single report generated by a single com mand Requires writing a program Mapping Rationale To exercise ISTAR functionality all three approaches were used Keystroke Details The contract menu and CMT operations are straightforward RGT is a workbench in its own right See appropriate manual Keystroke Problems CMU SEI 88 TR 3 113 e The rep
44. management workbench Exercises ISTAR functionality Places result under ISTAR configuration control The ISTAR build tool does not directly support Ada compilation Although it might have been possible for the experimenter to adjust the build tool to handle Ada it was not deemed appropriate The ISTAR build tool resembles and is an extension of the standard UNIX make facility As such it does not utilize the dependency information recorded in the Ada library Using the compiler facilities provided in the workbench The workbench provides a RECOMPILE command which schedules compila tions for all uncompiled compilation units in the work area using Ada depen dency information to order the compilation This functionality is provided by the workbench itself not the compiling system The result is not placed under ISTAR configuration control as a recorded build Mapping Rationale The actions taken in this step were interpreted as actions taken by a programmer acting as an ISTAR subcontractor in fulfillment of an ISTAR contract In particular this implies that only the finished product is delivered It was decided therefore to use Ada workbench work areas and Ada libraries to hold the modified versions using the ACQUIRE command to share unmodified components The compiler facilities were used to perform the builds Keystroke Details Create a new Ada workbench work area Import from the contract database those components wh
45. ments can be made immediately after schedule creation or at anytime thereafter Lazy assignment minimizes the amount of work necessary to accomplish the structural changes Tasks which are not assigned as contracts until they need to begin execution are less likely to need to be reassigned Projects may not be lazily scheduled however The entire work breakdown structure must be scheduled against the resource management center at one time Resources can become allocated in the resource management center long before they are actually needed This increases the probability that resource modifications will be made In summary ISTAR project management is a collection of tools covering the estimation planning scheduling and accounting tasks They could be improved if they were more tightly integrated and more flexible in their response to changes CMU SEI 88 TR 3 35 3 2 Configuration Management ISTAR offers configuration management capabilities for items stored within contract databases Storage within ISTAR is divided into work areas and contract databases Work areas are specific to workbenches and contain information while it is being created or modified There is no configuration management support for items within work areas Contract databases are specific to contracts and contain information once it has reached some level of stability ISTAR provides successor and variant control for items within contracts There is support for user def
46. new version of final global WBS and schedule as project history Generate a document containing final global schedule Mapping Issues Problems What does passing the global schedules to the team leaders demonstrate in the environment evaluation Ability of the environment to cope with changed schedules and to merge those modified schedules together into a new collective one ISTAR provides the mechanisms to send down a copy of the WBS the schedule and other documents to be commented on Schedules must be copied to another name before being sent because the same Cl cannot be assigned to multiple users need for traceability There is no automated support for merging modified schedules sent from below Mapping Rationale No sending of the initial global schedule to team members will be performed since there is no way for the leaders to effectively comment on it and have the system demonstrate that it can aid in constructing a modified schedule Keystroke Details Keystroke Problems Generic Experiment Description MPM9 Approve the final global schedule Book requests for resources Inform customers of release schedule for reports being handled by UI Release 1 1 Inform teams to proceed according to approved schedule e g by issuing tasks Mapping Issues Problems Mapping Rationale Approve final global schedule Because there are no changes from the original ver sion of the experiment this is a moot step Book
47. on a work breakdown structure previously developed in the WBS tool and then imported from the database into the scheduler For reference the time for non resource constrained time ae is also presented Enter scheduler Import WBS 60 Time analysis 5 Interactive schedule 12 critical path analysis P3g Context switching between plan alternatives during what if analysis Change alternatives cannot be switched between during what if analysis Each WBS or schedule plan is considered another alternative and can be saved and reimported P3h Collection of project statistics See P1e and P1b 186 CMU SEI 88 TR 3 C 3 3 User Interface Questions Ula How easy difficult is it to learn the project management facilities For example is the command syntax awkward mnemonic Is command completion provided Does the system offer selection from legal alter natives ISTAR takes a long time to learn The system is documented with numerous manuals the examples at the end of each tool description are the best help The command language is both menu and command line driven and are interchangeable almost everywhere The demo system with tutorial scripts was useful at the beginning of the learning curve Uib How easy difficult are the project management facilities for a knowledgeable user For example is there an efficient interaction mode Can menu and forms prompting be disabled Once the menu system is learned many commands can be
48. phase 2 The questions are included as well The body of the report can be read without reference to the appendices Only readers with interest in details of ISTAR or the evaluation methodology need consult the appendices Some of what we say in this report is specific to the ISTAR release we examined Release lt 2 11 3 gt hence if the reader acquires ISTAR some of the statements in this report may not be true of that release However we have generally avoided low level details of ISTAR and trust that the bulk of what we say will remain true for later ISTAR releases CMU SEI 88 TR 3 3 CMU SEI 88 TR 3 2 Architecture This chapter presents an overall description of ISTAR concentrating on its underlying principle the contract model and its user interface 2 1 Contract Model At the heart of ISTAR is the contract model of project organization This model views work assignment as the central fact in the organization and process of software develop ment The goal of the model is to ensure that each member of the organization has a well defined set of tasks which have well defined termination criteria 2 1 1 Project Organization As its name implies a contract is an agreement between two parties about a piece of work to be performed The client of the contract for whom the work is to be done issues the contract to a contractor who is to perform the work A contractor may perform the work specified in the contract by subcont
49. reviews bug report in 4 and begins design change Programmer 2 begins change to code PERFORMANCE MEASUREMENT Record the elapsed time to bring modules into work area QUESTIONS F5e P1j Leader reports progress and resource consumption at end of week 2 PERFORMANCE MEASUREMENT Record elapsed time to create report ACTIVITIES PX 1 c QUESTIONS F3e F4d F4e P1b S1 Programmer 2 quits the team in week 3 of his assignment Team leader requests manager to assign a new employee to that task and gives estimate of slippage caused by replacement of personnel Receives approval from manager PERFORMANCE MEASUREMENT Note responsiveness of change procedures ACTIVITIES PI 3 a PX 1 a PX 2 a PX 2 b QUESTIONS F3d F3e P3d Team leader uses access control mechanisms to grant the new programmer T12suc the same access rights to the source designs etc that the ex programmer T12 had PERFORMANCE MEASUREMENT Note responsiveness of access control QUESTIONS F3d F4c P3e Programmer 1 finishes design change as approved by team Design review by entire team CMU SEI 88 TR 3 9 Team approves design change and sends document to Documentation group ACTIVITIES PX 1 a QUESTIONS F4e F4g F5e 10 Programmer 1 changes code tests it and then passes new version to leader 11 New programmer 2 completes change to code tests it and then passes new ver sion to leader 12 Leader reports progress a
50. set of requirements into a family All requirements with the same tag which are automati cally listed in the appropriate panel of Figure 3 4 will be assigned to the same physical resource The identity of that resource will be determined when the structure is 22 CMU SEI 88 TR 3 xtere EST V3 4 playPasc Activity name gt MODE Embedded Current Activity H1 Level 2 DSI 20000 RELY high DATA nominal CPLX high TIME high STOR nominal VIRT low TURN nominal IACAP high AEXP nominal PCAP nominal VEXP nominal LEXP nominal MODP high TOOL high SCED nominal POCOST k 10 00 DDCOST k 10 00 CUTCOST k 10 00 ITCOST K 10 00 L SN a EE E E Figure 3 5 Estimation Tool Activity Definition xtere EST V3 4 playPasc gt MODE Embedded Current Activity proj Level 1 DSI 25000 0 a TS TI RE Rhase Person Months Cost K Months Staff 26 6 250 4 4 2 ITE Prodigt Design 6 3 minal IAC IPC Detailed Design 40 2 378 3 l IMO 5 1 15 6 __ Code amp Unit Test 39 4 368 1 i PD 0 00 t Integrate amp Test 36 2 337 0 2 9 12 5 J a A en ee ee Total 142 4 1333 8 12 2 a a a a ae i EER J Figure 3 6 Estimation Tool Results processed by the scheduler against the resource management center The name of a resource in a resource requirement of a work breakdown structure is th
51. supports the development of Pascal programs The central con tribution is a syntax directed editor for the language See the discussion of the Ada workbench for a discussion of syntax directed editing in ISTAR Like the other language centered tools e g Ada there are work areas in which programs are grouped Programs can be exported to the database or imported into the work area Code can be compiled if a native compiler has been made available to ISTAR at installation time Most tools cannot read the transfer items generated by other tools The Pascal tool can read SX1 transfer items The help facility is limited HELP is not context sensitive and provides only a general description of the tool BNF style language syntax is not provided when using the syntax directed editor CMU SEI 88 TR 3 55 4 3 APCR APCR Analysis Prompting Checking and Reporting is a meta tool for the creation of structured methods Such structured methods have entity types relationships and properties of relationships ISTAR stores the entities and relationships of the methods in its database APCR provides tool support for developing user s models the Analyzer checks model structure the Prompter asks for information that must be supplied to com plete the model s definition the Checker uses advisory rules to detect possibly un desirable model aspects and the Reporter interrogates the model Each running model requires its own definition and
52. takes longer to accomplish the same effort at a lower utilization Sometimes this necessitates using trial and error on the utilization and effort numbers to make the actual amount of time allocated be correct if there is a hard limit on the amount of real time permitted Mapping Rationale As mpm use the WBS to define the top level teams and their product and resource needs Note that this is the top level only Only top level personnel team leaders are mentioned in this level WBS In cases where a person will be allocated to work on lower level activities too less than 100 percent utilization is specified so that further effort can be obtained at the lower levels Keystroke Details As mpm enter errors contract Project management WBS tool Enter the activity hierarchy products consumed and produced and resources needed Enter resource attributes Enter attributes for products Do some reports to make sure all the data was input correctly e g completely consistently The effort for t1l is critical since he will be involved in technical work in the team plan as well as this managerial role thus allocate him at 80 man hours 25 percent utilization 320 duration hours Place the resulting WBS in planning 1 wbs 1 CMU SEI 88 TR 3 129 Keystroke Problems Percent utilization is not defined clearly and thus when til is to appear not only in the leadership role in the mpm plan but also technically in the next level plan shorter dur
53. that will be charged against by timesheet submissions Pooled data reports can also be input to a monitoring session from lower level monitoring reports sent to superiors Numerous reports can be generated from these data status reports actuals report see Figure 3 12 full activity report brief activity report full resource report brief activity report and an exceptions report that highlight exceeded user defined limits for consump tion or duration Monitoring is one of two the other being the resource definition tools which have serious performance problems Times of 45 seconds were observed for the task of obtaining monitoring tool input Lesser times of 11 seconds were also observed The task of incorporating external timesheet submissions into an internal database and consolidating the new data with old entries is clearly a demanding activity The discrepancy between the numbers can possibly be attributed to variation in the amount of data to be incor porated Creating full activity reports in the monitoring tool also took from 45 to 18 seconds based on the amount of data being manipulated 3 1 4 Quality Checklists ISTAR contracts are formal requests for action and are not enforcement mechanisms Quality checklists can however be one of the items mentioned in a contract s task description Checklists could be included in the task definition panels verification or standards Quality checklists are manipulated by creatin
54. the workbenches have specialized export operations for new successor and variant trans fers In many cases the VALIDSET key described in an earlier section will provide a list of transfer items in the contract for which the tool may export successors or variants In all cases the user must give the full name in the ciname xiname format displayed earlier of the item being exported CMU SEI 88 TR 3 37 Variants and successors of configuration items are created within the component management tool This is the only tool which has direct access to the contract database and therefore the only tool which has access to configuration items It can be invoked from the housekeeping menu of every other tool When a successor or variant of a con figuration item is created by the CMT the newly created item is an exact copy of the original This copy operation does not involve data replication the two Cls share copies of the XIs After creation the two copies may diverge through the addition or deletion of transfer items The CMT implements a merge operation for configuration items This operation allows the user to selectively copy transfer items from one Cl into another As above no data replication occurs in this copy operation the XIs are shared The CMT contains an operation to create a new empty Cl A new Cl can also be created when a transfer item whose ciname does not name an existing Cl in the contract is exported from a
55. the relationships among the individuals of the organization are modeled as contracts Each contract has a specification of the work to be performed under it a person to whom it has been assigned and a person for whom the work is being done ISTAR does not mandate any technical development strategy It does not enforce any management style Its philosophy is not to make decisions but rather to record decisions made by its users so that they are visible to the organization ISTAR s data storage model divides storage into contract databases in which public or semi public information is kept and work areas which are private to individuals All data manipulation is done to data stored in work areas For information to be shared among ISTAR users it must be moved to a contract database where it first comes under con figuration control and thence possibly to a library ISTAR s project management tools cover estimation planning scheduling task assign ment and tracking of projects during execution They give management control over resources and insight into work in progress They do not react well to changes in project structure after execution has begun ISTAR has rudimentary configuration management support It will control versions and parallel lines of development but only for objects stored in contract databases It has no equivalent of checkin checkout for configuration managed items It has no release management capability Its s
56. to child communication if second child wants to communicate again with first child there is actually a general problem of sibling communica tion Mapping Rationale T1L DELIVERS to mpm who ASSIGNS to qa who REVIEWS and DELIVERS back to mpm Keystroke Details As til CONTRACT titeam WORKBENCH CONFIGURATION COMPONENT FUNCTIONS CREATE NEW Cl tildeliv 1 EXIT Framework OPS DELIVER tildeliv 1 against workAssign t1 1 As mpm CONTRACT errors OPS REGISTER focus on delivery creates tildeliv 1 in errors EXIT WORKBENCH CONFIGURATION COMPONENT FUNCTIONS CREATE NEW Cl workAssign qaReview 1 Move over to workAssign qaReview 1 Change MERGE INTO Cl move over to tildeliv 1 Do merge cannot be done on command line Framework OPS ASSIGN which contract gqaTiLrev Cl workAssign qaReview 1 which user qa OK EXIT Framework LOGOUT Keystroke Problems Generic Experiment Description QA5 Changed Receives T1L deliverable via mpm Perform acceptance test against standard Mapping Issues Problems Mapping Rationale Retrieve copy of Cl of QA workbench acceptance test and perform checklist checkoff Keystroke Details As qa CONTRACT accept new contract from mpm as T1Lrev Back to contracts CONTRACT QAwork WORKBENCH CONFIGURATION COMPONENT FUNCTIONS RETRIEVE Cl this host yes login name qa contract QAwork Cl release qa1 1 log user yes wait a bit for transfer to happen FUNCTIONS IN
57. to create a fictitious person who acts as a hypothetical leader for the group The programmers could take turns in the leader role by logging in as the fictitious leader The decisions about who contributes what products are enacted by assigning contracts to the individual programmers Note though that both of these op tions have resulted in a return to the basic structure of a manager leaders and program mers which ISTAR supports 3 1 5 2 Accommodating Change Changes to a project plan can occur either during the planning stage that is before the project begins execution and a contract is assigned or after the project has begun and contracts are being executed Changes of the latter class that is changes during project execution can either be changes to the content or the structure of the project Content changes are those which affect the specification of the product and therefore are altera tions to the work being done by the project members Structural changes are changes in the project personnel their reporting relationships or their task responsibilities ISTAR s reaction to these changes is described beginning with changes during the planning stage As mentioned earlier the initial work breakdown structure is best created offline After the work breakdown structure is subjected to time analysis in the scheduler the resulting schedule which is a best possible scenario may not be acceptable If so it will be necessary
58. to reenter the estimation tool in order to change the estimation parameters reenter the WBS tool so as to enter the new effort estimates and possibly change the activity structure and reimport the work breakdown structure into the scheduler Of course all of these changes should be done only after a re analysis of the project s needs It is best if the intermediate versions of the work breakdown structure are stored under configuration control in the contract database As mentioned in the discussion of the scheduler see Section 3 1 1 3 the person per forming the scheduling task has some freedom to modify the resource requirements of activities within the schedule These changes are rather limited and any major changes to the structure of the plan will require re execution of the planning cycle In summary accommodating changes during the planning stage requires cycling through the estimation tool the WBS tool the scheduling tool and the resource control tools Movement from the estimation to the WBS tool is particularly difficult as there is no automated support for it The estimates produced by the estimation tool must be hand copied into the WBS tool The entire process is made tedious by the delay in bringing an ISTAR tool up or down This took anywhere from ten to thirty seconds on our experimen tal testbed Resource control is loosely integrated with the other project management tools The scheduler operates on a local copy of the in
59. used in place of the line editor The graphical layout program and presentation create graphical views of the modules on remote graphic instruction set ReGIS or Tektronix terminals Code generators produce output in the various languages mentioned above Options on output files error listings cross references are available for each generator 4 5 SDL SDL the System Description Language was developed by CCITT for specifying concur rent software systems The SDL workbench is logically a super set of SX1 SDL models have SX1 modules as their lower level building blocks SDL has a SYSTEM description at the top level which defines concurrent interactions SDL s workbench can be defined in terms of the added functionality beyond the SX1 workbench e Editing can be performed on the SDL description of the system or on the subsidiary SX1 procedural fragments e Consistency checking can be performed between SDL and SX1 charts e Queries of various types can be made against the SDL portions of the model s description Among the requests that can be completed are what are the types of variables mentioned in the SDL description find a process within a block list all blocks within in a block list connections between blocks list all signals used by processes to communicate over a channel and list the channels that carry a given signal e Reports on block connectivity decomposition block to process decomposition and process decomposi
60. workbench provides no means for importing previously existing Ada code from UNIX This should be detrimental to a conversion effort It is particularly unfortunate given that the workbench does provide a mechanism for converting character string representations of Ada code to the editors internal parse tree representation Using our knowledge of ISTAR internals we tried to handcraft a method of importing such pre existing code The minor syntax discrepancies mentioned earlier in conjunction with the poor error reporting mechanisms defeated us As constructed the Ada workbench does not have a symbolic debugger IST is not in the business of providing such tools Once such a tool becomes available we would suspect IST will have little difficulty incorporating it In conclusion we reiterate our opinion that in spite of the criticisms we have just made the ISTAR Ada workbench is a powerful and productive tool which greatly facilitates the production of Ada code We have not made any attempt to compare this workbench with other facilities supporting the production of Ada code 54 CMU SEI 88 TR 3 4 Other Workbenches and Tools In this section we give brief descriptions of some of the ISTAR workbenches and tools not covered in other parts of this report We have used these tools sparingly if at all Much of what is said in this section is therefore based on the content of the ISTAR user manual and not on our own experience 4 1 UNIX C
61. 1 ADA BODY 87 08 04_16 58 BOl type ADA SPEC Imported By AdaExp Created by marc on 87 08 04_16 58 BO1 3 PGETRM 1 ADA SPEC 87 08 04 16 58 BO1 type ADA SPEC Created by marc on 87 08 04_16 58 B01 3 STRUTLB 1 ADA BODY 87 08 04_16 59 BO1 type ADA SPEC Created by marc on 87 08 04_16 59 B01 3 STRUTL 1 ADA SPEC 87 08 04 16 59 BO1 type ADA SPEC Created by marc on 87 08 04_16 59 BO1 3 VWPRTMGR 1 ADA SPEC 87 08 04_17 00 BO1 type ADA SPEC Created by marc on 87 08 04_17 00 B01 3 VTSUPP 1 ADA SPEC 87 08 04_17 00 BO1 type ADA SPEC Imported By AdaExp Created by marc on 87 08 04_17 00 B01 3 WNDWMGR 1 ADA SPEC 87 08 04_17 01 BO1 type ADA SPEC Created by marc on 87 08 04_17 01 B01 3 MAIN VTSUPP 1 ADA BODY 87 09 04 15 46 B02 type ADA UNIT Created by marc on 87 09 04_15 46 BO1 3 PGETRMB 1 ADA BODY 87 09 04_15 56 B02 type ADA UNIT Created by marc on 87 09 04_15 56 Figure 4 4 The Report Generated by Figure 4 3 62 CMU SEI 88 TR 3 rlosin Report Generating Tool V2 2 CMExp2 1 Number of Fields 2 gt Edit Menu status report body Report Body edit script pageheader r 1 filter operations Page_f ooter 11 The Configuration Item named has latest version generate report constraints Field Information Vieu edit RGL output orderings Field Name F print RGL output Field Size rau L Field Expr CI_LIST _name
62. 12 submits final timesheet to T1L T1L cancels T12 s role T1L requests removal of T12 as an RMC resource T1L reschedules and reassigns tasks so that T12suc takes over for T12 taking into account new T12suc work and timesheet reporting conflicts Mapping Issues Problems Resource Management Centers RMC requests are processed as indivisible units when they are made to RMC controller from the scheduler For example the first scheduling of T1 s program mers are treated as a unit T11 and T12 would have to be both be removed or both remain Action All of T1 must be unbooked from RMC1 and then poten tially rebooked RMC2 will contain new resources T12suc and will be able to book on its own in conjunction with the old RMC1 Action Place T12suc in RMC2 Unbook all of Ti at RMC1 Schedule against RMC1 amp RMC2 accepting T12suc over T12 Book T1 T12suc at RMC1 and T12suc at RMC2 Easy method of including T12suc into the project team that does not interfere with the present scheme Is not a true replacement of T12 with T12suc since the two resources exist concurrently and thus manual scheduling selection will have to be made No rescheduling rebooking is going to take place without unbooking that which is already booked at RMC1 since it contains T12 which must be un booked This is problematic since past experience has shown ISTAR bugs do not enable the true removal of a booking which then results in conflicts with rebookings T
63. 144 CMU SEI 88 TR 3 Keystroke Problems Generic Experiment Description T1 12 T1L sets monitoring for new schedule Mapping Issues Problems Mapping Rationale Keystroke Details As til CONTRACT titeam WORKBENCH PROJECT MANAGEMENT MONITORING switchdown to schedule planning t1 1 sched 8 return EXIT LOGOUT Keystroke Problems Generic Experiment Description T1 11 T12suc sends timesheet to T1L Mapping Issues Problems Mapping Rationale Keystroke Details As t12suc CONTRACT codeS WORKBENCH GENERAL TIMESHEET SELECT do not save current timesheet 23 Jan 87 CCC pmexp til titeam activity name code_suc job code 7301 hours in week Rem aining is 0 Stay on same line PROGRESS es timated end date early 23 01 87 line feed to complete incomplete c omplete line feed OK CHECK SUBMIT STATUS EXIT LOGOUT Keystroke Problems Generic Experiment Description 11 12 T1L accepts timesheet Mapping Issues Problems Mapping Rationale Keystroke Details As til CONTRACT titeam WORKBENCH PROJECT MONITORING week ending 23 01 87 GET THE MAIL REPORTS build all the report types by naming them on the command line Housekeeping EXPORT PROJECTIONS monit 2 proj 1 Housekeeping EXPORT ACTUALS monit 2 actuals 1 SEND REPORT TO PARENT EXIT LOGOUT Keystroke Problems Generic Experiment Description QA1 Receive task from manager Define a release note format or call up a t
64. C 3 Project Management C 3 1 Functionality Questions C 3 2 Performance Questions C 3 3 User Interface Questions CMU SEI 88 TR 3 171 172 172 173 173 181 187 CMU SEI 88 TR 3 List of Figures Figure 2 1 Figure 2 2 Figure 2 3 Figure 2 4 Figure 3 1 Figure 3 2 Figure 3 3 Figure 3 4 Figure 3 5 Figure 3 6 Figure 3 7 Figure 3 8 Figure 3 9 Figure 3 10 Figure 3 11 Figure 3 12 Figure 3 13 Figure 3 14 Figure 3 15 Figure 3 16 Figure 3 17 Figure 3 18 Figure 3 19 Figure 3 20 Figure 3 21 Figure 3 22 Figure 3 23 Figure 3 24 Figure 3 25 Figure 3 26 Figure 3 27 Figure 3 28 Figure 3 29 Figure 3 30 Figure 3 31 Figure 4 1 Figure 4 2 Figure 4 3 Figure 4 4 Figure 4 5 Contracts and the Contract Hierarchy A Summary of ISTAR Data Movement A Framework Display Another Framework Display Project Management in ISTAR Work Breakdown Structure Activity View Work Breakdown Structure Product View Work Breakdown Structure Resource View Estimation Tool Activity Definition Estimation Tool Results Resource Definition Resource Control Schedule Summary After Time Analysis Task Definition A Timesheet Monitoring Tool Actuals Report Successors and Variants Version History Report for a Cl Status Report for a Cl Version History Report for an XI Status Report for an XI Users Taking a Copy of a Cl A Display of the Reports Attached to a Cl The Relationships Involving a Given Cl All the Relati
65. EW workAssign code 1 td 1 OK EXIT CONFIGURATION COMPONENT FUNC TIONS CREATE NEW CI admin 1 EXIT ops assign adminCon admin 1 t12 OK EXIT Pop back to current contracts CONTRACT focus on new contract accept as ADMIN LOGOUT T1L sends down the problem reports to T11 and T12 TiL creates admin 1 Cis and assigns self contracts named adminCon and accepted as ADMIN which will be used for timekeeping Timesheet monitoring is initialized Problem reports As til CONTRACT titeam WORKBENCH CONFIGURATION COMPONENT move over to workAssign t1 1 _ Problem reporting SELECT 1 4 SEND contract on this host yes user name t11 contract name desCh library no SELECT 1 3 SEND contract on this host yes user name t12 contract name code library no FUNCTIONS CREATE NEW Cl admin 1 EXIT OPS ASSIGN adminCon admin 1 t11 OK EXIT CLOSE contract focus accept as ADMIN Timesheet monitoring Framework CONTRACT titeam WORKBENCH PROJECT MANAGEMENT MONITORING switchdown to schedule planning t1 1 sched 1 EXIT LOGOUT T11 attaches PR to assigned Cl T11 sends timesheet to T1L PR As T11 CONTRACT desCh WORKBENCH CONFIGURATION COMPONENT FUNCTIONS INSTALL REPORTS focus on PR place on workAssign desCh 1 EXIT Timesheet WORKBENCH GENERAL TIMESHEET SELECT don t save current timesheet 16 Jan 87 CCC pmexp ttl tlteam activity name des_change job code 6101 hours in week Rem aining is 120 t
66. F4j How does the environment support the user in the user s workspace or working directory Examples by managing error messages by provid ing individual versus shared access control by providing transparency between database and workspace Each major tool can have data imported and exported from the database into the tool s work area which exists only for the duration of the tool use Some tools also have explicit persistent work areas that retain current work after returning to the framework F5a How does the system track connectivity How does it enforce traceability to requirements What is the interrelationship of documents as opposed to code Are pointers kept that associate for example an Ada module with its design or its test plan How are relationships represented e g as pointers in text as relationships about objects The system does not track connectivity There are user defined relationships which can be established between database objects but they cannot be queried and are not robust enough for traceability F5b What tools exist for generating standard deliverables and documents e g MIL STD 2167 for deriving documents from other documents There are no tools for generating standard documents Reports can be printed F5c What mechanisms exist for managing and controlling change requests Change requests include bug reports requests for added functionality improvements in the user interface and performan
67. Figures 3 14 through 3 19 star COM PONENT MANAGEMENT TOOL Version History query on BO1 1 Date 1 Feb 88 USER marc Time 11 16 48 HOST cmexp CONTRACT CMEXP LATEST CI in stem is BO1 3 PREFERRED is set to L which is BO1 3 Successor list for BO1 1 B01 1 FROZEN Access log users BO1 2 FROZEN Access log users T EA cnn ana onan to ar a a gt also a basis for B01 Test 1 BO1 3 FROZEN No Access End of Query Figure 3 14 Version History Report for a Cl 3 2 2 User Defined Relationships The internal data model of the contract database is the binary model The fundamental structuring mechanism of this model is the binary relationship These are of the form objecti has_relationship_with object2 For example the sharing of XIs by Cls within a contract is accomplished as follows XI names of the form ciname xiname are stored as elements of a class USER_XI Elements of that class are related to elements of the the class XFER_ITEM by the relationship HAS_REAL_XI_NAME The text of the item is stored outside of the database in a file whose identity is recorded in XFER_ITEM element So any number of USER_XIs may be related to the same transfer item via the HAS _REAL_XI_NAME relationship None of this internal structure is visible to the user of the CMT The user of the CMT may define his own relationships and use them to relate items Relationships must be defined before they can
68. G Raised from Raised 2nd Feb 88 15 00 48 Last Updated 2 Feb 88 15 06 40 Originator cmexp marc CMEXP2 Inform y Controller cmexp molly Library Holder cmexp molly Library Concerns GENERAL User Controller Problem type error Problem severity critical Problem urgency immediate Summary Example Problem Report Description This is a full description of the problem Responses From Date Comments gt End of Query Figure 3 22 Example Problem Report CMU SEI 88 TR 3 43 Only the holder of a problem report may modify it or send it to another user Thus there is exactly one holder of a given problem report Prior holders retain copies which they may display but not modify In order to send the report the current holder must know not only the name of the user who will become the new holder but also the name of the contract in which that user manages problem reports The holder of the problem report can RESPOND to it which will cause the report to be edited with the form directed editor The holder can then enter a response in the ap propriate portion of the form He or she can then SEND it to another user or RETURN it to its controller Any number of responses can be added to a problem report The controller of a problem report while also its holder may EVALUATE it This causes the report s status to be changed to EVALUATED and the problem evaluation section of the report to be fi
69. ISTAR all are planning to increase its use within their organization and would recommend it to others Among the strengths they listed were e the contract model e inherent configuration management e integration of development and management e extensibility The weaknesses mentioned included e lack of robustness e poor performance e missing functions in project and configuration management details not given CMU SEI 88 TR 3 65 e difficulty of report generation We maintained an error log throughout the course of evaluation of ISTAR It contains 95 items of which 49 are classified as errors that is clear deviations from the published documentation 66 CMU SEI 88 TR 3 SEI ISTAR Questionnaire The Software Engineering Institute a US federally funded research and development center is preparing a report on the Software Engineering Environment ISTAR We are basing our report in part on our own experimentation with ISTAR and in part on the experience of the ISTAR user community We would be very grateful if you would take the time to give us the information requested below Please be assured that this infor mation when published will not be attributable to any individual nor organization A Please give us a list of those projects which you know to be using ISTAR For each such project please give e A title and brief description of the project e The size of the project Please give any and all metrics with w
70. NOTIFICATION by which a user can have an item installed into another user s contract database The contract assignment and delivery operations result in such a movement CMU SEI 88 TR 3 45 Component Management Tool Wersion 2 3 gt FS USER marc HOST cmexp CONTRACT CMEXP Contract Scanning Library Library lt cr gt selects lt cmd q gt quits L Configuration iten selection BO1 1 gt BO1 2 gt Figure 3 24 A Library Scan Listing of a Cl but they are specialized and cannot be used for general transfer between any pair of contracts 3 2 5 Recorded System Building ISTAR provides a system building facility called Pmak which is based on the standard UNIX facility MAKE Strictly speaking Pmak is not an ISTAR tool but rather a UNIX tool supplied by IST The build tool invokes Pmak to perform the build but its purpose is to record it rather than perform it Pmak is a generalized version of MAKE Input to Pmak is considerably shorter and easier to construct than the equivalent input to MAKE Pmak is also conditionalized in the man ner of the UNIX C preprocessor CPP This allows a single Pmak script to vary its be havior in different environments IST uses Pmak for the construction and installation at customer sites of ISTAR To use the build tool an ISTAR user performs the following actions 1 Build the system under UNIX using Pmak 2 Export the source files of the system and
71. NV_USER Measure time taken to create new user account group Record file size increase caused by creating a new user account group 3 Create environment user account for John T Smith assume the last name is to be used for the username password and pathname of the account s home directory Measure time taken to create new user account Record file size increase caused by creating a new user account 4 Add user Smith to user group ENV_USER Measure time taken to add new user to an account group Record file size increase caused by adding new user to an ac count group 5 Copy Smith account characteristics into a new account for Thomas R Jones as sume the last name is to be used for the username password and pathname of the account s home directory Measure time taken to copy characteristics into a new user account Record file size increase caused by creating a new user account 6 Copy Smith account characteristics into a default account named DEFAULT to be used in the future for creating new environment accounts Measure time taken to copy characteristics into a new user account Record file size increase caused by creating a new user account 7 Disable logins for the DEFAULT account Measure time take to disable logins for an account 8 Display characteristics of the DEFAULT account Measure time taken to display account characteristics 9 Change account name of the DEFAULT account to be Env_User Measure time taken
72. OURCE move down to t12 DELETE RESOURCE interactively schedule INTERACTIVE SCHEDULE Try default allocations first and then new ones with VALIDSET if needed Schedule summary context and activity requirement allocation view to confirm correct resource allocations Book SEND BOOKINGS Save Housekeeping CONTRACTUAL OPERATIONS export new planning t1 1 sched 3 Keystroke Problems 142 CMU SEI 88 TR 3 Generic Experiment Description MPM 11 Accept bookings at RMC1 RMC2 Mapping Issues Problems Mapping Rationale Keystroke Details As mpm CONTRACT RMC1 WORKBENCH RESOURCE RESOURCE CONTROL Focus on new one VIEW DETAILS verify correct personnel have been assigned to the abstract requests and that the correct percent utilization has been assigned BOOK move into provisional bookings housekeeping CONFIRM PROVISIONAL BOOKINGS and exit CONTRACT RMC2 WORKBENCH RESOURCE RESOURCE CONTROL Focus on new one VIEW DETAILS verify correct personnel have been assigned to the abstract requests and that the correct percent utilization has been assigned BOOK move into provisional bookings housekeeping CONFIRM PROVISIONAL BOOKINGS cannot since ac tive session EXIT RESOURCE DEFINITION UPDATE RESOURCE CONTROL move to provisional bookings housekeeping CONFIRM and exit LOGOUT Keystroke Problems Generic Experiment Description T1 5 T12 delivers partial deliverables Mapping Issues Problems Mapping Rationale
73. PORT PROJECTIONS monit 1 proj 1 Housekeep ing EXPORT ACTUALS monit 1 actuals 1 Send SEND REPORT TO PARENT EXIT LOGOUT Keystroke Problems Generic Experiment Description DOC2 Take one week vacation Upon return he wants to see the latest status Mapping Issues Problems Mapping Rationale Since the initial assignment to doc has not even been created yet this step is moot Keystroke Details Keystroke Problems Generic Experiment Description MPM10 Generate first monthly progress report Produce summary report as well as complete reports of all views supported by the project management software Record progress report in project history Mapping Issues Problems Mapping Rationale As mpm accept report from T1L Construct own report Keystroke Details As mpm CONTRACT errors WORKBENCH PROJECT MONITORING GET THE MAIL week ending 16 01 87 REPORTS STATUS REPORT ACTUALS REPORT FULL ACTIVITY REPORTS FULL RESOURCE REPORT EXCEPTIONS REPORT Housekeeping EXPORT PROJECTIONS monit 1 proj 1 Housekeeping EXPORT ACTUALS monit 1 actuals 1 EXIT LOGOUT Keystroke Problems It was unclear how to read the incoming transfer at the parent mpm even though there was a notification in the framework IST suggested monitoring GET THE MAIL 138 CMU SEI 88 TR 3 Generic Experiment Description Re Planning T12 quits T1 in week 3 of his assignment T12 delivers what he has completed to T1L T
