Home
        3. PROJECTS
         Contents
1.   W COVOITS        C  Progra    Trns port       _  DPS Statu    g     EG  ORIEN MARTO Y 9 57AM       VDOT Trns port PES User   s Manual December 1  2011 3 5    The required fields for Page 2 are     Designer Date of Estimate Road System  Longitude Beg Station Latitude Beg Station FHWA 534   Fed ID UPC NUM C   B   Crew  etc   Ad Date Progress Schedule Category    Amt of Project  with E and C   This field defaults to 0 00  Once you enter the  quantities  price them and execute the Generate Preliminary Detail Estimate  process  the project cost will appear in this field  This is the cost WITH  engineering and contingencies  This field is display only and cannot be edited     Designer  Code for the designer  Select the appropriate code from the drop down menu     Date of Estimate  Press the clock icon     to access the calendar and select the date the  estimate is originally entered  Each time the project is revised and saved  this date  should be changed to reflect the revision     Control Group  The control group is the security designation which decides which user  has access to which project s   This field will already be filled out with your  control group  The data in this field may be changed in order to transfer the  project to another control group     Road System  The functional class of the road  obtained from the title sheet of the road  plans   Select the appropriate code from the drop down menu     Urban Rural Class  Select the appropriate code from the drop down me
2.  Appendix A for instructions for creating the PCN     Once the project is completed and added to the database  this field becomes  display only and cannot be changed      State Project No   Enter the state project number in its entirety  complete with dashes   commas  etc     VDOT Trns port PES User   s Manual December 1  2011 3 2    Description  For all projects  other than bridge   enter the description of the type of  work being performed on this project  For Bridge projects  enter the description  from the front sheet title block     Location  For L amp D projects  use the first line for FROM   location  and the second line  for TO   location   For Bridge projects  enter the location from the front sheet title  block     Unit System  Defaults to E  English Project   Enter M for a Metric Project     Federal Project No   Enter the federal project number  if applicable  in its entirety   complete with dashes  parentheses  etc  If the project is not federally funded  enter  NONE     EXAMPLE  NH 5401 876     Route Number  Enter the route number exactly as it appears in the State Project  Number  4 digits      Ex   1  Project number is 0064 122 101  C501  Route number is 0064   Ex   2  Project number is U000 124 110  B610  Route number is U000   Ex   3  Project number is 6007 058 102  C502  Route number is 6007     Road Section No   Enter the section number of the project number  the third part of the  State Project Number      Ex   Project number is 0064 122 101  C501  Section
3.  Over  2 up to  3 16 50   Over  3 up to  4 16   Over  4 up to  5 15 50   Over  5 up to  6 15 00   Over  6 up to  7 14 50   Over  7 up to  8 14 00   Over  8 up to  9 13 50   Over  9 up to  10 13 25   Over  10 up to  11 13 00   Over  11 up to  12 12 75   Over  12 12 50     Lump Sum Construction Engineering  You are encouraged to utilize the lump sum  construction engineering item code 25580 as a non bid item in category 3001 on your Trns port  estimate to capture your lump sum construction engineering costs  The District Construction or  Maintenance Staff can assist you when calculating this amount     If there  project     is more than one federal project number  the CE cost should be allocated to each federal  The cost may be divided among other PCN   s  if the Project Manager desires     The District Construction or District Maintenance Engineer will provide this cost to the Project  Manager  If there is more than one federal project number  the CE cost should be allocated to  each federal project  The cost may be divided among other PCN   s  if the Project Manager    desires     Disres  The reference table consists of all District Residency codes  Select the  appropriate code from the drop down menu  See Appendix C for help in  converting a county  and Appendix D for help in converting a city     Median  Select the appropriate code from the drop down menu   Project Work Type  Select the appropriate code from the drop down menu  Bridge  New  Construction Upgrade Existing Lan