74. Problems 152 CMU SEI 88 TR 3 B 5 System Administration Generic Experiment Description Experiment 1 steps 1 2 and 3 Load system from release media Mapping Issues Problems How should time and space be recorded See general introduction to this section Mapping Rationale Steps 1 and 2 were not needed Step 3 was done by following the installation instruc tions provided by IST Keystroke Details Keystroke Problems Generic Experiment Description Experiment 1 steps 4 and 5 Integrate and accept Mapping Issues Problems Mapping Rationale These steps were unnecessary because a There is no need to reconfigure the operating system for ISTAR b The online help files are installed with the system in the prior step c Aliases or symbols for execution access are created during system installation in the prior step d There is nothing to do about establishing access control privileges other than creat ing accounts next experiment e System wide start up command procedures are installed with the system in the prior step aad There is no need to invoke environment as this is accomplished by other ex perimental steps Keystroke Details Keystroke Problems Generic Experiment Description Experiment 2 User account manipulation Mapping Issues Problems How are the various activities of account copying account modification etc to be handled Of the activities described only c
75. R Has no configuration management CM Duplicates storage In UNIX files CM not to be tested in PM experiment Is out of ISTAR In Software Change and Configuration Control System SCCS Keep to experiment instructions CM is not the focus of the PM experiment Ignore the issue The goal of the experiment in PM is not configuration management Place holders Cls for sources being moved around can be used Can perform real transfers of data early in the experiment to illustrate the capability Then transfer the placeholding Cls later when there is more inter action Does not demonstrate the true data tree size that can be expected from a small project How should sources be protected from different teams Owned by the project management experimenter with read access by all and write access only by the experimenter who will grant access temporarily to others Most straightforward method of dealing with the situation within the UNIX model De emphasizes configuration management which is meant to be tested in another experiment Requires human intervention and another context switch when someone needs access Mapping Rationale Sources are stored in the UNIX file system one subdirectory for each subsystem SCCS or some other configuration control system was not used since the aim of this experiment is to focus on project management Only loose protection is needed since the teams are not trying to sabotag
76. R 3 31 are compared against an item lists can be tailored Editing the checklists permits con tent changes to be made while customizing them permits whole check lines status to be marked NOT APPLICABLE Reviewing a form is the central activity of checklists Only the status field can be changed when comparing the criteria are fixed The values assigned to each reviewed criterion are pass item under review has passed the criteria fail the item under review has failed the criteria requires action The requires action category can be upgraded to pass if the actions described in a pop up window are performed first Subordinate checklists that contain any not set requires action or fail status check lines make the superior reference fail Otherwise the parent passes The hierarchical evaluation method is applied recursively towards the root of the checklists 3 1 5 Analysis and Critique Designed for projects with one planner ISTAR s planning tools do not support group planning activities They do not react well to change after project initiation However they do offer extensive support for project planning and project execution tracking 3 1 5 1 Planning and Tracking ISTAR s planning facility envisions one main project manager performing a project s plan ning The manager performs the work breakdown structure layout subsequently schedules it against the resource management center and makes assignments The manag
77. Rel1 1 Fix and return Problem reporting at problemsRel1 1 _ RESPOND with comments UPDATE and then RETURN it to the controller Keystroke Problems Trial runs in copies of the data tree were fine but at the end of running on the real data tree there were errors that 2 nnnnn errors dir etc could not be written Generic Experiment Description MPM4 Receive recommendations from sa respond to customer about report 5 by recommending its accommodation in the next enhancement release Release 2 0 and inform mpe Approve recommended change requests Mapping Issues Problems Mapping Rationale Since mpm has remained controller of the PRs even when they were sent to the sa all the mpm has to do is focus on each one again and QUERY to review them The sa s comments are added to the PRs To inform the customer about PR 5 a mechanism for communicating with the person who filed the report is used Arbitrary users cannot be notified of a PR except by sending them a full copy of it without passing control The mpe can be contacted about PR 5 this way just send a copy without expecting anything in return Keystroke Details Initial contract for mpe As mpm CMT CREATE NEW CI mpeROOT 1 OPS ASSIGN mpe enh mpeROOT 1 Accept initial As mpe accept initial contract as enhance Get back reports In errors contract CMT INSTALL REPORTS place in problemRel1 1 again Place them back over old ones After install all prob
78. STALL TRANSFERS focus on it EXIT Management of qa IMPORT release qa1 1 note 1 as release SELECT release CUSTOMIZE note NOT_APPLICABLE or NOT_SET for each of the Status fields using DOWN as necessary REVIEW all NOT_SET entries changing them to PASS FAIL or REQUIRES ACTION OK out and provide explanations to remedy any REQUIRES ACTION fields CMU SEI 88 TR 3 147 Keystroke Problems QAM consistently crashes back to the framework when entering the status values associated with review of a checklist Crashes occur whether the values are entered by VALIDSET selection or by hand Generic Experiment Description QA7 Consider how the quality assurance group would report back to the developers if they discovered a problem in the newly generated document Mapping Issues Problems How can the strict hierarchical nature of contractual assignments and communica tions be violated Is it desirable Problem reports Unlike contractual communications problem reports are arbitrary point to point communications which is what this step calls for Problem reports also permit a dialog using the problem report as the media with each person EVALUATing Problem reporting maintains an historical record of the discussion which can be used as an audit trail Problem reports violate the core ISTAR theme of hierarchical communications along assignment lines With problem reports all communications would have to be routed through the manage
79. TIBILITY EXCLUSIVITY OR RESULTS OBTAINED FROM USE OF THE MATERIAL CARNEGIE MELLON UNIVERSITY DOES NOT MAKE ANY WARRANTY OF ANY KIND WITH RESPECT TO FREEDOM FROM PATENT TRADEMARK OR COPYRIGHT INFRINGEMENT This work was created in the performance of Federal Government Contract Number F19628 95 C 0003 with Carnegie Mellon University for the operation of the Software Engineering Institute a federally funded research and development center The Government of the United States has a royalty free government purpose license to use duplicate or disclose the work in whole or in part and in any manner and to have or permit others to do so for government purposes pursuant to the copyright license under the clause at 52 227 7013 This document is available through Research Access Inc 800 Vinial Street Pittsburgh PA 15212 Phone 1 800 685 6510 FAX 412 321 2994 RAI also maintains a World Wide Web home page at http www rai com Copies of this document are available through the National Technical Information Service NTIS For information on ordering please contact NTIS directly National Technical Information Service U S Department of Commerce Springfield VA 22161 Phone 703 487 4600 This document is also available through the Defense Technical Information Center DTIC DTIC provides acess to and transfer of scientific and technical information for DoD personnel DoD contractors and potential con tractors and other U S Gov
80. Technical Report CMU SEI 88 TR 003 ISTAR Evaluation Technical Report CMU SEI 88 TR 003 Unlimited distribution subject to the copyright ISTAR Evaluation Software Engineering Institute Carnegie Mellon University Pittsburgh Pennsylvania 15213 This report was prepared for the SEI Joint Program Office HQ ESC AXS 5 Eglin Street Hanscom AFB MA 01731 2116 The ideas and findings in this report should not be construed as an official DoD position It is published in the interest of scientific and technical information exchange FOR THE COMMANDER signature on file Thomas R Miller Lt Col USAF SEI Joint Program Office This work is sponsored by the U S Department of Defense Copyright 1988 by Carnegie Mellon University Permission to reproduce this document and to prepare derivative works from this document for internal use is granted provided the copyright and No Warranty statements are included with all reproductions and derivative works Requests for permission to reproduce this document or to prepare derivative works of this document for external and commercial use should be addressed to the SEI Licensing Agent NO WARRANTY THIS CARNEGIE MELLON UNIVERSITY AND SOFTWARE ENGINEERING INSTITUTE MATERIAL IS FURNISHED ON AN AS IS BASIS CARNEGIE MELLON UNIVERSITY MAKES NO WARRANTIES OF ANY KIND EITHER EXPRESSED OR IMPLIED AS TO ANY MATTER INCLUDING BUT NOT LIMITED TO WARRANTY OF FITNESS FOR PURPOSE OR MERCHAN
81. _16 58 BO1 3 PGETRM 1 ADA_SPEC 87 08 04_16 58 BO1 3 STRUTLB 1 ADA_BODY 87 08 04_16 59 B01 3 STRUTL 1 ADA_SPEC 87 08 04_16 59 BO1 3 VWPRTMGR 1 ADA_SPEC 87 08 04_17 00 BO1 3 VTSUPP 1 ADA_SPEC 87 08 04_17 00 BO1 3 WNDWMGR 1 ADA_SPEC 87 08 04_17 01 BO1 3 MAIN VTSUPP 1 ADA_BODY 87 09 04_15 46 BO1 3 PGETRMB 1 ADA_BODY 87 09 04_15 56 End of Query Figure 3 15 Status Report for a Cl star COMPONENT MANAGEMENT TOOL Version History query on B01 3 MAIN 1 Date 1 Feb 88 Time 14 12 55 LATEST XI in stem is B01 3 MAIN 1 Successor list for B0O1 3 MAIN 1 BO1 3 MAIN 1 ADA_BODY USER marc HOST cmexp CONTRACT CMEXP PREFERRED XI is defined as L which is BO1 3 MAIN 1 87 08 04_16 58 Rane S SS RON OSSRe SES SESE See gt also a basis for BO1 End of Query Figure 3 16 Version History Report for an XI 2 MAIN VISUPP 1 40 CMU SEI 88 TR 3 Istar COMPONENT MANAGEMENT TOOL Status query on BO1 3 MAIN 1 Date 1 Feb 88 USER marc Time 14 13 36 HOST cmexp CONTRACT CMEXP ae Sah Bt eh Os oes CONFIGURATION ITEM B01 3 is FROZE Access No Access see ee et TRANSFER ITEM Type ADA_BODY Created 87 08 04_16 58 Sp SS OTHER REFERENCES BO1 1 MAIN 1 Imported by B02 BO1 2 MAIN 1 BO1 Test 1 MAIN 1 New 1 MAIN 1 End of Query Figure 3 17 Status Report for a
82. _UTILITIES package Measure time taken to perform remove operation Add prologues to all Ada source code contained in the experiment s code directory Construct a configuration baseline named V1 2 of the current system In making this baseline each source code file in the experiment s code directory should be com pared against the latest version already baselined in version V1 0 only if the local copy is different i e more up to date than the already existing CM element shall it be placed into this new system baseline Measure time taken to perform the compare operations Measure time taken to perform baseline operation A 1 3 Configuration Management Experiment 3 The purpose of this generic experiment is to investigate a programming support environment s support of product release control Successful completion of Configuration Management Experiments 1 and 2 is assumed for the context of this experiment 1 Experiment setup 78 a Establish the product information database to be used as the initial state using the following information i Release BO 1 General Comments Beta test version of the system Build History Date built 2 15 85 Built by John R Johnson Release Components Version 1 of all source code files Hardware Requirements VAX 11 class machine VMS 3 x Customer distribution Customer A Errors reported fixed None ii Release BO 2 General Comments Fixed bugs in body of Vi
83. a tion CMU SEI 88 TR 3 163 F2e Describe the mechanics of fundamental CM operations Delete CM ele ment Both Cls and XIs can only be deleted in the CMT using the appropriate menu options However the success of this operation depends upon the status of the Cl whether it is FREE or FROZEN Deletions of Cls or of XIs within a Cl will succeed only if the Cl is FREE A Cl becomes FROZEN when a sig nificant operation is executed on it See IST document Component Manage ment System User s Guide 5001 67 Issue 2 p 2 5 para 2 3 7 italics added The significant operations are successor and variant creation and shipment to another contract via ASSIGN DELIVER RETRIEVE Cl etc F2f Describe the mechanics of fundamental CM operations Create a variant of a CM element A variant or successor of a CI is created in the CMT via the Version menu operations VARIANT or SUCCESSOR The newly created Cl is an exact copy of the Cl from which it was created A variant or successor of an XI can only be created by an export operation from a workbench Although the identity of a variant or Successor is es tablished by naming convention in the current ISTAR release many workbenches have specialized menu operations and forms for creating suc cessors and variants of XIs F2g h i j Describe the mechanics of fundamental CM operations Fetch reserve replace delete variant of a CM element These operations are performed in the same
84. a by product Note that this accidental CI creation is a feature in the sense that is documented behavior of the system XIs can only be created by export from a workbench F2b Describe the mechanics of fundamental CM operations Fetch CM ele ment XIs are brought into the appropriate workbench via an import operation Cls may be acquired from non local databases by CM operations RETRIEVE CI and SCAN LIBRARY Each of these last operations begins with a request for a CI in another database The two operations differ in the way this is done For SCAN LIBRARY a display of the target library contents is given the user For RETRIEVE CI the user must know the remote Cl name After the request is issued the data are transferred asynchronously The user is informed of the completion of the transfer and must then install the object via the INSTALL TRANSFER operation F2c Describe the mechanics of fundamental CM operations Reserve CM ele ments Not supported A transfer item XI may always be imported from the users contract database by the appropriate workbench It is possible to prevent ac cess to Cls by contracts other than that in which the Cl resides That is not reservation which is the process by which other programmers are informed that a source module is undergoing modification F2d Describe the mechanics of fundamental CM operations Replace CM ele ments Not supported A free Cl or XI can only be replaced by deletion and recre
85. a contract The collection of XIs within a Cl will form some logical entity a specification for a contract a baseline of a system etc Associated with each XI and with each Cl is a successor number and a variant name Any XI or Cl may thus appear within a contract database any number of times More accurately any number of Cls or XIs within a contract database may have the same name provided they differ in either the variant name or successor number The collec tion of all instances of an XI or Cl will form a tree in which each root to leaf path represents a parallel line of development and each node is a successor or variant of its parent ISTAR will track the relationships of variation and succession that form the edges of such a tree ISTAR will not however allow variants to be merged back into a mainline of development The graph must remain a tree This description is based on the version of ISTAR which we examined Future versions of ISTAR are planned which will implement an entity relationship data model The inverse data movement is accomplished by an IMPporT operation 8 CMU SEI 88 TR 3 As the XI is the unit of transfer between the tools and the contract the Cl is the unit of transfer between contracts The specification which must accompany the assignment of a contract is a Cl as are the deliverables returned in fulfillment of a contract These are not the only mechanisms by which information may be transported between c
86. access rights while others have only read access to the specification Modifying the specification of a part requires manager approval In the case of Team 1 inform the team leader who in turn will issue the tasks to the team members PERFORMANCE MEASUREMENT Record elapsed time for plan instantiation Record storage cost of plan instances If work areas are set up when tasks are issued record elapsed time and space to create a logical work area for a member of one team ACTIVITIES PPM 1 f PI 1 b Pl 1 c QUESTIONS F2h F3a F3b F3d F3f F4i Pia P2b P2f Generate first monthly progress report Produce summary report as well as complete report of all views supported by the project management software Record progress report in project history PERFORMANCE MEASUREMENT Record elapsed time and storage cost to produce reports and get project statistics ACTIVITIES PPM 2 a PPM 2 b PPM 2 c PPM 2 d PPM 2 e QUESTIONS P1b P2c P2h P3h Receive notice that personnel change in Team 1 causes tasks on critical path to slip In the process of what if analysis query the status of the project teams tasks Generate a report highlighting the plan changes Determine that no slippage is necessary if new team member T12suc does not participate in design review And consider how the plan would be changed if it were necessary to increase the number of working hours or add staff to the project Inform leader of Team 1 to reflect this fact
87. agement Functionality Checklist Design and Coding Functionality Checklist System Administration Experiment 1 Functionality Checklist 63 74 77 82 83 83 84 84 85 94 95 96 97 98 99 156 158 160 162 CMU SEI 88 TR 3
88. ailable for any syntactic item as a keystroke Folding is a syntax oriented method of controlling the display In the example the programmer is apparently uninterested in the subprogram body which he has folded He can now more easily ignore the text of that body while working on the remaining code Once all stubs have been either instantiated or deleted the unit may be compiled Com piler options may be set in a separate menu and remain in force for all compilations until explicitly changed If the compiler detects errors in the unit the user is informed and may re edit the unit The NEXT ITEM key will position the cursor to the next syntactic item having an associated error message A portion of the error message is displayed on the screen An example is given in Figure 3 30 The HELP key can now be used to toggle CMU SEI 88 TR 3 51 Example_Unit Body Insert gt procedure Example_Unit Input in integer dentifier type mark is type new_type is range 2 32 2 32 1 dummy new _type t 1 subprogram body FOLDED begin end Figure 3 29 A Partially Entered Procedure Body between the program text and the error message listing The error listing will be positioned at the error message associated with the item at which the program text is positioned An example of this is given in Figure 3 31 Once an error free compilation has occurred the unit can be bound and executed Options for the binder and
89. aining the sources Keystroke Details Keystroke Problems Generic Experiment Description SET4 Create a user manual for Version 1 0 of the UI Enter it into the development database and relate it to Release 1 0 of the Ul Mapping Issues Problems Same issues as the design documents Mapping Rationale Place the user manual in the subdirectory of the sources Keystroke Details CMU SEI 88 TR 3 119 Since the user manual is at the UI level and not at the lower level of each of the subsystems the user manual is placed in usr dhm Ul docs userMan mss Keystroke Problems Generic Experiment Description SET5 Package customer deliverable UI Release 1 0 executables of Release 1 0 sources and user manual Version 1 1 Mapping Issues Problems How to store releases Name the subdirectory after the release of the Ul system Easy to locate releases Can create in database XIs that shadow the UNIX directory to track which customers have which release and it is possible to thus make multiple releases of the same UNIX directory with multiple shadow XIs for tracking and problem reporting support from ISTAR Does not use ISTAR s build tool which is not usable at this stage because there is no true configuration management Mapping Rationale For each release there is a subdirectory of the Ul system directory which represents that release and all that is delivered to the customer only Keystroke Details Rele
90. al aspects of the database which although they may be true do not reflect the cause of the error as generated by the tool being used e g a syntactically malformed Cl name results in a database error Many error messages displayed in the error display line are in the short UNIX cryptic tradition CMU SEI 88 TR 3 187 U2c What degree of user customization is supported e g change key bind ings write your own command procedures The low level key mapping is very customizable ISTAR bindings can be augmented with a site s additions as well as individual user preferences The SEI augmented the standard binding with an EMACS binding Adjustments were also necessary to accommodate the X window manager Customization of printers available holidays and weekends are part of the system too U3a How much of routine interaction is streamlined through automation Examples are providing command completion or last used name as default for parameters on the user interface level and composite opera tions to automate steps with possible confirmation by the user on the action command level A command line history is maintained There is no macro facility In sending a sub contract in the task definition tool the old user supplied value is retained and shown again for editing upon the next task assignment This is an exception to the more common situation of needing to type complete values in each time U3b How much context sensitive on
91. al groups of users and joint ownership of tasks The contract model assumes one person will be responsible for each task F4d Can project information and status be communicated horizontally be tween peers vertically between supervisor and subordinate or both What is the communication paradigm point to point like e mail or broadcast like bboard Project management information is passed vertically along the lines of con tract assignments The communication paradigm is point to point F4e When information is communicated about a project s tasks status or resources what is the information content text structured objects such as schedules and design fragments etc In framework status there is a summary line per contract to whom the con tract was assigned status assigned initiated when it was assigned Monitoring tool textual report for each outstanding contract When contract started last booking of status information date estimated and planned start and end dates resource actual planned and remaining usage F4f How involved is the system in this communication Are there protocols to assist the exchange of project information or enforce rules of ex change i e are specialized information flow patterns supported ISTAR fully supports the submission of timesheets between contractors and clients which result in monitoring reports Servers move data between con tract and datatrees F4g How automated is the suppo
92. ality Keystroke Details In the CMT delete a transfer item from a configuration item using the DELETE XI operation In the Ada workbench delete a compilation unit using the DELETE opera tion Both operations are offered in menus Keystroke Problems None Luckily the configuration items created in step 3 are FREE Generic Experiment Description Experiment 2 steps 8 and 9 Create a system release that is based on differencing operations Mapping Issues Problems How are system builds to be done See Experiment 1 step 7 How are the differencing operations to be performed ISTAR does not offer any such function Mapping Rationale These steps were not executed Keystroke Details CMU SEI 88 TR 3 115 Keystroke Problems B 3 Project Management Generic Experiment Description SETO Create ISTAR database and prepare for start of experiment Mapping Issues Problems Where should the Project Management PM experiment database be Use a single ISTAR data tree containing all users in one experiment Convenient for making trial contexts copies of the data tree to try out various scenarios lmmune to other experiments Easy to make a distributed version of the system operational data trees tend to become large 40M with two people using the system for a few months an empty data tree is 1M Some support facilities will be duplicated between data trees inter data tree connectivity information prin
93. an be merged using operations of the Component Management Tool In the experimental step four transfer items were merged into an empty Cl Merge Cl 7 Elapsed time of composite CM operations Compare different versions of a CM file element Not supported Elapsed time of composite CM operations Baseline a system The transfer of a Cl to a library was timed for this question Send notification programmer 4 7 Accept notification librarian instantaneous Install into library librarian 12 Elapsed time of composite CM operations Build the current system Not supported for Ada Elapsed time of composite CM operations Re build an ealier baselined system Not supported for Ada File size increase caused by successive version Original base Cl 47K 624 Successor 12K 248 Figures for XI successors not calculated File size increase caused by variant version Original base Cl 47K 624 Variant Cl 28K 571 Figures for XI variants not calculated File size increase caused by baseline inclusion Comparative figures not calculable File size increase caused by merge operation Comparative figures not calculable CMU SEI 88 TR 3 C 2 3 User Interface Questions U1 U2 U3 U4 US U6 U7 U8 U9 U10 How easy difficult is it to create delete a CM element These are menu operations Their execution entails finding the appropriate menu item and selecting it Because configuration items can be c
94. anged by removing t12 and then rebooking them T12suc the new person is taken care of at another RMC Create RMC2 RMC2 will hold new programmer ti2suc Another RMC makes scheduling very easy since both RMCs will be references from the scheduler which will extract all the appropriate resources from either RMC 140 CMU SEI 88 TR 3 Create T12suc T12suc is placed in RMC2 with the expected 8 hour day effort and capabilities as a programmer Keystroke Details As mpm unbook t1 CONTRACT rmc1 WORKBENCH RESOURCE MANAGEMENT RESOURCE CONTROL move over to confirmed bookings window move down to titeam focus UNBOOK formerly confirmed titeam booking moves to outstanding booking requests No need to FORGET it since later will be able to accept new re quest over the booking just removed Create rmc2 Move back to framework current contract CONTRACT errors WORKBENCH CONFIGURATION COM PONENT FUNCTIONS CREATE NEW Cl rmc2 1 EXIT OPS ASSIGN subcontract rmc2Con configuration item rmc2 1 user mpm OK EXIT CLOSE back to current contracts CONTRACT focus on new one accept as RMC2 Create t12suc WORKBENCH RESOURCE MANAGEMENT RESOURCE DEFINITION name t12suc type RATE amount 8 units man hours available from 87 01 01 until 88 12 31 resource attributes UNIX 3 ada 3 CONSISTENCY housekeeping UPDATE LOGOUT Keystroke Problems Generic Experiment Description MPM11 Place t12suc in t12 s place in the pla
95. art of a contract specification however standards and verification require ments can be textually specified to the contractor The client may manually assure compliance with these requirements upon delivery F5g What assistance does the environment give the user to evaluate the quality of deliverables path testing code audits Q A plans etc Are there tools for rating ranking quality factors See F5e F5h Are the formal quality standards for a project kept on line See F5e F5i What mechanisms exist for communicating or reporting back from Q A to the developers There is no special support for quality assurance developer interaction The general problems of sibling communications remain as with F4d F5j Is the users workspace insulated from changes in the developed product For example if a user has reserved components in an exist ing library and a new version of the library is installed which version will be picked up The user s workspace contract is insulated from libraries and other con tracts Each contract contains it s own copies of contract items To answer the example a user would never notice that a new version had been installed in a library unless he requested a new copy from the library 180 CMU SEI 88 TR 3 C 3 2 Performance Questions The following are elapsed times in seconds for various project management activities Pia Pib Pic Pid Pie Instantiating a plan from an existing
96. ase 1 0 would be contained in usr dhm Ul rel1 0 and would include the user manual and executable composed of the appropriate sources The generation of the executable is performed by MAKE within UNIX Keystroke Problems Generic Experiment Description SET6 Initialize calendar with work hours workdays and holidays Mapping Issues Problems Mapping Rationale Because this is a system level modification under global files it must be performed by the database administrator Use the system administrator workbench to define the work day permissible years for projects and holidays and monitoring limits and set up timesheets Keystroke Details As frmadmin Workday Enter the system workbench and modify the syntax directed entries to reflect the work hours per day note this is a float and it does not convert from int to floats Years and holidays Use the stub commands PREVIOUS and NEXT to move to the syntax placeholders and then fill them in When holidays have been entered use DELETE LINE to delete the remaining holiday date Pressing return when the cursor is 120 CMU SEI 88 TR 3 at the end of the year displays the next stage Complete this and then go on to the next year Limits in monitoring tool Use the project management monitoring tool SET WARN ING LIMITS to set new values Timesheet databases Each user requires an ADMIN contract so that timesheets may be filed CMT functions create new Cl lt USER NAME gt
97. ation Within each role the experiment steps are described in temporal order 80 CMU SEI 88 TR 3 We cross reference to project management activities using a numbering system com posed of the initials of a major category followed by the group number followed by the activity letter For example activity PDM 3 a refers to the major category Product Management group 3 activity a Checking adherence to standards listed on this page We cross reference to questions using a numbering system consisting of the first letter of the criteria F P Ul SI followed by the number of the question category followed by a lower case letter indicating the specific question s For example question Ul3c refers to the User Interface criteria category 3 part c How complete concise and appropriate is the documentation shown on the previous page A 2 1 The Experiment Setup The steps listed here must be done before the actual experiment can be carried out Setup includes setting up the environment s development database to contain the initial release of the system as well as tailoring the environment to a specific organization or project In addition the person instantiating the experiment on a particular environment will have to determine the appropriate mechanisms for collecting timing and size information to answer performance questions First set up the development database Then initialize the environment with project specific parameter
98. ations with lower percent utilizations have to be carefully used to fit the leader s time into certain common activities with other team members Generic Experiment Description MPM5b Changed Apply COCOMO estimation tool Mapping Issues Problems To what extent does the estimation model fit into the overall environment and why is limited integration a reason for excluding the tool from detailed evaluation The COCOMO estimation tool is almost completely isolated from the rest of the tools in ISTAR and its only ability to interact with the database is to output copies of the reports it generates Limited integration is potentially not a reason to exclude a tool from the evaluation since it has still been incorporated into the overall toolchest al though not completely so At some future point the tool may be able to interact more closely with the database on the input side thus by doing an evaluation now there will be a basis of comparison The focus of the ISTAR environment is the close integration of the tools cooperating in for example project management around a central database of project information If tools do not adhere to these requirements they have not been given the level of attention that is to be expected and we should wait for their evaluation to be on a fair basis with the other tools Mapping Rationale The estimation tool is being excluded from the mainstream evaluation on the first pass since it is not integra
99. ave many programmers working on a product simul taneously if they are working on independent pieces Thus even this hand crafted solu tion to the element reservation problem will not be acceptable IST personnel have commented on this problem as follows Stenning2 87 The general approach within ISTAR then is to have few tasks contracts making changes to any one element at any one time and ideally only one such task The coordination of these tasks is the responsibility of the coordination contract In particular where for some reason it is necessary to have more than one task simultaneously changing a single element the coordination task is responsible for planning and controlling any necessary interaction between these tasks ensuring that results from one are forwarded to another merging of the changed elements or whatever CMU SEI 88 TR 3 47 Certainly simultaneous changes to a given element in the sense of source module must be tightly controlled Simultaneous changes to independent parts of a system need a degree of coordination However as the previously cited reference goes on to say It is recognized that this notion that changes must always be planned and coor dinated in advance may be regarded as unduly restrictive in some contexts Should this occur something along the lines of a check out check in mechanism could readily be implemented within a future release of ISTAR This last quotation indicates that lack of an
100. be parceled out to individuals directly below this current level in time order of the schedule In general assignments should not be given out before they are to be begun by the person assigned Easier to cancel a person s role on a project if that person has only one as signment outstanding The problem would be that much worse if the person nel to be canceled were already assigned recursively Sending Cls between contracts depends on whether or not the contracts ex ist thus the sender may be temporarily suspended in finishing his work be cause the contract to the target has not been issued by a superior An existing contract is necessary to receive PRs since the sender needs to specify which contract to deposit contract To send deliverables from one low level task to another low level task sibling all of low level tasks need to exist Assign all contracts once they have been defined Easy for lower level contracts to communicate with each other since there is no question about the existence of any contracts Much more difficult for changes in plans since there are more people involved and more tasks to be altered Middle road Lazy assignment by waiting until a contract has to be available because timewise the person has to start working on it or because it has to receive something from another contract Amenable to cancellation or changes since there are only the minimum num ber of tasks issued that need to be Sup
101. be used Every relationship has a cor responding inverse relationship The names of these relationships are specified separately by the user at definition time Once a relationship is defined any Cl or XI may be related to any other Cl or XI via the relationship The inverse relationship is im plemented automatically Thus if a user relates object x to object y via relationship R and Sis the inverse of R then y will be related to x via S at the same time The roles of R and S are fully symmetric the same state would have been achieved had the user re lated y to x via S ISTAR has a generalized walk facility for browsing contract databases This is of interest only to those having some knowledge of ISTAR internals and would not be needed by the average ISTAR user CMU SEI 88 TR 3 39 Istar COMPONENT MANAGEMENT Status query on BO1 3 Date 1 Feb 88 Time 14 11 58 BO01 3 is FROZEN Status query on BO1 3 Access No Access CI was created in current contract Transfer items TOOL USER marc HOST cmexp CONTRACT CMEXP BO1 3 AIMSUPPORT 1 ADA_SPEC 87 08 04_16 56 BO1 3 CISUPPORT 1 ADA_BODY 87 08 04_16 56 BO1 3 CISUPPORTB 1 ADA_SPEC 87 08 04_16 56 BO1 3 CMDINTB 1 ADA_BODY 87 08 04_16 56 BO1 3 CMNDINT 1 ADA_SPEC 87 08 04_16 57 BO1 3 PRFRMCMND 1 ADA_SUB 87 08 04_16 57 BO1 3 IMGMGR 1 ADA_SPEC 87 08 04_16 58 BO1 3 MAIN 1 ADA_BODY 87 08 04
102. blem reporting Database is not designed to handle bulk contents it can do it but it takes a long time to import export and it costs in duplicate space Switching back and forth between workbenches is time consuming Content of release is in UNIX workbench and shadow Cl is sent with pointer to content Efficient use of ISTAR as a PM system Cl provides a hook for problem reports Reduces space duplication Multiple shadow Cls can be created to show that the same release was made to a number of customers There is a separation of the real content of the delivery from its mapping into the support environment CMU SEI 88 TR 3 123 This is not a suitable release configuration management system for handling multiple customers of the same deliverable Mapping Rationale Bulk shipment is accomplished through the UNIX workbench while Cls are used by the project management and problem reporting capabilities within ISTAR The shadow approach will be used a directory of delivery is set aside within UNIX and distinct Cls are created for each user delivery Keystroke Details Create a shadow contract in frmadmin s tech contract for each release to a different customer Name them rel1 cu1 1 rel1 cu2 1 Place a note in the Cl explanation that the content of the delivery is located in usr dhm Ul rel1 0 Set them access log users Send these contracts to each of the customers as contract names relicu1 and relicu2 As frma
103. brary has the same name variant and successor number as an item already in the library This is called a name clash The librarian must resolve the name clash by providing a new name for the incoming item The item may therefore have different names in the library and originating contract It is up to the organization to provide naming conventions to prevent that behavior In order to retrieve an item from a library the user proceeds as follows The librarian must allow access to the Cl as the default even in libraries is no access The user then issues a SCAN LIBRARY operation in the CMT functions menu providing the name of the librarian and the library as parameters In the case that the library resides on the same host or datatree as the user the dominant case the system will respond with a listing of the library contents An example of such a listing is given in Figure 3 24 The user can then select the item to be retrieved using cursor movement The transfer occurs asynchronously as previously described and at transfer completion the user INSTALLS the item as previously described A user may retrieve configuration items from ordinary contract databases as well The procedures are much the same as for library access except that the operation RETRIEVE CI is used in place of SCAN LIBRARY The listing illustrated in Figure 3 24 is not provided and the user must know the exact name of the Cl There is no means similar to RAISE and SEND
104. build tool Pmak is a rather user unfriendly program It is organized around building C programs It is rather difficult to understand and use correctly Proper use requires cooperation from the programmer Pmak examines the source modules looking for pre formatted entries giving the identities of objects such as C libraries and header files on which the given program depends When used properly it is likely that Pmak is a powerful tool However proper use is not easily understood and in any case does not apply to Ada We were favorably impressed with the problem reporting mechanism As indicated in the preceding list it is not integrated with the configuration management system Although it is possible to record in the problem report the identity of the system release in which the error is repaired this is a manual operation accomplished by management policy and not enforceable by ISTAR There is no support for the inverse relationship that is there is no support for determining given a system release the identity of the problem reports it repairs 48 CMU SEI 88 TR 3 There is no support in ISTAR for the larger grained configuration management problems such as that mentioned in the prior paragraph Given a Cl successor there is no automated support for the recording of such information as why the successor was created the new facilities added by the successor the errors repaired by the successor the authorization to create the succes
105. but the first seventeen characters of the unit s name making the unit inaccessible The workbench allows unit names in mixed case The Alsys compiler translates the name to uppercase only consistent with Ada syntax which is case insensitive The workbench then fails to notice that a unit whose name is in mixed case has been successfully compiled These details belong to the class of bugs which are perhaps not uncommon in a pre release version of a software tool The editor s syntax description language is an extension of Backus Naur Form BNF This language is sensitive only to local or static syntax It will not notice any errors whose detection requires the use of a symbol table Examples of such errors are undeclared variables and type mismatches These errors will remain to be detected by the compiler The interfaces to the compiler supplied by the workbench are a marked improvement over the interface supplied by the compiler itself There is one place in which the workbench can be said to hinder the programmer The ACQUIRE command can acquire compilation units only from those work areas and Ada libraries owned by the program mer It is not unreasonable for an Ada software development organization to have a central Ada library containing reusable components meant to be shared by many programmers Such a facility is not provided for by the Ada workbench Given the ISTAR philosophy on data storage organization this may not be repairable The
106. cal to the successful use of ISTAR The claim that ISTAR has a consistent user interface is justifiable Still the inconsistencies are worth reporting The presence of two function menu pop up keys the local and housekeeping keys described earlier has unwanted side effects We found that the we frequently forgot in which of these menus or their submenus a given operation was to be found We have reported that many of the commands available from menus are also available on the command line Not all such commands are so available and it is frequently impos sible to guess which are and which are not Also the same command is handled dif ferently in different tools The validset and help keys are not implemented everywhere they might be This is not a comment on the user interface but rather on the state of development of the tools We should point out that our pattern of using ISTAR may have made these inconsis tencies more obvious than they would be to an average ISTAR user As our use of ISTAR was experimental our interest was solely in ISTAR with no interest in the 7This happens asynchronously in the background The recipient is free to do other work while waiting for the transfer 16 CMU SEI 88 TR 3 products being developed in the experiments Movement from tool to tool was more frequent and less time was spent in each tool than would be spent by a production oriented user As mentioned these inconsistencie
107. can be called the level by level approach In this technique each manager plans only the activities of his or her immediate subordinates The project as a whole develops into a hierarchy of activities as each person adds more subordinates and their activities This development model is lazy project management All persons are expected to contract for further support at their own discretion and when they deem necessary The level by level approach forces the planning hierarchy now only one level deep to be identical to the contract hierarchy The timesheet reporting hierarchy is likewise identical to the contract hierarchy Monitoring tool reports exactly follow the contracting hierarchy and thus up the planning hierarchy A number of advantages and disadvantages accrue from limiting planning to a level by level approach Advantages having to do with replanning activities are described in Sec tion 3 1 5 2 below A major disadvantage is that no one person is acting as project manager The project cannot be scheduled as a single entity Resources are not al located to the project as a whole but to its sub activities Conflicts are more likely and more difficult to resolve It is difficult to ensure that the various sub schedules correctly interrelate When the project is planned and scheduled in its entirety the project manager interacts with the resource manager to arrive at an equitable use of personnel by exchanging comments on the t
108. ce View gt resource nane resource type amount i available fron until Ve A SS Si a ST oo 1 man hours 187701701 187712731 L L L a __ SS Le E J internal allocation namne f I Istar 10 Cada 10 Figure 3 7 Resource Definition Resource Allocation Control V2 0 Comexp marc CMEXPI gt outstanding ing g provisional bookings confirmed bookings D view details print details unbook L hee a OA A Figure 3 8 Resource Control 3 1 1 3 Schedules Scheduling matches work breakdown structure activities and available resources in the resource management centers Schedules first determine the begin and end dates of a project as if there were no resource limitations Physical resources and people from the resource management centers are assigned to perform each activity in the work break down structure The dates permissible for the begin and end of the project are limited to those defined to ISTAR in its global calendar The calendar information is specified by the ISTAR system administrator using an E structure editor template The work day s duration is input along with work and non work time Work time for each year for example would be the normal 5 work days in the U S but could be different in other countries Weekends and holidays for each year are allocated as non work days Non work durations are correctly passed over by the scheduler The following detailed steps produce
109. ce enhancements There is extensive support for problem reports Problem reports are RAISEd by a user in general or against specific Cls or Xls and SENT to others and deal with them The person who is initially sent the report is designated con troller who retains responsibility for fixing the problem unless controllership is transferred to others when the problem is SENT The controller can request others to EVALUATE the report and make comments on it The report may be terminated by the controller by FINISHing or CLOSEing it F5d How are software bugs reported and tracked Can constraints be im posed regarding who can submit reports and what reports can be sub mitted against Bug reports are treated like change requests problem reports Problem reports are not connected by constraints or automatic support to other ISTAR services F5e How is adherence to standards and procedures checked There are no standards or procedures to be checked There is no support for code formatting structure or document style adherence The quality as surance workbench supports the definition and verification of checklists The user can define a checklist consisting of references to standards which could be compared against a configuration item for compliance CMU SEI 88 TR 3 179 F5f Are the deliverables from a software project required to undergo formal acceptance testing No deliverables are not required to undergo formal acceptance testing As p
110. ce from containing more than one datatree A user specifies the identity of his or her datatree through an environment variable which may be set by appropriate shell or login procedures However the essential purpose of the host or datatree construct is to implement inter machine communication ISTAR allows its system administrator to specify the mechanism by which communication between a given host and any other is to be accomplished This mechanism can be any UNIX program This general mechanism can support local and wide area networks e mail or other file transfer protocols or physical transport using magnetic tape ISTAR users within different companies can use the ISTAR communication facilities The au thors have used them to communicate with Imperial Software Such communication is possible only if the companies have agreed to use ISTAR communication facilities have determined the protocols to be used and know the names of each other s hosts The specification from the user s perspective of inter host communication is not identical to that for intra host communication but the differences are minor When doing contract assignment or inter contractual data movement the user must specify the target host name if it is not the local host For contract delivery the identity of the parent contract is locally recorded so this information is unnecessary The specialized procedures for library retrieval described earlier are not available wh
111. command line options for the program can be specified in menus rlosin Example_Unit Body No predefined integer type is compat gt procedure Example_Unit Input in integer is Bype new aa is renee 2 32 2 32 1 dummy new_ty subprogran_bedy FOLDED begin Example_Proc dummy z end Figure 3 30 A Compilation with Errors The Ada workbench incorporates the Alsys Ada compiler 14 The workbench provides interfaces to some of the compiler s auxiliary functions For example a DEPENDS menu option will call the compiler feature which lists the library units dependent on a given unit These dependents are those units which must be recompiled if the target unit is modified There is no interface to the compiler feature that lists the units on which a given unit depends those units whose modification will cause the target unit to require recompila tion The workbench supports the compiler s ACQUIRE command This command allows entries that are pointers to units in other libraries to be made in an Ada library thereby allowing 14We do not know if IST has plans to accommodate other compilers We do know that they have no plans to produce a compiler of their own 52 CMU SEI 88 TR 3 Example_Unit Body L gt gt type new_type is range 2 32 1 1 No predefined integer type is compatible with this integer type def RM 3 5 4 6 dummy new_type t 1 1 The declaration
112. contain the intended result The constraints which were used to produce Figure 4 4 are listed in Figure 4 6 They ensure that the XIs are elements of the selected Cl etc They also restrict the report to contain only information on the last successor of the Cl B01 The RGT allows for rapid production of simple reports from a single database As can be seen from Figure 4 4 it is difficult to have close control over the format of the report It is impossible to collect information from more than one database into a single report The RGT generates a program in RGL which in turn produces the report RGL is a C like language augmented with functions to access ISTAR databases The RGL generated by RGT is available to be edited by the programmer In RGL it is possible to access data from multiple databases owned by the ISTAR user running the report CMU SEI 88 TR 3 61 The Configuration Item named B01 has latest version BO1 3 It arrived in this contract from Its status is FROZEN and its description is Created by marc on 87 12 01_17 20 The XI s follow in the format name type date_time from workarea into workarea opt1 BO1 3 AIMSUPPORT 1 ADA SPEC 87 08 04_16 56 BOl type ADA SPEC Created by marc on 87 08 04_16 56 B01 3 CISUPPORT 1 ADA BODY 87 08 04_16 56 BO1 type ADA SPEC Created by marc on 87 08 04_16 56 B01 3 CISUPPORTB 1 ADA SPEC 87 08 04 16 56 BOl type ADA SPEC Created by marc on 87 08 04_16 56 B01 3 MAIN
113. corrective action Having raised a problem report a user may send the report to another user optionally passing controllership of the report In effect the reporter has assigned work to the recipient However for this transmission to take place the sender must know not merely the name of the recipient but also the name of the contract under which the maintenance and repair work will be carried out Although the specific task has been assigned outside the contract model the model still controls the assignment of responsibilities e g maintenance to individuals The problem reporting tools have their own methods for recording completion and inform ing the original reporter these are separate from the methods of time sheets and deliverables used in contract completion This separation recognizes that although a specific problem has been repaired the maintenance activity is on going 2 1 2 Data Organization We have been discussing the contract model as a means of organizing the work of a software development organization We will now turn to a description of the model as it affects ISTAR s data organization and storage and its model of tool usage When a contract is accepted by a contractor a new contract database is created This database is a large piece actually three pieces of the UNIX file space which is managed by ISTAR Each contract has its own database that the contractor the owner alone can modify The data model of a co
114. d available in units such as 8 hour days People are RATE resources TOTAL resources are consumables that are available in units such as 10000 sheets of paper Attribute matches during scheduling result in resource allocation An internal allocation is an assignment of personnel to non project activities It is the way in which training and vacations are accommodated Resource requests see Figure 3 8 are sent to the resource management centers where the resource manager uses the control tool to first read the requests provisionally accept them to examine the new request s introduction of conflicts over resources and accept them as assigned to the schedule that requested them Conflicts arise if more than one schedule requests use of the same physical resource for the same time period and the total effort exceeds 100 Full acceptance is not performed in the presence of conflicts There is no mechanism to report to the project manager that a resource request has been denied The resources required by a project must either be granted or denied as a whole The resource manager does not have the freedom to grant some of the requested resources to a project while denying others Creating a resource management center is an expensive operation It took 33 seconds to create a resource management center while it took only about 20 seconds to enter the tool on a center when it already existed 24 CMU SEI 88 TR 3 RDF V2 1 CMEXP Resour
115. d comment is as described for spacestamp This command can only be issued from within ISTAR 3 timestamp gets the time in seconds since 1 Jan 1970 using the UNIX function time Its usage format is timestamp comment where comment is as described for spacestamp 108 CMU SEI 88 TR 3 B 2 Configuration Management Generic Experiment Description Experiment 1 steps 1 and 2 Create initial conditions Mapping Issues Problems How should time and space be recorded See the general introduction to this section Where should the Ada source code be kept In UNIX files The Ada code is already available in those files and need not be re keyed Keeping the Ada code in UNIX In the ISTAR Ada workbench files As the point of this experiment is to exercise ISTAR this seems to be the correct approach Because ISTAR does not provide a way to transfer UNIX files into the Ada workbench the Ada source will have to be re keyed Mapping Rationale The Ada source code was entered into the ISTAR Ada workbench by hand Keystroke Details A keystroke file was constructed containing the keystrokes necessary to create an Ada workbench work area and load the source code into it Various attempts to copy the source files from UNIX files failed Keystroke Problems The ISTAR Ada workbench limits compilation unit names to 17 characters One of the experimental source units exceeded this limit COMMAND_INTERPRETER This had to be rectified by hand
116. d units L Figure 3 26 The Filter Menu To work on or examine an element in the work area the user selects it from the element listing in the standard way To create a new unit he or she selects the NEW_UNIT entry In that case the user must give the name of the unit which must conform to Ada syntax and its type specification body or subunit For subunits the name of the parent unit must also be given The workbench will allow subunits to be entered before the parent unit is entered Having selected the item the user may then use the ISTAR syntax directed editor to enter and modify Ada code It is not the purpose of this report here to give a full descrip tion of syntax directed editing in general nor of the ISTAR instantiation of it Instead a brief overview is presented Suppose that the user has declared a new unit named Example_Unit of type body Upon entering the editor the user is shown the screen given in Figure 3 27 The entry a_body in that screen is a stub a placeholder for syntactic categories A stub is replaced by the user with text which conforms to the syntax of the category The stub in the example must be replaced with an Ada body At this point the editor does not know what class of body is to be entered i e package subprogram or task The user may overtype the stub by entering procedure lt CR gt and the editor will respond with the display shown in Figure 3 28 The editor now knows tha
117. dmin create Cl errMPM 1 and send contract errorsMPM to mpm As mpm accept contract as errors As cul and cu2 accept contracts as rel1 the same name can be used in both places since the users are different Focus on sent CU1 s Cl and enter Cl problem report ing Raise a report Do not use old report as the basis for the new Do not inform originator Tab from field to field Use VALIDSET to fill in problem type severity and urgency Enter quick summary and description OK out SELECT the report attached to the Cl of concern SEND it and pass control to mpm contract errors Keystroke Problems Experimenter originally sent regular initial contracts to each customer and then had customer RETRIEVE CI the deliverable Cl since it is rare that a customer would already be an ISTAR user When a copied data tree was used in the experiment preparation the transfer did not occur and the customers were not being sent the release Cl as their initial contracts Generic Experiment Description CU2 Customer CU2 submits four error reports regarding UI Release 1 0 Mapping Issues Problems Mapping Rationale See CU1 Keystroke Details Keystroke Problems Generic Experiment Description MPM1 Generate an online and printed report Mapping Issues Problems Mapping Rationale Accept error reports from cu1 and cu2 Display them and then print them Keystroke Details 124 As mpm focus on errors contract Creat
118. dor dials into system under main tenance contract to service remotely What is the method of reporting software bugs Are there any automated tools avail able to report errors e g a program that makes it easy to fill in the form that must be delivered to report the error or an electronic address to mail the problem report Average turnaround time from bug report to bug fix to distribution of patch use past history for reference SM3 21 Average turnaround time from bug report to bug fix to distribution of patch use past history for reference SM3 22 Is the software covered under a warranty If so for how long CMU SEI 88 TR 3 SM3 23 What is the policy and procedure for acquiring third party software that will execute within the Ada environment Is there an integration kit available to aid in integrating third party software into the environ ment Archival Support SM3 24 Are full disk backups supported for both the software and the database SM3 25 Are incremental disk backups supported for both the software and the database SM3 26 Is there automated support for restoring the software and or database element from the backups A 4 4 System Management Experiment 4 The purpose of this generic experiment is to investigate the procedure for the collection of accounting statistics from within an Ada software environment Specifically this experi ment will address the issues of monitoring the system s p
119. e software life cycle will serve as the context of the CM evaluation experiments A 1 1 Configuration Management Experiment 1 Given the Ada software system Figure A 1 the following generic steps will serve as an initial evaluation experiment and will furthermore establish a baseline configuration Figure A 2 that will be used as a basis for all other experiments in this evaluation The configuration management model presented in Figure A 2 is a pictorial representation of a configuration thread view of the overall system Leblang 85 Note All data file size recordings and all timing measurements indicated below in italics should be logged into a file named Recordings in the experiment s home directory Fur CMU SEI 88 TR 3 73 Figure A 1 Evaluation System Model thermore each of the logged measurements should be labeled in some discernible fash ion 1 Experiment setup a Create subdirectory in which the experiment will be performed b Establish environment variables to be used in the experiment c Develop a command named record to collect data file size measurements d Develop a command named timeit to collect execution time measurements for any environment command 2 Establish Ada program library structure for system integration 74 CMU SEI 88 TR 3 3 Copy existing subsystems into integration program library structure see Appendix 3 A Assume the existence of logical names VT CLI SM and MAIN which are
120. e a Cl on which to attach PRs Enter CMT CMU SEI 88 TR 3 CREATE NEW CI problemsRel1 1 Install PRs INSTALL REPORTS to problemsRel 1 Examine reports Query on problemsRel1 1 Reports of interest focus Keystroke Problems Generic Experiment Description MPM2 Initiate task of analyzing error reports for system analyst sa and request response within 5 days Mapping Issues Problems Should the sa be sent the PRs for comment only or should there be an explicit assignment via tasking PRs The PR mechanism is well developed and is needed by many steps in the experiment There is only implicit control over someone who has been asked to do some thing by PR There is no way to annotate a PR with instructions except to deliver the item for evaluation and there is no way to ask him to have it done in 5 days Tasking Finer control by mpm over instructions given to sa Fits well within general model of ISTAR in which human communications are performed through contract assignments May be overkill for an obvious job Mapping Rationale Mpm retains control but each PR sent by the customers is sent to the sa for evalua tion The sa comments on what has to be done and sends them back to the mpm Keystroke Details Need a placeholder contract for PRs As mpm in contract errors create Cl errorsSA 1 and SEND contract errorsSAcon to sa As sa accept contract as errors Send each PR to sa As mpm enter con
121. e control in ISTAR is problem reporting A key operation on such reports is acceptance which provides the initial space cost Problem report installation 56 0 12 0 12 0 21 0 CMU SEI 88 TR 3 183 P2e Messages Not applicable P2f Work area overhead As discussed in P1f the notion of work area is different between the scenario and ISTAR We take overhead to mean the initial cost of accepting a contract assignment Initial contract space 103262 P2g Plan alternatives from what if analysis Create ISTAR user create second RMC and a single new user within it change WBS create new schedule send bookings accept bookings at old and new RMCs 256575 P2h Project statistics See P2c P2i Relationships of objects Not applicable The following are responsiveness timings in seconds for various project management facilities 184 CMU SEI 88 TR 3 P3a P3b P3c Plan development monitoring and revision Plan development involves working with wbs schedules resources and progress information WBS is interactively quick except for Import wbs 26 Scheduler is mostly interactive and quick except for Import WBS 60 Export new 24 Batch scheduling Last activity in interactive scheduling 4 Send bookings 20 Resource management is interactive and quick except for Enter resource definition 33 18 9 discrepancy see P1f Update main partition 15 11 27 Enter resource control 18 Monitoring is of
122. e each other Later Cls will be used to symbolize the movement of data Keystroke Details cp r usr dhm Support usr dhm Ul sources CMU SEI 88 TR 3 117 Keystroke Problems Generic Experiment Description SET2 Create a design document for each of the three subsystems of UI Mapping Issues Problems In what form should documents be stored Use ISTAR text workbench to generate documents that can be stored within the ISTAR database and that can be manipulated with ISTAR tools Shows that there is a document preparation facility within ISTAR Shows that textual objects can be stored within the database like other more project management oriented objects and that they can be versioned The documents can be bundled in the same Cl as the source code for traceability purposes Although other workbenches such as UNIX s would seem able to manipulate textual objects so that further processing can be performed on the text this is not actually possible in the current 2 10 1 version of ISTAR The environment does not provide configuration management and traceability sufficiently robust to make it worth the extra effort to carry them around in the formal database The extent of configuration management is Cl and transfer item successors and variants which are done by explicit hand numbering and not by relationship Use the general UNIX workbench to store the text and when necessary use XI description files to point to the
123. e following people with the indicated attributes available indefinitely with 8 hour days mpe ada 2 management 3 mpm ada 2 management 3 sa ada 3 analysis 3 qa ada 1 quality 3 doc doc 3 vacation internal allocation til ada 2 management 2 t11 ada 3 UNIX 3 t12 ada 3 UNIX 3 122 CMU SEI 88 TR 3 t21 ada 2 UNIX 2 t22 ada 2 UNIx 2 t3 ada 1 UNIX 1 cul cu2 Keystroke Problems Generic Experiment Description SET8 Carry out system administrative initialization such as default printers and report formats Make use of whatever support the environment offers in grouping tools or creating logical subsets of the environment for specific users Mapping Issues Problems Mapping Rationale Keystroke Details As frmadmin use the system administrator workbench to add printers Useful to rotate into landscape mode PATH usr ucb usr local bin enscript Pdan B r s Because there are already many report formats do not make any more even though the Report Generation Tool and Language could be used Keystroke Problems Generic Experiment Description CU1 Customer CU1 submits four error reports regarding Release 1 0 Mapping Issues Problems In what form should the release be sent to the customers Content of release is within ISTAR database XIs that are shipped under cover Cl Content of delivery has close proximity with project management delivery namely Cl which will be used for pro
124. e name of a physical resource in the resource management center By naming a resource in this way the project manager makes the resource allocation himself rather than allowing the scheduler to do it from the pool of available resources Tags and names are facilities by which the project manager can restrict the allocation of resources by the scheduling tool The work breakdown structure tool provides a collection of reports These include e Hierarchy reports giving the structures of the activity and product hierarchies e Dependency reports giving the product flows from activity to activity organized either by product or by activity e Summary reports giving all information on activities products or resources and a full report which combines the three summary reports e A consistency report The consistency report contains such information as activities which do not have a parent CMU SEI 88 TR 3 23 there should be exactly one of these activities which either do not produce or do not consume any products and products which are either not produced or not consumed by any activity The project manager can examine this listing and determine whether the information it contains represents errors in the structure definition The work breakdown structure tool is rather cumbersome to use The user interacts only with a small piece of the structure a single activity product or resource and never with the structure as a whole IST rec
125. ectory e Confirm that no files are currently reserved Remove any pre existing copies of files used throughout the experiment 2 Display configuration management historical information pertaining to the current state of the system Measure time taken to display historical information 3 Generate an executable load module named Product using the Ada source files presently baselined as V1 2 Release this new version to all customers running release BO 4 or later Update product information accordingly Measure time taken to perform the build operations Measure time taken to perform database update operation 4 Fetch all the Ada source code files belonging to the B0 3 baseline and build an ex ecutable load module named Version0 3 Release this version to all customers run ning release BO 2 or earlier Update product release information accordingly Measure time taken to perform the build operations Measure time taken to perform database update operation A 2 Project Management The experiment consists of concurrent activities by multiple people Because it is difficult to describe concurrent activities in sequential form as experiment steps we have or ganized the experiment steps into groups that represent the roles of different people such as customer manager and documentation group The interaction between the roles should be identifiable from the scenario description above and from the passing of deliverables or inform
126. element reservation operation is recognized as a significant defect in ISTAR Although the configuration management experiment did not make any demands on a traceability mechanism the project management experiment did Traceability in this con text is the ability to relate items via relationships other than successor or variant The DESIGN_FOR example given previously is one such relationship Attempts were made early on in the project management experiment to use user defined relationships to im plement this form of traceability These attempts were abandoned due to the excessive manual effort involved the perceived lack of reporting facilities and the inability to relate items across contracts ISTAR offers no support for release control The configuration management experiment calls for the recording of the following kinds of information related to release control e What was built when and by whom e Number of distributed versions e Differences among versions e Locations of each version e Required hardware for each version e Correlation between versions and error reports e Correlation between versions and components e Errors reported fixed by version The build tool will record what was built when and by whom and will correlate versions with their components the identity of XIs used to build a system Otherwise none of the above information is recorded As noted previously the build tool does not build Ada programs The
127. ell does the project planning facility support both planning in the large and planning in the small Planning in the large refers to ac tivities such as global cost estimation and global resource assignment e g number of people planning in the small represents activities such as assignment of individuals ISTAR supports these two ranges of planning The facilities for implementing each are distributed throughout the workbenches Cost estimation is the COCOMO stand alone tool in the project management workbench the defini tion of people as resources is performed in the resource definition facility at a resource definition center Assignment of tasks to individuals is performed in the task definition tool F2h How flexible is the project planning facility in handling different team structures Does it support certain team structures better than others ISTAR does not have teams but they can be simulated with a leader and subordinates each as individual users Team structure must be hierarchical and have reporting structures to match Peer communication violates the basic structure Non contract model relationships are difficult to attain through problem reporting for example F3a How and how closely can the planning information be reflected in the development support facility to guide the development Is there sup port for developers to track and manage their tasks and to work in the context of a task Each scheduled WBS activity
128. emplate from a library as the procedure for accepting a maintenance release CMU SEI 88 TR 3 145 Mapping Issues Problems Mapping Rationale Define a checklist for later use Keystroke Details As qa accept contract from mpm as quality assurance work WORKBENCH QA MANAGEMENT QA MANAGEMENT BUILD work area release SELECT release CREATE a form note with all checks applicable to a release Include a few criteria type C and one reference type R to another form No need to EDIT since the CREATE will have all the correct fields Export release work area to release 1 note 1 Framework CONFIGURATION COMPONENT move over to release 1 change ACCESS RIGHTS AC CESS LOG FUNCTIONS CREATE NEW Cl release qa1 1 move over to it change MERGE INTO from release 1 select note 1 ACCESS RIGHTS ACCESS LOG EXIT LOGOUT Keystroke Problems It was difficult to find in the documentation how to create new checks correctly The easiest method is to go to the ID field and just CR to the next check Generic Experiment Description QA2 deleted Refines plan and sends it back to manager QA3 deleted Receives two independent fixes from Team 2 Performs acceptance test on UI_SM Integrates this change into the system QA4 deleted Receives one fix from Team 3 Performs test on UI_VT Integrates these changes into the subsystem Mapping Issues Problems Mapping Rationale These steps are not performed in the ISTAR PM
129. en the library is remotely stored and so the requester must have complete information concerning the identity of the requested item These differences are not significant and not unexpected ISTAR does not maintain a user datatree mapping function Maintenance of such a map might require inter organizational cooperation in the area of user name assignment in particular that may not be desirable The inter contractual information transfer mechanisms within ISTAR have been designed with remote communication in mind For example the request a user makes for infor mation from a library as described earlier does not effect the transfer directly even in the intra host case The transfer is done by a background process or demon asynchronously The requester is notified when the transfer is complete and must then install the item in his database via a separate operation The delay involved in these operations is unavoidable for remote communication but annoying in the local case In our own experiments in which only local communication occurred we found the transfer occurred quickly CMU SEI 88 TR 3 11 2 2 User Interface ISTAR presents its users with a uniform user interface in the sense that every tool and interface expects input and returns output in roughly similar ways ISTAR accomplishes this by having all user communication done through its proprietary editor called E This editor and the interface it presents is the subject of t
130. enters to use in creating an automated experimental test bench However the keystroke files themselves which form the detailed instantiation of the experiments are not suitable for publication as they cannot be understood in isola tion Therefore they do not appear in this report Format The bulk of this section consists of the logs kept by the experimenters during the course of the experiments There were separate logs kept for each of the four experimen tal areas Configuration Management System Management Design and Development and Project Management Each log is formatted identically Each consists of a sequence of entries with each entry corresponding to one or more steps of a generic experiment CMU SEI 88 TR 3 107 Each entry has the following subentries e Generic Identifies the step being described e Issues Identifies the issues which arose during the mapping from the generic ex periment to the ISTAR instantiation Where appropriate alternative solutions are listed with their perceived advantages and disadvantages e Mapping Gives the decisions made regarding the issues and alternatives presented in the Issues entry e Key Details Gives a moderate to low level account of implementing decisions made in the Mapping entry e Key Problems Gives any significant problems encountered in executing the im plementation How the measurements were taken All of the generic experiments require that time and space measure
131. eport 5 indicate that the reported item should be handled as an enhance ment For error report 6 indicate a recommended change to SM package window_manager with an indication of the complexity of the change For error report 7 indicate a recommended change to SM package viewport_manager with an indication of the complexity of the change CMU SEI 88 TR 3 89 8 9 For error report 8 indicate that the reported item is the same as reported in 2 Pass recommendations for error reports to manager if possible in the form of proposed change requests PERFORMANCE MEASUREMENT Record storage cost of change control information ACTIVITIES PX 1 a PX 1 c PDM 2c QUESTIONS F4g F5e P2d A 2 5 Team 1 This team has three members a leader and two programmers It is responsible for the packages in UI_CLI 1 90 Team leader receives global plan from manager refines it and assigns people to tasks and sends a detailed plan back to manager PERFORMANCE MEASUREMENT Record elapsed time to create a task If work areas are set up by programmers record elapsed time and space to create a logical work area for one programmer ACTIVITIES PPM 1 f PX 1 a QUESTIONS F4d F4e F4i P1g P2f Team leader accepts tasks 3 and 4 from manager sends 4 to programmer 1 and 3 to programmer 2 PERFORMANCE MEASUREMENT Note responsiveness of communication ACTIVITIES PX 1 a QUESTIONS F4b F4d F4e P3c Programmer 1
132. eports Mapping Issues Problems What mechanisms should be used to communicate between the controller of the report and the person who sent it Contractual deliveries which appear as entries in the framework next to the con tracts affected Fits in with the rest of the problem reporting model The model consists of SENDing RETURNing and other operations on PRs External mail service All other information concerning problem reports is within the ISTAR model while this is not It is best to be able to view status within one query that does not need other data sources like mail CMU SEI 88 TR 3 133 Mapping Rationale As cui should have indication by mail of having been INFORMed about the EVALUATEd report Since this is just informational mail is sufficient Keystroke Details Keystroke Problems Although the INFORM was performed by the mpm no mail was ever received by cut and no mail was ever returned by the mailer as being undeliverable to cu1 Generic Experiment Description 11 2 T1L accepts task s 3 and 4 from mpm Generate a T1 plan based on the constraints of what was delivered to T1L Utilize lower level personnel in this WBS along with T1L in technical roles use less than 100 percent utilization TiL schedules detailed WBS against RMC T1L sends assignments to T11 and T12 Mapping Issues Problems In what order and schedule should assignments be parceled out How easy is it to undo them Assignments should
133. er sees the complete project and allocates programmers from the resource management center to the lowest planning level The model becomes fragile when the manager wishes to solicit development or review assistance from his team leaders IS TAR makes assistance difficult because there is no method to merge contributions or comments back into the work breakdown structure The ability to add to the work break down structure is critical since the work breakdown structure feeds the schedule resource management center and task assignment planning cycle One method to obviate the need for merging is to linearize access to the work break down structure In this technique the manager constructs an initial trial work breakdown structure and places it in a configuration item which he or she makes accessible to project leaders The first leader retrieves the configuration item and can access and if necessary modify it using the work breakdown structure tool creating a successor in his contract database That item is then made accessible to the next leader in line who repeats the process Serialization can also be interactive between the manager and each team leader so that the manager can confirm modifications Another coordination possibility has each team leader commenting in parallel on disjoint portions of the work breakdown structure The leaders would be working on numerous copies of the original manager s configuration item However there is no