4.  number is 101     Co  City  Select the appropriate code from the drop down menu  The reference table  consists of all county and city codes     Federal Oversight  Select the appropriate code from the drop down menu  Select NFO  for a federal project with no federal oversight  FO for a federal project with federal    oversight and N A for a state project     Beginning Station  Enter the station from STATION BEGIN PROJECT including the          and the           Ex   1290 10 72     Ending Station  Enter the value from STATION END PROJECT including the         and  the           Ex   1360 15 95      Item Code Table  Select from the drop down menu  Select 07 for English projects   select 08 for Metric projects     Status  Status of the project  Select the appropriate code from the drop down menu     VDOT Trns port PES User   s Manual December 1  2011 3 3    Const  Eng  Pct   If your project uses Lump Sum CEI  then the   field is blank or    zero  This lump sum Construction Engineering amount will be reflected on the  Fund Distribution Sheet  The Construction Engineering Percentage will not be  figured automatically by Trns port  The percentage shall be entered by the user  after the estimate is run and will be determined by the project total  Consider the  entire project   s total  including road  bridge s   etc  At this time  the construction  engineering rates are as follows     Contract Dollar Value in Millions Construction Engineering     0    1 17 50   Over  1 up to  2 17  
5.  satisfactorily and the PCN is a unique  number  the project will be added  You will notice that the PCN field has turned blue   indicating it is now display only and cannot be changed     o Ifa required field was not filled in or incorrect data entered at a field which is supported  with a reference table  a warning window will display with information  For example  if  you left a required field blank or entered invalid data  you will see an Project Tab  Folder   Errors window giving information as to what field was left blank or contains an  invalid value       u PES   Project Tabbed Folder   Errors    eneral Tab     Field  FED PROJ    contains an invalid value       OK  m Print      apy PES   Project Tabbed Folder   Errors      eneral Tab     Field  Route Number cannot be blank           If you attempted to create a project with a PCN already in existence in the Trns port  database  you will see an Error window with the message that the primary key must be  unique  A project could already exist in another control group with the PCN you have  just attempted to create  Trns port will not allow duplicate PCNs     Error    The primary key must be unique  This row cannot be added to the database  Please change the key values for this record before  attempting to save it again        VDOT Trns port PES User   s Manual December 1  2011 3 8    Errors must be corrected before the project record will be accepted into the database     3 3 Associating the County to a Project    Each p
6. 3  PROJECTS    This chapter covers adding  changing and deleting projects  Please note that the specifics for  entering maintenance funded projects are given in Chapter 4     3 1 Responsibility    Whether you  the user  actually initiate the creation of the project or wait to receive your copy  from another user can be determined by the three cases described below     Case 1  The Project Manager will create the project and make copies to send to the  control groups of the other designers involved  Before copies are sent out  a  Prime Project will be made and the projects will be associated to it     Case 2  The designer who is not a Project Manager will not create the project himself   He will find his copy of the project in his listing of projects once the Project  Manager has sent it into his control group  The designer will review this project  as submitted to him and make appropriate revisions    Case 3  For a    stand alone    project  a project in which no other division will be    involved   the designer will create the project s   A Prime Project will be  created  and the project s  will be associated to it     3 2 Adding a Project    Click on the Project List icon to display the existing list of projects   Right click within the list of the projects and select Tabbed Folder Add     An Add Project tabbed folder window displays  Use the  TAB  key to move between fields and  enter the project information on the General tab     Some fields have Reference Tables  As you  