134. erable improve ment over the text oriented command language of the compiler itself ISTAR is an emerging product not a completed one A software development organiza tion wishing to introduce an integrated support environment into its operation has a variety of implementation choices It may decide to handcraft an environment from exist ing and newly developed tools or it may acquire an environment framework upon which to build To our knowledge there are no environments currently available that can be installed and used unmodified and it is unlikely that any such environment will appear in the near future An organization wishing to build on an existing framework should con sider ISTAR a candidate system 1 2 Description of the Method Our evaluation of ISTAR was guided by the environment evaluation methodology described in Weiderman 87 This methodology is organized by the functional areas supported by an environment For each functional area an evaluation proceeds through six phases 1 Identify and Classify Key Activities Activities within the area are identified categorized refined and classified into primary and secondary functions 2 Establish Evaluative Criteria and Associated Questions Specific evaluative criteria are established and a list of questions evaluating each criterion is assembled 3 Develop Generic Experiments Environment independent evaluation experiments are developed whose execution on a specific envir
135. erformance and collecting specific accounting information CPU usage disk space usage connect time and num ber of pages printed The scope of this experiment will be the development of two com mand procedures one to automate the process of collecting system accounting statistics to be used an input for a resource billings program and the other to facilitate dynamic continuous monitoring of the system s performance 1 Experiment setup a Log in to underlying operating environment as the system administrator b Create subdirectory in which experimental results will be stored c Establish environment variables to be used in the experiment 2 Establish default access control to restrict non privileged users access to all com mand files and log files to be used for system management activities 3 Create a subdirectory named BILLINGS under the system root directory to house environment accounting statistics 4 Initially enable the logging of environment accounting information Measure time taken to enable logging of accounting information e CPU usage e Connect time e Disk usage e Number of logins e O activity e Page printed 5 Write a command procedure to automate the monthly collection of accounting infor mation to be used by a billings program assuming logging is already enabled Measure time taken to disable system logging Record size of the system accounting log file a Disable the logging of environment account
136. eriors can keep an eye on the progress of work with the rate of creation of new tasks Sending items to other contracts have to wait until the contract is created Overall structure of the project is a bit confused since tasks are created in an order that does not make the planning hierarchy apparent 134 CMU SEI 88 TR 3 Mapping Rationale Til accepts from mpm Examine task assignment and plan own task assignments for subordinates Make another WBS and schedule it against the same RMC as the parent schedule to catch overworked people This will not happen though since t1 for example has been utilized at a low enough rate to permit him to work on the lower level project as well Schedule the WBS against the RMC that was used by T1L s superior mpm and then book and accept requests to the RMC Create task assignments for the first activities and assign via lazy assignment in time for t11 and t12 Keystroke Details Fix resources AS mpm enter RMC1 contract resource control housekeeping ok logout Accept and examine tasks from mpm As til accept mpm contract as titeam WORKBENCH PROJECT MANAGEMENT TASK definition view workAssign t1 1 td 1 OK EXIT Generate a T1 WBS As t11 WORKBREAKDOWN fill in activity view fill in resource view fill in products view CONSISTENCY REPORTS Housekeeping export new planning t1 1 wbs 1 OK Schedule As til scheduling Housekeeping Contractual ope
137. ernment agency personnel and their contractors To obtain a copy please contact DTIC directly Defense Technical Information Center 8725 John J Kingman Road Suite 0944 Ft Belvoir VA 22060 6218 Phone 1 800 225 3842 or 703 767 8222 Use of any trademarks in this report is not intended in any way to infringe on the rights of the trademark holder ISTAR Evaluation Abstract ISTAR is an integrated project support environment produced by Im perial Software Technology Ltd This evaluation of ISTAR is intended for software technologists considering the adoption of an integrated project sup port environment Researchers and others interested in environments and evaluation methods will also benefit from this report 1 Introduction This report primarily descriptive in nature is the result of our evaluation of the integrated project support environment ISTAR In the report we present a factual description of the facilities offered by ISTAR so that readers can draw their own conclusions We also offer our own conclusions and opinions of ISTAR in subsections entitled Analysis and Critique A brief summary of the report and the methodology used follows 1 1 Summary of the Report ISTAR is a software development and project management environment that integrates management and technical development activities It is based on the contract model whose primary objective is that every individual in the organization know what is ex
138. es with VALIDSET if needed Schedule summary context and activity re quirement allocation view to confirm correct resource allocations SEND BOOKINGS Housekeeping contractual operations EXPORT NEW planning 1 sched 1 Keystroke Problems Internal database error MIS Generic Experiment Description MPMb5e Generate a document containing the initial global schedule If possible generate different views of the plan information Mapping Issues Problems Mapping Rationale Part of MPM5qd Keystroke Details Generation of the printed versions of schedule is a trivial printing of the sample reports produced in step MPM5d Keystroke Problems Generic Experiment Description MPM5f Retain a version of the schedule as part of the project history Mapping Issues Problems Mapping Rationale Part of MPM5qd Keystroke Details Keystroke Problems Generic Experiment Description MPM6 Issue schedule for review to T1 DOC QA DOC is requested to confirm T1 and QA are requested to refine CMU SEI 88 TR 3 131 T1 1 TIL receives initial global plan imports it into the scheduler reviews it and sends written comments back to mpm DOC1 Receives initial global schedule from mpm and sends back confirmation QA2 Refines initial global schedule and sends it back to mpm MPM7 changed Combine team leaders comments and perform consistency checks on new version of final WBS and schedule MPM8 Save
139. ew of the experiment will be summarized Four figures are provided to illustrate the design and development states at various stages in the experiment Booch diagrams will be used for this purpose Booch 83 The first step of the experiment creates a library named ADA_LIB which will house Ada program segments that may be copied when needed throughout the body of the experi ment The following steps represent a summary of the generic experiment 1 Set up experiment 2 Identify objects and operations 3 Create package specifications for packages named VECTOR_MANAGEMENT and MATRIX_MANAGEMENT 4 Design subprogram control flows identify subprogram interdependencies and define subprogram specifications local to each package body 5 Create package body for VECTOR_MANAGEMENT 6 Create main procedure named VEC_MAIN in a separate program library named TEST_LIB to test pairwise vector multiplication CMU SEI 88 TR 3 93 Figure A 9 Preliminary Package Design 7 Create package body for MATRIX_MANAGEMENT 8 Create a main procedure named MAT_MAIN in program library TEST_LIB to test matrix vector multiplication 9 Modify package specifications and bodies and examine retranslation behavior The experimental steps for the design and development generic experiment are detailed below It should be noted that the environment should always be used to the maximum extent Optimization of environment usage supersedes the generic experiment
140. f a released system Y Supported by Pmak and build tool Display system release history 0 0 N Might be programmed using user relationships CMU SEI 88 TR 3 157 Figure C 2 Project Management Functionality Checklist Project Plan Management Project plan creation tailor planning support facilities link plans to baseline eee develop WBS oe estimate work COSt cccceceeeeeeeeeeeeeeeeeeee develop schedule cee eeeeeeeeeeees assign resources ae estimate project COSt eeren merge group plans into global plans generate plan document Project monitoring report on actual progress sses analyze progress against schedule compare actuals to estimates 0 analyze resource utilization pie generate summary reports eee Project plan revision baseline the plans oes perform what if analysis 0 handle schedule slippage eee handle personnel changes sue handle changes in WBS s handle changes to project structure handle changes in deliverables adjust costs based on actuals ee handle computing resource changes generate reports ee eeeeeeeeeeteeeeeeeeeeees Plan Instantiation Project installation set up product structure set up team structure os set up task structure s Reporting mechanism installation set up task completion reports
141. fication request which sends a message to the library administrator The library administrator reads the notification request sent in the previous step He accepts the installation request The system asynchronously performs the data transfer The library administrator installs the transferred configuration item BO1 1 in the library Keystroke Problems Because the contract database does not allow underscore characters _ or periods in the names of transfer items the Ada source code compilation unit names had to be modified to be exported Generic Experiment Description Experiment 1 step 7 Modify various components Mapping Issues Problems Where should the individual modified components be kept In separate work areas of the Ada workbench The source must be in the Ada workbench work area in order to be modified The workbench command ACQUIRE can be used to access original versions of unmodified components Each work area has its own Ada library The workbench ACQUIRE command calls the Alsys compilers ACQUIRE command The ISTAR version and component management features are not used In separate configuration items in the experimenter s contract database The ISTAR version and component management features are used Components must be transferred between the contract database and the Ada workbench 110 CMU SEI 88 TR 3 How are system builds to be done Using the ISTAR build tool within the configuration
142. formation in the resource management centers data a copy of which is locally editable as described in Section 3 1 1 3 The local changes do not affect the central data If resource control and project planning are carried out by different individuals they must communicate informally outside of ISTAR The resources in the scheduler s local copy may be acquired by other projects during the 34 CMU SEI 88 TR 3 scheduling process In such a case when the scheduler s resource allocations are sent to the resource manager they may be rejected The project planner is not automatically notified of such an event The class of changes which can occur to a project plan after the project has begun execution can be of two types changes to the content and to the structure of the project Task content changes can be easily made with the task definition tool These changes involve the information passed to an existing task and thus do not involve changes that affect reporting relationships or personnel assignments ISTAR supports this ability with an operation in the task definition tool that sends another configuration item to the con tractor By using a new task id and the job code and activity name of an existing task see Figure 3 10 the project planner can transmit the new contract specifications to the original contractor Structural changes however are much more difficult to implement If a leaf activity of the work breakdown structure is to
143. functions on keys was extremely useful The most frequently used and useful of the functions are in the Sun case bound to the top row of keys The utility of these keys is such that they are worth discussing in dividually e pop This key is used to discard windows It is particularly useful for aborting inter actions in midstream e WIDE This key is used to control the size of windows e LOCAL and HOUSEKEEPING These keys cause the display of menus of commands The contents of these menus depend upon the context in which the keys are pressed The housekeeping menu contains commands specific to a given workbench No matter what the user is doing within in any tool of the workbench this menu s display remains constant The menu varies from workbench to workbench Generally the command to exit the workbench appears in the housekeeping menu The commands in the local menu vary with the tool being used The commands are also specific to the state of the user s interaction with the tool For example in the component management tool which is concerned with the elements of a contract database the local menu contains a command to create a new Cl when the inter action is in a state in which no Cl has been selected In a state in which a Cl has The difference between a folded construct and one which has not yet been entered is made clear on the display SIn the SunTool case these appear as mouse selectable buttons on the display
144. g storing and completing them The quality assurance workbench contains multiple named work areas The work areas contain quality checklist forms Each checklist is a sequence of check lines Each check line is identified by a label and whether it is a criterion or a reference to another checklist within the work area The body of a criterion check line is a description of what is to be checked for quality The body of a reference check line is the name of another checklist within the work area Thus a hierarchy of checklists is created The collection of checklists in a work area can be saved If the check lists are meant to be used by a number of project members to assure project quality the work area can be placed in a library Project members may then use the library transfer facilities to get copies Checklists are completed against configuration items or transfer items Before the lists 30 CMU SEI 88 TR 3 Monitoring Tool Page 1 Actuals report for contract errors on 8th of February 1988 Activities for which resource bookings have been received for 16 01 87 Activity pmexp t11 tlteam First booking date 12 01 87 Last booking date 12 01 87 Best end date estimate 23 01 87 Resource usage this week Actual Resource Usage t11 4 00 t12 4 00 things are going well Author t12 Progress comment the work is going well Personal activity estimates Figure 3 12 Monitoring Tool Actuals Report CMU SEI 88 T
145. g cycle They do well at tracking resources against a schedule as a project is executed The tools are not as well integrated at the tool level This makes moving from phase to phase unnecessarily difficult a phenomenon which is particularly unfortunate during replanning activities The tools do not support group planning activities at all well and should not be used for that purpose The most serious criticism which can be made of ISTAR s planning tools is that they do not react well to change particularly change which occurs during project execution such as reassignment of personnel or responsibilities CMU SEI 88 TR 3 1 ISTAR s configuration management support can best be described as rudimentary There is support for version control and little else There is no system modeling capability as such there is no check in check out paradigm there is no support for release manage ment ISTAR provides a sophisticated problem reporting mechanism but no automated support for tying a software module version to the problems it repairs The ISTAR editor E has a syntax directed editing mode which facilitates the entry of Ada source code The editor is sensitive only to static syntax it is not aware of semantic constraints such as type consistency and undeclared variables Thus a compilation unit which passes the editors syntax checks may not compile ISTAR provides a window and menu oriented front end to the Alsys Ada compiler which is a consid
146. he Report Generator Tool and Language calendar specification hours per day normally worked days of the week normally worked holidays default printer s ability to push to the native operating system if user is con sidered a developer Adaptation to a noncontractual style of management is difficult since ISTAR is based on a clear delineation of assignments from one person to another who then has responsibility to complete and deliver Using shared libraries may make it possible to achieve slight variations eliminating the need to pass deliverables up and down the hierarchy and placing them instead in a library which any colleague can obtain Fle To what degree can the environment support distributed project develop ment ISTAR can support different users on different machines with different datatrees Each contractual assignment to an ISTAR user results in the crea tion of a contract Contracts exist within datatrees Datatrees may be located on different physical machines Each datatree contains descriptions of other datatrees it may communicate with assign to receive deliveries from and how those communications are established arbitrary native operating system commands ISTAR has communicated between datatrees using Ethernet local area networks wide area public networks and mag tape Fif Does the environment encourage or support reusability in a formal way Is there a library of reusable software components What can be placed
147. he following section The interface is modeled on the capability of a DEC VT100 It can therefore be used with any device capable of emulating such a terminal Imperial Software has also im plemented a version of the interface under SunTools The additional features of that implementation are noted as appropriate The editor is configurable at the level of key bindings thereby accommodating the differing interpretations of the function keys on various terminals This feature can also be used to make the editor more nearly resemble an editor with which the user may be previously familiar We have ourselves used it in that way The interface is window and menu oriented The display may contain any number of windows simultaneously These windows can serve various purposes Some of them contain menus A user selects a menu item by positioning the cursor at the item using the cursor movement keys and entering either a carriage return or space Alternatively the user can move the cursor directly to the menu item by entering its first character a system which works less well for menus in which multiple items have the same initial character Because menu interaction like all other interaction is under the control of the editor the editor s positioning commands e g bottom of file for selecting the last item in a menu are available Menu interaction is identical for all tools as they all use the editor to accomplish it In the SunTools imple
148. he input to a contract consists of specifications and other infor mation the outputs are deliverables that fulfill the contract specifications and reports on work in progress All of these data flows can be incremental A contract specification can be updated after initial assignment a deliverable can be transmitted in pieces over time Transmittal of a deliverable does not terminate a contract Contracts can be canceled by the client in which case the contractor is informed of the cancellation A contract can be destroyed by the contractor at any time without administrative control or intervention However contracts are not meant to be destroyed In fact information on a project should not be discarded even after project termination In order to save secondary storage ISTAR offers an archival facility This was not implemented in the version of ISTAR which we examined ISTAR makes no attempt to enforce any rules or standards on the data flows into and out of the contract When a contract is assigned something must be transmitted as a specification When a delivery is made something must be delivered The identities of the specifications and deliverables are recorded in the parent contract Beyond this recording nothing is done to determine whether the specification is acceptable or the delivery conforms to it This philosophy has been called a liberal policy strictly en forced The enforcement occurs in ISTAR s requiring that a spec
149. he item has been sent is not listed in the form 44 CMU SEI 88 TR 3 star COMPONENT MANAGEMENT TOOL Reports query on BO1 1 Date 3 Feb 88 USER marc Time 16 20 01 HOST cmexp CONTRACT CMEXP No cmexp marc CMEXP 4 Status SENT Contract cmexp marc CMEXP Item BO1 1 Raised 3rd Feb 88 16 13 47 Summary of configuration item Initial Baseline for CM Experiment Full configuration item description This item contains the Ada code containing the initial baseline of the System used in the Configuration Management Experiment Reason for submission It is submitted in order to establish it as the initial baseline End of Query Figure 3 23 A Library Notification Form The librarian receives the notification form and reads it using the CMT function READ NOTIFICATION Having reviewed the form the user may then ACCEPT or REJECT it The user transferring the item into the library is not informed of the librarian s decision If the item is accepted the transfer operation is initiated That operation runs asynchronously as a background process It will not succeed until the librarian closes the library The librarian is informed of the transfer s completion and then re enters the library He then issues an INSTALL TRANSFER Command to complete the installation of the item in the library The item will now be frozen in both the library and the originating contract It is possible that the item being installed into the li
150. he library separate from the items in the contract However it seems good practice not to use a contract database in both ways simultaneously The library is meant to serve as a central repository of information Their may be any number of libraries within an ISTAR host or datatree The organization using ISTAR will determine how many libraries it needs and what class of information will be stored in each ISTAR imposes no restrictions and offers no constraints with respect to the content of libraries Recall that the unit of transfer between contracts is the configuration item So the items stored are Cls Of course there is nothing to prevent a Cl from containing a single XI so the granularity of storage in a library is not an issue In order to have an item stored into a library a user proceeds as follows The Cl to be transferred into the library must first have access for other users allowed for it The Cl is then selected the TRANSFERS menu is entered and the RAISE NOTIFICATION operation is performed This causes a form to be popped up into which information about the Cl is entered under the control of form directed editing After the form is completed it is SENT to the library The library contract name and the name of librarian the contract owner are entered as parameters to the SEND A copy of the notification form is kept by the user An example of the form is shown in Figure 3 23 Notice that the identity of the library to which t
151. hich you are comfort able budget number of personnel size of software product any other which you can describe e Is the project experimental Does it have a deliverable to an organization outside i the project team ii the company e How many individuals on the project are active ISTAR users Can you characterize the number of people whose usage exceeds i 2 hours a day ii 2 hours a week iii 2 hours a month iv 0 hours Please give the basis of your estimate e How long has this project been using ISTAR How long has the project been under way B Below is a listing of the Workbenches available from IST and the tools within each workbench Please indicate the extent to which each project listed above uses each tool Please be as specific as you can concerning how to what purposes and to what extent each tool is used General Project Management Text work breakdown Timesheet estimation cocomo scheduling Technical Development task definition ada monitoring unix c report generation pascal sx1 Resource Management sdl resource control vdm resource definition Configuration Management QA Management Component management QA Management Build Contract Operations Tool Development assign deliver etc APCR If you use aspects of ISTAR which are not listed above please list them with their usage CMU SEI 88 TR 3 67 For example does your organization use the admin functions of contract sharing and archiving C Has
152. ibraries b Create executable module Execute Time module creation 9 Modify package specifications and bodies and examine system retranslation behavior using MAT_MAIN as a main procedure Figure A 14 a Change a package specification by removing a function specification that no other package depends upon Delete pairwise vector multiplication specification and store temporarily in a separate location for subsequent reuse Translate Create an executable module Observe system retranslation behavior 98 CMU SEI 88 TR 3 Figure A 14 Matrix Multiplication Test Harness b Change package body by changing an algorithm in a subprogram body Change INNER_PROD body so that it no longer uses pairwise vector multiplica tion Translate into PROJECT_LIB Create executable module Observe system retranslation behavior c Change package body by deleting an unused subprogram body Delete pairwise vector multiplication function body and store temporarily in a separate location Translate into PROJECT_LIB Create executable module Observe system retranslation behavior d Change package body by adding a subprogram body Add back pairwise vector multiplication function body Translate into PROJECT_LIB Create executable module Observe system retranslation be havior e Change a package specification by adding a subprogram specification Add back pairwise vector multiplication function specification Translate into PROJECT_LIB Create executab
153. ich are to be modified Note the ISTAR library of the prior step was not used Acquire from the old work area those components which are not to be modified If necessary create new components Compile and bind using features of the workbench Keystroke Problems None Generic Experiment Description Experiment 1 steps 8 and 9 Prepare a new release Mapping Issues Problems How is the text merge operation to be done Using UNIX facilities e g diff or sccs This does not exercise ISTAR functionality Using ISTAR facilities ISTAR does not provide a text merge facility Where is the new release to be kept See Experiment 1 steps 3 4 5 and 6 Mapping Rationale The text merge operation needed for the three copies of the MAIN procedure was not performed A new configuration item Cl was created in the experimenter s contract database and exported to the library CMU SEI 88 TR 3 111 Keystroke Details Create a successor configuration item to BO1 1 namely BO1 2 in the contract database This is a copy of B01 1 Export the modified or newly created transfer items compilation units as variants or successors of their parents as appropriate Keystroke Problems See Experiment 1 steps 3 4 5 and 6 Generic Experiment Description Experiment 1 step 10 Create the new baseline Mapping Issues Problems What is a baseline in ISTAR See Experiment 1 steps 3 4 5 and 6 Mapping Rationale See Exper
154. ient IX Work Breakdown Structuring Tool wor Breakdown Structure Resource Mgmt Center Scheduler Tool Reports From Contract Specifications Contractors to Contractors Figure 3 1 Project Management in ISTAR 20 CMU SEI 88 TR 3 q Schedule gt Monitoring Tool Task Definition TN OS NZA Tool Timesheets tivities logically partition large tasks into smaller units whose union forms the solution Each activity in the work breakdown structure specifies paraphrased from Dowson 87 e A small prose description of what the activity is supposed to accomplish e A list of products the activity requires to produce its products e A list of products produced e The types of resources needed to perform on the activity The specification in the work breakdown structure is an abstract request for resources that have specified attributes Activities are entered one at time into the activity hierarchy Each activity s definition is entered onto a few panels or views Movement from view to view is accomplished via cursor movement and the CONTEXT key The activity view See Figure 3 2 describes the activity names the products produced and needed by the activities and the resources it requires Product descriptions are entered into product views an example of which appears in Figure 3 3 Like activities products can be decomposed hierarchically
155. ification be provided It is worth noting that ISTAR freezes the specification at the time it is transmitted thereby making it impossible for either party client or contractor to alter the specification This does not affect the client s ability to update the contract with subsequent specifications but it does prevent the text of the original specification from being modified These comments apply equally to deliverables This philosophy is justified in the following dis cussion of the support an environment should give to a software process Most of the processes that are currently employed within our industry would be completely unworkable were it not for human ingenuity and flexibility In prac 6 CMU SEI 88 TR 3 tice people follow the defined process until it breaks down and then find ways of getting round the problem Any attempt to strictly enforce a specified process in all its aspects is therefore likely to be counter productive the process will probably emerge as unworkable Stenning1 87 Although ISTAR enforces no requirements on the content of specifications it does provide tools for their construction These tools are encapsulated in the Project Manage ment workbench and are fully described in a subsequent chapter of this report They include a software cost estimation tool work breakdown and scheduling tools and a resource management tool Through the use of these tools and a task definition tool a client
156. ignment in the task definition tool e Task ID job code interactively specified Unique numbers which identify the assign ment The job code is used for timesheet reporting e Activity from work breakdown structure An activity name from the schedule This field is most easily input via VALIDSET VALIDSET provides a list of activity names from the schedule one of which can be selected e Start and end dates from schedule Retrieved from schedule upon selection of ac tivity e Status fields Cannot be altered by user filled in by system Date raised and issued Whether it has been superseded canceled or signed off completed Also indicates whether the contract was assigned to oneself or sub contracted to someone else e Reporting List of expected reporting by the contractor to the client May include timesheets e Standards List of expected standards to be adhered to in fulfilling the contract The task definition tool may be used without the work breakdown structure and scheduler tools CMU SEI 88 TR 3 27 e Objectives List of objective to be achieved in fulfilling the contract e Verification List of conditions that must be true before the contract can be considered complete The standards objectives and verification items may take the form of references to quality assurance checklists See Section 3 1 4 below TD V2 5terrors gt a status r 1 r 1 task id 301 start date 02 01 87 raised
157. iled The parents of subunits are clearly identified Ada Workbench V1 1 Insert gt Work area B01 Back ups L Compiled BoD Compiled 1_SUPPORT SPECIFICATION Compiled COMMAND_INTERPRET BODY Not compiled COMMAND_INTERPRET SPECIFICATION Not compiled PERFORM_COMMAND SUB UNIT Compiled IMAGE MANAGER SPECIFICATION Compiled Compiled MAIN EXECUTABLE PAGE_TERNINAL oDY Compiled Figure 3 25 Listing of the Elements Within a Work Area Selection of the FILTER item in the listing in Figure 3 25 gives the user access to a menu 13This listing may contain things other than compilation units These are various compiler and tool message listings A complete list of types appears in Figure 3 26 CMU SEI 88 TR 3 49 which controls the work area element listing An example of this menu appears in Figure 3 26 The PATTERN entry provides for regular expression matching on element names Only those elements whose names match the pattern will be listed The remaining entries restrict elements by type The example specifies specifications bodies and sub units to be listed compiler and binder listings to be omitted etc Ada Workbench V1 1 Pattern gt f IWork area Back ups L Specifications Bodies Sub_units Compiler listings Binder listings H It compiled Text files mpi led Executable files mpi led Object files mpiled Compiled units Uncompiled units Linke
158. iment 1 steps 3 4 5 and 6 Keystroke Details See Experiment 1 steps 3 4 5 and 6 Keystroke Problems Generic Experiment Description Experiment 1 step 11 Build executable of current system Mapping Issues Problems How are system builds to be done See Experiment 1 step 7 Mapping Rationale This step was not performed as it repeated functionality already tested Keystroke Details Keystroke Problems Generic Experiment Description Experiment 2 step 1 Experiment setup Mapping Issues Problems See Experiment 2 step 3 below Mapping Rationale A new contract owned by the experimenter was created to perform steps 3 and 4 Keystroke Details Enter Component Management Tool CMT in original contract Create a configura tion item to serve as the contract specification Assign new contract to self Commit action Leave CMT Await delivery which is instantaneous Accept new contract 112 CMU SEI 88 TR 3 Keystroke Problems None Generic Experiment Description Experiment 2 step 2 Display configuration management data Mapping Issues Problems What configuration management data should be printed The contract menu STATUS function output Displays the status of each configuration item FROZEN or FREE names types variant names version numbers and creation date time for transfer items XIs within a configuration item Cl the location contract name from whence a configuration
159. imesheets Each timesheet is filed as a response to a job code task name key pair Once a key pair is canceled task management it is not permissible to submit any more timesheets against that pair Thus a new pair of distinct job codes and task names must be issued to the new person Clear indication of where each new person began after the old person Lose the ability to create timesheet traceability summary reports because the person s responsible for a task is new and is not linked to his predecessors Scheduling Rescheduling T12suc in T12 s place must take place against a new schedule that contains modified assignment names for T12suc so task definition tool assign ments can be made later without conflicts and timesheets can be submitted and against an increased resource collection or one in which T12 is replaced by T12suc Task Assignments The schedule is constructed from the WBS where the task names are obtained Task assignments are made from the schedule which was booked against RMCs Task assignment is limited by the job code activity name being distinct in relation to previously issued tasks even the activity name may not be the same Implication Schedule tasks to be reassigned must have different names and new job codes Implication The WBSs must be altered with changed names as well In general ISTAR provides no support for the reassignment of a task to CMU SEI 88 TR 3 139 another person The superseding aspect
160. in his or her database as well Suppose that item must be forwarded to a third user As it turns out ISTAR does not record the identity of the original owner in the new recipient s database The history of movement of this item and of its modifications at each location as given by the version trees is recorded by the system as a whole It cannot however automatically be gathered into a single location or report This is be cause each contract is accessible only by its owner No report including those defined by the users can access databases owned by anyone other than the person running the report This makes the production of ad hoc user defined management reports difficult if not impossible to accomplish The ISTAR model works best when a development project is well planned in advance and the resulting plan is executed without modification Planning is certainly a vital com ponent of successful development projects however few plans particularly for large projects are ever executed without modification Unforeseen events necessitate re planning Engineers often find their responsibilities change in mid course This may not be desirable but it is often unavoidable The scenarios just described are realistic im plementations of such mid course changes in ISTAR 2 3 2 User Interface We have described the consistency of the ISTAR user interface We must also describe the interface s inconsistencies These are annoying but not inimi
161. in his plan execution Record the plan revision in the project history PERFORMANCE MEASUREMENT Record elapsed time for status query ACTIVITIES PPM 3 a PPM 3 b PPM 3 c PPM 3 d PPM 3 e PPM 3 k PI 3 a PX 1 a QUESTIONS F2e F3b F3c F3e F4a P1i Consider other changes in the project These include changes in work breakdown or task structure changes in schedule changes in project structure changes in product deliverables adjustments to cost parameters based on actual data and changes in computing resources PERFORMANCE MEASUREMENT Record storage cost of plan alternatives Note respon siveness of system when context switching between alternatives ACTIVITIES PPM 3 f PPM 3 g PPM 3 h PPM 3 i PPM 3 j PI 3 b Pl 3 c PI 3 d QUESTIONS F3d P2g P3g CMU SEI 88 TR 3 13 14 15 16 17 Generate second monthly progress report Perform a trend analysis which should show that delivery of a design document to the Documentation group slipped but that the schedule is not affected Record progress report in project history PERFORMANCE MEASUREMENT Record elapsed time to process progress data for trend analysis ACTIVITIES PPM 2 a PPM 2 b PPM 2 c PPM 2 d PPM 2 e QUESTIONS F2b F4a F4e P1e Receive customer release from QA and approve it for release Generate a report with statistics on project execution e g computer utilization or lines of code changed to mirror the organization s concern for metrics
162. ined relationships between configuration managed items and a problem reporting mechanism There is also a library service and support for recorded system building These capabilities are discussed in the next sec tion 3 2 1 Successor and Variant Control The unit of information within a contract database is the transfer item or XI Transfer items are the unit of transfer between work areas and contract databases The content and granularity of transfer items vary from tool to tool For the Ada workbench a transfer item is a compilation unit for the text workbench it is any number of text files for the WBS tool it is a work breakdown structure Within a contract database transfer items are gathered into sets called configuration items or Cls Cls exist only within such databases The primary technical function of a Cl is to act as the unit of transfer between contracts They can be used for various purposes The Cl which serves as the specification of a contract may contain as separate transfer items a design of the system to be built identity of the resources to be used to build it standards to be used and a schedule to be met A Cl may also serve as a baseline of a software system In this case the transfer items are the modules or compilation units which make up the system Both configuration and transfer items collectively called items are subject to successor and variant control A successor of an item is a new version
163. ing an Ada program aaa Create using the standard text editor a simple Ada program named hello within the ACC_TEST directory containing the following code with TEXT_IO procedure HELLO_TEST is begin TEXT_IO PUT_LINE Hello world end HELLO_TEST g Submit the hello main program as a compilation unit to be compiled into the ADA_LIB program library h Link the hello main program with the Ada runtime and produce an executable load module named Hello_ Test CMU SEI 88 TR 3 101 i Execute the Hello_Test program j Remove the ADA_LIB program library k Remove the ACC_TEST directory Log off the system A 4 2 System Management Experiment 2 This experiment assumes that the environment software has already been successfully installed The purpose of this generic experiment is to investigate an environment s sup port of user account management activities As is always the first step a user must have an account before being able to access the environment software In this vein the steps in this experiment will investigate the operations of creating deleting modifying copying displaying and verifying user account information 1 Experiment setup a Log in to environment as the system administrator b Create subdirectory in which experimental results will be stored c Establish environment variables to be used in the experiment 2 Create environment user account group named E
164. ing information b Rename current accounting log file to a file of the form mmmddyy LOG where CMU SEI 88 TR 3 105 mmm previous month e g Jan dd last day of previous month e g 31 yy year of the previous month e g 85 c Re enable the logging of environment accounting information 6 Write a command procedure to continuously monitor the system s performance i e number of processes currently active CPU usage per process physical memory used per process program image running under process page faults etc 106 CMU SEI 88 TR 3 Appendix B Phase 4 Develop Environment Specific Experiments B 1 Introduction This section details ISTAR instantiations of the generic environment evaluation experi ments as presented in the document Evaluation of Ada Environments CMU SEI 87 TR 1 and The Project Management Experiment This subsection presents information applicable to each of the generic experimental areas How the experiments were run Modifications of the generic experiments The general experimental goal was to explore measure understand and evaluate ISTAR The methodology was the implementation of the functional area models presented by the documents referenced above Decisions which were made during the course of the ex periment instantiation fall into four broad categories 1 Direct mapping of steps whose generic model matches the ISTAR method and which can be accomplished in basically one ISTAR acti
165. instruc tions The following conventions are used in the generic experiment Construct Typeface Examples Commands lower case bold a mklib Filenames bold login matrix_body a Directories bold PROJECT_LIB Ada Procedures UPPER CASE BOLD TEST_HARNESS and Packages 94 CMU SEI 88 TR 3 1 Set up experiment a Create directory named EXP_LIB in which the experiment will be performed b Create a subdirectory under the experimental directory named ADA_LIB to house Ada source code fragments which will be required throughout the experi ment c Create as text the source code fragments and data files in ADA_LIB Appendix 5 A exhibits these files by file name These exhibits will either be typed by hand or will have been previously created in another directory d Develop a command named recordit to collect general experimental data e Develop a command named time to collect experimental timing data 2 Identify objects and operations Figures A 9 A 10 and A 11 Figure A 10 Object Operation Model 3 Create package specification s a Create program library named PROJECT_LIB Measure the time it takes to create program library Measure disk utilization for newly created program library b Create package specification for a package named VECTOR_MANAGEMENT i Enter the package specification which is seeded with errors exactly as it is shown in Exhibit 1 1a i Display and correct translation errors i Translate i
166. intained at the client Possible statuses include issued but not begun begun complete and canceled 3 1 2 2 Acceptance After the contractor is notified of the appearance of a new contract he may accept and rename it He may not read the contract before acceptance and has no ability to reject it ISTAR assumes that contracts do not appear spontaneously but rather are anticipated by the contractor A copy of the configuration item sent by the client is placed in the newly created contract as the contract specification The contractor accesses the information from the work breakdown structure the scheduler and the task definition tool through the task definition tool 28 CMU SEI 88 TR 3 3 1 2 3 Update Cancel The contractual relationships between clients and contractors are formed once an initial assignment has been accepted ISTAR permits updates to the formal task definition or total cancellation of the contract The contractor can not terminate the contract from his end Updates to a task are specified by using the same jobcode and activity name but a different task id Existence of an incoming update to the contractor is flagged in the framework against the original contract s name The contract registers acceptance in the framework Cancellation is also performed from the task definition tool and is registered by the con tractor in the framework 3 1 2 4 Deliver Assuming the contractor has performed the technical as
167. ions Configuration Control Define system model Specify source dependencies Specify translation rules ccee Specify translation options 0 Specify translation tools 0 cceeee Build system Current default cccceccccseccsseeeesseeeee Earlier release Product Release Baseline system ou eee eee eset eeneees Create system release class ceeee 156 Supported Y N lt lt lt lt lt lt lt Observations Configuration Items Cls by the CMT Transfer Items XIs via export from a workbench Cls in CMT New copy by reference XIs via specialized workbench exports Just as for successive Known as variants in ISTAR Provided status is not FROZEN Any XI may be imported by name A Cl may be retrieved from another database if access is allowed by database owner L latest and P preferred symbolic version numbers are supported The Pmak utility and the build tool support these functions but do not support Ada See above comments Any operation which freezes a Cl can be thought of as creating a baseline CMU SEI 88 TR 3 SECONDARY ACTIVITIES Version Control Merge variants cce eee eeeeeeeeeeeeeeeees N Merging of variant versions of an XI is not supported Merging of the contents of Cls is supported Display history attributes ee Y Multiple formats and styles Product Release Display members o
168. iption Step 2 Identify objects and operations Mapping Issues Problems How should this be done ISTAR offers no design tools graphical or otherwise Mapping Rationale This step was not executed Keystroke Details Keystroke Problems Generic Experiment Description Step 3 Create a program library and enter source code Mapping Issues Problems No issues arose for this step Mapping Rationale The ISTAR Ada workbench creates work areas Each is associated with a distinct library The ISTAR syntax directed editor is used to enter the program text Keystroke Details Keystroke Problems The ISTAR syntax directed editor caught all but two of the errors seeded into the program text Generic Experiment Description Step 4 Design subprogram flows interdependencies etc CMU SEI 88 TR 3 149 Mapping Issues Problems See step 2 Mapping Rationale Keystroke Details Keystroke Problems Generic Experiment Description Step 5 Create program body Mapping Issues Problems Can a null body generator be found ISTAR does not support this function Mapping Rationale See step 3 Keystroke Details Keystroke Problems The syntax directed editor did not trap the error of a missing type mark in constant declaration It also did not trap the semantic error of a missing return statement but it was not designed to trap such errors Generic Experiment Description Step 6 Create and debug a ne
169. is assignable to a person as a contract using either the task definition tool or the framework s simpler ops assign The task definition tool retains a connection to the previous phases by creating and passing along to the contractor a textual summary of the information that was included when creating the WBS entry and the assigned time and resources from the scheduler Textual assignments are not enforced The ops assign framework assignment method performs the basic assignment but without connections to the WBS and scheduler Ops assignment is the most informal method of work in ISTAR that is within the contract model problem reports are not deemed to be within the model F3b How automated is the support for setting up and maintaining develop ment support facilities to reflect current plans Is the project plan tied to development such that it must reflect the current status of the project Task definition is a largely automated process Activities from a schedule are selected by hand and turned automatically into a contract after specifying who should perform the task and which Cl is to be sent along with textual assignment The textual assignment is generated from the WBS and schedule F3c How well is the development facility insulated from what if analyses of planning activities How difficult is it to merge a new plan with ongoing project execution What if analysis occurs within the scheduler while task assignment occurs in task
170. isted have been imported into any work area The remaining items do not have the associated text block level 3 in Figure 4 3 If the report described in Figure 4 3 were not constrained it would list all the configuration items within the contract against which it was run in combination with all the transfer items of all the configuration items in that contract in all possible combinations without regard to whether the XI appears within the Cl The constraint language of the RGT allows the report access to the relationships in the database This allows the report to 58 CMU SEI 88 TR 3 Figure 4 1 The Data Model of a Contract Database CMU SEI 88 TR 3 59 relationship HAS_PREFERRED_CI classes I_LIST complexity one optionality optional end relationship relationship HAS_LATEST_XI classes XI_LIST complexity one optionality compulsory end relationship relationship HAS_PREFERRED_XI classes XI_LIST complexity one optionality optional end relationship relationship CONTAINS_XI classes CONFIG_ITEM complexity one optionality optional end relationship relationship HAS_REAL XI_NAME PREFERRTE CONF IG_IT one optional CI_OF G J LATEST_XI_OF USER_XI one optional PRI US one optional FERRTED_XI_OF R_XI Aw XI_PART_OF USER_XI many compulsory EAL _XI_NAM GI _ OF classes USER_XI c
171. ith problem reporting SELECT 1 lt 3 and 1 4 EVALUATE each one INFORM each one do not set status to finished Stay in CMT for next step Issue tasks Command line function Create new Cls workAssign t1 1 workAssign doc 1 workAssign qa 1 Move to each of these Change MERGE INTO the WBS and schedule all from planning 1 PRs Move the problemsRel1 1 Problem ATTACH 1 3 to workAssign t1 1 do _not_ remove link to problemsRel1 1 Do same for 1 4 Issue tasks Back to framework PROJECT MANAGEMENT TASK DEFINITION IMPORT SCHEDULE planning 1 sched 1 Task id 101 jobcode 5101 ac tivity VALIDSET t1_team reporting weekly timesheets standards qa team objectives correctness verification qa team ISSUE TASK DEFINITION sub contract sub contract name pmexp til workT1 TD XI workAssign t1 1 td 1 Task id 201 jobcode 5201 activity VALIDSET doc reporting weekly timesheets standards qa team objectives correctness verification qa team ISSUE TASK DEFINITION sub contract sub contract name pmexp doc workDOC TD XI workAssign doc 1 td 1 Task id 301 jobcode 5301 activity VALIDSET qa reporting weekly timesheets standards qa team objec tives correctness verification qa team ISSUE TASK DEFINITION sub contract sub contract name pmexp qa workQA TD XI workAssign qa 1 td 1 Exit Keystroke Problems Generic Experiment Description CU3 Customers receive and examine responses regarding treatment of submitted r
172. ition and analysis of steps in the method under definition E editor forms will be constructed so information can be entered while the method is executing Example defined methods CORE Controlled Requirements Expression GASSAID in ternal Imperial Software Technology Ltd structured design methodology The CORE method is available as one loadable language into APCR CORE models are composed of hierarchical levels of data and actions Data and actions are integrated with relations Workbench menus permit entry of portions of the hierarchy data actions and relations Numerous pre defined relations can be placed between data and actions For example the input_general_data_details menu relates data to data with parts_are has_level has_attributes and other relations 56 CMU SEI 88 TR 3 4 4 SX1 The SX1 workbench supports the SX1 method developed by British Telecom Ltd SX1 models contain modules which can be compiled into a number of languages The workbench consists of e Editors for modules and line levels e Graphical layout and presentation programs e Code generators for C COBOL Pascal and PL M Standard ISTAR work area facilities for creation selection deletion and import export are provided Contents of the work area can be displayed as SX1 text or graphics and in the target languages that the SX1 can be translated into The module and line editors have the feel of the UNIX ed 1 editor The ISTAR E editor can be
173. ject to which they are related Furthermore as the class mechanism described earlier is not available to the user ISTAR will not assist the user in ensuring that if the relationship x DESIGN_FOR y holds that x is a design and ya code object The CMT will allow any Cl or XI to be related to any other Cl or XI by any user defined relationship The CMT has an operation which will display the relationships which involve a given item and an operation which will display all the relationships within a contract Examples of these two reports are given in Figures 3 20 and 3 21 Istar COMPONENT MANAGEMENT TOOL Relationship query on BO1 1 Date 9 Feb 88 USER marc Time 15 11 48 HOST cmexp CONTRACT CMEXP BO1 1 HAS_DEPENDENT New 1 End of Query Figure 3 20 The Relationships Involving a Given Cl Istar COMPONENT MANAGEMENT TOOL User defined relationship query Date 9 Feb 88 USER marc Time 15 22 13 HOST cmexp CONTRACT CMEXP BO1 1 HAS_DEPENDENT New 1 BO1 Test 1 AIMSUPPORT 1 HAS_DEPENDENT BO1 3 AIMSUPPORT 1 BO1 3 DEPENDS_ON New 1 BO1 3 AIMSUPPORT 1 DEPENDS_ON BO1 Test 1 AIMSUPPORT 1 ew 1 HAS_DEPENDENT BO1 3 ew 1 DEPENDS_ON BO1 1 End of Query Figure 3 21 All the Relationships Within a Contract 12The report generator tool RGT and its associated report generator language RGL can utilize user defined relationships in the production of user defined report
174. l always be pretty printed A syntactic document that is one using syntax directed editing may contain stubs generated by the editor that stand for syntactic categories For example the empty Pascal program will appear as the stub program The user replaces the stub with text and the editor ensures that the replacement conforms to the appropriate category The user may enter part of a syntactic element For example he may replace the stub statement with the term for and the editor will automatically supply the concrete syntax and stubs making up a for loop The editor can also fold a syntactic construct replacing the text with the stub This can be useful for program scanning The syntax direction supplied by the ISTAR editor in this mode is limited to that which can be described in BNF This limitation can be called static syntax it is the syntax which can be checked locally Items such as variable declarations and type constraints do not fall in this category Therefore a program entered in this way may not conform to the language and may not compile without error Many of the functions of the editor are bound to function keys The exact set of func tions so bound varies from terminal to terminal In the Sun implementation used in this experiment the functions bound to function keys include some used in form and syntax editing as well as frequently used functions of simple text editing The availability of these
175. late it to Release 1 0 of UI 6Content is irrelevant for this experiment other than a reference to CLI CMU SEI 88 TR 3 85 PERFORMANCE MEASUREMENT Record the storage cost for the user manual ACTIVITIES PI 1 a QUESTIONS P2b Package up the executable code and the user manual as a customer deliverable Release 1 0 PERFORMANCE MEASUREMENT Record the storage cost for the deliverable ACTIVITIES PI 1 a QUESTIONS P2b Initialize calendar with work hours work days holidays ACTIVITIES PPM 1 a Enter persons as available resources for the project Different individuals have dif ferent qualifications analysis documentation management etc see Figure A 7 for details Enter planned vacation for documentation person during second week after detailed plan has been approved ACTIVITIES PPM 1 a Carry out system administrative initialization such as default printers report formats Make use of whatever support the environment offers in grouping tools or creating logical subsets of the environment for specific users PERFORMANCE MEASUREMENT If work areas are set up at system initialization time record elapsed time and space to create a logical work area for a member of one team ACTIVITIES PPM 1 a Pl 2 a Pl 2 b Pl 2 c QUESTIONS F4h P1f P2f A 2 2 The Customers The two customers CU1 and CU2 are using UI Release 1 0 encounter problems and submit error reports They are informed of the treatme
176. le module Observe system retranslation be havior Change package body by adding comments Add comments to package body of VECTOR_MANAGEMENT Translate into PROJECT_LIB Create executable module Observe system retranslation be havior CMU SEI 88 TR 3 99 g Add comments to package specification of VECTOR_MANAGEMENT Translate into PROJECT_LIB Create executable module Observe system retranslation behavior A 4 System Administration This is a two step phase in which the environment independent evaluation experiments are first developed and then a list of specific applicable evaluation questions for each experiment is assembled from the general questions outlined in Step 2 of Phase 2 A 4 1 System Management Experiment 1 The purpose of this generic experiment is to investigate the procedures supporting the installation of an Ada software environment Specifically this experiment will address all aspects of installing an Ada environment including loading the software from the release media integrating the software with the probably existing underlying operating environ ment and exercising the installed Ada software environment Note All data file size recordings and all timing measurements indicated below in italics should be logged into a file named Recordings in the experiment s home directory Fur thermore each of the logged measurements should be labeled with a descriptive tag 1 Experiment setup a
177. lem reporting on problemRel1 1 Comment on them SELECT and EVALUATE each with an accepting annotation On PR 5 also INFORM cu2 person who sent it Send enhancement notice As mpm pass controllership with a SEND 5 to mpe enhance 126 CMU SEI 88 TR 3 Keystroke Problems Generic Experiment Description MPM5 Turn remaining recommendations into initial global plan Mapping Issues Problems How should a manager make assignments from a schedule hierarchy Leaf nodes in schedule are tasks to be assigned Each already has a task name Textual description is obtained from work breakdown structure WBS Each task is sent with reporting requirements verification etc Basic ISTAR model Cannot assign subtrees to a project Who maintains the schedule How are comments on a schedule coordinated First mpm maintains a global plan which is reviewed by subordinates and then adds in lower level details to form a detailed plan Comments are obtained by making copies into new Cls and XIs and sending them down to subordinates as contract assignments Subordinates view the global plan using the scheduler and respond with written comments via ops assignment not task assignment because then they could not send them out again as real assignments Subordinates comments are incorporated into global schedule by mpm to create detailed plan With task definition tool mpm makes assignments from complete detailed plan Associate
178. line assistance is provided All help is context sensitive Help is provided through the special HELP key Sensitivity is usually at the level of permissible commands at the current point although sometimes only tool level help is provided U3c How complete concise and appropriate is the documentation The written documentation is voluminous Each tool is described with keystroke level detail The most useful portion of each manual is the an notated running example which sheds some insight into the intent of the designers on how the system is to be used The manuals do not provide a quick method of looking up information such an index or an on line hypertext reference Short useful guides were published a few months after we began the experiment these defined ISTAR s high level model of management and how the tools support the model The online demonstration system initially provided a lot of good advice by example although it was not maintained with the newer system versions ISTAR is too complex a system to be learned without initial training U4a How much tolerance does the environment show for minor errors e g syntax errors In the common menu driven input model there is little chance for minor syntax errors since most activities are menu selections Command line input is prone to error which results in terse and often general comments There is no at tempt to provide a set of possibilities for the meaning of a command and a
179. lists the workbenches currently available in ISTAR Workbenches are collections of related tools and their local work areas All work in ISTAR is performed in workbenches which are initiated through this menu As the display indicates workbenches are accessible only through an open contract Therefore all work done by ISTAR users is necessarily done for some contract Some of the windows popped up by ISTAR contain forms These are created and manipulated by the ISTAR editor The ISTAR tool set contains tools for the creation of form templates the descriptions of forms Therefore the forms system is directly avail able to ISTAR tool builders 12 CMU SEI 88 TR 3 ISTAR ISTAR_2 10 1 gt gt USER marc contract r 1 ONTRACT CMEXP 25 full gt CURRENT CONTRACTS orkbench ops status close CMEXP new transfer s gt CNEXP2 CNEXP4 Figure 2 3 A Framework Display Figure 2 4 Another Framework Display As the name implies forms are electronic representations of paper forms They have fields containing constant information for display purposes only and fields containing user modifiable information For such fields the form designer can specify a prompt string which the editor will display when the form user is entering information into the field This string can be used by the designer to convey a brief description of the meaning and purpose of the information to be entered into the field The forms system includes a
180. lity Checklist PRIMARY ACTIVITIES Environment Installation Load environment software from media Setup necessary alias logical names Operating environment configuration Run installation procedure c ee Install help files as Establish access control Modify system wide start up procedures Perform acceptance tests Query the online help facility ee Create a program library er Edit an Ada source code file Compile a small main Ada program Link a small main Ada program Execute a small main Ada program Delete a program library eee Supported lt lt lt lt lt lt lt lt lt lt lt lt lt lt Observations Integr w existing OS By installation procedure By installation procedure UNIX etc rc 162 CMU SEI 88 TR 3 C 2 Configuration Management C 2 1 Functionality Questions F1 Functionality checklist Which key CM activities are supported Which are not See Figure C 1 F2a Describe the mechanics of fundamental CM operations Create CM ele ment A CI configuration item is created via the CMT Component Management Tool operation CREATE NEW CI Note also that when a contract is created the creator assigns a specification CI Thus a contract has at least one CI neces sarily A CI can be created accidently when an XI transfer item is exported to a non existent CI This will create the CI as
181. ll that all work in ISTAR is done within work areas which can be accessed solely by their owners For control of a product or document to be transferred from one user to another the following steps must be taken The owner of the item must export it to a contract database and must make the item publicly accessible The owner must inform the recipient of its name and location Sin the case of Ada variants of a system will need separate Ada libraries The ISTAR Ada workbench supports that concept rather well CMU SEI 88 TR 3 15 The recipient must then issue a request for a copy of the item and then wait for the copy operation to take place The recipient must then install the item into one of his contract databases and finally export the item into the appropriate work area The recipient is now able to begin work on it In the case of local transfer that is within the same ISTAR host the above steps take very little time There is however a good deal of manual intervention and of data replica tion involved In the case of remote transfer much of that intervention and certainly the data replication is unavoidable Local transfer would seem to be much more prevalent The separation of users storage has an effect on global project knowledge In the above scenario the fact of the transfer will be recorded in the recipients database as a property of the transferred item Optionally the original owner may have that fact recorded
182. llection of tool s data which persists from invocation to invocation Even this latter meaning is not useful within the context of this experiment so the times for opening and closing workbenches are given Opening CMT Resource definition Resource control WBS Monitoring QA Scheduler Timesheets Exiting appears quite consistent CMT Resource definition Resource control with confirm WBS Monitoring QA Scheduler Timesheets Creating a task 10 9 10 7 9 33 18 20 discrepancy 33 in cludes one time only creation beyond entering time 18 26 60 52 69 30 27 discrepancy based on the amount of data which needs to be consolidated 20 7 15 24 To create a task enter the task definition tool obtain a schedule from which to select tasks to be assigned assign a new task id which creates a new copy of the form and then issue the task Enter task definition tool Import schedule New task id Issue task definition Exit task definition tool 33 27 4 9 10 22 25 23 3 CMU SEI 88 TR 3 Pih Notifying project members with full propagation of task completion Team members are not notified of task completion Only the person who let the contract is notified Deliver 18 Pii Executing a status query See P1e P1j Making an object accessible in a work area e g by copying Protection is accomplished within the configuration management tool Only three levels of p
183. lled in with text The controller may FINISH the report changing the status to FINISHED and informing the originator that the problem has been solved Finally the con troller can CLOSE the report marking its status as CLOSED and making no further changes possible An organization wishing to use the ISTAR problem reporting mechanisms will need to have guidelines in place to support it Consider the user who first notices the problem Assuming that the user does not bear the responsibility for repairing the problem he or she must know who is responsible and the name of the contract under which that user carries out that repair work This places a considerable burden on the user In order to ease that burden the organization can appoint a central clearinghouse contract for problem reports The owner of the clearinghouse contract re sends problem reports to individuals who might be able to deal with the problem Through some number of rounds of SENDing and RESPONDing the appropriate individual is identified and controllership of the report is transferred to him or her Alternatively the responsible individual can be identified through informal means 3 2 4 Libraries The ISTAR library facility is an application of the contract database technology Tech nically a library is a partition of a contract database It is possible for a contract database to be used both as a contract in the standard way and as a library ISTAR will keep the items in t
184. m interface Interaction between different elements of the environment and between the environment and the support system operating system Functionality questions are summarized with checklists for each area Performance is a particularly sensitive category since the time and space measurements derived from experimentation were obtained under varying conditions and were not part of a formal statistical analysis The varying conditions were a number of hardware con figuration changes summarized in the following table Role Server Server2 Client1 Client2 CPU Memory Sun model 3 160 3 280 3 52 3 140 Speed MHz MIPS 16 6 2 25 4 15 1 5 16 6 2 Meg memory 16 8 4 16 Memory speed 120ns 100ns 120ns 120ns Disks Manufact Fujitsu Eagle Fujitsu Eagle Fujitsu Micropolis Model 2251 2351 M2243AS 1355 Size Mbytes 474 474 70 171 Quantity 2 2 1 1 Controller XY 450 XY 451 ST506 ESDI Disk gt contrl 1 8Mbytes s 1 8Mbytes s 625Kbytes s 1 25Mbytes s Contrl gt mem 2 0Mbytes s 2 2 2 8Mbytes s 2 0Mbytes s 2 0Mbytes s Date ISTAR began Jul 16 87 Jul 23 87 Sep 17 87 Notes VME bus transfer rate is about 17Mbytes s Ethernet transfer rate is 10Mbits s Server1 and Server2 provide Network File System NFS service to less than 10 clients Originally ISTAR was installed and run directly on Server1 Experiments run on Server1 and later on Server2 seemed identical within the 1 second resolution timings with all data and binaries on the se
185. manner for variant as for non variant elements 164 CMU SEI 88 TR 3 F2k Describe the mechanics of fundamental CM operations Query for his tory for a CM element simple vs variant elements The following comments apply equally to simple and variant elements The Cl Query Menu provides the following displays e Version History The variant and successor list for the Cl Identity of the latest and preferred successors Whether FREE or FROZEN Whether access is allowed for other users e Status Whether FREE or FROZEN within which contract the Cl was created this may serve to identify creator the list of transfer items in the Cl with dates times and types e Description A free text field which can be modified as long as the Cl is FREE Initialized with date and time of creation This information can be deleted however e Logged Users A list of retrievals of this Cl by CM operations RETRIEVE Cl or SCAN LIBRARY The date and time of the retrieval the host user and contract in which the retrieval occurred are recorded There is no notion of the Cls being put back there is no checkin checkout transaction mechanism The logging of these retrievals can be selectively turned off e Reports Problem reports posted against this item and other notifications e g library installations The XI Query Menu provides the following displays e Version History Same as for Cl e Status Shows status of containing Cl type of XI and
186. may construct a specification that includes schedule constraints and resource lists as well as development objectives standards to be adhered to by the contractor and termination criteria to be met These termination criteria take the form of checklists which the contractor is meant to fill out indicating that required quality assurance steps have been carried out The completed checklists are returned with the deliverable to the client In keeping with its philosophy ISTAR does not verify the completion of these checklists that must be done by the client who may examine the state of the checklist when it is returned The Project Management workbench also contains tools for monitoring the progress of contract fulfillment The contractors submit time sheets which record effort and resources time and material expended on the contract and an estimated completion percentage These time sheets can be summarized and sent up the contract hierarchy The contractor may indicate contract completion in a time sheet but ISTAR does not verify that anything has been delivered ISTAR supports a problem reporting mechanism which can be thought of as a method of work assignment parallel to the contract assignment mechanism Any ISTAR user can raise a problem report at any time These reports are predefined forms containing problem descriptions severity impact etc Problem reports have controllers individuals who presumably are responsible for taking
187. med BO 2 of the current system using MAIN A as the main program Record current sizes of CM files Measure time taken to perform baseline operation b Test CLI interfaces i Build executable load module named CLIL_MAIN using MAIN B as the main program Measure time taken for creating a variant line of descent Measure CM file size increase caused by variant Measure time taken to perform the build ii Fix bugs in MAIN B iii Construct a configuration baseline named BO 3 of the current system using MAIN B as the main program Record current sizes of CM files Measure time taken to perform baseline operation c Test SM interfaces i Build executable load module named SM_MAIN using MAIN C as the main program Measure time taken to perform the build Measure time taken for creating a variant line of descent Measure CM file size increase caused by variant CMU SEI 88 TR 3 75 10 11 ii Add new interface to Viewport_Manager package using variant versions Measure time taken for creating a variant line of descent Measure CM file size increase caused by variant Re build executable load module named SM_MAIN with new version of the Viewport_Manager Test new interface along with previous interfaces of the SM Measure time taken to perform the build iv Construct a configuration baseline named BO 4 of the current system using MAIN C as the main program and the new versions of the Viewport Manager Record current sizes of CM
188. mentation cursor positioning and item selection can be done directly with the mouse In addition to windows the display also contains a command line It will generally also contain an area reserved for the display of system status information Much of menu interaction results in the execution of a command either by the editor or the tool Many of these commands can also be entered on the command line which a knowledgeable ISTAR user may prefer particularly when the menu interaction requires multiple level of submenus There is a powerful abbreviation mechanism available for the command line and a history mechanism as well Figure 2 3 contains an example ISTAR screen This particular screen is displayed by the ISTAR framework The framework is the highest level of control in ISTAR which the user enters after logging on to ISTAR The command line appears at the top of the display at the point where the greater than sign gt appears The narrow window directly below is the initial menu In the example the user has selected the contract operation from that window which displayed the large window in the lower right of the screen this window contains a list of the user s contracts The user has selected and opened one of those contracts CMEXP resulting in the display of the menu on the lower left of the screen Selection of the workbench operation in that menu produces the display shown in Figure 2 4 The new pop up menu shown there
189. ments be taken for certain operations As implementors we faced the following problems e The C shell built in command time can only be used to time shell commands thus it cannot be used to take time measurements of ISTAR operations e The standard UNIX command du calculates space utilization to within the nearest kilobyte per node The cumulative error can be substantial Further du is incapable of measuring space utilized within ISTAR databases These are implemented as large UNIX files within which space is controlled by the ISTAR database management routines This space utilization is thus invisible to du To solve these problems IST personnel wrote three C programs to take time and space measurements All three programs send their output to a file specified by the environ ment variable AUDITLOG The programs are 1 spacestamp walks a UNIX directory structure picking up the sizes of each node It uses an IST supplied command rls to gather the data and the UNIX standard com mand awk to process it Its usage format is spacestamp p directory comment where directory is a pathname relative to the environment variable FRMDATA and comment is any string comment is copied to the output and used to identify it 2 dbsizestamp calls the ISTAR administration function dbops to count the number of database records in an ISTAR database Its usage is dbsizestamp database comment where database is a database owned by the current ISTAR user an
190. merging at the manager s level and the manager would have to manually update each portion of the master work breakdown structure Both of these solutions to the group planning problem are tedious Group planning ac tivities are best done offline and the completed work breakdown structure entered in one location This is in keeping with ISTAR s basic philosophy of formally recording informal communications Once a definitive work breakdown structure has been established by the project manager it evolves into a schedule A multi leveled work breakdown structure results in a schedule containing only the bottom layer leaf node activities The intermediate levels of the activity and product hierarchies are used to deduce the dependencies among the leaves but the other information associated with those products and activities their descriptions and resource requirements in particular are lost in the schedule 32 CMU SEI 88 TR 3 Assume for the moment that the project manager supervises a group of team leaders each of whom supervises a group of programmers If the project manager uses the task definition tool to directly assign the activities of the schedule the resulting contract hierar chy will be flat each of the contracts will have the manager s contract as its parent the structure of the organization will not be reflected in the contract hierarchy This has an effect on the cost control and timesheet reporting mechanisms These mechanism
191. n XI Istar COMPONENT MANAGEMENT TOOL Logged users query on B01 1 Date 9 Feb 88 USER marc Time 15 08 52 HOST cmexp CONTRACT CMEXP 2 logged users Copy taken by cmexp molly Library on 87 08 27_14 24 Copy taken by cmexp molly Library on 88 02 03_16 26 gt gt End of Query Figure 3 18 Users Taking a Copy of a Cl Component Management Tool Version 2 3 HOST cmexp CONTRACT CMEXP Contract p 0 query cnexp marc CMEXP 1 NOTIFY Raised 27th Aug 87 10 03 55 Concerns BO1 1 gt cnexp marc CMHEXP 3 PROBLEM Raised 25th Nov 87 16 57 36 Concerns GENERAL cnexp marc CMEXP 4 NOTIFY Raised 3rd Feb 88 16 13 47 Concerns BO1 1 gt Logged users Reports Relationships Quit menu Figure 3 19 A Display of the Reports Attached to a Cl CMU SEI 88 TR 3 41 Relationships cannot span contracts None of the ISTAR tools other than the CMT is aware of the existence of user defined relationships 2 For example it is not possible when importing an XI into a work area to reference the item to be imported via a base name and a relationship User defined relationships can be used to implement a traceability feature within ISTAR For example the user may wish to have a DESIGN_FOR relationship between a design object and a code object However the user must maintain all such relationships manually ISTAR has no means of enforcing an integrity constraint of the form all code objects must have a design ob
192. nalysis and a summary which is illustrated in Figure 3 9 rlosin Sched V3 0 CMEXP Schedule summary view Schedule summary view gt scheduled end 4 4 L 4 activity e start e finish 1 start total slack free slack slippage r 1 1 1 ae aa Pepe ER a lt lt 1 1 Enalysis 2nd Jan 87 8th Jan 87 2nd Jan 87 8th Jan 87 r time analysis start L StepInstantiate Sth Jan 87 29th Jan 87 Sth Jan 87 29th Jan 87 ProgramCreate Sth Jan 87 13th Jan 87 27th Jan 87 29th Jan 87 Execution 30th Jan 87 12th Mar 87 30th Jan 87 12th Mar 87 OtrAtTH TH TH WriteUp 13th Mar 87 14th May 87 13th Mar 87 14th May 87 Figure 3 9 Schedule Summary After Time Analysis Resource Limited Scheduling This is the final type of scheduling and involves matching the work breakdown structure against the resources in the resource management center Resource limited scheduling results in a more constrained schedule than that of time analysis Adding resource constraints only serves to limit capability to accomplish tasks The scheduler is given the names of resource management centers that it is allowed to draw upon A request for physical resources to the resource management centers is initiated and results in the creation of a resource pool local to the scheduler of those actual resources whose attributes match those of activities requirements Scheduling may then be done in either inte
193. nd resource consumption at end of week 6 13 Leader integrates changes tests and notifies the two programmers of successful test Approves new release of Ul_CLI and sends it to QA Notifies manager PERFORMANCE MEASUREMENT Record total storage space of messages for team leader programmer 1 programmer 2 Record elapsed time for notification of task completion ACTIVITIES PX 1 a PX 1 c QUESTIONS F4c F4d F4g F5e Pith P2e A 2 6 Team 2 This team has two members who work semi independently They are responsible for the packages in UI_SM 1 Receives global plan from manager and sends back confirmation 2 From task list 6 7 sent by manager programmer 1 chooses task 6 ACTIVITIES PX 1 a PX 1 b QUESTIONS F4b 3 From task list 6 7 sent by manager programmer 2 chooses task 7 4 Programmer 2 attempts a direct change to UI_VT This is an invalid access request o Oo and should be flagged by the system If the attempt is denied consider programmer 2 sending a change request to Team 3 17 PERFORMANCE MEASUREMENT Note action of system ACTIVITIES PX 1 b PX 2 b QUESTIONS F4d F4j F5c S3 Both programmers report progress and resource consumption at end of week 2 Programmer 1 makes change to code tests sends new version to QA Program mer 2 is working in parallel and should not see the new version ACTIVITIES PX 1 c QUESTIONS F5j 7 Programmer 2 makes change to code tests se