7. Manager Zachary Weddle Record Type Project   Sponsor Randy Hamilton Area Location Rural   Schedule Type MIN PLAN STATE  SECONDARY Functional Class RURAL LOCAL   Major Project Federal Highway NON NHS   Regionally Scope Of Work BRIDGE REPLACEMENT   coe for Air No FHWA 534 46009   Program Manager Programming Division Federal Eligibility Not Federally Eligible   wee OTe NA Administered By DOT             Local intranet    tg Start OE Mig   10 40 AM     p  2    ae       23 Project Detail   Micros    E  Project Detail   Micros    w Documenti   Microsof       Fed ID Enter the numbers only of the Federal Project Number  with no punctuation  no  alpha characters  and seven digits maximum     EXAMPLE  Fed  Project No  is BR 6 129 008    Enter  in this field  6129008     If the project does not have a Federal Project Number  enter NONE   UPC Num  Enter the 8 digit UPC number of the project  with leading zeroes      C   B   Crew  etc   Enter the    Type    part of the project number  the fourth part of the  State Project Number   Ex   C502  B601  R201  etc     Pavement Type  Select the appropriate code from the drop down menu     AD Date  Enter the Advertisement Date in MMDDYYYY format  You may select the  date by pressing the clock icon         VDOT Trns port PES User   s Manual December 1  2011 3 7    When both pages of the project have been completed  click on the SAVE icon  Gal   to enter the  project into the Trns port database     o If you have completed all required field criteria
8. TAB  to such a field  a drop down arrow will  appear  A selection MUST be made from the available choices in the table     Some fields are required  the project will not be saved to the database unless the required fields  are filled in  The required fields on Page 1 of the General tab of the Project are     PCN State Project No  Description  line 1   Location  line 1  Federal Project No  Route Number  Road Section No  Co  City Federal Oversight  Item Code Table Disres Project Work Type  Project Type    The Add Project tabbed folder window is displayed below     VDOT Trns port PES User   s Manual December 1  2011 3 1    Add Project  o     General Worksheet   Attachments            Counties   Categories   Funding   Pay Agjust    f page i   f page     PCN   r   Proposal ID   tem Code Table   07    State Project No     Description   Location       Unit Syster  IE  Federal Project Mo    Route Number   Status   Road Section Mo  Const  Eng  Pet    0 00  Cosci    DISRES   4  Federal Oversight   MEDIAM   Beginning Station   Project ork Type      Ending Station   Project Type           IMPORTANT  It cannot be stressed enough how crucial it is that complete and correct  information is entered into the Project fields  The project will eventually pass to the LAS and  Site Manager modules and will interface with other programs     PCN  The Project Control Number  PCN  may consist of as many as 11 characters  12  characters for maintenance funded  Maintenance Division  projects   Refer to 
9. es  Maintenance Asphalt Resurfacing     etc       Project Type  Select the appropriate code from the drop down menu  The following table will assist you in determining the type you should select     VDOT Trns port PES User   s Manual December 1  2011 3 4    when adding capacity Regular advertisement  when adding capacity SAAP advertisement    when maintenance only  not   Regular advertisement  adding capacity     when maintenance only  not   SAAP advertisement    adding capacity     when maintenance schedule   regular advertisement  only    when maintenance schedule SAAP advertisement  only    These types must have unique UPC   s that are opened to phase 9104 and x31 activities       Click on the radio button for page 2 of Project        Trns port PES  File Edit View Utilities Window Help    LrPeas oa f t  Project 00000054806  General   Counties   Categories   Funding   Pay Adjust   Worksheet   Attachments    C page 1         page 2    Amt of Project with E and C   494 359 72 Road System      Designer  e006 v  Urban Rural Class  U  Date of Estimate   05 19 1998 o   Last L  amp  D Estimate   00  Longitude Beg Station  F71 100  DDDMMSS   Latitude Beg Station   384720  DDMMSS     Progress Schedule Categary      Control GroupCCAS AdDate   09 19 1998      FHWA 534   34309  FED ID    ESTIMATOR     UPCNUM            SO    CSC  S event Type POCC  C   B   Crew  ete  B606 tt    Stim Fun     Date of Gen Bid Base Price  00 00 0000 o        Ready    ECG    verizon       f  Inbox  mi      
10. form this delete     Yes No         A Delete Warning  2 of 2  window displays  Click on the YEs button if you wish to proceed     apy Delete Warning  2 of 2   The following tables will be affected     Project Funding  Breakdown tems   Project tems   Project Categories   Project County Information    Are you sure you want to perform this delete     Tes No      A Confirm Delete window displays  Click on the YES button 1f you wish to proceed        au Confirm Delete    Delete row     Project Number 00000984B610        Yes to All   No   Cancel         VDOT Trns port PES User   s Manual December 1  2011 3 11    3 7 Copying a Project    Click on the Project List icon to display the existing list of projects     Highlight the project you wish to copy with one left click of the mouse  From the Edit menu   select Copy Special  A Copy Project window displays     apy Copy Project    Copy Project Control MWumber OOO00970C01    Hew Project Control Number       Enter the PCN of the new  copied  project in the New Project Control Number field  Click on  the OK button  The project listing will be re displayed        VDOT Trns port PES User   s Manual December 1  2011 3 12    