194. nds new version to QA Notifies manager ACTIVITIES PX 1 c 7For this experiment however programmer 2 proceeds without changes to UI_VT CMU SEI 88 TR 3 91 A 2 7 Team 3 This individual is responsible for packages in UI_VT 1 2 Receives global plan from manager and sends back confirmation Accepts task 2 from manager QUESTIONS F4b Makes change to code and tests Reports progress and resource consumption at end of week 2 Passes new release of UI_VT to QA Notifies manager ACTIVITIES PX 1 c A 2 8 Documentation Group 1 Receives plan from manager and sends back confirmation ACTIVITIES PX 1 a PX 1 c QUESTIONS F4f Takes one week vacation as planned Upon his return he wants latest status of his involvement in project ACTIVITIES PPM 3 e PX 1 a Accepts design document changes from Team 1 Updates user manual and releases it to QA ACTIVITIES PX 1 c A 2 9 QA Group 1 92 Receives task from manager Defines a release note format or calls up a template from a library as the procedure for accepting a maintenance release Adjusts QA plans for new release ACTIVITIES PDM 3 a PDM 4 QUESTIONS F5a F5b F5c F5d F5f F5g F5h Refines plan and sends it back to manager QUESTIONS F5i Receives two independent fixes from Team 2 Performs acceptance test on UI_SM Integrates this change into the subsystem ACTIVITIES PDM 3 b QUESTIONS F5f Receive
195. neously What is the procedure for fixing bugs that are uncovered between releases object code patches new object code entirely new software release Is patching of selected executable images supported If so is it facilitated via com mand procedures Can patches be applied within a multi user environment or must the machine be in single user mode How easy difficult is it to update the environment software How much human intervention is required during the update procedure How easy is it to recover from errors during the update procedure How well is the update procedure documented Customer Service and Support 1 2 104 Newsletter What is the frequency of publication Interest and or user groups Is there a dial up computer number to access a database of previously encountered bugs Level of software support Level 1 7 day 12 24 hour phone service preventive maintenance revised versions of software and documentation on site consultation regard ing problems Level 2 5 day 8 12 hour phone service preventive maintenance revised ver sions of software and documentation remote consultation regarding problems Level 3 no phone service no preventive maintenance revised versions of software and documentation no consulting support submit software trouble reports formally in writing What is the cost for the software maintenance ls remote preventive maintenance offered i e ven
196. nformation needed about a subsystem is located within one directory and manipulation by release programs is simplified There is a lack of typing of the files Future versions of the ISTAR database will turn this around and make it desirable to place all information within the database so that only the correct tools and people can be applied to various objects Mapping Rationale The documents will be stored within the UNIX workbench in a subdirectory to each of the subsystems Keystroke Details Keystroke Problems Generic Experiment Description SET3 Relate design documents final version to Release 1 0 of source to represent traceability Mapping Issues Problems How to create traceability between documents and sources Use explicit user defined relationships within the ISTAR database This is as close as ISTAR comes to supporting traceability now The objects which are being traced are located outside the database and thus it is cumbersome to have shadow database objects just for traceability The level of support is insufficiently automated to make it worthwhile Place closely related objects near each other within the UNIX hierarchy Easy to accomplish and emphasizes that ISTAR lacks this ability This is no substitute for lower level granularity and true individual specification traces Mapping Rationale Traceability is accomplished by placing the design documents in a UNIX subdirectory of the directory cont
197. ng the ratings An interactive choice among these resources can then be made Once a schedule has been constructed the resource management centers are sent re quests for the matched resources The resource management center control tool is used to mediate multiple requests as described in Section 3 1 1 2 3 1 2 Task Management The task definition tool transforms scheduled activities into executing contracts The schedule contains information derived from the work breakdown structure resource management center and scheduling processes The tool will display this information so that it can be used when an activity is issued as a task The issuing of a task is exactly the assignment of a contract Contracts are accepted by the contractor who eventually responds to the contract with a delivery During contract execution assignments can be updated or canceled by the client During execution the contractor sends timesheets to the issuing contract for consolidated reports in combination with other timesheets Completion of contracts is often verified with quality assurance checklists The quality management workbench can be used to accomplish the review and check off of itemized lists of required quality factors 3 1 2 1 Assignment The natural method of executing a plan is via task assignments derived from the schedule The schedule is the central input to the task definition tool The following fields shown in Figure 3 10 are added to the ass
198. nning trial schedule and reorganize Mapping Issues Problems Mapping Rationale Place t12suc in t12 s place in the planning Change the names of the tasks so that there are no conflicts with previous task assignments adding a learning step and rearranging dependencies Trial schedule New schedule including t12suc is attempted only to discover that it is not possible within time limitations of the parent Reorganize Remove t12suc from the team design review and adjust dependencies Now the schedule fits Keystroke Details As til CONTRACT titeam WORKBENCH PROJECT MANAGEMENT WORK BREAKDOWN housekeeping CONTRACTUAL OPERATIONS import planning t1 1 wbs 1 OK Activity code RENAME code_suc Activity code_and_test RENAME code_and_test_suc Learning Activity name learning resource required prog learning 1 products produced code_2 products needed dep_3 dep _3 In products needed context switch on dep_3 product type dependency producing activity des_review activities using product learning code_2 Product name code_2 product type dependency producing activity learning activities using product code_and_test_suc code_1 Product name code_1 DELETE dep 2 Product name dep 2 DELETE Move to activities using product Context switch back to learning Context switch on learning resources required amount 40 man hours resource tag p2 tag Required by activity context switch Save Housekeeping CONTRACTUAL OPERATIONS e
199. nt Ef forts In Workshop on Software Engineering for Programming in the Large Harwichport MA June 1985 Stenning V On the Role of an Environment In Proceedings of the 9t International Conference on Software Engineering pages 30 34 IEEE Computer Society Press 1987 Stenning V Notes on ISTAR configuration management private communication May 1987 Tsichritzis D C Lochovsky F H Data Models Prentice Hall Inc Englewood Cliffs NJ 1982 Walshe A Shaw R Concrete Syntax for the STC VDM Reference Language Standard Telephone and Cable 1985 Wiedermann N et al Evaluation of Ada Environments Technical Report CMU SEI 87 TR 1 Software Engineering Institute Carnegie Mellon University 1987 CMU SEI 88 TR 3 71 72 CMU SEI 88 TR 3 Appendix A Generic Experiment Steps The following are the generic steps involved in each of the experiments executed against ISTAR A 1 Configuration Management The generic configuration management CM experiments will be developed with the as sumption that a baselined Ada system already exists furthermore all experiments will be done relative to this baselined system state As such the first step in developing an evaluation experiment 1 is the specification of this baselined system configuration the second step is then the development of generic experiments to evaluate an Ada environment s support of configuration management activities Baselined
200. nt of these reports and will receive the new release with the expected bug fixes 1 86 Customer CU1 submits four error reports regarding UI Release 1 0 to the UI cus tomer service address CS UI lt Company gt The actual text of the error reports is not relevant for the purpose of this experiment unless the environment provides spe cial features for content processing that should be highlighted as part of the evalua tion Customer CU2 submits four error reports regarding UI Release 1 0 Customers receive and examine responses regarding treatment of the submitted reports Customers receive a release notice for Ul Release 1 1 which indicates changes in the new system They try to relate the information in this document to the submitted error reports and earlier responses Customers request actual delivery of Release 1 1 Customer CU2 checks on status of his first error report report 5 The initial response had stated that it would be handled in an enhancement release Customers receive delivery of Ul Release 1 1 ACTIVITIES PDM 2 b QUESTIONS F5e CMU SEI 88 TR 3 A 2 3 The Manager for Product Maintenance This individual is responsible for handling error reports received by customer service 1 o Oo Generate a report of error reports online and hardcopy ACTIVITIES PDM 2 b Initiate error report analysis task for system analyst and request a response within five days Initiate task
201. nto program library PROJECT_LIB Measure elapsed and CPU times for translation iv Compare corrected package specification to Exhibit 1 1b Note that the file resides in ADA_LIB Correct any differences and retranslate if necessary Measure program library disk utilization Measure disk utilization attributable to the package specification c Create package specification for a package named MATRIX_MANAGEMENT i Enter the package specification which is seeded with errors exactly as it is shown in Exhibit 1 2a ii Display and correct translation errors CMU SEI 88 TR 3 95 Figure A 11 Objects and Operations iii Translate into program library PROJECT_LIB Measure elapsed and CPU times for translation iv Compare corrected package specification to Exhibit 1 2b Correct any dif ferences and retranslate if necessary Measure program library disk utiliza tion Measure disk utilization attributable to the package specification 4 Design subprogram control flows identify subprogram interdependencies and define subprogram specifications local to each package body Figure A 12 5 Create package body for VECTOR_MANAGEMENT a Generate package body of VECTOR_MANAGEMENT using a null body gener ator if available Otherwise use vector_body_null in ADA_LIB b Modify the pairwise vector multiplication function i Enter the function body which is seeded with errors exactly as it is shown in Exhibit 1 3a ii Display and correct t
202. ntract database is a variant of the binary data model Tsichritzis 82 Objects within the database are typed and are related to one another through named binary relationships Users may declare relationship but not object types of their own and relate objects using these user relationships ISTAR provides a report writing facility CMU SEI 88 TR 3 7 with which the user may create specialized reports from the database The description or schema of much of the data in these databases is available on line to assist in the creation of these reports For the most part however ISTAR users need not be concerned with nor even aware of the organization of the contract databases Access to the database is usually done through tools which encapsulate the database interface and present a higher level inter face to the user The purpose of the contract database within ISTAR is to be the repository of controlled project knowledge Information within a contract database is subject to version control may be frozen and may be moved from contract to contract When data is moved in this way a record is kept of that movement making it possible to track the source of information The data stored in a contract database is originally created by some other means either an ISTAR tool or a UNIX program Generally an ISTAR tool will organize and maintain data within a special purpose work area These work areas are specific to the tool and to
203. o environments currently available which can be installed and used unmodified and it is unlikely that any such environment will appear in the near future An organization wishing to build on an existing framework should consider ISTAR a candidate system CMU SEI 88 TR 3 69 70 CMU SEI 88 TR 3 Bibliography Boehm 81 Booch 83 CMGuide 87 CMRef 86 Dowson 87 Feiler 88 Habermann 83 Imperial Software Leblang 85 Stenning1 87 Stenning2 87 Tsichritzis 82 Walshe 85 Weiderman 87 Boehm Barry W Software Engineering Economics Prentice Hall Inc Englewood Cliffs NJ 1981 Booch G Software Engineering with Ada Benjamin Cummings Menlo Park CA 1983 ISTAR Configuration Management Guide Issue 1 edition Imperial Software Technology 1987 Component Management System User Guide Issue 2 5001 67 edition Imperial Software Technology 1986 Dowson M Integrated Project Support with ISTAR IEEE Software 6 15 November 1987 Feiler P Project Management Experiment Final Report Technical Report CMU SEI 88 TR 7 Software Engineering Institute Carnegie Mellon University 1988 Habermann A N Perry D E Ada for Experienced Programmers Addison Wesley Reading MA 1983 Technology 87 ISTAR Project Management Guide Issue 1 edition Imperial Software Technology 1987 Leblang D B McLean G D Configuration Management for Large Scale Software Developme
204. o large and it has become desirable to divide into a set of smaller activities to be assigned to multiple individuals the WBS scheduler task defini tion cycle must be reexecuted The tasks assigned from this new schedule are not connected to the original tasks In particular timesheet and monitoring reports from the prior set of tasks are unrelated to the new set and the information they contain may be lost Consider the necessity of reassigning personnel assigned to the project after it has begun execution ISTAR does not have a facility to reassign a contract from one ISTAR user to another To accomplish this result the new user must be assigned a new contract and the items needed from the existing contract must be transferred on an item by item basis The new contract is not related to the old one from a timesheet cost accounting point of view The resource control tool will not delete nor add individual resources from or to a project It will only UNBOOK the entire project marking all of the resources of the project as un assigned Therefore if a single individual leaves a project the entire project must be rescheduled by the scheduler in order to replace that individual with another A lazy assignment mechanism reduces the effect of these difficulties Schedules contain task assignments waiting to be made It is matter of choice as to when to actually make the assignments ISTAR does not compel any task assignment methodology Assign
205. of Ada code By far the most popular are the project and configuration management tools Of the technical development tools only the Ada workbench was mentioned All of our respon dents mentioned that they were engaged in extending ISTAR s functionality One of them has developed tools for ISTAR amounting to some 30 000 lines of C None of them made any mention of the UNIX C workbench or the build tool The opinions held by our respondents of IST as a software vendor were mixed One respondent stated that response to error reports was uneven even for critical errors Another that critical errors were always fixed promptly Our own experience is that critical errors were always fixed promptly One of our respondents did not use IST training The other did and had mixed reactions The tool builders training was excellent they stated but the user training needed im provement They made their concerns known to IST and felt that IST would respond appropriately We did not use IST training One of our respondents stated dissatisfaction with the ISTAR documentation which tends to be detailed descriptions of tool interactions rather than guidelines for using the tools IST has recently rectified this situation by publishing a collection of overviews All our respondents pointed out that IST is a small company which occasionally overcom mits itself causing delays in their product releases All our respondents had a positive overall opinion of
206. of it which supersedes it The older version is not deleted A variant of an item represents a parallel line of development The sequence of item successors are distinguished by number the variant branches of an item are distinguished by name Variants may themselves have succes sors and variants The interaction of transfer items configuration items successor numbers and variant names can be understood by consideration of the full name of transfer items These are of the following form Ciname variant successor xiname variant successor The square brackets around variant indicate that it is an optional item The mainline of development is that sequence of successors having the null string as its variant name This is the only notion of mainline versus sideline in ISTAR If this document were stored in an ISTAR database as a configuration item named Report this section might be a transfer item within it called CM As the report goes through editorial revisions successors of that transfer item are created If a specialized version of the section were needed for a specialized audience say a variant would be created After awhile the collection of versions of this section would resemble the diagram in Figure 3 13 which is adapted from CMGuide 87 0There are no such variants of this report 36 CMU SEI 88 TR 3 Report 1 CM 1 Rep
207. of the products processed during project manage ment More detailed descriptions appear later in the report e Work breakdown structures specify the hierarchy of activities that need to be per formed to complete the project and the product flows between the activities e Resource management centers store physical resources to fulfill assignments within work breakdown structures The centers record resources which have been allocated and resources which are still available e Schedules are processed work breakdown structures that specify the calendar time and resources to be allocated for each of the work breakdown structure activities e Task assignments are the results of assigning scheduled activities to people selected from the resource management center e Timesheets are the raw data used to track project progress e Monitoring reports are consolidated timesheet submissions A pictorial representation of the interaction of these products and the tools which process them is given in Figure 3 1 which is adapted from Imperial Software Technology 87 3 1 1 1 Work Breakdown Structure The project manager specifies in the work breakdown structure the project s activities in terms of what is to be completed without specifying who will actually be performing it or when it will be done The work breakdown structure is a hierarchy of parent and child activities These ac CMU SEI 88 TR 3 19 Specification From Client Report to Cl
208. of the task definition tool is meant to change specifications not who is to do the work Remaining work is to be delivered from the person being canceled and is placed in possession of the new programmer Pass the completed work back up to the leader who made the assignment in the first place and then resend those work items using the Cl again when the new person is assigned Keeps the hierarchy of assignments and roles in check There is an official logging of materials being checked in and out with the manager of a group of people Inefficient Need to make two movements of the Cl instead of one direct Have the old person directly send the materials to the new person ls particularly easy with items like problem reports that do not transfer via Cls Violates the control hierarchy Mapping Rationale See steps below Keystroke Details Keystroke Problems Generic Experiment Description 11 5 Create ISTAR account for T12suc Mapping Issues Problems See Re Planning Mapping Rationale Keystroke Details As frmadmin ADMIN SYSTEM ADMIN GENERAL NEW USER user t12suc developer yes LIST DEVELOPERS EXIT until need to LOGOUT Keystroke Problems Generic Experiment Description MPM 11 Unbook T1 at RMC1 create RMC2 create T12suc Mapping Issues Problems See Re Planning Mapping Rationale Unbook T1 at RMC1 Since bookings are done in units of scheduling the whole team must be removed ch
209. of this item contained an error It cannot identified procedure Example_Sub_Proc Xt in new_type is The declaration of this item contained an error It cannot identified X t Mh 1s The declaration of this item contained an error It cannot Figure 3 31 The Result of Pressing HELP in Figure 3 30 compilation units to be shared The workbench supplied interface to this command is very useful Having selected the ACQUIRE item from the local functions menu the user is given a display of the other libraries in his work space Having selected one of the libraries the user is given a display of the units in the selected library and may then select units from that library to be ACQUIREd This interface is much easier to use than the text oriented commands of the compiler itself The workbench also supplies a RECOMPILE operation which does not correspond to any function directly supported by the compiler The RECOMPILE operation causes all compila tion units in the work area whose status is not compiled to be compiled The workbench ensures that these multiple compilations occur in an order consistent with the Ada com pilation order rules The workbench will at user option run these compilations as a back ground process However as Ada compilation causes the Ada library to be modified the workbench will not allow the user to perform any other actions in the work area until the compilations terminate Background recompila
210. oke environment access from a user s account Remove Jones account from the ENV_USER account group Measure time taken to remove user from an account group Record file size decrease caused by removing user from an account group Remove Jones account Measure time taken to remove user account Record file size decrease caused by removing user account A 4 3 System Management Experiment 3 Unlike the others this generic experiment is not a true experiment containing individual steps and data collection but is an assimilation of highly subjective questions aimed at evaluating the issues of maintaining an Ada software environment Specifically these questions will address the issues of maintaining current releases of the Ada environment software customer support and service and archiving and subsequent retrieving the Ada environment software and or database elements Software Updates and Maintenance 1 2 3 4 5 What is the overall process for updating the environment software How frequent are new software releases Are new releases accompanied by release notes Updating procedures Are new releases downward compatible Are new releases upward compatible Or do they supersede all previous versions Can new release be installed within a multi user environment or must the machine be in single user mode CMU SEI 88 TR 3 103 10 11 12 13 Can multiple versions of the environment be running simulta
211. ommends that the work breakdown structure WBS be sketched on paper before being entered into the tool Imperial Software Technology 87 Movement from item to item can only be accomplished navigationally There is no way to move directly from one item to another For example to move from a product to a resource description it is necessary to first move the cursor to an activity producing or consuming the product press the CONTEXT key to select an activity panel find an activity requiring the resource VALIDSET helps here move the cursor to the resource name and press the CONTEXT key again This is an annoying procedure 3 1 1 2 Resource Management Centers Resource management centers contain physical details of available resources The work breakdown structure contains the abstract specification of the needed resources to accomplish activities The scheduler matches the two A resource manager is assigned responsibility for each resource management center The creation of resources to be placed initially into the resource management center is accomplished with the definition tool The acceptance of requests and arbitration be tween conflicting requests is performed with the control tool Definition see Figure 3 7 involves assigning names to physical resources categorizing them as either RATE or TOTAL resources and assigning them attributes in the same manner as in the work breakdown structure entry RATE resources are non consumable an
212. omplexity many optionality compulsory end relationship relationship IS_BASED_ON classes XFER_ITEM complexity many optionality optional end relationship relationship IS_BASED_ON classes CI_SIGNATURE complexity many optionality optional end relationship relationship IMPORTED_BY classes USER_XI complexity many optionality optional end relationship relationship EXPORTED_BY classes XFER_ITEM complexity many optionality optional end relationship Figure 4 2 The Data Model of a Contract Database contd 60 R XFER_ITEM one compulsory IS_BASIS_OF XFER_ITEM one optional IS_BASIS_OF CI_SIGNATUR one optional GI IMPORTS WORK_AREA many optional EXPORTS WORK_AREA one optional CMU SEI 88 TR 3 Report Generating Tool V2 2 CMExp2 1 gt status report_body Page_header r 4 Page_f ooter Hi The Configuration Item named has latest version 1 l constraints 1l It arrived in this contract from edit script filter operations generate report 1lThe XI s follow in the format 1l name type date_time from workarea into workarea optl 2 21C C1 C1 EI type EI 3I Imported By 210 print RGL output rau list delete view edit RGL output orderings 1lIts status is and its description is 1 Figure 4 3 The Description of a Report
213. onment provides data for the answers to the questions developed in phase 2 4 Develop Environment Specific Experiments The generic experiments developed in phase 3 are instantiated for the object environment The result is a sequence of operations to be performed on the environment 5 Execute Environment Specific Experiments The operations defined in phase 4 are executed The data collected are used to answer the questions of phase 2 The answers to those questions are the result 6 Analyze Results Information collected from the prior phases is assimilated The environment is described and analyzed 2 CMU SEI 88 TR 3 The first three of these phases are independent of any environment the last three are specific to the environment being analyzed We used the results of Weiderman 87 and Feiler 88 for the environment independent phases The functional areas addressed are e Project Management e Configuration Management e System Management e Design and Development To make this report self contained we have included as an appendix the outputs of earlier phases of the evaluation methodology Appendix A contains the generic experi ments reproduced from Weiderman 87 and Feiler 88 Appendix B contains the experi ments instantiated for ISTAR We have attempted to include in that section our reason ing for implementing the generic steps as we did Appendix C contains the output of phase 5 the answers to the questions produced in
214. onships Within a Contract Example Problem Report A Library Notification Form A Library Scan Listing Listing of the Elements Within a Work Area The Filter Menu Initial Screen for a Newly Declared Body A Skeleton Procedure Body A Partially Entered Procedure Body A Compilation with Errors The Result of Pressing HELP in Figure 3 30 The Data Model of a Contract Database The Data Model of a Contract Database conid The Description of a Report The Report Generated by Figure 4 3 The Fields on the First Line CMU SEI 88 TR 3 10 13 13 20 21 22 22 23 23 25 25 26 28 29 31 37 39 40 40 41 41 41 42 42 43 45 46 49 50 51 51 52 52 53 59 60 61 62 63 vi Figure 4 6 Figure A 1 Figure A 2 Figure A 3 Figure A 4 Figure A 5 Figure A 6 Figure A 7 Figure A 8 Figure A 9 Figure A 10 Figure A 11 Figure A 12 Figure A 13 Figure A 14 Figure C 1 Figure C 2 Figure C 3 Figure C 4 The Constraints Used in Producing Figure 4 4 Evaluation System Model Configuration Model Resulting from Performing Steps in Experiment 1 Version History of Ul Subsystem Version History of CLI Version History of SM Customer Deliverable Organizational Structure Initial Global Plan Preliminary Package Design Object Operation Model Objects and Operations Subprogram Interdependencies Vector Multiplication Test Harness Matrix Multiplication Test Harness Configuration Management Functionality Checklist Project Man
215. ontracts Provided that a user knows the exact name including the successor number and variant name of a Cl in another user s database he may issue a request called RETRIEVE Cl for a copy of that Cl The owner of the Cl which is to say the owner of the database in which the Cl is stored must have taken action to allow such access which is disallowed by default Optionally the owner may have ISTAR record the identity of any user taking such a copy of the Cl These options are on a Cl by Cl basis ISTAR supports the concept of a library Structurally a library is a contract database Operationally it serves not to record information for a specific task but to act as a publicly accessible repository An ISTAR library may implement a library of programs standards regression tests or any collection of information at the user s discretion The process of copying information from a library is a simplification of the process described in the prior paragraph ISTAR provides to the requester a list of the Cls contained in the library The requester points to the Cl he wants to copy and makes his request through a menu selection He thus needs less a priori knowledge of the contents of the library then he does in the case of RETRIEVE Cl It is worth noting that every XI and every Cl has an associated free text description which is created when the item is created However the user of the library retrieval system does not have access to that
216. or variant This allows work to be performed on it subsequent to its transfer to another contract There is no operation which will unfreeze a frozen Cl There is no freeze operation as such a Cl becomes frozen only as the result of a transfer to another contract or creation of a successor to it Every item in the database has an associated description This is free text which can be displayed via a menu operation in the CMT The text can be edited provided that the item is free The CMT will display various information about a given item Some of this information is outlined in the following list e The variant and successor list for the item Identity of the latest and preferred suc cessors Whether free or frozen Whether access is allowed for other users e Identity of the contract in which the item was created e A list of retrievals of this Cl by CM operations RETRIEVE CI or SCAN LIBRARY The date 38 CMU SEI 88 TR 3 and time of the retrieval the host user and contract into which the retrieval occurred are recorded e Problem reports posted against this item and other notifications e g library instal lations e The list of XIs within a Cl their types and dates and times of creation e For XIs the identity of other appearances of the same item Recall from the above discussion that Xls can be shared The information in the preceding list appears in several different reports Examples of these reports are given in
217. ort 1 CM 2 Report 1 CM military 1 Report 1 CM 3 Report 1 CM military 2 and so on and so on Figure 3 13 Successors and Variants The picture given in Figure 3 13 describes the structure of a collection of versions of a single transfer item A similar sort of picture can be drawn for a collection of versions of a configuration item The tree structure shown in Figure 3 13 applies equally well to con figuration items ISTAR recognizes two symbolic successor numbers They are L meaning latest or last successor and P meaning preferred successor These symbolic numbers are of use when a transfer item is imported into a tool s work area Thus the name Report P CM L in an import operation calls for the preferred version of the report as a whole the con figuration item and within that the latest version of the configuration management sec tion The identity of the preferred version of an item is set within the component manage ment tool CMT Although the application of successor numbers and variant names is the same for con figuration and transfer items the operations which create the successors and variants differ for the two classes of items As noted transfer items are transferred between work areas and contract databases Therefore it is the export operation which moves the item from the work area to the database which creates successors and variants of transfer items Many of
218. ort took about 1 2 day to write The experimenter was familiar with RGT but had not used it in some time hence time was required for both reading the manual and learning the system e The experimenter was not able to produce the desired report due to the lack of conditional printing i e print this field if condition else skip this print but go on with others RGT qualifies on an all or nothing basis Some but not all of this was circumvented if a configuration item was created in the current contract the FROM_CONTRACT attribute is null or perhaps nonexistent which prevents con ditionally producing lines Generic Experiment Description Experiment 2 step 3 Retrieve an existing baseline and build it Mapping Issues Problems Which baseline should be fetched The copy of B01 2 in the experimenter s contract database The copy of BO1 2 in the library Where should the fetched baseline be put In the experimenter s contract database In a newly created contract database How should the build be done See Experiment 1 step 7 Mapping Rationale In order to exercise ISTAR s functionality both alternatives for fetching the baseline were implemented This required creating a new contract Retrieval from the library more closely approximates the envisioned procedure assuming the new modifica tions form a new piece of work in the organization Keystroke Details To retrieve from the experimenter s contract databa
219. otal allocation of people to the project In the level by level approach each leader competes against all other leaders for programmers Level by level planning promotes great tensions between planners To alleviate the tension multiple resource management centers could be created and one assigned to each leader A benefit of such an approach is that each leader is independent of other leaders and thus can per form planning and resource allocation without interference But this method is demand ing It requires that the organization partition the company s personnel to each manager and team leader in a strict hierarchy ahead of time CMU SEI 88 TR 3 33 Not all projects are organized hierarchically Alternatively work may be assigned to a group of equally capable programmers who determine among themselves how to divide up the work to fulfill the leader s request ISTAR does not directly support such coopera tion because a contract is issued to a single user There are two options and they both result in the imposition of a hierarchy The first option is that one of the programmers be designated the leader of the group not a leader among themselves but a leader from the outside view The designated person could receive contracts for the group and then after negotiation with his partners assign the other programmers their portions The lead programmer would then consolidate the work of the group to form the combined result The second option is
220. otal for week Stay on same line PROGRESS estimated end date early 23 01 87 line feed to complete incomplete i ncomplete line feed Ok CHECK SUBMIT STATUS EXIT LOGOUT T12 attaches PR to assigned Cl T12 sends timesheet to T1L PR As T12 CONTRACT code WORKBENCH CONFIGURATION COMPONENT FUNCTIONS INSTALL REPORTS focus on PR place on workAssign code 1 EXIT Timesheet WORKBENCH GENERAL TIMESHEET SELECT don t save current timesheet 16 Jan 87 CCC pmexp til t1team activity name code job code 6301 hours in week Rem aining is 120 total for week Stay on same line PROGRESS estimated end date early 23 01 87 line feed to complete incomplete i ncomplete line feed OK CHECK SUB MIT STATUS EXIT LOGOUT Keystroke Problems Bigbro startup problems and timesheet delivery It is not easy to kill the gpo and bigbro processes depending on what LCK and DIE files have been left over from when the data tree was copied into place CMU SEI 88 TR 3 137 Generic Experiment Description T1 4 T1L reports progress and resource consumption to mpm at the end of week 2 Mapping Issues Problems Mapping Rationale T1L accepts timesheets from subordinates T11 and T12 Bundles them for sending to mpm Keystroke Details Accept As t1l CONTRACT titeam WORKBENCH PROJECT MONITORING GET THE MAIL week ending 16 01 87 REPORTS build all the report types by naming them on the command line Housekeeping EX
221. ovides numerous information structures to support project manage ment and planning Work breakdown structures WBSs and resource centers RMCs are the main information gathering mechanisms WBSs in clude task name abstract resources needed as specified by the resource attributes and products used and produced and their interconnection with other tasks and products RMCs contain resource types attributes and availability information Scheduling adds the mapping of actual physical resources needed and a time line Task definition adds a contractual item which contains the plan for the recipient F2c How well is checking for inconsistencies and constraints in plans handled e g over assignment of resources budget overruns critical path For example if a person is reassigned is all information about that person s work on the project updated correctly Checking is only performed locally within each tool in the planning phase WBS for example has a check that all child activities belong to an existing parent Detection of out of sync versions of different tool s outputs is not per formed Making changes in the list of WBS activities does not signal inconsis tency with past schedules Resource allocation is a special case The scheduler makes a distributed request to resource management centers that are managing the potential resources to be used to fulfill the present schedule and can detect at the RMC end when more than one schedule o
222. owson 87 Although the collection of all contracts forms a tree the mapping of that tree onto the collection of ISTAR users is arbitrary Any ISTAR user can assign a contract to any other ISTAR user including himself at any time ISTAR does not record the organization s reporting or management structure except insofar as that is recorded in the contract structure There is no notion in ISTAR of a user s having authority to assign contracts to other users Therefore when the hierarchy of Figure 2 1 is mapped onto the individuals within the development organization the result is a graph of arbitrary topology ISTAR insists that the work be decomposed hierarchically it does not require the development organization to be managed hierarchically An ISTAR contractor receives asynchronous notification of a new contract assignment he or she must accept this contract without being able to read it No capability is provided to reject contract assignments Essentially an ISTAR contract assignment is the formal recorded counterpart to an informal assignment of work Communications within or between organizations mediated by ISTAR are generally meant to supplement informal communication channels not to replace them The value added by ISTAR comes from the recording of these communications This provides a basis upon which the contractor the client and their management can understand discuss and track work in progress As shown in Figure 2 1 t
223. pects of the contract completion is signaled by the delivery of a configuration item to the client Acceptance of the delivery in fulfillment by the client is acknowledged with a signoff in the task definition tool This concludes a formal contract 3 1 3 Tracking Once projects begin execution clients wish to track how resources are being used and how progress is being made toward completion Timesheets sent by contractors to the clients gather raw data Monitoring tools at the client consolidate multiple timesheets into reports Summary information can also be sent to superior clients 3 1 3 1 Timesheets Timesheets are filled out by contractors using the timesheet reporting tool Timesheets are submitted weekly in the ISTAR model and specification of the expected timesheet submission data is stored in the ISTAR s startup script for each installation Timesheets are entered on a E editor form There are columns for contract activity job code and time spent per day An automatic total per activity is maintained horizontally Per day totals are maintained vertically Input is made by hand An example appears in Figure 3 11 xtere Timesheet Tool Version 4 2 Enter Cost Control Centre Host User Contract gt iNane t1 i Fri 16 Jan 1987 Default Cost Centre pmexp tilititeam Status AWAITING APPROVAL PEO AEE E ENO ENIE TEA AEN ee eS 4 Cost Control Centre Activity Nane Hmexp t1l t1team des_change 6101 I 14
224. performed on the command line Commands can also be abbreviated to the least number of characters necessary to make them unique and in many cases can take ar guments Escapes to the operating system using the conventional bang notation made extraordinary requests possible without leaving ISTAR In some cases there is only one way to complete an activity and a form must be filled in e g problem reports U2a How consistent and uniform is the user dialogue i e the command syn tax use of menus etc The user interface is moderately consistent Some menus include multi case keywords which must be distinguished by using the particular case Printing is sometimes handled as a local function for reports for example and at other times is bound to forms as in problem reporting Help is mostly uniform with pop up menus of context sensitive information estimation help is old style and thus asks for the help topic U2b How consistent and uniform are the naming conventions on line help facilities error diagnostics and handling Naming conventions for tools do not exist since they are named in full and the user is allowed to specify them in the minimum number of characters that make them unique Online help is easy and consistent since it is one of the special keys and is context sensitive Extra help is often available under further topics displayed as a VALIDSET Error diagnostics are often mislead ing since they comment on technic
225. plan to be measured only if not manually performed ISTAR does not automatically instantiate tasks from a schedule For time to manually assign one task from the plan see P1g Generating a plan document and status reports Documents available which in the planning facility include the WBS report from within the WBS tool and the schedule summary that results from either time analysis or scheduling against resources within the scheduler WBS report Schedule summary report 4 display not print Status reports obtainable in the project monitoring tool Status report 8 12 Actuals report 12 12 Full activity report 18 44 discrepancy based on amount of collected data from mul tiple sources that needs to be con solidated Full resource report 16 19 Exceptions report 14 28 Standards checking e g coding standard if provided Not provided Retrieving related documents using traceability relations No traceability Processing progress data for trend analysis Processing progress data in ISTAR involves the monitoring tool and the reports it can generate Enter monitoring 27 Get the mail 45 Reports are timed in P1b Exit monitoring 3 CMU SEI 88 TR 3 181 P1f Pig 182 Opening closing a work area The definition of work area in the scenario is not the same as ISTAR s A work area in the scenario is a context from which one can abort and recover a previous state In ISTAR a work area is a co
226. r Mapping Rationale Problem reports address the specific question posed although it is clearly a violation of the contract model in which the manager is expected to be kept up to date Keystroke Details Keystroke Problems Generic Experiment Description QA9 Creates a customer deliverable Release 1 1 which consists of latest ex ecutable and user manual plus release note and informs manager Mapping Issues Problems Mapping Rationale Release note Take copy of release note form QA work area and fill in Determine which entries are applicable to this release review the release against those criteria Export the critique and print a copy Keystroke Details As qa Release note CMT merge pmexp qa def release 1 note 1 into release review 1 note 1 QAM IMPORT release review 1 note 1 SELECT release CUSTOMIZE note NOT_APPLICABLE or NOT_SET for each of the Status fields using DOWN as necessary REVIEW all NOT_SET entries changing them to PASS FAIL or REQUIRES ACTION OK out and provide explanations to remedy any REQUIRES ACTION fields Keystroke Problems 148 CMU SEI 88 TR 3 B 4 Design and Coding Generic Experiment Description Step 1 Set up initial conditions Mapping Issues Problems How should time and space be recorded See general introduction to this section Mapping Rationale Nothing new need be done for this step Keystroke Details Keystroke Problems Generic Experiment Descr
227. racting pieces of it to other contractors The terms client and contractor reference roles played by individuals rather than the in dividuals themselves The acts of contract and subcontract assignment and acceptance force the collection of all contracts within an ISTAR installation to form a tree See Figure 2 1 which is adapted from Dowson 87 The topology of this tree is recorded locally that is each contract maintains a record of its subcontracts and of its parent contract n Deliverables Inputs AeSeptance Criteria OUPUS Reports Contract contract contract contract contract contract contract contract Figure 2 1 Contracts and the Contract Hierarchy CMU SEI 88 TR 3 5 On the other hand ISTAR does not require or even suggest a software development methodology The division of a contractual obligation into subcontracts can be along any lines deemed appropriate An individual subcontract may require the execution of a life cycle phase design coding etc for the entire product it may require the execution of multiple phases for a piece of the product functional decomposition Different contracts may be handled in different ways The essence of a contract is that it is the contractor s responsibility to decide how to fulfill it subject to any constraints imposed by the contract specification or management directive D
228. ractive or batch mode Even if time analysis results in an acceptable schedule resource limited scheduling may not The scheduler offers two techniques for dealing with this situation resource modification and interactive schedul ing The attributes of resources required by the project may be altered That is the user performing the scheduling task may decide that a particular resource need not have a particular attribute or skill or need have it to a lesser degree The user can neither delete resource requirements nor alter the effort estimates He or she can edit the descriptions of the available resources in the resource pool Specifically he can e Alter the availability of the resource e g allow for overtime e Alter the attributes of the resource e Alter existing allocations of the resource 26 CMU SEI 88 TR 3 These modifications are all hypothetical They are not automatically entered in the resource management center Such modification requires communication with the resource manager outside of ISTAR If a work breakdown structure is scheduled by the scheduling tool in batch mode the attributes of resource requirements will be exactly matched and the constraints imposed by resource tagging and naming will be observed The schedulers interactive mode allows the person performing the scheduling task the freedom to modify this behavior The scheduler will display resources having the necessary skills but not necessarily matchi
229. ranslation errors iii Translate into program library PROJECT_LIB iv Compare corrected package body to Exhibit 1 3b Correct any differences and retranslate if necessary Measure program library disk utilization Measure disk utilization attributable to the package body 6 Create a main procedure named VEC_MAIN in a separate program library to drive pairwise vector multiplication Figure A 13 a Create a program library named TEST_LIB from within the directory EXP_LIB that will contain compilation units that will have dependencies upon units in PROJECT LIB b Create a test main program named VEC_MAIN that will be translated into TEST LIB 96 CMU SEI 88 TR 3 Figure A 12 Subprogram Interdependencies i Create the procedure VEC_MAIN which is seeded with errors by copying it from ADA_LIB Refer to Exhibit 1 4a ii Display and correct translation errors Display a cross reference map iii Translate into program library TEST_LIB iv Compare corrected package specification to Exhibit 1 4b Correct any dif ferences and retranslate if necessary Measure program library disk utiliza tion Measure disk utilization attributable to the procedure c Create executable module Execute Halt execution Resume execution Time module creation Observe execution error message s d Determine the cause of the execution error by first browsing VEC_MAIN and noticing that the variable v3 is of TYPE VECTOR 1 4 Examine the statement in
230. rations import WBS planning t1 1 wbs 1 Set start and end dates Jan 1 1987 through Dec 31 1988 RESOURCE management centers pmexp mpm RMC1 OK TIME ANALYSIS Context switch to schedule Housekeeping request availability Context switch to resource pool to see if request got correct resources INTERACTIVE SCHEDULE Try default allocations first and then new ones with VALIDSET if needed Schedule summary context and activity requirement allocation view to confirm correct resource alloca tions SEND BOOKINGS Housekeeping contractual operations export new planning t1 1 sched 1 EXIT Accept bookings at RMC As mpm focus on RMC1 workbench resource manage ment fix provisional accept error resource definition command line update accept bookings resource control focus on outstanding booking requests command line view details verify that correct personnel have been assigned to the abstract re quests and that the correct percent utilization has been assigned Command line book move into provisional bookings CONFIRM PROVISIONAL BOOKINGS and exit tool Fix lack of PRs at til from mpm As mpm enter errors CMT focus on problemsRel1 1 problem reporting SELECT 1 3 Send do not pass controllership send to titeam t1l not a library SELECT 1 4 Send do not pass controllership send to titeam t11 not a library EXIT Send assignments to T11 and T12 As t1l contract t1team CMT FUNCTIONS CREATE NEW CIs workAssign code
231. reated ac cidentally as a side effect of a transfer item creation it may be that the opera tion is too easily performed How easy difficult is it to fetch reserve a CM element Reserve is not supported For fetch see above How easy difficult is it to replace a CM element Must be done as delete create pair How are CM files referenced local name CM file name There are no CM files as such There are databases in which configuration and transfer items reside A configuration item may appear in two different contracts under two different names The name of a transfer item in the database will frequently be different from the name of the item in the workbench that created it How easy difficult is it to create a variant version of a CM element There are menu operations which accomplish this For configuration items this is done in the component management tool CMT in a straightforward way For transfer items the variant is created by the workbench How easy difficult is it to merge existing variant versions of a CM file element For configuration items this is a menu operation Submenus are used to select the transfer items to be merged The merging of transfer item texts is not supported How easy difficult is it to create a baseline The process of installing a configuration item into a library requires three separate actions by two separate people The process ensures that the item will have some quality control Ho
232. reation and deletion of user accounts are sup ported Mapping Rationale CMU SEI 88 TR 3 153 The System Administration workbench which is accessible solely to the system ad ministration user whose login name is given by the environment variable FRMAD MIN contains the operations of user creation and deletion Keystroke Details Keystroke Problems Generic Experiment Description Experiment 3 Questions on software support Mapping Issues Problems Mapping Rationale This experiment consists of a sequence of questions It contains no experimental steps Answers to these questions appear in the appropriate appendix Keystroke Details Keystroke Problems Generic Experiment Description Experiment 4 Accounting statistics Mapping Issues Problems What portions of ISTAR collect accounting statistics The only statistic kept is user login logout dates and times Mapping Rationale This experiment was not conducted Keystroke Details Keystroke Problems 154 CMU SEI 88 TR 3 Appendix C Phase 5 Execute Environment Specific Experiments This phase s goal is to answer questions about the environment specific experiments The questions are organized in four categories e Functionality Mapping of the generic experiment onto the target system ISTAR e Performance Timing and space analysis of tasks in the target system e User interface Interaction between the user and the environment e Syste
233. requests for resources As RMC manager mpm reviews requests and should only allocate team leaders Accept the provisional bookings Inform customers Evaluate the PRs with annotations that problems will be fixed in this release and then inform the customers about it Issue tasks Create an assignment Cl for each team workAssign t1 doc qa 1 In clude in each Cl textual assignment xi td 1 WBS xi wbs 1 schedule xi sched 1 attached PRs to the workAssign Cl Issue tasks work T1 DOC QA with task defini 132 CMU SEI 88 TR 3 tion tool so that reporting verification etc requirements are also specified More planning will have to be performed by team leaders as in the case of T1 inform team leader T1L who in turn will make detailed plans and will issue tasks to team members T11 and T12 Keystroke Details Approve final global schedule Book requests for resources AS mpm focus on RMC1 workbench fix provisional accept error resource definition command line update accept bookings resource management resource control focus on outstanding booking requests command line view details verify correct personnel have been assigned to the abstract requests and that the correct percent utilization has been assigned Command line book move into provisional bookings confirm provisional bookings and exit tool Inform customers AS mpm CONTRACT errors WORKBENCH CONFIGURATION COMPONENT focus on problemsRel1 1 w
234. riment speaks in terms of baselines and releases A release is a baseline which has been shipped to a customer A baseline is a collection of modules which make up a functioning and stable version of a software system The experiment is concerned solely with software configuration management The first problem was to determine what a baseline was in ISTAR It was not hard to decide to use a frozen configuration item as a baseline a frozen Cl contains elements which can easily be used to store modules of a system and cannot be modified The next problem was to determine where to keep baselines We decided to create a library within which they would be stored This was not strictly necessary but we did it in order to exercise the ISTAR library facility during the experiment We did not discover a technique to distinguish released baselines from non released baselines We could have done that by establishing another library in which only releases were stored The experiment also speaks of elements and of the operations create delete fetch reserve and replace on elements An element is a source module It is naturally mapped to a transfer item within a configuration item The creation and deletion of XIs has been described above The ISTAR model does not allow for the replacement of XIs except under limited circumstances if the XI is deletable that is if it is within a free Cl and does not have a successor or variant then it can be
235. rotection are offered no access access without logging who took copies and access with logging who took copies Make access log users 2 3 The following are storage costs measured in bytes consumed in the datatree as returned by spacestamp and in parentheses the number of used ISTAR database records as returned by dbsizestamp Originally in parentheses the fixed and marginal costs of these items were requested but since there is no method to separate the initial from the incremental storage cost in ISTAR only single measurements can be supplied P2a Plans schedule WBS resource management Resources 6042 0 WBS 88226 90 Schedule 213054 55 P2b Plan instances product structure team structure task structure In ISTAR there is only a task structure Product information is stored inside contracts which form the task structure There are no collections of people and thus no teams Tasks are assigned to individuals Accept new task 103262 P2c Progress information Progress information is gathered from subordinate timesheet submissions Monitoring must be initialized with the schedule being submitted against be fore submissions are accepted Getting the mail from timesheets produces reports which can then be sent to a superior Enter monitoring set schedule exit 196068 10 Get the mail timesheets produce reports send report to parent 26673 126 P2d Change control information The closest facsimile to chang
236. rrect products needed produced Save Housekeeping CONTRACTUAL OPERATIONS export new planning t1 1 wbs 3 EXIT LOGOUT Keystroke Problems Generic Experiment Description MPM 11 Fix RMC is empty error Mapping Issues Problems Mapping Rationale This micro step is necessary because of an ISTAR bug that makes the RMC essen tially busy and thus a special request to make it available must be made Keystroke Details As mpm enter RMC1 contract resource definition housekeeping OK Enter RMC2 contract resource definition housekeeping OK LOGOUT Keystroke Problems Generic Experiment Description MPM 11 Try new schedule by requesting availability of the old team and the new programmer schedule reserve resources at resource centers Mapping Issues Problems Mapping Rationale Keystroke Details As til Import planning t1 1 wbs 3 into scheduler CONTRACT titeam scheduler Housekeeping CONTRACTUAL OPERATIONS import WBS planning t1 1 wbs 3 Set start and end dates Jan 1 1987 through Dec 31 1988 RESOURCE MANAGEMENT CENTERS pmexp mpm RMC1 pmexp mpm RMC2 TIME ANALYSIS Context switch to schedule Request availability RMC1 RMC2 Housekeeping REQUEST AVAILABILITY Context switch to resource pool to see if request got correct resources Move down to t21 DELETE RESOURCE move down to t22 DELETE RESOURCE move down to t3 DELETE RESOURCE move down to mpe DELETE RESOURCE move down to mpm DELETE RES
237. rt for task notification and completion For example does the system do automatic checking constraints on tasks and their orderings If one task is dependent on the results of another task how is it activated What happens when a task is completed are team members automatically notified Does the cascading of change requests or task completion messages create a ripple effect There is no support for checking constraints between tasks and their order ings There is no automatic activation of tasks that depend on the results of another task When tasks are completed the contractor files a final timesh eet which will make an entry in the monitoring report of the client the contrac tor DELIVERS a Cl to the client There is no cascading of task completion notification F4h Does the environment have a means of grouping tools e g to support different roles Is the contents of a group fixed by the system or under user control Can the functionality of the environment be divided into subsets so as to tailor it to the needs of the individual user ISTAR groups tools into workbenches The contents of each workbench can be edited by ISTAR support personnel Individual users cannot tailor or restrict usage to subsets if only certain tools are required 178 CMU SEI 88 TR 3 F4i Can teams intersect i e can one person on a project simultaneously be a member of more than one team Yes People are associated with many parallel contracts
238. rtual Terminal package and the main program all other modules remained the same Build History Date built 3 11 85 Built by James T Smith Release Components Versions 1A of MAIN ADA and VT_BODY ADA version 1 of all other source code files Hardware Requirements VAX 11 class machine VMS 3 x Customer distribution Customer D Customer G and Customer J Errors reported fixed Virtual terminal did not refresh screen properly Virtual ter minal did not gracefully handle invalid cursor positions CMU SEI 88 TR 3 iii Release BO 3 General Comments Fixed deadlocking problems independent of version BO 2 fixes in the main program all other modules remained the same Build History Date built 3 16 85 Built by James T Smith Release Components Version 1B of MAIN ADA version 1 of all other source code files Hardware Requirements VAX 11 class machine VMS 3 x Customer distribution Customer B and Customer H Errors reported fixed Main program deadlocked during startup when certain excep tions were raised iv Release B0 4 General Comments Fixed sizing problems related to viewports effected both the specification and body of the Viewport Manager package Upgraded to run under next major revision of the operating system Build History Date built 3 27 85 Built by Jane C Doe Release Components Version 1C of MAIN ADA version 1A of VM_SPEC ADA and VM_BODY ADA version 1 of all other so
239. rvers Clienti was used to gain access UNIX rlogin to Server1 and Server2 so it did not affect performance Later Client2 used binaries from Server2 through Sun s Network File System NFS but referred to datatrees on its local disk The disk to controller bottleneck between Server2 and Client2 did not appear to make user perceived response changes Overall it appears from non statistical user impressions that timing was not affected by changes in hardware configurations The size of datatrees the other measured quantity for many operations is not affected by changes in configuration Comments on the user interface will be similar for each experiment since ISTAR s user interface is reasonably consistent Comments on the system interface will vary in detail for each tool since some tools naturally require closer interaction with the host system UNIX workbench than capabilities provided by the environment project management CMU SEI 88 TR 3 155 C 1 Checklists Figure C 1 Configuration Management Functionality Checklist PRIMARY ACTIVITIES Version Control Create CleMent cccccccececcessseccssseeeessaees Create new version SUCCESSIVE sed ehe tn Paralel retera an ees aas reeni 011A A o EEEN AEE S E E AE Delete element ssnssesnsnnseessernreenserrnnn eee Retrieve specific version Referentials niieu DYNAMIC ees ccvcacees cent cnicorsavenresscenderecstere crete Compare different file vers
240. s RGL RGT is described in a subsequent section of this report 42 CMU SEI 88 TR 3 3 2 3 Problem Reporting The CMT offers a problem reporting mechanism that works as follows The user first noticing a problem RAISEs a Problem Report This results in a form being displayed and edited using the form oriented editing capabilities of the editor as described in a prior section of this report The information entered into this form includes a summary and full description of the problem and the type severity and urgency of the problem A problem report may be attached to a Cl or XI within the contract or may be left unattached or general There are three not necessarily distinct people associated with any problem report the originator the controller and the holder The originator of the report is the user who RAISEd it The originator s identity does not change during the lifetime of the report After the report is RAISEd the originator holder and controller of the report are the same person The holder of a problem report may SEND the report to another user who then becomes the holder If the holder is also the controller he or she may pass controllership to the new holder Figure 3 22 is an example of a problem report at this stage star COMPONENT MANAGEMENT TOOL Report query on PR cmexp marc CMEXP2 1 Date 2 Feb 88 USER marc Time 15 28 01 HOST cmexp CONTRACT CMEXP2 PR cmexp marc CMEXP2 1 Status EVALUATIN
241. s Utilization percentages should then be correctly divided so that the same person can be responsible for the work as well as do other technical work on the project Requirement attributes that are a function of a future tools output should not be assigned For example there should not be a resource s attribute which indicates that people belong to a particular team since that is really not known until scheduling determines it Manual overriding of allocation by assigning the same person to two tags does not result in an warning error message when the next task requires those resources with the previously used tags As a documented feature not error it is intended that violation of schedule rules should be possible while handcrafting a schedule Generic Experiment Description MPM5a Define work packages in the initial global WBS for top level T1 DOC and QA teams Mapping Issues Problems How can someone be allocated to both managerial and technical work People are reserved out of a common RMC which keeps track of total percent utilization during spans of time If the total percent is less than 100 then allocation can continue for that segment of time Managers can be allocated as team leader at one level and technically in subordinate activities Relies on a single RMC for knowledge about potential conflicts Some or ganizations prefer multiple pools of people by division project or function instead of organization It
242. s ADMIN which will be used for timekeeping Keystroke Details As t12suc T12suc accepts and views assignments from T1L CONTRACT accept as codeS WORKBENCH PROJECT MANAGEMENT TASK VIEW workAssign codeSuc 1 td 1 OK EXIT T12suc creates admin 1 Cls and assign self contracts named adminCon CONFIGURATION COMPONENT CREATE NEW Cl admin 1 EXIT ops assign adminCon admin 1 t12suc OK EXIT Accepts as ADMIN which will be used for timekeeping Pop back to current contracts CONTRACT focus on new contract accept as ADMIN LOGOUT Keystroke Problems Generic Experiment Description T1 6 T12 accepts cancellation T12 sends problem report and pointers to T12suc Mapping Issues Problems Mapping Rationale Keystroke Details As t12 CONTRACT code WORKBENCH CONFIGURATION COMPONENT move over to workAssign code 1 problem reporting SELECT focus on 1 3 only one SEND on this host yes login name t12suc contract name codeS library no EXIT Framework OPS REGISTER focus on CANCEL EXIT LOGOUT Keystroke Problems Generic Experiment Description T1 11 T12suc accepts problem report from T12 Mapping Issues Problems Mapping Rationale Keystroke Details As t12suc CONTRACT codeS WORKBENCH CONFIGURATION COMPONENT FUNCTIONS INSTALL REPORTS place it on workAssign codeSuc 1 move over to workAssign codeSuc 1 problem reporting SELECT focus on 1 3 QUERY quit quit EXIT LOGOUT
243. s are merely annoying and have no significant effect on the use of ISTAR CMU SEI 88 TR 3 17 18 CMU SEI 88 TR 3 3 Functional Areas This chapter describes the ISTAR tool sets that were of greatest interest project management configuration management and the Ada Workbench 3 1 Project Management Project management is one of ISTAR s major strengths ISTAR s support of project management includes estimating effort developing plans assigning personnel to perform work tracking progress and verifying quality ISTAR provides linkages between these elements to provide coherent project level management support 3 1 1 Planning Process and Products The project management process can be described by roles and products The project manager manages the development of the work breakdown structure and schedule The resource manager controls the use of resources within resource management center s The cost controller monitors on going projects The project manager creates the work breakdown structure creates the schedule and issues tasks from the schedule The project manager interacts with the resource manager by asking for resources to fulfill schedule activities The resource manager assigns resources so that there are no conflicts among plans submitted by project managers The cost controller interacts with all the people assigned contracts and tracks their efforts on particular assignments The following are quick summaries
244. s can only be used on contracts which have been created by the task definition tool from a scheduled work breakdown structure Timesheets must be sent to a cost control center which contains the schedule from which the reporting contract was defined Thus if the manager directly assigns contracts from the schedule the intermediate supervisors will be bypassed and will not be able to track the efforts of the programmers who work for them One method of circumventing this problem is for the project manager to assign manage ment tasks as contracts to her team leaders The project manager should include the schedule as a transfer item within the configuration item which forms the specification of that contract The team leaders can then import the schedule into the task definition tool and assign activities from it to their programmers Timesheets will then be sent to them by their programmers It is best if the work breakdown structure contains management activities as leaves The scheduler and task definition tools can then be used to assign these management contracts and the project leader can receive timesheets from team leaders The schedule can also be sent to a cost control clerk who can use it within the monitoring tool the tool which accepts timesheets thereby relieving the technical management from that responsibility Another technique for dealing with this problem which we used in our instantiation of the project management experiment
245. s frozen Describe the mechanics of composite CM operations Build the current system Describe construction of software systems built in automation Makefile facility command procedures ISTAR provides a build tool which runs a make like utility called Pmak As suming the system exists in a UNIX directory structure suitable for Pmak then e Export the system from UNIX workbench mega export e Create necessary command files and export them from UNIX wb e Import those files into build tool e Run build This produces a recorded build Note however that this facility does not inter operate with the Ada workbench and cannot be used to build Ada systems ISTAR does not currently provide a build facility for Ada Describe the mechanics of composite CM operations Rebuild an earlier baselined system Systems built with the build facility see above may be rebuilt with it How are CM file versions maintained copy deltas data compression XIs appearing in more than one Cl are shared copies are not taken What kind of baselining mechanism is used See above How are baselines releases tagged numeric alpha alphanumeric Successors are numbered variants are named There are also the successor numbers L latest and P preferred These comments apply to XIs and Cls Can variant versions be placed easily into a baseline Yes Are fetching reserving replacing a variant harder than for a non variant CM element
246. s on which the unit depends directly or indirectly is not avail able Generic Experiment Description Step 9 Observe System Retranslation behavior Mapping Issues Problems How is recompilation accomplished in ISTAR The workbench supplies a RECOMPILE menu item Mapping Rationale The workbench RECOMPILE menu item causes all compilation units which are marked not compiled to be recompiled in an order that respects Ada compilation ordering Any modification including comment only etc causes a unit and those units which depend upon it to be marked not compiled These are the recompilation rules of the underlying compiler Keystroke Details Keystroke Problems Generic Experiment Description Not in experiment Test and measure certain workbench operations Mapping Issues Problems What is the time and space complexity of deleting copying and editing compilation units Compilation unit text is stored in a parse tree representation within the workbench CMU SEI 88 TR 3 151 Mapping Rationale Operations of the workbench not exercised by other steps are executed here Keystroke Details Use the workbench to delete entries Record time and determine if space is fully retrieved Test editor initiation and termination timings in particular the case of no modification Determine the time and space complexity of the transformation from internal parse tree to external text representations of the code Keystroke
247. s one fix from Team 3 Performs acceptance test on UI_VT Integrates these changes into the subsystem ACTIVITIES PDM 3 b QUESTIONS F5f Receives two bundled fixes from Team 1 Performs acceptance test on UI_CLI and checks new source against coding standards Integrates these changes into the subsystem CMU SEI 88 TR 3 PERFORMANCE MEASUREMENT Record the elapsed time required for the standards checking tool ACTIVITIES PDM 3 b QUESTIONS F5f Pic 6 Receives new user manual from Documentation group ACTIVITIES PDM 3 b 7 Consider how the QA group would report to the developers if they discovered a problem in the newly generated document ACTIVITIES PDM 2 c QUESTIONS F5i 8 Performs regression test on subsystem ACTIVITIES PDM 3 c QUESTIONS F5g 9 Creates a customer deliverable Release 1 1 which consists of the latest executable code and user manual plus a release note see Figure A 6 and informs manager ACTIVITIES PX 1 a PDM 4 QUESTIONS F3e F4a F4d F4g S2 A 3 Design and Coding This generic experiment will exercise a subset of activities inherent to detailed design and code development and translation The hypothetical setting is one where a small team is tasked with the creation of vector and matrix handling module s The matrix and vector example used here borrows heavily from Chapter 3 of Habermann and Perry Habermann 83 Before presenting the generic experiment step by step a global vi
248. s or RMCs These RMCs are like libraries repositories of publicly available infor mation and like libraries have individual owners called resource managers We have been unable to determine with precision Imperial Software s motivation for in cluding shared contracts but it would appear to have been done at customer demand The sharing of information through shared contracts can be simpler and quicker than the other methods previously described ISTAR s locking mechanism for shared contracts makes that sharing somewhat less effective We do not have enough knowledge or ex perience to have formed an opinion on the issue of shared contracts The databases work areas and ancillary files in which ISTAR stores its data are or ganized into a higher level structure known by the names datatree and host The name datatree conveys an accurate impression of the structure of these objects they are subtrees of the UNIX file space Each ISTAR user has a subtree of the datatree within which his databases and work areas appear as files and subtrees ISTAR prevents ac cess to the datatree by non ISTAR programs by creating fictitious owners for the files within the tree and preventing non owner access through the UNIX file protection mechanisms The term host conveys an accurate impression of the intended use of these structures they are used in the support of distributed operations There is nothing to prevent an individual UNIX file spa
249. s planning with one person instead of having each subordinate capable of scheduling his own mini schedule and requesting resources Whole plan need not be sent to each person upon final assignment Easy to accomplish timesheet and gather resource consumption statistics be cause all are in a central location Subordinates cannot respond with changes to the work breakdown structure or schedule using the same tools that were used to create them subordinates must respond in writing Need to make copies of the plan for each subordinate Cannot assign the same task to two people using the task definition tool two people cannot get the same assignment and negotiate between themselves about what to work on Same as above but Leave initial global plan with the mpm CMU SEI 88 TR 3 127 Each team or leader is assigned a high level task from the global plan with the direction to embellish the plans at their level and then assign work tasks ls in the spirit of ISTAR hierarchical contract assignments Frees manager from details when team1 has reassignment later on Complicates requests at the RMC since they would be coming from multiple sources beyond mpm What are the issues of multiple level plans Enables manager to allocate high level activities that he knows about and over which he can control resource allocations Lower level planning can be ac complished by the person to whom the single high level task is assigned For
250. s regarding this experiment CMU SEI 88 TR 3 81 Figure A 3 Version History of Ul Subsystem 1 Load the source code for the UI system and record it in the development database 82 CMU SEI 88 TR 3 Figure A 4 Version History of CLI Figure A 5 Version History of SM Version histories and configuration threads for Ul CLI and SM are diagramed in Figures A 3 A 4 and A 5 If the CM experiment has been completed use its source code configuration of UI as Release 1 0 PERFORMANCE MEASUREMENT Record the storage cost for UI source ACTIVITIES PI 1 a CMU SEI 88 TR 3 83 Figure A 6 Customer Deliverable Figure A 7 Organizational Structure QUESTIONS P2b Create a design document for each of the three subsystems of UI and enter them into the development database as versions The purpose is to demonstrate the ability to relate and trace documents which in some environments requires placing pointers in the document s content the text for example PERFORMANCE MEASUREMENT Record the storage cost for the design and for traceability relations ACTIVITIES Pl 1 a QUESTIONS P2b P2i Relate design documents their final versions to Release 1 0 of the UI source code to represent traceability ACTIVITIES PI 1 a PDM 1b 15Content is irrelevant 84 CMU SEI 88 TR 3 Figure A 8 Initial Global Plan 4 Create a user manual document Version 1 0 for UI 16 Enter it into the development database and re
251. s should be managed Modifications to the contents of a single RMC are easy to perform and the contents are easy to locate There is no partitioning of large work forces where some groups may not exercise any control over resources in other sections Multiple RMCs with resources being sent from the parent RMC after high level scheduling has been performed against the parent RMC to the current RMC Enables control by the superior of how many resources a subordinate gets but permits the subordinate to plan how those people will be assigned to par ticular tasks CMU SEI 88 TR 3 121 There is no support for formally assigning a resource from one RMC to a lower one within ISTAR Resources have to be deleted from the parent RMC and using non ISTAR facilities communicated to the manager of the lower level RMC who would have to install them below Even if multiple RMCs are maintained there is no consistency maintenance between them It is conceivable that a resource could be located in multiple RMCs or could exist without being located in any RMC If located in multiple RMCs a resource could be incorrectly allocated twice to different projects which is a planning impossibility Multiple RMCs with each planner obtaining permission to use resources exter nally from ISTAR and then creating an RMC at his level Haggling over which resources get to go in corresponding RMCs that have a close connection with the plans being drawn up would
252. se issue RETRIEVE CI from the CMT in the newly created contract For retrieving from the library issue SCAN LIBRARY from the CMT in the newly created contract Keystroke Problems Doing both retrieves creates a name conflict so that the second retrieval must be renamed This is an artifact of the experimental method Generic Experiment Description Experiment 2 steps 4 and 5 Move packages from an old system to the current one Mapping Issues Problems How can a single program be removed from a configuration item Importation into the Ada workbench Mapping Rationale As importation into the Ada workbench was thoroughly tested in Experiment 1 step 7 these steps were skipped Keystroke Details 114 CMU SEI 88 TR 3 Keystroke Problems Generic Experiment Description Experiment 2 step 6 Build the system using pragmas Mapping Issues Problems How are system builds to be done See Experiment 1 step 7 Mapping Rationale This step was not executed Keystroke Details Keystroke Problems Generic Experiment Description Experiment 2 step 7 Remove a configuration management file element Mapping Issues Problems What does removing a configuration managememt element mean It requires deleting a transfer item from the working configuration item and deleting a compilation unit from the Ada workbench and library Mapping Rationale Both alternatives were executed in order to exercise ISTAR function
253. selection for desired one Entry of Cl and XI names when no VALIDSET is available is very error prone and results in seemingly unrelated error mes sages 188 CMU SEI 88 TR 3 U4b How does the environment cope with mistaken use of commands that have potentially disastrous results e g by requesting confirmation or by providing an undo facility There is no specific support for large command impact but each workbench session is a transaction and it can be aborted by Quitting the session instead of ExITing In the commonly used configuration management tool even after requesting to exit the user is asked if he means it and then whether he will confirm the listed activities that he performed since entering the tool A database commit then closes the transaction The E editor has an undo operation U4c What is the quality of the error diagnostics early and correct detection appropriate identification and description differences in online interactive and printed batch run diagnostic messages brief or full error reporting See other comments on errors Uda How well does the environment use the available hardware for com munication with the user e g pointing devices multi window multi font screens ISTAR was developed to be used on vt100 class hardware in 132 column mode Under the X window manager vt100s were emulated A combination of X and ISTAR keymaps assigned the special function keys conveniently to the top row of f