11. nu  U  R or S     Longitude Beg Station  Enter in DDDMMSS   Trns port allows for three digits for the  degrees needed in some states   You may either enter a zero for the first D or  simply ignore it and enter your six digits     Latitude Beg Station  Enter in DDMMSS     Progress Schedule Category  Select the appropriate Progress Schedule from the drop   down menu  For description of codes or references  open link below   http   www  virginiadot org business resources const projectcategories pdf    VDOT Trns port PES User   s Manual December 1  2011 3 6    FHWA 534  Enter the five alpha numeric characters which follow    FHWA 534 DATA X   This code can also be found in the Project Pool under the general tab        2 Project Detail   Microsoft Internet Explorer provided by VDOT DER     File Edit View Favorites Tools Help    O   O AAG AOs krns O BS a  Whe      Address    http    coapp57 pool ProjectView  aspx upc 948 x  gt  Go Links           z       Virginia Department of Transportation    We Ke ep V irginia ui  gt  S Preferences User s Guide      Pro ject Search    Revision   Search 5 Revision History   5 Structure Search       AddProject    Revise Project   Description RTE 734   RECONSTRUCTION  amp  BRIDGE OVER CANE CREEK   6144  Workflow Jr Active  State Project    0734 071 287 UPC 948 SYP Status Live  Project Information   General Schedule   Estimates Misc Jobs Classification Federal Comments STIP    Project Status CONSTRUCTION COMPLETED Accomplishment CONTRACT    Project 
12. roject must have one  and only one  county associated to it  Failure to associate a county  will prevent the preliminary detail estimate from being generated     Click on the Project List icon to display the existing list of projects     Select the project for which you wish to associate a county  right click and select Tabbed Folder  Change  Click on the Counties tab     Right click anywhere within the window and select Add  A blank row appears     apy Tms  port PES  File Edit   BEA utilities   Window Help     LePeas   tra     Y      ay Project 000000018348    x   General Counties   Categories   Funding   Pay Adjust   Worksheet   Attachments      Find County District Code    Filter   Show All          The required field for County is  County District Code  County District Code  Select the appropriate code from the drop down menu  The  menu consists of all county and district codes  prefixed by a C   See Appendix D  for help in converting a city code into the appropriate county code     Approx  Pct  of Project Length  Enter 100     Click on the SAVE icon to enter the county into the Trns port database     VDOT Trns port PES User   s Manual December 1  2011 3 9    3 4 Disassociating the County from a Project    Click on the Project List icon   4  to display the existing list of projects   J y 8    Select the project for which you wish to disassociate a county  right click and select Tabbed  Folder Change  Click on the Counties tab     Right click on the county you wish to disa
13. ssociate and select Delete  A Delete Rows window  will display     Delete Rows Ea    a  YD    Tou are about to delete the highlighted rows from the list  Do you wish to continue        yes Ho      Click on the YES button  The county will be disassociated        3 5 Changing a Project    Click on the Project List icon   Wal to display the existing list of projects   J M 8    Select the project for which you wish to make changes  right click and select Tabbed Folder  Change     The Project tabbed folder window displays  After making the changes  click on the SAVE icon i    Note that changes cannot be made to the PCN field as it is display only  If an error was made at  the PCN field  you can copy the project  see 3 7 Copying a Project  and give the correct PCN    when copying  After the copy is made  the incorrect project can be deleted  see 3 6 Deleting a  Project      3 6 Deleting a Project    Note  Prior to deleting a project  PLEASE disassociate from prime and proposal  if attached     Click on the Project List icon to display the existing list of projects     On the project for which you wish to delete  right click and select Delete  A Delete Warning   1 of 2  window displays  Click on the YEs button if you wish to proceed     VDOT Trns port PES User   s Manual December 1  2011 3 10    ay Delete Warning  1 of 2     The following tables will be affected     Project Funding  Breakdown tems   Project tems   Project Categories   Project County Information    Do you want to per
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Samsung BD-J5900  エコフル多機能シャワー  Manuel d`Utilisateur  Omron R3 User's Manual  HP 7500 PCI User's Manual  取扱説明書ダウンロード(1.72MB)  Pyle PDWMG46  Bez nazwy-1  APEX-HPGL User`s Manual - Newing    Copyright © All rights reserved. 
   Failed to retrieve file