254. sor etc In summary the configuration management support provided by ISTAR is at best rudimentary Essentially ISTAR supplies version control and little else Although the basis of a configuration management system that is version control is in place a powerful and useful configuration management facility for ISTAR is not 3 3 Ada Workbench The ISTAR Ada workbench provides a front end to an Ada compiler and syntax directed editing for Ada This section details the functions of that workbench 3 3 1 Description of Ada Workbench Storage within the Ada workbench is divided into work areas These work areas are not specific to any contract The user gets access to all his Ada work areas from each of his contracts Each work area has an associated Ada library Upon entering the workbench the user is given a list of the work areas he or she has created The user may select one of those areas or create a new one Having selected a work area the user is given a listing of the elements within the area An example of such a listing is given in Figure 3 25 This listing is interesting in its own right Each line of the listing other than the first two which are discussed later identifies an Ada compilation unit 13 The workbench insists that no two compilation units appear together in a file Notice that the type of the unit specification body or subunit appears on the listing as does the compilation status of the unit compiled or not comp
255. subareas of project management Which project management activities are sup ported and which ones are not See the checklist Fib How well does the environment cover the management of all deliverables plans and products ISTAR provides management of deliverables plans and products well IS TAR manipulates collections of transfer items XIs in bundles called contrac tual items Cls When assigning a contract to someone copies of the plans WBS schedule that lead to the assignment can be included in the Cl SENT to the contractor When a contractor DELIVERS on a task assignment he too can bundle deliverable and product XIs under a Cl which is SENT to the client Fic To what degree does the environment impose a management style or management policies ISTAR imposes a management style based on contractual relationships be tween people Contracts are assigned from clients to contractors with clear specifications of expected deliveries resources to be used to accomplish the WBS and schedule constructed by the client Contractors may become clients yielding a hierarchy of contractual assignments CMU SEI 88 TR 3 173 Fid How well can the environment be adapted to a particular organization ISTAR can be tailored in report formats that match organizational needs al though adapting to noncontractual forms of interaction may be difficult Tailorability occurs in a number of forms Tailoring of reports and presen tations with t
256. t a procedure body is being entered and has supplied a skeleton Notice that it has supplied the procedure name given when the unit was selected It will not allow the user to supply a different name The user may now enter Ada code The editor supplies normal text editing capabilities such as character word and line movement insertion and deletion and regular expres sion searching It also provides syntax oriented movement commands In the Sun im plementation these are bound to function keys The keys PREVIOUS ITEM NEXT ITEM IN 50 CMU SEI 88 TR 3 Example_Unit Body gt Insert gt IP body Figure 3 27 Initial Screen for a Newly Declared Body Example_Unit Body gt Insert procedure Example_Unit is egin end Figure 3 28 A Skeleton Procedure Body ITEM and OUT ITEM move the cursor to the appropriate syntax element The terms in and out refer to levels of syntactic nesting The keys NEXT STUB and PREVIOUS STUB move the cursor to the appropriate stub The display given in Figure 3 29 shows the result of entering some text into the Example_Unit procedure Notice that there are still some stubs in the display The editor will allow the user to delay the instantiation of stubs at the user s discretion The workbench will not allow a unit containing stubs to be compiled however Notice also in the display that an item has been marked as folded The FOLD operation is av
257. ted into the database Keystroke Details Keystroke Problems Generic Experiment Description MPM5c Perform a cost estimation and set up a budget for the project as well as teams Mapping Issues Problems Same as MPMb5b Mapping Rationale Keystroke Details Keystroke Problems Generic Experiment Description MPM5d Work out initial global schedule Create initial global schedule concerning next level assignments and personnel Do not allocate lower level people in this plan Do not yet reserve team leaders as resources 130 CMU SEI 88 TR 3 Mapping Issues Problems Mapping Rationale Schedule the WBS against time and then against resources located in RMC1 Since only leaders are to be dealt with at this level the lower level staff remain to be al located when the leaders plans are constructed Since this is the planning stage only requests that team leaders be allocated to the jobs are made actual acceptance by the resource manager is held off Keystroke Details As mpm in errors workbench project management scheduling Housekeeping Contractual operations IMPORT WBS planning 1 wbs 1 Set start and end dates Jan 1 1987 through Dec 31 1988 RESOURCE MANAGEMENT CENTERS pmexp mpm RMC1 TIME ANALYSIS Context switch to schedule Housekeeping REQUEST AVAILABILITY Context switch to resource pool to see if re quest got correct resources INTERACTIVE SCHEDULE Try default allocations first and then new on
258. ten slow Enter monitoring 27 52 69 30 discrepancy num ber of timesheets and amount of in formation in them Monitoring schedule spec 46 50 Reporting information from development facilities to planning facilities Transfer of data between contractor and client is performed by servers bigbro and gpo In the time it takes to change from being the contractor who sent the data to becoming the client the data was ready to be accepted with GET THE MAIL Get the mail 45 11 discrepancy number of pending timesheets consolidation Communication between project members Communications between project members is formal and takes form in many ways Bookings send 20 Bookings accept 4 Contract assign 7 Contract accept 46 Delivery send 18 Delivery register 29 Task cancellation send 44 Task register 34 CMU SEI 88 TR 3 185 P3d Change management Problem report change management was performed with the problem report ing facility and not with change control Re assignment of old programmer s work to the new programmer is not per formed by change control but by transferring unfinished portions and a new contract assignment P3e Access control Reassignment of old programmer s work to the new programmer is not per formed by change control but by transferring unfinished portions and a new contract assignment P3f Critical path analysis Critical path analysis is performed within the scheduler tool It works
259. ter support Multiple data trees for different users in one experiment Emphasizes ability to distribute data trees and that users need not be on same machine to be contractually related under the ISTAR model Makes trials difficult because one has to roll back multiple data trees and wait for transactions to complete asynchronously How is the experiment itself administered Experimenter acts as administrator Does not abuse the privileges of frmadmin which may lead to undesirable losses Is not part of the experiment Frmadmin Does not introduce yet another user Already has to be used in various stages of the experiment for support roles and is thus consistent Mapping Rationale A single data tree on one machine makes the experiment easier to implement The ability to distribute data trees can be demonstrated separately and the lessons learned can be applied to the experiment Create initial project contracts for frmadmin by self assignment Keystroke Details SU root cd to F RMROOT install setenv FRMDATA to the project s data tree pmex pistardt sh mkenv ss pmexp SU frmadmin CMT functions create new ci tech 1 ops assign explnit tech 1 frmadmin Framework contract Name tech 116 CMU SEI 88 TR 3 Keystroke Problems Generic Experiment Description SET1 Load source code for user interface Ul Mapping Issues Problems Where to store sources In the ISTAR database Keeps within ISTA
260. the control files needed by Pmak from the UNIX file system using the UNIX workbench to the contract database 3 Import the files mentioned previously from the contract database into the build tool s work area This exportation and importation is facilitated by the tool The UNIX workbench has a mega export facility that exports an entire directory s contents The build tool uses the Pmak control files to automatically import the source files from the contract database 4 Invoke Pmak from the build tool This results in the system being rebuilt and the identity of the files used in the build being recorded in the build tool s work area Symbolic successor numbers L latest and P preferred are translated to the actual successor number used The date and time of the build are recorded The output of the build including the control files may be re exported to the contract and if desired re imported to the UNIx files Pmak does not inter operate with Ada source code It was therefore of little interest to us and we did not use it in our experiments 46 CMU SEI 88 TR 3 3 2 6 Analysis and Critique of Configuration Management We encountered numerous difficulties in using ISTAR configuration management facilities in the execution of the configuration management experiment The reader can find details of the experiment and of our mapping of it to ISTAR in the appendices A summary of those difficulties follows The expe
261. the user but generally not to any contract Thus a user has access to the same infor mation within a work area no matter what contract he is working on No other user may access that information in any way It is as though the data within a work area is the user s personal property whereas the information within the contract belongs to the or ganization The user transfers information from his personal work areas to one of his contract databases via an EXPORT operation 2 The unit of transfer is called the transfer item abbreviated XI Each XI has a type which identifies the tool that exported it although some tools can export items of more than one type The type of XI exported by the Ada tools for example will indicate whether the item is an Ada specification or an Ada body The typing of XIs is used to prevent importation of an item by a tool which is not prepared to deal with it Within the database transfer items are gathered into sets called configuration items abbreviated Cl This gathering into sets is not recursive in the sense that Cls may not appear as elements of other Cls A given XI may appear as an element of more than one Cl An individual XI may contain for example either a single program from the Ada or Pascal tools a schedule from the scheduling tool free text from the text tool or a quality checklist from the quality assurance tool ISTAR provides a mechanism whereby any UNIX file may be exported as an XI to
262. ting copies of files used throughout the experiment 2 Display configuration management historical information pertaining to the current state of the system Measure time taken to display historical information 3 Fetch all the Ada source code files belonging to the B0 4 baseline and build an ex 76 CMU SEI 88 TR 3 Figure A 2 Configuration Model Resulting from Performing Steps in Experiment 1 ecutable load module named Version0 4 Measure time taken to fetch the source files in the BO 4 baseline Measure time taken to perform the build 4 Move the STR_UTILITIES package specification and body of the current system V1 0 into the local copies of the AIM_SUPPORT package specification and body Recompile compilation units as necessary 5 Fetch the current version from baseline V1 0 of the COMMAND_INTERPRETER PERFORM_COMMAND subprogram Measure time taken to perform fetch operation D Generate an executable load module named Product using the Ada source files presently in the experiment s source code directory perform this system build using the pragma SUPPRESS to disable the following checks during the translation phase e access_check e discriminant_check e index_check e length_check e division_check e overflow_check e elaboration_check Measure time taken to perform the build CMU SEI 88 TR 3 77 7 Remove the configuration management file elements associated with the specifica tion and body of the STR
263. tion can be generated CMU SEI 88 TR 3 57 4 6 VDM The Vienna Development Method VDM is a language for the formal specification of software ISTAR has syntax directed editing for the British variant of the language as developed by STC Walshe 85 The tool is apparently unique among the syntax directed tools in ISTAR in that the HELP key pressed while editing VDM text displays the concrete syntax tree at the point which the editor is attempting to satisfy There is a type checking function listed for this tool It has however yet to be im plemented 4 7 RGL RGT ISTAR provides a report generation language RGL for retrieving information from its databases and formatting printed reports It also provides a front end to that language the report generation tool RGT which simplifies the use of the language As RGL retrieves data from ISTAR databases it needs a description or model of the database it is to access RGT provides a set of such models One of them describing the contract databases is given in Figures 4 1 and 4 2 A model contains the names and descriptions of the classes or record types stored in a database and the relationships among instances of those classes RGL uses the model to interpret the data in the database The person writing the report description uses the model to reference and constrain the data in the report In the RGT the report description is entered into a form template A copy of such a form
264. tion is useful therefore only if the user has work to be done somewhere else either in another Ada work area or another ISTAR tool The text of compilation units is kept in an internal format meaningful only to the syntax directed editor This text is larger than the associated character string format as it con tains a full parse of the text as well as much of the text itself In order for the text to be listed on a printer for example it must be converted to character string format This is accomplished by a COPY operation This operation also supports the conversion of character string representation to internal representation 3 3 2 Analysis and Critique of Ada Workbench The ISTAR Ada workbench is a powerful and productive tool for the creation of Ada code This power comes from syntax directed editing and from the workbench supplied inter faces to the compiler functions These make the process of creating Ada code faster and less error prone The bulk of the comments in this section should be understood in the context of our overall opinion of the workbench which is quite positive We begin with the syntax directed editor The error messages produced by the editor itself in response to illegal text or commands are the uninformative Syntax Error and the even less informative beep Users of the VDM workbench can use the HELP key from within the editor to display the underlying syntax tree positioned at the syntactic categor
265. tion which has unfortunate consequences For example an Ada programmer creates compilation units within the Ada workbench The name of the compilation unit within the workbench is identical to the Ada name of the compilation unit The workbench s work area is completely private to the user so in order to make the compilation unit publicly available he must export it to a contract database This causes a copy of the unit to be made The syntax of names within a contract database does not conform to Ada name syntax Thus the unit is likely to have a different name when exported The date and time of the export is recorded in the contract database but it is not recorded in the workbench It is relatively easy for the work area version and the database version of the unit to diverge inadvertently The fact that ver sion control is available only for items in the contract database makes it more difficult for an Ada programmer to work on several versions of a system simultaneously or to produce experimental versions of a unit In order to use the version control facilities the programmer must pay the penalty of exporting and importing The division of an in dividual user s storage into contracts and work areas results in excess data storage excess data movement and an excessively large name space The same can be said of the separation of the individual user s storage from each other s The sharing of information becomes more difficult Reca
266. to QA to adjust QA plans for maintenance release Release 1 1 and to define a release note document format PERFORMANCE MEASUREMENT To test the minimal overhead due to planning activities consider the trade offs on the one hand of carrying out a planning step with resource allocation or on the other hand of assuming that the manager does informal resource allocation negotiation with QA and the system analyst Receive recommendations from system analyst respond to customer about report 5 by recommending its accommodation in the next enhancement release Release 2 0 and inform manager of enhancement project Approve recommended change re quests PERFORMANCE MEASUREMENT Note responsiveness of change management facilities ACTIVITIES PDM 2 a QUESTIONS P3d Turn remaining recommendations into an initial global plan see Figure A 8 a Define work packages in the initial WBS for three maintenance teams a documentation group and a QA group b Estimate man days number of resources persons number of days number of changed lines of code c Perform a cost estimation and set up a budget for the project as well as for teams d Work out an initial global schedule e Generate a document containing the initial global plan If possible generate dif ferent views of the plan information e g PERT chart work package listing resource chart f Retain a version of the plan as part of the project history PERFORMANCE
267. to modify one characteristic of a user account Record file size increase caused by modifying a characteristic of a user account 102 CMU SEI 88 TR 3 10 11 12 13 14 15 16 17 18 19 Display characteristics of the DEFAULT account Measure time taken to display account characteristics Modify account names as above step 9 for the Smith and Jones accounts Measure time taken to modify one characteristic of a user account Record file size increase caused by modifying a characteristic of a user account Display characteristics of the Smith and Jones accounts Measure time taken to display account characteristics Create an account for Jane Doe using characteristics from the DEFAULT account assume the last name is to be used for the username password and pathname of the account s home directory Measure time taken to copy characteristics into a new user account Record file size increase caused by creating a new user account Create working directories containing login logout command procedures for the Smith Doe and Jones accounts Measure time taken to create initial account direc tories Update any environment specific databases to grant Smith Doe and Jones access to the environment software Verify the creation and correctness of the Smith Doe and Jones accounts e g log in and edit a text file from these accounts Revoke environment access from Jones account Measure time taken to rev
268. tool In a future release of ISTAR the relationship between Cls and XIs will be slightly modified XIs will exist as objects in their own right within the contract database The exporter of an item will give only the xiname portion of the full name The collection of XIs forming a Cl will be a matter determined solely by the CMT A Cl may be modified or deleted as long as its status is free The modification of a Cl is the addition or deletion of XIs A Cl which is not free is frozen Thus the XIs within a frozen Cl can not be deleted An XI within a contract database cannot be modified The corresponding text within the work area may be modified freely but its image in the database will remain unchanged An XI within a free Cl may be deleted only if it does not have a successor and it has not been imported into a work area A Cl becomes frozen when a significant operation is performed on it CMRef 86 Sig nificant operations are those which transfer the item to another contract or which create a successor or variant of it Thus the Cl forming a specification is frozen when the contract is assigned In this case it will be frozen in both the client s and the contractor s database This prevents either party from modifying the specification after the contract is initiated Likewise transferring an item to a library or retrieving one from another contract will freeze the item in both locations A frozen Cl can be copied to a successor
269. tract errors and focus on problemsRel1 1 Problem reporting SELECT reports one by one SEND them to sa contract errors in pmexp without giving controllership Keystroke Problems Generic Experiment Description MPM3 Initiate task to quality assurance qa to adjust qa plans for maintenance release Release 1 1 and to define a release note document format Mapping Issues Problems Mapping Rationale Have qa define a quality assurance checklist of all the items that should be present in a release Keystroke Details CMU SEI 88 TR 3 125 As mpm in contract errors assign qa a contract define by creating a Cl defCheck 1 OPS ASSIGN to qa As qa pick up contract as def Keystroke Problems Generic Experiment Description SA1 8 System analyst receives a collection of error reports analyzes them and the source code of the corresponding release and provides recommended actions to the manager for each problem report Mapping Issues Problems Mapping Rationale Error reports are attached to a configuration item by INSTALLing them Each report is then RESPONDed to which permits annotation for suggested fixes and is then SENT back to the controller of the PRs which has remained all along with mpm Keystroke Details Need a placeholder contract for PRs As sa enter errors contract There should be reports waiting Enter CMT Create new Cl problemsRel1 1 same as mpm In stall PRs INSTALL REPORTS to problems
270. tractual interdatabase movement Retrieve Cl Issue Request 8 7 Install Cl 28 Intercontractual interdatabase movement Scan Library Issue Request instantaneous Install Cl 18 Note The INSTALL Cl step is not different for the two intercontractual opera tions Timing differences have to do with the size of the objects transferred The asynchronous operations were not timed In the experimental environ ment these occurred almost at once Elapsed time of fundamental CM operations Reserve CM element Not supported Elapsed time of fundamental CM operations Replace CM element Not supported Elapsed time of fundamental CM operations Delete CM element Delete a Cl See P1a for CMT timings Delete Cl 3 Delete an XI Delete XI 3 Elapsed time of fundamental CM operations Create a variant of a CM element Create variant Cl See P1a for CMT timings Create variant Cl 19 12 Create variant XI Timed in the Ada workbench Create variant XI 25 P1g h i j Elapsed time of fundamental CM operations Fetch Reserve Replace Delete a variant of a CM element See earlier entries for non variant elements CMU SEI 88 TR 3 169 P1k P2a P2b P2c P2d P2e P3a F3b P3c P3d 170 Elapsed time of fundamental CM operations Query History Menu reports instantaneous Report Generator 16 Elapsed time of composite CM operations Merge variant versions of cm file element Only configuration items c
271. unction keys on the Sun 3 keyboard Under Suntools there is also mouse support for selecting menu entries U5b Is the quality of the information presentation acceptable e g legibility and size of fonts choice of background color placement of windows and menus key bindings CMU SEI 88 TR 3 189 190 CMU SEI 88 TR 3 Table of Contents 1 Introduction 1 1 Summary of the Report 1 2 Description of the Method 2 Architecture 2 1 Contract Model 2 1 1 Project Organization 2 1 2 Data Organization 2 2 User Interface 2 3 Analysis 2 3 1 Contract Model 2 3 2 User Interface 3 Functional Areas 3 1 Project Management 3 1 1 Planning Process and Products 3 1 1 1 Work Breakdown Structure 3 1 1 2 Resource Management Centers 3 1 1 3 Schedules 3 1 2 Task Management 3 1 2 1 Assignment 3 1 2 2 Acceptance 3 1 2 3 Update Cancel 3 1 2 4 Deliver 3 1 3 Tracking 3 1 3 1 Timesheets 3 1 3 2 Monitoring and Cost Control Centers 3 1 4 Quality Checklists 3 1 5 Analysis and Critique 3 1 5 1 Planning and Tracking 3 1 5 2 Accommodating Change 3 2 Configuration Management 3 2 1 Successor and Variant Control 3 2 2 User Defined Relationships 3 2 3 Problem Reporting 3 2 4 Libraries 3 2 5 Recorded System Building 3 2 6 Analysis and Critique of Configuration Management 3 3 Ada Workbench 3 3 1 Description of Ada Workbench 3 3 2 Analysis and Critique of Ada Workbench 4 Other Workbenches and Tools 4 1 UNIX C 4 2
272. urce code files Hardware Requirements VAX 11 class machine VMS 4 x Customer distribution Customer C Customer E and Customer I Errors reported fixed Invalid viewport sizes caused PROGRAM_ERROR Fixed problem by constraining the size of a viewport than allowing it to be simply an INTEGER v Release V1 0 General Comments Incorporated bug fixes from previous parallel releases BO 2 BO 3 BO 4 also added prologues to every source code file Build History Date built 4 12 85 Built by Jane C Doe Release Components Version 6 of MAIN ADA version 3 of VT _BODY ADA VM_SPEC ADA and VM_BODY ADA version 2 of all other source code files Hardware Requirements VAX 11 class machine VMS 4 x Customer distribution Customer F and Customer K CMU SEI 88 TR 3 79 Errors reported fixed None vi Release V1 2 General Comments Reverted back to B0 4 and added SUPPRESS pragmas to in crease system performance Build History Date built 5 2 85 Built by John R Johnson Release Components Most recent version of source code files Hardware Requirements VAX 11 class machine VMS 4 x Customer distribution No distribution to date Errors reported fixed None b Establish environment variables to be used in the experiment c Change working directory to the system_integration directory created in Experi ment 1 d Create a new program library named product_lib underneath the sys_integration dir
273. validation capability for information entered into form fields This takes the form of a regular expression match The form designer can specify an error string to be displayed by the editor when the user enters information which does not conform to the regular expression The designer can optionally have the validation strictly enforced in which case the user will not be allowed to leave a field containing non conforming data If this option has not been chosen the ISTAR allows the user to leave such data in a field but displays the error message All ISTAR tools use the forms system for capturing parameters to commands This in cludes such things as the names of XIs for transport between a work area and a contract for example Some tools use it for the entry of structured data of larger volume than command parameters The use of this system by all tools provides a high degree of consistency to ISTAR in this regard CMU SEI 88 TR 3 13 The ISTAR editor can also act as a general purpose syntax directed editor ISTAR uses the editor in this way in the Ada workbench among others The language in which the syntax is written is documented and available to the ISTAR tool builder It is an extension of the well known BNF Backus Naur Form notation for describing program ming languages The most important extensions are layout directives which describe and control the appearance of the document Thus an Ada program edited in this way wil
274. ver extends the same resource during a time period F2d What are the supported reporting formats for project plans and progress information e g PERT GANTT trend charts resource charts WBS Brief and complete textual listing of activities Schedule Allocation report what physical resources were allocated to each activity time and resource constrained sequential listing of activities require ment report requirements for each activity critical path graphs GANTT Resource management centers resources in use Monitoring percent of resources utilized percent activity completion F2e How well does the project planning facility support what if analysis Limited what if analysis is supported in the scheduler The set of available resources may be restricted and attributes of available resources may be edited Making these changes within the scheduler has no effect on the referenced RMCs contents nor the original WBS Modifications to the RMC and WBS must eventually be accomplished using other mechanisms F2f How much support is there for synchronizing plan development by mul tiple people for merging plans This is no support for more than one person to either create or comment on plans WBS or schedule A significant re design point in implementing the PM scenario was based on this inability See Turning remaining recommen dations into an initial global plan and subsidiary actions CMU SEI 88 TR 3 175 F2g How w
275. vity 2 Changing the meaning of existing steps to accomplish the same functional results that ISTAR achieves by a different method This was done to more fully exercise the capabilities of ISTAR Only rarely did this lead to multiple implementations of a generic experiment step 3 Altering the organization of a collection of steps to accomplish the same functional effect when the generic model did not match ISTAR s model These types of changes are typified by their having an effect on multiple generic steps 4 Removing a generic step when ISTAR could not support it A generic step might also be omitted if the experimenter recognized that no new information would be gained from its execution The discussions of the individual experiments and experimental steps indicate when and how these decisions were reached How the experiments were run Keystroke files ISTAR s user interface is window and menu oriented rather than command oriented It was therefore impossible to encode the experiment as a collection of UNIX shell scripts or command files ISTAR does provide a keystroke file facility which allows the capture and playback of a sequence of keystrokes Although this facility is documented in the ISTAR documentation it is not intended for end users Rather it is meant by Imperial Software Technology IST to be used to provide demonstration scripts and a batch oriented testing facility The facility was a natural choice for the experim
276. voking pairwise vector multiplication product3 v3 u3 Then browse the pair wise vector multiplication function and notice that there is no check for compatible dimensions 7 Create package body for MATRIX_MANAGEMENT a Create package body for MATRIX_MANAGEMENT by copying existing version from matrix_body_errors in ADA_LIB Correct all errors except for the excep tion declaration which will be corrected in the next step CMU SEI 88 TR 3 97 Figure A 13 Vector Multiplication Test Harness b Substitute for the VECTOR_MANAGEMENT package body a revised version copied from vector_body_excptn in ADA_LIB This version contains a non null INNER_PROD function body and a test for incompatible dimensions in the pair wise vector multiplication function Add Dimension_Error exception to the package specification and retranslate c Create function body for GET_ROW and null body for GET_COL by copying from get_row in ADA_LIB but do not translate until so directed in a subsequent step Retranslate MATRIX_MANAGEMENT package body into PROJECT_LIB 8 Create a main procedure named MAT_MAIN to drive matrix vector multiplication a Create main procedure by copying matrix_main from ADA_LIB Translate main procedure into program library TEST_LIB List the compilation unit names and types in program library TEST_LIB and PROJECT_LIB List package and sub program interdependencies Determine the completeness and recompilation status of both program l
277. w are the reasons for version changes recorded Is this mandatory or optional data collection Every configuration and transfer item has a Description which users can edit while the item is not frozen This information may be kept there The infor mation is optional Error handling capabilities Error diagnostics Neither unusually good nor unusually bad Command syntax Awkward Easy to learn and use Mnemonic com mands ISTAR is menu driven It allows command line entry of many menu operations and has a command history mechanism CMU SEI 88 TR 3 171 U11 Support for multiple views of a product Concurrent use No ISTAR databases are owned by one user C 2 4 System Interface Questions S1 S2 S3 S4 S5 S6 S7 Is the CM capability integrated into the compilation system No Are original files removed when a CM file is created No Where are the CM files stored separate directory maintained locally There are no CM files as such Configuration and transfer items are kept in ISTAR databases How are CM files stored text binary Answer not known Are the CM files delete protected See the answer to S3 All ISTAR databases and files are protected against all user access other than through ISTAR What is the default protection of a fetched CM file element Is the default reasonable Not applicable What is the default protection of a reserved CM file element Is the default reasonable
278. w main procedure in a new library Mapping Issues Problems How should the source text be copied from UNIX The current Ada workbench does not support this feature How can program execution be halted and resumed The compiling system being used was not supplied with a debugger How are inter library dependencies to be expressed The workbench supports the compiling system s ACQUIRE command Mapping Rationale A new work area library was created and necessary units acquired The program text was entered by hand Keystroke Details Keystroke Problems The editor did not discover the seeded error Generic Experiment Description Step 7 Create another package body Mapping Issues Problems See step 6 150 CMU SEI 88 TR 3 Mapping Rationale See step 6 Keystroke Details Keystroke Problems Generic Experiment Description Step 8 Create another main procedure Examine system dependency tracking Mapping Issues Problems See step 6 How is the system dependency tracking to be examined The workbench will list on a per compilation unit basis those library units which depend on the given unit directly or indirectly Mapping Rationale See step 6 with respect to procedure creation The workbench DEPENDS menu item is used to produce the dependency information Keystroke Details Keystroke Problems There seems to be no way to print the dependency information The converse infor mation the list of unit
279. xport new planning t1 1 wbs 2 OK REPORTS CONSISTENCY EXIT Import new wbs into scheduler Schedule Housekeeping CONTRACTUAL OPERATIONS import WBS planning t1 1 wbs 2 Set start and end dates Jan 1 1987 through Dec 31 1988 Request RMCs RESOURCE MANAGEMENT CENTERS pmexp mpm RMC1 pmexp mpm RMC2 Time analysis to show impossibility of new schedule TIME ANALYSIS Context switch to schedule EXIT do not commit database Import trial WBS into WBS WBS housekeeping CONTRACTUAL OPERATIONS import planning t1 1 wbs 2 OK Remove second programmer from des_review Activity CMU SEI 88 TR 3 141 name des_ review move to resources required delete prog dr 2 cannot delete prog dr 2 because it is the resource that defines the attributes for all the others that make tag references Context switch on resources required view prog dr 2 in the resource requirement field verify that it is not required by any activity and that prog learning 1 also has this tag so that it obtained the attributes Move to required by activity field context switch redo dependencies Move to products needed con text switch product name dep_1 DELETE product name dep_3 DELETE Product name dep_4 product type dependency producing activity code_suc activities using product learning Move up to learning and context back to activity view to make sure of dep_4 s entry into the graph Check code_suc and code_and_test_suc to make sure they have the co
280. y way that is with any tools at the same time A user working on a shared contract locks out other users sharing the contract for long periods of time Those users may of course work on other contracts during those periods The staff of Imperial Software have indicated in conversations that they do not favor the concept of the shared contract Indeed the shared contract violates the principle that the contract is an agreement on a task to be done However we have seen in the library facility that contract databases serve functions other than that of recording purely con tractual information The library is not the only example of such usage The resource SISTAR recognizes two symbolic successor numbers L latest and P preferred These may lower the burden of knowledge on the user in this context CMU SEI 88 TR 3 9 client contract CI CI A assign deliver contract contract tool work area VY CI CI XI kK expor retrieve ci impor CIK CI XI gt CI CI AN notifly scan library WY CI CI Figure 2 2 A Summary of ISTAR Data Movement 10 CMU SEI 88 TR 3 management tools used in project planning and management store information concern ing resource usage and availability in contract databases called resource management center
281. y which the editor is attempting to satisfy Although the ISTAR syntax language cannot be called user friendly or easily readable a knowledgeable programmer can prob ably make enough sense of it to discern the problem This facility was not implemented CMU SEI 88 TR 3 53 in the Ada workbench We were given a pre release of the workbench however and it may be that this feature or some other improvement to the editor s error messages will be forthcoming The editor s syntax description language includes layout directives which ensure that the text is always pretty printed We found these directives to be somewhat too constrain ing especially in conjunction with the poor error reporting mechanism For example the directives will not allow two statements to be entered on the same line If the user at tempts to do so the second one is erased when the user tries to leave the line as with a carriage return The editor will not allow the user to split the line nor will it attempt to split the line itself The editors Ada syntax descriptions differ in small but annoying ways from the syntax accepted by the Alsys compiler For example a discrete range something of the form r must be entered with a lt space gt between the and the r and the dots The compiler does not insist on that The workbench allows units with names of arbitrary length to be defined consistent with Ada s lexical rules However it subsequently loses all
282. your organization extended or modified ISTAR in some way For extensions to ISTAR did these take the form of code written by your organization or tools purchased from a third party and integrated into ISTAR or both For code written in house please describe e the functionality of the tool e the language used e the size of the tool in lines of code e the success of the effort Is the tool used for its intended purpose For tools purchased from third parties please give e the name of the tool and the company from whom purchased e the functionality of the tool e the success of the effort Is the tool used for its intended purpose D Please evaluate IST as a software vendor Has their level of support been adequate Have they responded well to error reports Have you utilized their training facilities courses and materials Were they adequate E Please give your opinion and the opinion of your organization concerning ISTAR Please give your view of ISTAR s strengths and weaknesses Does your organization plan to increase or decrease its use of ISTAR Would you recommend the system to others 68 CMU SEI 88 TR 3 6 Conclusions ISTAR is a software development and project management environment integrating management and technical development activities It is based on as the contract model whose primary objective is that every individual in the organization know what is ex pected of him or her To accomplish this
283. ystem build facility does not operate on Ada code It has a sophisticated problem reporting mechanism but does not integrate it with the configura tion management system ISTAR s technical development facilities are supported by syntax directed editing facilities for Ada Pascal and other languages This capability is a generalized feature of its standard editor which also provides a forms oriented editing feature The editor is the sole user interface to ISTAR providing considerable uniformity to that interface ISTAR is an emerging product Its development philosophy is to support what we regard as the four critical dimensions of any project project management technical development configuration manage ment quality control and most important the coordination of these four dimensions The basis of coordination is provided by the contract model and the corresponding contract databases To date virtually all our effort has been concentrated in two areas the con tract model and databases and project management In the other areas we have provided only the most basic of facilities Stenning2 87 A software development organization wishing to introduce an integrated support environ ment into its operation has a variety of implementation choices It may decide to hand craft an environment from existing and newly developed tools or it may acquire an en vironment framework upon which to build To our knowledge there are n

Download Pdf Manuals

image

Related Search

Related Contents

Samsung SC07APGAX Manuel de l'utilisateur  Biofilter - 1.1 User Manual  Connecting your TV - ProductReview.com.au  Appel à contribution - Velo-City 2015 Velo  取扱説明書 品番 NA-F50Z7  Hoya Skylight 1B Filter 58mm  LevelOne NetCon FBR-1415TX User's Manual  Calibration Manual - polarvortex.aemet.es  Manual Instrucciones  

Copyright © All rights reserved.
Failed to retrieve file